Subway vehicle debugging production line and maintenance method
Through the subway vehicle debugging production line system, the auxiliary debugging system, interactive terminal, tool management cabinet and access control management module are used to solve the problems of human recording errors and improper tool management during subway vehicle debugging, and the automation and safety management of debugging work are realized. , improves efficiency and safety.
Patent Information
- Application Number
- CN202411483400.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-23
- Publication Date
- 2024-11-26
AI Technical Summary
During the debugging and maintenance of subway vehicles, human records are prone to errors, improper tool management leads to loss, and there are safety hazards for non-professional personnel entering the debugging production line area, and it is difficult to achieve overall coordination and efficiency improvement of debugging work.
A subway vehicle debugging production line system was designed, including auxiliary debugging systems, interactive terminals, tool management cabinets and access control management modules. By generating and assigning maintenance tasks, real-time management of personnel and tools is ensured that only relevant personnel enter and use corresponding tools. Record and upload data in real time to realize automated data processing and task allocation.
It improves the simplicity and efficiency of debugging work, ensures the safe management of personnel and tools, reduces manual record errors, realizes automatic allocation of debugging tasks and real-time data recording, and shortens the debugging cycle.
Smart Images

Figure CN119027103A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of rail transportation, and in particular to a subway vehicle debugging production line and maintenance method. Background Art
[0002] During the subway debugging and maintenance process, dozens of trains are usually involved at one time. Each train has a corresponding debugging list, and the debugging tasks must be carried out item by item to ensure that there is no omission, so as to ensure that there is no possibility of missing faults in the train after the debugging and maintenance of the entire train. However, in this process, there are many debugging list items for each train, and the contents of the debugging list for trains of different projects are different. If it is only recorded manually, it will not only waste manpower, but also it is difficult to avoid data entry errors.
[0003] In addition, train debugging and maintenance are completed by different staff members, who use different debugging tools. There are various types of debugging tools, which are easy to be lost if not stored properly. In addition, the debugging production line area requires the use of contact network to power the train, so it is very dangerous for non-professionals to enter the debugging production line area. How to coordinate the overall work of the debugging production line, including personnel entry and exit management before debugging, tool management, debugging tasks during the debugging process, and debugging data record identification to make the overall debugging work easier and the debugging personnel more efficient is a problem that needs to be solved at present. Summary of the invention
[0004] In order to solve the problems existing in the above-mentioned prior art, the present invention provides a subway vehicle debugging production line and maintenance method, which solves the technical problem that the prior art cannot cooperate with the overall work of the debugging production line.
[0005] A subway vehicle debugging production line, including: an auxiliary debugging system, an interactive terminal, a tool management cabinet, and an access control management module. The auxiliary debugging system is used to generate and allocate maintenance tasks, and send personnel information to the tool management cabinet and access control management module according to the task allocation situation; The interactive terminal is used for the debugger to interact with the auxiliary debugging system in real time to understand the debugging task status; The access control management module is used to manage the entry and exit of personnel in the debugging production line area according to the personnel information issued by the data system, and record the entry and exit of personnel in the debugging production line area and upload it to the auxiliary debugging system; The tool management cabinet is located in the debugging production line area and is used to manage the debugging toolbox of the debugging personnel according to the information issued by the auxiliary debugging system, and to record and upload the access data of the debugging toolbox to the auxiliary debugging system. Preferably, the auxiliary debugging system includes: A task generation module is used to determine the corresponding debugging task table according to the subway project being debugged; The personnel allocation module is used to complete the debugging and maintenance in the shortest time. The debugging personnel are determined according to the debugging task table. At the same time, when the debugging personnel encounter a fault during debugging, the maintenance information including the maintenance car and the fault condition are generated with one click, so that the debugging personnel can quickly and conveniently distribute it to the corresponding maintenance personnel; A data processing module is used to determine whether the debugged object has a fault according to the debugged data; Database, used to store and access data uploaded by the access control management module and tool management cabinet.
[0006] Preferably, the task generation module includes a database, which includes a variety of debugging task forms. The debugging task forms are prepared in advance by relevant responsible personnel and stored after being given corresponding project labels. After receiving the relevant information of the debugging project, the task generation module searches for the corresponding debugging task form from the database and outputs it. The debugging task form includes debugging train lines, debugging task details, and debugging options.
