Power supply enterprise personal risk assessment method, device and equipment and storage medium

By building a multi-dimensional hierarchical index system and improving the snake heron optimization algorithm, the overall consideration of personal risk assessment and human patrol dependence in the production safety of power supply enterprises has been solved, and the rapid, accurate and reliable risk assessment has been achieved, and the evaluation system has been improved. and timeliness.

CN119005682AInactive Publication Date: 2024-11-22ELECTRIC POWER RES INST CHINA SOUTHERN POWER GRID CO LTD

Patent Information

Application Number
CN202411021129.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2024-11-22
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing technology lacks overall considerations in the production safety of power supply enterprises. Relying on artificial risk inspections leads to time-consuming and labor-intensive assessment and lack of accuracy and reliability, making it difficult to objectively, comprehensively and accurately analyze personal risks.

Method used

Build a multi-dimensional hierarchical index system, obtain information data based on the time section of the accident, use the improved snake heron optimization algorithm to solve the personal risk assessment model, and build objective functions and constraints to ensure the accuracy and reliability of the evaluation results.

Benefits of technology

Through the multi-dimensional hierarchical index system and the improved snake heron optimization algorithm, a rapid, accurate and reliable assessment of personal risks of power supply enterprises is achieved, which avoids the problem of time-consuming and labor-consuming assessment, and improves the systematicity and timeliness of assessment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119005682A_ABST
    Figure CN119005682A_ABST
Patent Text Reader

Abstract

The invention discloses a power supply enterprise personal risk assessment method, device and equipment and a storage medium, and the method comprises the steps: constructing a multi-dimensional hierarchical index system according to a preset power safety production requirement, and the multi-dimensional hierarchical index system comprises a plurality of assessment indexes; calculating a personal risk assessment index of the power supply enterprise based on the power supply enterprise information basic data obtained on the accident occurrence time section and the multi-dimensional hierarchical index system; constructing a personal risk assessment model according to the personal risk assessment indexes, wherein the personal risk assessment model comprises a target function and constraint conditions; and solving the personal risk assessment model by adopting an improved snake egret optimization algorithm to obtain a personal risk assessment result. The technical problems that the risk assessment is time-consuming and labor-consuming and is lack of accuracy and reliability due to the fact that the prior art lacks overall consideration on safety production of a power supply enterprise and depends on manual risk inspection can be solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of power safety technology, and in particular to a method, device, equipment and storage medium for personal risk assessment in a power supply enterprise. Background Art

[0002] The scale of power grid operation continues to expand, but the level of attention paid to power grid safety issues is insufficient, and it is easy to ignore the safety risks caused by factors such as loopholes in the management mechanism of power supply enterprises, unreasonable resource allocation, insufficient safety awareness of grassroots employees, and insufficient professional skills. Therefore, it is urgent to carry out research on the multi-dimensional assessment method of systematic personal risks in power supply enterprises. For the personal safety of power supply enterprises, accurate and reliable assessment of personal risks can timely discover the hidden risk factors in the power production process, which is a necessary prerequisite for formulating targeted control measures and achieving safe power production.

[0003] At present, the research on power production safety mainly focuses on a specific scenario, such as high-fall accidents, electric shock accidents, object impact accidents, etc., and the overall consideration of power supply enterprises is insufficient. In addition, the research idea requires data granularity to be accurate to the on-site operation behavior layer, which is usually not easy to obtain. In addition, power companies mainly focus on the on-site level to analyze and evaluate the personal risks of power production, which is a "point" work. For the systemic personal risks of power supply companies, they are mainly analyzed and evaluated through safety inspections and safety patrols. On the one hand, it takes a lot of time, manpower, and material resources, and it cannot be carried out regularly, and the timeliness is insufficient; on the other hand, it is highly dependent on the subjective experience of experts, and the application of big data is insufficient, making it difficult to objectively, comprehensively, and accurately analyze and evaluate risks. Summary of the invention

[0004] The present application provides a method, device, equipment and storage medium for personal risk assessment of power supply enterprises, which is used to solve the technical problems that the existing technology lacks overall consideration of power supply enterprise production safety and relies on manual risk inspections, resulting in time-consuming and labor-intensive risk assessment and lack of accuracy and reliability.

