Concrete modular building with rapid and automatic locking type connection
By adopting a fully dry-connected lock system in concrete modular buildings, the problems of low construction efficiency and high cost of the existing module connection method are solved, fast and stable connection between modules is achieved, construction costs are reduced, and construction costs are increased. The seismic resistance of the structure.
Patent Information
- Application Number
- CN202411371593.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-29
- Publication Date
- 2024-11-22
AI Technical Summary
The module connection method of existing concrete modular buildings has problems such as low construction efficiency, easy damage, and inconvenient construction in node areas, and increases construction costs, making it difficult to meet the bearing capacity and stiffness requirements under design loads.
A concrete modular building with fast automatic locking connection is adopted. The fully dry connection between modules is achieved by pre-embedding locks in the module unit. The module unit structure is to include only four sides of the bottom floor, two horizontal wall panels and one vertical wall panel. Space modules, the modules are quickly spliced through pre-embedded lock boxes and plug-ins to ensure stable connections and no damage to the pre-decorated modules.
It realizes rapid assembly between modules, reduces construction costs, improves construction efficiency and seismic resistance of the structure, avoids on-site wet operations, and ensures the stability and safety of the connection.
Smart Images

Figure CN118997338A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a concrete modular building, in particular to a concrete modular building with quick automatic locking connection. Background Art
[0002] Modular buildings are the most integrated and industrialized type of prefabricated buildings, and are currently the highest form of prefabricated buildings. In the design stage of the scheme or construction drawing, modular buildings are divided according to the building's use function, and each functional unit is split into multiple space unit modules. In the factory or production line, multiple structural components (such as base plates, floor slabs, wall panels, etc.) and non-structural components (such as doors, windows, etc.) are combined into a complete modular unit, and then the modular units are transported to the site for assembly and splicing to form a complete building. Therefore, modular buildings are not only a simple assembly of structural components, but also include the installation of water, heating, electricity and other pipelines and integrated design of decoration and decoration. They have the characteristics of standardized design, factory production, assembly construction, and integrated decoration. The application of modular construction methods can better utilize the advantages of industrialized production, improve the standardization and repeatability of buildings, and better adapt to the changes in building functions and the diversification of needs. It is an important way to develop industrialized construction and low-energy construction.
[0003] Concrete buildings have low costs, good durability, and good living experience. With the improvement of construction technology, concrete modular buildings have developed rapidly in recent years and have formed broad application prospects. However, the current concrete module units have problems such as heavy weight, difficulty in transportation and hoisting, and the implementation economy in the whole process of "production-transportation-installation" of prefabricated buildings is insufficient. Therefore, weight reduction is the key while ensuring that the structural seismic requirements are met. Existing concrete module units are usually hexahedral concrete module units, which themselves are often composed of a hexahedral structure of ceilings, floors, horizontal walls and vertical walls. After the module units are stacked and combined, the double-layer wall and double-layer floor features contained in the building not only make the composite slab thicker, but also increase the construction cost, and are not conducive to transportation and installation.
[0004] The key to giving full play to the advantages of modular construction and ensuring the overall stability and seismic performance of the structure is to adopt a fast and reliable inter-module connection method for multiple modular units of modular buildings, which has an important impact on the promotion and application of modular buildings. At present, the module connection method of concrete modular buildings has problems such as low construction efficiency, easy damage to pre-decoration, and inconvenient construction in node areas: for example, the use of post-pouring or large-scale grouting methods at the construction site greatly limits the advantages of rapid construction of modular buildings, and the pouring quality is difficult to control; the welding connection method used at the construction site is prone to brittle failure at the joints, and its energy consumption and deformation capacity are poor. The welding quality is greatly affected by the environment and the skills of the workers. At the same time, a large amount of residual stress affects the safety of the connection, and it is difficult to detect and control the construction quality of the connection area.
