Automatic excavation slope protection equipment for geotechnical engineering deep and narrow foundation pit construction
By introducing front hangers, slope buckets and transmission rollers into the excavation slope protection automation equipment for deep narrow foundation pit construction in geotechnical engineering, the problem of broken soil cannot be output, and leveling and safe construction in the foundation pit is achieved , improves construction quality and safety.
Patent Information
- Application Number
- CN202411174779.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-11-29
AI Technical Summary
The crushed soil excavated by excavation slope protection automation equipment for deep narrow foundation pit construction in the existing geotechnical engineering cannot be effectively output, affecting the construction quality, and the slope of the foundation pit cannot be leveled.
An automated equipment including a foundation pit body and a tractor is designed. The tractor is equipped with a front hanger and a slope bucket at the bottom. The excavated crushed soil is transported out of the foundation pit through a transmission roller and a discharge conveyor belt, and the excavated crushed soil is transported out of the foundation pit and at the foundation. Compact slope protection components and security alarm components are installed in the pit to achieve leveling and safe construction in the foundation pit.
It effectively avoids breaking soil remaining in the foundation pit, realizes leveling and compacting slope protection in the foundation pit, and improves construction quality and safety.
Smart Images

Figure CN119041506A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of geotechnical engineering, and in particular to automated equipment for excavating and slope protection used in deep and narrow foundation pit construction of geotechnical engineering. Background Art
[0002] Geotechnical engineering construction is an important part of the field of geotechnical engineering, which has a direct impact on the quality, safety and reliability of the project. In the process of geotechnical engineering construction, in order to ensure the construction quality, foundation pit excavation must be carried out first. With the advancement and development of science and technology, the use of excavation and slope protection automation equipment can efficiently carry out foundation pit excavation and slope protection construction operations; For example, the invention with the authorization announcement number CN115404881A discloses an automatic equipment for slope protection for deep and narrow foundation pit construction in geotechnical engineering. The automatic equipment for slope protection includes a slope protection body and a protection net laid on the slope surface on both sides of the slope protection body. A tractor travels inside the slope protection body to pull the protection net for laying. A hydraulic cantilever is arranged on the top of the tractor, and the hydraulic cantilever is used to suspend and pull the protection net. A soil covering mechanism is arranged at the bottom of the front end of the tractor, and a roller wheel for rolling the soil is installed at the end of the tractor. The automatic equipment for slope protection in deep and narrow foundation pit construction of geotechnical engineering can realize the complete and automatic laying of the whole roll of protective net while excavating, and realize the bottom covering and rolling operation during the laying process. The protective net is not easy to slide, and the slope protection effect is better. The construction process is safer and faster. It is particularly suitable for the construction of deep and narrow foundation pit projects such as highway engineering, municipal engineering, and bridge engineering. However, during the application of this technical solution, the broken soil excavated in the foundation pit is still unloaded in the foundation pit, which affects the quality of foundation pit construction, and the slope surface of the foundation pit cannot be excavated and leveled. There is a technical problem that the excavation construction in the foundation pit cannot be fully and efficiently carried out and the broken soil generated by the excavation cannot be exported to the outside of the foundation pit to ensure the quality of foundation pit construction. Summary of the invention
[0003] In order to overcome the shortcomings of the prior art, the present invention provides an automated excavation and slope protection equipment for deep and narrow foundation pit construction in geotechnical engineering, which can solve the problem that the broken soil excavated in the foundation pit is still unloaded in the foundation pit, affecting the quality of foundation pit construction, and the slope surface of the foundation pit cannot be excavated and leveled. There is a technical problem that the excavation construction in the foundation pit cannot be carried out comprehensively and efficiently, and the broken soil generated by the excavation cannot be exported to the outside of the foundation pit to ensure the quality of foundation pit construction.