[0007] Preferably, the debugging toolbox includes a variety of wireless tools, each wireless tool corresponds to a different IP address, the interactive terminal can identify the IP address of the nearby wireless tool and display the toolbar of the specific item in the debugging task table selected by the debugger, and the wireless tool can collect the debugging data generated by the debugger during the debugging process in real time and upload it to the corresponding position of the debugging task table.
[0008] Preferably, the access control management module includes an electric door and a control identification unit, the control identification unit is connected to the auxiliary debugging system via a wireless network, the control identification unit is used to control the electric door switch, and the control identification unit is used to obtain task allocation information from the auxiliary debugging system to identify personnel information that can enter the debugging production line area within a fixed time period. When a debugging personnel performs identity authentication through the control identification unit, the control identification unit compares the obtained identity information with the personnel information obtained from the auxiliary debugging system. If the comparison is successful, the personnel is allowed to enter. If the comparison fails, the personnel is not allowed to enter, thereby ensuring that only relevant debugging personnel can enter the debugging production line area, ensuring debugging safety, and uploading personnel entry and exit information to the auxiliary debugging system in a timely manner.
[0009] Preferably, the tool management cabinet includes a cabinet body, a control component and a plurality of storage frames are arranged in the cabinet body, an identification component is arranged on one side of the cabinet body, the storage frame is used to store the debugging tool box, an electric cabinet door is arranged on one side of the opening of the storage frame, the control component is electrically connected to the identification component and the electric cabinet door, respectively, and the control component is connected to the access control management module through a wireless network; the control component is used to obtain the personnel information entering the debugging production line area from the access control management module, when a debugging personnel performs identity authentication through the identification component, the control component compares the identity information with the personnel information entering the debugging production line area obtained from the access control management module, if the comparison is successful, the electric cabinet door is opened to allow the corresponding debugging personnel to take away the debugging tool box, if the comparison fails, the identity recognition failure is prompted, thereby ensuring the safety of the debugging tool box and avoiding the loss of the tool box.
[0010] Preferably, an identity authentication unit is provided on the inner side of the electric door, which is used to obtain the storage status of the debugging toolbox in the tool management cabinet in real time, and when the debugging personnel verifies their identity and wants to leave the debugging production line area, it is determined whether the debugging toolbox of the debugging personnel has been returned. If it has been returned, the debugging personnel is allowed to leave. If it has not been returned, the debugging personnel is prompted by voice to return the debugging toolbox before leaving, thereby avoiding the problem of the debugging toolbox being lost due to the debugging personnel leaving in a hurry and forgetting the debugging toolbox.
[0011] Preferably, the data processing module is used to compare and judge the debugging data in the debugging task table with the corresponding standard data range. If it is judged that the debugging data is within the corresponding standard data range, then it is judged that the function corresponding to the debugging data is fault-free. If it is judged that the debugging data is not within the corresponding standard data range, then it is judged that the function corresponding to the debugging data is faulty and needs maintenance, and a maintenance prompt message is sent to the corresponding debugging personnel, who can contact the maintenance personnel as soon as possible according to the maintenance prompt message.
[0012] Preferably, the personnel allocation module includes a debugging personnel database, an experience database and an allocation unit, the debugging personnel database includes relevant information of all debugging personnel involved in the current subway debugging, the experience database includes different debugging tasks and the time required for debugging, the allocation unit is used to determine the debugging personnel according to the debugging task, the relevant information of the debugging personnel includes the debugging personnel's personal information, the currently ongoing debugging task item and the duration of entering the current debugging task item, and the debugging task item is one of the items in the debugging task table; Determining the debugging personnel according to the debugging task includes: combining the data in the debugging personnel database with the data in the experience database, calculating the expected debugging time of the current debugging task of each debugging personnel in the debugging personnel database, if there is no debugging task currently being performed, assuming that the expected debugging time of the current debugging task is 0, and calculating the time for each debugging personnel to arrive at the designated debugging position according to the corresponding position of the debugging task to be assigned and the position of the debugging task currently being performed by each debugging personnel, adding the expected debugging time of the current debugging task of each debugging personnel and the time to arrive at the designated debugging position according to the weight, obtaining the estimated time for each debugging personnel to enter the debugging task to be assigned, and finally assigning the debugging task to be assigned to the debugging personnel with the shortest estimated time; The calculation process of the expected debugging time of the current debugging task is as follows:
[0013] Among them, A is the proportion of length of service, B is the proportion of efficiency, is the average maintenance time of the current debugging task, is the average length of service of the commissioning personnel, is the length of service of the current debugging personnel, α is the length of service weight parameter, Average efficiency factor, is the efficiency factor of the current debugger, and β is the efficiency factor weight parameter; The efficiency factor is calculated as follows: : in, The historical average time it takes for all debuggers to complete the debugging task. The historical average time it takes for the current debugger to complete the debugging task.
