Method and device for measuring non-excavation while-drilling track coordinates

Through real-time measurement and calculation of non-excavation drilling equipment, combined with Beidou satellite navigation and sensor data, the pipeline drilling trajectory is constructed, which solves the problem of measurement only after construction is completed in the existing technology, improves construction efficiency and accuracy, and reduces the Workload.

CN118997735APending Publication Date: 2024-11-22CHINA UNIV OF GEOSCIENCES (BEIJING)
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411221922.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-02
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

During the construction of non-excavation pipelines, the existing technology needs to wait until the construction is completed before the pipeline trajectory measurement is carried out, which increases the project workload and cost, and the measurement accuracy is difficult to ensure.

Method used

Using non-excavation drilling equipment to measure and record the coordinates and sensor data of the intermediate point in real time, use the combination of Beidou satellite navigation equipment and sensor data to calculate and integrate absolute coordinates in real time, build pipeline drilling trajectory, reduce subsequent measurement workload, and improve construction Efficiency and precision.

Benefits of technology

It realizes instant acquisition of the pipe drilling trajectory information during the construction process, significantly improves construction efficiency, reduces the subsequent measurement workload, and ensures high accuracy and construction safety of the measurement results.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997735A_ABST
    Figure CN118997735A_ABST
Patent Text Reader

Abstract

The invention discloses a non-excavation while-drilling track coordinate measuring method and device, and relates to the technical field of while-drilling measurement. The method comprises the following steps: receiving a target request; determining a first coordinate corresponding to the starting point of the target device; acquiring a second coordinate and sensor data corresponding to the first intermediate point; combining the second coordinate with the sensor data to obtain an absolute coordinate corresponding to the first intermediate point; the absolute coordinates of the multiple first middle points are integrated, a first pipeline drilling track is obtained, and one first middle point corresponds to one absolute coordinate; and the first pipeline drilling track is sent to an upper computer, so that the upper computer displays the first pipeline drilling track. According to the technical scheme, the method that measurement is carried out after completion is omitted, and the workload of non-excavation work measurement is greatly reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of measurement while drilling, and in particular to a method and device for measuring coordinates of a trenchless while drilling trajectory. Background Art

[0002] With the accelerated advancement of urbanization, water supply, gas supply, heating and other pipeline systems are the core components of urban infrastructure, and their stable operation is directly related to the quality of life of urban residents. In the field of pipeline construction, although the traditional excavation method has advantages in shallow burial and simple geological conditions, in the face of modern cities' high requirements for environmental protection, smooth traffic and cost control, trenchless technology, especially horizontal directional drilling technology, has become an indispensable alternative.

[0003] Trenchless technology minimizes surface disturbance and uses equipment such as horizontal directional drilling rigs to accurately lay or replace pipelines underground. It not only significantly reduces the impact of construction on the surrounding environment, but also improves construction efficiency and reduces cost expenditures, which is in line with the low-carbon, environmentally friendly and efficient construction concept of modern cities. In the actual trenchless pipeline construction process, in order to ensure the accuracy of pipeline laying and avoid conflicts with existing underground facilities (such as gas pipelines, water supply pipelines, communication cables, etc.), it is crucial to accurately measure the spatial position of underground pipelines. By collecting pipeline direction data, a detailed pipeline trajectory is constructed, and the pipeline trajectory provides construction guidance for subsequent new pipeline projects. However, the current measurement of pipeline trajectory curves mostly relies on the use of in-pipe robots and other equipment after the completion of the pipeline project, but the trajectory measurement work is carried out after the pipeline construction is completed, which increases the overall workload of trenchless projects.

[0004] Therefore, there is an urgent need for a trenchless drilling trajectory coordinate measurement method and device that can solve the above-mentioned technical problems. Summary of the invention

[0005] The present application provides a method and device for measuring the coordinates of a trenchless drilling trajectory. During the pipeline construction process, the method uses trenchless drilling equipment to measure and record the coordinates and sensor data of each intermediate point in real time, and then calculates the absolute coordinates of each intermediate point based on the coordinates and sensor data. The absolute coordinates of multiple intermediate points are then integrated to obtain the pipeline drilling trajectory, eliminating the need to measure after completion, thereby greatly reducing the workload of trenchless work measurement.

[0006] In a first aspect, the present application provides a method for measuring the coordinates of a trenchless drilling trajectory, which is applied to a measurement platform, and the method includes: receiving a target request, the target request is a measurement request for using a target device to perform pipeline construction, and the target device is a trenchless drilling device; determining that the target device is at a first coordinate corresponding to a starting point, and the starting point is an initial position of the target device; obtaining a second coordinate and sensor data corresponding to a first intermediate point, and the first intermediate point is any point other than the starting point; combining the second coordinate with the sensor data to obtain an absolute coordinate corresponding to the first intermediate point; integrating the absolute coordinates of multiple first intermediate points to obtain a first pipeline drilling trajectory, and one first intermediate point corresponds to one absolute coordinate; sending the first pipeline drilling trajectory to an upper computer so that the upper computer can display the first pipeline drilling trajectory.

[0007] By adopting the above technical solution, the first coordinate corresponding to the starting point of the target device is obtained. During the pipeline construction process, the second coordinate and sensor data of the first intermediate point are measured in real time by using the target device, allowing the trajectory information of the pipeline along the drilling to be obtained immediately during the pipeline construction process, rather than waiting until completion. The measured second coordinate and sensor data are combined to wait for the absolute coordinate of the first intermediate point, and then the absolute coordinates of multiple first intermediate points are integrated to form the first pipeline drilling trajectory. Real-time measurement and construction of the first pipeline drilling trajectory significantly improves construction efficiency, avoids the practice of measuring after completion, and greatly reduces the workload of subsequent inspection and measurement.

[0008] Optionally, the second coordinate is combined with the sensor data, specifically including: obtaining the second coordinate corresponding to the target device at the first intermediate point, the second coordinate is the coordinate collected by using the Beidou satellite navigation device; obtaining the sensor data corresponding to the first intermediate point, the sensor data is the data measured when the target device drills into the formation; the sensor data includes formation depth data, azimuth data and vertex data; calculating the second coordinate and the sensor data to obtain the absolute coordinate corresponding to the first intermediate point.

[0009] By adopting the above technical solution, the second coordinate is adopted by Beidou satellite navigation equipment to ensure the high accuracy of the measurement results. The depth, azimuth and top angle of the formation are measured in real time by the sensor on the drilling equipment. The second coordinate is then calculated with the sensor data to accurately calculate the absolute coordinates of each first intermediate point. Based on the real-time collection and calculation of drilling trajectory data, the precise measurement of the drilling trajectory during the trenchless construction of the pipeline is realized, thereby improving the safety of construction.

