Road and bridge construction formwork fixing opposite-pull rod structure

By designing the threaded column and fixing mechanism, the problem of the separation of the push nut from the B clamp plate affecting work efficiency in the existing technology is solved, and efficient disassembly and stable fixing of the construction template are achieved.

CN119021110APending Publication Date: 2024-11-26CHONGQING TIANJIA ENERGY TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411434094.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-15
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

In the existing technology, the push nut and the B clamp are separated. When disassembling, the separation nut needs to be removed first, and then the B clamp needs to be removed, which affects work efficiency.

Method used

The fixing mechanism consists of a threaded column, a movable plate, a retaining ring, a connecting plate, a fixed column, and a sleeve. By rotating the fixed column through the sleeve, the connecting plate moves, and the position of the threaded ring is adjusted, so that the movable plate and the fixed plate clamp the construction module, simplifying the operation process.

Benefits of technology

It improves the stability and disassembly efficiency of the construction modules, simplifies the operation steps, and reduces the amount of manual labor.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021110A_ABST
    Figure CN119021110A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of building construction equipment, in particular to a road and bridge construction formwork fixing opposite-pull rod structure which comprises a fixing plate, a threaded column and a fixing mechanism, the threaded column is fixedly connected with the fixing plate and located on one side of the fixing plate, and the fixing mechanism comprises a moving plate, a clamping ring, a threaded ring, a connecting plate and an adjusting assembly. The movable plate is in sliding connection with the threaded column, the clamping ring is rotationally connected with the movable plate and located on one side of the movable plate, the cross section of the clamping ring is in an L shape, the threaded ring is fixedly connected with the threaded column and the clamping ring, the connecting plate is fixedly connected with the threaded ring and located on one side of the threaded ring, and the adjusting assembly is arranged on one side of the connecting plate. Through the arrangement of the structure, the problems that in the prior art, the push nut and the clamping plate B are arranged in a separated mode, the separation nut needs to be taken down at present, then the clamping plate B needs to be taken down, and the working efficiency is affected are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction equipment, and in particular to a tie rod structure for fixing a road and bridge construction template. Background Art

[0002] The fixed tie rod is a device used to fix the formwork, which is mainly used to resist the lateral pressure of the newly poured concrete and ensure the uniform spacing between the formworks, so as to ensure the uniform thickness of the wall or structure of the poured concrete. This device usually consists of two parts: an internal tension member and an external fixing device. According to the needs after the concrete hardens, some tie rods can be removed, while others cannot. At present, in the construction of roads and bridges, it is necessary to set up formwork for the concrete pouring structure. When setting up the formwork, tie rods are used to fix the inner and outer formworks. The traditional structure reserves holes on the inner and outer formworks respectively, passes one end of the tie rod through the two holes in turn, and then tightens it with a nut, so as to achieve the fixing effect between the formworks and prevent the formworks from loosening and falling off during the pouring process.

[0003] In the prior art, the patent document with the announcement number (CN214245246U) mentions a road and bridge construction template fixing tie rod, including a screw, a clamping plate A, an anti-skid pad A, a connecting seat and a round rod, the surface of the round rod is fixedly connected with a handle, the surface of the screw is provided with a slide groove, the surface of the screw is movably connected with a push nut, one side of the push nut is fixedly connected with a connecting ring, the surface of the connecting ring is movably connected with a push ring, the surface of the push ring is fixedly connected with a clamping plate B, and one side of the clamping plate B is fixedly connected with an anti-skid plate B. After using this prior art, personnel can turn the crank in the opposite direction to move the push nut outward, thereby removing the push nut and the push ring, and then personnel can pull the handle outward to pull out the screw on the other side of the template, reducing the loss of the screw, facilitating personnel to recycle and use, and reducing the workload of personnel.

[0004] However, in the above-mentioned prior art, the push nut and the B clamping plate are separately arranged. When disassembling, it is necessary to first remove the separation nut and then remove the B clamping plate, which affects the work efficiency. Summary of the invention

[0005] The purpose of the present invention is to provide a tie rod structure for fixing a road and bridge construction template, which solves the problem in the prior art that a push nut and a B clamp are separately arranged, and when disassembling, the separation nut needs to be removed first, and then the B clamp is removed, which affects work efficiency.

