Superheater arranged outside boiler body

By arranging two sets of superheaters outside the boiler body and controlling them through gate valves, the overheating problem of the graphitization furnace boiler system under load fluctuations was solved, costs were reduced, tube rupture was avoided, and safe and reliable operation was achieved.

CN119022291APending Publication Date: 2024-11-26JIANGSU XIDE ENERGY & ENVIRONMENTAL ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411257119.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-09
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

The boiler system of the graphitization furnace is prone to overheating of the superheater tubes when the load fluctuates. Using high-temperature alloy steel increases manufacturing costs and poses a risk of tube rupture. Existing technologies are difficult to optimize.

Method used

Two superheaters are installed outside the boiler body. By controlling the opening and closing of the gate valve, the superheaters are switched to be used under different load conditions to ensure safe operation.

Benefits of technology

It reduces manufacturing costs, avoids the risk of superheater tube rupture, adapts to boiler load fluctuations, and ensures the safe operation of the superheater.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119022291A_ABST
    Figure CN119022291A_ABST
Patent Text Reader

Abstract

The invention provides a superheater arranged outside a boiler body, and relates to the technical field of graphitization furnace superheaters, the superheater comprises a graphitization furnace, a raw gas gate valve, a raw gas pipeline and a boiler body for burning raw gas, the surface of the boiler body for burning raw gas is communicated with a superheater flue gas gate valve A and a superheater flue gas gate valve B, and a boiler barrel saturated steam outlet stop valve is fixedly mounted at the top end of the boiler body for burning the raw gas, and the side face of the superheater flue gas gate valve A communicates with a superheater A. According to the invention, the superheater A and the superheater B are arranged, so that a set of superheater is additionally arranged outside the boiler body to cope with the low load of the boiler; and equivalently, one set of standby superheater is added, various loads of the boiler caused by severe fluctuation of the raw gas flow are adapted, safe operation of the superheater is ensured, the manufacturing cost is reduced, and the risk of pipe explosion is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of graphitization furnace superheaters, and in particular to a superheater arranged outside a boiler body. Background Art

[0002] In the raw gas utilization system of the graphitization furnace, due to production needs, the number of graphitization furnaces in operation is not fixed. Sometimes all the graphitization furnaces are running for a period of time, and sometimes only one or two graphitization furnaces are running for a period of time, which leads to the instability of the boiler system. The long-term operation of the boiler at ultra-low load will inevitably lead to the overheating of the superheater tubes in this raw gas waste heat utilization system. In order to avoid the danger of tube explosion, the superheater tubes must be made of high-temperature resistant alloy steel materials, and the manufacturing cost is much higher. In addition, the temperature of the superheater tube wall must be calculated to calibrate safety, which needs to be optimized and improved. Summary of the invention

[0003] The purpose of the present invention is to solve the technical problems raised in the above background technology.

[0004] The present invention adopts the following technical scheme: a superheater is arranged outside a boiler body, comprising a graphitization furnace, a raw gas gate valve, a raw gas pipeline and a boiler body burning raw gas, the surface of the boiler body burning raw gas is connected with a superheater flue gas gate valve A and a superheater flue gas gate valve B, a drum saturated steam outlet stop valve is fixedly installed on the top of the boiler body burning raw gas, the side of the superheater flue gas gate valve A is connected with superheater A, one end of the drum saturated steam outlet stop valve is connected with superheater steam inlet stop valve A and superheater steam inlet stop valve B, one end of the superheater flue gas gate valve B is connected with superheater B, one side of the superheater A is connected with superheater steam outlet stop valve A, and one side of the superheater B is connected with superheater steam outlet stop valve B.

[0005] Preferably, the graphitization furnace is connected to the boiler body burning raw coal gas through a raw coal gas gate valve, so that the raw coal gas can flow smoothly into the boiler body burning raw coal gas.

[0006] Preferably, the raw gas gate valve is arranged between the graphitization furnace and the raw gas pipeline. Here, the raw gas gate valve can smoothly control the amount of raw gas.

[0007] Preferably, the superheater steam inlet stop valve A is connected to the superheater A. Here, the heat is allowed to enter the interior of the superheater A smoothly.

[0008] Preferably, the superheater steam inlet stop valve B is connected to the superheater B. Here, the heat is allowed to enter the interior of the superheater B smoothly.

[0009] Preferably, the superheater steam outlet stop valve A is connected to the discharge end of the superheater steam outlet stop valve B. Here, the exhaust gas is discharged uniformly.

