Method and system for accurately acquiring position information and motion trail of suspension arm of construction crane based on multi-sensor information

Through multi-sensor technology, the position and motion trajectory of the construction crane boom is accurately obtained, which solves the problem of high safety risks in the construction of the crane in power grid, improves safety control accuracy and reduces costs.

CN118999528AActive Publication Date: 2024-11-22STATE GRID FUJIAN POWER ELECTRIC CO ECONOMIC RESEARCH INSTITUTE +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411122560.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-15
Publication Date
2024-11-22
Estimated Expiration
2044-08-15

AI Technical Summary

Technical Problem

During the construction of the power grid, the safety risks of cranes when operating near live wires are high. There are errors in existing manual visual control safety distances, making it difficult to avoid accidents.

Method used

Using multi-sensor technology, including Beidou high-precision positioning sensor, accelerometer, gyroscope, magnetometer and boom length detection device, the position and motion trajectory of the construction crane boom are accurately obtained through data fusion, and the configuration of Beidou high-precision positioning sensor is reduced. quantity, reduce costs.

Benefits of technology

It realizes accurate acquisition of the position and movement trajectory of the crane boom, improves safety control accuracy, reduces accident risk, and reduces costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118999528A_ABST
    Figure CN118999528A_ABST
Patent Text Reader

Abstract

The invention relates to a method and a system for accurately acquiring position information and a movement track of a suspension arm of a construction crane based on multi-sensor information. The system comprises at least one Beidou high-precision positioning sensor, one accelerometer, one gyroscope, one magnetometer, one suspension arm length detection device and one data processing module, and the three-dimensional space position of the front end of the suspension arm of the construction crane is collected in real time through the Beidou high-precision positioning sensor; the real-time position of the bottom of the suspension arm of the construction crane is collected through an inertial navigation sensor, and all-dimensional position information in the operation process of the construction crane is obtained. The method comprises the steps of installing a Beidou high-precision positioning sensor, installing an inertial navigation sensor, establishing communication between the sensors and a data processing module, collecting and transmitting data and the like, and accurate acquisition of position information and a movement track of the suspension arm of the construction crane is achieved. According to the invention, the configuration number of the Beidou high-precision positioning sensors can be reduced, and the cost is effectively reduced under the condition of realizing the same effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of power transmission and transformation engineering of power grids, and specifically relates to a method and system for accurately acquiring position information and motion trajectory of a construction crane boom based on multi-sensor information. Background Art

[0002] As the core business of power grid development, power grid construction is crucial to consolidate the foundation of safe production, deepen the investigation and treatment of hidden dangers, strengthen risk warning and control, and improve the ability to resist accident risks and emergency response. As an important large-scale construction machinery, cranes play a vital role in the construction of power transmission and transformation projects. Large-scale construction machinery has high safety risks when operating near live wires or structures, and safety control is difficult. The use of manual visual control of safety distances has the disadvantage that errors are inevitable. If an accident occurs, the loss will be huge and the consequences will be disastrous. In order to effectively monitor the precise position of large-scale construction machinery and its key components during the construction process, it is necessary to accurately obtain the position information and motion trajectory of the construction crane boom based on multi-sensor technology. Summary of the invention

[0003] The purpose of the present invention is to accurately obtain the position information and motion trajectory of the boom of a construction crane based on multi-sensor technology, and to provide a method and system for accurately obtaining the position information and motion trajectory of the boom of a construction crane based on multi-sensor information.

[0004] To achieve the above purpose, the technical solution of the present invention is: a method and system for accurately acquiring the position information and motion trajectory of a construction crane boom based on multi-sensor information, comprising the following steps:

[0005] S1. Install sensors on the crane boom, including at least one Beidou high-precision positioning sensor, at least one accelerometer, at least one gyroscope, at least one magnetometer, and at least one boom length detection device;

[0006] S2, deploy data processing module;

[0007] S3, obtain data from Beidou high-precision positioning sensor, accelerometer, gyroscope, magnetometer, and boom length detection device;

[0008] S4. Estimate the position and posture of the crane boom through data fusion of Beidou high-precision positioning sensor, accelerometer, gyroscope, magnetometer, and boom length detection device.

[0009] In one embodiment of the present invention, in step S1, the Beidou high-precision positioning sensor, accelerometer, gyroscope, and magnetometer are all installed at the bottom center of the crane boom to accurately measure the translational and rotational data of the bottom center of the boom axis; the boom length detection device is used to measure the length of the boom.

[0010] In one embodiment of the present invention, in step S2, a data processing module is deployed on-site to receive data from each sensor, calculate the crane boom position information, and record and store the crane boom position data at each time point to form a motion trajectory of the crane boom.

