Anti-leakage structure of bay window under aluminum formwork system and construction technology

By using adjusting support and overlapping structures in the aluminum mold system and combined with elastic cable-stayed components, the problems of low construction efficiency and leakage of prefabricated bay windows are solved, and efficient and stable connections are achieved.

CN118997463APending Publication Date: 2024-11-22上海泾东建筑发展有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411301700.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-18
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The construction efficiency of prefabricated bay windows under the existing aluminum mold system is low and it is prone to concrete leakage, resulting in unstable connections.

Method used

Adjustment support is used to connect prefabricated parts, and the prefabricated parts are synchronized with the building exterior wall through overlapping structure and elastic cable-stayed components to ensure that the concrete is not prone to leakage.

Benefits of technology

The construction efficiency of prefabricated bay windows is improved, the stability and sealing of connections are ensured, concrete leakage is avoided, and the connection strength between prefabricated parts and building exterior walls is enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997463A_ABST
    Figure CN118997463A_ABST
Patent Text Reader

Abstract

According to the aluminum formwork system lower bay window anti-seepage structure and the construction technology, two prefabricated parts are connected through an adjusting support and synchronously hoisted, so that the two prefabricated parts can be synchronously connected with a building outer wall, and the construction efficiency is improved; meanwhile, the outer wall connecting plate of the prefabricated part and the building outer wall are in direct lap joint through the lap joint structure, the cast-in-place baffles are arranged on the two sides of the lap joint structure, and the poured concrete is not prone to leakage; furthermore, an elastic cable-stayed assembly is arranged between the first aluminum formwork and the second aluminum formwork on the inner side of the bay window plate of the prefabricated part and the inner side of the outer wall connecting plate, and when concrete is cast in place between the outer wall connecting plate and the building outer wall, the prefabricated part extends and displaces outwards under the extrusion effect of the concrete; the elastic cable-stayed assembly exerts pressure on the first aluminum formwork and the second aluminum formwork, so that the prefabricated part does not displace to increase the gap between the outer wall connecting plate and the building outer wall, concrete leakage is not prone to occurring, and the connecting stability of the prefabricated bay window and the building outer wall is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building engineering, and in particular to a bay window anti-leakage structure and a construction process under an aluminum mold system. Background Art

[0002] In order to improve construction efficiency, in existing prefabricated concrete buildings, aluminum alloy formworks are usually used as formworks for concrete projects to cast and connect prefabricated components and building bodies. However, during the construction of the aluminum alloy formworks, there is often a gap between the corners of the aluminum formworks and the components, which can easily lead to leakage during the concrete pouring process, especially in the connection between the prefabricated bay window and the exterior wall of the building. When the prefabricated bay window and the exterior wall of the building are connected by cast-in-place concrete through an aluminum formwork, concrete leakage usually occurs at the connection between the prefabricated bay window and the exterior wall of the building, resulting in an unstable connection.

[0003] A Chinese patent with publication number CN 113417361 A discloses a prefabricated bay window and a connection method. The prefabricated bay window includes: two prefabricated components spaced apart from each other, with a bay window space formed between the two prefabricated components; the prefabricated components include a first prefabricated plate and a second prefabricated plate perpendicular to each other, the first prefabricated plate is used to be connected to a floor slab, and the second prefabricated plate is used to extend outward and enclose the bay window space; the first prefabricated plate includes a first embedded part and a second embedded part spaced apart from each other, the first embedded part has an extending part suitable for being inserted into the floor slab, and the second embedded part has a welding part suitable for being welded to a steel beam below the floor slab, and then the floor slab and the prefabricated components are cast together for connection.

[0004] However, the prefabricated bay windows constructed in the above scheme require the prefabricated components to be connected to the floor slab one by one, which has low construction efficiency and is prone to leakage when pouring concrete, resulting in low connection strength between the prefabricated components and the floor slab and unstable structure.

[0005] Therefore, how to effectively improve the construction efficiency of prefabricated bay windows, ensure that concrete leakage is not easy to occur under the aluminum formwork system, and improve the connection stability has become an urgent problem to be solved in this field. Summary of the invention

[0006] In view of the defects of the prior art, the purpose of the present invention is to provide an anti-leakage structure and construction process for bay windows under an aluminum formwork system with high construction efficiency, stable connection and low leakage.

