Superimposed shear wall mechanism and superimposed shear wall

Through the combination of structures such as locking guide rods and hooks, the rapid self-locking of overlapping shear walls and subsequent decorative panel installation in modular buildings is achieved, which is convenient for solving the problems of complex locking process and high accuracy requirements in the prior art. , improve construction efficiency and production efficiency.

CN118997359AActive Publication Date: 2024-11-22GUANGDONG HAILONG CONSTR TECH CO LTD +1

Patent Information

Application Number
CN202411375101.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-30
Publication Date
2024-11-22
Estimated Expiration
2044-09-30

AI Technical Summary

Technical Problem

In existing modular buildings, the locking process of overlapping shear walls is complicated and cumbersome, with a long construction period, and high requirements for the accuracy of prefabricated formwork through holes, and decorative panels cannot be added directly after forming.

Method used

The locking guide rod, hook, lock sleeve and traction sleeve are adopted to quickly lock the template by driving the lifting and flipping of the lock sleeve and traction sleeve through the locking guide rod, and the steel mesh and stirrups are embedded in the template to Enhance structural strength and stability, omit the perforation and sealing process, and facilitate subsequent installation of decorative panels.

Benefits of technology

It improves construction efficiency, reduces the accuracy requirements for hooks and lock sleeves, simplifies the installation process, facilitates the subsequent installation of decorative panels, reduces on-site workload and concrete thickness, and improves production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997359A_ABST
    Figure CN118997359A_ABST
Patent Text Reader

Abstract

The invention relates to a laminated shear wall mechanism and a laminated shear wall, the laminated shear wall mechanism comprises a first template and a second template, and further comprises a plurality of locking guide rods; a plurality of opposite pulling hooks are embedded in one side of the first template, are arranged in multiple rows and multiple columns, and are bent upwards; a plurality of lock sleeves are pre-embedded in one side of the second template, and the plurality of lock sleeves are in one-to-one correspondence with the plurality of opposite pull hooks; the plurality of locking guide rods are vertically oriented and can be connected with one side of the second template in a lifting manner relative to the second template; the plurality of locking guide rods are connected with the plurality of rows of lock sleeves in a one-to-one correspondence manner; when the locking guide rod moves upwards relative to the second template, the locking guide rod can drive the column of lock sleeves connected with the locking guide rod to turn upwards; when the locking guide rod moves downwards relative to the second template, the locking guide rod can drive the column of lock sleeves connected with the locking guide rod to turn downwards, and the column of lock sleeves can sleeve and press the opposite pull hooks of the corresponding column. The construction method has the beneficial effects that the construction efficiency is improved, the first formwork and the second formwork participate in stress, and follow-up installation of decorative plates is facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of modular buildings, and in particular to a composite shear wall mechanism and a composite shear wall. Background Art

[0002] In modular buildings, composite shear walls are suitable for use as interior walls of buildings. Composite shear walls include two prefabricated templates. After the two prefabricated templates are spliced ​​together, concrete is poured into the cavities of the two templates to form a composite shear wall as a whole. In order to prevent the concrete in the cavity from squeezing the prefabricated templates outward and causing the two prefabricated templates to disintegrate, the two prefabricated templates will be spliced ​​by a tension self-locking component. The general structure of the tension self-locking component is: a plurality of through holes are evenly distributed on the two prefabricated templates, screws are inserted into the corresponding through holes of the two prefabricated templates, and nuts are sleeved at both ends of the screws to pull the two prefabricated templates together for self-locking. In order to achieve stable self-locking of the two prefabricated templates, a large number of screws need to be inserted, and the reserved through holes need to be buried after self-locking, which will make the locking process complicated and cumbersome, the construction period is long, and the opening precision of the corresponding through holes on the two prefabricated templates is high. At the same time, the nuts will remain on the composite shear wall after forming, and it is impossible to directly install decorative panels on the composite shear wall. Summary of the invention

[0003] 1. Technical issues to be resolved

[0004] In view of the above-mentioned shortcomings and deficiencies of the prior art, the present invention provides a composite shear wall mechanism and a composite shear wall, which solve the technical problems that the existing locking method between two prefabricated templates has a complicated and cumbersome locking process, a long construction period, and a high requirement for the accuracy of opening the relative through holes on the two prefabricated templates, as well as the technical problem that nuts will remain on the composite shear wall after forming, making it impossible to directly install decorative panels on the composite shear wall.

