Crude helium heat exchanger and helium production equipment and method thereof

Through the alternating helium production method and the interlaced heat exchanger structure, the problems of helium reflux and high energy consumption are solved, efficient helium production is achieved, helium reflux and energy consumption is reduced, and helium reflux and energy consumption is increased. Refined production capacity and economic benefits.

CN119034423APending Publication Date: 2024-11-29ANHUI ZHONGKE HAOHAI GAS TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411335547.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-24
Publication Date
2024-11-29

Smart Images

  • Figure CN119034423A_ABST
    Figure CN119034423A_ABST
Patent Text Reader

Abstract

The invention discloses a crude helium heat exchanger and helium production equipment and method thereof. Purification comprises the following steps that S1, system cooling is conducted; s2, pressurizing the adsorber; s3, inlet gas purification; the regeneration comprises the following steps: P1, pressure relief of the adsorber and heating of the heat exchanger; p2, heat exchanger purging replacement; p3, heat exchanger charging and discharging replacement; p4, releasing the pressure of the adsorber and waiting; p5, evacuating an adsorber and cooling by a refrigerator; a sequential program is set for reciprocating operation, the operation is simple, the operation reliability is high, the helium refining capacity is improved, the helium backflow to the raw material gas film press is reduced, and during heat exchange, the flowing directions of the two media in the first heat exchange box and the second heat exchange box are opposite; therefore, the full duration of passing through all the snakelike flow channels of the first heat exchange box or the second heat exchange box is continuously kept in the heat exchange process, and sufficient heat exchange is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of helium refining, and in particular to a crude helium heat exchanger and helium production equipment and a production method thereof. Background Art

[0002] At present, the conventional helium extraction methods mainly include: condensation method, air separation method, hydrogen liquefaction method, membrane separation method, etc. Among them, the condensation method is used to extract helium from natural gas; the air separation method is used to extract helium from the atmosphere; the hydrogen liquefaction method is used to extract helium from synthetic ammonia tail gas; and the membrane separation method is only used for crude extraction of helium.

[0003] The existing helium refining sequential control process is prone to the phenomenon of increased helium backflow, which causes excessive backflow of helium to the raw gas membrane compressor, resulting in the consumption of more energy to eliminate the impact of the backflow, which is costly and greatly affects the helium production capacity. Summary of the invention

[0004] The purpose of the present invention is to provide a crude helium heat exchanger and helium production equipment and production method thereof to address the above-mentioned problems and shortcomings, reduce the backflow of helium, reduce the energy consumption per unit time, and improve the overall economic benefits.

[0005] The purpose of the present invention can be achieved by the following technical solution: A helium production method, including purification and regeneration, the purification and regeneration are carried out alternately, and the purification includes the following steps:

[0006] S1: system cooling;

[0007] S2: adsorber pressurization;

[0008] S3: Intake air purification;

[0009] The regeneration comprises the following steps:

[0010] P1: adsorber pressure relief and heat exchanger heating;

[0011] P2: Heat exchanger purge replacement;

[0012] P3: Heat exchanger charging and discharging;

[0013] P4: Waiting for adsorber pressure relief;

[0014] P5: Pump down the adsorber and cool down the refrigerator.

[0015] As a further scheme of the invention, in step S1, the following steps are performed in sequence: stop the temperature control of HT601A, HT601B and the temperature control of HT602A, HT602B; start the refrigerator in sequence at an interval of 1s, and release the cold head pause; turn off QV605, QV606, QV607, SV610; turn off FV601, PV601, PV602, PV603; turn off SV701; use "TI604A<-265℃" as the transfer condition, and make a judgment: if the transfer condition is met, the system cooling ends, and the program proceeds to step S2; if the transfer condition is not met, "whether the system cooling time reaches the set value" and perform the time condition. If the time condition is met, a warning message is issued, and wait until the transfer condition is met, and then proceed to step S2; if the time condition is not met, continue to wait until the time condition is met, and then judge whether the transfer condition is met.

