Device, method and system for prolonging service life of gas mixing box in ALD equipment
By adding a diversion line to the ALD equipment, the problems of damage and safety hazards to the mixing box during trimethylaluminum operation were solved, thus extending the life of the mixing box and ensuring stable operation of the equipment.
Patent Information
- Application Number
- CN202411135242.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-11-26
AI Technical Summary
In existing ALD equipment, the mixing box is easily damaged during trimethylaluminum TMA operation, posing a safety hazard. Furthermore, the equipment malfunctions frequently and has a low uptime.
Add a branch line to the air intake line of the ALD equipment to blow out the residual gas in the line. Before maintenance, ensure that the pressure of the first valve is greater than the external pressure to prevent compressed air from the process chamber from entering the mixing box and avoid reaction and blockage.
It extends the service life of the mixing box, reduces safety hazards, and improves equipment uptime and production stability.
Smart Images

Figure CN119020754A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of deposition equipment, and in particular to a device, method and system for extending the life of a gas mixing box in an ALD device. Background Art
[0002] Plasma Enhanced Chemical Vapor Deposition (PECVD) is a common method for preparing dielectric films, and is widely used in preparing aluminum oxide films for N-type TOPCon cells.
[0003] When using the PECVD method, the N-type TOPCon battery needs to be passed through the loading chamber, heating chamber, process chamber, cooling chamber and unloading chamber of the atomic layer deposition (ALD) equipment in sequence.
[0004] However, at the current stage, when the PECVD method is carried out, the process chamber may cause the gas to flow back into the controlled evacuate mixer (CEM), that is, the mixing box, which will bring safety hazards to the operation of trimethylaluminum TMA, resulting in a series of problems such as short life of the mixing box, long equipment failure time, and low start-up rate.
[0005] Specifically, when the process chamber is maintained, it is necessary to fill the process chamber with compressed air to make the process chamber become normal pressure before the chamber cover can be opened for maintenance. However, when the manual valve at the rear end of the mixing box has internal leakage, compressed dry air (CDA) will enter the mixing box, and oxygen or water will react with the residual TMA to generate powdery substances, causing blockage and damage to the mixing box. If the ALD equipment is not stopped and cleaned and repaired in time, an explosive decomposition reaction will occur, and methane will be generated, and sometimes a fire may occur.
[0006] Therefore, at this stage, a technical means is urgently needed to solve the problem that the mixing box is easily damaged during the operation of trimethylaluminum TMA and there are potential safety hazards. Summary of the invention
[0007] The embodiments of the present invention provide a device, method and system for extending the life of a gas mixing box in an ALD device, so as to solve the problem that the gas mixing box is easily damaged during the operation of trimethylaluminum (TMA) and there are potential safety hazards.
[0008] In a first aspect, an embodiment of the present invention provides a device for extending the life of a gas mixing box in an ALD device, comprising: an air intake pipeline and a flow distribution pipeline; the air intake pipeline comprises a first flow meter, a gas mixing box and a first valve;
[0009] The first end of the shunt pipeline is connected to the first end of the first flow meter, and the second end of the shunt pipeline is connected to the first end of the first valve; the shunt pipeline is used to ensure that the pressure at the first end of the first valve is greater than the external pressure;
[0010] The second end of the first flow meter is connected to the first end of the first valve through the gas mixing box.
[0011] In a possible implementation, the flow diversion pipeline includes a second flow meter and a second valve;
[0012] The first end of the second flowmeter is connected to the first end of the first flowmeter, the second end of the second flowmeter is connected to the first end of the second valve, and the second end of the second valve is connected to the first end of the first valve.
[0013] In a possible implementation, the air intake line further includes a third valve;
[0014] The first end of the third valve is connected to the first end of the shunt pipeline, and the second end of the third valve is connected to the first end of the gas mixing box.
[0015] In a possible implementation, the air intake line further includes a filter;
[0016] The filter is connected to the first end of the shunt pipeline and is used for filtering the special gas supplied to the device.
[0017] In a possible implementation, the device further includes a process chamber;
[0018] The process chamber is connected to the second end of the first valve.
[0019] In a possible implementation, the device further includes a radio frequency power supply;
[0020] The radio frequency power supply is connected to the process chamber.