[0005] (II) Technical solution

[0006] In order to achieve the above object, the main technical solutions adopted by the present invention include:

[0007] In a first aspect, an embodiment of the present invention provides a composite shear wall, comprising a first formwork and a second formwork, and further comprising a plurality of locking guide rods;

[0008] A plurality of pull hooks are embedded in one side of the first template, the pull hooks are arranged in multiple rows and columns, and the pull hooks are bent upward; a plurality of locking sleeves are embedded in one side of the second template, and the locking sleeves correspond to the pull hooks one by one; the locking guide rods are vertically oriented and can be connected to one side of the second template by lifting relative to the second template, and the locking guide rods are connected to the locking sleeves in multiple columns one by one;

[0009] When the locking guide rod moves upward relative to the second template, the locking guide rod can drive a row of locking sleeves connected thereto to flip upward;

[0010] When the locking guide rod moves downward relative to the second template, the locking guide rod can drive a row of locking sleeves connected thereto to flip downward, and the locking sleeves in this row can be sleeved on and press down the corresponding row of pull hooks.

[0011] According to the present invention, a plurality of vertically oriented sleeves are also embedded in one side of the second template, and the plurality of sleeves are arranged in multiple rows and columns;

[0012] The plurality of locking guide rods are inserted into the plurality of rows of sleeves in a one-to-one correspondence and can be lifted and lowered along the sleeves;

[0013] The upper end of the locking guide rod is threadedly connected to two fasteners, and the two fasteners are spaced apart and arranged at two ends of the top sleeve among the plurality of sleeves;

[0014] When the locking guide rod drives a row of locking sleeves connected thereto to sleeve and press down the corresponding pulling hooks, the two fasteners can press against the two ends of a sleeve to lock the locking guide rod.

[0015] According to the present invention, each locking guide rod is provided with a plurality of horizontally oriented traction sleeves spaced apart from each other, and the plurality of traction sleeves can be sleeved one by one with a plurality of the locking sleeves in a row of the locking sleeves;

[0016] When the locking guide rod drives the plurality of traction sleeves to synchronously rise and fall relative to the second template, the plurality of traction sleeves drive a row of connected locking sleeves to flip up and down.

[0017] According to the present invention, the material of the locking sleeve is a steel wire rope, and the material of the tension hook is a steel bar.

[0018] According to the present invention, both ends of each locking sleeve are fixed on anchor rods, and the anchor rods are pre-buried in the second template to anchor the locking sleeve on one side of the second template.

[0019] According to the present invention, steel mesh is embedded in the first template and the second template.

[0020] According to the present invention, two sets of stirrups are also pre-embedded on the first side of the first template or the second template, and the two sets of stirrups are located at the left and right ends of the second template;

[0021] Each group of stirrups includes a plurality of annular stirrups, and the plurality of stirrups are arranged in parallel up and down to form a connected insertion cavity.

[0022] In a second aspect, the present invention further provides a composite shear wall, comprising a plurality of the composite shear wall mechanisms, wherein the plurality of the composite shear wall mechanisms are arranged up and down to form the composite shear wall;

[0023] The composite shear wall mechanism further comprises a plurality of vertically oriented connecting steel bars, wherein threads are arranged at the upper and lower ends of the connecting steel bars;

[0024] The composite shear wall mechanism further comprises a plurality of overlapping U-shaped steel bars, wherein the overlapping U-shaped steel bars are in an inverted U shape;

