Building anti-seismic support construction technology
By binding steel bars, installing embedded plates, casting concrete at one time and tightening high-strength bolts in the construction process of rubber seismic isolation support, the problem of excessive shearing and capsizing of rubber seismic isolation support in major earthquakes is solved, and the problem of excessive shearing and capsizing of rubber seismic isolation support is achieved. The stability and seismic resistance of the seismic isolation structure are improved, which reduces the seismic fortification intensity requirements of the building and brings economic benefits.
Patent Information
- Application Number
- CN202411256363.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-09
- Publication Date
- 2024-11-26
AI Technical Summary
Existing rubber seismic isolation support is prone to excessive shearing and capsizing in major earthquakes, resulting in building safety hazards.
A construction technology of building seismic bearings is adopted, including binding pier steel bars, installing embedded plates, binding seismic insulation layer bottom plate beam steel bars, precise calibration and fixing of embedded plates, single-use pouring concrete, and installing rubber seismic bearings. The gradual tightening of high-strength bolts and the use of vibrating rods ensure the stability and shock resistance of the shock-isolating support.
The period of the seismic isolation structure is significantly extended, the seismic response of the superstructure is reduced, the seismic resistance of the building is improved, and the engineering cost saving is achieved by reducing the reinforcement rate of the component section.
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of bearing isolation devices, and in particular relates to a construction process for an earthquake-resistant bearing of a building. Background Art
[0002] As an effective seismic isolation technology, seismic isolation bearings are widely used all over the world. Its basic principle is to divide the building into the upper structure and the lower structure, and connect the two through seismic isolation bearings to form an isolation layer. In this way, the destructive force of the earthquake can be effectively weakened, preventing the building from being seriously damaged in the earthquake.
[0003] Rubber seismic isolation bearings are one of the common types. They are made of multiple layers of steel plates and rubber alternately stacked together. The steel plates are used as stiffening materials for rubber bearings, which greatly improve the vertical stiffness of the rubber body. In this way, rubber seismic isolation bearings can not only reduce the impact of horizontal earthquakes on buildings, but also withstand large vertical loads. Therefore, rubber seismic isolation bearings have broad application prospects in the construction industry.
[0004] However, existing rubber seismic isolation bearings also have some problems during use. For example, in the case of a major earthquake, due to excessive horizontal displacement, rubber seismic isolation bearings are prone to excessive shearing and overturning. This will not only affect the building, but may also cause other safety hazards. Summary of the invention
[0005] In view of the technical problem that the above-mentioned rubber seismic isolation bearing is prone to excessive shearing and overturning, the present invention provides a construction process for a building seismic bearing.
[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is:
[0007] A construction process for building seismic bearings comprises the following steps:
[0008] S1. Tie up the reinforcement of the piers; S2. Install the lower embedded plate; S3. Tie up the reinforcement of the bottom plate beam of the seismic isolation layer; S4. The side formwork of the piers and beams uses 12mm thick plywood, and the back is lined with 50mm×100mm square wood; after the floor formwork is supported, mark the plane position control line of the seismic isolation bearing on it; S5. After the reinforcement of the bottom plate is tied, accurately calibrate the lower embedded plate and fix it firmly; S6. Screw the high-strength bolts onto the embedded plate without tightening; S7. Pour concrete on the beams and piers at one time; S8. Install rubber seismic isolation bearings.
[0009] The method for tying the pier reinforcement in S1 is: first tie the main reinforcement of the pier, then tie the stirrups and hooks on the outside of the pier; all the stirrups and hooks below the beam top surface elevation are tied in place, and the stirrups and hooks above are constructed after the beam reinforcement is tied; then weld a short steel bar at each of the four corners of the pier, and the top elevation of the steel bar is the elevation of the lower surface of the steel plate of the lower embedded plate; at the same time, the beam bottom formwork is set up.
[0010] The method for installing the lower embedded plate in S2 is: use a tower crane to lift the lower embedded plate onto the pier, then use a hoist crane or manually lift the embedded plate into place, and fix the lower embedded plate after the elevation and center line position of the lower embedded plate are accurately adjusted.