[0005] The ideal module-to-module connection should be able to meet the bearing capacity and stiffness requirements under the design load, be easy to operate and install, and not affect the prefabricated room units, so as to promote standardized and rapid assembly of modules. Therefore, it is necessary to propose a module-to-module connection method that does not damage the prefabricated module units and is suitable for rapid splicing. Summary of the invention
[0006] The technical problem to be solved by the present invention is that, in view of the shortcomings of the connection method between modules of concrete modular buildings, the present invention provides a concrete modular building with a quick automatic locking connection to achieve weight reduction of the concrete modular building, reduce construction costs, facilitate transportation and installation, and at the same time achieve rapid assembly between modules without destroying the non-structural components of the pre-decorated module units.
[0007] In order to solve the above technical problems, the present invention adopts the following technical solutions:
[0008] A concrete modular building with a quick automatic locking connection includes a plurality of module units spliced together. The structural feature of the building is that the structural components of the module units are four-sided space module units including only a bottom floor, two horizontal wall panels and one vertical wall panel; adjacent module units are connected by locks pre-buried in the module units.
[0009] The module unit of the present invention is a space tetrahedron pre-decorated module unit with only a bottom floor, a horizontal wall plate, and a vertical wall plate, so that the weight of the concrete modular building can be reduced and the construction cost can be reduced. At the same time, the pre-embedded lock in the module unit of the present invention does not protrude from the surface of the module unit, which facilitates the stacking, transportation, and installation of the module unit. In addition, the adjacent module units of the present invention complete the module splicing through the pre-embedded lock, and the entire construction process is a full dry connection. The construction process can achieve rapid assembly between concrete module units without affecting the non-structural components of the pre-decorated module unit.
[0010] Preferably, the lock comprises:
[0011] A lock box is embedded in a connection end of a module unit, the lock box comprises a box body, a spring, and a lock element, the spring and the lock element are installed in the box body, one end of the spring is connected to the lock element, and the other end is connected to the box body, the lock elements are symmetrically arranged in the box body, a lock hole is formed between two lock elements, and lock buckles are arranged on the front sides of the two lock elements opposite to each other, and the springs are respectively installed between the back sides of the two lock elements and the box body;
[0012] A plug-in having a lock at one end and a first connecting structure at the other end;
[0013] A connecting rod, one end of which is used to connect to a second connecting structure pre-buried on another module unit, and the other end of which is used to connect to the first connecting structure of the plug-in;
[0014] When adjacent module units are spliced, the lock box installed on one module unit is arranged opposite to the plug-in installed on another module unit, and the plug-in is inserted into the lock hole, and the lock head passes over the two lock buckles and interferes with the two lock buckles to form a locked connection. In this way, there is no outwardly protruding structure on the module unit, which not only facilitates the stacking, transportation and temporary storage of the module units, but also during assembly, since the module units are fully dry-connected through the lock box and the plug-in, there is no need for on-site post-casting, grouting and other wet operations, and the module units can be quickly assembled without affecting the non-structural components of the pre-decorated module units.
[0015] Furthermore, the lock buckle has a first locking surface and a first guide surface, and the lock head has a second locking surface and a second guide surface. When locking, the first locking surface and the second locking surface abut against each other. During the locking process, the second guide surface is guided by the first guide surface, so that the locking process of the present invention is smoother and the locking state after locking is more stable and reliable.
[0016] Furthermore, the lock head is semi-cylindrical, the arc surface of the semi-cylindrical shape forms the second guide surface, the plane of the semi-cylindrical shape forms the second locking surface, the first locking surface of the lock buckle is a plane, and the first guide surface is an arc surface matching the second guide surface.
[0017] Furthermore, the first connection structure is an internal thread arranged in the plug-in, the connecting rod is a screw rod, and the plug-in is connected to the connecting rod through threads.
