Method for carrying out template matching on beam structure
Through the systematic method of formwork matching of beam structure, the problem of poor stability between formwork and beam structure is solved, the construction accuracy and durability are improved, and the project quality is improved.
Patent Information
- Application Number
- CN202411235497.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2024-11-22
AI Technical Summary
The existing beam structure formwork assembly method has poor stability between the formwork and the beam structure, which affects the quality of the project.
Through detailed pre-molding preparation, template molding design, template assembly and reinforcement, template installation and adjustment, template acceptance and protection, and template removal and maintenance steps, ensure the stability and firmness of the template, including selecting appropriate template materials and support systems, and formulate Detailed mold matching plan, template numbering and statistics are carried out to ensure the joints at the nodes are tightly spliced, the joints and reinforcement methods are controlled, clamps or steel wires are used, pulling screws are used and arching issues are considered to ensure the integrity and flatness of the template.
It improves the construction accuracy and stability of the beam structure, reduces construction errors and rework time, extends the durability of the structure, reduces the workload of later maintenance and repairs, and enhances the overall stability of the structure.
Smart Images

Figure CN118997461A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of mold matching, in particular to a method for matching templates for a beam structure. Background Art
[0002] The construction industry is an industry that revolves around the design, construction, decoration and management of buildings. Urban buildings are an important part of the construction industry. Urban buildings inherit culture in their unique way, spread the charm of life, and constantly penetrate into people’s daily lives, creating a harmonious and peaceful spiritual home for people.
[0003] Aluminum formwork is extruded by special equipment and can be freely combined according to different structural dimensions. The design, development and construction application of aluminum formwork is a major development in the construction industry. The application of aluminum formwork in the construction industry has improved the construction efficiency of housing construction projects, including greatly saving a lot of building materials and labor arrangements.
[0004] With the continuous development of modern construction technology, the construction quality of beam structure, as an important component of building structure that bears vertical and horizontal loads, is directly related to the safety and stability of the building. Formwork matching is a key link in the construction of beam structure, which is of great significance to ensure the dimensional accuracy, surface flatness and overall strength of the beam structure.
[0005] The invention patent with publication number CN111428330A discloses a method for matching aluminum formwork for beam structures, which relates to the field of matching formwork. The specific steps of the invention are as follows: first, determine whether it is a static matching formwork mode or a dynamic matching formwork mode; second, when it is determined to be a static matching formwork mode, calculate the information of the formwork to be placed at each position. The invention classifies the matching formwork algorithms and can adopt different matching formwork algorithms for different usage scenarios, which is more in line with the actual situation, with small matching formwork errors and high accuracy. However, the stability between the formwork and the beam structure in this beam structure formwork matching method is poor, which is easy to affect the quality of the project and cannot meet the construction requirements. Therefore, a method for matching formwork for beam structures is proposed to solve the above-mentioned problems. Summary of the invention
[0006] In view of the shortcomings of the prior art, the present invention provides a method for matching formwork for a beam structure, which has the advantage of enhancing structural stability and solves the problem that the existing method of matching formwork for beam structures has poor stability between the formwork and the beam structure, which easily affects the quality of the project.
[0007] To achieve the above object, the present invention provides the following technical solution: a method for forming a formwork for a beam structure, comprising the following steps:
[0008] S1. Preliminary preparation for formwork: The preliminary preparation for formwork includes understanding the project requirements, material preparation and measurement and layout; by carefully reading the construction drawings, understand the specific size, shape and position requirements of the beam structure; then prepare the required formwork materials according to the requirements of the drawings; then measure and lay out at the construction site to determine the exact position of the beam structure;
[0009] S2. Formwork design: The formwork design includes formulating a formwork plan, drawing a formwork diagram, and considering node processing; formulating a detailed formwork plan based on the size and shape of the beam structure; and drawing a formwork diagram of the beam structure based on the formwork plan; and then, for the intersections between beams and columns, walls, and other structures, special consideration should be given to the splicing and reinforcement methods of the formwork;
[0010] S3, template assembly and reinforcement: the template assembly and reinforcement includes template assembly and template reinforcement; according to the template matching plan, the template is assembled into a whole; and then according to the height and span of the beam structure, a suitable reinforcement method is selected;
[0011] S4. Template installation and adjustment: The template installation and adjustment includes template installation and template adjustment; the assembled template is installed on the beam structure according to the layout position; and then the template is adjusted as necessary according to the inspection results;
[0012] S5. Formwork acceptance and protection: The formwork acceptance and protection include formwork acceptance and formwork protection. After the formwork is installed, the acceptance work is carried out; before pouring concrete, the formwork is protected to prevent damage and contamination;
[0013] S6. Formwork removal and maintenance: The formwork removal and maintenance include formwork removal and formwork maintenance. Formwork removal work can only be carried out after the concrete strength reaches the design requirements, and the removed formwork must be cleaned and maintained in time.
