Self-floating and undocking method for offshore wind power barrel type foundation
By conducting airtightness inspection and self-floating stability calculation on offshore wind turbine-type foundations, self-floating is achieved by using gas pressure in the cabin, and towed out of the dock by sliding rail trolleys, the dependence of traditional methods on site and hoisting equipment is solved. , achieving the expansion of stability and conditions.
Patent Information
- Application Number
- CN202410925551.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-11
- Publication Date
- 2024-11-26
AI Technical Summary
The traditional construction method of offshore wind turbine-type foundations requires special sites and thousand-ton lifting equipment, which limits the construction and movement conditions and is difficult to ensure the stability of self-floating.
By conducting airtightness checks and self-floating stability calculations on the cylinder foundation, self-floating is achieved by using the gas pressure in the cabin, and the docking is achieved by towing the slide rail cart, avoiding the dependence on special sites and hoisting equipment.
The self-floating and docking of the cylinder foundation is realized, which significantly reduces the restrictions on construction and movement, ensures the stability after self-floating, and avoids the use of hoisting equipment, expands the construction scenario.
Smart Images

Figure CN119026495A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of offshore wind power generation, and in particular to a self-floating and undocking method for an offshore wind power cylinder foundation. Background Art
[0002] As a clean and renewable energy, wind energy has become one of the fastest growing new energy sources in recent years. Sea breeze is different from land breeze. The wind force at sea is much greater than that on land. Offshore wind power is far away from people and does not occupy arable land. There is huge room for development. It is fully capable of playing the role of the main force of green renewable electricity. Vigorously developing offshore wind power has great strategic value. Offshore wind power has been developing rapidly around the world in recent years. The most common foundation structures in offshore wind turbine construction are pile foundations, gravity foundations, and barrel foundations, which have developed rapidly in recent years. The barrel foundation is widely used in offshore wind farms affected by typhoons and with shallow rock strata due to its advantages of high rigidity, strong anti-overturning ability, and low overall cost.
[0003] The conventional construction method of the offshore wind power cylindrical foundation requires the use of a special site, such as a sufficiently open and flat dock factory, and after the construction is completed, special lifting equipment is required for lifting and loading, and the lifting capacity of the lifting equipment needs to reach several thousand tons. Therefore, the traditional method has high requirements for the site and construction equipment, which is not conducive to promotion. The utility model patent with the authorization announcement number CN212294724U discloses a device for prefabricating offshore wind power cylindrical foundations at the front of the dock, and the utility model patent with the authorization announcement number CN211922691U discloses a device for prefabricating offshore wind power cylindrical foundations that can be moved. These two patents propose a conventional construction and loading method for offshore wind power composite cylindrical foundations, that is, construction at a special dock, and a special site is required to be divided into a material area, a welding area, a casting area, and a maintenance area. Before loading, the transport ship is parked on the shore, and the cylindrical foundation is moved to the dock by a specific gantry crane and a slide rail, and it can be loaded immediately, which requires special docks, sites, and thousands of tons of lifting equipment. Summary of the invention
[0004] The purpose of the present invention is to address the defects of the prior art and provide a method for self-floating and undocking of an offshore wind turbine cylindrical foundation. The method utilizes the gas pressure in the cylindrical foundation's own cabin to self-float and undock while maintaining sufficient stability. No special site or lifting equipment is required, which can significantly reduce the restrictions on construction and movement.
[0005] In order to solve the above technical problems, the present invention provides a method for self-floating and undocking of an offshore wind turbine cylinder foundation, comprising:
[0006] S1. Check the air tightness of the barrel foundation;
[0007] S2. Calculate the self-floating stability of the barrel foundation;
[0008] S3. Determine the self-floating and undocking time of the barrel foundation;
[0009] S4. Carry out self-floating of the barrel foundation in the dock;
[0010] S5. Drag the barrel foundation out of the dock.
[0011] Further, step S1 includes:
[0012] S11. Fill the dock with water so that the liquid seal height in the tube skirt reaches the designed liquid seal height;
[0013] S12, pumping air into each compartment of the tube skirt so that the pressure in each compartment reaches the target compartment pressure;
[0014] S13. Monitor for h hours, observe and record the pressure changes in each cabin. If the pressure changes in each cabin do not exceed the set value, the air tightness of each cabin meets the requirements.