[0007] In order to achieve the above-mentioned object, the present invention provides an anti-leakage structure for bay windows under an aluminum formwork system, comprising a prefabricated bay window and a building exterior wall, wherein the prefabricated bay window is composed of two prefabricated parts distributed at a distance, and the prefabricated parts include an exterior wall connecting plate and a bay window plate that are perpendicular to each other.

[0008] An adjustment support is detachably provided between the two prefabricated parts, and the adjustment support is configured to adjust the distance between the two prefabricated parts, and the two prefabricated parts can be hoisted synchronously through the adjustment support.

[0009] The outer wall connection plate of the prefabricated part is overlapped with the outer wall of the building through an overlap structure, and cast-in-place baffles are provided on both sides of the overlap structure.

[0010] The prefabricated parts and the exterior wall of the building are respectively provided with a bay window aluminum formwork assembly and an exterior wall aluminum formwork assembly, the bay window aluminum formwork assembly comprises a first aluminum formwork and a second aluminum formwork respectively arranged on the inner side of the bay window plate and the inner side of the exterior wall connecting plate, an elastic diagonal tension assembly is provided between the first aluminum formwork and the second aluminum formwork, so that the first aluminum formwork and the second aluminum formwork form an elastic connection fit.

[0011] Furthermore, the lap joint structure is composed of a lap joint platform arranged on the outer wall connecting plate of the prefabricated component and a support platform arranged on the outer wall of the building. Lapping steel bars extend from the lap joint platform, and the support platform is provided with supporting steel bars for connecting and cooperating with the lap steel bars.

[0012] Furthermore, the cast-in-place baffle is arranged on both sides of the bridging platform, and is configured so that when the prefabricated parts are bridgingly mounted on the supporting platform of the building exterior wall through the bridging platform, the cast-in-place baffle abuts against both sides of the supporting platform.

[0013] Furthermore, the outer wall connection plate of the prefabricated component is provided with grouting holes, and the grouting holes extend to the connection between the outer wall connection plate and the outer wall of the building.

[0014] Furthermore, the grouting holes are arranged in the overlapping platforms of the exterior wall connecting plates.

[0015] Furthermore, the exterior wall aluminum formwork assembly includes a third aluminum formwork and a fourth aluminum formwork respectively arranged on the outside of the exterior wall of the building and the outside of the bay window panel of the prefabricated component.

[0016] Furthermore, the second aluminum formwork and the third aluminum formwork are connected by wall tension bolts that pass through the exterior wall connecting plate and the exterior wall of the building.

[0017] Furthermore, the elastic inclined-stayed assembly is composed of a hydraulic telescopic rod and a cylinder control device.

[0018] In order to achieve the above-mentioned object, the construction process of the anti-leakage structure of the bay window under the aluminum mold system provided by the present invention adopts the anti-leakage structure of the bay window under the aluminum mold system, and the construction process comprises:

[0019] Embed the overlapping steel bars in the overlapping platforms of the two prefabricated parts respectively, install cast-in-place baffles on both sides of the overlapping platforms, and pre-set grouting holes on the outer wall connection plates of the prefabricated parts.

[0020] Prefabricate the support platform in the connection area where the building exterior wall matches the two prefabricated parts, and embed the supporting steel bars in the support platform.

[0021] The two prefabricated parts are connected respectively by adjusting the support, and the two prefabricated parts are hoisted synchronously. The distance between the two prefabricated parts is adjusted by adjusting the support to adapt to the distance between the two connection areas on the building's exterior wall, so that the two prefabricated parts can be connected to the building's exterior wall synchronously.

[0022] The lap joint on the prefabricated exterior wall connection plate is directly set up on the support platform of the building exterior wall, so that the lap joint steel bars are coordinated with the support steel bars, and the cast-in-place baffle plate abuts against both sides of the support platform.

[0023] The bay window aluminum formwork assembly and the exterior wall aluminum formwork assembly are respectively installed on the prefabricated parts and the exterior wall of the building, the second aluminum formwork and the third aluminum formwork are connected by wall tension bolts, and an elastic inclined tie rod is installed between the first aluminum formwork and the second aluminum formwork. The length of the hydraulic telescopic rod is controlled by the oil cylinder control device, so that the first aluminum formwork and the second aluminum formwork are elastically connected and matched with the bay window plate and the exterior wall connecting plate respectively.