[0021] In a second aspect, an embodiment of the present invention provides a method for extending the life of a gas mixing box in an ALD device, which is applied to the device for extending the life of a gas mixing box in an ALD device as provided in the first aspect, and the method comprises:
[0022] Before maintaining the process chamber, the residual gas in the pipeline is blown out through the shunt pipeline. After there is no residual gas in the pipeline, the first valve in the air inlet pipeline is closed, and the process chamber is maintained when the pressure at the first end of the first valve is greater than the external pressure.
[0023] In a possible implementation, before maintaining the process chamber, the residual gas in the pipeline is blown out through the shunt pipeline, and after there is no residual gas in the pipeline, the first valve in the air inlet pipeline is closed, and when the pressure at the first end of the first valve is greater than the external pressure, the process chamber is maintained, including:
[0024] Before performing maintenance on the process chamber, stop introducing special gases and trimethylaluminum into the device, set the first flow meter to zero, and close the third valve;
[0025] Introducing special gas into the device, setting the second flow meter to a preset flow value, and keeping the first valve and the second valve in the diversion pipeline open for a first preset time;
[0026] After the first preset time is reached, the first valve is closed, and at the same time, the second flow meter and the second valve in the diversion pipeline are kept in an open state for a second preset time;
[0027] After the second preset time is reached, closing the second flow meter and the second valve in the diversion pipeline;
[0028] Compressed dry air is introduced into the process chamber, and when the pressure in the process chamber is equal to the external pressure, the process chamber is maintained.
[0029] In a possible implementation, the method further includes:
[0030] When the first valve leaks, the residual gas in the pipeline is blown out through the shunt pipeline. After there is no residual gas in the pipeline, the first valve in the air inlet pipeline is closed, and the process chamber is maintained when the pressure at the first end of the first valve is greater than the external pressure.
[0031] In a third aspect, an embodiment of the present invention provides a system for extending the life of a mixing box in an ALD device, comprising a device for extending the life of a mixing box in an ALD device as provided in the first aspect, a loading chamber, a heating chamber, a cooling chamber, and an unloading chamber.
[0032] The embodiment of the present invention provides a device, method and system for extending the life of a mixing box in an ALD device. Compared with a traditional ALD device, the embodiment of the present invention adds a special gas diversion pipeline to the original air inlet pipeline, which can divert the special gas to control the special gas flow at the air inlet and outlet ends of the mixing box. Before maintenance, the residual gas in the ALD equipment pipeline can be blown out through the diversion pipeline, and the first valve can be closed in time. In this way, not only can the residual gas in the mixing box be reduced as much as possible, but also the pressure at the front end of the first valve, that is, the end connected to the mixing box, can be ensured to be greater than the external pressure. Even if the first valve leaks, it can also prevent the pressure difference between the air pressure in the process chamber and the pressure in the mixing box during maintenance, resulting in the reaction of water or oxygen in the compressed air in the process chamber with the trimethylaluminum remaining in the mixing box. The device provided by this embodiment can not only extend the service life of the mixing box, but also avoid safety hazards. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0034] Figure 1 It is a schematic diagram of the structure of the Topcon battery;
[0035] Figure 2 It is a schematic diagram of the structure of the process chamber;
[0036] Figure 3 is a schematic diagram of the structure of a device for extending the life of a gas mixing box in an ALD device provided by an embodiment of the present invention;
[0037] Figure 4 is a schematic structural diagram of a conventional ALD device provided in an embodiment of the present invention;
[0038] Figure 5 is a schematic diagram of the structure of a device for extending the life of a gas mixing box in an ALD device provided by an embodiment of the present invention;
[0039] Figure 6 It is a flow chart of the implementation of the method for extending the life of the mixing box in the ALD equipment provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0040] In order to enable people in the technical field to better understand the present solution, the technical solution in the embodiment of the present solution will be clearly described below in conjunction with the drawings in the embodiment of the present solution. Obviously, the described embodiment is an embodiment of a part of the present solution, not all of the embodiments. Based on the embodiments in the present solution, all other embodiments obtained by ordinary technicians in the field without creative work should fall within the scope of protection of the present solution.