[0018] Furthermore, a through hole is axially arranged on the plug-in, the internal thread is arranged at one end of the through hole, a hexagonal hole is axially arranged on the screw, the through hole is coaxially arranged with the hexagonal hole, and the aperture of the through hole is not less than the aperture of the hexagonal hole. In this way, the present invention can insert a tool such as an hexagonal wrench into the hexagonal hole through the through hole and adjust the installation height and angle of the plug-in by rotating the screw, so that the installation height of the plug-in at the same joint and the angle of the plug-in and the lock box are consistent, thereby improving the sensitivity of installation errors.
[0019] Furthermore, the box body, spring, lock, plug-in and connecting rod are all made of steel to ensure strength requirements.
[0020] Furthermore, both ends of the locking element are respectively matched with the box body in a clearance, and both ends of the locking element are respectively provided with rounded corners to improve the smoothness of plugging and protect the box body.
[0021] Furthermore, the box body is connected to the steel frame in the module unit by welding to improve the installation stability of the box body.
[0022] The modular unit of the present invention is composed of structural components and non-structural components, wherein the structural components are composed of the bottom floor, two horizontal wall panels and one vertical wall panel, and the non-structural components include doors, windows, etc. The structural components can be integrally cast by concrete or assembled by wall panels in the factory according to actual needs. The non-structural components can be completed by using different materials, door and window positions and sizes, and water and electricity pipe network layout designs according to the building use requirements.
[0023] The module unit of the present invention is a spatial tetrahedron pre-decorated module unit with only a bottom floor, a horizontal wall panel, and a vertical wall panel. A lock box and / or a second connection structure (generally a threaded hole) is pre-set at the connection end of the module unit. When adjacent module units are hoisted and spliced, the connecting rod and the plug-in can be installed in sequence on the second connection structure, and then the module splicing can be completed by self-locking by relative insertion of the plug-in and the lock box. The entire construction process is a fully dry connection. The construction process can achieve rapid assembly between concrete module units without affecting the non-structural components of the pre-decorated module unit.
[0024] Furthermore, the two transverse wall panels and one longitudinal wall panel in the module unit can be arranged in different positions according to the functional use requirements of the building.
[0025] Furthermore, the size of the plug-in is smaller than the size between the two locks in the lock box. The through hole in the plug-in and the hexagonal hole in the connecting rod can be used in conjunction to make the height of the plug-in consistent, and the angle of the plug-in and the lock box consistent, compensating for processing and construction errors.
[0026] Furthermore, the stress bearing performance of the joints can be improved by adjusting the structural dimensions of the concrete module connection locks.
[0027] Furthermore, the stress-bearing performance of the overall structure can be improved by adjusting the position and number of the concrete module connection locks.
[0028] Compared with the prior art, the present invention has the following beneficial effects:
[0029] (1) The module units are connected in a fully dry manner, which is efficient and fast: adjacent module units are connected through lock boxes and plug-ins, eliminating the need for on-site wet operations such as post-pouring and grouting, thereby improving the efficiency of module construction.
[0030] (2) On-site construction does not damage the pre-decoration in the module unit: the lock box is built into the concrete module, and on-site splicing is achieved by the automatic fastening of the plug-in and the lock when the modules are stacked, without the need to work inside the module.
[0031] (3) It has the function of compensating for manufacturing and installation errors: the size of the plug-in in the lock box is smaller than the gap between the lock parts, which can improve the production and splicing errors. In addition, the height of the plug-in can be made consistent through the cooperation between the through hole in the plug-in and the hexagonal hole in the connecting rod, and the angle between the plug-in and the lock box can be consistent, thereby improving the sensitivity of installation errors.
[0032] (4) Direct force transmission: The lock box is welded to the steel frame near the module. Under the action of an earthquake, force is directly transmitted between adjacent modules through the lock box at the joint, and the force transmission path is clear.
[0033] (5) Lightweighting of concrete module units: Weight reduction of concrete module units is a key link in improving the efficient production and construction of modular buildings. The present invention adopts the design of four-sided space module units to meet the building use and structural force requirements while meeting the requirements of pre-decorated non-structural components such as water and electricity pipelines.