[0011] The method for tying the bottom plate beam reinforcement of the seismic isolation layer in S3 is: when tying the beam reinforcement, do not collide with the lower embedded plate. If the position of the single-row reinforcement conflicts with the position of the embedded anchor bars and the embedded bolt sleeves, arrange the beam reinforcement in double or multiple rows, and the number of stirrups remains unchanged; the length of the embedded bolt sleeve is 30mm to 50mm longer than that of the conventional bolt sleeve.
[0012] At the bottom of the embedded anchor bar position, the position corresponding to the embedded anchor bar is marked with a signal pen of a prominent color, and the mark is extended to the transverse and longitudinal directions of the position corresponding to the embedded anchor bar. When tying the beam reinforcement, avoid the marked position to prevent the beam reinforcement from blocking the embedded anchor bar.
[0013] The method for pouring concrete in one go for the S7 middle beam and pier is:
[0014] S7.1. During installation, place 4 level rulers on each side of the embedded plate for initial leveling, and make initial adjustments to the axis and flatness of the embedded steel plate;
[0015] S7.2. After the embedded plate is initially leveled, use the ET-02 theodolite to deliver the axis to the embedded plate. After the embedded plate is positioned, use the self-made adjusters at the four corners of the embedded plate to adjust the height.
[0016] S7.3. After the embedded plate is accurately positioned, the connecting rod is fixed to the beam and column reinforcement by arc welding. During pouring, it is strictly forbidden for the formwork, construction personnel, and vibrator to directly contact the embedded plate to prevent the embedded plate from being displaced and deformed by human factors;
[0017] S7.4. When pouring, a concrete pouring hopper is set on the upper part of the embedded plate. When the slump of concrete is between 200mm and 220mm and the concrete in the hopper reaches the required amount, the concrete will flow due to its own weight and fill the area to be poured under the pressure of its own weight.
[0018] S7.5. Before pouring, put cement slurry with the same composition as that in concrete at the interface of the component, and then put 2-3 high-frequency vibrating rods on each side of the seismic isolation support. During pouring, the vibrating rods vibrate at the same time to prevent concrete segregation;
[0019] S7.6. Under the upper pressure and lower vibration, the poured concrete is intensified in liquefaction state, the resistance is reduced, and the concrete quickly fills all parts. When the concrete is full, the bubbles in the concrete are exhausted and the slurry rises through the vents. At this time, close the hopper valve and stop feeding. Slowly pull out the vibrating rod, and then use the vibrating rod to vibrate around the support. The spacing between the vibration points is 100mm to 300mm. After pouring and cleaning the concrete on the embedded plate, start curing immediately. The curing time should be no less than 7 days to fully supply the moisture needed for the expansion of the concrete.
[0020] The method for installing the rubber seismic isolation bearing in S8 is as follows: after the concrete strength of the lower pier reaches 75% of the design strength, clean the screw holes of the embedded parts; use high-strength bolts to firmly connect the lower connecting plate to the lower embedded plate; the high-strength bolts should be tightened symmetrically, and the tightening process is divided into three stages: initial tightening, repeated tightening, and final tightening, and all should be completed on the same day; when connecting the bolts, it is strictly forbidden to force the bolts in by hammering, and in addition, the friction surface of the component should be kept clean and dry, and it is strictly forbidden to work in the rain; the bolt holes on the connecting plate of the rubber seismic isolation bearing and the lifting screw holes should be sealed and smoothed with putty; the close-hanging method requires the seismic isolation bearing to be hung to a distance of 10mm from the embedded plate surface, and after all the bolts are aligned and half-locked, all the lower anchor bolts are lowered, and the diagonal locking method is adopted. After completion, mark them one by one.
[0021] A laminated rubber bearing seismic isolation device comprises a first-floor frame column, an upper pier of a seismic isolation layer, high-strength bolts, embedded anchor bars, a lower pier of the seismic isolation layer, and a rubber seismic isolation bearing. The bottom of the first-floor frame column is connected to the upper pier of the seismic isolation layer, the bottom of the upper pier of the seismic isolation layer is connected to the rubber seismic isolation bearing via high-strength bolts, and the bottom of the rubber seismic isolation bearing is connected to the lower pier of the seismic isolation layer via embedded anchor bars.