[0024] Concrete is poured through the grouting holes on the exterior wall connection plates of the prefabricated parts to form a reinforced concrete connection structure between the prefabricated parts and the exterior wall of the building.

[0025] Remove the adjustment support and install the bay window glass between the two prefabricated parts.

[0026] The anti-seepage structure and construction process of the bay window under the aluminum formwork system provided by the present invention adopts an adjustable support to connect the two prefabricated parts, so as to synchronously hoist the two prefabricated parts, and adjust the spacing between the two prefabricated parts to adapt to the two connection areas of the building's exterior wall, so that the two prefabricated parts can be synchronously connected to the building's exterior wall, so that the prefabricated bay window can be hoisted and connected to form at one time, thereby improving the construction efficiency; at the same time, the exterior wall connection plate of the prefabricated parts is directly overlapped with the building's exterior wall through an overlap structure, so that the prefabricated parts can be directly erected on the building's exterior wall without setting up temporary supports, and cast-in-place baffles are arranged on both sides of the overlap structure, so that the exterior wall connection plate and the building's exterior wall are tightly connected by the cast-in-place baffles. Sealed, poured concrete is not prone to leakage; further, an elastic diagonal-stayed component is provided between the first aluminum formwork and the second aluminum formwork on the inner side of the bay window plate of the prefabricated component and the inner side of the exterior wall connecting plate, and is configured to be elastically connected and matched. When concrete is cast between the exterior wall connecting plate and the exterior wall of the building, the prefabricated component extends and displaces outward under the extrusion of the concrete. The elastic diagonal-stayed component applies pressure to the first aluminum formwork and the second aluminum formwork under the action of the elastic force, so that the prefabricated component maintains a stable connection with the exterior wall of the building, and does not displace to increase the gap between the exterior wall connecting plate and the exterior wall of the building, thereby not easily causing concrete leakage, thereby ensuring the connection stability of the prefabricated bay window and the exterior wall of the building. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments.

[0028] Figure 1 A schematic diagram of the anti-leakage structure of the bay window under the aluminum mold system provided by the present invention;

[0029] Figure 2 and Figure 3 It is a schematic diagram of the structure of the prefabricated part in the present invention;

[0030] Figure 4 It is a schematic diagram of the structure of the exterior wall of the building in the invention;

[0031] Figure 5 It is a schematic diagram of the matching structure of the bay window aluminum mold assembly and the exterior wall aluminum mold assembly in the present invention;

[0032] Figure 6 The present invention provides an anti-leakage structure for bay windows under an aluminum formwork system and a construction process flow chart.

[0033] Reference numerals:

[0034] 100. Prefabricated part; 101. First prefabricated part; 102. Second prefabricated part; 110. External wall connection plate; 111. Lap platform; 112. Lap steel bars; 113. Cast-in-place baffle; 114. Grouting hole; 120. Bay window plate; 121. First bay window plate; 122. Second bay window plate;

[0035] 200. Building exterior wall; 210. Support platform; 211. Support steel bars;

[0036] 300. Adjust support;

[0037] 400. Aluminum formwork assembly for bay window; 410. First aluminum formwork; 420. Second aluminum formwork; 430. Third aluminum formwork; 440. Fourth aluminum formwork; 450. Corner aluminum formwork; 460. Wall tension bolts;

[0038] 500. External wall aluminum formwork components;

[0039] 600. Elastic inclined-stayed assembly; 610. Hydraulic telescopic rod; 620. Cylinder control device. DETAILED DESCRIPTION

[0040] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below with reference to specific diagrams.

[0041] See also Figure 1, which shows an example of the anti-leakage structure of the bay window under the aluminum formwork system provided by the present invention. As can be seen from the figure, the anti-leakage structure of the bay window under the aluminum formwork system of this example mainly includes a prefabricated bay window and a building exterior wall 200. The prefabricated bay window is composed of two prefabricated parts 100 distributed at a distance. The prefabricated parts 100 include mutually perpendicular exterior wall connecting plates 110 and bay window plates 120.