[0010] A method for using a superheater arranged outside a boiler body comprises the following steps:

[0011] S1: When the boiler is running at full load or high load, superheater A is put into operation, superheater flue gas damper valve B is closed, superheater flue gas damper valve A is opened, superheater steam inlet stop valve B is closed, superheater steam outlet stop valve B is closed, superheater steam inlet stop valve A is opened, and superheater steam outlet stop valve A is opened;

[0012] S2: When the boiler is running at low load, only superheater B is put into operation, superheater flue gas damper valve B is opened, superheater flue gas damper valve A is closed, superheater steam inlet stop valve B is opened, superheater steam outlet stop valve B is opened, superheater steam inlet stop valve A is closed, and superheater steam outlet stop valve A is closed.

[0013] Compared with the prior art, the advantages and positive effects of the present invention are:

[0014] In the present invention, by arranging superheater A and superheater B, a set of superheaters is now added outside the boiler body to cope with the low load of the boiler, which is equivalent to having an additional set of spare superheaters, adapting to various loads of the boiler caused by the drastic fluctuation of the raw gas flow, ensuring the safe operation of the superheaters, and reducing the manufacturing cost and avoiding the risk of pipe burst. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 The present invention provides an overall structural schematic diagram of a superheater arranged outside a boiler body.

[0016] Legend:

[0017] 1. Graphitization furnace; 2. Raw gas gate valve; 3. Raw gas pipeline; 4. Boiler body burning raw gas; 5. Superheater flue gas gate valve A; 6. Superheater flue gas gate valve B; 7. Drum saturated steam outlet stop valve; 8. Superheater steam inlet stop valve A; 9. Superheater A; 10. Superheater steam outlet stop valve A; 11. Superheater steam inlet stop valve B; 12. Superheater B; 13. Superheater steam outlet stop valve B. DETAILED DESCRIPTION

[0018] In order to more clearly understand the above-mentioned purpose, features and advantages of the present invention, the present invention is further described below in conjunction with the accompanying drawings and embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.

[0019] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways than those described herein. Therefore, the present invention is not limited to the specific embodiments of the following disclosure.

[0020] Unless otherwise specified, the reagents, methods and equipment used in the present invention are conventional reagents, methods and equipment in the technical field.

[0021] Example

[0022] See also Figure 1 The present invention provides a technical solution: a superheater is arranged outside a boiler body, comprising a graphitization furnace 1, a raw gas gate valve 2, a raw gas pipeline 3 and a boiler body 4 burning raw gas, the surface of the boiler body 4 burning raw gas is connected with a superheater flue gas gate valve A5 and a superheater flue gas gate valve B6, and the superheater flue gas gate valve A5 or the superheater flue gas gate valve B6 can be opened as needed, a drum saturated steam outlet stop valve 7 is fixedly installed on the top of the boiler body 4 burning raw gas, which can block the steam, the side of the superheater flue gas gate valve A5 is connected with a superheater A9 to recover the heat, one end of the drum saturated steam outlet stop valve 7 is connected with a superheater steam inlet stop valve A8 and a superheater steam inlet stop valve B11, which can transport heat to the superheater A9 or the superheater B12 as needed, one end of the superheater flue gas gate valve B6 is connected with the superheater B12, which can be opened at a relatively high temperature. It is used at low load. One side of the superheater A9 is connected to the superheater steam outlet stop valve A10, and one side of the superheater B12 is connected to the superheater steam outlet stop valve B13, so that the exhaust gas can be discharged as needed. The graphitization furnace 1 is connected to the boiler body 4 burning raw gas through the raw gas gate valve 2, so that the raw gas can flow smoothly to the inside of the boiler body 4 burning raw gas. The raw gas gate valve 2 is arranged between the graphitization furnace 1 and the raw gas pipeline 3. The raw gas gate valve 2 can smoothly control the amount of raw gas. The superheater steam inlet stop valve A8 is connected to the superheater A9, so that the heat can smoothly enter the inside of the superheater A9. The superheater steam inlet stop valve B11 is connected to the superheater B12, so that the heat can smoothly enter the inside of the superheater B12. The superheater steam outlet stop valve A10 is connected to the discharge end of the superheater steam outlet stop valve B13, so that the exhaust gas is discharged uniformly.