[0014] A subway vehicle maintenance method is implemented by a subway vehicle debugging production line, comprising the following steps: Step 1: The auxiliary debugging system generates debugging tasks and assigns debugging tasks through the personnel allocation module, then notifies the corresponding debugging personnel through the interactive terminal, and sends the debugging personnel information involved in the debugging task to the access control management module and the tool management cabinet; Step 2: The debugging personnel go to the debugging production line area for identity recognition. The access control management module compares the personnel information with the data sent by the auxiliary debugging system. If the comparison is successful, the debugging personnel are allowed to enter the debugging production line area. At the same time, the access control management module uploads the personnel entry information to the auxiliary debugging system for archiving; Step 3: After the debugging personnel enter the debugging production line area, they go to the tool management cabinet for identity recognition. The tool management cabinet compares the recognized identity information with the information uploaded by the access control management module. If the comparison is successful, the electric cabinet of the corresponding tool management cabinet is opened to facilitate the debugging personnel to take the debugging tool box. Step 4: The debugger performs the debugging task through the interactive terminal and the wireless tool in the debugging toolbox. The data processing module determines whether there is a functional fault based on the debugging data collected by the wireless tool. If there is a fault, it generates a maintenance prompt message and jumps to step 5. If there is no fault, it determines whether the data in the debugging task table has been filled. If not, it prompts the debugger to proceed to the next step. If it is filled, it prompts that the relevant debugging task is completed and the debugger can leave the debugging production line area after returning the debugging toolbox. Step 5: The task generation module generates a maintenance task according to the maintenance prompt information and sends it to the corresponding commissioning personnel, who then forward it to the corresponding maintenance personnel; Step 6: After the maintenance personnel complete the maintenance task, the personnel allocation module notifies the original debugging personnel to re-debug the corresponding functions; Step 7: After the debugger completes the re-debugging, the debug data is uploaded to the corresponding position in the debug task table, overwriting the original recorded data, and then jumps to step 4.
[0015] The beneficial effects of the present invention include: The debugging production line is improved to be intelligent and collaborative, so that it can coordinate the overall work of subway vehicle debugging, including personnel entry and exit management before debugging, tool management, debugging tasks during the debugging process, and debugging data record identification, so as to make the overall debugging work simpler and the debugging personnel more efficient.
[0016] The personnel entry and exit, tool management and debugging task allocation of the debugging production line are bound to ensure that only the corresponding debugging personnel enter the debugging production line area to ensure personnel safety; and through the information interaction between the tool management cabinet and the access control module, the debugging personnel can enter the debugging production line area to pick up the debugging tools and return the debugging tools before leaving the debugging production line area, so as to achieve a one-to-one correspondence between the debugging tools, debugging personnel and debugging work, and avoid the problem of simply stacking the debugging tools or taking them at will, which may cause the tools to be lost or damaged and affect the debugging efficiency.
[0017] The debugging data of the corresponding debugging task items are collected in real time without manual recording, and the error rate is low. In addition, by recording and displaying the debugging data through the interactive terminal, it is possible to realize multiple debuggers to carry out different debugging task items at the same time on the basis of a debugging task table and record the debugging data in real time, which is helpful for all debuggers to check the data and improve the debugging efficiency when faced with complicated debugging task lists.
[0018] The task generation module and the personnel allocation module can automatically allocate debugging tasks and generate maintenance information when the debugging data is abnormal, so that the debugging personnel can promptly notify the corresponding maintenance personnel, and notify the original debugging personnel to re-debugging after the maintenance is completed, so as to ensure that the debugging task is completed as soon as possible, shorten the entire subway debugging and maintenance cycle, and improve the efficiency of subway debugging and maintenance. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is a system architecture diagram for a subway vehicle debugging production line.