[0014] Furthermore, the understanding of the project requirements in S1 requires selecting appropriate formwork materials and support systems based on the project quality and safety requirements. The formwork materials include plywood, wood and steel pipes; the material preparation in S1 requires checking the quality of the materials to ensure that there are no decay, mildew and bubbling problems; the measurement and layout in S1 requires marking the control lines and elevation lines for the formwork installation based on the layout results.
[0015] Furthermore, the formwork scheme in S2 needs to take into account the reuse rate and construction efficiency of the formwork, and configure whole panels and large panels as much as possible; the formwork diagram in S2 needs to clearly specify the splicing method, reinforcement method and support method of the formwork, and the formwork diagram includes the partition, numbering and size of the formwork; the node processing in S2 needs to ensure that the formwork at the node is tightly spliced to prevent leakage and deformation at the formwork joints.
[0016] Furthermore, the template assembly in S3 includes the following specific steps:
[0017] A1. Control the joints between adjacent panels to ensure they are tight;
[0018] A2. Use clips or steel wire to securely tie the formwork and vertical steel pipes to maintain the integrity of the formwork.
[0019] Furthermore, the template reinforcement in S3 includes the following specific steps:
[0020] B1. For beams with a large height, tension screws can be used for reinforcement to ensure the stability of the formwork;
[0021] B2. For beams with larger spans, the arching of the formwork must be considered to ensure the flatness of the top surface of the beam after pouring concrete.
[0022] Furthermore, the template installation in S4 needs to use a level ruler and a vertical ruler to check the verticality and horizontality of the template to ensure accurate installation of the template; the template adjustment in S4 needs to ensure that the template joints are tight, the lines are straight, and the dimensions are accurate.
[0023] Furthermore, the formwork acceptance in S5 needs to check whether the verticality, horizontality and joint tightness indicators of the formwork meet the requirements; when the formwork protection in S5 needs to pour concrete, the pouring speed and height are controlled to avoid impact on the formwork.
[0024] Furthermore, when removing the formwork in S6, care must be taken to avoid damaging the concrete structure and the formwork itself; when maintaining the formwork in S6, the formwork must be checked for damage and the damaged portion must be repaired or replaced; and when maintaining the formwork in S6, the formwork must be stored in a dry and ventilated place to avoid moisture and deformation.
[0025] Compared with the prior art, the present invention provides a method for matching formwork for a beam structure, which has the following beneficial effects:
[0026] The method for matching formwork for beam structure can clearly grasp the use of each formwork by numbering and counting the formwork, reduce construction errors caused by formwork confusion, and improve the accuracy of formwork matching construction; by special treatment of the intersection nodes of beams and columns, walls and other structures, it can ensure that the formwork at the nodes is tightly spliced, and improve the stability of the overall structure; through the reasonable arrangement of the partition, numbering and installation sequence of the formwork, the construction process can be made more orderly, and unnecessary waiting and rework time can be reduced; through the stability and firmness of the formwork, the durability of the beam structure can be improved, and the workload of later maintenance and repair can be reduced; thereby achieving the advantage of enhancing structural stability and solving the problem that the stability between the formwork and the beam structure in the existing beam structure formwork matching method is poor, which is easy to affect the quality of the project. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 The present invention is a construction flow chart of a method for matching formwork for a beam structure. DETAILED DESCRIPTION
[0028] The following will be combined with the embodiments of the present invention and the accompanying drawings to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0029] See also Figure 1 In this embodiment, a method for forming a formwork for a beam structure includes the following steps:
[0030] S1. Preliminary preparation for formwork: Preliminary preparation for formwork includes understanding the project requirements, material preparation and measurement and layout; by carefully reading the construction drawings, understand the specific size, shape and position requirements of the beam structure; then prepare the required formwork materials according to the requirements of the drawings; then measure and lay out at the construction site to determine the exact position of the beam structure;
[0031] S2. Formwork design: Formwork design includes formulating formwork scheme, drawing formwork diagram and considering node processing; formulating detailed formwork scheme according to the size and shape of beam structure; drawing formwork diagram of beam structure according to formwork scheme; and considering the splicing and reinforcement method of formwork for the intersection of beam, column, wall and other structures;
[0032] S3. Formwork assembly and reinforcement: Formwork assembly and reinforcement include formwork assembly and formwork reinforcement. According to the formwork matching plan, the formwork is assembled into a whole. Then, according to the height and span of the beam structure, the appropriate reinforcement method is selected.