[0015] Further, step S12 includes: opening the main valve and the sub-valves of each cabin, pumping air into each cabin through the main valve, closing the main valve after the gauge pressure in each cabin reaches the target cabin pressure, so that the pressures between the cabins are equalized, wherein the main valve and the sub-valves are connected in series, and the sub-valves of each cabin are connected in parallel, each sub-valve is used to independently control the air intake of a cabin, and the main valve is used to switch the air intake of all cabins;
[0016] Continue to observe the gauge pressure in each cabin. If the gauge pressure is lower than the target cabin pressure, inflate through the main valve. If the gauge pressure is higher than the target cabin pressure, release air through the main valve until the gauge pressure in each cabin is maintained at the target cabin pressure.
[0017] Further, step S1 includes:
[0018] S14. In step S13, if there is a cabin whose cabin pressure change exceeds the set value, the leaking cabin is determined;
[0019] S15. Spray soap solution on the cylinder wall weld of the leaking compartment above the water surface to find the leaking point; for the cylinder wall weld of the leaking compartment below the water surface, determine the position by judging whether there are bubbles on the water surface, and the diver determines the exact position of the leaking point underwater;
[0020] S16. Ultrasonic leak detector is used to detect the leakage points of the compartment plates corresponding to the leaking cabin;
[0021] S17, repair welding and ultrasonic flaw detection of leaking points;
[0022] S18. Re-check the air tightness of the barrel foundation.
[0023] Further, step S2 includes:
[0024] S21. Calculate the target cabin pressure of the barrel foundation = weight of the barrel foundation / area of the top cover of the barrel skirt - atmospheric pressure;
[0025] S22. Calculate the target draft depth of the barrel foundation = target tank pressure / seawater density + designed liquid seal height;
[0026] S23. According to the target draft depth and the designed liquid seal height, the self-floating stability of the barrel foundation is calculated using the barrel foundation hydrodynamic model to determine whether the barrel foundation meets the requirements.
[0027] Further, step S3 includes:
[0028] S31. Calculate the minimum dock depth = target draft + safety distance;
[0029] S32, determining the tidal height required to meet the minimum dock water depth;
[0030] S33. According to the time required for the cylinder foundation to be towed out of the dock after self-floating, the self-floating and undocking time of the cylinder foundation is determined with reference to the tide table at the dock location.
[0031] Further, step S4 includes:
[0032] S41. Open the dock door at the lowest tide;
[0033] S42, when the draft of the barrel foundation reaches the minimum liquid seal height, close the main valve and all branch valves of the barrel foundation, wherein the minimum liquid seal height is the liquid seal height that satisfies the stability of the barrel foundation;
[0034] S43. When the draft of the barrel foundation reaches 1m less than the target draft, open the main valve and all sub-valves, start pumping air into each compartment of the barrel skirt, and stop pumping air into each compartment until the pressure is 1kpa less than the target compartment pressure, and close the main valve and all sub-valves;
[0035] When the draft of the barrel foundation reaches the target draft, observe whether the pressure of each compartment reaches the target cabin pressure, and release or replenish air according to the pressure of each compartment until the pressure of each compartment reaches the target cabin pressure, so that the barrel foundation can stably float.
[0036] Furthermore, step S5 includes: connecting the slide rail trolleys on both sides of the dock to the barrel-type foundation using cables, and dragging the barrel-type foundation to move using the slide rail trolleys on both sides of the dock to achieve dragging of the barrel-type foundation out of the dock.
[0037] Further, in step S5, the slide trolley includes a front slide trolley and a rear slide trolley, and the front slide trolley and the rear slide trolley are respectively arranged on the front and rear sides of the cylinder foundation, the front slide trolley includes a first front slide trolley and a second front slide trolley respectively arranged on both sides of the dock, and the rear slide trolley includes a first rear slide trolley and a second rear slide trolley respectively arranged on both sides of the dock, the cables connecting the first front slide trolley and the second front slide trolley to the cylinder foundation are cross-symmetrically arranged, and the cables connecting the first rear slide trolley and the second rear slide trolley to the cylinder foundation are cross-symmetrically arranged.
[0038] Furthermore, in step S5, during the process of the slide rail trolley dragging the barrel foundation, the pressure of each compartment is observed in real time, and an air compressor is configured to follow the movement of the barrel foundation to inflate the compartments of the barrel foundation at any time.
