Big data driven power grid load fine management method and system
Through the power grid load management method driven by big data, a similarity algorithm is used to analyze load disturbance information, form a set of marks and issue disturbance hazard notifications, solving the problem of difficult to detect potential load disturbances and safety hazards in the existing technology, and achieving stability of the power grid Improvement of sexual and security and operational cost savings.
Patent Information
- Application Number
- CN202410938517.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-13
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-07-13
AI Technical Summary
The existing grid load management model is difficult to detect potential load disturbances and safety hazards, resulting in unstable grid operation and difficult to achieve refined management.
By adopting a big data-driven method, by acquiring and classifying information of power distribution equipment, a similarity algorithm is used to analyze load disturbance information, forming a set of marks and issuing disturbance hazard notifications, realizing early risk warning and preventive maintenance.
It improves the level of refinement and intelligence of power grid management, enhances the stability and safety of power grid, reduces equipment failures and maintenance costs, and optimizes resource allocation and operational efficiency.
Smart Images

Figure CN119027268A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of intelligent management of power grid loads, and in particular to a method and system for refined management of power grid loads driven by big data. Background Art
[0002] With the rapid development of smart grids and the continuous accumulation of power data, the scale of distribution networks has gradually increased, and the complexity of loads has brought great challenges to the safe and stable operation of power systems. Grid operations are facing massive data processing and analysis needs. These data include not only traditional grid operation parameters such as voltage, current, power, etc., but also multi-dimensional information such as various equipment status, environmental monitoring, and user power consumption behavior. How to effectively use these data to improve the refinement and intelligence level of grid load management has become an important issue facing the current power industry.
[0003] At present, refined management of power grid load refers to the precise monitoring, analysis and prediction of the load conditions of each distribution equipment in the power grid to achieve safe, stable and efficient operation of the power grid. Under the traditional power grid management model, the power grid can only be managed in an extensive manner, making it difficult to detect potential load disturbances and safety hazards. Summary of the invention
[0004] In view of the defects in the prior art, the present invention provides a big data driven refined management method and system for power grid load.
[0005] A method for fine-grained management of power grid load driven by big data, comprising: S1, obtaining a plurality of existing power distribution devices, the plurality of existing power distribution devices including a first power distribution device, a second power distribution device and a target management device; S2, obtaining a plurality of different set rules, and respectively grouping the plurality of existing power distribution devices into a plurality of sets based on different set rules, so as to form a set model, wherein each set rule includes at least two sets; S3, obtaining first load disturbance information of the first power distribution device, obtaining second load disturbance information of the second power distribution device, and obtaining the similarity between the first load disturbance information and the second load disturbance information based on a comprehensive calculation model; if the similarity is greater than a first preset value, judging whether there is a set that simultaneously groups the first power distribution device and the second power distribution device based on the set model, and if so, forming a marked set with the set that simultaneously groups the first power distribution device and the second power distribution device; S4, judging whether the target management device is in the marked set, and if so, issuing a disturbance hidden danger notification.
[0006] Preferably, in acquiring the similarity between the first load disturbance information and the second load disturbance information based on the comprehensive calculation model, the comprehensive calculation model includes: ; wherein said is the similarity between the first load disturbance information and the second load disturbance information, is the load disturbance of the first distribution equipment at time t, is the load disturbance of the second distribution equipment at time t, and They are and The average value within the preset time series.
[0007] Preferably, the S4 includes: S41, determining whether the target management device is in the tag set, and if so, proceeding to S42; S42, obtaining the real-time load change value of the target management device; S43, processing the real-time load change value based on a comprehensive calculation model and obtaining a comprehensive index, determining whether the comprehensive index exceeds a second preset value, and if so, issuing a disturbance risk notification.
[0008] Preferably, in said S43, the comprehensive calculation model includes: ;in, As a comprehensive indicator, is the real-time load change value, for The average value within a preset time series, is the correction factor.