[0010] Optionally, before integrating the absolute coordinates of multiple first intermediate points, the method also includes: obtaining timestamps corresponding to multiple first intermediate points, one first intermediate point corresponding to one timestamp; sorting the multiple timestamps in chronological order to obtain a target sorting result; obtaining the second intermediate point corresponding to the target timestamp, and setting the second intermediate point as the end point, the target timestamp is the timestamp corresponding to the last position in the target sorting result, and the end point is the calculated position where the target device ends work.

[0011] By adopting the above technical solution, the timestamps corresponding to multiple first intermediate points are obtained, and they are sorted in chronological order to obtain the target sorting result. The occurrence time of each intermediate point in the entire construction process can be accurately recorded, and the timestamp corresponding to the last position in the target sorting result is determined as the target timestamp, and the second intermediate point corresponding to the target timestamp is set as the end point, thereby accurately determining the position where the trenchless drilling equipment ends its work, providing data support for the construction of the first pipeline drilling trajectory.

[0012] Optionally, after obtaining the second intermediate point corresponding to the target timestamp and setting the second intermediate point as the end point, the method also includes: obtaining the third coordinate corresponding to the end point; determining whether the third coordinate is consistent with the preset coordinate, the preset coordinate is the position corresponding to the actual end of the work of the target device; when the third coordinate is consistent with the preset coordinate, confirming the adjustment of the first pipeline drilling trajectory to obtain the second pipeline drilling trajectory.

[0013] By adopting the above technical solution, the third coordinate corresponding to the end point is obtained, and the third coordinate is compared with the preset coordinate to verify whether the actual construction end position is consistent with the calculated position. When the first coordinate is consistent with the preset coordinate, it is confirmed that the first pipeline drilling trajectory is adjusted to generate a second pipeline drilling trajectory. By adjusting the first pipeline drilling trajectory, the second pipeline drilling trajectory is provided as a construction guide for subsequent construction.

[0014] Optionally, determining whether the third coordinate is consistent with the preset coordinate specifically includes: calculating the third coordinate and the preset coordinate to obtain the target distance; determining whether the target distance is less than or equal to the preset distance; when the target distance is less than or equal to the preset distance, confirming that a correction operation is performed on the first pipeline drilling trajectory to obtain the second pipeline drilling trajectory, and the correction operation includes a scaling operation and a stretching operation.

[0015] By adopting the above technical solution, the third coordinate and the preset coordinate are calculated to obtain the target distance. By comparing the target distance with the preset distance, the degree of deviation between the actual construction end position and the calculated construction end point can be quantitatively evaluated. When the target distance is less than or equal to the preset distance, the first pipeline drilling trajectory is adjusted through correction operation, which can further improve the construction accuracy and ensure the accuracy of the pipeline drilling trajectory.

[0016] Optionally, after determining whether the target distance is less than or equal to the preset distance, the method further includes: when the target distance is greater than the preset distance, confirming that the first pipeline drilling trajectory is in an abnormal state, and re-measurement is required according to the abnormal state.

[0017] By adopting the above technical solution, when the target distance is greater than the preset distance, abnormal conditions in the construction process can be quickly identified. After determining that the first pipeline drilling trajectory is in an abnormal state, re-measurement can be performed to ensure the accuracy of subsequent construction and ensure that the obtained pipeline drilling trajectory matches the actual one.

[0018] Optionally, the absolute coordinates of multiple first intermediate points are integrated to obtain the first pipeline drilling trajectory, specifically including: determining the third intermediate point according to the target sorting result; judging whether the third intermediate point is a preset intermediate point, the preset intermediate point being the intermediate point corresponding to the first position in the target sorting result; if the third intermediate point is the preset intermediate point, constructing a first sub-trajectory according to the starting point and the first relative relationship, the first relative relationship being the corresponding relationship between the absolute coordinates of the third intermediate point and the starting point; if the third intermediate point is not the preset intermediate point, constructing a second sub-trajectory according to the third intermediate point and the second relative relationship, the second relative relationship being the corresponding relationship between the absolute coordinates of the third intermediate point and the fourth intermediate point, the fourth intermediate point being the intermediate point before the third intermediate point in the target sorting result; integrating the first sub-trajectory and multiple second sub-trajectories to obtain the first pipeline drilling trajectory.

[0019] By adopting the above technical solution, the third middle point is obtained from the target sorting result, and it is determined whether the third middle point is a preset middle point. When the third middle point is a preset middle point, a first sub-trajectory is constructed according to the starting point and the third middle point. When the third middle point is not a preset middle point, a second sub-trajectory is constructed according to the third middle point and the fourth middle point. The first sub-trajectory and multiple second sub-trajectories are constructed in segments and integrated into a first pipeline drilling trajectory. The constructed first pipeline trajectory not only provides guidance for the current construction, but also provides a reference for the construction of subsequent similar projects.

[0020] In a second aspect of the present application, a device for measuring coordinates of a trenchless drilling trajectory is provided, the device being a measuring platform, the measuring platform comprising an acquisition unit, a processing unit and a sending unit; the acquisition unit receives a target request, the target request is a measurement request for using a target device for pipeline construction, the target device being a trenchless drilling device; acquires a second coordinate and sensor data corresponding to a first intermediate point, the first intermediate point being any point other than a starting point; the processing unit determines that the target device is at a first coordinate corresponding to the starting point, the starting point being the initial working position of the target device; combines the second coordinate with the sensor data to obtain an absolute coordinate corresponding to the first intermediate point; integrates the absolute coordinates of a plurality of first intermediate points to obtain a first pipeline drilling trajectory, one first intermediate point corresponding to one absolute coordinate; the sending unit sends the first pipeline drilling trajectory to a host computer so that the host computer can display the first pipeline drilling trajectory.

[0021] Optionally, the acquisition unit is used to acquire the second coordinate corresponding to the target device at the first intermediate point, the second coordinate being the coordinate collected using the Beidou satellite navigation device; the acquisition unit is used to acquire sensor data corresponding to the first intermediate point, the sensor data being the data measured when the target device drills into the formation; the sensor data includes formation depth data, azimuth data, and vertex data; the processing unit is used to calculate the second coordinate and the sensor data to obtain the absolute coordinate corresponding to the first intermediate point.

[0022] Optionally, the acquisition unit is used to obtain timestamps corresponding to multiple first intermediate points, one first intermediate point corresponds to one timestamp; the processing unit is used to sort the multiple timestamps in chronological order to obtain a target sorting result; the acquisition unit is used to obtain the second intermediate point corresponding to the target timestamp, and set the second intermediate point as the end point, the target timestamp is the timestamp corresponding to the last position in the target sorting result, and the end point is the calculated position where the target device ends work.