[0022] It also includes embedded bolt sleeves, an upper floor, an upper connecting plate, a lower connecting seat, a lower embedded plate, a seismic isolation layer beam, a seismic isolation layer floor and an independent column of the first underground layer. The high-strength bolts and embedded anchor bars are sleeved with embedded bolt sleeves. The upper floor is arranged between the first-floor frame column and the upper pier of the seismic isolation layer, the upper connecting plate is arranged between the upper pier of the seismic isolation layer and the rubber seismic isolation seat, the lower connecting seat is arranged between the rubber seismic isolation seat and the lower pier of the seismic isolation layer, a lower embedded plate is arranged below the lower connecting seat, the lower pier of the seismic isolation layer is arranged in the seismic isolation layer beam, the seismic isolation layer floor is arranged in the seismic isolation layer beam, and the bottom of the lower pier of the seismic isolation layer is connected to the independent column of the first underground layer.
[0023] Compared with the prior art, the present invention has the following beneficial effects:
[0024] The period of the seismic isolation structure system of the present invention is significantly extended. When an earthquake occurs, due to this improvement, the seismic response of the superstructure will be greatly reduced, thereby effectively reducing the seismic fortification intensity requirements of the superstructure. This innovation not only ensures the safety of the building under the same seismic performance standards, but also achieves significant savings in engineering costs by reducing the reinforcement ratio of the component section. This groundbreaking design not only improves the seismic performance of the building structure, but also brings new possibilities for economic benefits and sustainable development to the construction industry. DETAILED DESCRIPTION
[0025] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. These descriptions are only to further illustrate the features and advantages of the present invention, rather than to limit the claims of the present invention. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0026] The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0027] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0028] In this embodiment, a construction process for a building seismic support includes the following steps:
[0029] Step 1: Tie up the main reinforcement of the pier first, then tie up the stirrups and hooks on the outside of the pier. Tie up all the stirrups and hooks below the beam top elevation, and install the stirrups and hooks above after the beam reinforcement is tied up. Then weld a short steel bar at each of the four corners of the pier, and the top elevation of the steel bar is the elevation of the lower surface of the steel plate of the lower embedded plate. At the same time, complete the support of the beam bottom formwork.
[0030] Step 2: Use a tower crane to lift the lower embedded plate onto the pier, and then use a hoist or manually lift the embedded plate into place. After the elevation and centerline position of the lower embedded plate are accurately adjusted, fix the lower embedded plate.
[0031] Step 3: When tying the beam reinforcement, do not collide with the lower embedded plate. If the position of the single-row reinforcement conflicts with the position of the embedded anchor bar and the embedded bolt sleeve, arrange the beam reinforcement in double or multiple rows, and the number of stirrups remains unchanged. At the bottom of the embedded anchor bar position, use a signal pen with a prominent color to mark the position corresponding to the embedded anchor bar, and extend the mark to the horizontal and longitudinal directions of the position corresponding to the embedded anchor bar. When tying the beam reinforcement, avoid the marked position to prevent the beam reinforcement from blocking the embedded anchor bar.
[0032] Step 4: The side formwork of the pier and beam is made of 12mm thick plywood, with 50mm×100mm square wood on the back. After the floor formwork is supported, mark the plane position control line of the seismic isolation bearing on it.
[0033] Step 5. After the bottom plate reinforcement is tied, the lower embedded plate is accurately calibrated and firmly fixed.
[0034] Step 6. Screw the high-strength bolts onto the embedded plates without tightening them. At the same time, take protective measures to prevent contamination of the surface of the embedded plates when pouring concrete.
[0035] Step 7: Pour concrete for beams, slabs and piers at one time.
[0036] 1) During installation, place 4 levels on each side of the embedded plate for initial leveling, and make initial adjustments to the axis and flatness of the embedded steel plate.
[0037] 2) After the embedded plate is initially leveled, use the ET-02 theodolite to project the axis onto the embedded plate. After the embedded plate is positioned, use the homemade adjusters at the four corners of the embedded plate to adjust the height.