[0009] Preferably, the S42 also includes: S421, selecting a first time period T1 and a second time period T2; S422, obtaining the current time point t0 of the target management device; S423, drawing a load value change curve of the target management device from t0-T1 to t0+T2, and obtaining the maximum load difference according to the load value change curve, and the real-time load change value is the maximum load difference.
[0010] Preferably, S3 further includes: if there is a set that simultaneously summarizes the first power distribution equipment and the second power distribution equipment, forming an associated tag based on the comprehensive calculation model, the first load disturbance information and the second load disturbance information, and associating the associated tag with the tag set.
[0011] Preferably, in forming the association mark based on the comprehensive calculation model, the first load disturbance information and the second load disturbance information, the comprehensive calculation model includes: ;in, is the association tag, is the serialized string of the first load disturbance information, is the serialized string of the second load disturbance information, is a hash function.
[0012] Preferably, a big data driven power grid load refined management system is also provided, the system is used to implement the above-mentioned big data driven power grid load refined management method, the system includes: a first acquisition module, used to acquire multiple existing power distribution equipment, the multiple existing power distribution equipment includes a first power distribution equipment, a second power distribution equipment and a target management equipment; a second acquisition module, used to acquire multiple different set rules, and based on different set rules, the multiple existing power distribution equipment are respectively summarized into multiple sets to form a set model, wherein each set rule contains at least two sets; a calculation and processing module, used to acquire the first load disturbance information of the first power distribution equipment, acquire the second load disturbance information of the second power distribution equipment, and acquire the similarity of the first load disturbance information and the second load disturbance information based on the comprehensive calculation model; the calculation and processing module is also used to determine whether there is a set that simultaneously summarizes the first power distribution equipment and the second power distribution equipment based on the set model when the similarity is greater than a first preset value, and if so, the set that simultaneously summarizes the first power distribution equipment and the second power distribution equipment forms a marked set; a judgment and notification module, used to determine whether the target management device is in the marked set, and if so, a disturbance hidden danger notification is issued.
[0013] Preferably, a non-temporary computer-readable storage medium is also provided, on which a computer program is stored, and when the program is executed by a processor, the above-mentioned big data-driven refined management method of power grid load is implemented.
[0014] Preferably, an electronic device is also provided, comprising: a memory on which a computer program is stored; and a processor for executing the computer program in the memory to implement the above-mentioned big data-driven refined management method for power grid loads.
[0015] The beneficial effects of the present invention are embodied in: By comprehensively collecting information on distribution equipment through the power grid management system or database, and classifying and summarizing it according to clear collection rules, power grid operators can more systematically manage equipment of different types, different geographical locations, different voltage levels and different operating years. This classification management method not only improves management efficiency, but also makes it possible to conduct targeted analysis of equipment of specific types or regions, thereby improving the accuracy and effectiveness of management decisions; further, by real-time monitoring of load disturbance information of distribution equipment and using similarity algorithms to analyze the similarity of load disturbances between different equipment, the technical solution can detect potential load disturbance risks at an early stage. When similar load disturbance patterns are identified, the system can quickly mark the relevant equipment collection and issue disturbance hidden danger notifications in a timely manner, thereby achieving risk warnings, which enables power grid operators to Preventive maintenance measures are taken to avoid equipment failures and improve the stability and reliability of the power grid. Furthermore, by accurately identifying a group of equipment facing similar load disturbance risks, power grid operators can allocate maintenance resources more reasonably, give priority to equipment with higher risks, and avoid waste of resources. At the same time, the implementation of preventive maintenance strategies also reduces power outages and repair costs caused by equipment failures, thereby effectively saving operating costs. Furthermore, this technical solution uses big data analysis and intelligent algorithms to achieve refined management of power grid loads. By automatically collecting, analyzing and processing data, the system can intelligently identify risks and respond, thereby improving the level of intelligence in power grid management. This not only enhances the security and stability of the power grid system, but also lays a solid foundation for the development of future smart grids. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the following is a brief introduction to the drawings required for the specific embodiments or the description of the prior art. In all the drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, the elements or parts are not necessarily drawn according to the actual scale.