[0023] Optionally, the acquisition unit is used to obtain the third coordinate corresponding to the end point; the processing unit is used to determine whether the third coordinate is consistent with the preset coordinate, and the preset coordinate is the position corresponding to the actual end of the work of the target device; when the third coordinate is consistent with the preset coordinate, it is confirmed that the first pipeline drilling trajectory is adjusted to obtain the second pipeline drilling trajectory.

[0024] Optionally, the processing unit is used to calculate the third coordinate and the preset coordinate to obtain the target distance; determine whether the target distance is less than or equal to the preset distance; when the target distance is less than or equal to the preset distance, confirm that a correction operation is performed on the first pipeline drilling trajectory to obtain a second pipeline drilling trajectory, and the correction operation includes a scaling operation and a stretching operation.

[0025] Optionally, the processing unit is used to confirm that the first pipeline drilling trajectory is in an abnormal state when the target distance is greater than a preset distance, and re-measurement is required according to the abnormal state.

[0026] Optionally, the processing unit is used to determine the third midpoint according to the target sorting result; determine whether the third midpoint is a preset midpoint, the preset midpoint is the midpoint corresponding to the first position in the target sorting result; if the third midpoint is the preset midpoint, construct a first sub-trajectory according to the starting point and the first relative relationship, the first relative relationship is the correspondence between the absolute coordinates of the third midpoint and the starting point; if the third midpoint is not the preset midpoint, construct a second sub-trajectory according to the third midpoint and the second relative relationship, the second relative relationship is the correspondence between the absolute coordinates of the third midpoint and the fourth midpoint, the fourth midpoint is the midpoint before the third midpoint in the target sorting result; integrate the first sub-trajectory and multiple second sub-trajectories to obtain a first pipeline drilling trajectory.

[0027] In a third aspect of the present application, an electronic device is provided, which includes a processor, a memory, a user interface and a network interface, the memory is used to store instructions, the user interface and the network interface are used to communicate with other devices, and the processor is used to execute the instructions stored in the memory, so that an electronic device executes any one of the methods described above in the present application.

[0028] In a fourth aspect of the present application, a computer-readable storage medium is provided, wherein the computer-readable storage medium stores instructions, and when the instructions are executed, any one of the above methods of the present application is executed.

[0029] In summary, one or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages: 1. Obtain the first coordinate corresponding to the starting point of the target device. During the pipeline construction process, use the target device to measure the second coordinate and sensor data of the first intermediate point in real time, allowing the trajectory information of the pipeline along the drilling to be obtained immediately during the pipeline construction process, rather than waiting until completion. The measured second coordinate and sensor data are combined to wait for the absolute coordinate of the first intermediate point, and then the absolute coordinates of multiple first intermediate points are integrated to form the first pipeline drilling trajectory. Real-time measurement and construction of the first pipeline drilling trajectory significantly improves construction efficiency, avoids the practice of measuring after completion, and greatly reduces the workload of subsequent inspection and measurement.

[0030] 2. Use the second coordinates of Beidou satellite navigation equipment to ensure high accuracy of measurement results. Then use the sensors on the drilling equipment to measure the depth, azimuth, vertex and other data in real time. Then calculate the second coordinates with the sensor data to accurately calculate the absolute coordinates of each first intermediate point. Based on the real-time collection and calculation of drilling trajectory data, accurate measurement of the drilling trajectory during the trenchless construction of the pipeline is achieved, thereby improving the safety of construction.

[0031] 3. Obtain the third middle point from the target sorting result, and determine whether the third middle point is a preset middle point. When the third middle point is a preset middle point, construct the first sub-trajectory according to the starting point and the third middle point. When the third middle point is not a preset middle point, construct the second sub-trajectory according to the third middle point and the fourth middle point. The first sub-trajectory and multiple second sub-trajectories are constructed in segments and integrated into the first pipeline drilling trajectory. The constructed first pipeline trajectory not only provides guidance for the current construction, but also provides a reference for the construction of subsequent similar projects. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 It is a flow chart of a method for measuring coordinates of a trenchless while-drilling trajectory provided in an embodiment of the present application; Figure 2 It is a scene schematic diagram of a method for measuring coordinates of a trenchless while-drilling trajectory provided in an embodiment of the present application; Figure 3 It is a structural schematic diagram of a trenchless drilling trajectory coordinate measuring device provided in an embodiment of the present application; Figure 4 It is a structural schematic diagram of an electronic device disclosed in an embodiment of the present application.

[0033] Explanation of the reference numerals: 301, acquisition unit; 302, processing unit; 303, sending unit; 400, electronic device; 401, processor; 402, communication bus; 403, user interface; 404, network interface; 405, memory. DETAILED DESCRIPTION

[0034] In order to enable technicians in this field to better understand the technical solutions in this specification, the technical solutions in the embodiments of this specification will be clearly and completely described below in conjunction with the drawings in the embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this application, not all of the embodiments.

[0035] In the description of the embodiments of the present application, words such as "for example" or "for example" are used to indicate examples, illustrations or explanations. Any embodiment or design described as "for example" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "for example" or "for example" is intended to present related concepts in a specific way.

[0036] In the description of the embodiments of the present application, the meaning of the term "multiple" refers to two or more. For example, multiple systems refer to two or more systems, and multiple screen terminals refer to two or more screen terminals. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the indicated technical features. Thus, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. The terms "include", "comprise", "have" and their variations all mean "including but not limited to", unless otherwise specifically emphasized.

[0037] With the accelerated advancement of urbanization, water supply, gas supply, heating and other pipeline systems are the core components of urban infrastructure, and their stable operation is directly related to the quality of life of urban residents. In the field of pipeline construction, although the traditional excavation method has advantages in shallow burial and simple geological conditions, in the face of modern cities' high requirements for environmental protection, smooth traffic and cost control, trenchless technology, especially horizontal directional drilling technology, has become an indispensable alternative.

[0038] Trenchless technology minimizes surface disturbance and uses equipment such as horizontal directional drilling rigs to accurately lay or replace pipelines underground. It not only significantly reduces the impact of construction on the surrounding environment, but also improves construction efficiency and reduces cost expenditures, which is in line with the low-carbon, environmentally friendly and efficient construction concept of modern cities. In the actual trenchless pipeline construction process, in order to ensure the accuracy of pipeline laying and avoid conflicts with existing underground facilities (such as gas pipelines, water supply pipelines, communication cables, etc.), it is crucial to accurately measure the spatial position of underground pipelines. By collecting pipeline direction data, a detailed pipeline trajectory is constructed, and the pipeline trajectory provides construction guidance for subsequent new pipeline projects. However, the current measurement of pipeline trajectory curves mostly relies on the use of in-pipe robots and other equipment after the completion of the pipeline project, but the trajectory measurement work is carried out after the pipeline construction is completed, which increases the overall workload of trenchless projects.

