Intelligent logistics storage cart management method and system
By automatically analyzing and planning the loading paths and sequences in logistics warehousing orders, the efficiency problem of smart carts when loading carts in different sizes is solved, achieving faster and more efficient cargo processing.
Patent Information
- Application Number
- CN202411459549.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-18
- Publication Date
- 2024-11-22
AI Technical Summary
In modern logistics and warehousing systems, when loading goods, the loading process is complicated and time-consuming due to differences in cargo size and weight. Especially when the initial cargo area is larger than the cargo exposure area, the cargo position needs to be readjusted due to the difference in cargo size and weight. The order of placement affects the pickup efficiency.
By analyzing logistics warehousing orders, automatically plan loading paths based on the quality information and loading planning strategies of the target items, optimize loading order and paths, ensure balanced loading of carts, use carts to accommodate space, avoid waste of goods, and adopt synergy if necessary Loading solves the problem of large-area cargo.
It reduces the loading time of goods, improves the pick-up efficiency, ensures balanced loading of the cart, avoids the problem that a single cart cannot carry large areas of goods, and improves the overall loading efficiency and transparency.
Smart Images

Figure CN119005866A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to data processing technology, and in particular to an intelligent logistics warehousing cart management method and system. Background Art
[0002] In modern logistics warehousing systems, the introduction of automation and intelligent technologies has greatly improved the efficiency of cargo handling. However, the sizes and weights of goods in orders vary, making the loading process of smart carts complicated and time-consuming. In particular, when the area of the initial cargo is larger than the open area of the cart, the subsequent cargo cannot be placed in the cart, and the order of cargo placement must be readjusted, which not only wastes time but also affects the overall efficiency of picking up goods.
[0003] The traditional way of picking up goods usually configures the corresponding picking path according to the position of the items in the shelf so that the smart cart can pick up the goods. However, this method does not consider the impact of the size of the goods on the loading order. When the area of the goods initially picked up is larger than the open area of the cart, the smart cart needs to take away the large area of goods, place the small area of goods first, and then re-place the large area of goods. This operation process is cumbersome, wastes a lot of time, and seriously affects the efficiency of picking up goods.
[0004] Therefore, how to automatically plan the loading route based on the information of the actual order items, reduce the loading time of goods, and improve the efficiency of picking up goods has become an urgent problem that needs to be solved. Summary of the invention
[0005] The embodiment of the present invention provides an intelligent logistics warehousing cart management method and system, which can automatically plan the loading path according to the information of the actual order items, reduce the loading time of the goods, and improve the efficiency of picking up the goods.
[0006] A first aspect of an embodiment of the present invention provides an intelligent logistics warehousing cart management method, comprising: Receiving a logistics warehousing order sent by a demand side, parsing the logistics warehousing order, and obtaining a plurality of target items corresponding to the logistics warehousing order; Based on the mass information of the target object, each cart end is configured with a corresponding loading object, and the loading of the cart end is planned according to the loading planning strategy and the loading object to obtain a loading sequence corresponding to each cart end, and a loading path corresponding to each cart end is determined based on the loading sequence; Acquire the real-time position of the cart end in the loading path, transform the loading path according to the progress display strategy and the real-time position, and generate a task progress axis corresponding to each cart end; The real-time progress and total task progress of the task progress axis corresponding to each cart end are obtained, and based on the real-time progress and the total task progress, a fusion progress axis corresponding to the logistics warehousing order is generated and sent to the demand end.
[0007] Optionally, in a possible implementation manner of the first aspect, configuring corresponding loading items for each cart end based on the mass information of the target item includes: Acquire quality information of the target items, and sort the target items in ascending order according to the quality information to obtain an item sequence; Retrieving the load limit of the corresponding cart end, selecting the first and last target items in the item sequence as the selected items, and accumulating the quality information of the selected items to obtain the cumulative selection quality; When it is determined that the cumulative selection mass is less than or equal to the carrying limit, the item sequence is deleted and updated according to the selected items to obtain a current item sequence; Repeat the above steps of obtaining the current item sequence until the cumulative picked mass is greater than the load limit, or the current item sequence does not have the target item, and then count the corresponding picked items as the loaded items at the corresponding cart end.
[0008] Optionally, in a possible implementation manner of the first aspect, the performing loading planning on the cart ends according to the loading planning strategy and the loaded items to obtain a loading sequence corresponding to each cart end, and determining a loading path corresponding to each cart end based on the loading sequence includes: Retrieving the accommodation dimensions of the accommodation space corresponding to the cart end, the accommodation dimensions including the accommodation length and the accommodation width, and obtaining the loading dimensions corresponding to the loaded items, the loading dimensions including the loading length and the loading width; When it is determined that the loading length is greater than the accommodation length, and / or the loading width information is greater than the accommodation width information, the corresponding loading items are regarded as external loading items, and the remaining loading items are regarded as internal loading items; Obtaining an internal loading area corresponding to the internally loaded items according to the product of the loading length of the internally loaded items and the loading width, and determining an internal loading sequence corresponding to the internally loaded items based on the internal loading area; Obtaining an external loading area corresponding to the external loading items according to the product of the loading length of the external loading items and the loading width, and sorting the external loading items in descending order based on the external loading areas to obtain an external loading sequence corresponding to the external loading items; The external loading sequence is spliced to the rear of the internal loading sequence to obtain the loading sequence corresponding to each cart end, and the loading path corresponding to each cart end is determined based on the position information of each loaded object in the loading sequence.
[0009] Optionally, in a possible implementation manner of the first aspect, determining the internal loading sequence corresponding to the internally loaded items based on the internal loading area includes: Determine the stacked loading items corresponding to each stacked layer according to the internal loading area, count the stacked loading items corresponding to each stacked layer, obtain a stacked loading set corresponding to each stacked layer, and sort the stacked loading set in ascending order based on the number of layers of the stacked layers to obtain a stacked layer sequence; Obtaining position information corresponding to the base loading object as the starting position, selecting the first stacking loading set in the stacking layer sequence as the planning set, and obtaining position information of the stacking loading objects in the planning set as the planning position; Based on the planned position and the starting position, determine the stacked loading item in the planned set that is closest to the base loading item as a connected loading item, and add the connected loading item to the back of the base loading item to obtain an internal construction sequence; Deleting and updating the planning set according to the connected loading objects to obtain a current planning set, and obtaining the position information of the connected loading objects as the connection position; Based on the connection position and the planned position in the current planning set, determine the superimposed loading item in the current planning set that is closest to the connected loading item as a relay loading item, and add the relay loading item to the rear of the internal construction sequence to obtain the current internal construction sequence; The relay loaded item is used as the current connected loaded item, and the above steps of obtaining the current internal construction sequence are repeated until the current planning set is an empty set, thereby obtaining a relay superposition layer sequence; The last relay loading item in the relay overlay sequence is used as the current base loading item, the first overlay loading set in the overlay sequence is deleted, and the above steps of obtaining the relay overlay sequence are repeated until there is no overlay loading set in the overlay sequence, thereby obtaining an internal loading sequence.
[0010] Optionally, in a possible implementation manner of the first aspect, determining the stacked loading objects corresponding to each stacking layer according to the internal loading area includes: The largest internal loading area is selected as the base area, and the internal loading items corresponding to the base area are selected as the base loading items, and the remaining internal loading items are sorted in descending order based on the internal loading area to obtain a pending loading sequence; Sequentially select the internal loading areas corresponding to the internally loaded items in the pending loading sequence and add them up to obtain a cumulative selection area; When it is determined that the cumulative selection area is less than or equal to the base area, the selected internal loading items are deleted and updated from the pending loading sequence to obtain a current pending loading sequence; Until the accumulated picking area is larger than the base area, or the current pending loading sequence has no internal loading items, the corresponding internal loading items are used as the superimposed loading items of the corresponding superimposed layer.
[0011] Optionally, in a possible implementation of the first aspect, acquiring the real-time position of the cart end in the loading path, converting the loading path according to a progress display strategy and the real-time position, and generating a task progress axis corresponding to each cart end includes: Decomposing the loading path based on the position information of the loaded objects to obtain a plurality of sub-loading paths, each of which has two corresponding position information; The order of the loaded items corresponding to the position information in the loading sequence is obtained as the arrangement order, the sub-loading paths are sorted based on the arrangement order to obtain a sub-path sequence, and the loaded items corresponding to the position information are added to both sides of the corresponding sub-loading path in the sub-path sequence to obtain a fused cargo distribution sequence; Obtaining the placement height of the loaded items, and calculating according to the loading size of the loaded items and the placement height to obtain the corresponding distribution time of the loaded items; Determine the moving speed of the cart end, and obtain the moving time corresponding to the sub-loading path according to the ratio of the distance of the sub-loading path and the moving speed; According to the ratio of the cargo distribution time to the preset time, a cargo distribution scaling factor is obtained, and the preset progress axis is processed based on the cargo distribution scaling factor to obtain a cargo distribution progress axis corresponding to the cargo distribution time; Based on the ratio of the moving duration to the preset duration, a moving scaling factor is obtained, and based on the moving scaling factor, a preset progress axis is processed to obtain a moving progress axis corresponding to the moving duration, and the preset duration has a corresponding preset progress axis; According to the order of loading items and sub-path sequences in the fused cargo distribution sequence, the corresponding cargo distribution progress axis and the moving progress axis are sequentially spliced to generate an initial progress axis corresponding to each cart end; Acquire the real-time position of the cart end in the loading path, determine the travel distance of the cart end based on the real-time position, and complete the loading items of the cargo as the pickup items; Counting the delivery time corresponding to the picked-up items to obtain the real-time delivery time, and obtaining the real-time moving time according to the ratio of the walking distance and the moving speed; Obtaining an update duration corresponding to the real-time location according to the sum of the real-time distribution duration and the real-time movement duration; The total task duration of the initial progress axis is obtained, and the progress ratio is obtained according to the ratio of the update duration to the total task duration. The initial progress axis is updated based on the progress ratio to obtain the task progress axis corresponding to each cart end.