[0016] As a further solution of the invention, in step S2, the following steps are performed: close QV602, open QV607; set PI602 and use the set value as the transfer condition, and make a judgment: if the transfer condition is met, close QV607, and the program proceeds to the next step S3; if the transfer condition is not met, "whether the system charging time reaches the set value" and perform the time condition. If the time condition is met, issue a warning message, and wait until the transfer condition is met. After it is met, proceed to step S3. If the time condition is not met, continue to wait until the time condition is met, and then judge whether the transfer condition is met.

[0017] As a further scheme of the invention, in step S3, the following steps are performed: FV601, PV602, and PV603 are opened to their respective set values, and QV605 is opened, QV606 is closed, and then wait for at least five minutes. After the time is reached, FV601, PV602, and PV603 are readjusted, and then "Interlock One" is put into operation; the pressure difference value Abs and the duration of (PI603-PI605) are set, and the set pressure difference value Abs and the duration are used as transfer conditions. After waiting until the transfer conditions are met, the program proceeds to the regeneration step P1, and the "Interlock One" is cut off at the same time.

[0018] As a further solution of the invention, in step S3, the judgment condition and operation of "Interlock 1" are: if TI605 is less than -265℃: open QV1901, close QV1902, open QV606, close QV605, and put PI703 automatic control loop into operation; if TI605 is greater than or equal to -263℃: open QV1902, close QV1901, close QV606, open QV605, and when the unloading of the high-purity helium filling membrane press is triggered, "Interlock 1" is released; only after a loading program is performed, can "Interlock 1" be automatically put into operation again.

[0019] As a further solution of the invention, in step P1, the following steps are performed in sequence: close QV602, QV607, SV701, and FV601; start HT601A (TI602A) to start heating, and the heating temperature is -220°C; start HT602A (TI604A) to start heating, and the heating temperature is -220°C; stop refrigerators HC06 and HC07, open HC08, and pause the HC08 cold head; the pressure relief valve PV601 starts to put into the "pressure and valve (PI602-PV601) opening comparison table" program to relieve pressure; open SV610 and SV1301, open PV603 to 100%, and open PV602 to 25%; open QV1902, close QV1901, close QV606, and open QV605;

[0020] In step P2, the following steps are performed in sequence: stop heater HT601A, control the temperature of HT601B, HT602A and HT602B; close SV1301; open SV701, and perform reverse purge of high-purity helium gas on the heat exchanger.

[0021] As a further embodiment of the invention, step P3 comprises the following steps:

[0022] P30: charging, set the charging time, close SV610, open SV701; PV602 is closed to 0%; judge: PI603>200kpa, if yes, proceed to P31, if not, continue to judge the charging time, if the charging time ≥ the set value, issue an alarm message, continue to wait until PI603>200kpa, then proceed to P31, if the charging time < the set value, wait until the charging time meets the requirements, and then judge the pressure;

[0023] P31: Stand still, turn off SV701, and wait until the set time is reached. Then proceed to P32;

[0024] P32: Pressure relief, open SV610, set the pressure relief time and pressure value, and then judge. When PI603 < the set value, proceed to P33. When the pressure relief time exceeds the set value, an alarm message is issued, and wait until the pressure value meets the requirements before proceeding to P33.

[0025] P33 to P38: Repeat P30 to P32 for two cycles;

[0026] P39: Pressurization, close SV610, open SV701, set the pressure value of PI603, wait for the charging time to reach the set value, if PI603>set value, proceed to P4, if not, issue an alarm message, then wait until it meets the requirements, and then proceed to P4.

[0027] As a further solution of the invention, in step P4, the pressure relief time and the pressure value of PI602 are set, and after the pressure relief time reaches the set value, when PI602 < 10kpa, P5 is performed, and if it does not meet the requirements, an alarm message is issued, and then P5 is performed after waiting until the requirements meet the requirements;

[0028] In step P5, the pressure relief valve PV601 cuts off the "pressure and valve (PI602-PV601) opening comparison table" program and stops pressure relief; PV601 is closed to 0%; QV602 is opened, the refrigerator is started, and the refrigerator pause is canceled, and the pump-down time is set. When the pump-down time is greater than the set value, the purge is ended and purification is entered.