[0041] The term "including" and any other variations in the specification and claims of this solution and the above drawings mean "including but not limited to", and is intended to cover non-exclusive inclusions and is not limited to the examples listed in the text. In addition, the terms "first" and "second" are used to distinguish different objects, not to describe a specific order.
[0042] The following is a detailed description of the implementation of the present invention in conjunction with the specific drawings:
[0043] Figure 1 Schematic diagram of the structure of the Topcon battery provided by the embodiment of the present invention. Figure 1 As shown, the main body of the N-type Topcon battery is an N-type silicon substrate, on the upper surface of which a front contact pin is provided. The upper surface includes SiN x A back contact pin is provided on the lower surface of the N-type silicon substrate, and the lower surface thereof includes a tunneling SiO x layer, phosphorus-doped polysilicon and SiN x layer.
[0044] In order to improve the conversion efficiency of crystalline silicon cells such as Topcon cells and reduce the surface load of the cell, a thin layer of aluminum oxide is prepared on the front of the cell at this stage. One of the commonly used methods for preparing aluminum oxide is the PECVD method. The PECVD method mostly adopts a plate-type coating method. The process steps are: the battery passes through the loading chamber, heating chamber, process chamber, cooling chamber and unloading chamber in turn, and the corresponding operations are completed in the corresponding chambers. One of the key steps in this process is the corresponding operation in the process chamber. Since the PECVD method generally adopts a plate-type coating method, this method requires the introduction of N2O (laughing gas) and TMA (trimethylaluminum) into the process chamber, and uses microwave discharge to generate plasma for chemical vapor deposition to generate Al2O3, which is deposited on the back of the silicon wafer to form an anti-reflection film with a passivation effect, increase the absorption of the long-wave band of sunlight, and passivate the back of the silicon wafer. Among them, the structural schematic diagram of the process chamber is detailed in Figure 2 .
[0045] See also Figure 2The process chamber may include an electrode 1, a microwave generator 2, a chamber cover 3, a graphite boat 4, a process transfer start device 5 and a heater 6.
[0046] During the maintenance of the process chamber, the process chamber needs to be filled with compressed air to make the process chamber become normal pressure before the chamber cover 3 can be opened for maintenance. However, this process may cause safety hazards. To address this problem, an embodiment of the present invention provides a device for extending the life of the gas mixing box in the ALD equipment, such as Figure 3 As shown, the device comprises:
[0047] Intake pipeline A and diversion pipeline B; intake pipeline A includes a first flow meter MFC1, a mixing box CEM and a first valve EV1.
[0048] The first end of the shunt pipe B is connected to the first end of the first flow meter MFC1, and the second end of the shunt pipe B is connected to the first end of the first valve EV1; the shunt pipe B is used to ensure that the pressure at the first end of the first valve EV1 is greater than the external pressure.
[0049] The second end of the first flow meter MFC1 is connected to the first end of the first valve EV1 through the gas mixing box CEM.
[0050] In this embodiment, the arrows indicate the transmission direction of the gas. In a normal process flow, TMA is introduced into the gas mixing box CEM for production.
[0051] Figure 4 This is a schematic diagram of the structure of a traditional ALD device, where: Figure 4 The dotted line between the process chamber T1 and the mixing chamber and CEM indicates the gas flow direction when the compressed air flows back into the process chamber T1. Figure 4 Explain the safety risks brought by traditional ALD equipment.
[0052] The traditional ALD equipment only includes an air inlet line A. When performing maintenance on the process chamber, it is necessary to blow out the TMA and the like in the line through the air inlet line A. The liquid TMA enters the gas mixing box CEM, where it is mixed with a special gas (the special gas in this embodiment is set to argon) and heated. The gas mixture is finally transmitted to the process chamber, and microwave discharge is used to generate plasma to achieve chemical vapor deposition. Since the pressure of argon is generally 2.5 bar (the atmospheric pressure is about 1 bar), when the device is maintained, it is necessary to fill the chamber with compressed air. When the first valve EV1 leaks, compressed air will enter the gas mixing box CEM. The water or oxygen in the compressed air will react with the residual TMA, causing blockage and damage to the gas mixing box CEM, which requires replacement of the gas mixing box CEM. That is, in the process of the traditional ALD equipment, before the pressure at the first end of the first valve EV1 is greater than the external pressure, the air inlet line A needs to remain in a conductive state. When the first valve EV1 leaks, due to the pressure difference, when the pressure at the first end of the first valve EV1 is not greater than the external pressure, the compressed air and oxygen in the process chamber may enter the gas mixing box CEM and react with the remaining TMA therein, causing a safety accident.