[0011] In one embodiment of the present invention, in step S3, the boom length l is measured by a boom length detection device; the spatial position (B, L, H) of the bottom center of the crane boom axis is measured by a Beidou high-precision positioning sensor; and the angle of rotation of the boom around the origin, i.e., the bottom center of the crane boom axis, is measured by an accelerometer, a gyroscope, and a magnetometer.

[0012] In one embodiment of the present invention, in step S4, the position and posture of the crane boom are estimated by data fusion of Beidou high-precision positioning sensor, accelerometer, gyroscope and magnetometer; the spatial position (B, L, H) of the bottom center of the crane boom axis is measured by Beidou high-precision positioning sensor, and the longitude and latitude are converted into coordinates (x1, y1, z1) of the engineering custom coordinate system based on coordinate conversion, and the outer contour of the crane can be depicted based on the known spatial three-dimensional shape of the crane body to obtain the precise position of the crane body; the angle of rotation of the boom around the origin, that is, the bottom center of the crane boom axis, is measured by accelerometer, gyroscope and magnetometer; based on the known boom length L, the spatial position (x2, y2, z2) of the top center of the crane boom axis is obtained based on the rigid body motion equation.

[0013] In one embodiment of the present invention, since the Beidou high-precision positioning sensor is installed in the spatial position of the bottom center of the crane boom axis, the Beidou high-precision positioning sensor position information is used to characterize the crane position, and (B, L, H) is converted into the coordinates (x1, y1, z1) of the engineering custom coordinate system. The specific method is as follows:

[0014] x1=x0+N·(L-L0)·cosB

[0015]

[0016] z1=H

[0017] Where, e is the first eccentricity of the ellipsoid, N is the radius of curvature of the meridian, M is the length of the meridian arc, B is the latitude, L is the longitude, H is the elevation, L0 is the longitude of the central meridian, x0 and y0 are the coordinates of the origin of the Gaussian projection coordinate system, ... represents the higher-order terms;

[0018]

[0019] In the formula, a is the long semi-axis of the ellipsoid. The position of the crane in the project custom coordinate system can be obtained through the above formula;

[0020] At this time, if the boom length measured by the boom length detection device is l, then

[0021] The spatial position (x2, y2, z2) of the top center of the crane boom axis is calculated by the following formula:

[0022] x2=x1+l·cosγ·cos(φ-β)

[0023]

[0024] z2=z1+l·sinγ

[0025] Where β is the angle between the Y axis of the project's custom coordinate system and the true north direction, φ is the yaw angle, and γ is the Euler angle of the crane boom composed of the pitch angle and the roll angle θ. The specific calculation formula of the Euler angle is as follows:

[0026]

[0027]

[0028] In the formula, (α x ,α y ,α z ) is the measured value of the accelerometer when the crane arm is in any posture, is the measurement value of the magnetometer, Δφ is the magnetic declination between true north and magnetic north, and for the crane arm, the roll angle θ is 0.

[0029] The present invention also provides a system for accurately acquiring the position information and motion trajectory of a construction crane boom based on multi-sensor information, comprising at least one Beidou high-precision positioning sensor, at least one accelerometer, at least one gyroscope, at least one magnetometer, at least one boom length detection device, and at least one data processing module; wherein,

[0030] The Beidou high-precision positioning sensor calculates the spatial position of the bottom center of the crane boom axis by measuring position information;

[0031] The accelerometer calculates the attitude of the crane boom by measuring the acceleration of the crane boom;

[0032] The gyroscope calculates the attitude of the crane boom by measuring the angular velocity of the crane boom when it rotates;

[0033] The magnetometer calculates the attitude of the crane boom by measuring the strength of the earth's magnetic field;

[0034] The boom length detection device measures the length of the crane boom;

[0035] The data processing module aggregates and stores the data collected by each sensor, and fuses and estimates the position and posture of the crane boom.

[0036] Compared with the prior art, the present invention has the following beneficial effects: the present invention can reduce the number of Beidou high-precision positioning sensors configured, and effectively reduce costs while achieving the same effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 It is a schematic diagram of the principle of the method of the present invention;

[0038] Figure 2 A diagram showing the steps of the method of the present invention. DETAILED DESCRIPTION

[0039] The technical solution of the present invention is described in detail below in conjunction with the accompanying drawings.

[0040] In order to make the purpose, technical solutions and advantages of the present application clearer, the present application is described and illustrated below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not intended to limit the present application. Based on the embodiments provided in the present application, all other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of the present application.