[0023] A method for using a superheater arranged outside a boiler body comprises the following steps:

[0024] S1: When the boiler is running at full load or high load, superheater A9 is put into operation, superheater flue gas damper valve B6 is closed, superheater flue gas damper valve A5 is opened, superheater steam inlet stop valve B11 is closed, superheater steam outlet stop valve B13 is closed, superheater steam inlet stop valve A8 is opened, and superheater steam outlet stop valve A10 is opened;

[0025] S2: When the boiler is running at low load, only superheater B12 is put into operation, superheater flue gas damper valve B6 is opened, superheater flue gas damper valve A5 is closed, superheater steam inlet stop valve B11 is opened, superheater steam outlet stop valve B13 is opened, superheater steam inlet stop valve A8 is closed, and superheater steam outlet stop valve A10 is closed.

[0026] Working principle: By opening the raw gas damper valve 2, the raw gas inside the graphitization furnace 1 can enter the boiler body 4 burning raw gas through the raw gas pipeline 3 for operation. When all the graphitization furnaces 1 are in operation, the flow of raw gas can meet the full load operation of the supporting boiler system. When only one or two graphitization furnaces 1 are in operation, the flow of raw gas can only meet about 20% of the load of the supporting boiler system. When the boiler is in full load or high load operation, the superheater A9 is put into operation and the superheater flue gas damper valve B6 is closed, and the superheater flue gas is turned off. The air brake valve A5 is opened, the superheater steam inlet stop valve B11 is closed, the superheater steam outlet stop valve B13 is closed, the superheater steam inlet stop valve A8 is opened, and the superheater steam outlet stop valve A10 is opened. When the boiler is running at low load, only the superheater B12 is put into operation, the superheater flue gas damper valve B6 is opened, the superheater flue gas damper valve A5 is closed, the superheater steam inlet stop valve B11 is opened, the superheater steam outlet stop valve B13 is opened, the superheater steam inlet stop valve A8 is closed, and the superheater steam outlet stop valve A10 is closed.

[0027] The above description is only a preferred embodiment of the present invention and does not limit the present invention in other forms. Any technician familiar with the profession may use the technical content disclosed above to change or modify it into an equivalent embodiment with equivalent changes and apply it to other fields. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.

Claims

1. A boiler body with a superheater arranged outside the boiler body, comprising a graphitization furnace (1), a raw gas gate valve (2), a raw gas pipeline (3) and a boiler body (4) burning raw gas, characterized in that: The surface of the raw coal gas burning boiler body (4) is connected to a superheater smoke gas damper valve A (5) and a superheater smoke gas damper valve B (6); a drum saturated steam outlet stop valve (7) is fixedly installed on the top of the raw coal gas burning boiler body (4); the side of the superheater smoke gas damper valve A (5) is connected to a superheater A (9); one end of the drum saturated steam outlet stop valve (7) is connected to a superheater steam inlet stop valve A (8) and a superheater steam inlet stop valve B (11); one end of the superheater smoke gas damper valve B (6) is connected to a superheater B (12); one side of the superheater A (9) is connected to a superheater steam outlet stop valve A (10); and one side of the superheater B (12) is connected to a superheater steam outlet stop valve B (13).

2. The superheater is arranged outside the boiler body according to claim 1, characterized in that: The graphitization furnace (1) is connected to a boiler body (4) burning raw coal gas via a raw coal gas gate valve (2).

3. The superheater is arranged outside the boiler body according to claim 1, characterized in that: The raw gas gate valve (2) is arranged between the graphitization furnace (1) and the raw gas pipeline (3).

4. The superheater is arranged outside the boiler body according to claim 1, characterized in that: The superheater steam inlet stop valve A (8) is connected to the superheater A (9).

5. The superheater is arranged outside the boiler body according to claim 1, characterized in that: The superheater steam inlet stop valve B (11) is connected to the superheater B (12).

6. The superheater is arranged outside the boiler body according to claim 1, characterized in that: The superheater steam outlet stop valve A (10) is connected to the discharge end of the superheater steam outlet stop valve B (13).

7. A method for using a superheater arranged outside a boiler body according to any one of claims 1 to 9, characterized in that: The following steps are involved: S1: When the boiler is running at full load or high load, superheater A (9) is put into operation, superheater flue gas damper valve B (6) is closed, superheater flue gas damper valve A (5) is opened, superheater steam inlet stop valve B (11) is closed, superheater steam outlet stop valve B (13) is closed, superheater steam inlet stop valve A (8) is opened, and superheater steam outlet stop valve A (10) is opened; S2: When the boiler is running at low load, only superheater B (12) is put into operation, superheater flue gas damper valve B (6) is opened, superheater flue gas damper valve A (5) is closed, superheater steam inlet stop valve B (11) is opened, superheater steam outlet stop valve B (13) is opened, superheater steam inlet stop valve A (8) is closed, and superheater steam outlet stop valve A (10) is closed.