[0029] As a further scheme of the invention, it includes an adsorber, a compressor, a refrigerator, a high-purity helium filling membrane press and a heat exchanger. The heat exchanger includes a first insulation box, in which a first heat exchange box and a second heat exchange box are buried. There are several first heat exchange boxes and second heat exchange boxes, which are staggered. The input end and output end of the first heat exchange box are both installed with a first delivery pipe, and the input end and output end of the second heat exchange box are both installed with a second delivery pipe. Each column of first delivery pipes is commonly connected to a first diverter, and each column of second delivery pipes is commonly connected to a second diverter. The middle of the first diverter is connected to a first main pipe head, and the middle of the second diverter is connected to a second main pipe head. The outer periphery of each column of first delivery pipes and the outer periphery of each column of second delivery pipes are both sleeved with a second insulation box, the outer periphery of the first diverter and the second diverter is sleeved with a third insulation box, and the outer periphery of the first main pipe head and the second main pipe head are installed with insulation flanges.

[0030] As a further scheme of the invention, a plurality of vacuum guide plates are installed inside the first heat exchange box and the second heat exchange box, and the vacuum guide plates of each heat exchange box are evenly distributed in a staggered manner, and a serpentine flow channel is formed by the staggered distribution of the vacuum guide plates, a first vacuum layer is opened inside the vacuum guide plate, and each bend of the serpentine flow channel is smoothly guided by a guide triangle block, and the outer walls of the first conveying pipe, the second conveying pipe, the first diverter, the second diverter, the first main pipe head and the second main pipe head are all sleeved with a thermal insulation sleeve, and a second vacuum layer is opened inside the thermal insulation sleeve, and the first vacuum layer and the second vacuum layer are supported by ribs.

[0031] Beneficial effects of the present invention:

[0032] (1) The helium refining process is sequentially controlled, and the steps of system cooling, adsorber pressurization, inlet gas purification, adsorber pressure relief and heat exchanger heating, heat exchanger purge replacement, heat exchanger filling and replacement, adsorber pressure relief waiting, adsorber evacuation and refrigerator cooling are repeated in sequence, and set as a sequential program for reciprocating operation, which is simple to operate and has high operating reliability, thereby improving the helium refining capacity and reducing the reflux of helium to the raw gas membrane compressor;

[0033] (2) During operation, the first heat exchange box and the second heat exchange box respectively hold and transport media of different temperatures for heat exchange. During heat exchange, the two media flow in opposite directions in the first heat exchange box and the second heat exchange box, so that the heat exchange process continues to maintain the full length of the serpentine flow channel of the first heat exchange box or the second heat exchange box, ensuring sufficient heat exchange. The space in the box is divided into serpentine flow channels by the vacuum guide plate, so as to extend the time the medium stays in the box as much as possible, that is, to extend the time of the heat exchange process as much as possible, ensuring sufficient heat conduction and exchange, and being able to cope with media with high flow rates. The first vacuum layer prevents heat conduction between adjacent sections of the serpentine flow channel to avoid unnecessary interference, ensuring that heat conduction occurs between the two media as much as possible, thereby increasing the heat exchange amount. The second vacuum layer further prevents the loss of cold, reduces heat loss, and improves energy efficiency. The guide triangle block reduces turbulence during medium flow, reduces the generation of internal energy, thereby avoiding heat generation and improving overall work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.

[0035] Figure 1 It is the overall structure diagram of the production method of the present invention;

[0036] Figure 2 The figure is a flow chart of purification in the production method of the present invention;

[0037] Figure 3 A flow chart of regeneration in the production method of the present invention;

[0038] Figure 4 for Figure 3 Flowchart of step P3 in FIG.