[0005] In view of this, the first aspect of the present application provides a method for assessing personal risk of a power supply enterprise, comprising:

[0006] Constructing a multi-dimensional hierarchical indicator system according to preset power production safety requirements, wherein the multi-dimensional hierarchical indicator system includes multiple evaluation indicators;

[0007] Calculate the personal risk assessment index of the power supply enterprise based on the basic information data of the power supply enterprise obtained at the time section of the accident and the multi-dimensional hierarchical index system;

[0008] Constructing a personal risk assessment model based on the personal risk assessment indicators, wherein the personal risk assessment model includes an objective function and constraint conditions;

[0009] The improved snake heron optimization algorithm is used to solve the personal risk assessment model to obtain the personal risk assessment result.

[0010] Preferably, the calculation of the personal risk assessment index of the power supply enterprise based on the basic information data of the power supply enterprise obtained at the time section of the accident and the multi-dimensional hierarchical index system includes:

[0011] Obtain basic information data of power supply enterprises at the time section of the accident;

[0012] Based on the multi-dimensional hierarchical indicator system, the basic indicator influence is calculated according to the basic power supply enterprise information data and the first weight to obtain the basic indicator influence value;

[0013] Based on the multi-dimensional hierarchical indicator system, the influence of the intermediate indicator is calculated according to the impact value of the basic indicator and the second weight, and the personal risk assessment index of the power supply enterprise is obtained.

[0014] Preferably, the step of obtaining basic information data of the power supply enterprise at the time section of the accident also includes:

[0015] The basic information data of the power supply enterprise of different magnitudes are normalized to the optimal value.

[0016] Preferably, the improved snake heron optimization algorithm is used to solve the personal risk assessment model to obtain a personal risk assessment result, including:

[0017] Based on the improved snake heron optimization algorithm, population initialization processing is performed according to the personal risk assessment model to obtain an initial population and initial parameters;

[0018] The population optimization process is divided into three stages based on the cycle, and the optimization stage time is obtained;

[0019] At different optimization stage times, different preset composite functions are used to optimize the initial population by simulating the predation process of secretary birds to obtain personal risk assessment results. The preset composite functions include exponential composite functions, power composite functions and linear composite functions.

[0020] The second aspect of the present application provides a personal risk assessment device for a power supply enterprise, comprising:

[0021] A system construction unit, used to construct a multi-dimensional hierarchical indicator system according to preset power safety production requirements, wherein the multi-dimensional hierarchical indicator system includes multiple evaluation indicators;

[0022] An index calculation unit, used to calculate the personal risk assessment index of the power supply enterprise based on the basic information data of the power supply enterprise obtained at the time section of the accident and the multi-dimensional hierarchical index system;

[0023] A model building unit, used to build a personal risk assessment model according to the personal risk assessment index, wherein the personal risk assessment model includes an objective function and constraint conditions;

[0024] The evaluation and solving unit is used to solve the personal risk evaluation model by using the improved snake heron optimization algorithm to obtain the personal risk evaluation result.

[0025] Preferably, the indicator calculation unit includes:

[0026] The data acquisition subunit is used to obtain basic information data of the power supply enterprise at the time section when the accident occurs;

[0027] A basic calculation subunit, configured to calculate the basic indicator influence based on the multi-dimensional hierarchical indicator system, according to the power supply enterprise information basic data and the first weight, to obtain a basic indicator influence value;

[0028] The intermediate calculation subunit is used to calculate the influence of the intermediate indicator based on the multi-dimensional hierarchical indicator system according to the impact value of the basic indicator and the second weight, so as to obtain the personal risk assessment indicator of the power supply enterprise.

[0029] Preferably, it also includes:

[0030] The normalization unit is used to perform optimal value normalization processing on the basic information data of the power supply enterprise of different magnitudes.

[0031] Preferably, the evaluation and solution unit is specifically used for:

[0032] Based on the improved snake heron optimization algorithm, population initialization processing is performed according to the personal risk assessment model to obtain an initial population and initial parameters;

[0033] The population optimization process is divided into three stages based on the cycle, and the optimization stage time is obtained;

[0034] At different optimization stage times, different preset composite functions are used to optimize the initial population by simulating the predation process of secretary birds to obtain personal risk assessment results. The preset composite functions include exponential composite functions, power composite functions and linear composite functions.

[0035] A third aspect of the present application provides a personal risk assessment device for a power supply enterprise, the device comprising a processor and a memory;

[0036] The memory is used to store program code and transmit the program code to the processor;

[0037] The processor is used to execute the power supply enterprise personal risk assessment method described in the first aspect according to the instructions in the program code.