[0033] S4. Template installation and adjustment: Template installation and adjustment include template installation and template adjustment; by installing the assembled template on the beam structure according to the layout position; and then making necessary adjustments to the template based on the inspection results;
[0034] S5. Formwork acceptance and protection: Formwork acceptance and protection include formwork acceptance and formwork protection. After the formwork is installed, acceptance work is carried out; before pouring concrete, the formwork is protected to prevent damage and contamination.
[0035] S6. Formwork removal and maintenance: Formwork removal and maintenance include formwork removal and formwork maintenance. Formwork removal work can only be carried out after the concrete strength reaches the design requirements, and the formwork after removal must be cleaned and maintained in time.
[0036] In this embodiment, by numbering and counting the templates, the usage of each template can be clearly understood, which can reduce construction errors caused by template confusion and improve the accuracy of template construction; by special treatment of the intersection nodes of beams and columns, walls and other structures, it can ensure that the templates at the nodes are tightly spliced and the stability of the overall structure is improved; through the reasonable arrangement of the partitioning, numbering and installation sequence of the templates, the construction process can be made more orderly and unnecessary waiting and rework time can be reduced; through the stability and firmness of the templates, the durability of the beam structure can be improved and the workload of later maintenance and repair can be reduced; thereby achieving the advantage of enhanced structural stability.
[0037] Specifically, understanding the project requirements in S1 requires selecting appropriate formwork materials and support systems based on the project quality and safety requirements. Formwork materials include plywood, wood and steel pipes; material preparation in S1 requires checking the quality of materials to ensure that there are no decay, mildew and bubbling problems; measurement and layout in S1 requires marking the control lines and elevation lines for formwork installation based on the layout results.
[0038] Specifically, the formwork plan in S2 needs to take into account the reuse rate and construction efficiency of the formwork, and configure whole panels and large panels as much as possible; the formwork diagram in S2 needs to clearly specify the splicing method, reinforcement method and support method of the formwork. The formwork diagram includes the partition, numbering and size of the formwork; the node processing in S2 needs to ensure that the formwork at the node is tightly spliced to prevent leakage and deformation at the formwork joints.
[0039] Specifically, the template assembly in S3 includes the following specific steps:
[0040] A1. Control the joints between adjacent panels to ensure they are tight;
[0041] A2. Use clips or steel wire to securely tie the formwork and vertical steel pipes to maintain the integrity of the formwork.
[0042] Specifically, the template reinforcement in S3 includes the following specific steps:
[0043] B1. For beams with a large height, tension screws can be used for reinforcement to ensure the stability of the formwork;
[0044] B2. For beams with larger spans, the arching of the formwork must be considered to ensure the flatness of the top surface of the beam after pouring concrete.
[0045] Specifically, the template installation in S4 requires the use of a level ruler and a vertical ruler to check the verticality and horizontality of the template to ensure accurate installation of the template; the template adjustment in S4 requires ensuring that the template joints are tight, the lines are straight, and the dimensions are accurate.
[0046] Specifically, the formwork acceptance in S5 requires checking whether the verticality, horizontality and joint tightness indicators of the formwork meet the requirements; when pouring concrete for formwork protection in S5, the pouring speed and height must be controlled to avoid impact on the formwork.
[0047] Specifically, when removing the formwork in S6, you need to be careful to avoid damaging the concrete structure and the formwork itself; when maintaining the formwork in S6, you need to check the damage of the formwork and repair or replace the damaged part; when maintaining the formwork in S6, you need to store the formwork in a dry and ventilated place to avoid moisture and deformation.
[0048] The beneficial effects of the present invention are:
[0049] The method for matching formwork for beam structure can clearly grasp the use of each formwork by numbering and counting the formwork, reduce construction errors caused by formwork confusion, and improve the accuracy of formwork matching construction; by special treatment of the intersection nodes of beams and columns, walls and other structures, it can ensure that the formwork at the nodes is tightly spliced, and improve the stability of the overall structure; through the reasonable arrangement of the partition, numbering and installation sequence of the formwork, the construction process can be made more orderly, and unnecessary waiting and rework time can be reduced; through the stability and firmness of the formwork, the durability of the beam structure can be improved, and the workload of later maintenance and repair can be reduced; thereby achieving the advantage of enhancing structural stability and solving the problem that the stability between the formwork and the beam structure in the existing beam structure formwork matching method is poor, which is easy to affect the quality of the project.