[0004] In order to solve the above technical problems, the present invention provides the following technical solutions: an automated equipment for excavation and slope protection for deep and narrow foundation pit construction in geotechnical engineering, comprising a foundation pit main body and a tractor, the tractor can travel at the inner bottom end of the foundation pit main body, a front bracket is arranged at the front end of the bottom of the tractor, a traction bracket is arranged at the rear end of the tractor, a fixed vertical plate is arranged at the bottom of the front end of the front bracket, the fixed vertical plate is matched with the inner side shape of the foundation pit main body, a bottom bucket is arranged at the bottom of the front end of the fixed vertical plate, slope buckets are arranged on both sides of the front end of the fixed vertical plate, and guide plates are arranged on the inner sides of the bottom bucket and the slope bucket. An inclined plate, a first transmission roller is arranged between the front end of the fixed vertical plate and the rear end of the bottom bucket, a first unloading conveyor belt is arranged between the outside of the first transmission roller, second transmission rollers are arranged between the two sides of the front end of the fixed vertical plate and the rear end of the slope bucket, a second unloading conveyor belt is arranged between the outside of the second transmission roller, driving motors are arranged at the tops of the two sides of the rear end of the fixed vertical plate, a servo motor is arranged at one side of the bottom of the rear end of the fixed vertical plate, stabilizing frames are arranged at the front ends of the two sides of the front of the tractor, a compaction slope protection assembly is arranged on the inner side of the traction bracket, and a security alarm assembly is arranged on the top of the tractor.
[0005] As a preferred technical solution of the present invention, the bottom bucket is parallel to the bottom surface of the foundation pit body, and the slope bucket is parallel to the slope surfaces on both sides inside the foundation pit body.
[0006] As a preferred technical solution of the present invention, the first transmission rollers are arranged at equal intervals between the front end of the fixed vertical plate and the rear end of the bottom bucket, the top of the rear end of the first transmission roller passes through the fixed vertical plate and is connected to the output end of the drive motor, and the second transmission rollers are arranged at equal intervals between the two sides of the front end of the fixed vertical plate and the rear end of the slope bucket, and one side of the rear end of the second transmission roller passes through the fixed vertical plate and is connected to the output end of the servo motor.
[0007] As a preferred technical solution of the present invention, the inclination angle of the second unloading conveyor belt is the same as the inclination angle of the inner side wall of the foundation pit body, and one side of the front end of the stabilizing frame is fixedly connected to the rear end of the fixed vertical plate.
[0008] As a preferred technical solution of the present invention, the compaction slope protection assembly includes a mounting rod, which is arranged between the bottoms on both sides of the inside of the traction hanger, a horizontal pressure roller is arranged at the bottom end of the outside of the mounting rod, and slope pressure rollers are arranged on both sides of the outside of the mounting rod, and a protective baffle is arranged on the top of the horizontal pressure roller and the slope pressure roller at the front end between the traction hangers.
[0009] As a preferred technical solution of the present invention, the mounting rod is matched with the internal shape of the foundation pit body, the outside of the slope pressure roller is matched with the internal slope surface of the foundation pit body, and the protective baffle is arranged at an angle.
[0010] As a preferred technical solution of the present invention, the security alarm component includes a mounting seat, the mounting seat is arranged on the top of the tractor, a positioning prism is arranged on the top of the mounting seat, an alarm speaker is arranged on the top of the positioning prism, an alarm light is arranged on the top of the alarm speaker, and an ultrasonic sensor is arranged on the outside of the positioning prism.
[0011] As a preferred technical solution of the present invention, the positioning prism is a hexagonal prism, six groups of ultrasonic sensors are provided, and four groups of alarm speakers are provided.