[0039] Therefore, how to change the current pipeline trajectory curve measurement work and reduce the overall workload of trenchless engineering is an urgent problem to be solved. A trenchless drilling trajectory coordinate measurement method provided in the embodiment of the present application is applied to a measurement platform. The measurement platform of the present application can provide a platform for drilling measurement services for pipeline construction projects. Figure 1 is a flow chart of a method for measuring coordinates of a trenchless drilling trajectory provided by an embodiment of the present application, with reference to Figure 1 The method includes the following steps S101-S106.

[0040] S101: receiving a target request, where the target request is a measurement request for pipeline construction using a target device, and the target device is a trenchless drilling device.

[0041] In the above S101, after the user controls the target device to arrive at the area to be constructed, the area to be constructed is the area for pipeline construction. The user refers to the construction personnel who control the target device, and the target device refers to the trenchless drilling equipment, that is, the trenchless drilling rig. The user can send a target request to the measurement platform through the user device, and the target request clearly specifies the measurement task of using the trenchless drilling equipment for pipeline construction. The measurement platform receives the target request sent by the user through the user device. The user device sends the target request to the measurement platform through the network interface.

[0042] S102: Determine that the target device is at a first coordinate corresponding to a starting point, where the starting point is an initial working position of the target device.

[0043] In the above S102, it is confirmed that the trenchless drilling equipment has been accurately placed at the predetermined starting working position, and its current position is recorded as the starting point, and the starting position is collected through Beidou satellite navigation to obtain the first coordinate. At this time, the first coordinate is the position coordinate of the trenchless drilling equipment starting to work, and the first coordinate is the Beidou three-dimensional coordinate. In addition to using Beidou satellite navigation to obtain the first coordinate, a GPS module, a laser rangefinder, a gyroscope or an integrated positioning system can also be used to obtain the precise position of the equipment, and the obtained position information is converted into a coordinate value in a geographic coordinate system (such as WGS-84). The first coordinate corresponding to the starting point is then stored for subsequent reference and calculation. In this application, the drilling process of the target device is: the trenchless drilling rig uses a drill bit to drill a hole at a point on the ground, and a point on the ground can be defined as the starting point. After the hole is completed, the drill bit is used to continue drilling the stratum. The drilling measurement short section has a sensor to monitor the drilling posture of the drill bit in real time. Every time a certain distance is drilled, a drill rod will be driven into it to ensure that the drilling can continue. After the drill bit exits the exit point, the exit point can be defined as the end point.

[0044] S103: Acquire the second coordinates and sensor data corresponding to the first intermediate point, where the first intermediate point is any point except the starting point.

[0045] In the above S103, when the target device starts to move and drill, the coordinates and sensor data of the target device at different positions (i.e., the first intermediate point) are continuously obtained. The sensor data may include readings of a depth sensor, a tilt sensor, a direction sensor (such as a magnetometer), etc. These data are collected in real time and integrated to obtain sensor data. The second coordinate is collected using a Beidou satellite navigation device.

[0046] S104: Combine the second coordinate with the sensor data to obtain the absolute coordinate corresponding to the first middle point.

[0047] In the above S104, the second coordinate is combined with the sensor data to obtain the absolute coordinate corresponding to the first intermediate point, specifically including: obtaining the second coordinate corresponding to the first intermediate point of the target device, the second coordinate is the coordinate collected by using the Beidou satellite navigation device; obtaining the sensor data corresponding to the first intermediate point, the sensor data is the data measured by the target device drilling into the stratum; the sensor data includes stratum depth data, azimuth data and vertex data; calculating the second coordinate and the sensor data to obtain the absolute coordinate corresponding to the first intermediate point. Specifically, the Beidou satellite navigation device built into the target device is used to track and collect the coordinates of each intermediate point passed by the trenchless drilling device during the drilling process in real time, which is referred to as the second coordinate. During the collection process, it is necessary to ensure that the Beidou satellite navigation device has been correctly installed on the trenchless drilling device and is in good working condition. During the drilling process of the target device, the Beidou satellite navigation device will continue to receive satellite signals and calculate the longitude and latitude coordinates of the current position of the device (i.e., the second coordinate). The Beidou satellite navigation system supports high-precision positioning and can provide centimeter-level or even millimeter-level positioning accuracy, which is crucial for pipeline construction. While obtaining the second coordinate, it is also necessary to collect the data measured by the sensors on the drilling equipment, which reflects the status and environmental information of the equipment during the drilling process. Sensor data includes formation depth data, azimuth data and vertex data. These data are usually provided by depth sensors, gyroscopes (or magnetometers for azimuth measurement) and inclination sensors installed on the equipment. The depth sensor is used to measure the vertical distance from the ground to the current position of the drill bit, that is, the formation depth. The gyroscope or magnetometer is used to measure the direction of the drill bit, that is, the azimuth. The magnetometer determines the direction by sensing the earth's magnetic field, while the gyroscope measures the angular velocity to infer the change in direction. The inclination sensor is used to measure the angle between the drill bit and the horizontal plane, that is, the vertex angle. This angle is very important for determining the specific position of the drill bit in the underground space. By calculating the second coordinate and the sensor data, the absolute coordinates of the drill bit at the first intermediate point in the underground space can be obtained. The absolute coordinates can be calculated by the following formula. If the first intermediate point is the Nth point, the second coordinates are obtained. The second coordinates can be represented by (Xn, Yn, Zn). Then the sensor data corresponding to the first intermediate point is obtained. The absolute coordinates are obtained by calculating the second coordinates and the sensor data. If the absolute coordinates are represented by (Xn+1, Yn+1, Zn+1); the absolute coordinates corresponding to the first intermediate point can be calculated by calculating the following formula: L=Ln+1-Ln, where Ln and Ln+1 represent the oblique depth, H=Hn+1-Hn, where Hn and Hn+1 represent the vertical depth, B=(Bn+Bn+1) / 2, where Bn and Bn+1 represent the vertex angle, and A=(An+An+1) / 2, where An and An+1 represent the azimuth angle. The spatial position of each first intermediate point can be calculated based on the above target segment.Since there are two ways to express depth, oblique depth and vertical depth, there are also two corresponding trajectory calculation methods. When oblique depth L is used, the recursive formula for the three-dimensional coordinates of the spatial measurement point is: ; ; ; If the vertical depth H is used, the coordinate recursion formula of the spatial measuring point is: ; ; In the above formula, L and H represent depth data, B represents vertex data, A represents azimuth data, and Xn, Yn, and Zn represent second coordinates. Based on the above formula, the three-dimensional absolute coordinates of the drill bit at the first intermediate point in the underground space can be calculated.