[0042] An adjustment support 300 is detachably provided between the two prefabricated parts 100. The adjustment support 300 is configured to adjust the distance between the two prefabricated parts 100. The two prefabricated parts 100 can also be synchronously hoisted through the adjustment support 300 to make the two prefabricated parts 100 match the two connection areas of the building exterior wall 200. The two prefabricated parts 100 are synchronously connected, so that the prefabricated bay window can be hoisted and connected at one time, thereby improving construction efficiency.

[0043] At the same time, the outer wall connecting plate 110 of the prefabricated component 100 is overlapped with the outer wall 200 of the building through an overlap structure, and cast-in-place baffles 113 are provided on both sides of the overlap structure, so that the prefabricated component 100 is directly mounted on the outer wall 200 of the building and sealed by the cast-in-place baffles, and the poured concrete is not easy to leak.

[0044] Furthermore, the prefabricated component 100 and the building exterior wall 200 are respectively provided with a bay window aluminum formwork assembly 400 and an exterior wall aluminum formwork assembly 500. The bay window aluminum formwork assembly 400 includes a first aluminum formwork 410 and a second aluminum formwork 420 respectively arranged on the inner side of the bay window plate 120 and the inner side of the exterior wall connecting plate 110. An elastic diagonal-stayed component 600 is provided between the first aluminum formwork 410 and the second aluminum formwork 420, so that the first aluminum formwork 410 and the second aluminum formwork 420 form an elastic connection fit. Concrete is cast between the exterior wall connecting plate 110 and the building exterior wall 200. When the prefabricated component 100 extends and displaces outward under the extrusion of concrete, the elastic diagonal-stayed component 600 applies pressure to the first aluminum formwork 410 and the second aluminum formwork 420, so that the prefabricated component 100 will not be displaced to increase the gap between the exterior wall connecting plate 110 and the building exterior wall 200, and concrete leakage is not easy to occur, thereby ensuring the connection stability between the prefabricated bay window and the building exterior wall.

[0045] Among them, the bay window board 120 in the prefabricated component 100 is composed of a first bay window board 121 and a second bay window board 122 which are vertically connected to the two ends of the exterior wall connecting plate 110 at a distance, so that when the upper first prefabricated component 101 and the lower second prefabricated component 102 are synchronously connected to the two connecting areas of the building exterior wall 200, a distance is formed between the second bay window board 122 of the first prefabricated component 101 and the first bay window board 121 of the second prefabricated component 102, and they cooperate to form a prefabricated bay window, so that the prefabricated bay window can be formed by synchronously hoisting and connecting two prefabricated components 100.

[0046] Furthermore, the first bay window plate 121 of the first prefabricated component 101 can cooperate with the prefabricated component above, and the second bay window plate 122 of the second prefabricated component 102 can cooperate with the prefabricated component below, thereby forming a plurality of prefabricated bay windows, thereby improving the construction efficiency of the prefabricated bay windows.

[0047] In order to synchronously lift the two prefabricated parts 100, an adjustment support 300 is detachably provided between the two prefabricated parts 100. Preferably, the adjustment support 300 is composed of an adjustable and telescopic aluminum support rod, so that the distance between the two prefabricated parts 100 can be adjusted by adjusting the length of the adjustment support 300, so that the two prefabricated parts 100 respectively correspond to the two connecting areas of the building exterior wall 200, and are synchronously connected to the building exterior wall 200 to form a prefabricated bay window.

[0048] Furthermore, combined with Figures 2 to 4 A lap platform 111 is formed on one side of the outer wall connecting plate 110 of the prefabricated component 100 that cooperates with the outer wall 200 of the building. In coordination with this, a support platform 210 that matches the lap platform 111 is formed on one side of the outer wall 200 of the building that cooperates with the prefabricated component 100, so that the outer wall connecting plate 110 can be directly erected on the support platform 210 of the outer wall 200 of the building through the lap platform 111, so that the prefabricated component 100 can be directly hung on the outer wall 200 of the building without setting up temporary support, thereby improving construction efficiency.