[0053] To solve this problem, this embodiment introduces a shunt pipeline B to the original air intake pipeline A. When performing maintenance on the process chamber, the air intake pipeline A is set to a cut-off state, the shunt pipeline B is set to a conducting state, and the remaining gas in the pipeline is blown out through the shunt pipeline B to ensure that the pressure at the first end of the first valve EV1 is greater than the external pressure. In this way, even if the first valve EV1 leaks, since the air intake pipeline A is in a cut-off state and the shunt pipeline B is in a conducting state, the compressed air in the process chamber will also be compressed into the shunt pipeline B and flow out through the shunt pipeline B, thereby preventing the compressed air in the process chamber from entering the gas mixing box CEM.
[0054] Figure 5 A diagram of a realizable device structure of this embodiment is given, such as Figure 5 As shown, in the device for extending the life of the mixing box in the ALD equipment, the air inlet line A can also include a third valve EV3.
[0055] A first end of the third valve EV3 is connected to a first end of the flow dividing line B, and a second end of the third valve EV3 is connected to a first end of the gas mixing box CEM.
[0056] The air intake line A may further include a filter T2.
[0057] The filter T2 is connected to the first end of the diversion pipeline B and is used to filter the special gas supplied to the device.
[0058] Accordingly, in an optional embodiment, the flow diversion line B may include a second flow meter MFC2 and a second valve EV2.
[0059] A first end of the second flow meter MFC2 is connected to a first end of the first flow meter MFC1 , a second end of the second flow meter MFC2 is connected to a first end of the second valve EV2 , and a second end of the second valve EV2 is connected to a first end of the first valve EV1 .
[0060] Since the gas mixing box CEM is part of the gas inlet pipeline A, the gas inlet pipeline A is used to transport gas to the process chamber. Accordingly, the device may also include a process chamber T1.
[0061] The process chamber T1 is connected to the second end of the first valve EV1, wherein compressed dry air CDA can be supplied into the process chamber T1.
[0062] Since the device requires power to drive, accordingly, in an optional embodiment, the device may also include a radio frequency power supply G1.
[0063] The RF power source G1 is connected to the process chamber T1 to provide power for the operation of the process chamber T1.
[0064] In another optional embodiment, the first end of the bypass line B may not be connected to the air inlet line A, but may be separately connected to a gas tank or a gas supply port to supply gas through a separate gas tank or a gas supply port, so that the device can still work normally when a failure occurs at the gas supply end.
[0065] The following describes the working process corresponding to the device provided in this embodiment in combination with the method for extending the life of the gas mixing box in the ALD equipment provided in this embodiment.
[0066] The method includes:
[0067] Before maintaining the process chamber, the residual gas in the pipeline is blown out through the bypass pipeline B. After there is no residual gas in the pipeline, the first valve EV1 in the air inlet pipeline A is closed, and when the pressure at the first end of the first valve EV1 is greater than the external pressure, the process chamber T1 is maintained.
[0068] Figure 6 is a flowchart of a method for extending the life of a gas mixing box in an ALD device provided by an embodiment of the present invention, referring to Figure 6 In an optional embodiment, before the process chamber is maintained, the residual gas in the pipeline is blown out through the shunt pipeline B. After there is no residual gas in the pipeline, the first valve EV1 in the air inlet pipeline A is closed, and when the pressure at the first end of the first valve EV1 is greater than the external pressure, the process chamber T1 is maintained, which may include:
[0069] Before performing maintenance on the process chamber T1, stop introducing special gases and trimethylaluminum into the device, set the first flow meter MFC1 to zero, and close the third valve EV3.
[0070] The special gas is introduced into the device, the second flow meter MFC2 is set to a preset flow value, and the first valve EV1 and the second valve EV2 in the diversion pipeline B are kept open for a first preset time.
[0071] After the first preset time is reached, the first valve EV1 is closed, and at the same time, the second flow meter MFC2 and the second valve EV2 in the diversion pipeline B are kept in the open state for the second preset time.