[0048] S105: Integrate the absolute coordinates of the multiple first intermediate points to obtain a first pipeline drilling trajectory, where one first intermediate point corresponds to one absolute coordinate.

[0049] In the above S105, after the absolute coordinates corresponding to the first intermediate point are obtained based on the above formula, multiple first intermediate points will be obtained when the drill is working. The absolute coordinates of all calculated first intermediate points can be integrated in sequence to form a continuous pipeline drilling trajectory.

[0050] In addition, after the absolute coordinates of multiple first intermediate points are integrated in chronological order to obtain the first pipeline drilling trajectory, the first pipeline drilling trajectory needs to be verified to ensure that the calculated first pipeline drilling trajectory matches the actual drilling trajectory. The accuracy of the first pipeline drilling trajectory can be determined by comparing the end point coordinates in the first pipeline drilling trajectory with the actual end point coordinates. Before the comparison, it is necessary to determine whether the target device is at the end point, which specifically includes: obtaining the timestamps corresponding to multiple first intermediate points, one first intermediate point corresponds to one timestamp; sorting the multiple timestamps in chronological order to obtain the target sorting result; obtaining the second intermediate point corresponding to the target timestamp, and setting the second intermediate point as the end point, the target timestamp is the timestamp corresponding to the last position in the target sorting result, and the end point is the calculated position where the target device ends work. Specifically, during the operation of the drilling equipment, for each recorded first intermediate point (i.e., a certain position passed by the equipment during the drilling process), a corresponding timestamp is recorded at the same time. This timestamp marks the specific time when the intermediate point is recorded. When the target device reaches a new intermediate point, in addition to recording the position coordinates and sensor data of the point, it is also necessary to obtain the current timestamp through the device's internal time system and store it together with the data of the intermediate point. All recorded timestamps are sorted in the order of the time they represent so that the data can be processed and analyzed in chronological order later. When sorting, it is necessary to ensure that the format of the timestamps is unified so that the times they represent can be correctly compared. After the sorting is completed, an array of timestamps arranged in chronological order is obtained, which is the target sorting result. In the target sorting result, find the timestamp at the end, which is the timestamp representing the end of the work of the drilling equipment. Then, find the corresponding intermediate point based on this timestamp and set it as the end point. This end point is the calculated position where the drilling equipment ends its work. The target sorting result array can be traversed to find the last element, which is the target timestamp. Then use the mapping relationship to find the intermediate point data associated with the target timestamp. This mapping relationship should have been established when the timestamp and intermediate point data were recorded before. Once the intermediate point corresponding to the target timestamp is found (here we call it the second intermediate point, but it is actually the last recorded intermediate point), it is set as the end point. Through the above method, the position where the drilling equipment ends its work (i.e., the end point) can be accurately determined, and strong support can be provided for subsequent data processing and analysis.

[0051] For example, multiple timestamps include 11;03;04, 11;02;34, 11;03;44, 11;04;14, and they are sorted in chronological order. The target sorting result is 11;02;34, 11;03;04, 11;03;44, 11;04;14. Then, 11;04;14, which is at the last position in the target sorting result, is obtained, and 11;04;14 is set as the target timestamp. The second middle point G corresponding to the target timestamp is obtained, and the second middle point G is set as the end point. The end point indicates the position where the target device ends the drilling work.

[0052] Further, the first pipeline drilling trajectory can be constructed based on the target sorting result, and the absolute coordinates of multiple first intermediate points are integrated to obtain the first pipeline drilling trajectory, which specifically includes: determining the third intermediate point according to the target sorting result; judging whether the third intermediate point is a preset intermediate point, and the preset intermediate point is the intermediate point corresponding to the first position in the target sorting result; if the third intermediate point is a preset intermediate point, constructing a first sub-trajectory according to the starting point and the first relative relationship, and the first relative relationship is the corresponding relationship between the absolute coordinates of the third intermediate point and the starting point; if the third intermediate point is not a preset intermediate point, constructing a second sub-trajectory according to the third intermediate point and the second relative relationship, and the second relative relationship is the corresponding relationship between the absolute coordinates of the third intermediate point and the fourth intermediate point, and the fourth intermediate point is the intermediate point before the third intermediate point in the target sorting result; integrating the first sub-trajectory and multiple second sub-trajectories to obtain the first pipeline drilling trajectory. Specifically, the target sorting result is obtained by sorting based on the time sequence, and the third intermediate point can be selected from the target sorting result as the focus of current processing. After obtaining the third intermediate point, it is necessary to determine whether the third intermediate point is a preset intermediate point. The preset intermediate point refers to the intermediate point ranked first in the target sorting result, that is, it is also understood to be an intermediate point ranked after the starting point. If the third intermediate point is a preset intermediate point, then the first sub-track needs to be constructed based on the third intermediate point and the first relative relationship. At this time, the first relative relationship is the positional relationship between the absolute coordinates of the starting point and the absolute coordinates of the third intermediate point. Obtain the absolute coordinates of the starting point, that is, the first coordinate, and then obtain the absolute coordinates of the third intermediate point. At this time, the third intermediate point is a preset intermediate point. According to the first coordinate and the absolute coordinate, use a straight line or curve interpolation method to construct the first sub-track from the starting point to the preset intermediate point. When the third intermediate point is not a preset intermediate point, it is necessary to find the previous intermediate point (the fourth intermediate point) of the third intermediate point in the target sorting result, and construct the second sub-track based on the third intermediate point and the second relative relationship. At this time, the second relative relationship refers to the positional relationship corresponding to the absolute coordinates of the third intermediate point and the absolute coordinates of the fourth intermediate point. The same method as constructing the first sub-track can be used to construct the second sub-track from the fourth intermediate point to the third intermediate point based on two coordinate points. In this application, there is only one starting point, so the starting point and the preset middle point in the target sorting result need to be constructed to form the first sub-track.

[0053] However, there are multiple intermediate points in the target sorting result. It is necessary to construct the other two intermediate points in the same way as the third intermediate point and the fourth intermediate point to construct the second sub-trajectory to obtain multiple second sub-trajectories. Finally, all constructed sub-trajectories, including the first sub-trajectory and multiple second sub-trajectories, are integrated to form a complete first pipeline drilling trajectory. When the third intermediate point is a preset intermediate point, it is confirmed as the starting point of the integrated trajectory. Connect each second sub-trajectory to the end point of the previous sub-trajectory in turn to form a continuous trajectory. After the integration is completed, necessary smoothing and verification are performed to ensure the accuracy and feasibility of the drilling trajectory.