[0012] Optionally, in a possible implementation manner of the first aspect, obtaining the placement height of the loaded items and calculating according to the loading size of the loaded items and the placement height to obtain the distribution time corresponding to the loaded items includes: Acquire the placement height of the loaded items, and obtain a height deviation coefficient according to the ratio of the placement height to a preset height; A length offset coefficient is obtained based on a ratio of a loading length corresponding to a loading size of the loaded items to a preset length, and a width offset coefficient is obtained based on a ratio of a loading width corresponding to a loading size of the loaded items to a preset width; Performing an offset process on the preset cargo distribution time according to the height offset coefficient, the length offset coefficient, and the width offset coefficient to obtain the cargo distribution time corresponding to the loaded items; The delivery time is obtained by the following formula: , in, For the delivery time, To preset the delivery time, For placement height, For the preset height, is the height weight value, is the loading length, is the preset length, is the length weight value, is the loading width, is the preset width, is the width weight value.
[0013] Optionally, in a possible implementation manner of the first aspect, acquiring the real-time progress and the total task progress of the task progress axis corresponding to each of the cart ends, and generating a fused progress axis corresponding to the logistics warehousing order according to the real-time progress and the total task progress, and sending it to the demand end, includes: Obtain the update duration of the task progress axis corresponding to each of the cart ends as the real-time progress, and the total duration of the task as the total progress of the task; Counting the total progress of tasks corresponding to each of the task progress axes to obtain the fused total progress, and counting the real-time progress corresponding to each of the task progress axes to obtain the fused real-time progress; According to the ratio of the total fusion progress and the preset duration, a fusion scaling coefficient is obtained, and the preset progress axis is processed based on the fusion scaling coefficient to obtain an initial fusion axis corresponding to the total fusion progress; Based on the ratio of the real-time fusion progress and the total fusion progress, the fusion progress ratio is obtained, and the initial fusion axis is updated according to the fusion progress ratio to obtain the fusion progress axis corresponding to the logistics warehousing order and send it to the demand side.
[0014] Optionally, in a possible implementation of the first aspect, a storage area corresponding to the storage space is obtained according to the product of the storage length and the storage width, and an area ratio is obtained based on a ratio of the external loading area to the storage area; When it is determined that the area ratio is greater than 2, the corresponding externally loaded items are used as cooperatively loaded items, and the cart end with the cooperatively loaded items is used as the first cooperative end; The mass information of the external loaded items corresponding to the first collaborative end is counted to obtain the collaborative mass, the residual mass is obtained according to the difference between the load limit and the collaborative mass, and the loading mass of the loaded items corresponding to the cart end is obtained, and the cart end whose loading mass is less than or equal to the residual mass is selected as the second collaborative end; Using the internal loading sequence corresponding to the first collaborative end as a first asynchronous loading path, and using the internal loading sequence corresponding to the second collaborative end as a second asynchronous loading path; Determine an external loading sequence corresponding to the first collaborative end as a first synchronous loading sequence, and determine an external loading sequence corresponding to the second collaborative end as a second synchronous loading sequence, count the external loading items in the first synchronous loading sequence and the external loading items in the second synchronous loading sequence, and obtain a synchronous loading set; Deleting and updating the synchronous loading set based on the cooperative loading object to obtain an actual synchronous set, obtaining position information corresponding to the cooperative loading object as a synchronous loading position, and a synchronous superposition position of external loading objects in the actual synchronous set; According to the synchronous loading position and the synchronous superposition position, determine the external loading item in the actual synchronous set that is closest to the coordinated loading item as a subsequent loading item, and add the subsequent loading item to the rear of the coordinated loading item to obtain a subsequent construction sequence; Deleting and updating the actual synchronization set based on the subsequent loading object to obtain a current actual synchronization set, and obtaining the position information of the corresponding subsequent loading object as the current synchronization loading position; Repeat the above steps of obtaining a subsequent build sequence until the current actual synchronization set is an empty set, and obtain a synchronization loading path; Updating the synchronous mounting path to the first asynchronous mounting path to obtain a fused mounting path corresponding to the first collaborative end; The synchronous mounting path is updated to the second asynchronous mounting path to obtain a fused mounting path corresponding to the second cooperative end.
[0015] A second aspect of an embodiment of the present invention provides an intelligent logistics warehousing cart management system, including: The parsing module is used to receive the logistics warehousing order sent by the demand side, parse the logistics warehousing order, and obtain multiple target items corresponding to the logistics warehousing order; A planning module, configured to configure corresponding loading items for each cart end based on the mass information of the target item, perform loading planning for the cart end according to the loading planning strategy and the loading items, obtain a loading sequence corresponding to each cart end, and determine a loading path corresponding to each cart end based on the loading sequence; A conversion module, used to obtain the real-time position of the cart end in the loading path, convert the loading path according to the progress display strategy and the real-time position, and generate a task progress axis corresponding to each cart end; A generation module is used to obtain the real-time progress and total task progress of the task progress axis corresponding to each cart end, and generate a fusion progress axis corresponding to the logistics warehousing order based on the real-time progress and the total task progress, and send it to the demand end.
[0016] According to a third aspect of an embodiment of the present invention, there is provided an electronic device, comprising: a memory, a processor and a computer program, wherein the computer program is stored in the memory, and the processor runs the computer program to execute the first aspect of the present invention and various methods that may be involved in the first aspect.
[0017] According to a fourth aspect of an embodiment of the present invention, a storage medium is provided, in which a computer program is stored. When the computer program is executed by a processor, it is used to implement the first aspect of the present invention and various methods that may be involved in the first aspect.
[0018] The beneficial effects of the present invention are as follows: 1. The present invention can automatically plan the loading path according to the information of the actual order items, reduce the loading time of goods, and improve the efficiency of picking up goods. First of all, the present invention can parse the logistics warehousing order and obtain the detailed information of the corresponding items, so that the loading path of the items can be automatically planned according to the detailed information of the items, so as to facilitate the subsequent loading of items, reduce the time of adjusting the order of goods placement, and improve the efficiency of logistics loading. In addition, the present invention can also transform the loading path according to the progress display strategy and real-time position, generate the task progress axis corresponding to each cart end, and intuitively display the task completion status of each cart, so that the operator can grasp the progress of logistics operations in real time. In addition, the present invention can also send the task progress axis to the demand side, and the demand side personnel can view the order execution status in real time, which improves the transparency and efficiency of order processing.
[0019] 2. The present invention can reasonably distribute the load of each cart to ensure that the carrying capacity of each cart is within a safe range. At the same time, through loading planning strategies, optimizing loading sequence and loading paths, an efficient cargo loading process is achieved. This implementation reduces the uneven load phenomenon of the carts, improves loading efficiency, and reduces cargo loading time. In addition, the present invention can also retrieve the size of the cart's storage space and the size of the loaded items, determine whether the items need to be loaded externally, and sort and plan the path based on the area of the items. This method not only takes into account the weight of the items, but also makes full use of the cart's loading area, reduces the waste of cart space, optimizes the loading sequence, and further improves loading efficiency.
[0020] 3. The present invention can also enable carts to collaboratively load items with a larger area, avoiding the problem that a single cart cannot carry large items, and improving the overall loading efficiency. When the area of the items is too large, the present invention can automatically select two carts for collaborative loading and comprehensively plan the collaborative loading path. This method ensures the safe transportation of large-area goods and avoids the problem that a single cart cannot carry large items. At the same time, through the planning of synchronous loading paths, the operation time of the collaborative cart is reduced, and the overall loading efficiency is improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 This is a flow chart of an intelligent logistics warehousing cart management method provided by the present invention; Figure 2 A schematic diagram of a fusion progress axis provided by the present invention; Figure 3 This is a structural schematic diagram of an intelligent logistics warehousing cart management system provided by the present invention; Figure 4 A schematic diagram of the hardware structure of an electronic device provided by the present invention. DETAILED DESCRIPTION
[0022] The technical solution of the present invention is described in detail with specific embodiments below. The following specific embodiments can be combined with each other, and the same or similar concepts or processes may not be described in detail in some embodiments.
[0023] like Figure 1 As shown, the present invention provides an intelligent logistics warehousing cart management method, comprising: S1, receiving a logistics warehousing order sent by a demand side, parsing the logistics warehousing order, and obtaining a plurality of target items corresponding to the logistics warehousing order.
[0024] It should be noted that since the area of the goods in the order is different, the traditional picking method only configures the corresponding picking path according to the position of the items in the shelf so that the intelligent robot vehicle can pick up the goods. However, when the area of the initial picked goods is larger than the open area of the picking cart, the subsequent items to be picked up will not be able to be placed in the cart. It is necessary to take away the large area, put the small area of goods into the cart, and then place the large area of goods on the cart, which wastes picking time and affects the picking efficiency. Therefore, the received logistics warehousing orders can be analyzed to determine the corresponding target items, so that the corresponding loading path can be automatically planned according to the area of the items, reducing the loading time of goods and improving the picking efficiency.
[0025] It can be understood that the demand side is the information terminal of the person who receives the logistics goods, such as the mobile phone of the logistics pick-up personnel, the logistics warehousing order is the goods order of the logistics warehousing, and the target item is the goods corresponding to the demand side.