[0025] When each of the locking sleeves is sleeved and pressed down on the corresponding tension hook, a plurality of the connecting steel bars are inserted into the inserting cavity of the stirrups pre-buried in the first formwork or the first side of the second formwork, and the lower parts of a plurality of parallelly arranged overlapping U-shaped steel bars are inserted into the cavity between the first formwork and the second formwork and arranged in the middle of the cavity in the horizontal direction; then, concrete is poured into the cavity to form the composite shear wall mechanism; at this time, the upper and lower ends of each of the connecting steel bars and the upper part of the overlapping U-shaped steel bars are all extended out of the cast-in-place concrete;

[0026] In the two adjacent upper and lower composite shear wall mechanisms, the upper end of the lower connecting steel bar and the lower end of the upper connecting steel bar are threadedly connected to the same connecting sleeve, and the upper part of the overlapping U-shaped steel bar is inserted into the cavity of the upper composite shear wall mechanism and is located in the cast-in-place concrete.

[0027] (III) Beneficial effects

[0028] The beneficial effects of the present invention are:

[0029] Improved construction efficiency: In the composite shear wall mechanism of the present invention, during the splicing process of the first template and the second template, when the locking guide rod is lifted relative to the second module, the locking guide rod can drive multiple lock sleeves in a row of connected lock sleeves to flip up and down at the same time, so that when the lock sleeve flips upward, it is convenient to arrange the first template and the second template relative to each other, and when the lock sleeve flips downward, the corresponding tension hook is installed and pressed down, and the lifting and lowering of multiple locking guide rods can quickly complete the tension self-locking between the two templates. This tension locking method is efficient and fast, and the matching accuracy requirements of the tension hook and the lock sleeve are relatively low. Compared with the connection method of perforating holes in the two templates and self-locking by screws in the prior art, this tension locking method omits the hole opening process and the hole sealing process, thereby improving the installation efficiency.

[0030] It is convenient to install the subsequent decorative panels: after the pull hook on one side of the first template and the locking sleeve on one side of the second template are opposite to each other, there is no protruding structure on the opposite sides of the first template and the second template, so the decorative panels can be directly installed, which is convenient for subsequent construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is a three-dimensional schematic diagram of the composite shear wall mechanism of the present invention (the first formwork, the second formwork and the cast-in-place concrete are not shown);

[0032] Figure 2 for Figure 1 A partial schematic diagram of

[0033] Figure 3 for Figure 1 Side view of

[0034] Figure 4 for Figure 3 A partial schematic diagram of

[0035] Figure 5 for Figure 1 A top view of (without stirrups shown);

[0036] Figure 6 for Figure 1 A partial schematic diagram of

[0037] Figure 7 is a front view of the first template;

[0038] Figure 8 for Figure 7 A top view of

[0039] Fig. 9 It is a three-dimensional schematic diagram of the composite shear wall of the present invention (the first formwork, the second formwork and the cast-in-place concrete are not shown);

[0040] Fig.10 for Fig. 9 A partial schematic diagram of .

[0041] [Description of Reference Numerals]

[0042] 1: First template;

[0043] 2: Second template;

[0044] 31: locking guide rod; 32: traction sleeve; 33: pulling hook; 34: locking sleeve; 35: sleeve; 36: fastener;

[0045] 4: Steel mesh;

[0046] 5: Connect steel bars;

[0047] 6: stirrups;

[0048] 7: Connecting sleeve;

[0049] 8: Overlap U-shaped steel bars;

[0050] 9: Anchor rod. DETAILED DESCRIPTION

[0051] In order to better explain the present invention and facilitate understanding, the present invention is described in detail below in conjunction with the accompanying drawings through specific embodiments. Figure 1 The orientation is used as a reference.

[0052] Example 1

[0053] See also Figure 1-10 The composite shear wall mechanism proposed in the embodiment of the present invention includes a first template 1 and a second template 2, and also includes a plurality of locking guide rods 31.

[0054] A plurality of pull hooks 33 are embedded in one side of the first template 1, and the pull hooks 33 are arranged in multiple rows and columns, and the pull hooks 33 are bent upward. A plurality of locking sleeves 34 are embedded in one side of the second template 2, and the plurality of locking sleeves 34 correspond to the plurality of pull hooks 33 one by one. A plurality of locking guide rods 31 are vertically oriented and can be connected to one side of the second template 2 by lifting relative to the second template 2, and the plurality of locking guide rods 31 are connected to the plurality of locking sleeves 34 in a one-to-one correspondence.