[0017] Figure 1 A schematic diagram of the steps of the method for fine management of power grid load driven by big data of the present invention; Figure 2 It is a schematic diagram of step S4 of the present invention; Figure 3 It is a schematic diagram of the steps of S42 of the present invention; Figure 4 The present invention is a block diagram of an electronic device.
[0018] Reference numerals: 700 - electronic device, 701 - processor, 702 - memory, 703 - multimedia component, 704 - input / output (I / O) interface, 705 - communication component. DETAILED DESCRIPTION
[0019] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0020] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0021] It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in subsequent drawings. In addition, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.
[0022] like Figure 1 As shown, a method for fine-grained management of power grid load driven by big data is provided, including: S1. Acquire multiple existing power distribution devices, where the multiple existing power distribution devices include a first power distribution device, a second power distribution device, and a target management device; S2. Acquire multiple different set rules, and classify multiple existing power distribution devices into multiple sets based on the different set rules, so as to form a set model, wherein each set rule contains at least two sets; S3, obtaining first load disturbance information of the first power distribution device, obtaining second load disturbance information of the second power distribution device, and obtaining similarity between the first load disturbance information and the second load disturbance information based on a comprehensive calculation model; If the similarity is greater than a first preset value, judging whether there is a set that simultaneously summarizes the first power distribution device and the second power distribution device based on the set model; if so, forming a tag set with the set that simultaneously summarizes the first power distribution device and the second power distribution device; S4. Determine whether the target management device is in the tag set. If so, issue a disturbance risk notification.
[0023] In this embodiment, it should be noted that in S1 and S2, multiple existing distribution equipment are obtained and classified and summarized; first, the basic information and operation data of all existing distribution equipment are collected through the power grid management system or related databases. This information may include the type, geographical location, capacity, operation status, historical load data, etc. of the equipment; according to the needs and goals of power grid management, appropriate collection rules are determined. These collection rules can be based on the equipment type (transformer, switch, capacitor, etc.), geographical location (city A, city B, suburbs, etc.), voltage level (high voltage, medium voltage, low voltage) and operating years (new equipment, 5-10 years, more than 10 years), etc. of the distribution equipment; according to the determined collection rules, the collected distribution equipment is summarized into different collections. For example, transformers, switches, capacitors, etc. can be summarized into different collections according to the equipment type; the equipment can also be summarized into different city or regional collections according to the geographical location; the summarized equipment collection is represented in the form of a data model to facilitate subsequent data analysis and processing. This model can be a data structure, such as a tree structure or a graph structure, which is used to describe the relationship and attributes between devices.
[0024] In S3, the load disturbance information of the distribution equipment is obtained; the first load disturbance information and the second load disturbance information of the first distribution equipment and the second distribution equipment are collected by real-time monitoring equipment such as sensors or smart meters installed on the distribution equipment, the first load disturbance information and the second load disturbance information both represent that a load disturbance event has occurred, and abnormal conditions such as voltage fluctuation and current mutation have been caused; according to the characteristics of the load disturbance information, a suitable similarity algorithm is selected, such as cosine similarity, Pearson correlation coefficient, etc., which can quantify the similarity between two load disturbance events; using the selected similarity algorithm, the similarity value between the first load disturbance information and the second load disturbance information is calculated, and this value will serve as an important basis for judging whether there is a correlation between the two devices. If the similarity is greater than a first preset value, it means that the first load disturbance information and the second load disturbance information are traced back to the same fault, such as capacitor faults at the same time; then it is judged whether there is a set that simultaneously summarizes the first distribution equipment and the second distribution equipment. If such a set exists, it means that the load disturbance phenomenon with the same traceability occurs at least twice in the set, so all the distribution equipment in the set is at too great a risk of similar load disturbances.
[0025] In S4, the target management device can be a strictly monitored distribution device, such as a distribution device with a long maximum load operation duration. If it is in the tag set, it means that it may face similar load disturbance risks. At this time, the system should automatically issue a disturbance hazard notification to remind relevant personnel to pay attention and take corresponding preventive measures. The notification can be sent via email, SMS or other instant messaging methods to ensure that relevant personnel can respond and deal with potential risks in a timely manner.