[0039] Figure 5 It is a schematic diagram of the overall structure of the heat exchanger of the present invention;

[0040] Figure 6 It is a side view of the overall structure of the heat exchanger of the present invention;

[0041] Figure 7 A top view of the internal structure of the first heat exchange box of the present invention;

[0042] Figure 8 It is a cross-sectional view of the cross-sectional structure of the first main pipe head of the present invention;

[0043] Fig. 9 for Figure 7 A magnified schematic diagram of the middle A area;

[0044] In the figure: 101, first insulation box; 102, second insulation box; 103, third insulation box; 104, insulation flange; 105, first heat exchange box; 106, second heat exchange box; 107, first delivery pipe; 108, second delivery pipe; 109, first diverter; 110, second diverter; 111, first main pipe head; 112, second main pipe head; 201, vacuum guide plate; 202, serpentine flow channel; 203, first vacuum layer; 204, guide triangle block; 205, insulation sleeve; 206, second vacuum layer. DETAILED DESCRIPTION

[0045] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the specific implementation mode, structure, characteristics and effects of the present invention are described in detail below in combination with the accompanying drawings and preferred embodiments.

[0046] See also Figure 1-9 A method for producing helium, comprising purification and regeneration, wherein the purification and regeneration are performed alternately.

[0047] The purification process includes the following steps:

[0048] S1: system cooling;

[0049] S2: adsorber pressurization;

[0050] S3: Intake air purification;

[0051] Regeneration involves the following steps:

[0052] P1: adsorber pressure relief and heat exchanger heating;

[0053] P2: Heat exchanger purge replacement;

[0054] P3: Heat exchanger charging and discharging;

[0055] P4: Waiting for adsorber pressure relief;

[0056] P5: Pump down the adsorber and cool down the refrigerator.

[0057] In step S1, the following steps are performed in sequence: stop the temperature control of HT601A, HT601B and the temperature control of HT602A, HT602B; start the refrigerator in sequence at intervals of 1s, and release the cold head pause; turn off QV605, QV606, QV607, SV610; turn off FV601, PV601, PV602, PV603; turn off SV701.

[0058] In step S1, "TI604A<-265℃" is used as the transfer condition and a judgment is made: if the transfer condition is met, the system cooling is completed and the program proceeds to step S2;

[0059] If the transfer condition is not met, the "system cooling time reaches the set value" and the time condition is performed. The set value of this embodiment is forty minutes: if the time condition is met, a warning message is issued, and wait until the transfer condition is met, and then proceed to step S2; if the time condition is not met, continue to wait until the time condition is met, and then determine whether the transfer condition is met.

[0060] In step S2, the following steps are performed: close QV602 and open QV607.

[0061] In step S2, PI602 is set and the set value is used as the transfer condition. In this embodiment, "PI602>200KPa" is used as the transfer condition, and a judgment is made: if the transfer condition is met, QV607 is closed, and the program proceeds to the next step S3;

[0062] If the transfer condition is not met, the "system charging time reaches the set value" and the time condition is performed. The set value in this embodiment is fifteen minutes: if the time condition is met, a warning message is issued, and wait until the transfer condition is met. After it is met, step S3 is performed. If the time condition is not met, continue to wait until the time condition is met, and then determine whether the transfer condition is met.

[0063] In step S3, the following steps are performed: FV601, PV602, and PV603 are opened to their respective set values. In this embodiment, FV601 is opened to 35%, PV602 is opened to 20%, and PV603 is opened to 60%, and QV605 is opened and QV606 is closed. Then wait for at least five minutes. After the time is reached, FV601, PV602, and PV603 are readjusted. In this embodiment, FV601 remains unchanged, PV602 is opened to 42%, and PV603 is opened to 100%, and then "Interlock 1" is put into operation.

[0064] In step S3, the pressure difference value Abs and duration of (PI603-PI605) are set, and the set pressure difference value Abs and duration are used as transfer conditions. In this embodiment, "pressure difference value Abs (PI603-PI605)>70KPa and lasts for 10s" is set. After waiting until the transfer condition is met, the program proceeds to the regeneration step P1 and cuts off "Interlock 1" at the same time.