[0038] 3) After the embedded plates are precisely positioned, arc welding is used to fix the connecting rods to the beam and column reinforcements. During pouring, it is strictly forbidden for the formwork, construction workers, and vibrators to directly contact the embedded plates to prevent human-caused displacement and deformation of the embedded plates.
[0039] 4) During pouring, a concrete pouring hopper is set on the upper part of the embedded plate. When the slump of concrete is between 200mm and 220mm and the concrete in the hopper reaches the required amount, the concrete will flow due to its own weight and fill the part to be poured under the pressure of its own weight.
[0040] 5) When pouring, put cement slurry with the same composition as the concrete at the interface of the component in advance, and then put 2-3 high-frequency vibrating rods on each side of the seismic isolation support. During pouring, the vibrating rods vibrate at the same time to prevent concrete segregation.
[0041] 6) Under the pressure from the top and vibration from the bottom, the poured concrete is intensified in liquefaction, the resistance is reduced, and the concrete quickly fills all parts. When the concrete is full, the bubbles in the concrete are exhausted and the slurry rises along the vents. At this time, close the hopper valve and stop feeding. Slowly pull out the vibrating rod, and then use the vibrating rod to vibrate around the support. The spacing between the vibration points is 100mm to 300mm. After pouring and cleaning the concrete on the embedded plate, start curing immediately. The curing time should be no less than 7 days to fully supply the water needed during the expansion of the concrete.
[0042] Step 8. After the concrete strength of the lower pier reaches 75% of the design strength, clean the screw holes of the embedded parts. Use high-strength bolts to firmly connect the lower connecting plate to the lower embedded plate. High-strength bolts should be tightened symmetrically. The tightening process is divided into three stages: initial tightening, repeated tightening, and final tightening, and must be completed on the same day. When connecting bolts, it is strictly forbidden to force the bolts in by hammering or other destructive methods. In addition, the friction surface of the component must be kept clean and dry, and it is strictly forbidden to work in the rain. The bolt holes and lifting screw holes on the connecting plate of the rubber isolation bearing are sealed with putty and smoothed. The close-hanging method requires the isolation bearing to be suspended to a distance of 10mm from the embedded plate surface. The lower anchor bolts can be fully lowered only after all bolts are aligned and half-locked. The diagonal locking method is adopted, and marks are marked one by one after completion.
[0043] Only the preferred embodiments of the present invention are described in detail above, but the present invention is not limited to the above embodiments. Various changes can be made within the knowledge scope of ordinary technicians in this field without departing from the purpose of the present invention, and various changes should be included in the protection scope of the present invention.
Claims
1. A construction process for earthquake-resistant building bearings, characterized in that: The following steps are involved: S1. Tie up the reinforcement of the piers; S2. Install the lower embedded plate; S3. Tie up the reinforcement of the bottom plate beam of the seismic isolation layer; S4. The side formwork of the piers and beams uses 12mm thick plywood, and the back is lined with 50mm×100mm square wood; after the floor formwork is supported, mark the plane position control line of the seismic isolation bearing on it; S5. After the reinforcement of the bottom plate is tied, accurately calibrate the lower embedded plate and fix it firmly; S6. Screw the high-strength bolts onto the embedded plate without tightening; S7. Pour concrete on the beams and piers at one time; S8. Install rubber seismic isolation bearings.
2. A construction process for earthquake-resistant building support according to claim 1, characterized in that: The method for tying the pier reinforcement in S1 is: first tie the main reinforcement of the pier, then tie the stirrups and hooks on the outside of the pier; all the stirrups and hooks below the beam top surface elevation are tied in place, and the stirrups and hooks above are constructed after the beam reinforcement is tied; then weld a short steel bar at each of the four corners of the pier, and the top elevation of the steel bar is the elevation of the lower surface of the steel plate of the lower embedded plate; at the same time, the beam bottom formwork is set up.