[0020] Figure 2 This is the on-site layout diagram of a subway vehicle commissioning production line.
[0021] Figure 3 The present invention is a flow chart of a subway vehicle maintenance method.
[0022] Reference numerals
[0023] 1-Debugging train, 2-Access control management module, 3-Tool management cabinet. DETAILED DESCRIPTION
[0024] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments. Therefore, the following detailed description of the embodiments of the present application provided in the drawings is not intended to limit the scope of the application for protection, but merely represents the selected embodiments of the present application. Based on the embodiments of the present application, all other embodiments obtained by those skilled in the art without making creative work belong to the scope of protection of the present application.
[0025] The following is combined with Figure 1-2 The specific embodiment of the present invention is described in detail; a subway vehicle debugging production line, including: an auxiliary debugging system, an interactive terminal, a tool management cabinet 3, an access control management module 2, The auxiliary debugging system is used to generate and allocate maintenance tasks, and send personnel information to the tool management cabinet and access control management module according to the task allocation situation; The interactive terminal is used for the debugger to interact with the auxiliary debugging system in real time to understand the debugging task status; The access control management module is used to manage the entry and exit of personnel in the debugging production line area according to the personnel information issued by the data system, and record the entry and exit of personnel in the debugging production line area and upload it to the auxiliary debugging system; specifically, the debugging production line area is surrounded by a fence, and debugging personnel can only enter and exit through the access control management module, thereby preventing unrelated personnel from entering and exiting the area.
[0026] The tool management cabinet is located in the debugging production line area. It is used to manage the debugging toolboxes of the debugging personnel according to the information issued by the auxiliary debugging system, and record the access data of the debugging toolboxes and upload them to the auxiliary debugging system.
[0027] In another embodiment, the auxiliary debugging system includes: A task generation module is used to determine the corresponding debugging task table according to the subway project being debugged; The personnel allocation module is used to complete the debugging and maintenance in the shortest time. The debugging personnel are determined according to the debugging task table. At the same time, when the debugging personnel encounter a fault during debugging, the maintenance information including the maintenance car and the fault condition are generated with one click, so that the debugging personnel can quickly and conveniently distribute it to the corresponding maintenance personnel; A data processing module is used to determine whether the corresponding panel has a fault based on the debugging data; The database is used to store and access the data uploaded by the access control management module 2 and the tool management cabinet 3.
[0028] In another embodiment, the task generation module includes a database, which includes multiple debugging task forms. The debugging task forms are prepared in advance by relevant responsible personnel and stored after being given corresponding project labels. After the task generation module receives information related to the debugging project, it searches for the corresponding debugging task form from the database and outputs it. The debugging task form includes debugging train 1 line, debugging task details, and debugging options.
[0029] In another embodiment, the debugging toolbox includes multiple wireless tools, each of which corresponds to a different IP address. The interactive terminal can identify the IP address of the nearby wireless tool and display the toolbar of the specific item in the debugging task table selected by the debugger. The wireless tool can collect the debugging data generated by the debugger during the debugging process in real time and upload it to the corresponding position of the debugging task table. Specifically, Wireless tools include a door clamping force tester, a smart pressure gauge, a pantograph tension tester, and a smart multimeter (AMC93100 portable smart meter).
[0030] In another embodiment, the access control management module 2 includes an electric door and a control identification unit, and the control identification unit is connected to the auxiliary debugging system via a wireless network. The control identification unit is used to control the electric door switch, and the control identification unit is used to obtain task allocation information from the auxiliary debugging system to identify personnel information that can enter the debugging production line area within a fixed time period. When a debugging personnel performs identity authentication through the control identification unit, the control identification unit compares the obtained identity information with the personnel information obtained from the auxiliary debugging system. If the comparison is successful, the personnel is allowed to enter. If the comparison fails, the personnel is not allowed to enter, thereby ensuring that only relevant debugging personnel can enter the debugging production line area, ensuring debugging safety, and uploading personnel entry and exit information to the auxiliary debugging system in a timely manner.
[0031] The access control management module records the entry and exit information of debuggers while managing their entry and exit, so as to understand the debuggers' response to the debug tasks and their efficiency in completing the debug tasks. This can be used to fully understand the debuggers' work situation and serve as the basic data for subsequently accurately calculating the expected debug time for the current debug tasks.