[0006] To achieve the above-mentioned objectives, the present invention provides a road and bridge construction template fixing tie rod structure, comprising a fixing plate, a threaded column and a fixing mechanism, wherein the threaded column is fixedly connected to the fixing plate and is located on one side of the fixing plate, and the fixing mechanism comprises a movable plate, a clamping ring, a threaded ring, a connecting plate, a fixing column and a sleeve, the movable plate is slidingly connected to the threaded column and covers the surface of the threaded column, the clamping ring is rotatably connected to the movable plate and is located on one side of the movable plate, the cross-section of the clamping ring is L-shaped, the threaded ring is fixedly connected to the threaded column and is located on one side of the clamping ring, the threaded ring is fixedly connected to the clamping ring, the connecting plate is fixedly connected to the threaded ring and is located on one side of the threaded ring, the fixing column is fixedly connected to the connecting plate and is located on one side of the connecting plate, and the sleeve is rotatably connected to the fixing column and sleeved on the surface of the fixing column.

[0007] Wherein, the fixing mechanism further comprises a limit block, which is fixedly connected to the fixing column and is located on one side of the fixing column.

[0008] Among them, the road and bridge construction template fixing tie rod structure also includes four rubber pads, and the four rubber pads are respectively fixedly connected to the fixed plate and the movable plate, and are relatively arranged at both ends of the fixed plate and the movable plate.

[0009] Among them, the road and bridge construction template fixing tie rod structure also includes two fixed blocks and a handle, the two fixed blocks are fixedly connected to the fixed plate and are located on one side of the fixed plate, and the handle is rotatably connected to the two fixed blocks and is located between the two fixed blocks.

[0010] Among them, the road and bridge construction template fixing tie rod structure also includes an inner tube and an outer tube, the inner tube is fixedly connected to the fixing plate and covered on the surface of the threaded column, and the outer tube is slidably connected to the inner tube and covered on the outside of the inner tube.

[0011] Wherein, a protruding block is arranged at one end of the inner tube, a sliding groove is arranged inside the outer tube, and the protruding block is adapted to the sliding groove.

[0012] Wherein, a limiting ring is arranged on one side of the outer tube, and the limiting ring is arranged on one side of the inner tube.

[0013] The present invention provides a road and bridge construction template fixing tie rod structure, the movable plate is slidably connected to the threaded column and covered on the surface of the threaded column, the clamping ring is rotatably connected to the movable plate and is located on one side of the movable plate, the cross section of the clamping ring is L-shaped, the threaded ring is fixedly connected to the threaded column and is located on one side of the clamping ring, the threaded ring is fixedly connected to the clamping ring, the connecting plate is fixedly connected to the threaded ring and is located on one side of the threaded ring, the fixed column is fixedly connected to the connecting plate and is located on one side of the connecting plate, the sleeve is rotatably connected to the fixed column and sleeved on the surface of the fixed column, the threaded column is passed through the construction module, the movable plate is sleeved on the surface of the threaded column, the threaded ring is rotated by the adjusting assembly and the connecting plate, the threaded ring pushes the movable plate, the clamping ring connects the movable plate and the threaded ring, so that the threaded ring drives the movable plate to move accordingly, the movable plate and the fixed plate clamp the construction module, the operation is simple, and the stability of the construction module is improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0015] Figure 1 It is a schematic diagram of the overall structure of the first embodiment of the present invention.

[0016] Figure 2 is a front view of the first embodiment of the present invention.

[0017] Figure 3 The present invention Figure 2 AA line section view.

[0018] Figure 4 It is a schematic diagram of the overall structure of the second embodiment of the present invention.

[0019] Figure 5 is a top view of a second embodiment of the present invention.

[0020] Figure 6 The present invention Figure 5 BB line cross-sectional view.

[0021] Figure 7 It is a schematic diagram of the overall structure of the third embodiment of the present invention.

[0022] Figure 8 is a top view of a third embodiment of the present invention.

[0023] 101-fixed plate, 102-threaded column, 103-rubber pad, 104-fixed block, 105-handle, 106-movable plate, 107-clamping ring, 108-threaded ring, 109-connecting plate, 110-fixed column, 111-limiting block, 112-sleeve, 201-inner tube, 202-sliding groove, 203-outer tube, 204-raised block, 205-limiting ring, 301-first side plate, 302-second side plate, 303-screw, 304-nut, 305 adjusting block. DETAILED DESCRIPTION

[0024] Embodiments of the present invention are described in detail below. Examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, but should not be construed as limiting the present invention.