[0034] (6) Improving the problem of double walls and double floors: The present invention adopts a four-sided space module unit design. The module unit only includes the bottom floor, horizontal wall panels and vertical wall panels. After the module units are stacked and spliced, adjacent module units share the floor and wall panels, which increases the space utilization efficiency, saves building materials, and achieves energy conservation and carbon reduction.
[0035] (7) The surface of the module unit is flat: the surface of the module unit of the present invention has no ribs, and the connecting rod is separately arranged from the module unit. When the module units are connected on site, the connecting rod is connected to the module unit, which makes the module units easier to stack and transport.
[0036] (8) Strong scene adaptability: The present invention can adapt to different plane layouts and meet the diverse combination requirements of module units by setting the positions of wall panels in different module units.
[0037] (9) Good overall structural stress performance: By adjusting the position and number of the connecting lock boxes, the structural integrity and seismic performance can be improved, making the overall building composed of discrete module units safer. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0039] Figure 1 A schematic diagram of the three-dimensional structure of a modular unit of a concrete modular building with rapid automatic locking connection according to the present invention;
[0040] Figure 2 Schematic diagram of the locked state of the lock of the present invention, wherein a is a perspective view and b is an appearance view;
[0041] Figure 3 3D schematic diagram of the exploded state of the lock of the present invention, wherein a is a perspective view of the lock box, b is a perspective view of the plug-in unit, and c is a perspective view of the connecting rod;
[0042] Figure 4 It is a schematic diagram of the internal structure of the lock of the present invention;
[0043] Figure 5 It is a connection schematic diagram of the lock of the present invention;
[0044] Figure 6 A schematic diagram of splicing adjacent module units of a concrete modular building using the quick automatic locking connection of the present invention;
[0045] Figure 7 A schematic diagram of a scene of a concrete modular building with quick and automatic locking connections according to the present invention.
[0046] Description of the markings in the figure:
[0047] 1-lock box, 101-box body, 102-spring, 103-locking piece, 104-lock buckle, 2-plug-in, 201-through hole, 202-internal thread, 203-locking head, 3-connecting rod, 301-hexagonal hole, 4-module unit, 401-bottom floor, 402-horizontal wall panel, 403-vertical wall panel, 404-threaded hole. DETAILED DESCRIPTION
[0048] The present invention is further described below in conjunction with specific preferred embodiments, but the protection scope of the present invention is not limited thereby.
[0049] In the description of the present invention, it should be noted that the terms "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.
[0050] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0051] See also Figure 1 The module unit 4 of one embodiment of the concrete modular building with quick automatic locking connection of the present invention comprises a bottom floor 401, two horizontal wall panels 402, a vertical wall panel 403, a threaded hole 404 and a lock box 1. The bottom floor 401, two horizontal wall panels 402 and a vertical wall panel 403 are connected to form a four-sided space module unit. The threaded hole 404 and the lock box 1 are respectively arranged at the connection ends of the four-sided space module unit. In this way, the module unit 4 of the present invention forms a four-sided space module unit formed by only a bottom floor 401, two horizontal wall panels 402 and a vertical wall panel 403, so that under the premise of meeting the pre-decorated non-structural components such as water and electricity pipe networks, it not only meets the building use and structural force requirements, but also after the module units are stacked and spliced, the adjacent module units 4 share the floor and wall panels, which increases the space utilization efficiency, saves materials, and achieves energy saving and carbon reduction.
[0052] The structural components in the module unit 4 of the present invention can be integrally cast or assembled in a factory, and the non-structural components are designed and configured according to the requirements of building use.
[0053] The adjacent module units 4 of the present invention are connected by locks, that is, during factory production, a lock box 1 is pre-embedded at the first connection end of the module unit 4, and a threaded hole 404 is preset at the second connection end.