[0072] After the second preset time is reached, the second flow meter MFC2 and the second valve EV2 in the flow diversion pipeline B are closed, so that the pressure at the first end of the first valve EV1 is greater than the external pressure.
[0073] Compressed dry air is introduced into the process chamber T1 , and when the pressure in the process chamber T1 is equal to the external pressure, the process chamber T1 is maintained.
[0074] In this embodiment, the preparation work required before maintaining the process chamber T1 can be divided into four steps.
[0075] Specific:
[0076] Step 1: Stop the production process, that is, stop introducing special gases and trimethyl aluminum into the device. At this time, the battery placed in the process chamber T1 can be taken out or placed in the chamber corresponding to the next process. At the same time, the first flow meter MFC1 is set to zero and the third valve EV3 is closed, so that the air inlet pipeline A is in a cut-off state. Among them, the special gas selected in this embodiment is argon.
[0077] Step 2: After the first step is completed, the special gas is reintroduced into the device, and the second flowmeter MFC2 is set to a preset flow value, and the first valve EV1 and the second valve EV2 in the diversion pipeline B are kept open for a first preset time, wherein the preset flow value may be 200scom, and the first preset time may be 10 seconds. This step is to utilize the pressure difference to remove the residual gas in the intake pipeline A when it is in a cut-off state. In this state, the residual gas in the intake pipeline A and the re-input special gas will enter the process chamber T1, so that the air pressure in the process chamber T1, which was originally in a vacuum state, will gradually increase.
[0078] Step 3: After the second step is completed, it can be considered that there is no residual gas in the air inlet pipeline A. At this time, the first valve EV1 is closed to prevent the process chamber T1 from compressing air into the air inlet pipeline A. In order to ensure that the pressure at the first end of the first valve EV1 is greater than the external pressure, the second flow meter MFC2 and the second valve EV2 in the diversion pipeline B are kept open for the second preset time. Since the special gas is not supplied at this time, this step can increase the pressure at the first end of the first valve EV1. The second preset time can be 2 seconds.
[0079] Step 4: After the third step is completed, it can be considered that there is no residual gas in the air inlet pipeline A, and the pressure at the first end of the first valve EV1 is greater than the external pressure, then the second flow meter MFC2 and the second valve EV2 in the diversion pipeline B can be closed, and the supply of special gas can also be stopped. Then, if the process chamber T1 has not recovered to normal pressure at this time, compressed dry air is introduced into the process chamber T1. When the pressure in the process chamber T1 is equal to the external pressure, that is, when the chamber pressure is restored, the chamber cover 3 of the process chamber T1 is opened to maintain the process chamber T1.
[0080] It can be seen that the device and the corresponding method provided in this embodiment can prevent the gas in the process chamber T1 from flowing back into the gas mixing box CEM after atmospheric pressure, and the water or oxygen in the compressed air reacts with the TNA remaining in the gas mixing box CEM to generate dust, causing the gas mixing box CEM to be blocked, which can increase the service life of the gas mixing box CEM, reduce the frequency, avoid the safety hazards caused by TMA operation, and ensure the start-up rate of the device. In addition, by adding a diversion pipeline B, the influence of the purity of the special gas on the device can be reduced.
[0081] The above is the maintenance process of the process chamber T1 under normal circumstances. When the first valve EV1 leaks, the corresponding maintenance process may include:
[0082] When the first valve EV1 leaks, the residual gas in the pipeline is blown out through the bypass pipeline B. After there is no residual gas in the pipeline, the first valve EV1 in the air inlet pipeline is closed, and when the pressure at the first end of the first valve EV1 is greater than the external pressure, the process chamber T1 is maintained.
[0083] In this embodiment, when the first valve EV1 leaks, it is also necessary to supply special gas through the first end of the shunt pipeline B, so that when the pressure at the first end of the first valve EV1 is greater than the external pressure, the process chamber T1 is maintained. The specific operation process can refer to the maintenance process of the process chamber T1 under normal circumstances, which will not be repeated here. It can be seen that the embodiment of the present invention can minimize the probability of damage to the gas mixing box CEM during maintenance, avoid stopping work to purge the pipeline to replace the gas mixing box CEM, and reduce the loss of production capacity.