[0026] Through the above implementation, the present invention can determine the target items on the demand side, so as to subsequently quickly load the items according to the storage location of the corresponding target items.
[0027] S2, configuring corresponding loading items for each cart end based on the mass information of the target item, performing loading planning for the cart end according to the loading planning strategy and the loading items, obtaining the loading sequence corresponding to each cart end, and determining the loading path corresponding to each cart end based on the loading sequence.
[0028] It is understandable that, since the carts loaded with goods have corresponding load limits, the items to be loaded in each cart can be determined according to the corresponding weights of the items, and then the corresponding loading path of the cart end can be determined through the loading planning strategy and the loaded items.
[0029] Among them, the mass information is the weight of the target item, the cart end is the cart carrying the item, the loaded item is the item loaded on the corresponding cart, the loading sequence is the sequence of the order in which the items are loaded on the cart, and the loading path is the path of the cart loading the items.
[0030] Through the above implementation, the present invention can determine the loading path corresponding to each cart end, so that the cart can quickly load the corresponding items according to the loading path, thereby improving the loading efficiency.
[0031] In some embodiments, the specific implementation of step S2 (configuring corresponding loading items at each cart end based on the mass information of the target item) includes: S21, obtaining quality information of the target items, and sorting the target items in ascending order according to the quality information to obtain an item sequence.
[0032] It is understandable that in order to ensure that the weight of the items carried in each cart is within the loadable range, the target items may be sorted in ascending order based on the mass information, so as to subsequently allocate the items to each cart.
[0033] The item sequence is a sequence in which the target items are arranged in order from low to high according to the item weight.
[0034] S22, retrieve the load limit of the corresponding cart end, select the first and last target items in the item sequence as the selected items, and accumulate the quality information of the selected items to obtain the accumulated selection quality.
[0035] It can be understood that the load limit is the maximum weight that the cart can carry, picking items is to pick out items in the item sequence to be assigned to the cart, that is, the target items at the head and tail of the item sequence, and the cumulative picking mass is the total weight of the picked items.
[0036] It is not difficult to understand that by selecting the first and last items in the item sequence as the selected items in sequence, the weight allocated to each cart for loading items can be kept balanced, so that the number of items loaded on each cart is approximately the same.
[0037] S23, when it is determined that the accumulated selection mass is less than or equal to the carrying limit, the item sequence is deleted and updated according to the selected items to obtain a current item sequence.
[0038] It is understandable that when the cumulative selection mass is less than or equal to the carrying limit, it can be said that the cart can carry the currently selected items. Therefore, in order to continue to select carrying items for the cart in the item sequence and avoid items being selected repeatedly, the items that meet the cart carrying conditions can be deleted from the item sequence, so as to facilitate the subsequent selection of cart carrying items in the current item sequence.
[0039] S24, repeating the above steps of obtaining the current item sequence until the cumulative picked mass is greater than the load limit, or the current item sequence does not have the target item, and counting the corresponding picked items as the loaded items at the corresponding cart end.
[0040] It can be understood that when the mass of the items selected for the cart is not greater than the load limit of the corresponding cart, it can be said that the corresponding cart can continue to be loaded with items. Therefore, the above steps of determining the selected items and deleting and updating the current item sequence when the requirements are met can be repeated. Furthermore, when the cumulative selected mass is greater than the load limit, it can be said that the total weight of the selected items exceeds the weight that the cart can bear. Therefore, the items that have been selected and deleted in the item sequence are used as the loading items of the cart. When it is determined that the current item sequence does not contain the target item, it can be said that the items in the item sequence have been selected and allocated to the corresponding cart for carrying. Therefore, the items selected for each cart can be used as the loading items of the corresponding cart.
[0041] The loaded items are the items that the cart carries.
[0042] In some embodiments, the specific implementation of step S2 (the loading planning of the cart ends according to the loading planning strategy and the loaded items, obtaining the loading sequence corresponding to each cart end, and determining the loading path corresponding to each cart end based on the loading sequence) includes: S25, retrieve the accommodation dimensions of the accommodation space corresponding to the cart end, the accommodation dimensions including the accommodation length and the accommodation width, and obtain the loading dimensions corresponding to the loaded items, the loading dimensions including the loading length and the loading width.
[0043] It can be understood that the accommodating space is the space that the cart can accommodate items, the accommodating size is the size of the cart corresponding to the accommodating space, including the accommodating length and the accommodating width, wherein the accommodating length is the length of the accommodating space, and the accommodating width is the width of the accommodating space, and the loading size is the size of the loaded items, including the loading length and the loading width, wherein the loading length is the length of the loaded items, and the loading width is the width of the loaded items.
[0044] It is not difficult to understand that by determining the capacity size of the cart and the loading size of the loaded items, it is convenient to subsequently determine the items that can be loaded inside the cart and the items that can be loaded outside the cart, and then plan a reasonable loading sequence to reduce the waste of cart space.
[0045] S26, when it is determined that the loading length is greater than the accommodating length, and / or the loading width information is greater than the accommodating width information, the corresponding loaded items are regarded as external loaded items, and the remaining loaded items are regarded as internal loaded items.
[0046] It can be understood that when the loading length is greater than the accommodating length, and / or the loading width is greater than the accommodating width, it can be explained that the corresponding loaded items cannot be placed regularly inside the cart. Therefore, they can be treated as external loading items so that they can be placed outside the cart later, and the remaining loading items with a size less than or equal to the accommodating size can be treated as internal loading items so that they can be smoothly loaded inside the cart later.
[0047] Among them, the externally loaded items are items loaded on the outside of the cart, and the internally loaded items are items loaded on the inside of the cart.
[0048] S27, obtaining an internal loading area corresponding to the internally loaded items according to the product of the loading length of the internally loaded items and the loading width, and determining an internal loading sequence corresponding to the internally loaded items based on the internal loading area.
[0049] It can be understood that the internal loading area is the area of the internally loaded items, that is, the product of the loading length of the corresponding items and the loading width, and the internal loading sequence is the sequence of the internally loaded items arranged in order.
[0050] It is not difficult to understand that the length and width of the internally loaded items are multiplied to determine the corresponding internal loading area, and then the internally loaded items can be arranged according to the internal loading area, so that the order of taking the internally loaded items can be determined according to the internal loading sequence, and then the loading route for loading the internally loaded items on the corresponding cart can be determined.
[0051] In some embodiments, the specific implementation of step S27 (determining the internal loading sequence corresponding to the internally loaded items based on the internal loading area) includes: S271, determining the stacked loading items corresponding to each stacked layer according to the internal loading area, and counting the stacked loading items corresponding to each stacked layer to obtain a stacked loading set corresponding to each stacked layer, and sorting the stacked loading set in ascending order based on the number of layers of the stacked layers to obtain a stacked layer sequence.
[0052] It is understandable that since the area for the cart to carry items is limited, when there are multiple items, the items can be loaded in layers. Therefore, the stacked loading items and the stacked layer sequence corresponding to each stacked layer can be determined according to the internal loading area, so that the corresponding stacked layer sequence can be subsequently spliced and sorted to obtain the corresponding internal loading sequence.
[0053] Among them, the stacking layer is an item layer where the items loaded inside the cart are stacked and placed, such as the first layer, the second layer, etc., the stacked loaded items are the loaded items corresponding to the stacking layer, for example, the first layer is loaded with item A, and the second layer can be loaded with item B and item C, that is, each stacking layer has corresponding stacked loaded items, the stacking loading set is a set of stacking loaded items corresponding to each stacking layer, and the stacking layer sequence is a sequence after the stacking loading set is sorted in ascending order, that is, a sequence after the corresponding stacking loading set is sorted in ascending order according to the number of stacking layers.
[0054] In some embodiments, the specific implementation of step S271 (determining the stacked loading items corresponding to each stacked layer according to the internal loading area) includes: S2711, select the largest internal loading area as the base area, and the internal loading items corresponding to the base area as the base loading items, and sort the remaining internal loading items in descending order based on the internal loading area to obtain a pending loading sequence.
[0055] It can be understood that the base area is the largest internal loading area, and the largest area is selected as the base area to facilitate the stacking of subsequent items and improve the stability of the loaded items. The base loaded items are the internal loaded items corresponding to the base area, and the pending loading sequence is the sequence of internal loaded items waiting to be sorted, that is, the sequence after the internal loaded items are arranged from large to small according to the corresponding areas.
[0056] It is not difficult to understand that after arranging the internal loaded items in descending order from large to small, the items with larger areas can be selected in turn for priority arrangement and loading, so as to facilitate the loading of items with smaller areas in turn and achieve the stability of the items in placement.
[0057] S2712, sequentially selecting the internal loading areas corresponding to the internally loaded items in the pending loading sequence and accumulating them to obtain a cumulative selection area.
[0058] It can be understood that in order to ensure that the corresponding loaded items of each layer can be stably placed above the corresponding next layer, and to ensure that as many items as possible can be placed in the same layer, the internal loaded items can be selected in sequence in the pending loading sequence, and the areas of the corresponding items can be accumulated to obtain the cumulative selection area, so as to determine the internal loaded items of the corresponding stacked layer.
[0059] The cumulative selection area is the sum of the internal loading areas corresponding to the internal loading items selected in the pending loading sequence.
[0060] S2713: When it is determined that the cumulative selection area is less than or equal to the base area, the selected internal loading items are deleted and updated from the pending loading sequence to obtain a current pending loading sequence.