[0032] In another embodiment, the tool management cabinet 3 includes a cabinet body, a control component and a plurality of storage frames are arranged in the cabinet body, an identification component is arranged on one side of the cabinet body, the storage frame is used to store the debugging tool box, an electric cabinet door is arranged on one side of the opening of the storage frame, the control component is electrically connected to the identification component and the electric cabinet door respectively, and the control component is connected to the access control management module 2 via a wireless network; the control component is used to obtain the personnel information entering the debugging production line area from the access control management module 2, when a debugging personnel performs identity authentication through the identification component, the control component compares the identity information with the personnel information entering the debugging production line area obtained from the access control management module 2, if the comparison is successful, the electric cabinet door is opened to allow the corresponding debugging personnel to take away the debugging tool box, if the comparison fails, it prompts that the identity recognition fails, thereby ensuring the safety of the debugging tool box and avoiding the loss of the tool box. Specifically, The debugging toolbox in each containing frame is bound to a designated debugging personnel. The control component is provided with a touch screen so that the debugging personnel can interact with the control component. When the debugging personnel takes the debugging toolbox, they click the take button on the touch screen and follow the instructions displayed on the screen to perform identity recognition through the identification component. The identification method includes face recognition, work card recognition and fingerprint recognition. After the identity recognition is passed, the corresponding electric cabinet door can be opened to allow the corresponding debugging personnel to take the debugging toolbox; After debugging, the debugging personnel return the debugging toolbox before leaving the debugging production line area. Specifically, they click the return button on the touch screen and perform identity recognition. If the recognition is successful, the electric cabinet door will open for the debugging personnel to store the debugging toolbox, thereby realizing the process management of the toolbox and preventing the debugging personnel from taking the toolbox out, resulting in the toolbox being left behind and affecting the debugging efficiency.
[0033] In another embodiment, an identity authentication unit is provided on the inner side of the electric door, which is used to obtain the storage status of the debugging toolbox of the tool management cabinet 3 in real time, and when the debugging personnel verifies their identity and wants to leave the debugging production line area, it is determined whether the debugging toolbox of the debugging personnel has been returned. If it has been returned, the debugging personnel is allowed to leave. If it has not been returned, the debugging personnel is prompted by voice to return the debugging toolbox before leaving, thereby avoiding the problem of the debugging toolbox being lost due to the debugging personnel leaving in a hurry and forgetting the debugging toolbox.
[0034] In another embodiment, the data processing module is used to compare and judge the debugging data in the debugging task table with the corresponding standard data range. If it is judged that the debugging data is within the corresponding standard data range, then it is judged that the function corresponding to the debugging data is fault-free. If it is judged that the debugging data is not within the corresponding standard data range, then it is judged that the function corresponding to the debugging data is faulty and requires maintenance, and a maintenance prompt message is sent to the corresponding debugging personnel, who can contact the maintenance personnel as soon as possible based on the maintenance prompt message.
[0035] In another embodiment, the personnel allocation module includes a debugging personnel database, an experience database and an allocation unit, the debugging personnel database includes relevant information of all debugging personnel involved in the current subway debugging, the experience database includes different debugging tasks and the time required for debugging, the allocation unit is used to determine the debugging personnel according to the debugging task, the relevant information of the debugging personnel includes personal information of the debugging personnel, the currently ongoing debugging task item and the duration of entering the current debugging task item, and the debugging task item is one of the items in the debugging task table; The method of determining the debugger according to the debugging task includes: combining the data in the debugger database with the data in the experience database, calculating the expected debugging time of the current debugging task of each debugger in the debugger database, if there is no debugging task currently being performed, the expected debugging time of the current debugging task is defaulted to 0, and at the same time calculating the time for each debugger to arrive at the designated debugging position according to the corresponding position of the debugging task to be assigned and the position of the debugging task currently being performed by each debugger, adding the expected debugging time of the current debugging task of each debugger and the time to arrive at the designated debugging position according to the weight, obtaining the estimated time for each debugger to enter the debugging task to be assigned, and finally assigning the debugging task to be assigned to the debugger with the shortest estimated time.
[0036] Specifically, the experience database also includes the distance from each location within the factory to the debugging production line area and the walking arrival time. The location information of the debugging personnel is updated in real time through the interactive terminal, so as to assist the debugging system in obtaining the location of each on-duty debugging personnel in real time and the time of their arrival at the debugging production line area in real time as the time when the debugging personnel arrive at the designated debugging location.