[0054] S106: Sending the first pipeline drilling trajectory to the host computer so that the host computer displays the first pipeline drilling trajectory.

[0055] In the above S106, when the first pipeline drilling trajectory is sent to the host computer, the host computer refers to the monitoring center and the mobile application, etc., so that the host computer can perform visual display. Before sending the first pipeline drilling trajectory, the calculated end position in the first pipeline drilling trajectory needs to be compared with the actual exit position of the target device, and the first pipeline drilling trajectory is compared according to the comparison result.

[0056] Further, after determining the end point according to the target sorting result, it is determined whether the end point position is consistent with the actual exit position of the target device, specifically including: obtaining the third coordinate corresponding to the end point; determining whether the third coordinate is consistent with the preset coordinate, the preset coordinate is the position corresponding to the actual end of the work of the target device; when the third coordinate is consistent with the preset coordinate, it is confirmed that the first pipeline drilling trajectory is adjusted to obtain the second pipeline drilling trajectory. Specifically, after determining the end point (that is, the position where the drilling equipment actually ends the work), it is necessary to obtain the precise coordinates of the end point in the geographic space, which we call the third coordinate here. Since the absolute position of each intermediate point is calculated after determining each intermediate point, the third coordinate corresponding to the second intermediate point can be directly obtained at this time. The third coordinate is compared with the preset coordinate. At this time, the preset coordinate is the coordinate measured by the Beidou satellite navigation system after the drill head of the target device comes out of the exit point, that is, the actual exit position of the target device. To determine whether the third coordinate is consistent with the preset coordinate, the target distance can be obtained by calculating the third coordinate and the preset coordinate; an appropriate distance calculation formula (such as the Euclidean distance formula) can be used to calculate the distance between the two coordinates, and the calculated result is used as the target distance. Then determine whether the target distance is less than or equal to the preset distance. The preset distance is a threshold used to determine whether the calculated end point position is within an acceptable range. The preset distance is a value set in advance according to engineering requirements, equipment accuracy and other factors. When the target distance is less than or equal to the preset distance, it is confirmed that the first pipeline drilling trajectory is corrected to obtain the second pipeline drilling trajectory. The correction operation includes scaling and stretching operations. If the target distance is less than or equal to the preset distance, it is considered that the end point position is within an acceptable range, and the first pipeline drilling trajectory can be corrected to obtain the second pipeline drilling trajectory. After confirming that the target distance meets the conditions, it is necessary to perform a correction operation on the first pipeline drilling trajectory to obtain a more accurate second pipeline drilling trajectory. The correction operation here includes scaling and stretching operations. Scaling operation If the target distance is less than the preset distance, but there is a certain deviation between the two (which may be caused by changes in geological conditions, equipment performance deviations, etc.), the local size of the drilling trajectory can be adjusted by scaling operations. Specifically, some parts of the trajectory can be enlarged or reduced according to the size and direction of the deviation to make it closer to the actual drilling situation. If the target distance is less than or equal to the preset distance, but the overall length or shape of the drilling trajectory is not as expected (for example, the trajectory is longer than expected due to the slow drilling speed caused by encountering hard rock), the length and shape of the trajectory can be adjusted through stretching. The stretching operation can be performed along a certain direction of the trajectory to make it more consistent with the actual drilling situation. After the correction is completed, the second pipeline drilling trajectory is obtained. This trajectory reflects the actual drilling situation more accurately than the first pipeline drilling trajectory, and can be used for subsequent pipeline laying, acceptance and other work. Figure 2As shown, A represents the entrance of the borehole, that is, the starting point. B represents the exit of the borehole, that is, the actual end point. C represents the middle point corresponding to the last position in the target sorting result, that is, the calculated end point. The first pipeline drilling trajectory is integrated according to the first sub-trajectory and multiple second sub-trajectories, and the first pipeline drilling trajectory is L. Since the actual end point coordinates of B are inconsistent with the end point coordinates calculated by C, and the target distance between the two is less than the preset distance, the first pipeline drilling trajectory needs to be adjusted to obtain the second pipeline drilling trajectory M from A to B. The second pipeline drilling trajectory is represented by a dotted line, and the first pipeline drilling trajectory is represented by a solid line.

[0057] When the target distance is greater than the preset distance, it is confirmed that the first pipeline drilling trajectory is in an abnormal state, and it is necessary to re-measure according to the abnormal state. Specifically, the target distance calculated previously is compared with the preset distance. If the target distance is greater than the preset distance, it means that there is a significant difference between the calculated end point coordinates and the actual drilling exit point, and the cause needs to be further analyzed. It is determined that the first pipeline drilling trajectory is in an abnormal state. The abnormal state may be caused by a variety of reasons, such as changes in geological conditions, equipment failures, and human operation errors. After determining the abnormal state, it is necessary to immediately formulate a specific plan for re-measurement according to the cause of the abnormal state, and then formulate a detailed measurement plan to ensure that the re-measurement work can be carried out in an orderly manner. After re-measurement, the corresponding pipeline drilling trajectory is drawn according to the measurement data. After the first pipeline drilling trajectory is processed by the above method, the second pipeline drilling trajectory is obtained, and the second pipeline drilling trajectory is sent to the upper computer so that the upper computer can store the second pipeline drilling trajectory, and the second pipeline drilling trajectory can also be displayed to the user so that the user can view the second pipeline drilling trajectory obtained after the target device performs pipeline construction.

[0058] The above method solves the problem of only absolute coordinates in the traditional drilling process. The real-time trajectory measurement during the drilling process replaces the post-completion measurement, which reduces the amount of work and construction costs. Secondly, the three-dimensional trajectory coordinates obtained by traditional calculations are in error with the actual three-dimensional trajectory coordinates. The error is reduced by correcting according to the actual three-dimensional trajectory coordinates. Finally, the underground position information of the pipeline trajectory is given by coordinate positioning, which can provide construction guidance for subsequent pipeline trenchless projects, greatly reduce the probability of pipeline intersection, and reduce various losses caused by accidents.

[0059] The present application also provides a trenchless drilling trajectory coordinate measuring device. Figure 3 is a schematic diagram of a structure of a trenchless drilling trajectory coordinate measuring device provided in an embodiment of the present application, with reference to Figure 3 The device is a measurement platform, which includes an acquisition unit 301, a processing unit 302 and a sending unit 303.

