Pipeline anti-floating and foundation treatment method in narrow river

By using small electric equipment to rotate steel spiral piles and steel plate hoops to fix the sewage intercept pipes in a narrow river, the problems of uneven settlement of the foundation and reduced flood discharge area are solved, and construction convenience and anti-float effect are achieved. Environmentally friendly and durable.

CN119021203APending Publication Date: 2024-11-26ARCHITECTURAL DESIGN RES INST OF GUANGDONG PROVINCE
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411194171.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

When sewage interceptor pipes are installed in a narrow river rush, the prior art is difficult to effectively deal with the problems of uneven settlement of foundations and reduced flood discharge area, and the difficulty of construction machinery entering leads to construction difficulties.

Method used

Small electric equipment rotating steel spiral piles are used for foundation treatment, and sewage interceptor pipes are fixed through steel plates and steel plate hoops. Concrete is used to resist floating and compressive resistance, avoiding the reduction of flood discharge area caused by concrete pipes and the foundation of pressing stone filling Uneven settlement.

Benefits of technology

The convenience of construction and anti-float effect are achieved, avoiding the problems of uneven settlement of the foundation and the reduction of flood discharge area, while reducing construction costs, and the method is safe, environmentally friendly and durable.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021203A_ABST
    Figure CN119021203A_ABST
Patent Text Reader

Abstract

The invention provides a pipeline anti-floating and foundation treatment method in a narrow river, which specifically comprises the following steps: S1, rotating a steel screw pile by using small electric equipment, and placing the steel screw pile into a stratum; s2, a steel plate with a hole with the diameter of 60 mm reserved in the middle is welded to the top of the steel screw pile, and the steel plate is welded to the top of the steel screw pile; s3, a steel plate hoop of 80 mm * 6 mm is welded to one side of the steel plate, then the sewage interception pipe to be laid is placed on the steel plate to be well stabilized, then the steel plate hoop is broken off to fasten the sewage interception pipe, then the other end of the steel plate hoop is welded to the steel plate, and the sewage interception pipe is well fixed through the steel plate hoop; and S4, gaps among the steel plate hoop, the steel plate and the sewage intercepting pipe are filled with concrete. The purpose of arranging the sewage intercepting pipe in the narrow river branch can be achieved, construction is easy, the problem of uneven settlement of a foundation possibly caused by conventional rubble pressing and filling in the past is solved, and the problem that the flood drainage area of the river branch is reduced due to concrete pipe wrapping anti-floating is also solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a foundation treatment method, in particular to a pipeline anti-floating and foundation treatment method in a narrow river. Background Art

[0002] River management is an important project in many urban infrastructure projects. Especially for rivers in urban areas, there are a large number of houses on both sides of the rivers, and many sewage pipes directly discharge sewage into the rivers, causing serious pollution of the rivers. Affected by the age, the width of these rivers is relatively narrow (the minimum width may be 2m), and the cross-section of the rivers is small. If you want to manage rivers, you need to collect the sewage from the sewage pipes on both sides first. At this time, you need to set up a large sewage interception pipe on one side of the river bottom to intercept all the sewage from the sewage pipes on one side. Because the newly built sewage interception pipe is in the river, it needs to be treated with anti-floating and foundation treatment. The conventional method in the past was to use concrete to wrap the pipe for anti-floating, and at the same time fill the bottom of the pipe with rough stone for foundation treatment. However, the disadvantages of this method are: first, the foundation treatment method of filling rough stones is relatively rough and cannot effectively treat the silt under the river, and there is a risk of uneven settlement in the later stage; second, the minimum thickness of the concrete pipe is 120mm (for crack resistance, the larger the pipe diameter, the thicker the pipe). If one sewage interception pipe is wrapped on each side, it will occupy a larger area of ​​the river (taking two 500 pipes as an example, the cross-sectional area before wrapping is 0.40m 2 , the cross-sectional area after encapsulation is 1.125m 2 , increased by 2.8 times; taking two 800 tubes as an example, the tube thickness is 140mm. The cross-sectional area before encapsulation is 1.0m 2 The cross-sectional area after encapsulation is 2.33m 2 , increased by 2.3 times), thus affecting the flood discharge capacity of the originally narrow rivers and creeks, which is not allowed in many cases.