[0037] If the estimated time for multiple debuggers to enter the debugging task to be assigned is the same, the debugging task will be assigned to the debugger with the shorter remaining debugging time of the current debugging task first; if the estimated time for multiple debuggers to enter the debugging task to be assigned and the remaining debugging time of the current debugging task are the same, the debugging task will be assigned to the debugger with a higher efficiency factor first.
[0038] The calculation process of the expected debugging time of the current debugging task is as follows: ; Among them, A is the proportion of length of service, B is the proportion of efficiency, is the average maintenance time of the current debugging task, is the average length of service of the commissioning personnel, is the length of service of the current debugging personnel, α is the length of service weight parameter, and the value here is 0.2. Average efficiency factor, is the efficiency factor of the current debugging personnel, β is the efficiency factor weight parameter, and the value here is 0.8; the calculation method of the efficiency factor is: The efficiency factor is calculated as follows: : in, The historical average time it takes for all debuggers to complete the debugging task. The historical average time it takes for the current debugger to complete the debugging task.
[0039] Specifically, before this debugging production line went online, , Calculate through the relevant data recorded in the existing data system or the data registered by the debugging personnel. After the debugging production line is online, , The data collected by the access control system is processed to obtain the time taken by the debugger to complete the debugging task within the last 30 days for calculation and update, thereby ensuring the accuracy of the calculated expected debugging time for the current debugging task.
[0040] In another embodiment, a subway vehicle maintenance method is provided, which is implemented by a subway vehicle debugging production line, such as Figure 3 As shown, the following steps are included: Step 1: The auxiliary debugging system generates a debugging task and allocates the debugging task through the personnel allocation module, then notifies the corresponding debugging personnel through the interactive terminal, and sends the debugging personnel information involved in the debugging task to the access control management module 2 and the tool management cabinet 3; Step 2: The debugging personnel go to the debugging production line area for identity recognition. The access control management module 2 compares the personnel information with the data sent by the auxiliary debugging system. If the comparison is successful, the debugging personnel is allowed to enter the debugging production line area. At the same time, the access control management module 2 uploads the personnel entry information to the auxiliary debugging system for archiving; Step 3: After the debugging personnel enter the debugging production line area, they go to the tool management cabinet 3 for identity recognition. The tool management cabinet 3 compares the recognized identity information with the information uploaded by the access control management module 2. If the comparison is successful, the electric cabinet of the corresponding tool management cabinet 3 is opened to facilitate the debugging personnel to take the debugging tool box. Step 4: The debugging personnel use the interactive terminal and the wireless tool in the debugging toolbox to perform debugging tasks in the debugging train 1. The debugging task items include voice broadcast, train door opening and closing, light flashing, etc. The data processing module determines whether there is a functional fault based on the debugging data collected by the wireless tool. If there is a fault, it generates a maintenance prompt message and jumps to step 5; if there is no fault, it determines whether the data in the debugging task table has been filled. If not, it prompts the debugging personnel to proceed to the next step. If it is filled, it prompts that the relevant debugging task is completed and the debugging production line area can be left after returning the debugging toolbox; Step 5: The task generation module generates a maintenance task according to the maintenance prompt information and sends it to the corresponding commissioning personnel, who then forward it to the corresponding maintenance personnel; Step 6: After the maintenance personnel complete the maintenance task, the personnel allocation module notifies the original debugging personnel to re-debug the corresponding functions; Step 7: After the debugger completes the re-debugging, the debug data is uploaded to the corresponding position in the debug task table, overwriting the original recorded data, and then jumps to step 4.
[0041] The above-mentioned embodiments only express the specific implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the protection scope of the present application. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the technical solution concept of the present application, and these all belong to the protection scope of the present application.
Claims
1. A subway vehicle commissioning production line, characterized in that: include: Auxiliary debugging system, interactive terminal, tool management cabinet, access control management module, The auxiliary debugging system is used to generate and allocate maintenance tasks, and send personnel information to the tool management cabinet and access control management module according to the task allocation situation; The interactive terminal is used for the debugger to interact with the auxiliary debugging system in real time to understand the debugging task status; The access control management module is used to manage the entry and exit of personnel in the debugging production line area according to the personnel information issued by the data system, and record the entry and exit of personnel in the debugging production line area and upload it to the auxiliary debugging system; The tool management cabinet is located in the debugging production line area. It is used to manage the debugging toolboxes of the debugging personnel according to the information issued by the auxiliary debugging system, and record the access data of the debugging toolboxes and upload them to the auxiliary debugging system.