[0025] First embodiment:

[0026] See also Figure 1 to Figure 3 ,in, Figure 1 is a schematic diagram of the overall structure of the first embodiment of the present invention, Figure 2 is a front view of a first embodiment of the present invention, Figure 3 The present invention Figure 2 AA line section view.

[0027] The present invention provides a tie rod structure for fixing a road and bridge construction template, comprising a fixing plate 101, a threaded column 102, a fixing mechanism, four rubber pads 103, two fixing blocks 104 and a handle 105, wherein the fixing mechanism comprises a moving plate 106, a clamping ring 107, a threaded ring 108, a connecting plate 109, a fixing column 110, a limiting block 111 and a sleeve 112. The above-mentioned scheme solves the problem in the prior art that a push nut is separately arranged from a B clamping plate, and during disassembly, the separation nut needs to be removed first, and then the B clamping plate is removed, which affects the work efficiency.

[0028] According to the present specific embodiment, the threaded column 102 is fixedly connected to the fixed plate 101 and is located on one side of the fixed plate 101; the movable plate 106 is slidably connected to the threaded column 102 and is covered on the surface of the threaded column 102; the retaining ring 107 is rotatably connected to the movable plate 106 and is located on one side of the movable plate 106; the cross section of the retaining ring 107 is L-shaped; the threaded ring 108 is fixedly connected to the threaded column 102 and is located on one side of the retaining ring 107; the threaded ring 108 is fixedly connected to the retaining ring 107; the connecting plate 109 is fixedly connected to the threaded ring 108 and is located on one side of the threaded ring 108; the fixed column 110 is fixedly connected to the connecting plate 109 and is located on one side of the connecting plate 109; the sleeve The tube 112 is rotatably connected to the fixed column 110 and is sleeved on the surface of the fixed column 110. The threaded column 102 is passed through the construction module, and the movable plate 106 is sleeved on the surface of the threaded column 102. The fixed column 110 is rotated by holding the sleeve 112, and the fixed column 110 drives the connecting plate 109 to move, thereby adjusting the position of the threaded ring 108. During the rotation process, the sleeve 112 rotates accordingly on the surface of the fixed column 110 to facilitate the rotation of the fixed column 110. The retaining ring 107 connects the movable plate 106 and the threaded ring 108, so that the threaded ring 108 drives the movable plate 106 to move accordingly. The movable plate 106 and the fixed plate 101 clamp the construction module, which is easy to operate and improves the stability of the construction module.

[0029] The limiting block 111 is fixedly connected to the fixing column 110 and is located at one side of the fixing column 110 . The limiting block 111 limits the sleeve 112 to prevent the sleeve 112 from being separated from the fixing column 110 .

[0030] Secondly, the four rubber pads 103 are fixedly connected to the fixed plate 101 and the movable plate 106 respectively, and are relatively arranged at both ends of the fixed plate 101 and the movable plate 106. The rubber pads 103 are in contact with the construction module to prevent the fixed plate 101 and the movable plate 106 from causing damage to the construction module.

[0031] In addition, the two fixing blocks 104 are fixedly connected to the fixing plate 101 and are located on one side of the fixing plate 101. The handle 105 is rotatably connected to the two fixing blocks 104 and is located between the two fixing blocks 104. The handle 105 is rotated to one side of the fixing plate 101 for storage. When in use, the handle 105 can control the angle of the fixing plate 101 and fix the threaded column 102 at the same time, so as to facilitate the rotation of the threaded ring 108.

[0032] When using the present invention, the threaded column 102 is passed through the construction module, and the movable plate 106 is sleeved on the surface of the threaded column 102. The handle 105 can control the angle of the fixed plate 101 and fix the threaded column 102 at the same time, so as to facilitate the rotation of the threaded ring 108. The fixed column 110 is rotated by holding the sleeve 112, and the fixed column 110 drives the connecting plate 109 to move, so as to adjust the position of the threaded ring 108. The threaded ring 108 pushes the movable plate 106, and the retaining ring 107 connects the movable plate 106 and the threaded ring 108, so that the threaded ring 108 drives the movable plate 106 to move accordingly. The movable plate 106 and the fixed plate 101 clamp the construction module, which is easy to operate and improves the stability of the construction module.

[0033] Second embodiment:

[0034] See also Figures 4 to 6 ,in, Figure 4 is a schematic diagram of the overall structure of the second embodiment of the present invention, Figure 5 is a top view of a second embodiment of the present invention, Figure 6 The present invention Figure 5 BB line cross-sectional view.