[0003] However, other anti-floating or foundation treatment methods such as pressing prefabricated square piles, constructing steel pipe piles or micro piles are difficult to construct because of limited space and the inability of large construction machinery to enter. Summary of the invention

[0004] In view of the shortcomings of the prior art, the present invention proposes a method for anti-floating and foundation treatment of pipelines in narrow rivers and creeks, which can achieve the purpose of setting up sewage interception pipes in narrow rivers and creeks. The construction is easy, and it not only solves the problem of uneven foundation settlement that may be caused by conventional pressure filling of rubble stones, but also solves the problem of reduced river discharge area caused by anti-floating concrete pipe wrapping.

[0005] In order to realize the above technical solution, the present invention provides a pipeline anti-floating and foundation treatment method in a narrow river, which specifically comprises the following steps:

[0006] S1. Use a small electric device to rotate the steel screw pile and place the steel screw pile into the ground;

[0007] S2. Weld a steel plate (D+40mm)×160mm×20mm with a hole of 60mm in the middle to the top of the steel spiral pile, where D is the outer diameter of the steel spiral pile;

[0008] S3. Weld an 80mm×6mm steel plate hoop to one side of the steel plate, then place the sewage interception pipe to be laid on the steel plate and stabilize it, then bend the steel plate hoop over to fasten the sewage interception pipe, then weld the other end of the steel plate hoop to the steel plate, and fix the sewage interception pipe with the steel plate hoop;

[0009] S4. Fill the gaps between the steel plate hoops, the steel plates and the sewage interception pipe with concrete.

[0010] Preferably, the steel spiral pile is a hollow steel pipe of φ60mm×6mm and a length of 1.5m-3.0m. Spiral blades of 70mm width are welded at intervals on the periphery of the steel spiral pile, so that the outer diameter D of the steel spiral pile is 200mm.

[0011] Preferably, in step S1, before the steel screw piles are placed, the steel screw piles are treated by coating with epoxy asphalt.

[0012] Preferably, the sewage interception pipe is a plastic pipe, each section of the plastic sewage interception pipe is 6 meters long, the interval between the steel spiral piles is 3 meters, and there are 2 steel spiral piles under each section of the sewage interception pipe.

[0013] The beneficial effects of the pipeline anti-floating and foundation treatment method in a narrow river provided by the present invention are: the method first uses a small electric machinery to rotate and construct small steel spiral piles in the narrow river, so as to achieve the purposes of vibration-free construction, small construction working area, small construction machinery and convenient construction, and avoids the difficult problems of prefabricated square piles, steel pipe piles or micro piles requiring medium and large machinery and a large construction working area. By welding steel plates on the tops of the steel spiral piles and welding steel plates to steel plate hoops, the sewage interception pipes are firmly fixed on the steel spiral piles, and the steel spiral piles are used for anti-floating and pressure resistance, which not only solves the problem of uneven foundation settlement that may be caused by conventional pressure filling of rough stones, but also solves the problem of reduced river discharge area caused by concrete pipe wrapping for anti-floating, killing two birds with one stone, and the steel spiral pile treatment method is relatively economical in cost, will not increase costs, is safe and economical, green and environmentally friendly, and durable. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the construction structure of the present invention.

[0015] Figure 2 It is a schematic diagram of the fixing structure of the sewage interception pipe in the present invention.

[0016] In the figure: 1. Steel screw pile; 2. Spiral blade; 3. Steel plate; 4. Sewage interception pipe; 5. Steel plate hoop; 6. Concrete; 7. Hole. DETAILED DESCRIPTION

[0017] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. All other embodiments obtained by ordinary persons in the art without creative work are within the scope of protection of the present invention.

[0018] Embodiment: A pipeline anti-floating and foundation treatment method in a narrow river.

[0019] Reference Figure 1 and Figure 2 As shown, a pipeline anti-floating and foundation treatment method in a narrow river includes the following steps:

[0020] S1. Before inserting the steel spiral pile 1, the steel spiral pile 1 is treated by brushing epoxy asphalt to do a good job of anti-corrosion and ensure the durability of the steel spiral pile 1. Then, a small electric device is used to rotate the steel spiral pile 1 and the steel spiral pile 1 is inserted into the formation; wherein the steel spiral pile 1 is a hollow steel pipe of φ60mm×6mm and a length of 1.5m-3.0m. The outer periphery of the steel spiral pile 1 is welded with spiral blades 2 with a width of 70mm at intervals, so that the outer diameter D of the steel spiral pile 1 is 200mm. The provision of the spiral blades 2 facilitates the steel spiral pile 1 to drill downward into the formation.