[0038] A fourth aspect of the present application provides a computer-readable storage medium, wherein the computer-readable storage medium is used to store program code, and the program code is used to execute the power supply enterprise personal risk assessment method described in the first aspect.

[0039] It can be seen from the above technical solutions that the embodiments of the present application have the following advantages:

[0040] In the present application, a method for assessing personal risk of a power supply enterprise is provided, including: constructing a multidimensional hierarchical indicator system according to preset power production safety requirements, the multidimensional hierarchical indicator system including multiple assessment indicators; calculating the personal risk assessment indicators of the power supply enterprise based on the basic information data of the power supply enterprise obtained at the time section of the accident and the multidimensional hierarchical indicator system; constructing a personal risk assessment model based on the personal risk assessment indicators, the personal risk assessment model including an objective function and constraints; and solving the personal risk assessment model using an improved snake-heron optimization algorithm to obtain a personal risk assessment result.

[0041] The personal risk assessment method for power supply enterprises provided in this application constructs a multi-dimensional hierarchical indicator system according to the preset power production safety requirements, fully considers the impact of different factors on personal risk assessment in the safety generation process of power supply enterprises, and can ensure the accuracy and reliability of the assessment results based on actual accident sample indicators; moreover, the assessment model constructed based on personal risk assessment indicators is not affected by human factors, and the use of improved snake-heron optimization algorithm to solve the model can also ensure the accuracy and reliability of the solution results; in addition, the model assessment method can avoid the problem of time-consuming and labor-intensive assessment. Therefore, this application can solve the technical problems that the existing technology lacks overall consideration of power supply enterprise safety production, and relies on human risk inspections, resulting in time-consuming and labor-intensive risk assessment, and lacks accuracy and reliability. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] Figure 1 A flowchart of a method for assessing personal risk in a power supply enterprise provided in an embodiment of the present application;

[0043] Figure 2 A schematic diagram of the structure of a personal risk assessment device for a power supply enterprise provided in an embodiment of the present application;

[0044] Figure 3 A schematic diagram of the interaction between a person, an environment and a tube provided in an embodiment of the present application;

[0045] Figure 4 A schematic diagram of the corresponding relationship between accident samples and indicator data provided in the embodiment of the present application;

[0046] Figure 5 A schematic diagram of an accident causation model provided in an embodiment of the present application. DETAILED DESCRIPTION

[0047] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0048] For easier understanding, see Figure 1 , an embodiment of a personal risk assessment method for a power supply enterprise provided in this application includes:

[0049] Step 101: construct a multi-dimensional hierarchical indicator system according to preset power production safety requirements, wherein the multi-dimensional hierarchical indicator system includes multiple evaluation indicators.

[0050] It should be noted that the preset power production safety requirements of this embodiment are based on the "Hazards and Harmful Factors in the Production Process" as a reference to construct a hierarchical indicator system of "people, materials, environment, and management" for power production safety. For details, please refer to Figure 3 The multidimensional hierarchical indicator system includes basic indicators and intermediate indicators. An intermediate indicator includes multiple basic indicators, and each basic indicator can contain multiple basic parameters. Such a hierarchical relationship can produce hierarchical influences, based on which the impact of the power production safety process on personal risk assessment can be analyzed.