[0084] In order to enable the ALD equipment to carry out the production process normally, in an optional embodiment, the embodiment of the present invention also provides a system for extending the life of the mixing box in the ALD equipment, including a device for extending the life of the mixing box in the ALD equipment, a loading chamber, a heating chamber, a cooling chamber and a unloading chamber.
[0085] For parts of the embodiments of the present invention that are not described in detail, reference may be made to other related embodiments.
[0086] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A device for extending the life of a gas mixing box in an ALD device, characterized in that: include: Intake and bypass lines; The air intake pipeline includes a first flow meter, a gas mixing box and a first valve; The first end of the shunt pipeline is connected to the first end of the first flow meter, and the second end of the shunt pipeline is connected to the first end of the first valve; the shunt pipeline is used to ensure that the pressure at the first end of the first valve is greater than the external pressure; The second end of the first flow meter is connected to the first end of the first valve through the gas mixing box.
2. The device for extending the life of a gas mixing box in an ALD device according to claim 1, characterized in that: The flow diversion pipeline includes a second flow meter and a second valve; The first end of the second flowmeter is connected to the first end of the first flowmeter, the second end of the second flowmeter is connected to the first end of the second valve, and the second end of the second valve is connected to the first end of the first valve.
3. The device for extending the life of a mixing box in an ALD device according to claim 1, characterized in that: The air intake pipeline also includes a third valve; The first end of the third valve is connected to the first end of the diversion pipeline, and the second end of the third valve is connected to the first end of the gas mixing box.
4. The device for extending the life of a mixing box in an ALD device according to claim 1, characterized in that: The air intake pipeline also includes a filter; The filter is connected to the first end of the shunt pipeline and is used for filtering the special gas supplied to the device.
5. The device for extending the life of a gas mixing box in an ALD device according to claim 1, characterized in that: The apparatus also includes a process chamber; The process chamber is connected to the second end of the first valve.
6. The device for extending the life of a gas mixing box in an ALD device according to claim 1, characterized in that: The device also includes a radio frequency power supply; The radio frequency power supply is connected to the process chamber.
7. A method for extending the life of a gas mixing box in an ALD device, characterized in that: The device for extending the life of a gas mixing box in an ALD device as claimed in claim 1, wherein the method comprises: Before maintaining the process chamber, the residual gas in the pipeline is blown out through the diversion pipeline. After there is no residual gas in the pipeline, the first valve in the air inlet pipeline is closed, and the process chamber is maintained when the pressure at the first end of the first valve is greater than the external pressure.
8. The method for extending the life of a gas mixing box in an ALD device according to claim 7, characterized in that: Before the process chamber is maintained, the residual gas in the pipeline is blown out through the shunt pipeline, and after there is no residual gas in the pipeline, the first valve in the air inlet pipeline is closed, and when the pressure at the first end of the first valve is greater than the external pressure, the process chamber is maintained, including: Before performing maintenance on the process chamber, stop introducing the special gas and trimethylaluminum into the device, set the first flow meter to zero, and close the third valve; The special gas is introduced into the device, the second flow meter is set to a preset flow value, and the first valve and the second valve in the diversion pipeline are kept in an open state for a first preset time; After the first preset time is reached, the first valve is closed, and the second flow meter and the second valve in the diversion pipeline are kept in an open state for a second preset time; After the second preset time is reached, closing the second flow meter and the second valve in the diversion pipeline; Compressed dry air is introduced into the process chamber, and when the pressure in the process chamber is equal to the external pressure, the process chamber is maintained.
9. The method for extending the life of a gas mixing box in an ALD device according to claim 7, characterized in that: The method further comprises: When the first valve leaks, the residual gas in the pipeline is blown out through the diversion pipeline. After there is no residual gas in the pipeline, the first valve in the air inlet pipeline is closed, and when the pressure at the first end of the first valve is greater than the external pressure, the process chamber is maintained.
10. A system for extending the life of a mixing box in a crystalline silicon cell alumina equipment, characterized in that: It comprises a device for extending the life of a mixing box in an ALD device as described in any one of claims 1 to 6, a loading chamber, a heating chamber, a cooling chamber and a unloading chamber.