[0021] S2. Weld a steel plate 3 of (D+40mm)×160mm×20mm with a hole 7 of 60mm in the middle to the top of the steel spiral pile 1. The steel plate 3 is welded to the top of the steel spiral pile 1. The function of the steel plate 3 is to provide a welding position for the subsequent steel plate hoop 5.

[0022] S3, weld a 80mm×6mm steel plate hoop 5 on one side of the steel plate 3, then place the sewage interception pipe 4 to be laid on the steel plate 3 and stabilize it, then bend the steel plate hoop 3 over to fasten the sewage interception pipe 4, then weld the other end of the steel plate hoop 5 to the steel plate 3, and fix the sewage interception pipe 4 with the steel plate hoop 5. The sewage interception pipe 4 is a plastic pipe, and the plastic sewage interception pipe 4 is 6m long. The interval of the steel spiral pile 1 is 3m, and it is ensured that there are 2 steel spiral piles 1 under each section of the sewage interception pipe 4;

[0023] S4. Fill the gap between the steel plate hoop 5 and the steel plate 3 and the sewage interception pipe 4 with concrete 6 to ensure that the steel plate hoop 5 and the steel plate 3 and the sewage interception pipe 4 are fixed and stable.

[0024] The method achieves the purpose of vibration-free construction, small construction work area, small construction machinery and convenient construction by first using a small electric machine to rotate and construct small steel spiral piles in a narrow river, avoiding the problem that prefabricated square piles, steel pipe piles or micro piles require medium and large machinery and a large construction work area. The sewage interception pipe is firmly fixed on the steel spiral pile by welding steel plates on the top of the steel spiral pile and welding steel plates to steel plate hoops. The steel spiral pile is used to resist floating and compression, which not only solves the problem of uneven foundation settlement that may be caused by conventional pressure filling of rough stones, but also solves the problem of reduced river drainage area caused by concrete pipe wrapping for anti-floating, killing two birds with one stone. In addition, the steel spiral pile treatment method is relatively economical, does not increase costs, is safe and economical, green and environmentally friendly, and durable. After review, for the sewage interception pipe 4 with a diameter of 400-1000mm, the characteristic value of the anti-buoyancy bearing capacity that each steel spiral pile 1 needs to provide is 5kN-28kN, and the characteristic value of the compressive bearing capacity that it needs to provide is 5kN-28kN. Even if there is poor silt at the bottom of the river, the 1.5m-3.0m steel spiral pile 1 can easily meet the requirements, which illustrates the strong applicability of the steel spiral pile 1.

[0025] The above description is only a preferred embodiment of the present invention, but the present invention should not be limited to the contents disclosed in the embodiment and the drawings, so any equivalent or modification completed without departing from the spirit disclosed in the present invention shall fall within the scope of protection of the present invention.

Claims

1. A pipeline anti-floating and foundation treatment method in a narrow river, characterized in that The specific steps include: S1. Use a small electric device to rotate the steel screw pile and place it into the ground; S2. Weld a steel plate (D+40mm)×160mm×20mm with a hole of 60mm in the middle to the top of the steel spiral pile, where D is the outer diameter of the steel spiral pile; S3. Weld an 80mm×6mm steel plate hoop to one side of the steel plate, then place the sewage interception pipe to be laid on the steel plate and stabilize it, then bend the steel plate hoop over to fasten the sewage interception pipe, then weld the other end of the steel plate hoop to the steel plate, and fix the sewage interception pipe with the steel plate hoop; S4. Fill the gaps between the steel plate hoops, the steel plates and the sewage interception pipe with concrete.

2. The pipeline anti-floating and foundation treatment method in a narrow river as claimed in claim 1, characterized in that: The steel spiral pile is a hollow steel pipe of φ60mm×6mm and a length of 1.5m-3.0m. Spiral blades with a width of 70mm are welded at intervals on the periphery of the steel spiral pile, so that the outer diameter D of the steel spiral pile is 200mm.

3. The pipeline anti-floating and foundation treatment method in a narrow river as claimed in claim 1, characterized in that: In the step S1, before the steel screw piles are placed, the steel screw piles are treated by coating with epoxy asphalt.

4. The pipeline anti-floating and foundation treatment method in a narrow river as claimed in claim 1, characterized in that: The sewage interception pipe is a plastic pipe, each section of the plastic sewage interception pipe is 6 meters long, the interval between steel spiral piles is 3 meters, and there are 2 steel spiral piles under each section of the sewage interception pipe.