[0055] When the locking guide rod 31 moves upward relative to the second template 2, the locking guide rod 31 can drive a row of locking sleeves 34 connected thereto to flip upward.

[0056] When the locking guide rod 31 moves downward relative to the second template 2 , the locking guide rod 31 can drive a row of locking sleeves 34 connected thereto to flip downward, and the row of locking sleeves 34 can be sleeved on and press down the corresponding row of pull hooks 33 .

[0057] During the splicing, after one side of the first template 1 and one side of the second template 2 are arranged relative to each other, each locking guide rod 31 is moved upward relative to the second template 2, so that the locking guide rod 31 can drive a row of locking sleeves 34 connected thereto to flip upward. Then, each locking guide rod 31 is moved downward relative to the second template 2, so that the locking guide rod 31 drives a row of locking sleeves 34 connected thereto to flip downward, and the row of locking sleeves 34 can be sleeved and press down the corresponding row of pulling hooks 33. In this way, the pulling and self-locking of the first template 1 and the second template 2 can be achieved.

[0058] The above-mentioned splicing method of the first template 1 and the second template 2 has the following advantages:

[0059] Improved construction efficiency: When the locking guide rod 31 is lifted relative to the second module 2, the locking guide rod 31 can drive multiple locking sleeves 34 in a row of connected locking sleeves 34 to flip up and down at the same time, so that when the locking sleeves 34 flip up, it is convenient to arrange the first template 1 and the second template 2 relatively, and when the locking sleeves 34 flip down, the corresponding pull hooks 33 are set and pressed down, and multiple locking guide rods 31 are lifted to quickly complete the pull-to-pull self-locking between the two templates. This pull-to-pull locking method is efficient and fast, and the matching accuracy requirements of the pull hooks 33 and the locking sleeves 34 are low. Compared with the connection method of perforating holes on the two templates and self-locking by screws in the prior art, this pull-to-pull locking method omits the hole opening process and the hole sealing process, thereby improving installation efficiency.

[0060] Facilitates the subsequent installation of decorative panels: after the pull hook 33 on one side of the first template 1 and the locking sleeve 34 on one side of the second template 2 are oppositely mounted, there is no protruding structure on the opposite side of the first template 1 and the second template 2, so the decorative panel can be directly installed, which is convenient for subsequent construction.

[0061] Preferably, the locking sleeve 34 is made of steel wire rope, and the pulling hook 33 is made of steel bar, so as to ensure the locking strength of the two.

[0062] Furthermore, both ends of each locking sleeve 34 are fixed on the anchor rod 9, and the anchor rod 9 is pre-buried in the second template 2 to anchor the locking sleeve 34 on one side of the second template 2, so as to facilitate the pre-buried locking sleeve 34 on one side of the second template 2 and ensure its pre-buried strength.

[0063] Furthermore, a plurality of vertically oriented sleeves 35 are pre-embedded on one side of the second template 2, and the plurality of sleeves 35 are arranged in a plurality of rows and columns.

[0064] The plurality of locking guide rods 31 are inserted into the plurality of rows of sleeves 35 in a one-to-one correspondence and can be lifted and lowered along the sleeves 35 to ensure that the locking guide rods 31 are lifted and lowered in the vertical direction.

[0065] Furthermore, the upper end of the locking guide rod 31 is threadedly connected to two fasteners 36 , and the two fasteners 36 are spaced apart at two ends of a top sleeve 35 among the plurality of sleeves 35 .

[0066] When the locking guide rod 31 drives a row of locking sleeves 34 connected thereto to sleeve and press down the corresponding pulling hooks 33, the two fasteners 36 can press the two ends of the top sleeve 35 to lock the locking guide rod 31, thereby preventing the locking guide rod 31 from moving up and down, and further preventing the locking sleeves 34 from turning up and down relative to the pulling hooks 33 and disengaging.

[0067] Specifically, the fastener 36 is a nut for easy operation.