[0026] In summary, by comprehensively collecting information on distribution equipment through the power grid management system or database, and classifying and summarizing it according to clear collection rules, power grid operators can more systematically manage equipment of different types, different geographical locations, different voltage levels and different operating years. This classification management method not only improves management efficiency, but also makes it possible to conduct targeted analysis of equipment of specific types or regions, thereby improving the accuracy and effectiveness of management decisions; further, by real-time monitoring of the load disturbance information of distribution equipment and using a similarity algorithm to analyze the similarity of load disturbances between different devices, the technical solution can detect potential load disturbance risks at an early stage. When similar load disturbance patterns are identified, the system can quickly mark the relevant equipment collection and issue disturbance hidden danger notifications in a timely manner, thereby achieving risk warnings, which enables power grid operators to It can take preventive maintenance measures to avoid equipment failures and improve the stability and reliability of the power grid. Furthermore, by accurately identifying sets of equipment facing similar load disturbance risks, power grid operators can allocate maintenance resources more reasonably, give priority to equipment with higher risks, and avoid waste of resources. At the same time, the implementation of preventive maintenance strategies also reduces power outages and repair costs caused by equipment failures, thereby effectively saving operating costs. Furthermore, this technical solution uses big data analysis and intelligent algorithms to achieve refined management of power grid loads. By automatically collecting, analyzing and processing data, the system can intelligently identify risks and respond, thereby improving the level of intelligence in power grid management. This not only enhances the security and stability of the power grid system, but also lays a solid foundation for the development of future smart grids.
[0027] Specifically, in acquiring the similarity between the first load disturbance information and the second load disturbance information based on the comprehensive calculation model, the comprehensive calculation model includes: ;in, Said is the similarity between the first load disturbance information and the second load disturbance information, is the load disturbance of the first distribution equipment at time t, is the load disturbance of the second distribution equipment at time t, and They are and The average value within the preset time series.
[0028] In this embodiment, it should be noted that: and They are and The average value within a preset time series. Specifically, if we have a time series such as , which is at different time points t1, t2, ..., t N If there are different values on , then the average value of this time series is It is the arithmetic mean of all these values, where N is the total number of time points. Setting such a similarity function is to quantify the two time series, namely the first load disturbance information and the second load disturbance information This quantitative method helps to understand and compare the similarity of load disturbances of two distribution equipment. In the defined similarity function: the numerator is The dot product of the two time series after removing the mean (i.e., centering) is calculated, which reflects the product of the degree to which the load disturbances of the two time series at the same time point deviate from their mean values, thereby capturing the co-variation between them; the denominator It is the product of the standard deviations of the two time series, which is used to normalize the numerator so that the output value of the similarity function is between -1 and 1. The standard deviation measures the degree to which each point in the time series deviates from the average value, so the denominator reflects the degree of fluctuation of the two time series. In practical applications, if the load disturbance information of two distribution devices is highly similar, then their similarity function value will be close to 1; if their load disturbance information is completely dissimilar, then the similarity function value will be close to 0; if their load disturbance information has opposite trends, then the similarity function value will be negative.
[0029] like Figure 2 As shown, specifically, S4 includes: S41, determining whether the target management device is in the tag set, if so, proceeding to S42; S42, obtaining the real-time load change value of the target management device; S43. Process the real-time load change value based on the comprehensive calculation model and obtain a comprehensive index, determine whether the comprehensive index exceeds a second preset value, and if so, issue a disturbance hidden danger notification.
[0030] In this embodiment, it should be noted that in S41, the target management devices that need to be monitored are determined. These devices may be selected based on specific risk assessments, business importance or other criteria; then, the previously formed tag set (i.e., the set selected in step S3 due to similar load disturbance risks) is queried; it is determined whether the target management device is included in these tag sets. If so, the next step S42 is performed; if not, the status of other devices is continued to be monitored. In S42, for the target management devices in the tag set, the real-time load data of the device is collected through real-time monitoring tools such as sensors or smart meters installed on the device; the real-time load data is used to obtain the real-time load change value. In S43, a comprehensive index is calculated through the model, which comprehensively reflects the load disturbance risk of the equipment; it is determined whether this comprehensive index exceeds a preset second preset value. If it exceeds, it means that the load disturbance risk of the equipment has reached a high level and immediate action is required.