[0041] Obviously, the drawings described below are only some examples or embodiments of the present application. For ordinary technicians in this field, the present application can also be applied to other similar scenarios based on these drawings without creative work. In addition, it can also be understood that although the efforts made in this development process may be complicated and lengthy, for ordinary technicians in this field related to the content disclosed in this application, some changes in design, manufacturing or production based on the technical content disclosed in this application are just conventional technical means, and should not be understood as insufficient content disclosed in this application.

[0042] Reference to "embodiments" in this application means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those of ordinary skill in the art that the embodiments described in this application may be combined with other embodiments without conflict.

[0043] Unless otherwise defined, the technical terms or scientific terms involved in this application should be understood by people with ordinary skills in the technical field to which this application belongs. The words "one", "a", "a", "the" and the like involved in this application do not indicate a quantitative limitation, and may represent the singular or plural. The terms "include", "comprise", "have" and any of their variations involved in this application are intended to cover non-exclusive inclusions; for example, a process, method, system, product or device that includes a series of steps or modules (units) is not limited to the listed steps or units, but may also include steps or units that are not listed, or may also include other steps or units inherent to these processes, methods, products or devices. The words "connect", "connected", "coupled" and the like involved in this application are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. The "multiple" involved in this application refers to two or more. "And / or" describes the association relationship of associated objects, indicating that there may be three relationships, for example, "A and / or B" can represent: A exists alone, A and B exist at the same time, and B exists alone. The character " / " generally indicates that the objects before and after are in an "or" relationship. The terms "first", "second", "third", etc. involved in this application are only used to distinguish similar objects and do not represent a specific ordering of the objects.

[0044] The present invention provides a method and system for accurately acquiring the position information and motion trajectory of a construction crane boom based on multi-sensor information, comprising the following steps:

[0045] S1. Install sensors on the crane boom, including at least one Beidou high-precision positioning sensor, at least one accelerometer, at least one gyroscope, at least one magnetometer, and at least one boom length detection device;

[0046] S2, deploy data processing module;

[0047] S3, obtain data from Beidou high-precision positioning sensor, accelerometer, gyroscope, magnetometer, and boom length detection device;

[0048] S4. Estimate the position and posture of the crane boom through data fusion of Beidou high-precision positioning sensor, accelerometer, gyroscope, magnetometer, and boom length detection device.

[0049] The present invention also provides a system for accurately acquiring the position information and motion trajectory of a construction crane boom based on multi-sensor information, comprising at least one Beidou high-precision positioning sensor, at least one accelerometer, at least one gyroscope, at least one magnetometer, at least one boom length detection device, and at least one data processing module; wherein,

[0050] The Beidou high-precision positioning sensor calculates the spatial position of the bottom center of the crane boom axis by measuring position information;

[0051] The accelerometer calculates the attitude of the crane boom by measuring the acceleration of the crane boom;

[0052] The gyroscope calculates the attitude of the crane boom by measuring the angular velocity of the crane boom when it rotates;

[0053] The magnetometer calculates the attitude of the crane boom by measuring the strength of the earth's magnetic field;

[0054] The boom length detection device measures the length of the crane boom;

[0055] The data processing module aggregates and stores the data collected by each sensor, and fuses and estimates the position and posture of the crane boom.

[0056] The following are specific implementation examples of the present invention.

[0057] Example:

[0058] Reference Figure 1 and Figure 2 This embodiment provides a method for accurately acquiring the position information and motion trajectory of a construction crane boom based on multi-sensor information, comprising the following steps:

[0059] S1. Install sensors at key positions of the crane boom, including 1 Beidou high-precision positioning sensor, 1 accelerometer, 1 gyroscope, 1 magnetometer, and 1 boom length detection device.

[0060] S2. Deploy data processing module.

[0061] S3, obtaining data of the boom length detection device, Beidou high-precision positioning sensor, accelerometer, gyroscope, magnetometer, and boom length detection device;

[0062] S4. Estimate the position and posture of the crane boom through data fusion of Beidou high-precision positioning sensor, accelerometer, gyroscope, magnetometer, and boom length detection device.

[0063] Step S1: Install one Beidou high-precision positioning sensor, one accelerometer, one gyroscope, and one magnetometer at specific positions of the crane boom. The length of the boom is usually measured by the crane itself. The Beidou high-precision positioning sensor, accelerometer, gyroscope, and magnetometer are all installed at the bottom center of the crane boom to accurately measure the translation and rotation data of the bottom center of the boom axis. The boom length detection device is used to measure the length of the boom.

[0064] Step S2: deploy a data processing module on-site to receive data from various sensors, calculate the position information of the crane boom, and record and store the position data at each time point to form the motion trajectory of the crane and the boom.