[0065] In step S3, the judgment conditions and operations of "interlock 1" are:

[0066] If TI605<-265℃: open QV1901, close QV1902, open QV606, close QV605, and put into PI703 automatic control loop;

[0067] If TI605 ≥ -263℃: open QV1902, close QV1901, close QV606, and open QV605.

[0068] In step S3, when the unloading of the high-purity helium filling membrane press is triggered, interlock one is released; only after a loading procedure is performed, interlock one can be automatically put into operation again.

[0069] In step P1, the following steps are performed in sequence: close QV602, QV607, SV701, and FV601; start HT601A (TI602A) to start heating, and the heating temperature is -220°C; start HT602A (TI604A) to start heating, and the heating temperature is -220°C; stop refrigerators HC06 and HC07, open HC08, and pause the HC08 cold head; the pressure relief valve PV601 starts to use the "Pressure and Valve (PI602-PV601) Opening Comparison Table" program to relieve pressure; open SV610 and SV1301, open PV603 to 100%, and PV602 to 25%; open QV1902, close QV1901, close QV606, and open QV605.

[0070] In step P1, the heating time is set and the relationship between the heating time and the set value is determined, and the temperature of TI602A is set. In this embodiment, the heating time is set to twenty minutes, and the temperature of TI602A is set to -235°C. When the heating time ≥ the set value, it is determined that TI602A ≥ -235°C, PI603 ≤ 15KPa and PI605 ≤ 15KPa; when the above conditions are met, the heating is terminated and step P2 is performed. When any condition is not met, wait until all conditions are met; when only the heating time is met, an alarm message is issued, and then wait until all conditions are met and step P2 is performed.

[0071] In step P2, the following steps are performed in sequence: stop heater HT601A, control the temperature of HT601B, HT602A and HT602B; close SV1301; open SV701, and perform reverse purge of high-purity helium gas on the heat exchanger.

[0072] In step P2, the purge time is set, which is set to one minute in this embodiment, and the temperature of TI607 and TI606 is set, which is set to -245°C in this embodiment. Then, it is judged that: when the purge time ≥ the set value, TI607 ≥ -245°C and TI606 ≥ -245°C are judged. When the temperature meets the requirements, the purge is terminated and step P3 is performed.

[0073] When the temperature does not match, an alarm message is issued, and after waiting until the temperature matches, the purge is ended and step P3 is performed; when the purge time does not match, the temperature is judged after waiting until the purge time matches.

[0074] Step P3 includes the following steps:

[0075] P30: charging, set the charging time, which is set to ten minutes in this embodiment, close SV610, open SV701; PV602 is closed to 0%; judge: PI603>200kpa, if yes, proceed to P31, if not, continue to judge the charging time, if the charging time ≥ the set value, issue an alarm message, continue to wait until PI603>200kpa, then proceed to P31, if the charging time < the set value, wait until the charging time meets the requirement, and then judge the pressure;

[0076] P31: Stand still, turn off SV701, and wait until the set time reaches the set value, which is set to one minute in this embodiment. After reaching the set value, proceed to P32;

[0077] P32: Pressure relief, open SV610, set the pressure relief time and pressure value, which are set to 10 minutes and 10kpa in this embodiment, and then judge, when PI603 < 10kpa, proceed to P33, when the pressure relief time exceeds the set value, issue an alarm message, and wait for the pressure value to meet the requirements before proceeding to P33;

[0078] P33 to P38: Repeat P30 to P32 for two cycles;

[0079] P39: Pressurization, close SV610, open SV701, set the pressure value of PI603, which is set to 300kpa in this embodiment, and set the charging time to ten minutes. After waiting for the charging time to reach the set value, if PI603>the set value, proceed to P4. If it does not meet the requirements, an alarm message will be issued, and then wait until it meets the requirements before proceeding to P4.

[0080] In step P4, the pressure relief time and the pressure value of PI602 are set. In this embodiment, they are set to one minute and 10 kpa. After waiting for the pressure relief time to reach the set value, when PI602 < 10 kpa, proceed to P5. If it does not match, an alarm message is issued, and then wait until it matches before proceeding to P5.