[0068] Specifically, a rod body is fixedly disposed on the sleeve 35 , and the rod body is pre-buried in the second template 2 , so that the sleeve 35 is pre-buried on one side of the second template 2 .

[0069] Furthermore, each locking guide rod 31 is inserted into a row of locking sleeves 34 connected thereto, and each locking guide rod 31 is provided with a plurality of horizontally oriented traction sleeves 32 at intervals above and below, and the plurality of traction sleeves 32 can be correspondingly sleeved on a plurality of locking sleeves 34 in a row of locking sleeves 34 one by one.

[0070] When the locking guide rod 31 drives the plurality of traction sleeves 32 to rise and fall synchronously relative to the second template 2 , the plurality of traction sleeves 32 drives a row of connected locking sleeves 34 to flip up and down.

[0071] It should be noted that the locking sleeve 34, the locking guide rod 31, the sleeve 35, the fastener 36 and the traction sleeve 32 on the second template 2 can be arranged in the following manner:

[0072] First, connect the fastener 36 to the locking guide rod 31 and insert the locking guide rod 31 into the sleeve 35 and the locking sleeve 34, arrange the position of the above-mentioned structural parts, and then cast the above-mentioned structural parts to form the second template 2, so that the above-mentioned structural parts are pre-embedded in the second template 2, and then, each traction sleeve 32 is sleeved on the corresponding locking sleeve 34 and fixed on the corresponding locking guide rod 31; or,

[0073] First, connect the fastener 36 to the locking guide rod 31 and insert the locking guide rod 31 into the sleeve 35 and the locking sleeve 34, and each traction sleeve 32 is sleeved on the corresponding locking sleeve 34 and fixed on the corresponding locking guide rod 31, arrange the positions of the above-mentioned structural parts, and then cast the above-mentioned structural parts to form the second template 2, so that the above-mentioned structural parts are pre-embedded in the second template 2.

[0074] Specifically, the traction sleeve 32 is welded to the locking guide rod 31 for easy fixation.

[0075] Furthermore, the first formwork 1 and the second formwork 2 are both pre-embedded with steel mesh 4 so that the two can participate in the force: after the first formwork 1 and the second formwork 2 are self-locked by pulling the hook 33 and the locking sleeve 34 and cast in-situ concrete into the cavity of the first formwork 1 and the second formwork 2 to form a composite shear wall mechanism, the hook 33 and the locking sleeve 34 can combine the cast-in-situ concrete and the two formworks into a whole, so that the two formworks and the cast-in-situ concrete are subjected to force together, rather than just using the two formworks as temporary formworks that are not subjected to force. Therefore, under the same load-bearing requirements, the cast-in-situ concrete can be set thinner, which can reduce the overall thickness setting of the composite shear wall mechanism, reduce the occupied indoor usable area of ​​the building, and save the amount of cast-in-situ concrete. Furthermore, since the first formwork 1 and the second formwork 2 are pre-embedded with steel mesh 4 to participate in the force, there is no need to tie the steel mesh on site, which can greatly reduce the workload on site and improve production efficiency.

[0076] Specifically, the first formwork 1 and the second formwork 2 are shell plates cast from fiber concrete material, and both have a thickness of 30 mm to 50 mm.

[0077] Furthermore, two sets of stirrups 6 are embedded in the first side of the first template 1 or the second template 2, and the two sets of stirrups 6 are located at the left and right ends of the second template 2. Each set of stirrups 6 includes a plurality of annular stirrups 6, which are arranged in parallel up and down to form a connected insertion cavity.

[0078] When the cast-in-place concrete between the first formwork 1 and the second formwork 2 forms a composite shear wall, the two sets of stirrups 6 between the two can form end columns, which bear the vertical axial force and shear bending moment. The stirrups 6 are pre-embedded, so they do not need to be inserted on site into the cavity between the first formwork 1 and the second formwork 2, further reducing the workload on site and improving production efficiency.

[0079] Preferably, stirrups 6 are embedded in the first side of the second formwork 2 .