[0051] Examples of basic indicators in the multi-dimensional hierarchical indicator system regarding "people, objects, environment, and management" are as follows: Signing rate of safety production responsibility letters = number of signed safety production responsibility letters / number of personnel in power supply enterprises; Personnel traffic fatigue index = number of employees in power supply enterprises / power supply area of ​​power supply enterprises; Proportion of insulated wires in medium-voltage distribution networks = length of insulated wires in medium-voltage distribution networks of power supply enterprises / length of overhead lines in medium-voltage distribution networks of power supply enterprises; Proportion of medium-voltage distribution network cables = length of medium-voltage distribution network cables in power supply enterprises / length of medium-voltage distribution network lines in power supply enterprises; Effective coverage rate of distribution automation = number of medium-voltage public power distribution networks with distribution automation functions in power supply enterprises Number of lines in use / total number of public lines used by the power supply enterprise; Emergency defect completion rate = number of emergency defects eliminated in time by the power supply enterprise / number of emergency defects that should be eliminated by the power supply enterprise; Hazard treatment completion rate = number of hidden dangers rectified by the power supply enterprise / number of hidden dangers that should be rectified by the power supply enterprise; Terrain index: topographic coefficient of the area where the power supply enterprise is located; Weather index: rainfall in the area where the power supply enterprise is located; Overall human resource allocation = number of employees of the power supply enterprise / total length of the public medium-voltage distribution network lines of the power supply enterprise; Safety and supervision personnel allocation = number of safety and supervision personnel of the power supply enterprise / total amount of operations of the power supply enterprise; Reliability management level = Effective coverage rate of power distribution automation of power supply enterprises / average power outage time of power supply enterprises; Operation plan accuracy rate = 1-(the number of unstarted operation plans of power supply enterprises + the number of delayed operation plans of power supply enterprises + the number of cancelled operation plans of power supply enterprises) / the total number of operation plans of the unit; Operation risk distribution = (the number of low-risk operations of power supply enterprises + the number of acceptable risk operations of power supply enterprises) / the total number of operations of power supply enterprises; Operation type distribution = 1-the number of emergency repair work tickets of power supply enterprises / the total number of work tickets of power supply enterprises; Violation level distribution = the number of serious violations of power supply enterprises / the total number of violations of the unit; Operation violation index = The power supply enterprise's workload / the number of violations of the power supply enterprise; the average violation index = the number of employees of the power supply enterprise / the number of violations of the power supply enterprise; the efficiency index of the investigation and handling of serious violations = the number of serious violations of the power supply enterprise / the number of safety and supervision personnel of the power supply enterprise; the annual accident event management index = the total length of the power supply enterprise's distribution network lines / the number of annual accidents of the power supply enterprise; the accident event management index in the past three years = the total length of the power supply enterprise's distribution network lines / the number of accidents of the power supply enterprise in the past three years; the safety and wind system rating index = the diamond star rating of the power supply enterprise's risk assessment and grading accuracy, reflecting the overall appearance of the power supply enterprise's safety production management. The above are only examples, which can be increased or decreased according to the actual scenario, and are not limited here.

[0052] Step 102: Calculate the personal risk assessment index of the power supply enterprise based on the basic information data of the power supply enterprise obtained at the time section of the accident and the multi-dimensional hierarchical index system.

[0053] Further, step 102 includes:

[0054] Obtain basic information data of power supply enterprises at the time section of the accident;

[0055] Based on the multi-dimensional hierarchical indicator system, the basic indicator influence is calculated according to the basic data of power supply enterprise information and the first weight to obtain the basic indicator influence value;

[0056] Based on the multi-dimensional hierarchical indicator system, the influence of the intermediate indicator is calculated according to the impact value of the basic indicator and the second weight, and the personal risk assessment index of the power supply enterprise is obtained.

[0057] Furthermore, basic information data of power supply enterprises is obtained at the time section of the accident, and then it also includes:

[0058] The basic information data of power supply enterprises of different magnitudes are normalized to the optimal values.

[0059] Please note that Figure 4 For different accidents, the basic data in the indicator system at the defined time section of the accident can be obtained, that is, the basic data of the power supply enterprise information; that is, the basic data of the power supply enterprise information required for the current accident can be obtained according to the hierarchical indicators in the multi-dimensional hierarchical indicator system. In order to facilitate subsequent calculation and analysis, this embodiment will also normalize these basic data. The actual operation is to take the optimal value of each dimensional indicator for normalization calculation. For example, if the larger the basic data value, the better the result of the indicator, then take the maximum value X of the basic data of the indicator max As the benchmark value, the normalized result of all data of this indicator is then calculated:

[0060]

[0061] Among them, X is the basic data of the current indicator, and X' is the normalized result.

[0062] If the smaller the basic data value is, the better the result is, then take the minimum value Y of the basic data of the indicator min As the benchmark value, the normalized result of all data of this indicator is then calculated:

[0063]

[0064] This embodiment sets different weight values ​​to analyze and calculate the influence of different levels of indicators, and then determines the importance of different indicators. Figure 5 The accident causation model of power supply enterprises shown can be used to calculate personal risk assessment indicators:

[0065]

[0066] T=Q1·M1·(Q2·M2+Q3·M3+Q4·M4)

[0067] Among them, q is the first weight, Q is the second weight, M is the basic indicator impact value, T is the overall personal risk assessment index, and X is the normalized basic data. This embodiment selects 22 basic indicator data to participate in the calculation. The actual scenario can be increased or decreased as needed. It is not limited here and is only used as an example. According to the formula example, the first category of intermediate indicators includes two basic indicator data X1 and X2, so the corresponding first weight includes q1 and q2; the others are similar. It can be understood that the larger the value of the overall personal risk assessment index T, the greater the probability of an accident, and the value is close to 1.