[0065] Step S3: Measure the length l of the boom by using the boom length detection device; measure the spatial position (B, L, H) of the bottom center of the crane boom axis by using the Beidou high-precision positioning sensor; and measure the angle of rotation of the boom around the origin (the bottom center of the crane boom axis) by using the accelerometer, gyroscope, and magnetometer.

[0066] Step S4: Estimate the position and posture of the crane boom through data fusion of Beidou high-precision positioning sensor, accelerometer, gyroscope and magnetometer. The spatial position (B, L, H) of the bottom center of the crane boom axis is measured by Beidou high-precision positioning sensor, and the longitude and latitude are converted into the coordinates (x1, y1, z1) of the project custom coordinate system based on coordinate conversion. The outer contour of the crane can be depicted based on the known spatial three-dimensional shape of the crane body, that is, the precise position of the crane body is obtained; the angle of rotation of the boom around the origin (bottom center of the crane boom axis) is measured by accelerometer, gyroscope and magnetometer. Based on the known boom length l, the spatial position (x2, y2, z2) of the top center of the crane boom axis can be obtained based on the rigid body motion equation.

[0067] Specifically, because the Beidou high-precision positioning sensor is installed in the spatial position of the bottom center of the crane boom axis, the Beidou high-precision positioning sensor position information is used to represent the crane position, and (B, L, H) is converted into the coordinates (x1, y1, z1) of the project custom coordinate system. The specific method is:

[0068] x1=x0+N·(L-L0)·cosB

[0069]

[0070] z1=H

[0071] Where, e is the first eccentricity of the ellipsoid, N is the radius of curvature of the meridian, M is the length of the meridian arc, B is the latitude, L is the longitude, H is the elevation, L0 is the longitude of the central meridian, x0 and y0 are the coordinates of the origin of the Gaussian projection coordinate system, ... represents the higher-order terms;

[0072]

[0073] In the formula, a is the long semi-axis of the ellipsoid. The position of the crane in the project custom coordinate system can be obtained through the above formula;

[0074] At this time, if the boom length measured by the boom length detection device is l, then

[0075] The spatial position (x2, y2, z2) of the top center of the crane boom axis is calculated by the following formula:

[0076] x2=x1+l·cosγ·cos(φ-β)

[0077]

[0078] z2=z1+l·sinγ

[0079] Where β is the angle between the Y axis of the project's custom coordinate system and the true north direction, φ is the yaw angle, and γ is the Euler angle of the crane boom composed of the pitch angle and the roll angle θ. The specific calculation formula of the Euler angle is as follows:

[0080]

[0081]

[0082] In the formula, (α x ,α y ,α z ) is the measured value of the accelerometer when the crane arm is in any posture, is the measurement value of the magnetometer, Δφ is the magnetic declination between true north and magnetic north, and for the crane arm, the roll angle θ is 0.

[0083] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0084] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0085] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0086] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0087] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0088] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be subject to the attached claims.

[0089] This patent is not limited to the above-mentioned optimal implementation mode. Anyone can derive various other forms of a method and system for accurately acquiring the position information and motion trajectory of a construction crane boom based on multi-sensor information under the inspiration of this patent. All equal changes and modifications made within the scope of the patent application of the present invention shall fall within the scope of coverage of this patent.

Claims

1. A method and system for accurately acquiring the position information and motion trajectory of a construction crane boom based on multi-sensor information, characterized in that: The steps include: S1. Install sensors on the crane boom, including at least one Beidou high-precision positioning sensor, at least one accelerometer, at least one gyroscope, at least one magnetometer, and at least one boom length detection device; S2, deploy data processing module; S3, obtain data from Beidou high-precision positioning sensor, accelerometer, gyroscope, magnetometer, and boom length detection device; S4. Estimate the position and posture of the crane boom through data fusion of Beidou high-precision positioning sensor, accelerometer, gyroscope, magnetometer, and boom length detection device.

2. The method for accurately acquiring the position information and motion trajectory of a construction crane boom based on multi-sensor information according to claim 1 is characterized in that: In step S1, the Beidou high-precision positioning sensor, accelerometer, gyroscope, and magnetometer are all installed at the bottom center of the crane boom to accurately measure the translational and rotational data of the bottom center of the boom axis; the boom length detection device is used to measure the length of the boom.

3. The method for accurately acquiring the position information and motion trajectory of a construction crane boom based on multi-sensor information according to claim 1 is characterized in that: In step S2, a data processing module is deployed on-site to receive data from various sensors, calculate the position information of the crane boom, and record and store the position data of the crane boom at each time point to form a motion trajectory of the crane boom.