[0081] In step P5, the pressure relief valve PV601 cuts off the "pressure and valve (PI602-PV601) opening comparison table" program and stops pressure relief; PV601 is closed to 0%; QV602 is opened, the refrigerator is started, and the refrigerator pause is canceled, and the evacuation time is set. In this embodiment, it is set to thirty minutes. When the evacuation time is greater than the set value, the purge is ended and purification is entered.

[0082] The heat exchanger includes a first heat preservation box 101, in which a first heat exchange box 105 and a second heat exchange box 106 are buried, and the first heat exchange box 105 and the second heat exchange box 106 are provided with a plurality of first heat exchange boxes 105 and a staggered arrangement. The input end and the output end of the first heat exchange box 105 are both installed with a first delivery pipe 107, and the input end and the output end of the second heat exchange box 106 are both installed with a second delivery pipe 108. Each row of the first delivery pipes 107 is commonly connected to a first diverter 109, and each row of the second delivery pipes 108 is connected to a first diverter 109. 08 are commonly connected to the second diverter 110, the middle of the first diverter 109 is connected to the first main pipe head 111, the middle of the second diverter 110 is connected to the second main pipe head 112, the outer periphery of each row of first delivery pipes 107 and the outer periphery of each row of second delivery pipes 108 are sleeved with a second insulation box 102, the outer peripheries of the first diverter 109 and the second diverter 110 are sleeved with a third insulation box 103, and the outer peripheries of the first main pipe head 111 and the second main pipe head 112 are installed with insulation flanges 104;

[0083] A plurality of vacuum guide plates 201 are installed inside the first heat exchange box 105 and the second heat exchange box 106. The vacuum guide plates 201 of each heat exchange box are evenly distributed in a staggered manner, and a serpentine flow channel 202 is formed by the staggered distribution of the vacuum guide plates 201. A first vacuum layer 203 is provided inside the vacuum guide plate 201. Each bend of the serpentine flow channel 202 is smoothly guided by a guide triangle block 204. The outer walls of the first delivery pipe 107, the second delivery pipe 108, the first flow splitter 109, the second flow splitter 110, the first manifold head 111 and the second manifold head 112 are sleeved with a heat insulation sleeve 205. A second vacuum layer 206 is provided inside the heat insulation sleeve 205. The first vacuum layer 203 and the second vacuum layer 206 are supported by ribs.

[0084] When the present embodiment is working, the first heat exchange box 105 and the second heat exchange box 106 are used to respectively hold and transport media of different temperatures for heat exchange. During heat exchange, the two media flow in opposite directions in the first heat exchange box 105 and the second heat exchange box 106, so that the heat exchange process continues to maintain the full length of the serpentine flow channel 202 of the first heat exchange box 105 or the second heat exchange box 106, ensuring that the heat exchange is fully carried out. The space in the box is divided into the serpentine flow channel 202 by the vacuum guide plate 201, so as to extend the time of the medium in the box as much as possible, that is, as much as possible. The duration of the heat exchange process can be extended as much as possible to ensure sufficient conduction and exchange of heat. It can cope with media with high flow rates. The first vacuum layer 203 prevents heat conduction between adjacent sections of the serpentine flow channel 202 to avoid unnecessary interference, ensures that heat conduction occurs between the two media as much as possible, and increases the heat exchange amount. The second vacuum layer 206 further prevents the loss of cold, reduces heat loss, and improves energy efficiency. The guide triangle block 204 reduces turbulence during medium flow and reduces the generation of internal energy, thereby avoiding heat generation and improving overall work efficiency.

[0085] When the present invention is in use, the staff performs purification and regeneration alternately, performs sequential control operations on the helium refining process, and repeats the steps of system cooling, adsorber pressurization, air intake purification, adsorber pressure relief and heat exchanger heating, heat exchanger purging and replacement, heat exchanger filling and replacement, adsorber pressure relief waiting, adsorber evacuation and refrigerator cooling in sequence, and sets it as a sequential program to perform reciprocating operation, which is simple to operate and has high operating reliability, improves the helium refining capacity, and reduces the reflux of helium to the raw gas membrane compressor.