[0061] It can be understood that when the cumulative picking area is less than or equal to the base area, it can be explained that the area of the corresponding selected internal loading items is less than or equal to the base area, and the corresponding internal loading items can be firmly placed on the base device items. Therefore, the selected internal loading items can be deleted and updated in the pending loading sequence to avoid repeated selection of the same internal loading items during subsequent item picking.
[0062] S2714, until the accumulated picking area is larger than the base area, or the current pending loading sequence does not have any internal loading items, the corresponding internal loading items are used as the stacking loading items of the corresponding stacking layer.
[0063] It can be understood that when the cumulative selection area is larger than the base area, it can be explained that the sum of the areas of the multiple internal loading items currently selected exceeds the base area, and thus cannot be simultaneously superimposed on the base loading items. Therefore, the internal loading items that have been selected and deleted in the pending loading sequence can be used as the superimposed loading items of the corresponding superimposed layer. Similarly, when it is determined that the current pending loading sequence does not contain any internal loading items, it can be explained that the internal loading items in the pending loading sequence have been selected, and thus the corresponding selected internal loading items can be used as the superimposed loading items of the corresponding superimposed layer.
[0064] Through the above-mentioned implementation mode, the present invention can determine the internal load items loaded in the corresponding stacking layer inside each cart, so as to subsequently determine the arrangement order of multiple load items corresponding to the same stacking layer, and then determine the item device sequence of each cart, so as to subsequently automatically plan the corresponding loading route.
[0065] S272, obtaining the position information corresponding to the base loading items as the starting position, selecting the first stacking loading set in the stacking layer sequence as the planning set, and obtaining the position information of the stacking loading items in the planning set as the planning position.
[0066] It can be understood that since the first items loaded will be placed on the bottom layer of the cart, the position information of the base loaded items can be used as the starting information, and the first superimposed loading set in the superimposed layer sequence can be selected as the planning set, thereby using the position information of the superimposed loading items in the planning set as the planning information.
[0067] Among them, the location information is the location of the items in the storage warehouse, such as the second layer of shelf No. 1, the first layer of shelf No. 3, etc., that is, each loaded item has a corresponding preset position, the starting position is the starting position of the cart's loading route for the items, and the planned position is the position of the superimposed loaded items in the selected superimposed loading set.
[0068] It is not difficult to understand that after determining the starting position, the position of the stacked loaded items stacked on the corresponding items can be obtained, so that the loading order of the stacked loaded items corresponding to the corresponding stacked layer can be determined based on the interval distance between the planned position and the starting position.
[0069] S273, based on the planned position and the starting position, determine the superimposed loading item in the planned set that is closest to the base loading item as a connected loading item, add the connected loading item to the back of the base loading item, and obtain an internal construction sequence.
[0070] It is understandable that, since there may be multiple stacked loading items in the same stacked layer, it is necessary to arrange the loading order of the items in the same stacked layer, so that the stacked loading item closest to the starting position can be used as the connected loading item, so that the corresponding connected loading item can be added behind the base loading item to obtain an internal construction sequence, which is convenient for the subsequent determination of the internal loading sequence of the internal loading items.
[0071] The connected loading items are the superimposed loading items that are closest to the base loading items in the planning set, and the internal construction sequence is the item arrangement sequence for constructing and planning the route of the internal loading items.
[0072] S274, deleting and updating the planning set according to the connected loading objects to obtain a current planning set, and acquiring the position information of the connected loading objects as the connection position.
[0073] It can be understood that in order to determine the arrangement order of each item in the planning set, the connected loaded items can be deleted from the planning set to avoid repeated selection when arranging the positions of the remaining items in the planning set, and the position information of the connected loaded items can be used as the connection position so that they can be arranged in sequence according to the distance length from the connection position based on the position information of each item in the current planning set, so that the cart can load the items efficiently.
[0074] The connection position is the location information of the connected loading items.
[0075] S275, based on the connection position and the planned position in the current planning set, determine the superimposed loading item in the current planning set that is closest to the connected loading item as a relay loading item, and add the relay loading item to the back of the internal construction sequence to obtain the current internal construction sequence.
[0076] It can be understood that the relay loading items are determined based on the connection position and the planned position of each item in the current planning set, so that the corresponding relay loading items can be added to the back of the internal construction sequence, so that the current order can be repeated to obtain the relay superposition sequence, which is convenient for the subsequent determination of the internal loading sequence.
[0077] The relay loading item is the superimposed loading item that is closest to the connected loading item in the current planning set.
[0078] S276, taking the relay loaded item as the current connected loaded item, repeating the above steps of obtaining the current internal construction sequence until the current planning set is an empty set, and obtaining the relay superposition layer sequence.
[0079] It can be understood that the determined relay loading items are used as the current connected loading items, so that the above steps of determining the current internal construction sequence can be repeated until the current planning set is an empty set, that is, all the items in the planning set are arranged in position to obtain the relay superposition layer sequence, so that the items in the remaining superposition loading sets can be sorted subsequently to obtain the internal loading sequence.
[0080] S277, taking the last relay loading item in the relay overlay sequence as the current base loading item, deleting the first overlay loading set in the overlay sequence, repeating the above steps of obtaining the relay overlay sequence until there is no overlay loading set in the overlay sequence, and obtaining an internal loading sequence.
[0081] It is understandable that in order to sort the items in the remaining stacking loading sets in the stacking layer sequence, the stacking loading sets that have been sorted can be deleted and updated in the stacking layer sequence to avoid subsequent repeated selection and arrangement.
[0082] Among them, the current base loading item is the last relay loading item in the relay overlay layer sequence.
[0083] It is not difficult to understand that when all the items in the superimposed loading sets in the superimposed layer sequence are sorted, the corresponding superimposed layer sequence will not have a superimposed loading set, so that an internal loading sequence can be obtained, so that the loading route of the corresponding items can be automatically planned later, and the loading method of the items in the cart can be determined to save cart space.
[0084] S28, obtaining an external loading area corresponding to the external loading items according to the product of the loading length and the loading width of the external loading items, and sorting the external loading items in descending order based on the external loading area to obtain an external loading sequence corresponding to the external loading items.
[0085] It can be understood that the external loading area is the area of external loading items. When there are multiple items accumulated on the outside of the cart, in order to place multiple external loading items stably on the cart, the external loading area of each external device item can be determined, so that the larger items can be placed at the bottom later, and then when the items continue to be stacked, the smaller items can be placed on the larger items, so that the items can remain stable during the loading operation of the cart and are not prone to tilting.
[0086] The external loading sequence is the arrangement sequence of external loading items.
[0087] S29, splicing the external loading sequence to the rear of the internal loading sequence to obtain the loading sequence corresponding to each cart end, and determining the loading path corresponding to each cart end based on the position information of each loaded item in the loading sequence.
[0088] It can be understood that the external loading sequence is spliced at the rear of the internal loading sequence so that when the items are subsequently loaded, the items loaded inside the cart can be taken out and loaded first, and then the external items can be selected and loaded, thereby reducing the loading time of position exchange and improving loading efficiency.
[0089] The loading sequence is the sequence in which items are loaded into the cart, and the loading path is the path along which the cart is loaded with items.
[0090] S3, obtaining the real-time position of the cart end in the loading path, transforming the loading path according to the progress display strategy and the real-time position, and generating a task progress axis corresponding to each cart end.
[0091] It is understandable that in order to view the loading task of the cart in real time, the loading path can be transformed through the real-time position of the cart end in the loading path and the progress display strategy, so as to generate the task progress axis corresponding to the cart end, so as to be able to track the cart position and task progress in real time, make dynamic adjustments, and ensure the smooth progress of the task.
[0092] Among them, the real-time position is the real-time position of the cart end during the loading process, and the task progress axis is the display axis of the cart end completing the item loading task.
[0093] In some embodiments, the specific implementation of step S3 (obtaining the real-time position of the cart end in the loading path, converting the loading path according to the progress display strategy and the real-time position, and generating the task progress axis corresponding to each cart end) includes: S301, decomposing the loading path based on the position information of the loaded objects to obtain a plurality of sub-loading paths, wherein the sub-loading paths have corresponding two pieces of position information.
[0094] It is understandable that each loading path may have multiple loading items, so the loading path can be decomposed according to the position information of the loading items to obtain multiple sub-loading paths, wherein the position information of two adjacent loading items in the loading path is the starting point and end point of the corresponding sub-loading path.
[0095] It is not difficult to understand that the loading path is divided into multiple sub-loading paths so that the time information of each sub-loading path can be determined more accurately later, so as to determine the time axis of the entire loading path, and then achieve more refined management of the progress of each loading task.
[0096] S302, obtaining the order of the loaded items corresponding to the position information in the loading sequence as the arrangement order, sorting the sub-loading paths based on the arrangement order to obtain a sub-path sequence, and adding the loaded items corresponding to the position information to both sides of the corresponding sub-loading path in the sub-path sequence to obtain a fused distribution sequence.
[0097] It can be understood that the arrangement order is the position order in which the corresponding position information is arranged according to the order of the loaded items in the loading sequence. For example, when the loading sequence is (item A, item B, item C, item D, item E, item F), the corresponding position information is shelf A, 3 rows and 2 columns, shelf A, 2 rows and 4 columns, shelf C, 3 rows and 2 columns, shelf B, 1 row and 3 columns, shelf D, 2 rows and 1 column, and shelf B, 3 rows and 2 columns. Then the corresponding arrangement order is shelf A, 3 rows and 2 columns, shelf A, 2 rows and 4 columns, shelf C, 3 rows and 2 columns, shelf B, 1 row and 3 columns, shelf D, 2 rows and 1 column, and shelf B, 3 rows and 2 columns.