[0050] Those skilled in the art will readily appreciate other embodiments of the present disclosure after considering the specification and practicing the invention disclosed herein. The present disclosure is intended to cover any variations, uses or adaptations of the present disclosure that follow the general principles of the present disclosure and include common knowledge or customary techniques in the art that are not disclosed in the present disclosure. The description and examples are to be considered exemplary only, and the true scope and spirit of the present disclosure are indicated by the following claims.
[0051] The above description is only a preferred embodiment of the present disclosure and is not intended to limit the present disclosure. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present disclosure shall be included in the scope of protection of the present disclosure.
Claims
1. A method for forming a formwork for a beam structure, characterized in that: The following steps are involved: S1. Preliminary preparation for formwork: The preliminary preparation for formwork includes understanding the project requirements, material preparation and measurement and layout; by carefully reading the construction drawings, understand the specific size, shape and position requirements of the beam structure; then prepare the required formwork materials according to the requirements of the drawings; then measure and lay out at the construction site to determine the exact position of the beam structure; S2. Formwork design: The formwork design includes formulating a formwork plan, drawing a formwork diagram, and considering node processing; formulating a detailed formwork plan based on the size and shape of the beam structure; and drawing a formwork diagram of the beam structure based on the formwork plan; and then, for the intersections between beams and columns, walls, and other structures, special consideration should be given to the splicing and reinforcement methods of the formwork; S3, template assembly and reinforcement: the template assembly and reinforcement includes template assembly and template reinforcement; according to the template matching plan, the template is assembled into a whole; and then according to the height and span of the beam structure, a suitable reinforcement method is selected; S4. Template installation and adjustment: The template installation and adjustment includes template installation and template adjustment; the assembled template is installed on the beam structure according to the layout position; and then the template is adjusted as necessary according to the inspection results; S5. Template acceptance and protection: The template acceptance and protection include template acceptance and template protection. After the template is installed, the acceptance work is carried out; Before pouring concrete, protect the formwork to prevent damage and contamination; S6. Formwork removal and maintenance: The formwork removal and maintenance include formwork removal and formwork maintenance. Formwork removal work can only be carried out after the concrete strength reaches the design requirements, and the removed formwork must be cleaned and maintained in time.
2. The method for arranging formwork for a beam structure according to claim 1, characterized in that: Understanding the project requirements in S1 requires selecting appropriate formwork materials and support systems based on the project quality and safety requirements. The formwork materials include plywood, wood and steel pipes; the material preparation in S1 requires checking the quality of the materials to ensure that there are no decay, mildew and bubbling problems; the measurement and layout in S1 requires marking the control lines and elevation lines for the formwork installation based on the layout results.
3. The method for arranging formwork for a beam structure according to claim 1, characterized in that: The formwork scheme in S2 needs to take into account the reuse rate and construction efficiency of the formwork, and configure whole panels and large panels as much as possible; the formwork diagram in S2 needs to clearly specify the splicing method, reinforcement method and support method of the formwork, and the formwork diagram includes the partition, numbering and size of the formwork; the node processing in S2 needs to ensure that the formwork at the node is tightly spliced to prevent leakage and deformation at the formwork joints.
4. The method for arranging formwork for a beam structure according to claim 1, characterized in that: The template assembly in S3 includes the following specific steps: A1. Control the joints between adjacent panels to ensure they are tight; A2. Use clips or steel wire to securely tie the formwork and vertical steel pipes to maintain the integrity of the formwork.
5. The method for arranging formwork for a beam structure according to claim 1, characterized in that: The template reinforcement in S3 includes the following specific steps: B1. For beams with a large height, tension screws can be used for reinforcement to ensure the stability of the formwork; B2. For beams with larger spans, the arching of the formwork must be considered to ensure the flatness of the top surface of the beam after pouring concrete.
6. The method for arranging formwork for a beam structure according to claim 1, characterized in that: The template installation in S4 needs to use a level ruler and a vertical ruler to check the verticality and horizontality of the template to ensure accurate installation of the template; the template adjustment in S4 needs to ensure that the template joints are tight, the lines are straight, and the dimensions are accurate.
7. The method for arranging formwork for a beam structure according to claim 1, characterized in that: The formwork acceptance in S5 needs to check whether the verticality, horizontality and joint tightness indicators of the formwork meet the requirements; when the formwork protection in S5 needs to pour concrete, the pouring speed and height should be controlled to avoid impact on the formwork.
8. The method for arranging formwork for a beam structure according to claim 1, characterized in that: When removing the formwork in S6, care must be taken to avoid damaging the concrete structure and the formwork itself; when maintaining the formwork in S6, the formwork must be checked for damage and the damaged portion must be repaired or replaced; when maintaining the formwork in S6, the formwork must be stored in a dry and ventilated place to avoid moisture and deformation.