[0054] See also Figure 2-Figure 5 The lock for connecting adjacent module units 4 of the present invention comprises:
[0055] A lock box 1 is pre-buried at the connection end of the first module 4, the lock box 1 comprises a box body 101, a spring 102, and a lock 103, one end of the spring 102 is connected to the lock 103, and the other end is connected to the box body 101, the lock 103 is symmetrically arranged in the box body 101, two locks 103 are oppositely arranged with lock buckles 104, and the springs 102 are respectively installed between the backs of the two locks 103 and the inner wall of the box body 101;
[0056] The plug-in 2 has a lock head 203 at one end and an internal thread 202 at the other end. The lock head 203 is used to be inserted between the two lock buckles 104 in the box body 101 and pass over the two lock buckles 104 to form a locked connection with the two lock buckles 104;
[0057] The connecting rod 3 is preferably a screw rod, one end of which is used for threaded connection with the connecting end of the second module 5, and the other end is threadedly connected with the internal thread 202 of the plug-in 2.
[0058] Furthermore, the plug-in 2 is provided with a through hole 201 in the axial direction, the internal thread 202 is arranged at one end of the through hole 201, the screw is provided with a hexagonal hole 301 in the axial direction, the through hole 201 and the hexagonal hole 301 are arranged coaxially, and the aperture of the through hole 201 is not less than the aperture of the hexagonal hole 301. In this way, the present invention can adjust the installation height and angle of the plug-in 2 by inserting the hexagonal wrench into the hexagonal hole 301 through the through hole 201, so that the installation height and angle of the plug-in 2 at the same joint are consistent.
[0059] To ensure the connection strength of the present invention, the box body 101, spring 102, lock 103, plug-in 2 and connecting rod 3 are all made of steel, and the box body 101 is welded to the steel frame in the first module 4, and the two ends of the spring 102 are welded to the inner surface of the box body 101 and the lock 103 respectively.
[0060] To improve the smoothness of plugging: the two ends of the lock 103 are respectively clearance-matched with the box body 101, and the two ends of the lock 103 are respectively provided with chamfered corners; the top surface of the lock buckle 104 is set as a first locking surface 1041, and a first guide surface 1042 with an arc surface is set between the first locking surface 1041 and the lock 103, and the first locking surface 1041 and the first guide surface 1042 form a quarter of a cylinder, and the lock head 203 is a semi-cylindrical shape as a whole, and the bottom surface of the lock head 203 is set as a second locking surface 2031, and the top surface of the lock head 203 is set as a second guide surface 2032 with an arc surface, and the first guide surface 1042 matches the second guide surface 2032. When the plug-in 2 is inserted into the lock box 1 and locked, the first locking surface 1041 and the second locking surface 2031 abut against each other. During the locking process, the second guide surface 2032 slides along the first guide surface 1042 and compresses the spring 102. Finally, the second locking surface 2031 passes over the first locking surface 1041. Under the action of the restoring force of the spring 102, the first locking surface 1041 and the second locking surface 2031 abut against each other.
[0061] See also Figure 6 , Figure 7 When the upper and lower module units 4 are spliced, the connecting rod 3 can be threadedly connected in the threaded hole 404 of the lower module unit at the construction site, the plug-in 2 can be threadedly installed on the connecting rod 3, and a tool such as an inner hexagonal wrench is inserted into the inner hexagonal hole 301 of the connecting rod 3 through the through hole 201 of the plug-in 2. The height and angle of each plug-in 2 on the lower module unit are adjusted by rotating the connecting rod 3 to make the height of each plug-in 2 consistent, and the angle of the plug-in 2 is consistent with the installation angle of the matching lock box 1 to compensate for the processing and construction errors. Then, with the help of lifting equipment, the upper module unit is hoisted above the lower module unit and slowly lowered until the lock box 1 of the upper module unit 4 falls on the plug-in 2 of the lower module unit, and the plug-in 2 pushes the lock 103 outward, squeezes the spring 102 connected to the box body 101 and the lock 103, so that the lock head 203 of the plug-in 2 is buckled by the lock buckle 104 on the lock 103 to form a self-locking, and the splicing of the upper and lower module units is completed. In this way, through rapid assembly, efficient stacking and combination of adjacent module units can be achieved, and finally a modular building with fast construction, high quality, low energy consumption and good economy is formed.