[0098] The sub-path sequence is a sequence of sub-loading paths arranged in an arrangement order, wherein each sub-loading path can be arranged in order according to the starting position information of each sub-loading path, and each sub-loading path has a corresponding number, for example, the sub-loading path between item A and item B is sub-loading path No. 1, the sub-loading path between item B and item C is sub-loading path No. 3, etc., so that the corresponding loading items can be added to both sides of the corresponding sub-loading path in the sub-path sequence to obtain a fused distribution sequence.
[0099] It is not difficult to understand that the fused distribution sequence is a sequence in which the routes and the items to be picked up are fused and sorted, so that the corresponding time can be determined based on the fused distribution sequence in the future, thereby generating an accurate timeline for intuitive display.
[0100] For example, when the sub-path sequence is (sub-loading path No. 1, sub-loading path No. 2, sub-loading path No. 3, sub-loading path No. 4, sub-loading path No. 5), the corresponding loading items are added to both sides of the corresponding sub-loading path in the sub-path sequence, and the fused distribution sequence is (item A, sub-loading path No. 1, item B, sub-loading path No. 2, item C, sub-loading path No. 3, item D, sub-loading path No. 4, item E, sub-loading path No. 5, item F).
[0101] S303, obtaining the placement height of the loaded items, and performing calculation according to the loading size of the loaded items and the placement height to obtain the distribution time corresponding to the loaded items.
[0102] It is understandable that the different heights at which items are placed on the shelves will have a certain impact on the time it takes for the smart cart to pick up items. When the goods are higher, the corresponding pickup time may be longer. Therefore, the placement height of the loaded items can be obtained in order to determine the corresponding distribution time for the loaded items, which will facilitate the subsequent determination of the time length of the corresponding progress timeline.
[0103] Among them, the placement height is the height of the location where the loaded items are located, and the distribution time is the loading time corresponding to the loaded items.
[0104] Through the above implementation, the present invention can accurately calculate the distribution time of each loaded item, which takes into account the placement height and size of the items, thereby more accurately reflecting the time consumption in actual operation and providing a reliable data basis for the subsequent generation of the task progress axis.
[0105] In some embodiments, the specific implementation of step S303 (obtaining the placement height of the loaded items, and calculating according to the loading size of the loaded items and the placement height to obtain the corresponding distribution time of the loaded items) includes: S3031, obtaining the placement height of the loaded items, and obtaining a height offset coefficient according to a ratio of the placement height to a preset height.
[0106] Understandably, because items are placed at different heights, this will affect the pickup time, and the height offset factor reflects this difference.
[0107] Among them, the preset height is a standard placement height of a preset item, which is preset manually. The placement height is the position height corresponding to the loaded item, and the height deviation coefficient is the deviation coefficient between the actual placement height of the loaded item and the preset height.
[0108] S3032: Obtain a length offset coefficient based on a ratio of a loading length corresponding to a loading size of the loaded items to a preset length, and obtain a width offset coefficient based on a ratio of a loading width corresponding to a loading size of the loaded items to a preset width.
[0109] It is understandable that in order to improve the accuracy of the distribution time, the offset coefficient can be calculated according to the loading size corresponding to the loaded items, so as to facilitate the subsequent accurate distribution time. Among them, the length and width offset coefficients reflect the impact of the item size on the pickup time. Larger items may require more time to load.
[0110] Among them, the preset length is a preset reference length of the item, which can be preset manually, the preset width is a preset reference width of the item, the length offset coefficient is an offset coefficient between the length of the actual loaded item and the preset length, that is, the ratio of the loaded length to the preset length, and the width offset coefficient is an offset coefficient between the width of the actual loaded item and the preset width, that is, the ratio of the loaded width to the preset width.
[0111] S3033: Perform an offset process on the preset cargo distribution time according to the height offset coefficient, the length offset coefficient, and the width offset coefficient to obtain the cargo distribution time corresponding to the loaded items.
[0112] It is understandable that by comprehensively considering the offset coefficients of height, length and width, the preset distribution time is adjusted to obtain a more accurate distribution time.
[0113] The preset delivery time is a delivery time determined in advance according to the location of the corresponding items.
[0114] Through the above implementation, the preset distribution time is adjusted according to the actual size and height of the loaded items, so that the corresponding distribution time can be automatically determined and the accuracy of the distribution time can be improved, so as to subsequently generate a corresponding accurate task progress axis.
[0115] S3034, the distribution time is obtained by the following formula: , in, For the delivery time, To preset the delivery time, For placement height, For the preset height, is the height weight value, is the loading length, is the preset length, is the length weight value, is the loading width, is the preset width, is the width weight value.
[0116] It is understandable that placing the height With preset height The ratio is the height offset coefficient. Therefore, when the difference between the placement height and the preset height increases, the corresponding height offset coefficient will also increase. With preset length The length offset coefficient is obtained by comparing the loading length with the preset length. Therefore, when the difference between the loading length and the preset length is larger, the corresponding length offset coefficient will also increase. Similarly, the loading width With preset width The width offset coefficient is obtained by comparing the values. When the difference between the loading width and the preset width is larger, the corresponding width offset coefficient will also become larger, and then the proportion of adjusting the preset distribution time after multiplying it with the corresponding height weight value, length weight value and width weight value will also increase accordingly, so that the distribution time can be obtained. Conversely, when the placement height, loading length and loading width are smaller, the corresponding degree of adjustment to the preset distribution time will be smaller, so that the distribution time of the corresponding loaded items can be obtained.
[0117] Among them, since the degree to which height, length and width affect the distribution time may be different, different weight values can be set to improve the accuracy of the distribution time, and the height weight value, length weight value and width weight value are all preset manually.
[0118] S304, determining the moving speed of the cart end, and obtaining the moving time corresponding to the sub-loading path according to the ratio of the distance of the sub-loading path and the moving speed.
[0119] It is understandable that the time the cart spends in each sub-loading path can be calculated based on the distance of the sub-loading path and the moving speed of the cart, thereby obtaining the moving time corresponding to the sub-loading path, so as to provide accurate time data reference for the subsequent generation of the progress timeline.
[0120] The moving speed is the speed at which the cart travels, and the moving duration is the travel duration of the corresponding sub-loading path.
[0121] S305: Obtain a distribution scaling factor according to a ratio of the distribution time to a preset time, and process a preset progress axis based on the distribution scaling factor to obtain a distribution progress axis corresponding to the distribution time.
[0122] It can be understood that since the corresponding time axis length is pre-configured for the preset duration, for example, 1 second of driving corresponds to 1 mm of the time axis length, in order to generate a progress time axis that conforms to the corresponding cart pickup, the corresponding distribution scaling factor can be calculated through the distribution duration and the preset duration, so as to scale the preset progress axis to obtain the distribution progress axis corresponding to the distribution duration.
[0123] Among them, the preset duration is a pre-set duration, the distribution scaling factor is a scaling factor for generating the distribution time axis, the preset progress axis is a progress axis pre-set according to the preset duration, and the distribution progress axis is a time progress axis for loading the corresponding items generated according to the distribution duration.
[0124] S306, based on the ratio of the moving duration and the preset duration, a moving scaling factor is obtained, and the preset progress axis is processed based on the moving scaling factor to obtain a moving progress axis corresponding to the moving duration, and the preset duration has a corresponding preset progress axis.
[0125] It can be understood that in order to generate a progress timeline that conforms to the corresponding cart path, the corresponding movement scaling factor can be calculated by the movement duration and the preset duration, so as to scale the preset progress axis to obtain a movement progress axis corresponding to the movement duration.
[0126] Among them, the movement scaling factor is the scaling factor for generating the movement time axis, and the movement progress axis is the progress axis of the cart traveling in the corresponding sub-loading path.
[0127] S307, sequentially splicing the corresponding distribution progress axis and the moving progress axis according to the order of loading items and the sub-path sequence in the fused distribution sequence to generate an initial progress axis corresponding to each cart end.
[0128] It can be understood that the generated distribution progress axis and movement progress axis are spliced in sequence according to the order of each loading item and sub-path sequence in the fusion distribution sequence, so that the initial progress axis corresponding to the cart end can be generated. By generating a complete task timeline, the progress of the subsequent task of transporting the items loaded on the cart can be monitored in real time, so that personnel can grasp the logistics progress in a timely manner.
[0129] The initial progress axis is a task progress axis that is not updated in real time to display the task completion progress.
[0130] S308, obtaining the real-time position of the cart end in the loading path, determining the travel distance of the cart end based on the real-time position, and completing the loading items of the distribution as the pickup items.
[0131] It can be understood that after obtaining the initial progress axis corresponding to each cart end, the corresponding real-time position of the cart can be obtained in real time, so that the walking distance of the cart end and the completion of picking up and loading the items into the cart can be determined through the corresponding real-time position.
[0132] Among them, the real-time position is the real-time position of the cart, the travel distance is the distance the cart has traveled, and the items to be picked up are the items that have been loaded into the cart.
[0133] Through the above implementation, the present invention can determine the walking distance and the items to be picked up, and provide real-time data for subsequent time calculation and progress update.
[0134] S309, counting the delivery time corresponding to the picked-up items to obtain real-time delivery time, and obtaining real-time moving time according to the ratio of the walking distance and the moving speed.
[0135] It can be understood that the real-time distribution time is the sum of the distribution time of the items picked up in the real-time update, and the real-time movement time is the time spent walking in the path in the real-time update state.
[0136] Through the above implementation, the real-time distribution time and the real-time movement time can be determined, so that the subsequent progress calculation is based on the latest real-time data, so that the display progress when the initial progress axis is updated in real time is more accurate.