[0080] Example 2

[0081] Based on the first embodiment, this embodiment further provides a composite shear wall, which includes a plurality of composite shear wall mechanisms. The plurality of composite shear wall mechanisms are arranged up and down to form the composite shear wall.

[0082] The composite shear wall mechanism further comprises vertically oriented connecting steel bars 5 , and threads are arranged at the upper and lower ends of the connecting steel bars 5 .

[0083] The composite shear wall structure further comprises a plurality of overlapping U-shaped steel bars 8, and the overlapping U-shaped steel bars 8 are in an inverted U shape.

[0084] When each locking sleeve 34 is sleeved and pressed down on the corresponding tension hook 33, multiple connecting steel bars 5 are inserted into the insertion cavity of each set of stirrups 6, and the lower parts of multiple parallel overlapping U-shaped steel bars 8 are inserted into the cavity between the first template 1 and the second template 2 and arranged in the middle of the cavity in the horizontal direction. Subsequently, concrete is poured into the cavity to form a composite shear wall mechanism. At this time, the upper and lower ends of each connecting steel bar 5 and the upper part of the overlapping U-shaped steel bar 8 are all extended out of the cast-in-place concrete.

[0085] In the two adjacent upper and lower composite shear wall structures, the upper end of the lower connecting steel bar 5 and the lower end of the upper connecting steel bar 5 are threadedly connected to the same connecting sleeve 7, and the upper part of the overlapping U-shaped steel bar 8 is inserted into the cavity of the upper composite shear wall structure and is located in the cast-in-place concrete.

[0086] The upper end of the lower connecting steel bar 5 and the lower end of the upper connecting steel bar 5 are threadedly connected to the same connecting sleeve 7 to improve the connection stability of the composite shear wall formed by the upper and lower composite shear wall mechanisms. At the same time, the upper and lower parts of the overlapping U-shaped steel bars 8 are respectively located in the cast-in-place concrete of the upper and lower composite shear wall mechanisms to further improve the connection stability of the upper and lower composite shear wall mechanisms in the formed composite shear wall.

[0087] Specifically, a plurality of connecting steel bars 5 are arranged in the insertion cavity in a plurality of rows and columns, so as to further improve the connection stability of the composite shear wall formed by the upper and lower composite shear wall mechanisms.

[0088] In the description of this specification, the description of the terms "one embodiment", "some embodiments", "embodiment", "example", "specific example" or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, unless they are contradictory.

[0089] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may alter, modify, replace and modify the above embodiments within the scope of the present invention.

Claims

1. A composite shear wall structure, comprising a first template (1) and a second template (2), It is characterized in that Also includes a plurality of locking guide rods (31); A plurality of pull hooks (33) are embedded in one side of the first template (1), the plurality of pull hooks (33) are arranged in multiple rows and columns, and the pull hooks (33) are bent upward; a plurality of locking sleeves (34) are embedded in one side of the second template (2), the plurality of locking sleeves (34) and the plurality of pull hooks (33) correspond one to one; a plurality of locking guide rods (31) are vertically oriented and can be connected to one side of the second template (2) by being lifted and lowered relative to the second template (2), and at the same time, the plurality of locking guide rods (31) and the plurality of rows of locking sleeves (34) are connected one to one; When the locking guide rod (31) moves upward relative to the second template (2), the locking guide rod (31) can drive a row of locking sleeves (34) connected thereto to flip upward; When the locking guide rod (31) moves downward relative to the second template (2), the locking guide rod (31) can drive a row of locking sleeves (34) connected thereto to flip downward, and the locking sleeves (34) in this row can be sleeved on and press down the corresponding row of pull hooks (33).

2. The composite shear wall mechanism according to claim 1, It is characterized in that A plurality of vertically oriented sleeves (35) are also pre-embedded on one side of the second template (2), and the plurality of sleeves (35) are arranged in multiple rows and columns; The plurality of locking guide rods (31) are inserted into the plurality of rows of sleeves (35) in a one-to-one correspondence and can be raised and lowered along the sleeves (35); The upper end of the locking guide rod (31) is threadedly connected to two fasteners (36), and the two fasteners (36) are arranged at intervals at the two ends of the top sleeve (35) among the plurality of sleeves (35); When the locking guide rod (31) drives a row of locking sleeves (34) connected thereto to sleeve and press down the corresponding pulling hooks (33), the two fasteners (36) can press against the two ends of the top sleeve (35) to lock the locking guide rod (31).