[0035] Based on the first embodiment, the present invention provides a tie rod structure for fixing a road and bridge construction template, which also includes an inner tube 201 and an outer tube 203. Through the arrangement of the above structure, the problem that during use, the threaded column 102 collides with the construction template and impurities fall onto the surface of the threaded column 102, affecting the normal use of the threaded column 102 is solved.

[0036] According to this specific embodiment, the inner tube 201 is fixedly connected to the fixing plate 101 and covered on the surface of the threaded column 102. The outer tube 203 is slidably connected to the inner tube 201 and covered on the outside of the inner tube 201. The inner tube 201 and the outer tube 203 cover the surface of the threaded column 102 to prevent the construction module from dropping impurities, and at the same time protect the threaded column 102 to ensure the normal use of the threaded column 102.

[0037] Secondly, a protruding block 204 is provided at one end of the inner tube 201, and a sliding groove 202 is provided on the inside of the outer tube 203. The protruding block 204 is adapted to the sliding groove 202. The sliding groove 202 and the protruding block 204 limit the direction of the outer tube 203. The first side plate 301 and the second side plate 302 fix the outer tube 203 and the movable plate 106, so that the fixed plate 101 and the movable plate 106 are in the same direction. When in use, the positions of the fixed plate 101 and the movable plate 106 correspond, thereby improving the stability of the construction module.

[0038] In addition, a limiting ring 205 is provided on one side of the outer tube 203, and the limiting ring 205 is provided on one side of the inner tube.

[0039] When using the present invention, the threaded column 102 is passed through the construction module, and the movable plate 106 is sleeved on the surface of the threaded column 102. The handle 105 can control the angle of the fixed plate 101 and fix the threaded column 102 at the same time, so that the threaded ring 108 can be rotated conveniently. The fixed column 110 is rotated by holding the sleeve 112, and the fixed column 110 drives the connecting plate 109 to move, so as to adjust the position of the threaded ring 108. The threaded ring 108 pushes the movable plate 106, and the clamping ring 107 connects the movable plate 106 and the threaded ring 108, so that the threaded ring 108 drives the movable plate 106 to move accordingly. The movable plate 106 and the fixed plate 101 clamp the construction module, which is simple to operate and improves the stability of the construction module. The outer tube 203 and the inner tube 201 are covered on the surface of the threaded column 102 to prevent the construction module from dropping impurities, and at the same time, the threaded column 102 is protected to ensure the normal use of the threaded column 102.

[0040] Third embodiment:

[0041] The road and bridge construction template fixing tie rod structure also includes a connecting component, and the connecting component is arranged on one side of the outer tube 203.

[0042] The connecting assembly includes a first side plate 301, a second side plate 302, a screw 303 and a nut 304. The first side plate 301 is fixedly connected to the outer shell, the second side plate 302 is fixedly connected to the movable plate 106 and is located on one side of the first side plate 301, the screw 303 is fixedly connected to the first side plate 301 and passes through the second side plate 302, and the nut 304 is threadedly connected to the screw 303 and is located on one side of the second side plate 302.

[0043] Adjustment blocks 305 are disposed on both sides of the nut 304 .

[0044] See also Figure 7-8 ,in, Figure 7 is a schematic diagram of the overall structure of the third embodiment of the present invention, Figure 8 is a top view of a third embodiment of the present invention.

[0045] On the basis of the second embodiment, the present invention provides a road and bridge construction template fixing tie rod structure, which also includes a connecting assembly, and the connecting assembly includes a first side plate 301, a second side plate 302, a screw 303 and a nut 304. Through the arrangement of the above structure, the problem that the positions of the inner tube 201 and the outer tube 203 are difficult to fix and the surface of the threaded column 102 cannot be accurately covered is solved.

[0046] According to this specific embodiment, the connection assembly is disposed on one side of the outer tube 203 , and the connection assembly connects the outer tube 203 to the movable plate 106 to fix the position of the outer tube 203 .

[0047] Among them, the first side plate 301 is fixedly connected to the shell, the second side plate 302 is fixedly connected to the movable plate 106 and is located on one side of the first side plate 301, the screw rod 303 is fixedly connected to the first side plate 301 and passes through the second side plate 302, the nut 304 is threadedly connected to the screw rod 303 and is located on one side of the second side plate 302, when installing the movable plate 106, the second side plate 302 is sleeved on the screw rod 303, and the second side plate 302 is fixed by the nut 304, when the movable plate 106 moves, the first side plate 301 drives the outer tube 203 to move accordingly, so that the outer tube 203 and the inner tube 201 are covered on the surface of the threaded column 102.