[0049] As a preferred setting scheme, the lap platform 111 is composed of a boss formed on the mating surface of the exterior wall connecting plate 110 and the building exterior wall 200. Correspondingly, the support platform 210 is composed of a groove formed on the mating surface of the building exterior wall 200 and the prefabricated component 100, which is compatible with the lap platform 111, so that the lap platform 111 can be directly inserted into the support platform 210 and abut against the support platform 210 to form a sealed lap structure.

[0050] Furthermore, overlapping steel bars 112 are pre-embedded in the overlapping platform 111 of the exterior wall connecting plate 110 of the prefabricated component 100, and the overlapping steel bars 122 extend out of the overlapping platform 111. In coordination therewith, supporting steel bars 211 are pre-embedded in the supporting platform 210 of the building exterior wall 200, and the supporting steel bars 211 are built into the supporting platform 210, so that when the overlapping platform 111 can be directly erected in the supporting platform 210, the overlapping steel bars 112 and the supporting steel bars 211 form a coordinated distribution to improve the connection reliability between the prefabricated component 100 and the building exterior wall 200.

[0051] As a preferred arrangement, the lap steel bars 112 are configured to extend downward in a 7-shape, and the support steel bars 211 are configured to extend upward in an L-shape, so that the lap steel bars 112 can be lapped on the support steel bars 211, further maintaining the connection reliability between the prefabricated component 100 and the building exterior wall 200.

[0052] The prefabricated component 100 and the building exterior wall 200 thus constructed can cooperate with each other to achieve stable overlap after hoisting.

[0053] In order to connect the prefabricated component 100 and the building exterior wall 200 by cast-in-place concrete, a grouting hole 114 is provided on the exterior wall connecting plate 110 of the prefabricated component 100, and the grouting hole 114 extends to the connection between the exterior wall connecting plate 110 and the building exterior wall 200, so that cast-in-place concrete can be carried out on the prefabricated component 100 and the building exterior wall 200 through the grouting hole 114.

[0054] As a preferred setting scheme, the grouting hole 114 is set in the lap platform 111 of the exterior wall connecting plate 110, so that the cast-in-place concrete first enters the lap platform 111 and the support platform 210, connects the lap structure, and cooperates with the lap steel bars 112 and the support steel bars 211 to form a stable reinforced concrete connection structure, thereby stably connecting the prefabricated component 100 and the building exterior wall 200.

[0055] Combination Figure 2 and Figure 3 In order to prevent leakage during the cast-in-place process, cast-in-place baffles 113 are also provided on both sides of the overlapping platform 111 of the external wall connection plate 110. The cast-in-place baffles 113 extend along both sides of the overlapping platform 111, so that when the overlapping platform 111 is set in the support platform 210, the cast-in-place baffles 113 can abut and cooperate with both sides of the support platform 210, thereby sealing the overlapping structure formed by the overlapping platform 111 and the support platform 210, so that the cast-in-place concrete is not easy to leak from the overlapping joint.

[0056] Furthermore, combined with Figure 5 The prefabricated component 100 and the building exterior wall 200 are respectively provided with a bay window aluminum mold assembly 400 and an exterior wall aluminum mold assembly 500, so that the bay window aluminum mold assembly 400 and the exterior wall aluminum mold assembly 500 cooperate with the prefabricated component 100 and the building exterior wall 200 respectively to limit the cast-in-place area of ​​concrete and prevent concrete leakage.

[0057] Specifically, the bay window aluminum formwork assembly 400 includes a first aluminum formwork 410 and a second aluminum formwork 420 which are respectively arranged on the inner side of the bay window plate 120 of the prefabricated component 100 and the inner side of the exterior wall connecting plate 110, and a corner aluminum formwork 450 is provided between the first aluminum formwork 410 and the second aluminum formwork 420, so that the first aluminum formwork 410 and the second aluminum formwork 420 are vertically connected through the corner aluminum formwork 450, so that the bay window aluminum formwork assembly 400 can cooperate with the exterior wall aluminum formwork assembly 500 to seal the connection between the prefabricated component 100 and the exterior wall 200 of the building to prevent leakage of cast-in-place concrete.