2. A subway vehicle commissioning production line according to claim 1, characterized in that: The auxiliary debugging system comprises: a subway vehicle debugging production line, characterized in that the auxiliary debugging system comprises: A task generation module is used to determine the corresponding debugging task table according to the subway project being debugged; The personnel allocation module is used to complete the debugging and maintenance in the shortest time. The debugging personnel are determined according to the debugging task table. At the same time, when the debugging personnel encounter a fault during debugging, the maintenance information including the maintenance car and the fault condition are generated with one click, so that the debugging personnel can quickly and conveniently distribute it to the corresponding maintenance personnel; A data processing module is used to determine whether the debugged object has a fault according to the debugged data; Database, used to store and access data uploaded by the access control management module and tool management cabinet.
3. A subway vehicle commissioning production line according to claim 1, characterized in that: The task generation module includes a database, which includes a variety of debugging task forms. The debugging task forms are prepared in advance by relevant responsible personnel and stored after being given corresponding project labels. After receiving the relevant information of the debugging project, the task generation module searches for the corresponding debugging task form from the database and outputs it. The debugging task form includes debugging train lines, debugging task details, and debugging options.
4. A subway vehicle commissioning production line according to claim 2, characterized in that: The debugging toolbox includes multiple wireless tools, each wireless tool corresponds to a different IP address. The interactive terminal can identify the IP address of the nearby wireless tool and display the toolbar of the specific item in the debugging task table selected by the debugger. The wireless tool can collect the debugging data generated by the debugger during the debugging process in real time and upload it to the corresponding position of the debugging task table.
5. The subway vehicle commissioning production line according to claim 1, characterized in that: The access control management module includes an electric door and a control identification unit. The control identification unit is connected to the auxiliary debugging system via a wireless network. The control identification unit is used to control the electric door switch. The control identification unit is used to obtain task allocation information from the auxiliary debugging system to identify personnel information that can enter the debugging production line area within a fixed time period. When a debugging personnel authenticates his identity through the control identification unit, the control identification unit will compare the obtained identity information with the personnel information obtained from the auxiliary debugging system. If the comparison is successful, the person is allowed to enter. If the comparison fails, the person is not allowed to enter.
6. A subway vehicle commissioning production line according to claim 1, characterized in that: The tool management cabinet includes a cabinet body, a control component and a plurality of storage frames are arranged in the cabinet body, an identification component is arranged on one side of the cabinet body, the storage frame is used to store the debugging tool box, an electric cabinet door is arranged on one side of the opening of the storage frame, the control component is electrically connected to the identification component and the electric cabinet door respectively, and the control component is connected to the access control management module through a wireless network; the control component is used to obtain the personnel information entering the debugging production line area from the access control management module, when a debugging personnel performs identity authentication through the identification component, the control component compares the identity information with the personnel information entering the debugging production line area obtained from the access control management module, if the comparison is successful, the electric cabinet door is opened to allow the corresponding debugging personnel to take away the debugging tool box, if the comparison fails, the identity recognition failure is prompted.
7. A subway vehicle commissioning production line according to claim 5, characterized in that: An identity authentication unit is provided on the inner side of the electric door, which is used to obtain the storage status of the debugging tool box in the tool management cabinet in real time, and when the debugging personnel verify their identity and want to leave the debugging production line area, it is determined whether the debugging tool box of the debugging personnel has been returned. If it has been returned, the debugging personnel is allowed to leave. If it has not been returned, the debugging personnel is prompted by voice to return the debugging tool box before leaving.
8. A subway vehicle commissioning production line according to claim 2, characterized in that: The data processing module is used to compare and judge the debugging data in the debugging task table with the corresponding standard data range. If it is judged that the debugging data is within the corresponding standard data range, it is judged that the function corresponding to the debugging data is faulty. If it is judged that the debugging data is not within the corresponding standard data range, it is judged that the function corresponding to the debugging data is faulty and needs maintenance, and a maintenance prompt information is sent to the corresponding debugging personnel, who can contact the maintenance personnel as soon as possible according to the maintenance prompt information.