[0031] Specifically, in S43, the comprehensive calculation model includes: ;in, As a comprehensive indicator, is the real-time load change value, for The average value within a preset time series, is the correction factor.
[0032] In this embodiment, it should be noted that such a comprehensive index function is set to combine the real-time load change value of the target management device. The similarity of the load disturbances of the first distribution equipment and the second distribution equipment calculated previously , in order to evaluate whether it is necessary to issue a disturbance risk notification. In this comprehensive indicator function: is the similarity calculated previously, which reflects the similarity between the load disturbances of the first distribution device and the second distribution device. The value range is between -1 and 1. When the load disturbances of the two devices are exactly the same, the similarity is 1; when the load disturbances of the two devices are completely opposite, the similarity is -1; when there is no linear relationship between the load disturbances of the two devices, the similarity is 0; Calculate the real-time load change value of the target management equipment With its average This reflects the fluctuation degree of the load change of the target management equipment. If the values at different time points differ greatly from their average values, then this value will be large, indicating that the load changes of the target management equipment have large fluctuations; is a correction coefficient, which is used to adjust the sensitivity of the comprehensive index function according to the actual situation. By changing the value of , we can make the function more sensitive or more conservative to adapt to different application scenarios and security requirements.
[0033] To sum up, if the load disturbances of the first power distribution equipment and the second power distribution equipment are very similar, and the load changes of the target management equipment also have similar large enough fluctuations, then this may mean that the target management equipment has been affected by disturbance factors similar to those of the first power distribution equipment and the second power distribution equipment, and therefore there is a high probability that there are hidden dangers. By comprehensively evaluating these two factors, we can more accurately determine whether it is necessary to issue a disturbance hidden danger notification.
[0034] like Figure 3 As shown, specifically, the S42 also includes: S421, selecting a first time period T1 and a second time period T2; S422, obtaining the current time point t0 of the target management device; S423. Draw a load value change curve of the target management device from time t0-T1 to t0+T2, and obtain the maximum load difference according to the load value change curve. The real-time load change value is the maximum load difference.
[0035] In this embodiment, it should be noted that, first, in step S421, the system will select two time periods, namely the first time period T1 and the second time period T2; the selection of these two time periods may be based on the historical data of the power grid load, operating experience or specific monitoring requirements; for example, T1 and T2 may represent a time period in the past and the future, respectively, for analyzing the load changes of the target management device before and after the current time point. Next, in step S422, the system will obtain the current time point t0 of the target management device; this time point can be obtained in real time or a time point specified by the user for subsequent load analysis. Then, in step S423, the system will draw a load value change curve of the target management device from t0-T1 to t0+T2 based on the acquired data; this curve can intuitively show the load changes of the target management device in the selected time period, including the peak value, valley value and change trend of the load. Finally, based on this load value change curve, the system will obtain the maximum load difference, that is, the difference between the highest point and the lowest point on the curve; this difference represents the load fluctuation of the target management equipment within the selected time period, that is, the real-time load change value; this value is of great significance for evaluating the operating status of the equipment, predicting potential load disturbances, and formulating corresponding management measures. The acquisition process of this real-time load change value is based on the real-time analysis and processing capabilities of big data technology, which can quickly process a large amount of real-time data, accurately draw the load value change curve, and extract useful information from it.
[0036] Specifically, the S3 further includes: If there is a set that includes both the first power distribution equipment and the second power distribution equipment, an associated tag is formed based on the comprehensive calculation model, the first load disturbance information and the second load disturbance information, and the associated tag is associated with the tag set.