[0060] The acquisition unit 301 receives a target request, which is a measurement request for pipeline construction using a target device, and the target device is a trenchless drilling device; obtains the second coordinates and sensor data corresponding to the first intermediate point, and the first intermediate point is any point except the starting point.

[0061] The processing unit 302 determines that the target device is at the first coordinate corresponding to the starting point, where the starting point is the initial working position of the target device; combines the second coordinate with the sensor data to obtain the absolute coordinate corresponding to the first intermediate point; integrates the absolute coordinates of multiple first intermediate points to obtain the first pipeline drilling trajectory, where one first intermediate point corresponds to one absolute coordinate.

[0062] The sending unit 303 sends the first pipeline drilling trajectory to the host computer so that the host computer displays the first pipeline drilling trajectory.

[0063] In a possible implementation, the acquisition unit 301 is used to acquire the second coordinate corresponding to the target device at the first intermediate point, and the second coordinate is the coordinate collected using a Beidou satellite navigation device; the acquisition unit 301 is used to acquire sensor data corresponding to the first intermediate point, and the sensor data is data measured by the target device drilling into the formation; the sensor data includes formation depth data, azimuth data, and vertex data; the processing unit 302 is used to calculate the second coordinate and the sensor data to obtain the absolute coordinate corresponding to the first intermediate point.

[0064] In a possible implementation, the acquisition unit 301 is used to obtain timestamps corresponding to multiple first intermediate points, one first intermediate point corresponds to one timestamp; the processing unit 302 is used to sort the multiple timestamps in chronological order to obtain a target sorting result; the acquisition unit 301 is used to obtain the second intermediate point corresponding to the target timestamp, and set the second intermediate point as the end point, the target timestamp is the timestamp corresponding to the last position in the target sorting result, and the end point is the calculated position where the target device ends work.

[0065] In a possible implementation, the acquisition unit 301 is used to acquire the third coordinate corresponding to the end point; the processing unit 302 is used to determine whether the third coordinate is consistent with the preset coordinate, and the preset coordinate is the position corresponding to the actual end of the work of the target device; when the third coordinate is consistent with the preset coordinate, it is confirmed that the first pipeline drilling trajectory is adjusted to obtain the second pipeline drilling trajectory.

[0066] In one possible implementation, the processing unit 302 is used to calculate the third coordinate and the preset coordinate to obtain the target distance; determine whether the target distance is less than or equal to the preset distance; when the target distance is less than or equal to the preset distance, confirm that a correction operation is performed on the first pipeline drilling trajectory to obtain a second pipeline drilling trajectory, and the correction operation includes a scaling operation and a stretching operation.

[0067] In a possible implementation, the processing unit 302 is configured to determine that the first pipeline drilling trajectory is in an abnormal state when the target distance is greater than a preset distance, and that re-measurement is required according to the abnormal state.

[0068] In a possible implementation, the processing unit 302 is used to determine a third midpoint according to the target sorting result; determine whether the third midpoint is a preset midpoint, the preset midpoint being the midpoint corresponding to the first position in the target sorting result; if the third midpoint is a preset midpoint, construct a first sub-trajectory according to the starting point and the first relative relationship, the first relative relationship being the correspondence between the absolute coordinates of the third midpoint and the starting point; if the third midpoint is not a preset midpoint, construct a second sub-trajectory according to the third midpoint and the second relative relationship, the second relative relationship being the correspondence between the absolute coordinates of the third midpoint and the fourth midpoint, the fourth midpoint being the midpoint before the third midpoint in the target sorting result; integrate the first sub-trajectory and multiple second sub-trajectories to obtain a first pipeline drilling trajectory.

[0069] It should be noted that: when the device provided in the above embodiment realizes its function, only the division of the above functional modules is used as an example. In actual application, the above functions can be assigned to different functional modules as needed, that is, the internal structure of the device is divided into different functional modules to complete all or part of the functions described above. In addition, the device and method embodiments provided in the above embodiment belong to the same concept, and the specific implementation process is detailed in the method embodiment, which will not be repeated here.

[0070] The present application also discloses an electronic device. Figure 4 , Figure 4 The electronic device 400 may include: at least one processor 401 , at least one network interface 404 , a user interface 403 , a memory 405 , and at least one communication bus 402 .

[0071] The communication bus 402 is used to realize the connection and communication between these components.

[0072] The user interface 403 may include a display screen (Display) and a camera (Camera). Optionally, the user interface 403 may also include a standard wired interface and a wireless interface.

[0073] The network interface 404 may optionally include a standard wired interface or a wireless interface (such as a WI-FI interface).

[0074] Among them, the processor 401 may include one or more processing cores. The processor 401 uses various interfaces and lines to connect various parts in the entire server, and executes various functions of the server and processes data by running or executing instructions, programs, code sets or instruction sets stored in the memory 405, and calling data stored in the memory 405. Optionally, the processor 401 can be implemented in at least one hardware form of digital signal processing (Digital Signal Processing, DSP), field programmable gate array (Field-Programmable Gate Array, FPGA), and programmable logic array (Programmable Logic Array, PLA). The processor 401 can integrate one or a combination of a central processing unit (Central Processing Unit, CPU), a graphics processing unit (Graphics Processing Unit, GPU) and a modem. Among them, the CPU mainly processes the operating system, user interface and application requests; the GPU is responsible for rendering and drawing the content to be displayed on the display screen; the modem is used to process wireless communications. It can be understood that the above-mentioned modem may not be integrated into the processor 401, and it can be implemented separately through a chip.

[0075] Among them, the memory 405 may include a random access memory (RAM) or a read-only memory (Read-Only Memory). Optionally, the memory 405 includes a non-transitory computer-readable storage medium. The memory 405 can be used to store instructions, programs, codes, code sets or instruction sets. The memory 405 may include a program storage area and a data storage area, wherein the program storage area. Instructions for implementing an operating system, instructions for at least one function (such as a touch function, a sound playback function, an image playback function, etc.), instructions for implementing the above-mentioned various method embodiments, etc. can be stored; the data storage area can store data involved in the above-mentioned various method embodiments, etc. The memory 405 can also be optionally at least one storage device located away from the aforementioned processor 401.

[0076] like Figure 4 As shown, the memory 405 as a computer storage medium may include an operating system, a network communication module, a user interface module, and an application program for measuring trenchless drilling trajectory coordinates.

[0077] exist Figure 4In the electronic device 400 shown, the user interface 403 is mainly used to provide an input interface for the user and obtain data input by the user; and the processor 401 can be used to call the application for measuring the coordinates of the trenchless drilling trajectory stored in the memory 405. When executed by one or more processors, the electronic device executes one or more of the methods described in the above embodiments.