3. A construction process for earthquake-resistant building support according to claim 1, characterized in that: The method for installing the lower embedded plate in S2 is: use a tower crane to lift the lower embedded plate onto the pier, then use a hoist crane or manually lift the embedded plate into place, and fix the lower embedded plate after the elevation and center line position of the lower embedded plate are accurately adjusted.
4. A construction process for earthquake-resistant building support according to claim 1, characterized in that: The method for tying the bottom plate beam reinforcement of the seismic isolation layer in S3 is: when tying the beam reinforcement, do not collide with the lower embedded plate. If the position of the single-row reinforcement conflicts with the position of the embedded anchor bars and the embedded bolt sleeves, arrange the beam reinforcement in double or multiple rows, and the number of stirrups remains unchanged; the length of the embedded bolt sleeve is 30mm to 50mm longer than that of the conventional bolt sleeve.
5. The construction process of a building seismic support according to claim 4 is characterized in that: At the bottom of the embedded anchor bar position, the position corresponding to the embedded anchor bar is marked with a signal pen of a prominent color, and the mark is extended to the transverse and longitudinal directions of the position corresponding to the embedded anchor bar. When tying the beam reinforcement, avoid the marked position to prevent the beam reinforcement from blocking the embedded anchor bar.
6. A construction process for earthquake-resistant building support according to claim 1, characterized in that: The method for pouring concrete in one go for the S7 middle beam and pier is: S7.
1. During installation, place 4 level rulers on each side of the embedded plate for initial leveling, and make initial adjustments to the axis and flatness of the embedded steel plate; S7.
2. After the embedded plate is initially leveled, use the ET-02 theodolite to deliver the axis to the embedded plate. After the embedded plate is positioned, use the self-made adjusters at the four corners of the embedded plate to adjust the height. S7.
3. After the embedded plate is accurately positioned, the connecting rod is fixed to the beam and column reinforcement by arc welding. During pouring, it is strictly forbidden for the formwork, construction personnel, and vibrator to directly contact the embedded plate to prevent the embedded plate from being displaced and deformed by human factors; S7.
4. When pouring, a concrete pouring hopper is set on the upper part of the embedded plate. When the slump of concrete is between 200mm and 220mm and the concrete in the hopper reaches the required amount, the concrete will flow due to its own weight and fill the area to be poured under the pressure of its own weight. S7.
5. Before pouring, put cement slurry with the same composition as that in concrete at the interface of the component, and then put 2-3 high-frequency vibrating rods on each side of the seismic isolation support. During pouring, the vibrating rods vibrate at the same time to prevent concrete segregation; S7.
6. Under the upper pressure and lower vibration, the poured concrete is intensified in liquefaction state, the resistance is reduced, and the concrete quickly fills all parts. When the concrete is full, the bubbles in the concrete are exhausted and the slurry rises through the vents. At this time, close the hopper valve and stop feeding. Slowly pull out the vibrating rod, and then use the vibrating rod to vibrate around the support. The spacing between the vibration points is 100mm to 300mm. After pouring and cleaning the concrete on the embedded plate, start curing immediately. The curing time should be no less than 7 days to fully supply the moisture needed for the expansion of the concrete.
7. The construction process for building seismic bearings according to claim 1, characterized in that: The method for installing the rubber seismic isolation bearing in S8 is as follows: after the concrete strength of the lower pier reaches 75% of the design strength, clean the screw holes of the embedded parts; use high-strength bolts to firmly connect the lower connecting plate to the lower embedded plate; the high-strength bolts should be tightened symmetrically, and the tightening process is divided into three stages: initial tightening, repeated tightening, and final tightening, and all should be completed on the same day; when connecting the bolts, it is strictly forbidden to force the bolts in by hammering, and in addition, the friction surface of the component should be kept clean and dry, and it is strictly forbidden to work in the rain; the bolt holes on the connecting plate of the rubber seismic isolation bearing and the lifting screw holes should be sealed and smoothed with putty; the close-hanging method requires the seismic isolation bearing to be hung to a distance of 10mm from the embedded plate surface, and after all the bolts are aligned and half-locked, all the lower anchor bolts are lowered, and the diagonal locking method is adopted. After completion, mark them one by one.