9. A subway vehicle commissioning production line according to claim 2, characterized in that: The personnel allocation module includes a debugging personnel database, an experience database and an allocation unit. The debugging personnel database includes relevant information of all debugging personnel involved in the current subway debugging. The experience database includes different debugging tasks and the time required for debugging. The allocation unit is used to determine the debugging personnel according to the debugging task. The relevant information of the debugging personnel includes the debugging personnel's personal information, the currently ongoing debugging task item and the duration of entering the current debugging task item. The debugging task item is one of the items in the debugging task table. Determining the debugging personnel according to the debugging task includes: combining the data in the debugging personnel database with the data in the experience database, calculating the expected debugging time of the current debugging task of each debugging personnel in the debugging personnel database, if there is no debugging task currently being performed, assuming that the expected debugging time of the current debugging task is 0, and calculating the time for each debugging personnel to arrive at the designated debugging position according to the corresponding position of the debugging task to be assigned and the position of the debugging task currently being performed by each debugging personnel, adding the expected debugging time of the current debugging task of each debugging personnel and the time to arrive at the designated debugging position according to the weight, obtaining the estimated time for each debugging personnel to enter the debugging task to be assigned, and finally assigning the debugging task to be assigned to the debugging personnel with the shortest estimated time; The calculation process of the expected debugging time of the current debugging task is as follows: ; Among them, A is the proportion of length of service, B is the proportion of efficiency, is the average maintenance time of the current debugging task, is the average length of service of the commissioning personnel, is the length of service of the current debugging personnel, α is the length of service weight parameter, Average efficiency factor, is the efficiency factor of the current debugger, and β is the efficiency factor weight parameter; The efficiency factor is calculated as follows: : in, The historical average time it takes for all debuggers to complete the debugging task. The historical average time it takes for the current debugger to complete the debugging task.
10. A subway vehicle maintenance method, characterized in that: The method is implemented by a subway vehicle debugging production line according to any one of claims 2 to 9, comprising the following steps: Step 1: The auxiliary debugging system generates debugging tasks and assigns debugging tasks through the personnel allocation module, then notifies the corresponding debugging personnel through the interactive terminal, and sends the debugging personnel information involved in the debugging task to the access control management module and the tool management cabinet; Step 2: The debugging personnel go to the debugging production line area for identity recognition. The access control management module compares the personnel information with the data sent by the auxiliary debugging system. If the comparison is successful, the debugging personnel are allowed to enter the debugging production line area. At the same time, the access control management module uploads the personnel entry information to the auxiliary debugging system for archiving; Step 3: After the debugging personnel enter the debugging production line area, they go to the tool management cabinet for identity recognition. The tool management cabinet compares the recognized identity information with the information uploaded by the access control management module. If the comparison is successful, the electric cabinet of the corresponding tool management cabinet is opened to facilitate the debugging personnel to take the debugging tool box. Step 4: The debugger performs the debugging task through the interactive terminal and the wireless tool in the debugging toolbox. The data processing module determines whether there is a functional fault based on the debugging data collected by the wireless tool. If there is a fault, it generates a maintenance prompt message and jumps to step 5. If there is no fault, it determines whether the data in the debugging task table has been filled. If not, it prompts the debugger to proceed to the next step. If it is filled, it prompts that the relevant debugging task is completed and the debugger can leave the debugging production line area after returning the debugging toolbox. Step 5: The task generation module generates a maintenance task according to the maintenance prompt information and sends it to the corresponding commissioning personnel, who then forward it to the corresponding maintenance personnel; Step 6: After the maintenance personnel complete the maintenance task, the personnel allocation module notifies the original debugging personnel to re-debug the corresponding functions; Step 7: After the debugger completes the re-debugging, the debug data is uploaded to the corresponding position in the debug task table, overwriting the original recorded data, and then jumps to step 4.
Citation Information
Patent Citations
Method for distributing and recovering electric power overhaul tool
CN104616108A
Transformer substation fine-debugging method based on electronic debugging form
CN108256657A
Test task allocation method and device, computer equipment and storage medium
CN110083528A
Task scheduling method and device
CN112286663A
Full-automatic driving unmanned area train inspection intelligent management control system
CN114019949A