[0037] In this embodiment, it should be noted that when the system detects the existence of a set that includes both the first power distribution device and the second power distribution device, this means that the two devices may have similar load characteristics to some extent or be affected by the same external factors; in order to further analyze and confirm this correlation, the system will form an association tag based on the comprehensive calculation model, the first load disturbance information and the second load disturbance information; once the association tag is generated, the system will associate it with the tag set. The advantage of this is that in the future, when the system detects a similar load disturbance pattern again, it can quickly find the relevant equipment combination through the association tag, thereby accelerating the process of troubleshooting and hidden danger identification.
[0038] Specifically, in forming the association mark based on the comprehensive calculation model, the first load disturbance information and the second load disturbance information, the comprehensive calculation model includes: ;in, is the association tag, is the serialized string of the first load disturbance information, is the serialized string of the second load disturbance information, is a hash function.
[0039] In this embodiment, it should be noted that: is the serialized string of the first load disturbance information, is the serialized string of the second load disturbance information. The serialization means are as follows: if the load disturbance information is a series of numerical values arranged in chronological order, the data at each time point can be converted into a string, and then these strings are connected with specific separators (such as commas); for example, the serialized string of the first load disturbance information is { , ,……, }. If the load disturbance information contains multiple numerical attributes, these numerical values can be converted into strings and connected with separators. If the load disturbance information is structured, such as JSON or XML format, the information can be directly converted into a string representation. For JSON format, a standard JSON serialization library can be used to generate a string.
[0040] A hash function is a function that maps input data to a hash value of a fixed length. The hash function (H) here should be a secure hash algorithm, such as SHA-256 or SHA-3, to ensure that the generated hash value is sufficiently unique and secure.
[0041] A big data driven power grid load refined management system is also provided, the system is used to implement the above big data driven power grid load refined management method, the system comprises: A first acquisition module, used to acquire multiple existing power distribution devices, where the multiple existing power distribution devices include a first power distribution device, a second power distribution device and a target management device; A second acquisition module is used to acquire a plurality of different set rules, and classify a plurality of existing power distribution devices into a plurality of sets based on the different set rules, so as to form a set model, wherein each set rule contains at least two sets; A calculation processing module, used to obtain first load disturbance information of a first power distribution device, obtain second load disturbance information of a second power distribution device, and obtain similarity between the first load disturbance information and the second load disturbance information based on a comprehensive calculation model; The calculation processing module is also used to determine whether there is a set that simultaneously summarizes the first power distribution device and the second power distribution device based on the set model when the similarity is greater than a first preset value, and if so, form a tag set with the set that simultaneously summarizes the first power distribution device and the second power distribution device; The judgment notification module is used to judge whether the target management device is in the tag set, and if so, issue a disturbance risk notification.
[0042] Regarding the big data driven refined management method for power grid load in the above embodiment, the specific manner of performing the operation has been described in detail in the implementation method of the big data driven refined management method for power grid load, and will not be elaborated here.
[0043] Figure 4 is a block diagram of an electronic device shown. Figure 4 As shown, the electronic device 700 may include: a processor 701 , a memory 702 . The electronic device 700 may also include one or more of a multimedia component 703 , an input / output (I / O) interface 704 , and a communication component 705 .