[0058] In coordination therewith, the exterior wall aluminum formwork assembly 500 includes a third aluminum formwork 430 and a fourth aluminum formwork 440 which are respectively arranged on the outside of the building exterior wall 200 and the outside of the bay window panel 120 of the prefabricated component 100, and the fourth aluminum formwork 440 extends from the outside of the bay window panel 120 to the end of the connection area of ​​the building exterior wall 200, so that the third aluminum formwork 430 and the fourth aluminum formwork 440 cooperate to seal the connection gap between the prefabricated component 100 and the building exterior wall 200.

[0059] Furthermore, the second aluminum formwork 420 and the third aluminum formwork 430 are connected by wall tension bolts 460 that pass through the exterior wall connecting plate 110 and the building exterior wall 200, so that the second aluminum formwork 420 and the third aluminum formwork 430 are fixedly connected, so that the bay window aluminum formwork assembly 400 and the exterior wall aluminum formwork assembly 500 are connected and clamped to the exterior wall connecting plate 110 and the building exterior wall 200, and the connecting gap between the exterior wall connecting plate 110 and the building exterior wall 200 is sealed, so that the exterior wall connecting plate 110 and the building exterior wall 200 maintain a stably connected connection, and the cast-in-place concrete is not easy to leak from the connecting gap between the exterior wall connecting plate 110 and the building exterior wall 200.

[0060] When pouring concrete through the grouting holes 114 on the exterior wall connecting plate 110, the concrete will squeeze the prefabricated component 110 at the connecting gap between the exterior wall connecting plate 110 and the exterior wall 200 of the building, causing the prefabricated component 110 to extend and displace outward under the squeezing action of the concrete, resulting in an increase in the connecting gap between the exterior wall connecting plate 110 and the exterior wall 200 of the building, causing concrete leakage.

[0061] Therefore, an elastic diagonal-stayed assembly 600 is provided between the first aluminum formwork 410 and the second aluminum formwork 420, so that the first aluminum formwork 410 and the second aluminum formwork 420 form an elastic connection fit, which can offset the squeezing effect caused by pouring concrete, ensure the connection stability between the prefabricated component 100 and the building exterior wall 200, and prevent concrete from leaking easily.

[0062] Specifically, the elastic inclined-stayed assembly 600 is composed of a hydraulic telescopic rod 610 and a cylinder control device 620. One end of the hydraulic telescopic rod 610 is connected to the first aluminum template 410, and the other end is connected to the second aluminum template 420. The cylinder control device 620 is configured to control the pressure in the hydraulic telescopic rod 610, thereby controlling the extension and shortening of the hydraulic telescopic rod 610, applying pressure to the first aluminum template 410 and the second aluminum template 420, so that the first aluminum template 410 and the second aluminum template 420 respectively maintain contact with the exterior wall connecting plate 110 and the bay window plate 120.

[0063] As an example, when the prefabricated component 110 extends and displaces outward under the squeezing action of concrete, the second aluminum formwork 420 deflects outward accordingly. At this time, the second aluminum formwork 420 applies pressure to the hydraulic telescopic rod 610, causing the hydraulic telescopic rod 610 to be compressed. In order to control the pressure in the hydraulic telescopic rod 610 to remain unchanged, the cylinder control device 620 inputs high-pressure oil into the hydraulic telescopic rod 610, so that the cylinder control device 620 extends under the action of high pressure, applies pressure to the second aluminum formwork 420, and thus moves the second aluminum formwork 420 toward the exterior wall 200 of the building, thereby offsetting the squeezing action of the poured concrete, and allowing the second aluminum formwork 420 to maintain pressure against the exterior wall connecting plate 110, so that the prefabricated component 100 and the exterior wall 200 of the building are stably connected, and the concrete is not easy to leak.

[0064] The anti-leakage structure of the bay window under the aluminum formwork system thus formed can synchronously hoist and connect the two prefabricated parts 100, and directly overlap with the exterior wall of the building through the overlap structure, and maintain a stable connection during the cast-in-place concrete connection process, which is not easy to leak.