[0048] Secondly, adjustment blocks 305 are arranged on both sides of the nut 304 , and the arrangement of the adjustment blocks 305 is convenient for turning to the nut 304 .

[0049] When using the present invention, the threaded column 102 is passed through the construction module, and the movable plate 106 is sleeved on the surface of the threaded column 102. The handle 105 can control the angle of the fixed plate 101 and fix the threaded column 102 at the same time, so as to facilitate the rotation of the threaded ring 108. The fixed column 110 is rotated by holding the sleeve 112, and the fixed column 110 drives the connecting plate 109 to move, so as to adjust the position of the threaded ring 108. The threaded ring 108 pushes the movable plate 106, and the clamping ring 107 connects the movable plate 106 and the threaded ring 108, so that the threaded ring 108 is 8 drives the movable plate 106 to move accordingly, and the movable plate 106 and the fixed plate 101 clamp the construction module, which is easy to operate and improves the stability of the construction module. The second side plate 302 is sleeved on the screw rod 303, and the second side plate 302 is fixed by the nut 304. When the movable plate 106 moves, the first side plate 301 drives the outer tube 203 to move accordingly, so that the outer tube 203 and the inner tube 201 are covered on the surface of the threaded column 102, preventing the construction module from dropping impurities, and at the same time protecting the threaded column 102 to ensure the normal use of the threaded column 102

[0050] What is disclosed above is only one or more preferred embodiments of the present application, and cannot be used to limit the scope of rights of the present application. Ordinary technicians in this field can understand that all or part of the processes of implementing the above embodiments and equivalent changes made according to the claims of the present application are still within the scope covered by the present application.

Claims

1. A tie rod structure for fixing a road and bridge construction template, comprising a fixing plate and a threaded column, wherein the threaded column is fixedly connected to the fixing plate and is located on one side of the fixing plate, characterized in that: It also includes a fixing mechanism, which includes a movable plate, a retaining ring, a threaded ring, a connecting plate, a fixed column and a sleeve. The movable plate is slidably connected to the threaded column and covers the surface of the threaded column. The retaining ring is rotatably connected to the movable plate and is located on one side of the movable plate. The cross-section of the retaining ring is L-shaped. The threaded ring is fixedly connected to the threaded column and is located on one side of the retaining ring. The threaded ring is fixedly connected to the retaining ring. The connecting plate is fixedly connected to the threaded ring and is located on one side of the threaded ring. The fixed column is fixedly connected to the connecting plate and is located on one side of the connecting plate. The sleeve is rotatably connected to the fixed column and sleeved on the surface of the fixed column.

2. The road and bridge construction template fixing tie rod structure as claimed in claim 1, characterized in that: The fixing mechanism further comprises a limiting block, which is fixedly connected to the fixing column and is located on one side of the fixing column.

3. The road and bridge construction template fixing tie rod structure as claimed in claim 2, characterized in that: The road and bridge construction template fixing tie rod structure also includes four rubber pads, which are fixedly connected to the fixed plate and the movable plate respectively and are arranged at two ends of the fixed plate and the movable plate opposite to each other.

4. The road and bridge construction template fixing tie rod structure as claimed in claim 3, characterized in that: The road and bridge construction template fixing tie rod structure also includes two fixed blocks and a handle. The two fixed blocks are fixedly connected to the fixed plate and are located on one side of the fixed plate. The handle is rotatably connected to the two fixed blocks and is located between the two fixed blocks.

5. The road and bridge construction template fixing tie rod structure as claimed in claim 4, characterized in that: The road and bridge construction template fixing tie rod structure also includes an inner tube and an outer tube. The inner tube is fixedly connected to the fixing plate and covered on the surface of the threaded column. The outer tube is slidably connected to the inner tube and covered on the outside of the inner tube.

6. The road and bridge construction template fixing tie rod structure as claimed in claim 5, characterized in that: A convex block is arranged at one end of the inner tube, a sliding groove is arranged inside the outer tube, and the convex block is adapted to the sliding groove.

7. The road and bridge construction template fixing tie rod structure as claimed in claim 6, characterized in that: A limiting ring is arranged on one side of the outer tube, and the limiting ring is arranged on one side of the inner tube.