[0137] S310, obtaining an update duration corresponding to the real-time location according to the sum of the real-time distribution duration and the real-time movement duration.
[0138] It can be understood that the update duration is the duration of the update task progress axis corresponding to the real-time position, that is, the sum of the real-time distribution duration and the real-time movement duration.
[0139] Through the above implementation, the present invention can determine the update duration of the corresponding real-time position, so that accurate time data is available when the initial progress axis is subsequently updated and displayed.
[0140] S311, obtaining the total task duration of the initial progress axis, obtaining the progress ratio according to the ratio of the update duration to the total task duration, updating the initial progress axis based on the progress ratio, and obtaining the task progress axis corresponding to each cart end.
[0141] It can be understood that the total task duration is the duration for the cart corresponding to the initial progress axis to complete the device transportation task, and the progress proportion is the proportion of tasks completed in the progress axis at the current moment, that is, the ratio of the update duration to the total task duration. The initial progress axis is displayed and updated according to the progress proportion to obtain the task progress axis on the cart side, so as to visualize the task completion status, facilitate personnel to view intuitively, and understand the task completion degree of each cart in real time.
[0142] Among them, the task progress axis is the progress display axis of the cart's real-time task completion. For example, when the initial progress axis is white, when the cart starts to load items, the progress ratio can be calculated, and then the color can be filled starting from time 0 of the initial progress axis, so that personnel can determine the completion of the cart task by the color of the progress completion.
[0143] S4, obtaining the real-time progress and the total task progress of the task progress axis corresponding to each cart end, and generating a fusion progress axis corresponding to the logistics warehousing order according to the real-time progress and the total task progress, and sending it to the demand end.
[0144] It is understandable that the number of items in a logistics warehousing order may be large, so multiple carts are needed to load the items. Therefore, in order for personnel to intuitively and quickly understand the completion status of the corresponding logistics warehousing orders, the task progress axis of the corresponding cart end can be integrated and displayed, so that personnel can quickly grasp the execution status of the order and improve logistics operation efficiency.
[0145] Among them, the real-time progress is the real-time completion progress corresponding to each cart end, the total task progress is the total task of loading items corresponding to each cart, the fusion progress axis is the progress axis that integrates the actual progress data of all carts, and the demand end is the information terminal of the person who publishes the demand for item orders.
[0146] Through the above implementation, the present invention can generate a comprehensive integrated progress axis to display the overall execution progress of the current logistics warehousing order. The progress axis takes into account the task progress of multiple carts, so that relevant personnel can quickly and intuitively understand the execution status of the entire order.
[0147] In some embodiments, the specific implementation of step S4 (obtaining the real-time progress and the total task progress of the task progress axis corresponding to each cart end, and generating a fusion progress axis corresponding to the logistics warehousing order according to the real-time progress and the total task progress and sending it to the demand end) includes: S41, obtaining the update duration of the task progress axis corresponding to each cart end as the real-time progress, and the total duration of the task as the total progress of the task.
[0148] It can be understood that the real-time progress is the update time of the task progress axis corresponding to each cart end, and the total task progress is the total task time for each cart to complete the loading of items.
[0149] S42, counting the total task progress corresponding to each of the task progress axes to obtain the integrated total progress, and counting the real-time progress corresponding to each of the task progress axes to obtain the integrated real-time progress.
[0150] It can be understood that the fusion total progress is the sum of the total progress of tasks in the task progress axes corresponding to all carts, and the fusion real-time progress is the sum of the corresponding real-time progress in all task progress axes.
[0151] Through the above implementation mode, the present invention can determine the corresponding total fusion progress and the corresponding real-time fusion progress, and provide data reference for the subsequent generation of the corresponding fusion progress axis, so as to obtain an accurate fusion progress axis for intuitive display, which is convenient for personnel to intuitively view and quickly understand the completion status of the order.
[0152] S43, obtaining a fusion scaling factor according to the ratio of the total fusion progress to the preset duration, and processing the preset progress axis based on the fusion scaling factor to obtain an initial fusion axis corresponding to the total fusion progress.
[0153] It can be understood that in order to generate a fusion progress axis that conforms to the corresponding cart path, the corresponding fusion scaling factor can be calculated by the total fusion progress and the preset duration, so as to scale the preset progress axis to obtain a fusion progress axis corresponding to the total fusion progress.
[0154] Among them, the fusion scaling factor is the scaling factor for generating the fusion progress axis, and the initial fusion axis is the work progress axis for all carts to complete the cargo assembly.
[0155] S44, based on the ratio of the real-time fusion progress and the total fusion progress, obtain the fusion progress ratio, update the initial fusion axis according to the fusion progress ratio, obtain the fusion progress axis corresponding to the logistics warehousing order and send it to the demand side.
[0156] It can be understood that the fusion progress ratio is the ratio of the real-time fusion progress to the total fusion progress.
[0157] It is not difficult to understand that according to the proportion of fusion progress, the length of the initial fusion axis corresponding to the update is determined, so that the initial fusion axis can be updated to obtain the fusion progress axis and send it to the demand side, so that personnel can check the progress of task completion. For example, Figure 2As shown, when the fusion progress ratio is 1 / 2 and the length of the initial fusion axis is 10 cm, the 5 cm from left to right of the initial fusion axis can be filled with black pixel values to indicate that the task is half completed, and a fusion progress axis is obtained, which is convenient for personnel to watch and quickly grasp the completion status of the order task.
[0158] It should be noted that the size of the goods in the order may be very large. When loading with one cart, the goods are prone to fall. Therefore, two carts may be needed for coordinated transportation to ensure the normal loading of the goods and improve the efficiency of logistics transportation. Therefore, it also includes: A1. A storage area corresponding to the storage space is obtained according to the product of the storage length and the storage width, and an area ratio is obtained based on the ratio of the external loading area to the storage area.
[0159] It can be understood that the accommodating area is the area of the accommodating space for the cart loaded with goods, that is, it can be obtained by multiplying the accommodating length and the accommodating width, and the area ratio is the ratio of the area of the external loaded items to the area of the accommodating space of the cart.
[0160] Through the above implementation, the present invention can determine the corresponding area ratio, so as to subsequently determine whether the item needs to be transported together with a cart.
[0161] A2, when it is determined that the area ratio is greater than 2, the corresponding external loading items are used as cooperative loading items, and the cart end with the cooperative loading items is used as the first cooperative end.
[0162] It can be understood that when the area ratio is greater than 2, it means that the area of the external loading items exceeds the corresponding load-bearing area of the two cart ends. Therefore, in order to ensure that the items can be transported normally, it is necessary to select two cart ends for collaborative loading. Thus, the external loading items can be used as collaborative loading items, and the cart end initially assigned to load the collaborative loading items can be used as the first collaborative end, so that the second collaborative end can be selected later according to the information of the first collaborative end, and the collaborative loading items can be safely transported.
[0163] A3, statistics are collected on the mass information of the external loaded items corresponding to the first collaborative end to obtain the collaborative mass, the remaining mass is obtained according to the difference between the load limit and the collaborative mass, and the loading mass of the loaded items corresponding to the cart end is obtained, and the cart end whose loading mass is less than or equal to the remaining mass is selected as the second collaborative end.
[0164] It can be understood that the collaborative mass is the sum of the weights of all external load items corresponding to the first collaborative end, the residual mass is the weight that the cart end can continue to carry, that is, the difference between the load limit and the collaborative mass, the loaded mass is the sum of the masses of the loaded items corresponding to the vehicle end, and the second collaborative end is the cart end whose loaded mass is less than or equal to the residual mass.
[0165] It is not difficult to understand that when the loaded mass is less than or equal to the remaining mass, it means that the corresponding cart end has not reached the load limit and can continue to carry items of a certain weight. Therefore, the corresponding cart end can be selected as the second collaborative end to load the collaboratively loaded items together with the first collaborative end.
[0166] A4: Use the internal loading sequence corresponding to the first collaborative end as the first asynchronous loading path, and use the internal loading sequence corresponding to the second collaborative end as the second asynchronous loading path.
[0167] It should be noted that when the first collaborative end and the second collaborative end perform collaborative transport of items, they need to complete the loading of the corresponding internally loaded items in advance, so that the corresponding collaboratively loaded items can be subsequently loaded together on the outside of the cart for the transportation of goods.
[0168] It can be understood that the first asynchronous loading path is an internal loading sequence corresponding to the first collaborative end, and the second asynchronous loading path is an internal loading sequence corresponding to the second collaborative end.
[0169] A5, determine the external loading sequence corresponding to the first collaborative end as the first synchronous loading sequence, and the external loading sequence corresponding to the second collaborative end as the second synchronous loading sequence, count the external loading items in the first synchronous loading sequence and the external loading items in the second synchronous loading path, and obtain a synchronous loading set.
[0170] It can be understood that the first synchronous loading sequence is the external loading sequence corresponding to the first collaborative end, the second synchronous loading sequence is the external loading sequence corresponding to the second collaborative end, and the synchronous loading set is the set of external loading items in the first synchronous loading sequence and external loading items in the second synchronous loading path.
[0171] It is not difficult to understand that since the area of collaborative loading items is larger, they need to be loaded first so that the corresponding external loading items at each cart end can be placed above the collaborative loading items later. Therefore, it is necessary to count the synchronous loading sets so that the corresponding items can be loaded together later.
[0172] A6, based on the collaborative loading items, the synchronous loading set is deleted and updated to obtain an actual synchronous set, and the position information corresponding to the collaborative loading items is obtained as the synchronous loading position, and the synchronous superposition position of the external loading items in the actual synchronous set.