[0012] Compared with the prior art, the present invention can achieve the following beneficial effects: 1. By arranging an excavation and leveling assembly at the front end of the front bracket, the bottom bucket and the slope bucket are pushed by the tractor to move in the main body of the foundation pit to perform excavation and leveling treatment on the foundation pit during use, and as the tractor moves forward, the crushed soil produced by the first excavation and leveling is squeezed by the crushed soil excavated later and guided to the first unloading conveyor belt and the second unloading conveyor belt through the guide inclined plate, and at the same time, the servo motor is started to drive the first transmission roller to drive the first unloading conveyor belt to transfer the crushed soil to the second unloading conveyor belt, and the second unloading conveyor belt is driven by the driving motor to drive the second transmission roller to move upward to transfer the crushed soil out of the foundation pit, thereby avoiding the crushed soil remaining in the foundation pit during the excavation and leveling treatment of the foundation pit, affecting the subsequent construction work, and the feasibility is strong; 2. By arranging a compaction slope protection component on the inner side of the traction bracket, the tractor pulls the excavation mechanism to excavate the foundation pit, and at the same time, the traction bracket is used to pull the horizontal roller and the slope roller arranged outside the installation rod to roll forward on the bottom surface and slope surface inside the foundation pit body. The horizontal roller and the slope roller are used to compact the ground and slope surface inside the foundation pit body to prevent the collapse of the convex blocks in the foundation pit. The protective baffle is used to isolate and protect the horizontal roller and the slope roller from the direction of travel to prevent the construction personnel from accidentally entering and being crushed by the horizontal roller and the slope roller, thereby achieving the effect of safe and comprehensive compaction and slope protection in the foundation pit; 3. By installing a security alarm component on the top of the tractor, when the equipment is used to excavate the foundation pit for slope protection construction, the six groups of ultrasonic sensors installed on the outside of the positioning prism are activated to use ultrasonic echolocation technology to measure and calculate the distance between the tractor and the surrounding obstacles or construction workers. Once the controller calculates that the distance to the obstacles or surrounding construction workers is too close, the alarm speaker and alarm light will warn the driver and construction workers, thereby reminding the tractor driver to pay attention to the distance and take corresponding operations, making the equipment operation safer and more reliable. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a schematic diagram of the three-dimensional structure of the present invention; Figure 2 It is a rear-view stereoscopic structural schematic diagram of the present invention; Figure 3 It is a schematic diagram of the top view structure of the present invention; Figure 4 It is a schematic diagram of a partial cross-sectional structure of the present invention; Figure 5 It is a rear view structural schematic diagram of the present invention; Figure 6 It is a schematic diagram of the three-dimensional structure of the security alarm component of the present invention.
[0014] Among them: 1. foundation pit body; 2. tractor; 3. slope bucket; 4. bottom bucket; 5. front bracket; 6. guide inclined plate; 7. first unloading conveyor belt; 8. second unloading conveyor belt; 9. fixed vertical plate; 10. drive motor; 11. protective baffle; 12. traction bracket; 13. mounting seat; 14. positioning prism; 15. slope pressure roller; 16. horizontal pressure roller; 17. stabilizing frame; 18. alarm light; 19. servo motor; 20. first transmission roller; 21. second transmission roller; 22. mounting rod; 23. alarm speaker; 24. ultrasonic sensor. DETAILED DESCRIPTION
[0015] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific embodiments, but the following embodiments are only preferred embodiments of the present invention, not all. Based on the embodiments in the implementation mode, other embodiments obtained by those skilled in the art without creative work all belong to the protection scope of the present invention. The experimental methods in the following embodiments, unless otherwise specified, are conventional methods, and the materials, reagents, etc. used in the following embodiments, unless otherwise specified, can all be obtained from commercial channels. Example