[0039] The beneficial effects of the present invention are:
[0040] 1. Compared with the prior art of hoisting offshore wind power foundations, the present invention utilizes the gas pressure in the cylindrical foundation cabin to self-float and undocking, and maintains sufficient stability, without the need for special sites and hoisting equipment, significantly reducing the restrictions on construction and movement.
[0041] 2. The present invention can ensure the stability of the barrel foundation after self-floating by checking the air tightness of the cabin.
[0042] 3. The various compartments of the present invention can be connected by setting a branch valve, and the air pressure in each compartment is equalized after the air is pumped into the compartment, so that the air pressure in each compartment is the same, thereby ensuring the stability of the cylindrical foundation after self-floating.
[0043] 4. In the process of self-floating of the barrel foundation of the present invention, when the draft of the barrel foundation reaches 1m less than the target draft, the main valve and all the sub-valves are opened to pump air into each cabin. The pressure in each cabin is stopped when it is 1kpa less than the target cabin pressure, and the main valve and all the sub-valves are closed to avoid the draft of the barrel foundation exceeding the target draft during high tide, which affects the safety of the self-floating of the barrel foundation.
[0044] 5. The present invention uses crossed cables and a slide trolley on the front and rear sides of the barrel foundation respectively, so that the barrel foundation is prevented from deflecting when the slide trolley drives the barrel foundation out of the dock, thereby ensuring the floating stability of the barrel foundation. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] Figure 1 is a flow chart of the present invention;
[0046] Figure 2 It is a structural schematic diagram of the barrel foundation of the present invention;
[0047] Figure 3It is a schematic diagram of the structure of each compartment in the tube skirt of the present invention;
[0048] Figure 4 This is a schematic diagram of the overall orientation of the cylindrical foundation in the dock of the present invention;
[0049] Figure 5 It is a schematic diagram of the draft depth and liquid seal height of the barrel foundation after self-floating of the present invention;
[0050] Figure 6 It is a schematic diagram of grid division for calculating the stability of the barrel foundation of the present invention;
[0051] Figure 7 It is a schematic diagram of the hydrodynamic model for calculating the stability of the barrel foundation of the present invention;
[0052] Figure 8 This is a diagram showing the calculation results of the self-floating stability of the barrel foundation of the present invention;
[0053] Fig. 9 This is a schematic diagram of the dock slide rail of the present invention;
[0054] Fig.10 It is a side view of the slide rail trolley and the slide rail of the present invention;
[0055] Fig.11 A top view of the slide rail trolley and the slide rail of the present invention;
[0056] Fig.12 It is an axonometric view of the slide rail trolley of the present invention;
[0057] Fig.13 It is a side view of the slide rail trolley of the present invention;
[0058] Fig.14 A bottom view of the slide rail trolley of the present invention;
[0059] Fig.15 It is a schematic diagram of the position arrangement of the barrel foundation and the slide rail trolley of the present invention;
[0060] Fig.16 It is a structural schematic diagram of the basic connecting plate of the present invention;
[0061] Fig.17 It is a schematic diagram of the structure of the cable-connected cylindrical foundation and the slide rail trolley of the present invention.
[0062] Reference numerals:
[0063] Cylindrical foundation 1; column 2; cylinder skirt 3; cabin 4; foundation connecting plate 5; foundation connecting hole 6; dock 7; slide rail 8; slide rail trolley 9; roller 10; fixing rod 11; trolley connecting plate 12; trolley connecting hole 13; cable 14. DETAILED DESCRIPTION
[0064] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0065] This embodiment is described by taking the self-floating out of a certain offshore wind power cylinder-type foundation 1 as an example.
[0066] The basic conditions of the dock 7 and the offshore wind power cylindrical foundation 1 are as follows: Figure 4 As shown, Dock 7 is 265 meters long, 38 meters wide and 8 meters deep. Figure 2 As shown, the weight of the barrel foundation 1 is 1670 tons. The barrel foundation 1 includes a barrel skirt 3 and a column 2. The column 2 is welded to the top of the barrel skirt 3. The diameter of the barrel skirt 3 is 34m, and the height of the barrel skirt 3 is 14m. Figure 3 As shown, the bottom of the tube skirt 3 is an open structure that is not enclosed. The interior of the tube skirt 3 is evenly divided into seven compartments 4 by a partition plate, and the partition plate is sealed and connected to the inner wall of the tube skirt 3 by welding.