[0065] The present invention also provides a construction process for the anti-leakage structure of the bay window under the aluminum mold system, which adopts the anti-leakage structure of the bay window under the aluminum mold system composed of the above scheme, combined with Figure 6 , the construction process includes:

[0066] First, overlapping steel bars 112 are embedded in the overlapping platforms 111 of the two prefabricated parts 100, and cast-in-place baffles 113 are installed on both sides of the overlapping platforms 111. Grouting holes 114 are preset on the external wall connecting plate 110 so that the prefabricated parts 100 can be connected and matched with the building external wall 200. Figure 2 and Figure 3 shown.

[0067] At the same time, a support platform 210 is prefabricated in the connection area where the building exterior wall 200 cooperates with the two prefabricated parts 100, and a support steel bar 211 is pre-embedded in the support platform 210. Figure 4 As shown, the building exterior wall 200 can be connected to the prefabricated component 100 through the support platform 210 and the support steel bars 211.

[0068] The two prefabricated parts 100 are transported to the site, and the two prefabricated parts 100 are connected respectively by adjusting the supports 300, so that the two prefabricated parts 100 can be hoisted synchronously by adjusting the supports 300, and the distance between the two prefabricated parts 100 is adjusted by adjusting the supports 300 to adapt to the distance between the two connection areas on the building exterior wall 200, so that the two prefabricated parts 100 can be synchronously connected to the building exterior wall 200.

[0069] At that time, the lap platform 111 on the exterior wall connecting plate 110 of the prefabricated component 100 is directly erected on the support platform 210 of the building exterior wall 200, so that the lap steel bars 112 and the support steel bars 211 are coordinated and distributed, and the cast-in-place baffle plate 113 is abutted against both sides of the support platform 210, so that the cast-in-place baffle plate 113 seals the lap structure to prevent concrete leakage.

[0070] Next, the bay window aluminum formwork assembly 400 and the exterior wall aluminum formwork assembly 500 are respectively installed on the prefabricated component 100 and the building exterior wall 200, and the second aluminum formwork 420 and the third aluminum formwork 430 are connected by wall tension bolts 460, so that the bay window aluminum formwork assembly 400 and the exterior wall aluminum formwork assembly 500 are fixedly connected, the prefabricated component 100 and the building exterior wall 200 are clamped, and the connection gap between the prefabricated component 100 and the building exterior wall 200 is sealed.

[0071] Next, an elastic inclined rod 600 is installed between the first aluminum template 410 and the second aluminum template 420, so that the first aluminum template 420 and the second aluminum template 430 are configured to be elastically connected, and then the length of the hydraulic telescopic rod 610 is controlled by the cylinder control device 620, so that the first aluminum template 410 and the second aluminum template 420 are elastically connected and cooperated with the bay window plate 120 and the exterior wall connecting plate 110 respectively. The prefabricated part 100 will not be displaced under the squeezing action of the concrete, resulting in an increase in the connection gap, thereby ensuring that the concrete will not leak.

[0072] Furthermore, concrete is poured through the grouting holes 114 on the exterior wall connecting plate 110 of the prefabricated component 100, so that the concrete fills the connection gap between the prefabricated component 100 and the building exterior wall 200 and does not leak from the connection gap, so that a reinforced concrete connection structure is formed between the prefabricated component 100 and the building exterior wall 200 to ensure structural stability.

[0073] Finally, the adjustment support 300 is removed, and the bay window glass is installed between the two prefabricated parts 100 to form a prefabricated bay window.

[0074] In the same way, all prefabricated parts 100 are hoisted to complete the connection between all prefabricated bay windows and the building exterior wall 200.

[0075] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A bay window anti-leakage structure under an aluminum formwork system, comprising a prefabricated bay window and a building exterior wall, wherein the prefabricated bay window is composed of two prefabricated parts distributed at a distance, wherein the prefabricated parts include an exterior wall connecting plate and a bay window plate that are perpendicular to each other, and wherein: An adjustment support is detachably provided between the two prefabricated parts, and the adjustment support is configured to adjust the distance between the two prefabricated parts, and the two prefabricated parts can be hoisted synchronously through the adjustment support. The outer wall connection plate of the prefabricated part is overlapped with the outer wall of the building through an overlap structure, and cast-in-place baffles are provided on both sides of the overlap structure. The prefabricated parts and the exterior wall of the building are respectively provided with a bay window aluminum formwork assembly and an exterior wall aluminum formwork assembly, the bay window aluminum formwork assembly comprises a first aluminum formwork and a second aluminum formwork respectively arranged on the inner side of the bay window plate and the inner side of the exterior wall connecting plate, an elastic diagonal tension assembly is provided between the first aluminum formwork and the second aluminum formwork, so that the first aluminum formwork and the second aluminum formwork form an elastic connection fit.