[0068] Step 103: construct a personal risk assessment model based on the personal risk assessment indicators, and the personal risk assessment model includes an objective function and constraints.

[0069] According to the personal risk assessment indicators, the following personal risk assessment model can be constructed:

[0070]

[0071] The constraints configured for the personal risk assessment model are:

[0072]

[0073] Where N is the number of accident samples, J k represents the personal risk assessment index value of the power supply enterprise using the k-th accident sample data, w k is the weight value corresponding to each indicator in the kth accident.

[0074] Step 104: Use the improved snake heron optimization algorithm to solve the personal risk assessment model to obtain a personal risk assessment result.

[0075] Furthermore, step 104 includes:

[0076] Based on the improved snake heron optimization algorithm and the personal risk assessment model, the population is initialized to obtain the initial population and initial parameters;

[0077] The population optimization process is divided into three stages based on the cycle, and the optimization stage time is obtained;

[0078] At different optimization stages, different preset composite functions are used to optimize the initial population by simulating the predation process of secretary birds to obtain the personal risk assessment results. The preset composite functions include exponential composite functions, power composite functions and linear composite functions.

[0079] It should be noted that the initial population vector is constructed based on the above information as follows:

[0080] S=[(s1,s2,...,s 22), (s 23 ,s 24 ,s 25 ,s 26 )]

[0081] Among them, s1,s2,......,s 22 is the importance of each dimension indicator of the basic layer; 23 ,s 24 ,s 25 ,s 26 It is the importance of the middle-level risk factors of “people, objects, environment, and management”.

[0082] Initialize the initial population:

[0083] s i,j = l j +r·(u j -l j ),i=1,2,...,V,j=1,2,...,D

[0084] Among them, l j 、u j are the lower and upper limits of the control variable, which are 0 or 1, r is a random variable between [0,1], V is the population size, and D is the individual dimension, that is, the number of weight variables, which can be 26.

[0085] This embodiment divides the population optimization process into three stages according to the time period, so the optimization stage time includes t<1 / 3T, 1 / 3T<t<2 / 3T, 2 / 3T<t<T, where T is the time period, which corresponds to the maximum number of iterations in the algorithm optimization process. Each stage uses a specific preset composite function for optimization processing to balance the search speed and optimization accuracy.

[0086] If the optimization phase time is t<1 / 3T, the search speed needs to be accelerated. This embodiment uses an exponential composite function for optimization:

[0087]

[0088] Where t is the number of iterations, T is the maximum number of iterations, is the updated state of the i-th individual in the first stage, s h,1 、s h,2 are the random candidate solutions of the first stage iteration, s best In order to obtain the optimal individual in the population with the minimum corresponding objective function J, R1 is a 1×1 dimensional vector randomly generated between [0,1], r i,c The reference value for selecting the ith individual strategy is 0.5 in the present invention; rand is a random function, and round is a rounding function.

[0089] If the optimization phase time is 1 / 3T<t<2 / 3T, the search speed should be reduced, and the optimization accuracy should be mainly used for optimization. This embodiment uses a power type composite function for optimization:

[0090]

[0091] Among them, R2 is a 1×D-dimensional array generated by the standard normal distribution, and randn is the standard normal distribution function.

[0092] If the optimization phase time is 2 / 3T<t<T, the optimization accuracy should be focused on. This embodiment uses a linear composite function for optimization:

[0093]

[0094] Here, R3 is a 1×D array generated for the standard normal distribution.

[0095] After each stage of optimization is completed and the latest population is updated, the individuals in the population need to be updated according to the following formula:

[0096]

[0097] Among them, J i represents the risk value calculated by the personal risk assessment model for the i-th individual in the population, s i represents the i-th individual, It represents the current highest risk value in the population. The optimal solution in the population can be updated through successive comparisons.