[0016] Please refer to Figure 1-6As shown, the present invention provides an automated equipment for excavation and slope protection for deep and narrow foundation pit construction in geotechnical engineering, including a foundation pit main body 1 and a tractor 2. The tractor 2 can travel at the inner bottom end of the foundation pit main body 1, and the excavation and slope protection mechanism is pulled by the tractor 2 to move in the foundation pit to perform excavation and slope protection construction operations. A front bracket 5 is provided at the front end of the bottom of the tractor 2, and a traction bracket 12 is provided at the rear end of the tractor 2. A fixed vertical plate 9 is provided at the bottom of the front end of the front bracket 5, and the fixed vertical plate 9 is matched with the inner side shape of the foundation pit main body 1. A bottom bucket 4 is provided at the bottom of the front end of the fixed vertical plate 9, and slope buckets 3 are provided on both sides of the front end of the fixed vertical plate 9. The bottom bucket 4 is parallel to the foundation pit main body. 1, the slope bucket 3 is parallel to the slope surfaces on both sides of the interior of the foundation pit body 1. When in use, the driver drives the tractor 2 to push the bottom bucket 4 and the slope bucket 3 through the front bracket 5 to move in the foundation pit body 1 to excavate and level the foundation pit. A guide inclined plate 6 is arranged on the inner side of the bottom bucket 4 and the slope bucket 3, a first transmission roller 20 is arranged between the front end of the fixed vertical plate 9 and the rear end of the bottom bucket 4, a first unloading conveyor belt 7 is arranged between the outside of the first transmission roller 20, a driving motor 10 is arranged on the top of both sides of the rear end of the fixed vertical plate 9, the first transmission roller 20 is arranged at equal intervals between the front end of the fixed vertical plate 9 and the rear end of the bottom bucket 4, and the first transmission roller 2 0, the top of the rear end passes through the fixed vertical plate 9 and is connected to the output end of the drive motor 10, a second transmission roller 21 is arranged between the two sides of the front end of the fixed vertical plate 9 and the rear end of the slope bucket 3, and a second unloading conveyor belt 8 is arranged between the outside of the second transmission roller 21. When excavating the foundation pit, the crushed soil produced by the first excavation and leveling is squeezed by the crushed soil excavated later through the guide inclined plate 6 and guided to the first unloading conveyor belt 7 and the second unloading conveyor belt 8, and the first transmission roller 20 is driven by the servo motor 19 to drive the first unloading conveyor belt 7 to convey the crushed soil to the second unloading conveyor belt 8. A servo motor 19 is arranged on one side of the bottom of the rear end of the fixed vertical plate 9, and the second unloading conveyor belt 8 is arranged between the second transmission roller 21 and the outside of the second transmission roller 21. When excavating the foundation pit, the crushed soil produced by the first excavation and leveling is squeezed by the crushed soil excavated later through the guide inclined plate 6 and guided to the first unloading conveyor belt 7 and the second unloading conveyor belt 8. The second transmission rollers 21 are arranged at equal intervals between the two sides of the front end of the fixed vertical plate 9 and the rear end of the slope bucket 3. One side of the rear end of the second transmission roller 21 penetrates the fixed vertical plate 9 and is connected to the output end of the servo motor 19. The inclination angle of the second unloading conveyor belt 8 is the same as the inclination angle of the inner side wall of the foundation pit body 1. The front ends of the two sides of the front of the tractor 2 are provided with a stabilizing frame 17, and one side of the front end of the stabilizing frame 17 is fixedly connected to the rear end of the fixed vertical plate 9. The second transmission roller 21 is driven by the driving motor 10 to drive the second unloading conveyor belt 8 to move upward to transport the crushed soil out of the foundation pit, thereby avoiding the crushed soil remaining in the foundation pit when the foundation pit is excavated and leveled, affecting the subsequent construction work; When in use, the bottom bucket 4 and the slope bucket 3 are pushed by the tractor 2 to move in the foundation pit body 1 to perform excavation and leveling processing on the foundation pit, and as the tractor 2 moves forward, the crushed soil produced by the first excavation and leveling is squeezed by the crushed soil excavated later through the guide inclined plate 6 and guided to the first unloading conveyor belt 7 and the second unloading conveyor belt 8. At the same time, the servo motor 19 is started to drive the first transmission roller 20 to drive the first unloading conveyor belt 7 to transfer the crushed soil to the second unloading conveyor belt 8, and the second transmission roller 21 is driven by the drive motor 10 to drive the second unloading conveyor belt 8 to move upward to transfer the crushed soil out of the foundation pit; As a further implementation of this embodiment, Figure 1-5 As shown, a compaction slope protection assembly is arranged on the inner side of the traction bracket 12, and the compaction slope protection assembly includes a mounting rod 22, which is arranged between the bottoms of both sides of the interior of the traction bracket 12, and the mounting rod 22 matches the internal shape of the foundation pit body 1, and a horizontal pressure roller 16 is arranged on the bottom of the exterior of the mounting rod 22, and slope pressure rollers 15 are arranged on both sides of the exterior of the mounting rod 22, and the exterior of the slope pressure roller 15 matches the internal slope of the foundation pit body 1. When the tractor 2 is moving, the traction bracket 12 is used to pull the horizontal pressure roller 16 and the slope pressure roller 15 arranged outside the mounting rod 22 to simultaneously press the foundation pit body 1. The bottom surface and slope surface inside the foundation pit body 1 are rolled forward