[0062] Furthermore, the size of the plug-in 2 is smaller than the size between the two lock members 103 in the lock box 1. The through hole 201 in the plug-in and the hexagonal hole 301 of the connecting rod 3 can be used together to ensure that the installation height of the plug-in 2 is consistent, and the installation angles of the plug-in 2 and the lock box 1 are consistent.
[0063] Furthermore, the stress-bearing performance of the overall structure can be improved by adjusting the position and number of the concrete module connection locks of the present invention.
[0064] The above is only a specific implementation scheme of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the art can make many possible changes and modifications to the technical scheme of the present invention by using the technical content disclosed above without departing from the scope of the technical scheme of the present invention, or modify it into an equivalent embodiment of equivalent changes. Therefore, any simple modification, equivalent change and modification made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical scheme of the present invention should fall within the protection scope of the technical scheme of the present invention.
Claims
1. A concrete modular building with a quick automatic locking connection, comprising a plurality of modular units connected to each other, characterized in that: The structural member of the module unit is a four-sided space module unit including only a bottom floor, two transverse wall panels and one longitudinal wall panel; adjacent module units are connected by locks pre-buried in the module units.
2. The concrete module connection lock for concrete modular buildings with rapid automatic locking connection according to claim 1 is characterized in that: The lock comprises: A lock box is embedded in a connection end of a module unit, the lock box comprises a box body, a spring, and a lock element, the spring and the lock element are installed in the box body, one end of the spring is connected to the lock element, and the other end is connected to the box body, the lock elements are symmetrically arranged in the box body, a lock hole is formed between two lock elements, and lock buckles are arranged on the front sides of the two lock elements opposite to each other, and the springs are respectively installed between the back sides of the two lock elements and the box body; A plug-in having a lock at one end and a first connecting structure at the other end; A connecting rod, one end of which is used to connect to a second connecting structure embedded in another module unit, and the other end of which is used to connect to the first connecting structure of the plug-in; When adjacent module units are spliced, the lock box installed on one module unit is arranged opposite to the plug-in installed on another module unit, and the plug-in is inserted into the lock hole, the lock head passes over the two lock buckles, and interferes with the two lock buckles to form a locked connection.
3. The concrete modular building with quick automatic locking connection according to claim 2 is characterized in that: The lock buckle has a first locking surface and a first guide surface, and the lock head has a second locking surface and a second guide surface. When locking, the first locking surface and the second locking surface abut against each other, and during the locking process, the second guide surface is guided by the first guide surface.
4. The concrete modular building with rapid automatic locking connection according to claim 3 is characterized in that: The lock head is semi-cylindrical, the arc surface of the semi-cylindrical shape forms the second guide surface, the plane of the semi-cylindrical shape forms the second locking surface, the first locking surface of the lock buckle is a plane, and the first guide surface is an arc surface matching the second guide surface.
5. The concrete modular building with quick automatic locking connection according to claim 2, characterized in that: The first connection structure is an internal thread arranged in the plug-in, the connecting rod is a screw rod, and the plug-in is connected to the connecting rod through threads.
6. The concrete modular building with rapid automatic locking connection according to claim 5, characterized in that: A through hole is axially arranged on the plug-in, the internal thread is arranged at one end of the through hole, a hexagonal hole is axially arranged on the screw rod, the through hole is coaxially arranged with the hexagonal hole, and the aperture of the through hole is not less than the aperture of the hexagonal hole.
7. The concrete modular building with rapid automatic locking connection according to claim 2, characterized in that: The box body is made of steel.
8. The concrete modular building with rapid automatic locking connection according to claim 2, characterized in that: Both ends of the locking element are respectively matched with the box body in a clearance, and both ends of the locking element are respectively provided with rounded corners.
9. The concrete modular building with rapid automatic locking connection according to claim 2, characterized in that: The box body is connected to the steel reinforcement frame in the module unit by welding.