[0098] The personal risk assessment method for power supply enterprises provided in the embodiment of the present application constructs a multi-dimensional hierarchical indicator system according to the preset power production safety requirements, fully considers the impact of different factors on personal risk assessment in the safety generation process of power supply enterprises, and can ensure the accuracy and reliability of the assessment results based on actual accident sample indicators; moreover, the assessment model constructed based on personal risk assessment indicators is not affected by human factors, and the use of improved snake-heron optimization algorithm to solve the model can also ensure the accuracy and reliability of the solution results; in addition, the model assessment method can avoid the problem of time-consuming and labor-intensive assessment. Therefore, the embodiment of the present application can solve the technical problems that the existing technology lacks overall consideration of power supply enterprise safety production, and relies on human risk inspections, resulting in time-consuming and labor-intensive risk assessment, and lacks accuracy and reliability.

[0099] For easier understanding, see Figure 2 The present application provides an embodiment of a personal risk assessment device for a power supply enterprise, including:

[0100] A system construction unit 201 is used to construct a multi-dimensional hierarchical indicator system according to preset power safety production requirements, wherein the multi-dimensional hierarchical indicator system includes multiple evaluation indicators;

[0101] An index calculation unit 202, used to calculate the personal risk assessment index of the power supply enterprise based on the basic information data of the power supply enterprise obtained at the time section of the accident and the multi-dimensional hierarchical index system;

[0102] A model building unit 203 is used to build a personal risk assessment model according to the personal risk assessment index, and the personal risk assessment model includes an objective function and constraint conditions;

[0103] The evaluation and solving unit 204 is used to solve the personal risk evaluation model by using the improved snake heron optimization algorithm to obtain the personal risk evaluation result.

[0104] Furthermore, the indicator calculation unit 202 includes:

[0105] The data acquisition subunit 2021 is used to acquire basic information data of the power supply enterprise at the time section when the accident occurs;

[0106] The basic calculation subunit 2022 is used to calculate the basic indicator influence based on the multi-dimensional hierarchical indicator system according to the basic data of the power supply enterprise information and the first weight to obtain the basic indicator influence value;

[0107] The intermediate calculation subunit 2023 is used to calculate the influence of the intermediate indicator based on the multi-dimensional hierarchical indicator system according to the basic indicator impact value and the second weight, so as to obtain the personal risk assessment index of the power supply enterprise.

[0108] Furthermore, it also includes:

[0109] The normalization unit 205 is used to perform optimal value normalization processing on basic information data of power supply enterprises of different magnitudes.

[0110] Furthermore, the evaluation and solving unit 204 is specifically used for:

[0111] Based on the improved snake heron optimization algorithm and the personal risk assessment model, the population is initialized to obtain the initial population and initial parameters;

[0112] The population optimization process is divided into three stages based on the cycle, and the optimization stage time is obtained;

[0113] At different optimization stages, different preset composite functions are used to optimize the initial population by simulating the predation process of secretary birds to obtain the personal risk assessment results. The preset composite functions include exponential composite functions, power composite functions and linear composite functions.

[0114] The present application also provides a personal risk assessment device for a power supply enterprise, the device comprising a processor and a memory;

[0115] The memory is used to store the program code and transmit the program code to the processor;

[0116] The processor is used to execute the power supply enterprise personal risk assessment method in the above method embodiment according to the instructions in the program code.

[0117] The present application also provides a computer-readable storage medium, which is used to store program code, and the program code is used to execute the power supply enterprise personal risk assessment method in the above method embodiment.

[0118] In the several embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.

[0119] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0120] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0121] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for executing all or part of the steps of the method described in each embodiment of the present application through a computer device (which can be a personal computer, a server, or a network device, etc.). The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (full name in English: Read-Only Memory, English abbreviation: ROM), random access memory (full name in English: Random Access Memory, English abbreviation: RAM), disk or optical disk and other media that can store program codes.

[0122] As described above, the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application.

Claims

1. A method for assessing personal risk in power supply enterprises. It is characterized in that include: Constructing a multi-dimensional hierarchical indicator system according to preset power production safety requirements, wherein the multi-dimensional hierarchical indicator system includes multiple evaluation indicators; Calculate the personal risk assessment index of the power supply enterprise based on the basic information data of the power supply enterprise obtained at the time section of the accident and the multi-dimensional hierarchical index system; Constructing a personal risk assessment model based on the personal risk assessment indicators, wherein the personal risk assessment model includes an objective function and constraint conditions; The improved snake heron optimization algorithm is used to solve the personal risk assessment model to obtain the personal risk assessment result.