[0173] It can be understood that in order to reduce the driving path, the optimal path is automatically planned for collaborative loading of the items in the synchronous loading set. Therefore, the collaboratively loaded items can be deleted from the synchronous loading set, and the synchronous loading position and the synchronous superposition position can be obtained, so that the corresponding loading order can be determined based on the distance between the synchronous loading position and the actual synchronous set of items, and then the corresponding loading path can be generated, saving time and improving the loading efficiency of logistics.
[0174] The actual synchronization set is the set after deleting the collaborative loading items in the synchronization loading set, the synchronization loading position is the position information corresponding to the collaborative loading items, and the synchronization superposition position is the position where the external loading items in the actual synchronization set are stored.
[0175] A7, determining the external loading item in the actual synchronous set that is closest to the cooperative loading item according to the synchronous loading position and the synchronous superposition position as the subsequent loading item, and adding the subsequent loading item to the rear of the cooperative loading item to obtain a subsequent construction sequence.
[0176] It can be understood that the external loading item closest to the cooperative loading item is used as the subsequent loading item so as to determine the path between the corresponding two items and reduce the back and forth path time.
[0177] The subsequent construction sequence is a sequence of items for constructing a collaborative loading path, that is, the subsequent loading items are added after the collaborative loading items.
[0178] A8, based on the subsequent loading objects, the actual synchronization set is deleted and updated to obtain the current actual synchronization set, and the position information of the corresponding subsequent loading objects is obtained as the current synchronization loading position.
[0179] It is understandable that the subsequent loaded items are deleted from the actual synchronization set to obtain the current actual synchronization set, so that when the items are subsequently arranged, the items are repeatedly selected and arranged, which affects the path generation.
[0180] It is not difficult to understand that in order to further sort the items in the current actual synchronization set, the position information of the subsequent loading items can be obtained as the current synchronization loading position, so as to continue to select the item closest to the current synchronization loading position in the current actual synchronization set as the next subsequent loading item, thereby realizing the arrangement of the loading order of the items, so as to obtain the corresponding fusion loading path later.
[0181] A9, repeat the above steps of obtaining the subsequent construction sequence until the current actual synchronization set is an empty set, and obtain the synchronization loading path.
[0182] It can be understood that repeating the steps of the subsequent construction sequence until the current actual synchronization set is an empty set can indicate that there are no external loading items in the current actual synchronization set, so as to complete the loading arrangement of all items, thereby obtaining a synchronous loading path to facilitate the coordinated loading of subsequent carts.
[0183] Among them, the synchronous loading path is the path for collaborative loading of two cart ends.
[0184] A10, update the synchronous loading path to the first asynchronous loading path to obtain a fused loading path corresponding to the first cooperative end.
[0185] It can be understood that the synchronous loading path is spliced behind the first asynchronous loading path to obtain a fused loading path corresponding to the first collaborative end, so that the first collaborative end can load items according to the fused loading path, saving loading time and improving logistics loading efficiency.
[0186] A11, update the synchronous loading path to the second asynchronous loading path to obtain a fused loading path corresponding to the second cooperative end.
[0187] It can be understood that the synchronous loading path is spliced behind the first asynchronous loading path to obtain a fused loading path corresponding to the second collaborative end, so that the second collaborative end can load items according to the fused loading path, saving loading time and improving logistics loading efficiency.
[0188] See also Figure 3 , is a structural diagram of an intelligent logistics warehousing cart management system provided by an embodiment of the present invention, the intelligent logistics warehousing cart management system includes: The parsing module is used to receive the logistics warehousing order sent by the demand side, parse the logistics warehousing order, and obtain multiple target items corresponding to the logistics warehousing order.
[0189] The planning module is used to configure corresponding loading items for each cart end based on the mass information of the target item, perform loading planning for the cart end according to the loading planning strategy and the loading items, obtain the loading sequence corresponding to each cart end, and determine the loading path corresponding to each cart end based on the loading sequence.
[0190] The conversion module is used to obtain the real-time position of the cart end in the loading path, convert the loading path according to the progress display strategy and the real-time position, and generate a task progress axis corresponding to each cart end.
[0191] A generation module is used to obtain the real-time progress and total task progress of the task progress axis corresponding to each cart end, and generate a fusion progress axis corresponding to the logistics warehousing order based on the real-time progress and the total task progress, and send it to the demand end.
[0192] See also Figure 4 , is a schematic diagram of the hardware structure of an electronic device provided by an embodiment of the present invention, the electronic device 40 includes: a processor 41, a memory 42 and a computer program; wherein The memory 42 is used to store the computer program, and the memory may also be a flash memory. The computer program is, for example, an application program, a functional module, etc. for implementing the above method.
[0193] The processor 41 is used to execute the computer program stored in the memory to implement each step performed by the device in the above method. For details, please refer to the relevant description in the above method embodiment.
[0194] Optionally, the memory 42 may be independent or integrated with the processor 41 .
[0195] When the memory 42 is a device independent of the processor 41, the device may further include: The bus 43 is used to connect the memory 42 and the processor 41 .
[0196] The present invention also provides a readable storage medium, in which a computer program is stored. When the computer program is executed by a processor, it is used to implement the methods provided by the various embodiments described above.
[0197] Among them, the readable storage medium can be a computer storage medium or a communication medium. The communication medium includes any medium that facilitates the transmission of a computer program from one place to another. The computer storage medium can be any available medium that can be accessed by a general-purpose or special-purpose computer. For example, a readable storage medium is coupled to a processor so that the processor can read information from the readable storage medium and write information to the readable storage medium. Of course, the readable storage medium can also be a component of the processor. The processor and the readable storage medium can be located in an application-specific integrated circuit (Application Specific Integrated Circuits, referred to as: ASIC). In addition, the ASIC can be located in a user device. Of course, the processor and the readable storage medium can also exist in a communication device as discrete components. The readable storage medium can be a read-only memory (ROM), a random access memory (RAM), a CD-ROM, a magnetic tape, a floppy disk, and an optical data storage device, etc.
[0198] The present invention also provides a program product, which includes an execution instruction, which is stored in a readable storage medium. At least one processor of a device can read the execution instruction from the readable storage medium, and at least one processor executes the execution instruction so that the device implements the methods provided in the above various embodiments.
[0199] In the embodiments of the above-mentioned devices, it should be understood that the processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), etc. The general-purpose processor may be a microprocessor or any conventional processor. The steps of the method disclosed in the present invention may be directly implemented as being executed by a hardware processor, or may be executed by a combination of hardware and software modules in the processor.
[0200] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. An intelligent logistics warehousing cart management method, characterized in that: include: Receiving a logistics warehousing order sent by a demand side, parsing the logistics warehousing order, and obtaining a plurality of target items corresponding to the logistics warehousing order; Based on the mass information of the target object, each cart end is configured with a corresponding loading object, and the loading of the cart end is planned according to the loading planning strategy and the loading object to obtain a loading sequence corresponding to each cart end, and a loading path corresponding to each cart end is determined based on the loading sequence; Acquire the real-time position of the cart end in the loading path, transform the loading path according to the progress display strategy and the real-time position, and generate a task progress axis corresponding to each cart end; The real-time progress and total task progress of the task progress axis corresponding to each cart end are obtained, and based on the real-time progress and the total task progress, a fusion progress axis corresponding to the logistics warehousing order is generated and sent to the demand end.
2. The method according to claim 1, characterized in that The configuring corresponding loading items for each cart end based on the mass information of the target item includes: Acquire quality information of the target items, and sort the target items in ascending order according to the quality information to obtain an item sequence; Retrieving the load limit of the corresponding cart end, selecting the first and last target items in the item sequence as the selected items, and accumulating the quality information of the selected items to obtain the cumulative selection quality; When it is determined that the cumulative selection mass is less than or equal to the carrying limit, the item sequence is deleted and updated according to the selected items to obtain a current item sequence; Repeat the above steps of obtaining the current item sequence until the cumulative picked mass is greater than the load limit, or the current item sequence does not have the target item, and then count the corresponding picked items as the loaded items at the corresponding cart end.
3. The method according to claim 2, characterized in that The step of performing loading planning on the cart ends according to the loading planning strategy and the loaded items, obtaining a loading sequence corresponding to each cart end, and determining a loading path corresponding to each cart end based on the loading sequence includes: Retrieving the accommodation dimensions of the accommodation space corresponding to the cart end, the accommodation dimensions including the accommodation length and the accommodation width, and obtaining the loading dimensions corresponding to the loaded items, the loading dimensions including the loading length and the loading width; When it is determined that the loading length is greater than the accommodation length, and / or the loading width information is greater than the accommodation width information, the corresponding loading items are regarded as external loading items, and the remaining loading items are regarded as internal loading items; Obtaining an internal loading area corresponding to the internally loaded items according to the product of the loading length of the internally loaded items and the loading width, and determining an internal loading sequence corresponding to the internally loaded items based on the internal loading area; Obtaining an external loading area corresponding to the external loading items according to the product of the loading length of the external loading items and the loading width, and sorting the external loading items in descending order based on the external loading areas to obtain an external loading sequence corresponding to the external loading items; The external loading sequence is spliced to the rear of the internal loading sequence to obtain the loading sequence corresponding to each cart end, and the loading path corresponding to each cart end is determined based on the position information of each loaded object in the loading sequence.