[0067] like Figure 1 As shown, the self-floating and undocking method of the barrel foundation 1 includes:
[0068] S1. After the construction of the cylindrical foundation 1 is completed, it is necessary to organize and arrange an airtightness test of the cylindrical foundation 1 to ensure that the airtightness of each cabin 4 meets the requirements and there is no air leakage in the cabin 4; specifically including:
[0069] S11, open the dock door, fill the dock 7 with water, and compress the gas inside the cabin 4 after the water enters the skirt 3. After the liquid seal height in the skirt 3 reaches the designed liquid seal height of 2m, close the dock door to prevent the water level from continuing to increase and causing the air pressure value in the skirt 3 to change;
[0070] S12. The seven compartments 4 of the tube skirt 3 are all equipped with an air pumping system. Each compartment 4 corresponds to a sub-valve. The seven sub-valves can independently control the air intake and air outlet of the seven compartments 4. In addition, a main valve is arranged to close the air intake and air outlet of all compartments 4. Open the main valve and all sub-valves, pump air into each compartment 4 of the tube skirt 3, so that the pressure in each compartment 4 reaches the target cabin pressure of 10kpa, close the main valve, and balance the pressure between each compartment 4; after pressure balance, if the pressure in the compartment 4 is less than 10kpa, reopen the main valve and pump air; if the pressure in the compartment 4 is greater than 10kpa, reopen the main valve and release air until the gauge pressure in each compartment 4 stabilizes at the target cabin pressure of 10kpa;
[0071] S13. Monitor for 12 hours, observe and record the pressure changes in each cabin 4. If the pressure change in each cabin 4 does not exceed the set value of 1 kpa, it means that the airtightness of each cabin 4 meets the requirements.
[0072] S14. In step S13, if there is a cabin 4 whose cabin pressure change exceeds the set value of 1 kpa, the leaking cabin is determined;
[0073] S15. Spray soap solution on the cylinder wall weld of the leaking compartment above the water surface to find the leaking point; for the cylinder wall weld of the leaking compartment below the water surface, determine the position by judging whether there are bubbles on the water surface, and the diver determines the exact position of the leaking point underwater;
[0074] S16. Ultrasonic leak detector is used to detect the leakage points of the compartment plates corresponding to the leaking cabin;
[0075] S17, repair welding and ultrasonic flaw detection of leaking points;
[0076] S18. Re-check the air tightness of the barrel foundation 1 until the barrel foundation 1 meets the air tightness requirements.
[0077] S2. Calculate the self-floating stability of the barrel foundation 1; specifically include:
[0078] S21, such as Figure 5 As shown, after the dock 7 is flooded, seawater enters the seven compartments 4 of the tube skirt 3. Under the action of air pressure, the water surface inside the tube skirt 3 will be lower than the water surface outside the tube skirt 3. The difference between the external water surface and the internal water surface is the air pressure difference generated by the compression of the gas inside the basic tube skirt 3. The distance between the internal water surface and the bottom of the tube skirt 3 is the liquid seal height, and the distance between the external water surface and the bottom of the tube skirt 3 is the draft depth.
[0079] Calculate the target pressure in the tank of the barrel foundation 1 = weight of the barrel foundation / area of the top cover of the barrel skirt - atmospheric pressure = 18 kPa, that is, when the gas pressure in the barrel skirt 3 is 18 kPa, the upward force generated by the gas pressure in the barrel skirt 3 is equal to the gravity of the barrel foundation 1 itself, and the barrel foundation 1 will float in the dock 7, realizing the self-floating of the barrel foundation 1;
[0080] S22. Calculate the target draft of barrel foundation 1 = target tank pressure / seawater density + designed liquid seal height = 3.8m, where the designed liquid seal height is 2m;
[0081] It is understandable that the smaller the liquid seal height is, the greater the possibility of gas leakage inside the tube skirt 3 and capsizing after the tube foundation 1 is tilted, so a sufficient liquid seal height must be ensured. In addition, the deeper the draft of the tube foundation 1, the better its stability, but the requirement for water depth will be higher. Therefore, if the water depth of the dock 7 can meet the requirements, the draft should be increased as much as possible.