to compact the ground and slope surface, so as to prevent the collapse of the convex blocks in the foundation pit. The top of the horizontal roller 16 and the slope roller 15 at the front end between the traction hanger 12 is provided with a protective baffle 11, and the protective baffle 11 is inclined. The inclined protective baffle 11 is used to isolate and protect the horizontal roller 16 and the slope roller 15 from the moving direction, so as to prevent the construction personnel from accidentally entering and being crushed by the horizontal roller 16 and the slope roller 15 and causing safety accidents, thereby achieving the effect of compacting the slope protection in the foundation pit in a safe and comprehensive manner; The excavation mechanism is towed by the tractor 2 to excavate the foundation pit. At the same time, the horizontal roller 16 and the slope roller 15 arranged outside the mounting rod 22 are towed by the traction bracket 12 to roll forward on the bottom surface and the slope surface inside the foundation pit body 1. The ground and the slope surface inside the foundation pit body 1 are compacted by the horizontal roller 16 and the slope roller 15, and the protective baffle 11 is used to isolate and protect the horizontal roller 16 and the slope roller 15 from the moving direction. As a further implementation of this embodiment, Figure 1-6As shown, a security alarm component is arranged at the top of the tractor 2, and the security alarm component includes a mounting seat 13, and the mounting seat 13 is arranged at the top of the tractor 2. A positioning prism 14 is arranged at the top of the mounting seat 13, and the positioning prism 14 is a hexagonal prism. An ultrasonic sensor 24 is arranged on the outside of the positioning prism 14, and six groups of ultrasonic sensors 24 are arranged. When the tractor 2 is moving, the six groups of ultrasonic sensors 24 arranged on the outside of the positioning prism 14 are activated to measure and calculate the distance between the tractor 2 and the surrounding obstacles or construction personnel using ultrasonic echolocation technology. An alarm speaker 23 is arranged on the top of the positioning prism 14, and an alarm light 18 is arranged on the top of the alarm speaker 23. There are four groups of alarm speakers 23. Once the controller calculates that the distance of the obstacle or the surrounding construction personnel is too close, the alarm speaker 23 and the alarm light 18 will warn the driver and the construction personnel, thereby reminding the driver of the tractor 2 to pay attention to the distance and take corresponding operations, so that the equipment can be operated more safely and reliably. When the equipment is used to excavate the foundation pit for slope protection construction, the six groups of ultrasonic sensors 24 arranged outside the positioning prism 14 are activated to measure and calculate the distance between the tractor 2 and the surrounding obstacles or construction personnel using ultrasonic echolocation technology, and once the controller calculates that the distance between the obstacles or surrounding construction personnel is too close, the alarm speaker 23 and the alarm light 18 will warn the driver and construction personnel to take measures or pay attention to avoid them; Specific working principle: When using the automatic equipment for excavation and slope protection, the construction personnel first drive the tractor 2 to the designated foundation pit construction section. After the construction starts, the driver drives the tractor 2 to push the bottom bucket 4 and the slope bucket 3 to move in the foundation pit body 1 to excavate and level the foundation pit. As the tractor 2 moves forward, the crushed soil produced by the first excavation and leveling is squeezed by the crushed soil excavated later through the guide inclined plate 6 and guided to the first unloading conveyor belt 7 and the second unloading conveyor belt 8. At the same time, the servo motor 19 is started to drive the first transmission roller 20 to drive the first unloading conveyor belt 7 to transfer the crushed soil to the second unloading conveyor belt 8, and the second transmission roller 21 is driven by the drive motor 10 to drive the second unloading conveyor belt 8 to move upward to transfer the crushed soil out of the foundation pit. At the same time, the tractor 2 uses the rear traction bracket 12 to pull the setting The horizontal roller 16 and the slope roller 15 outside the mounting rod 22 simultaneously roll forward on the bottom surface and the slope surface inside the foundation pit body 1 to compact the ground and the slope surface inside the foundation pit body 1, and the protective baffle 11 is used to isolate and protect the horizontal roller 16 and the slope roller 15 from the moving direction to prevent the construction personnel from being crushed. After the equipment is in operation, the six groups of ultrasonic sensors 24 arranged on the outside of the positioning prism 14 are started to measure and calculate the distance between the tractor 2 and the surrounding obstacles or construction personnel using ultrasonic echolocation technology. Once the controller calculates that the distance to the obstacles or the surrounding construction personnel is too close, the alarm speaker 23 and the alarm light 18 will warn the driver and the construction personnel to take measures or avoid them, thereby carrying out comprehensive and safe foundation pit excavation and slope protection construction operations.