[0078] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all described as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the order of the actions described, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required for the present application.

[0079] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.

[0080] In the several embodiments provided in the present application, it should be understood that the disclosed devices can be implemented in other ways. For example, the device embodiments described above are only schematic, such as the division of the units, which is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some service interfaces, and the indirect coupling or communication connection of devices or units can be electrical or other forms.

[0081] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0082] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0083] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable memory. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, which is stored in a memory and includes several instructions for a computer device (which can be a personal computer, server or network device, etc.) to execute all or part of the steps of the method described in each embodiment of the present application. The aforementioned memory includes: various media that can store program codes, such as USB flash drives, mobile hard drives, magnetic disks or optical disks.

[0084] The above is only an exemplary embodiment of the present disclosure and cannot be used to limit the scope of the present disclosure. That is, any equivalent changes and modifications made according to the teachings of the present disclosure are still within the scope of the present disclosure. After considering the disclosure of the specification and the truth of practice, it will be easy for those skilled in the art to think of other embodiments of the present disclosure. This application is intended to cover any variation, use or adaptive change of the present disclosure, which follows the general principles of the present disclosure and includes common knowledge or customary technical means in the technical field that are not recorded in the present disclosure.

Claims

1. A method for measuring coordinates of trenchless drilling trajectory, characterized in that: Applied in a measurement platform, the method comprises: receiving a target request, wherein the target request is a measurement request for pipeline construction using a target device, wherein the target device is a trenchless drilling equipment; Determine that the target device is at a first coordinate corresponding to a starting point, where the starting point is an initial working position of the target device; Acquire a second coordinate and sensor data corresponding to a first intermediate point, where the first intermediate point is any point other than the starting point; combining the second coordinates with the sensor data to obtain the absolute coordinates corresponding to the first intermediate point; Integrate the absolute coordinates of the plurality of first intermediate points to obtain a first pipeline drilling trajectory, wherein one first intermediate point corresponds to one absolute coordinate; The first pipeline drilling trajectory is sent to a host computer so that the host computer displays the first pipeline drilling trajectory.

2. The method according to claim 1, characterized in that The combining the second coordinate with the sensor data specifically includes: Acquire the second coordinates corresponding to the first intermediate point of the target device, where the second coordinates are coordinates collected using a Beidou satellite navigation device; Acquire the sensor data corresponding to the first intermediate point, the sensor data being data measured by the target device drilling into the formation; the sensor data including formation depth data, azimuth data, and vertex angle data; The second coordinate and the sensor data are calculated to obtain the absolute coordinate corresponding to the first intermediate point.

3. The method according to claim 1, characterized in that: Before integrating the absolute coordinates of the plurality of first intermediate points, the method further includes: Acquire timestamps corresponding to a plurality of the first intermediate points, where one first intermediate point corresponds to one timestamp; Sorting the multiple timestamps in chronological order to obtain a target sorting result; The second middle point corresponding to the target timestamp is obtained, and the second middle point is set as the end point, the target timestamp is the timestamp corresponding to the last position in the target sorting result, and the end point is the calculated position where the target device ends work.

4. The method according to claim 3, characterized in that After obtaining the second intermediate point corresponding to the target timestamp and setting the second intermediate point as the end point, the method further includes: Obtaining the third coordinate corresponding to the end point; Determine whether the third coordinate is consistent with a preset coordinate, where the preset coordinate is a position corresponding to when the target device actually finishes working; When the third coordinate is consistent with the preset coordinate, it is confirmed that the first pipeline drilling trajectory is adjusted to obtain a second pipeline drilling trajectory.

5. The method according to claim 4, characterized in that The determining whether the third coordinate is consistent with the preset coordinate specifically includes: Calculating the third coordinate and the preset coordinate to obtain a target distance; Determining whether the target distance is less than or equal to a preset distance; When the target distance is less than or equal to the preset distance, it is confirmed that a correction operation is performed on the first pipeline drilling trajectory to obtain the second pipeline drilling trajectory, and the correction operation includes a scaling operation and a stretching operation.

6. The method according to claim 5, characterized in that After determining whether the target distance is less than or equal to a preset distance, the method further includes: When the target distance is greater than the preset distance, it is confirmed that the first pipeline drilling trajectory is in an abnormal state, and it is necessary to re-measure according to the abnormal state.

7. The method according to claim 3, characterized in that Integrating the absolute coordinates of the plurality of first intermediate points to obtain a first pipeline drilling trajectory specifically includes: Determine a third intermediate point according to the target sorting result; Determine whether the third middle point is a preset middle point, the preset middle point being the middle point corresponding to the first one in the target sorting result; If the third middle point is the preset middle point, constructing a first sub-track according to the starting point and a first relative relationship, wherein the first relative relationship is a corresponding relationship between the absolute coordinates of the third middle point and the starting point; If the third intermediate point is not the preset intermediate point, constructing a second sub-track according to the third intermediate point and a second relative relationship, wherein the second relative relationship is a corresponding relationship between the absolute coordinates of the third intermediate point and a fourth intermediate point, and the fourth intermediate point is an intermediate point before the third intermediate point in the target sorting result; The first sub-trajectory and a plurality of the second sub-trajectories are integrated to obtain the first pipeline drilling trajectory.

8. A trenchless drilling trajectory coordinate measuring device, characterized in that: The device is a measurement platform, and the measurement platform comprises an acquisition unit (301), a processing unit (302) and a sending unit (303); The acquisition unit (301) receives a target request, the target request is a measurement request for pipeline construction using a target device, the target device is a trenchless drilling device; acquires a second coordinate and sensor data corresponding to a first intermediate point, the first intermediate point is any point other than the starting point; The processing unit (302) determines that the target device is at a first coordinate corresponding to a starting point, the starting point being an initial position of the target device; The second coordinate is combined with the sensor data to obtain the absolute coordinate corresponding to the first intermediate point; the absolute coordinates of multiple first intermediate points are integrated to obtain a first pipeline drilling trajectory, where one first intermediate point corresponds to one absolute coordinate; The sending unit (303) sends the first pipeline drilling trajectory to a host computer so that the host computer can display the first pipeline drilling trajectory.

9. An electronic device, characterized in that: The electronic device (400) comprises a processor (401), a memory (405), a user interface (403) and a network interface (404), wherein the memory (405) is used to store instructions, the user interface (403) and the network interface (404) are used to communicate with other devices, and the processor (401) is used to execute the instructions stored in the memory (405) so that the electronic device (400) executes the method according to any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores instructions, and when the instructions are executed, the method according to any one of claims 1 to 7 is executed.