4. The method according to claim 3, characterized in that The determining, based on the internal loading area, an internal loading sequence corresponding to the internally loaded items comprises: Determine the stacked loading items corresponding to each stacked layer according to the internal loading area, count the stacked loading items corresponding to each stacked layer, obtain a stacked loading set corresponding to each stacked layer, and sort the stacked loading set in ascending order based on the number of layers of the stacked layers to obtain a stacked layer sequence; Obtaining position information corresponding to the base loading object as the starting position, selecting the first stacking loading set in the stacking layer sequence as the planning set, and obtaining position information of the stacking loading objects in the planning set as the planning position; Based on the planned position and the starting position, determine the stacked loading item in the planned set that is closest to the base loading item as a connected loading item, and add the connected loading item to the back of the base loading item to obtain an internal construction sequence; Deleting and updating the planning set according to the connected loading objects to obtain a current planning set, and obtaining the position information of the connected loading objects as the connection position; Based on the connection position and the planned position in the current planning set, determine the superimposed loading item in the current planning set that is closest to the connected loading item as a relay loading item, and add the relay loading item to the rear of the internal construction sequence to obtain the current internal construction sequence; The relay loaded item is used as the current connected loaded item, and the above steps of obtaining the current internal construction sequence are repeated until the current planning set is an empty set, thereby obtaining a relay superposition layer sequence; The last relay loading item in the relay overlay sequence is used as the current base loading item, the first overlay loading set in the overlay sequence is deleted, and the above steps of obtaining the relay overlay sequence are repeated until there is no overlay loading set in the overlay sequence, thereby obtaining an internal loading sequence.
5. The method according to claim 4, characterized in that The step of determining the stacked loading items corresponding to each stacked layer according to the internal loading area includes: The largest internal loading area is selected as the base area, and the internal loading items corresponding to the base area are selected as the base loading items, and the remaining internal loading items are sorted in descending order based on the internal loading area to obtain a pending loading sequence; Sequentially select the internal loading areas corresponding to the internally loaded items in the pending loading sequence and add them up to obtain a cumulative selection area; When it is determined that the cumulative selection area is less than or equal to the base area, the selected internal loading items are deleted and updated from the pending loading sequence to obtain a current pending loading sequence; Until the accumulated picking area is larger than the base area, or the current pending loading sequence has no internal loading items, the corresponding internal loading items are used as the superimposed loading items of the corresponding superimposed layer.
6. The method according to claim 3, characterized in that The acquiring the real-time position of the cart end in the loading path, converting the loading path according to the progress display strategy and the real-time position, and generating a task progress axis corresponding to each cart end, includes: Decomposing the loading path based on the position information of the loaded objects to obtain a plurality of sub-loading paths, each of which has two corresponding position information; The order of the loaded items corresponding to the position information in the loading sequence is obtained as the arrangement order, the sub-loading paths are sorted based on the arrangement order to obtain a sub-path sequence, and the loaded items corresponding to the position information are added to both sides of the corresponding sub-loading path in the sub-path sequence to obtain a fused cargo distribution sequence; Obtaining the placement height of the loaded items, and calculating according to the loading size of the loaded items and the placement height to obtain the corresponding distribution time of the loaded items; Determine the moving speed of the cart end, and obtain the moving time corresponding to the sub-loading path according to the ratio of the distance of the sub-loading path and the moving speed; According to the ratio of the cargo distribution time to the preset time, a cargo distribution scaling factor is obtained, and the preset progress axis is processed based on the cargo distribution scaling factor to obtain a cargo distribution progress axis corresponding to the cargo distribution time; Based on the ratio of the moving duration to the preset duration, a moving scaling factor is obtained, and based on the moving scaling factor, a preset progress axis is processed to obtain a moving progress axis corresponding to the moving duration, and the preset duration has a corresponding preset progress axis; According to the order of loading items and sub-path sequences in the fused cargo distribution sequence, the corresponding cargo distribution progress axis and the moving progress axis are sequentially spliced to generate an initial progress axis corresponding to each cart end; Acquire the real-time position of the cart end in the loading path, determine the travel distance of the cart end based on the real-time position, and complete the loading items of the cargo as the pickup items; Counting the delivery time corresponding to the picked-up items to obtain the real-time delivery time, and obtaining the real-time moving time according to the ratio of the walking distance to the moving speed; Obtaining an update duration corresponding to the real-time location according to the sum of the real-time distribution duration and the real-time movement duration; The total task duration of the initial progress axis is obtained, and the progress ratio is obtained according to the ratio of the update duration to the total task duration. The initial progress axis is updated based on the progress ratio to obtain the task progress axis corresponding to each cart end.
7. The method according to claim 6, characterized in that The obtaining of the placement height of the loaded items and performing calculation according to the loading size of the loaded items and the placement height to obtain the distribution time corresponding to the loaded items include: Acquire the placement height of the loaded items, and obtain a height deviation coefficient according to the ratio of the placement height to a preset height; A length offset coefficient is obtained based on a ratio of a loading length corresponding to a loading size of the loaded items to a preset length, and a width offset coefficient is obtained based on a ratio of a loading width corresponding to a loading size of the loaded items to a preset width; Performing an offset process on the preset cargo distribution time according to the height offset coefficient, the length offset coefficient, and the width offset coefficient to obtain the cargo distribution time corresponding to the loaded items; The delivery time is obtained by the following formula: , in, For the delivery time, To preset the delivery time, For placement height, For the preset height, is the height weight value, is the loading length, is the preset length, is the length weight value, is the loading width, is the preset width, is the width weight value.
8. The method according to claim 6, characterized in that The obtaining of the real-time progress and the total task progress of the task progress axis corresponding to each of the cart ends, and generating a fusion progress axis corresponding to the logistics warehousing order according to the real-time progress and the total task progress, and sending the fusion progress axis to the demand end, includes: Obtain the update duration of the task progress axis corresponding to each of the cart ends as the real-time progress, and the total duration of the task as the total progress of the task; Counting the total progress of tasks corresponding to each of the task progress axes to obtain the fused total progress, and counting the real-time progress corresponding to each of the task progress axes to obtain the fused real-time progress; According to the ratio of the total fusion progress and the preset duration, a fusion scaling coefficient is obtained, and the preset progress axis is processed based on the fusion scaling coefficient to obtain an initial fusion axis corresponding to the total fusion progress; Based on the ratio of the real-time fusion progress and the total fusion progress, the fusion progress ratio is obtained, and the initial fusion axis is updated according to the fusion progress ratio to obtain the fusion progress axis corresponding to the logistics warehousing order and send it to the demand side.
9. The method according to claim 3, characterized in that: Also includes: According to the product of the accommodation length and the accommodation width, a housing area corresponding to the housing space is obtained, and based on the ratio of the external loading area to the housing area, an area ratio is obtained; When it is determined that the area ratio is greater than 2, the corresponding externally loaded items are used as cooperatively loaded items, and the cart end with the cooperatively loaded items is used as the first cooperative end; The mass information of the external loaded items corresponding to the first collaborative end is counted to obtain the collaborative mass, the residual mass is obtained according to the difference between the load limit and the collaborative mass, and the loading mass of the loaded items corresponding to the cart end is obtained, and the cart end whose loading mass is less than or equal to the residual mass is selected as the second collaborative end; Using the internal loading sequence corresponding to the first collaborative end as a first asynchronous loading path, and using the internal loading sequence corresponding to the second collaborative end as a second asynchronous loading path; Determine an external loading sequence corresponding to the first collaborative end as a first synchronous loading sequence, and determine an external loading sequence corresponding to the second collaborative end as a second synchronous loading sequence, count the external loading items in the first synchronous loading sequence and the external loading items in the second synchronous loading sequence, and obtain a synchronous loading set; Deleting and updating the synchronous loading set based on the cooperative loading object to obtain an actual synchronous set, obtaining position information corresponding to the cooperative loading object as a synchronous loading position, and a synchronous superposition position of external loading objects in the actual synchronous set; According to the synchronous loading position and the synchronous superposition position, determine the external loading item in the actual synchronous set that is closest to the coordinated loading item as a subsequent loading item, and add the subsequent loading item to the rear of the coordinated loading item to obtain a subsequent construction sequence; Deleting and updating the actual synchronization set based on the subsequent loading object to obtain a current actual synchronization set, and obtaining the position information of the corresponding subsequent loading object as the current synchronization loading position; Repeat the above steps of obtaining a subsequent build sequence until the current actual synchronization set is an empty set, and obtain a synchronization loading path; Updating the synchronous mounting path to the first asynchronous mounting path to obtain a fused mounting path corresponding to the first collaborative end; The synchronous mounting path is updated to the second asynchronous mounting path to obtain a fused mounting path corresponding to the second cooperative end.
10. An intelligent logistics warehousing cart management system, characterized in that: include: The parsing module is used to receive the logistics warehousing order sent by the demand side, parse the logistics warehousing order, and obtain multiple target items corresponding to the logistics warehousing order; A planning module, configured to configure corresponding loading items for each cart end based on the mass information of the target item, perform loading planning for the cart end according to the loading planning strategy and the loading items, obtain a loading sequence corresponding to each cart end, and determine a loading path corresponding to each cart end based on the loading sequence; A conversion module, used to obtain the real-time position of the cart end in the loading path, convert the loading path according to the progress display strategy and the real-time position, and generate a task progress axis corresponding to each cart end; A generation module is used to obtain the real-time progress and total task progress of the task progress axis corresponding to each cart end, and generate a fusion progress axis corresponding to the logistics warehousing order based on the real-time progress and the total task progress, and send it to the demand end.
Citation Information
Patent Citations
Multiple deck cargo container
CN105531186A
Goods picking path planning method and device, equipment and storage medium
CN112815941A
Goods picking method and device, electronic equipment and computer readable medium
CN113240370A
Multi-AGV (Automatic Guided Vehicle) collaborative cargo handling method and system
CN114185342A
Warehouse logistics scheduling method and system
CN115599063A