[0086] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technical personnel in this field can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any simple modification, equivalent change and modification made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solution of the present invention still fall within the scope of the technical solution of the present invention.

Claims

1. A method for producing helium, comprising purification and regeneration, the purification and regeneration being carried out alternately, characterized in that: The purification comprises the following steps: S1: system cooling; S2: adsorber pressurization; S3: Intake air purification; The regeneration comprises the following steps: P1: adsorber pressure relief and heat exchanger heating; P2: Heat exchanger purge replacement; P3: Heat exchanger charging and discharging; P4: Waiting for adsorber pressure relief; P5: Pump down the adsorber and cool down the refrigerator.

2. A helium production method according to claim 1, characterized in that: In step S1, the following steps are performed in sequence: stop the temperature control of HT601A, HT601B and the temperature control of HT602A, HT602B; start the refrigerator in sequence at intervals of 1s, and release the cold head pause; turn off QV605, QV606, QV607, SV610; turn off FV601, PV601, PV602, PV603; turn off SV701; use "TI604A<-265℃" as the transfer condition, and make a judgment: if the transfer condition is met, the system cooling ends, and the program proceeds to step S2; if the transfer condition is not met, "whether the system cooling time reaches the set value" and perform the time condition. If the time condition is met, a warning message is issued, and wait until the transfer condition is met. After that, step S2 is performed; if the time condition is not met, continue to wait until the time condition is met, and then judge whether the transfer condition is met.

3. A helium production method according to claim 1, characterized in that: In step S2, the following steps are performed: close QV602, open QV607; set PI602 and use the set value as the transfer condition, and make a judgment: if the transfer condition is met, close QV607, and the program proceeds to the next step S3; If the transfer condition is not met, "whether the system charging time reaches the set value" is checked and the time condition is performed. If the time condition is met, a warning message is issued and waits until the transfer condition is met. After the condition is met, step S3 is performed. If the time condition is not met, continue to wait until the time condition is met, and then determine whether the transfer condition is met.

4. A helium production method according to claim 1, characterized in that: In step S3, the following steps are performed: open FV601, PV602, and PV603 to their respective set values, open QV605, close QV606, and then wait for at least five minutes. After the time is up, readjust FV601, PV602, and PV603, and then put into "Interlock One"; set the pressure difference value Abs and duration of (PI603-PI605), and use the set pressure difference value Abs and duration as transfer conditions. Wait until the transfer conditions are met, and then the program proceeds to the regeneration step P1, and cuts off "Interlock One" at the same time.

5. A helium production method according to claim 4, characterized in that: In step S3, the judgment conditions and operations of "Interlock 1" are: if TI605 is less than -265℃: open QV1901, close QV1902, open QV606, close QV605, and put into operation the PI703 automatic control loop; if TI605 is greater than or equal to -263℃: open QV1902, close QV1901, close QV606, open QV605, and when the unloading of the high-purity helium filling membrane press is triggered, "Interlock 1" is released; only after a loading program is performed, "Interlock 1" can be automatically put into operation again.

6. A helium production method according to claim 1, characterized in that: In step P1, the following steps are performed in sequence: close QV602, QV607, SV701, and FV601; start HT601A (TI602A) to start heating, and the heating temperature is -220°C; start HT602A (TI604A) to start heating, and the heating temperature is -220°C; stop refrigerators HC06 and HC07, open HC08, and pause the HC08 cold head; the pressure relief valve PV601 starts to use the "pressure and valve (PI602-PV601) opening comparison table" program to relieve pressure; open SV610 and SV1301, open PV603 to 100%, and open PV602 to 25%; open QV1902, close QV1901, close QV606, and open QV605; In step P2, the following steps are performed in sequence: stop heater HT601A, control the temperature of HT601B, HT602A and HT602B; close SV1301; open SV701, and perform reverse purge of high-purity helium gas on the heat exchanger.