3. The composite shear wall mechanism according to claim 1, It is characterized in that Each locking guide rod (31) is provided with a plurality of horizontally oriented traction sleeves (32) at intervals above and below, and the plurality of traction sleeves (32) can be sleeved one by one with a plurality of the locking sleeves (34) in a row of the locking sleeves (34); When the locking guide rod (31) drives the plurality of traction sleeves (32) to rise and fall synchronously relative to the second template (2), the plurality of traction sleeves (32) drive a row of connected locking sleeves (34) to turn up and down.

4. The composite shear wall mechanism according to claim 1, It is characterized in that The locking sleeve (34) is made of a steel wire rope, and the pulling hook (33) is made of a steel bar.

5. The composite shear wall mechanism according to claim 1, It is characterized in that Both ends of each locking sleeve (34) are fixed on an anchor rod (9), and the anchor rod (9) is pre-buried in the second template (2) to anchor the locking sleeve (34) on one side of the second template (2).

6. The composite shear wall mechanism according to claim 1, It is characterized in that Steel meshes (4) are pre-embedded inside the first template (1) and the second template (2).

7. The composite shear wall mechanism according to claim 1, It is characterized in that Two groups of stirrups (6) are also pre-embedded on the first side of the first template (1) or the second template (2), and the two groups of stirrups (6) are located at the left and right ends of the second template (2); Each group of stirrups (6) comprises a plurality of annular stirrups (6), and the plurality of stirrups are arranged in parallel up and down to form a connected insertion cavity.

8. A composite shear wall, It is characterized in that It comprises a plurality of the composite shear wall mechanisms according to any one of claims 1 to 7, wherein the plurality of composite shear wall mechanisms are arranged up and down to form the composite shear wall; The composite shear wall mechanism further comprises a plurality of vertically oriented connecting steel bars (5), wherein threads are arranged at the upper and lower ends of the connecting steel bars (5); The composite shear wall structure further comprises a plurality of overlapping U-shaped steel bars (8), wherein the overlapping U-shaped steel bars (8) are in an inverted U shape; When each of the locking sleeves (34) is sleeved and pressed down on the corresponding tension hook (33), the plurality of connecting steel bars (5) are inserted into the insertion cavity of the stirrups (6) pre-buried in the first side of the first formwork (1) or the second formwork (2), and the lower parts of the plurality of parallel-arranged overlapping U-shaped steel bars (8) are inserted into the cavity between the first formwork (1) and the second formwork (2) and arranged in the middle of the cavity in the horizontal direction; then, concrete is poured into the cavity to form the composite shear wall mechanism; at this time, the upper and lower ends of each of the connecting steel bars (5) and the upper part of the overlapping U-shaped steel bars (8) are all extended out of the cast-in-place concrete; In the two adjacent upper and lower composite shear wall structures, the upper end of the lower connecting steel bar (5) and the lower end of the upper connecting steel bar (5) are threadedly connected to the same connecting sleeve (7), and the upper part of the overlapping U-shaped steel bar (8) is inserted into the cavity of the upper composite shear wall structure and is located in the cast-in-place concrete.

Citation Information

Patent Citations

  • Method for construction of steel bar welding net rack composite shear wall and shear wall structure

    CN105133755A

  • Self-insulation and decoration integrated bearing wall body prefabricated and produced in industrialized batch mode

    CN113513104A

  • Building template's slant reinforcing apparatus

    CN207794600U

  • Superimposed shear wall structure for modular building

    CN220565503U

  • Methods for construction of pre-fabricated modular reinforcement cages for concrete structures

    US8375678B1

Cited By

  • Lock rib sleeve shear wall structure, modular house and construction method of modular house

    CN122215470A

  • Locked-rib shear wall structure, modular housing and its construction methods

    CN122215470B