[0017] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the present invention and are not intended to limit the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. An automated equipment for excavation and slope protection for deep and narrow foundation pit construction in geotechnical engineering, comprising a foundation pit body (1) and a tractor (2), characterized in that: The tractor (2) can travel at the bottom end of the foundation pit body (1). The front end of the bottom of the tractor (2) is provided with a front bracket (5). The rear end of the tractor (2) is provided with a traction bracket (12). The bottom of the front end of the front bracket (5) is provided with a fixed vertical plate (9). The fixed vertical plate (9) matches the shape of the inner side of the foundation pit body (1). The bottom of the front end of the fixed vertical plate (9) is provided with a bottom bucket (4). Slope buckets (3) are provided on both sides of the front end of the fixed vertical plate (9). The inner sides of the bottom bucket (4) and the slope bucket (3) are provided with a material guide inclined plate (6). A first guide plate (12) is provided between the front end of the fixed vertical plate (9) and the rear end of the bottom bucket (4). A drive roller (20), a first unloading conveyor belt (7) is arranged between the outside of the first drive roller (20), a second drive roller (21) is arranged between the two sides of the front end of the fixed vertical plate (9) and the rear end of the slope bucket (3), a second unloading conveyor belt (8) is arranged between the outside of the second drive roller (21), a drive motor (10) is arranged at the top of both sides of the rear end of the fixed vertical plate (9), a servo motor (19) is arranged at one side of the bottom of the rear end of the fixed vertical plate (9), a stabilizing frame (17) is arranged at the front end of both sides of the front of the tractor (2), a compacting slope protection component is arranged on the inner side of the traction bracket (12), and a security alarm component is arranged at the top of the tractor (2).
2. The automatic equipment for excavation and slope protection for deep and narrow foundation pit construction in geotechnical engineering according to claim 1 is characterized by: The bottom bucket (4) is parallel to the bottom surface of the foundation pit body (1), and the slope bucket (3) is parallel to the slope surfaces on both sides inside the foundation pit body (1).
3. The automatic equipment for excavation and slope protection for deep and narrow foundation pit construction in geotechnical engineering according to claim 1 is characterized by: The first transmission rollers (20) are arranged at equal intervals between the front end of the fixed vertical plate (9) and the rear end of the bottom bucket (4); the top of the rear end of the first transmission roller (20) penetrates the fixed vertical plate (9) and is connected to the output end of the drive motor (10); the second transmission rollers (21) are arranged at equal intervals between the two sides of the front end of the fixed vertical plate (9) and the rear end of the slope bucket (3); one side of the rear end of the second transmission roller (21) penetrates the fixed vertical plate (9) and is connected to the output end of the servo motor (19).
4. The automatic equipment for excavation and slope protection for deep and narrow foundation pit construction in geotechnical engineering according to claim 1 is characterized by: The inclination angle of the second unloading conveyor belt (8) is the same as the inclination angle of the inner side wall of the foundation pit body (1), and one side of the front end of the stabilizing frame (17) is fixedly connected to the rear end of the fixed vertical plate (9).
5. The automatic equipment for excavation and slope protection for deep and narrow foundation pit construction in geotechnical engineering according to claim 1 is characterized by: The compaction slope protection assembly comprises a mounting rod (22), the mounting rod (22) being arranged between the bottoms of both sides of the interior of a traction hanger (12), a horizontal pressure roller (16) being arranged at the bottom end of the exterior of the mounting rod (22), slope pressure rollers (15) being arranged on both sides of the exterior of the mounting rod (22), and a protective baffle (11) being arranged at the top of the horizontal pressure roller (16) and the slope pressure roller (15) at the front end between the traction hangers (12).
6. The automatic equipment for excavation and slope protection for deep and narrow foundation pit construction in geotechnical engineering according to claim 5 is characterized by: The mounting rod (22) matches the internal shape of the foundation pit body (1), the exterior of the slope pressure roller (15) matches the internal slope surface of the foundation pit body (1), and the protective baffle (11) is arranged in an inclined manner.
7. The automatic equipment for excavation and slope protection for deep and narrow foundation pit construction in geotechnical engineering according to claim 1 is characterized by: The security alarm component comprises a mounting seat (13), the mounting seat (13) being arranged on the top of the tractor (2), a positioning prism (14) being arranged on the top of the mounting seat (13), an alarm speaker (23) being arranged on the top of the positioning prism (14), an alarm light (18) being arranged on the top of the alarm speaker (23), and an ultrasonic sensor (24) being arranged on the outer side of the positioning prism (14).
8. The automatic equipment for excavation and slope protection for deep and narrow foundation pit construction in geotechnical engineering according to claim 7 is characterized by: The positioning prism (14) is a hexagonal prism, six groups of ultrasonic sensors (24) are provided, and four groups of alarm speakers (23) are provided.