2. The anti-leakage structure of the lower bay window of the aluminum formwork system according to claim 1, characterized in that: The lap joint structure is composed of a lap joint platform arranged on the outer wall connecting plate of the prefabricated component and a support platform arranged on the outer wall of the building. Lap joint steel bars extend from the lap joint platform, and the support platform is provided with support steel bars for connecting and cooperating with the lap joint steel bars.

3. The anti-leakage structure of the lower bay window of the aluminum formwork system according to claim 2, characterized in that: The cast-in-place baffle is arranged on both sides of the bridging platform, and is configured so that when the prefabricated parts are bridgingly mounted on the supporting platform of the building exterior wall through the bridging platform, the cast-in-place baffle abuts against both sides of the supporting platform.

4. The anti-leakage structure of the lower bay window of the aluminum formwork system according to claim 3, characterized in that: The outer wall connection plate of the prefabricated component is provided with grouting holes, and the grouting holes extend to the connection between the outer wall connection plate and the outer wall of the building.

5. The anti-leakage structure of the lower bay window of the aluminum formwork system according to claim 4, characterized in that: The grouting holes are arranged in the overlapping platforms of the external wall connecting plates.

6. The anti-leakage structure of the lower bay window of the aluminum formwork system according to claim 1, characterized in that: The exterior wall aluminum formwork assembly comprises a third aluminum formwork and a fourth aluminum formwork which are respectively arranged on the outside of the exterior wall of the building and the outside of the bay window plate of the prefabricated component.

7. The anti-leakage structure of the lower bay window of the aluminum formwork system according to claim 6, characterized in that: The second aluminum formwork and the third aluminum formwork are connected by wall tension bolts passing through the exterior wall connecting plate and the exterior wall of the building.

8. The anti-leakage structure of the lower bay window of the aluminum formwork system according to claim 1, characterized in that: The elastic inclined-stayed assembly is composed of a hydraulic telescopic rod and a cylinder control device.

9. An anti-leakage structure and construction process of a bay window under an aluminum formwork system, characterized in that: The anti-leakage structure of the bay window under the aluminum formwork system according to any one of claims 1 to 8 is adopted, and the construction process includes: Embed the overlapping steel bars in the overlapping platforms of the two prefabricated parts respectively, install cast-in-place baffles on both sides of the overlapping platforms, and preset grouting holes on the outer wall connection plates of the prefabricated parts. Prefabricate the support platform in the connection area where the building exterior wall matches the two prefabricated parts, and embed the supporting steel bars in the support platform. The two prefabricated parts are connected respectively by adjusting the support, and the two prefabricated parts are hoisted synchronously. The distance between the two prefabricated parts is adjusted by adjusting the support to adapt to the distance between the two connection areas on the building's exterior wall, so that the two prefabricated parts can be connected to the building's exterior wall synchronously. The lap joint on the prefabricated exterior wall connection plate is directly set up on the supporting platform of the building exterior wall, so that the lap joint steel bars are distributed in coordination with the supporting steel bars, and the cast-in-place baffle plate abuts against both sides of the supporting platform. The bay window aluminum formwork assembly and the exterior wall aluminum formwork assembly are respectively installed on the prefabricated parts and the exterior wall of the building, the second aluminum formwork and the third aluminum formwork are connected by wall tension bolts, and an elastic inclined tie rod is installed between the first aluminum formwork and the second aluminum formwork. The length of the hydraulic telescopic rod is controlled by the oil cylinder control device, so that the first aluminum formwork and the second aluminum formwork are elastically connected and matched with the bay window plate and the exterior wall connecting plate respectively. Concrete is poured through the grouting holes on the exterior wall connection plates of the prefabricated parts to form a reinforced concrete connection structure between the prefabricated parts and the exterior wall of the building. Remove the adjustment support and install the bay window glass between the two prefabricated parts.