[0082] S23, such as Figure 6 , 7 As shown in the figure, according to the target draft and the designed liquid seal height, the self-floating stability of the barrel foundation 1 is calculated using the hydrodynamic model of the barrel foundation 1. The initial stability height of the barrel foundation 1 is calculated to be 30.4m, which meets the requirements of the "Technical Rules for the Legal Inspection of Offshore Mobile Platforms" of the Maritime Safety Administration of the Ministry of Transport and the "Classification Rules for Offshore Mobile Platforms" of the China Classification Society that "the initial stability height after free liquid surface correction is not less than 0.15m"; on the other hand, the stability and wind inclination curves are shown in Figure 8 As shown, at the second intersection, the ratio of the area under the righting moment curve to the area of the wind heeling moment is 1.7, which meets the requirements of the Maritime Safety Administration of the Ministry of Transport on the "Technical Rules for Mandatory Inspection of Offshore Mobile Platforms" and the China Classification Society's "Offshore Mobile Platform Classification Rules" that "the area from the righting moment curve to the second intersection or the water inlet angle (whichever is smaller) should be at least 40% larger than the area under the wind pressure heeling moment to the same limited angle."
[0083] Therefore, the self-floating stability of the barrel foundation 1 is excellent, far meeting the requirements of the corresponding specifications.
[0084] S3. Determine the self-floating and undocking time of the barrel foundation 1; specifically include:
[0085] S31. According to step S2, the barrel foundation 1 has self-floating stability when the draft is 3.8 meters and the liquid seal height is 2 meters. In order to ensure the safety of the self-floating process, the barrel foundation 1 takes into account an additional safety distance of 0.7 meters. Therefore, the minimum dock water depth = target draft + safety distance = 4.5 meters, where the safety distance = 0.7 meters. The self-floating water depth condition is that the dock 7 water depth is not less than 4.5 meters.
[0086] S32. Refer to the tide table at the location of dock 7 to determine that a tidal height of 3.2 m or more is required to meet the water depth of dock 7 of 4.5 m.
[0087] S33. In addition, it is also necessary to consider whether the time within a high tide cycle meets the time required for the cylindrical foundation 1 to be towed out of the dock 7 during high tide after self-floating. It is estimated that the time required for the cylindrical foundation 1 to be towed out of the dock 7 is 2 hours. After taking into account the margin, the high tide time is considered to be no less than 4 hours. According to the time required for the cylindrical foundation 1 to be towed out of the dock 7 after self-floating, the self-floating and undocking time of the cylindrical foundation 1 is determined.
[0088] S4. After determining the date when the tidal conditions can meet the requirements, organize and implement the self-floating and towing out of the dock of the barrel foundation 1 in the dock 7; specifically including:
[0089] S41. Open the dock door at the lowest tide;
[0090] S42, when the draft of the barrel foundation 1 reaches the minimum liquid seal height of 0.4m, close the main valve and all branch valves of the barrel foundation 1, wherein the minimum liquid seal height is the liquid seal height that satisfies the stability of the barrel foundation 1;
[0091] S43, when the draft of the barrel foundation 1 reaches 1m less than the target draft, that is, when the draft of the barrel foundation 1 reaches 2.8m, open the main valve and all the sub-valves, start to pump air into each cabin 4 of the barrel skirt 3, and stop when the pressure of each cabin 4 is 1kpa less than the target cabin pressure, and close the main valve and all the sub-valves;
[0092] When the draft of the barrel foundation 1 reaches the target draft of 3.8m, observe whether the pressure of each cabin 4 reaches the target cabin pressure of 18kpa, and deflate or replenish air according to the pressure of each cabin 4 until the pressure of each cabin 4 reaches the target cabin pressure of 18kpa, so that the barrel foundation 1 can float stably.
[0093] S5, towing the barrel foundation 1 out of the dock. Specifically including:
[0094] like Fig. 9 As shown, slide rails 8 are fixedly arranged on both sides of the dock 7. Fig.10 As shown, a slide rail trolley 9 is slidably arranged on the slide rail 8, as shown in FIG. Figures 12 to 14 As shown, a trolley connecting plate 12 is fixedly arranged on the top of the slide trolley 9, a trolley connecting hole 13 is opened on the trolley connecting plate 12, an inverted U-shaped groove is opened at the bottom of the slide trolley 9, four fixing rods 11 are fixedly arranged on the inner wall of the inverted U-shaped groove, and rollers 10 are rotatably arranged on the fixing rods 11, and the rollers 10 are used to realize the sliding of the slide trolley 9 on the slide rail 8.