2. The personal risk assessment method for power supply enterprises according to claim 1, It is characterized in that The personal risk assessment index of the power supply enterprise is calculated based on the basic information data of the power supply enterprise obtained at the time section of the accident and the multi-dimensional hierarchical index system, including: Obtain basic information data of power supply enterprises at the time section of the accident; Based on the multi-dimensional hierarchical indicator system, the basic indicator influence is calculated according to the basic power supply enterprise information data and the first weight to obtain the basic indicator influence value; Based on the multi-dimensional hierarchical indicator system, the influence of the intermediate indicator is calculated according to the impact value of the basic indicator and the second weight, and the personal risk assessment index of the power supply enterprise is obtained.

3. The personal risk assessment method for power supply enterprises according to claim 2, It is characterized in that The basic data of power supply enterprise information is obtained at the time section of the accident, and then it also includes: The basic information data of the power supply enterprise of different magnitudes are normalized to the optimal value.

4. The personal risk assessment method for power supply enterprises according to claim 1, It is characterized in that The improved snake heron optimization algorithm is used to solve the personal risk assessment model to obtain a personal risk assessment result, including: Based on the improved snake heron optimization algorithm, population initialization processing is performed according to the personal risk assessment model to obtain an initial population and initial parameters; The population optimization process is divided into three stages based on the cycle, and the optimization stage time is obtained; At different optimization stage times, different preset composite functions are used to optimize the initial population by simulating the predation process of secretary birds to obtain personal risk assessment results. The preset composite functions include exponential composite functions, power composite functions and linear composite functions.

5. A personal risk assessment device for power supply enterprises, It is characterized in that include: A system construction unit, used to construct a multi-dimensional hierarchical indicator system according to preset power safety production requirements, wherein the multi-dimensional hierarchical indicator system includes multiple evaluation indicators; An index calculation unit, used to calculate the personal risk assessment index of the power supply enterprise based on the basic information data of the power supply enterprise obtained at the time section of the accident and the multi-dimensional hierarchical index system; A model building unit, used to build a personal risk assessment model according to the personal risk assessment index, wherein the personal risk assessment model includes an objective function and constraint conditions; The evaluation and solving unit is used to solve the personal risk evaluation model by using the improved snake heron optimization algorithm to obtain the personal risk evaluation result.

6. The personal risk assessment device for power supply enterprises according to claim 5, It is characterized in that The indicator calculation unit includes: The data acquisition subunit is used to obtain basic information data of the power supply enterprise at the time section when the accident occurs; A basic calculation subunit, configured to calculate the basic indicator influence based on the multi-dimensional hierarchical indicator system, according to the power supply enterprise information basic data and the first weight, to obtain a basic indicator influence value; The intermediate calculation subunit is used to calculate the influence of the intermediate indicator based on the multi-dimensional hierarchical indicator system according to the impact value of the basic indicator and the second weight, so as to obtain the personal risk assessment indicator of the power supply enterprise.

7. The personal risk assessment device for power supply enterprises according to claim 6, It is characterized in that Also includes: The normalization unit is used to perform optimal value normalization processing on the basic information data of the power supply enterprise of different magnitudes.

8. The personal risk assessment device for power supply enterprises according to claim 5, It is characterized in that The evaluation and solution unit is specifically used for: Based on the improved snake heron optimization algorithm, population initialization processing is performed according to the personal risk assessment model to obtain an initial population and initial parameters; The population optimization process is divided into three stages based on the cycle, and the optimization stage time is obtained; At different optimization stage times, different preset composite functions are used to optimize the initial population by simulating the predation process of secretary birds to obtain personal risk assessment results. The preset composite functions include exponential composite functions, power composite functions and linear composite functions.

9. A personal risk assessment device for power supply enterprises, It is characterized in that The device comprises a processor and a memory; The memory is used to store program code and transmit the program code to the processor; The processor is used to execute the power supply enterprise personal risk assessment method described in any one of claims 1-4 according to the instructions in the program code.

10. A computer-readable storage medium, It is characterized in that The computer-readable storage medium is used to store program code, and the program code is used to execute the power supply enterprise personal risk assessment method described in any one of claims 1-4.

Citation Information

Patent Citations

  • Power operation personal safety risk evaluation method and device

    CN116109140A

  • Power supply enterprise safety responsibility control strategy optimization method and device and electronic device

    CN116843075A

Cited By

  • Personal risk feature extraction method and device, computer equipment and program product

    CN121210977A