[0044] The processor 701 is used to control the overall operation of the electronic device 700 to complete all or part of the steps in the above-mentioned big data driven power grid load refined management method. The memory 702 is used to store various types of data to support the operation of the electronic device 700, and these data may include, for example, instructions for any application or method used to operate on the electronic device 700, and application-related data, such as contact data, sent and received messages, pictures, audio, video, etc. The memory 702 can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (Static Random Access Memory, referred to as SRAM), electrically erasable programmable read-only memory (Electrically Erasable Programmable Read-Only Memory, referred to as EEPROM), erasable programmable read-only memory (Erasable Programmable Read-Only Memory, referred to as EPROM), programmable read-only memory (Programmable Read-Only Memory, referred to as PROM), read-only memory (Read-Only Memory, referred to as ROM), magnetic memory, flash memory, disk or optical disk. The multimedia component 703 may include a screen and an audio component. The screen may be, for example, a touch screen, and the audio component is used to output and / or input audio signals. For example, the audio component may include a microphone, which is used to receive external audio signals. The received audio signal may be further stored in the memory 702 or sent through the communication component 705. The audio component also includes at least one speaker for outputting audio signals. The I / O interface 704 provides an interface between the processor 701 and other interface modules, and the above-mentioned other interface modules may be keyboards, mice, buttons, etc. These buttons may be virtual buttons or physical buttons. The communication component 705 is used for wired or wireless communication between the electronic device 700 and other devices. Wireless communication, such as Wi-Fi, Bluetooth, Near Field Communication (NFC), 2G, 3G, 4G, NB-IOT, eMTC or other 5G, etc., or a combination of one or more of them, is not limited here. Therefore, the corresponding communication component 705 may include: Wi-Fi module, Bluetooth module, NFC module, etc.
[0045] In an exemplary embodiment, the electronic device 700 can be implemented by one or more application specific integrated circuits (ASIC), digital signal processors (DSP), digital signal processing devices (DSPD), programmable logic devices (PLD), field programmable gate arrays (FPGA), controllers, microcontrollers, microprocessors or other electronic components to execute the above-mentioned big data driven refined management method for power grid loads.
[0046] In another exemplary embodiment, a computer-readable storage medium including program instructions is also provided, and when the program instructions are executed by a processor, the steps of the above-mentioned method for fine management of power grid load driven by big data are implemented. For example, the computer-readable storage medium can be the above-mentioned memory 702 including program instructions, and the above-mentioned program instructions can be executed by the processor 701 of the electronic device 700 to complete the above-mentioned method for fine management of power grid load driven by big data.
[0047] In another exemplary embodiment, a computer program product is also provided, which includes a computer program that can be executed by a programmable device, and the computer program has a code portion for executing the above-mentioned big data-driven power grid load refined management method when executed by the programmable device.
[0048] The preferred embodiments of the present disclosure are described in detail above in conjunction with the accompanying drawings; however, the present disclosure is not limited to the specific details in the above embodiments. Within the technical concept of the present disclosure, a variety of simple modifications can be made to the technical solution of the present disclosure, and these simple modifications all fall within the protection scope of the present disclosure.
[0049] It should also be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable manner without contradiction. In order to avoid unnecessary repetition, the present disclosure will not further describe various possible combinations.
[0050] In addition, various embodiments of the present disclosure may be arbitrarily combined, and as long as they do not violate the concept of the present disclosure, they should also be regarded as the contents disclosed by the present disclosure.
[0051] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. These modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention, and they should all be included in the scope of the claims and specification of the present invention.
Claims
1. A method for fine-grained management of power grid load driven by big data, characterized in that: include: S1. Acquire multiple existing power distribution devices, where the multiple existing power distribution devices include a first power distribution device, a second power distribution device, and a target management device; S2. Acquire multiple different set rules, and classify multiple existing power distribution devices into multiple sets based on the different set rules, so as to form a set model, wherein each set rule contains at least two sets; S3, obtaining first load disturbance information of the first power distribution device, obtaining second load disturbance information of the second power distribution device, and obtaining similarity between the first load disturbance information and the second load disturbance information based on a comprehensive calculation model; If the similarity is greater than a first preset value, judging whether there is a set that simultaneously summarizes the first power distribution device and the second power distribution device based on the set model; if so, forming a tag set with the set that simultaneously summarizes the first power distribution device and the second power distribution device; S4. Determine whether the target management device is in the tag set. If so, issue a disturbance risk notification.
2. The method for fine-grained management of power grid load driven by big data according to claim 1 is characterized in that: In obtaining the similarity between the first load disturbance information and the second load disturbance information based on the comprehensive calculation model, the comprehensive calculation model includes: ;in, Said is the similarity between the first load disturbance information and the second load disturbance information, is the load disturbance of the first distribution equipment at time t, is the load disturbance of the second distribution equipment at time t, and They are and The average value within the preset time series.