[0095] like Fig.16 As shown, at least two foundation connecting plates 5 are welded on the top of the tube skirt 3, and foundation connecting holes 6 are provided on the foundation connecting plates 5. The foundation connecting plates 5 are distributed on the front and rear sides of the tube foundation 1, and the front side of the tube foundation 1 is the side of the tube foundation 1 facing the dock door.
[0096] like Fig.15 , 17 As shown, the slide trolley 9 includes a front slide trolley and a rear slide trolley, and the front slide trolley and the rear slide trolley are respectively arranged on the front and rear sides of the barrel foundation 1. The front slide trolley includes a first front slide trolley and a second front slide trolley respectively arranged on both sides of the dock 7, and the rear slide trolley includes a first rear slide trolley and a second rear slide trolley respectively arranged on both sides of the dock 7. The cables 14 connecting the first front slide trolley and the second front slide trolley to the barrel foundation 1 are cross-symmetrically arranged, and the cables 14 connecting the first rear slide trolley and the second rear slide trolley to the barrel foundation 1 are cross-symmetrically arranged.
[0097] The slide rail trolleys 9 on both sides of the dock 7 are connected to the barrel foundation 1 by using cables 14, and the barrel foundation 1 is dragged and moved by the slide rail trolleys 9 on both sides of the dock 7 to realize the dragging and undocking of the barrel foundation 1. During the process of the slide rail trolleys 9 dragging the barrel foundation 1, the pressure of each cabin 4 is observed in real time, and an air compressor is configured to follow the movement of the barrel foundation 1 to inflate the cabin 4 of the barrel foundation 1 at any time.
[0098] As a mature foundation type, the cylindrical foundation 1 is widely used in the field of offshore wind power. However, its construction is often carried out in a special site. After the construction is completed, it is hoisted and loaded on board by specific lifting equipment, which has high requirements for the site and lifting equipment. The self-floating multi-parameter stability control and floating undocking process and method of the cylindrical foundation 1 of an offshore wind power plant in the dock 7 proposed in this embodiment provide relevant personnel with a set of detailed and specific processes and reference methods. After the construction is completed, the cylindrical foundation 1 of this embodiment realizes the autonomous floating of the foundation through air pressure, and no longer relies on special docks, sites, and thousand-ton lifting equipment. It can greatly expand the construction scene of the cylindrical foundation of offshore wind power plants and significantly reduce the restrictions on construction conditions. If promoted, it will greatly increase the construction scene of the cylindrical foundation 1 and increase the utilization rate of this foundation type.
[0099] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.
Claims
1. A method for self-floating and undocking of an offshore wind turbine cylinder foundation, characterized in that: include: S1. Check the air tightness of the barrel foundation (1); S2. Calculate the self-floating stability of the barrel foundation (1); S3. Determine the self-floating and undocking time of the barrel foundation (1); S4, performing self-floating of the barrel foundation (1) in the dock (7); S5. Drag the barrel foundation (1) out of the dock.
2. The method for self-floating and undocking of an offshore wind turbine cylinder foundation according to claim 1, characterized in that: Step S1 includes: S11, filling the dock (7) with water so that the liquid seal height in the tube skirt (3) reaches the designed liquid seal height; S12, pumping air into each compartment (4) of the tube skirt (3) so that the pressure in each compartment (4) reaches the target compartment pressure; S13. Monitor for h hours, observe and record the pressure changes in each compartment (4). If the pressure changes in each compartment (4) do not exceed the set value, the airtightness of each compartment (4) meets the requirements.
3. The method for self-floating and undocking of an offshore wind turbine cylindrical foundation according to claim 2 is characterized in that: Step S12 comprises: opening the main valve and the sub-valves of each cabin (4), pumping air into each cabin (4) through the main valve, and closing the main valve after the gauge pressure in each cabin (4) reaches the target cabin pressure, so that the pressure between the cabins (4) is equalized, wherein the main valve and the sub-valves are connected in series, and the sub-valves of each cabin (4) are connected in parallel, each sub-valve is used to independently control the air intake of a cabin (4), and the main valve is used to switch the air intake of all cabins (4); Continue to observe the gauge pressure in each cabin (4). If the gauge pressure is less than the target cabin pressure, air is pumped in through the main valve. If the gauge pressure is greater than the target cabin pressure, air is released through the main valve until the gauge pressure in each cabin (4) is maintained at the target cabin pressure.