4. The method for accurately acquiring the position information and motion trajectory of a construction crane boom based on multi-sensor information according to claim 1 is characterized in that: In step S3, the boom length l is measured by a boom length detection device; the spatial position (B, L, H) of the bottom center of the crane boom axis is measured by a Beidou high-precision positioning sensor; and the angle of rotation of the boom around the origin, i.e., the bottom center of the crane boom axis, is measured by an accelerometer, a gyroscope, and a magnetometer.

5. The method for accurately acquiring the position information and motion trajectory of a construction crane boom based on multi-sensor information according to claim 1, characterized in that: In step S4, the position and posture of the crane boom are estimated by data fusion of Beidou high-precision positioning sensor, accelerometer, gyroscope and magnetometer; the spatial position (B, L, H) of the bottom center of the crane boom axis is measured by Beidou high-precision positioning sensor, and the longitude and latitude are converted into coordinates (x1, y1, z1) of the engineering custom coordinate system based on coordinate transformation, and the outer contour of the crane can be depicted based on the known spatial three-dimensional shape of the crane body to obtain the precise position of the crane body; the angle of rotation of the boom around the origin, that is, the bottom center of the crane boom axis, is measured by accelerometer, gyroscope and magnetometer; based on the known boom length L, the spatial position (x2, y2, z2) of the top center of the crane boom axis is obtained based on the rigid body motion equation.

6. The method for accurately acquiring the position information and motion trajectory of a construction crane boom based on multi-sensor information according to claim 5 is characterized in that: Because the Beidou high-precision positioning sensor is installed at the spatial position of the bottom center of the crane boom axis, the Beidou high-precision positioning sensor position information is used to represent the crane position, and (B, L, H) is converted into the coordinates (x1, y1, z1) of the project custom coordinate system. The specific method is as follows: x1=x0+N·(L-L0)·cosB z1=H Where, e is the first eccentricity of the ellipsoid, N is the radius of curvature of the meridian, M is the length of the meridian arc, B is the latitude, L is the longitude, H is the elevation, L0 is the longitude of the central meridian, x0 and y0 are the coordinates of the origin of the Gaussian projection coordinate system, ... represents the higher-order terms; In the formula, a is the long semi-axis of the ellipsoid. The position of the crane in the project custom coordinate system can be obtained through the above formula; At this time, if the boom length measured by the boom length detection device is l, then The spatial position (x2, y2, z2) of the top center of the crane boom axis is calculated by the following formula: x2=x1+l·cosγ·cos(φ-β) z2=z1+l·sinγ Where β is the angle between the Y axis of the project's custom coordinate system and the true north direction, φ is the yaw angle, and γ is the Euler angle of the crane boom composed of the pitch angle and the roll angle θ. The specific calculation formula of the Euler angle is as follows: In the formula, (α x ,α y ,α z ) is the measured value of the accelerometer when the crane arm is in any posture, is the measurement value of the magnetometer, Δφ is the magnetic declination between true north and magnetic north, and for the crane arm, the roll angle θ is 0.

7. A system for accurately acquiring the position information and motion trajectory of a construction crane boom based on multi-sensor information, characterized in that: It includes at least one Beidou high-precision positioning sensor, at least one accelerometer, at least one gyroscope, at least one magnetometer, at least one boom length detection device, and at least one data processing module; wherein, The Beidou high-precision positioning sensor calculates the spatial position of the bottom center of the crane boom axis by measuring position information; The accelerometer calculates the attitude of the crane boom by measuring the acceleration of the crane boom; The gyroscope calculates the attitude of the crane boom by measuring the angular velocity of the crane boom when it rotates; The magnetometer calculates the attitude of the crane boom by measuring the strength of the earth's magnetic field; The boom length detection device measures the length of the crane boom; The data processing module aggregates and stores the data collected by each sensor, and fuses and estimates the position and posture of the crane boom.

Citation Information

Patent Citations

  • Safety monitoring device and safety monitoring system for high-altitude hoisting operation

    CN111006656A

  • Multi-sensor fusion positioning method, device and system and storage medium

    CN116972834A

  • Head-mounted Beidou inertial camera fusion integrated positioning system, device and method

    CN118149792A

  • METHOD FOR DETERMINING THE ORIENTATION OF A SENSOR REFERENCE POINT LINKED TO A MOBILE TERMINAL EQUIPPED WITH A SENSOR ASSEMBLY, WORN BY A USER AND COMPRISING AT LEAST ONE MOTION SENSOR LINKED IN MOTION

    FR3015072A1

  • Method and system for positioning using optical sensor and motion sensors

    WO2022036284A1