3. The method for fine-grained management of power grid load driven by big data according to claim 2 is characterized in that: The S4 includes: S41, determining whether the target management device is in the tag set, if so, proceeding to S42; S42, obtaining the real-time load change value of the target management device; S43. Process the real-time load change value based on the comprehensive calculation model and obtain a comprehensive index, determine whether the comprehensive index exceeds a second preset value, and if so, issue a disturbance hidden danger notification.
4. The method for fine-grained management of power grid load driven by big data according to claim 3 is characterized in that: In said S43, the comprehensive calculation model includes: ;in, As a comprehensive indicator, is the real-time load change value, for The average value within a preset time series, is the correction factor.
5. The method for fine-grained management of power grid load driven by big data according to claim 3 is characterized in that: The S42 further includes: S421, select the first time period T<-sub88221a1d-cdd1-42a9-9bde-146b31cfea75-> and the second time period T<-sub9651cacd-2586-4835-b5d6-27d6cac16e70->; S422, obtain the current time point of the target management device t<-subdb4b9c44-f109-49ab-9da7-0745a33dce91->; S423. Draw a load value change curve of the target management device from time t<-sub9b28c2ca-c207-429c-b5bc-858f49b9e2f3->-T<-sub65ffc220-c218-4cf5-915c-f803bd483735-> to time t<-sub3e6ff6d0-9ebc-43dc-876e-cb1558682b9b->+T<-sub6f49c2c3-c4ff-45c2-b3b0-3a74f1b7c027->, and obtain the maximum load difference according to the load value change curve. The real-time load change value is the maximum load difference.
6. The method for fine-grained management of power grid load driven by big data according to claim 1, characterized in that: The S3 further includes: If there is a set that includes both the first power distribution equipment and the second power distribution equipment, an associated tag is formed based on the comprehensive calculation model, the first load disturbance information and the second load disturbance information, and the associated tag is associated with the tag set.
7. The method for fine-grained management of power grid load driven by big data according to claim 1, characterized in that: In forming an association mark based on a comprehensive calculation model, first load disturbance information, and second load disturbance information, the comprehensive calculation model includes: ;in, is the association tag, is the serialized string of the first load disturbance information, is the serialized string of the second load disturbance information, is a hash function.
8. A big data driven power grid load refined management system, characterized in that: The system is used to implement the big data driven refined management method for power grid loads as described in any one of claims 1 to 7, and the system includes: A first acquisition module, used to acquire multiple existing power distribution devices, where the multiple existing power distribution devices include a first power distribution device, a second power distribution device and a target management device; A second acquisition module is used to acquire a plurality of different set rules, and classify a plurality of existing power distribution devices into a plurality of sets based on the different set rules, so as to form a set model, wherein each set rule contains at least two sets; A calculation processing module, used to obtain first load disturbance information of a first power distribution device, obtain second load disturbance information of a second power distribution device, and obtain similarity between the first load disturbance information and the second load disturbance information based on a comprehensive calculation model; The calculation processing module is also used to determine whether there is a set that simultaneously summarizes the first power distribution device and the second power distribution device based on the set model when the similarity is greater than a first preset value, and if so, form a tag set with the set that simultaneously summarizes the first power distribution device and the second power distribution device; The judgment notification module is used to judge whether the target management device is in the tag set, and if so, issue a disturbance risk notification.
9. A non-transitory computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, it implements the big data driven refined management method for power grid load as described in any one of claims 1 to 7.
10. An electronic device, characterized in that: include: a memory having a computer program stored thereon; A processor, used to execute the computer program in the memory to implement the big data driven refined management method for power grid load as described in any one of claims 1 to 7.
Citation Information
Patent Citations
Equipment fault early warning method based on maintenance records
CN108023782A
Method, device and apparatus for discovering quality problems of parts
CN110600112A
Power transmission safety management system and method based on Internet of Things
CN117471236A
PDU operation fault detection method
CN117540284A
Equipment fault diagnosis method and device, electronic equipment and readable storage medium
CN118244740A