4. The method for self-floating and undocking of an offshore wind turbine cylinder foundation according to claim 2, characterized in that: Step S1 includes: S14, in step S13, if there is a cabin (4) whose cabin pressure change exceeds the set value, then the leaking cabin is determined; S15. Spray soap solution on the cylinder wall weld of the leaking compartment above the water surface to find the leaking point; for the cylinder wall weld of the leaking compartment below the water surface, determine the position by judging whether there are bubbles on the water surface, and the diver determines the exact position of the leaking point underwater; S16. Ultrasonic leak detector is used to detect the leakage points of the compartment plates corresponding to the leaking cabin; S17, repair welding and ultrasonic flaw detection of leaking points; S18. Re-check the air tightness of the barrel foundation (1).
5. The method for self-floating and undocking of an offshore wind turbine cylindrical foundation according to claim 1 is characterized in that: Step S2 includes: S21. Calculate the target cabin pressure of the barrel foundation (1) = weight of the barrel foundation / area of the top cover of the barrel skirt - atmospheric pressure; S22. Calculate the target draft of the barrel foundation (1) = target tank pressure / seawater density + designed liquid seal height; S23. According to the target draft and the designed liquid seal height, the self-floating stability of the barrel foundation (1) is calculated using the barrel foundation (1) hydrodynamic model to determine whether the barrel foundation (1) meets the requirements.
6. The method for self-floating and undocking of an offshore wind turbine cylinder foundation according to claim 5, characterized in that: Step S3 includes: S31. Calculate the minimum dock depth = target draft + safety distance; S32, determining the tidal height required to meet the minimum dock water depth; S33. According to the time required for the cylinder foundation (1) to be towed out of the dock (7) after self-floating, the self-floating and undocking time of the cylinder foundation (1) is determined with reference to the tide table of the location of the dock (7).
7. The method for self-floating and undocking of an offshore wind turbine cylindrical foundation according to claim 6, characterized in that: Step S4 includes: S41. Open the dock door at the lowest tide; S42, when the draft of the barrel foundation (1) reaches the minimum liquid seal height, the main valve and all sub-valves of the barrel foundation (1) are closed, wherein the minimum liquid seal height is the liquid seal height that satisfies the stability of the barrel foundation (1); S43, when the draft of the barrel foundation (1) reaches 1m less than the target draft, open the main valve and all the sub-valves, start pumping air into each compartment (4) of the barrel skirt (3), and stop pumping air into each compartment (4) when the pressure is 1kpa less than the target compartment pressure, and close the main valve and all the sub-valves; When the draft of the barrel foundation (1) reaches the target draft, observe whether the pressure of each compartment (4) reaches the target compartment pressure, and release or replenish air according to the pressure of each compartment (4) until the pressure of each compartment (4) reaches the target compartment pressure, so that the barrel foundation (1) can stably float.
8. The method for self-floating and undocking of an offshore wind turbine cylindrical foundation according to any one of claims 1 to 7, characterized in that: Step S5 comprises: using cables (14) to connect the slide rail trolleys (9) on both sides of the dock (7) to the barrel-type foundation (1), and using the slide rail trolleys (9) on both sides of the dock (7) to drag the barrel-type foundation (1) to move, thereby achieving the dragging of the barrel-type foundation (1) out of the dock.
9. The method for self-floating and undocking of an offshore wind turbine cylindrical foundation according to claim 8, characterized in that: In step S5, the slide rail trolley (9) includes a front slide rail trolley and a rear slide rail trolley, and the front slide rail trolley and the rear slide rail trolley are respectively arranged on the front and rear sides of the barrel foundation (1), the front slide rail trolley includes a first front slide rail trolley and a second front slide rail trolley respectively arranged on both sides of the dock (7), and the rear slide rail trolley includes a first rear slide rail trolley and a second rear slide rail trolley respectively arranged on both sides of the dock (7), the cables (14) connecting the first front slide rail trolley and the second front slide rail trolley to the barrel foundation (1) are arranged cross-symmetrically, and the cables (14) connecting the first rear slide rail trolley and the second rear slide rail trolley to the barrel foundation (1) are arranged cross-symmetrically.
10. The method for self-floating and undocking of an offshore wind turbine cylindrical foundation according to claim 8, characterized in that: In step S5, while the slide rail trolley (9) is dragging the cylindrical foundation (1), the pressure of each cabin (4) is observed in real time, and an air compressor is configured to follow the movement of the cylindrical foundation (1) to inflate the cabin (4) of the cylindrical foundation (1) at any time.