7. A helium production method according to claim 1, characterized in that: Step P3 includes the following steps: P30: charging, set the charging time, close SV610, open SV701; PV602 is closed to 0%; judge: PI603>200kpa, if yes, proceed to P31, if not, continue to judge the charging time, if the charging time ≥ the set value, issue an alarm message, continue to wait until PI603>200kpa, then proceed to P31, if the charging time < the set value, wait until the charging time meets the requirements, and then judge the pressure; P31: Stand still, turn off SV701, and wait until the set time is reached. Then proceed to P32; P32: Pressure relief, open SV610, set the pressure relief time and pressure value, and then judge. When PI603 < the set value, proceed to P33. When the pressure relief time exceeds the set value, an alarm message is issued, and wait until the pressure value meets the requirements before proceeding to P33. P33 to P38: Repeat P30 to P32 for two cycles; P39: Pressurization, close SV610, open SV701, set the pressure value of PI603, wait for the charging time to reach the set value, if PI603>set value, proceed to P4, if not, issue an alarm message, then wait until it meets the requirements, and then proceed to P4.

8. A helium production method according to claim 1, characterized in that: In step P4, set the pressure relief time and the pressure value of PI602, wait for the pressure relief time to reach the set value, and when PI602 < 10kpa, proceed to P5. If it does not meet the requirements, an alarm message is issued, and then wait until it meets the requirements before proceeding to P5; In step P5, the pressure relief valve PV601 cuts off the "pressure and valve (PI602-PV601) opening comparison table" program and stops pressure relief; PV601 is closed to 0%; QV602 is opened, the refrigerator is started, and the refrigerator pause is canceled, and the pump-down time is set. When the pump-down time is greater than the set value, the purge is ended and purification is entered.

9. A helium production method according to any one of claims 1 to 8, using a helium production device, characterized in that: The invention comprises an adsorber, a compressor, a refrigerator, a high-purity helium filling membrane press and a heat exchanger, wherein the heat exchanger comprises a first heat preservation box (101), wherein a first heat exchange box (105) and a second heat exchange box (106) are embedded in the first heat preservation box (101), wherein a plurality of first heat exchange boxes (105) and second heat exchange boxes (106) are provided and arranged in a staggered manner, wherein the input end and the output end of the first heat exchange box (105) are both provided with a first delivery pipe (107), the input end and the output end of the second heat exchange box (106) are both provided with a second delivery pipe (108), and each row of the first delivery pipes (107) are commonly connected to a first flow divider (10 9), each row of second delivery pipes (108) is commonly connected to a second flow divider (110), the middle of the first flow divider (109) is connected to a first main pipe head (111), the middle of the second flow divider (110) is connected to a second main pipe head (112), the outer periphery of each row of first delivery pipes (107) and the outer periphery of each row of second delivery pipes (108) are sleeved with a second heat preservation box (102), the outer peripheries of the first flow divider (109) and the second flow divider (110) are sleeved with a third heat preservation box (103), and the outer peripheries of the first main pipe head (111) and the second main pipe head (112) are installed with heat preservation flanges (104).

10. A helium production method according to claim 9, using a heat exchanger, characterized in that: A plurality of vacuum guide plates (201) are installed inside the first heat exchange box (105) and the second heat exchange box (106). The vacuum guide plates (201) of each heat exchange box are evenly distributed in a staggered manner, and a serpentine flow channel (202) is formed by the staggered distribution of the vacuum guide plates (201). A first vacuum layer (203) is provided inside the vacuum guide plates (201). Each bend of the serpentine flow channel (202) is provided with a guide triangle block ( 204) for smooth flow diversion, the outer walls of the first delivery pipe (107), the second delivery pipe (108), the first flow splitter (109), the second flow splitter (110), the first main pipe head (111) and the second main pipe head (112) are all sleeved with a heat insulating sleeve (205), a second vacuum layer (206) is opened inside the heat insulating sleeve (205), and the first vacuum layer (203) and the second vacuum layer (206) are both supported by ribs.