Construction method for double-sided laminated shear wall of transformer substation

Through laser review and positioning line placement, combined with lifting beams and shackle connection methods, the problems of insufficient accuracy and edge damage in the construction of double-sided overlapping shear wall of the substation are solved, achieving higher construction accuracy and completeness .

CN119041707APending Publication Date: 2024-11-29STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER CO +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411410095.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-10
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

During the construction process, the double-sided overlapping shear wall of the substation has problems such as insufficient installation accuracy of exterior walls and easy damage to the edges of prefabricated wall panels.

Method used

Use laser theodolite to review the elevation, release the exterior wall positioning line and installation control line, and connect the wire rope with lifting beams and shackles. Check the quality of the component during lifting, and nail multi-layer boards before lifting to ensure edge protection.

Benefits of technology

It effectively improves the accuracy of the exterior wall installation of the double-sided overlapping shear wall of the substation, avoids damage to the edges of prefabricated wall panels, and ensures the accuracy and completeness of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119041707A_ABST
    Figure CN119041707A_ABST
Patent Text Reader

Abstract

According to the construction method for the double-sided laminated shear wall of the transformer substation, an outer wall positioning line of the double-sided laminated shear wall of the transformer substation is paid off according to the axis relation on a construction drawing of the double-sided laminated shear wall of the transformer substation, and meanwhile, an outer wall installation control line of the double-sided laminated shear wall of the transformer substation is paid off to ensure the accuracy of outer wall installation; a hoisting beam is adopted for hoisting the wallboard of the power station double-sided laminated shear wall, a reasonable hoisting point is arranged according to the position of a hoisting ring of the prefabricated wallboard, after a steel wire rope and a reserved hoisting ring of an outer wallboard are connected through a shackle, the wallboard is hoisted to the position 500 mm away from the ground, and hoisting continues after the appearance quality of a component and the correct connection of the hoisting ring are checked. Before hoisting, the full-length multi-layer board with the width of 500 mm is nailed on the lower side of the prefabricated wallboard to be hoisted at a constant speed, so that it is ensured that the edge of the prefabricated wallboard is not damaged, and the defects that the installation accuracy of the outer wall of the double-sided laminated shear wall of the transformer substation is insufficient and the edge of the prefabricated wallboard of the double-sided laminated shear wall of the transformer substation is prone to being damaged are effectively overcome.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of double-sided superimposed shear walls of transformer substations, and in particular relates to a construction method for double-sided superimposed shear walls of transformer substations. Background Art

[0002] Substation double-sided composite shear wall, as the name implies, is composed of two concrete wall panels stacked at the set position of the substation, and the stacking method is to connect the concrete panels on both sides with steel trusses. When prefabricated in the factory, there is a cavity between the panels. After the substation is installed on site, concrete is poured in the cavity. The prefabricated and cast-in-place concrete integrally stressed wall formed is the substation double-sided composite shear wall, commonly known as the "double skin wall".

[0003] The double-sided composite shear wall of the substation is often the double-sided composite shear wall mentioned in the prior art solution with the patent publication number "CN211572134U". However, in the actual construction of the double-sided composite shear wall of the substation, there are still the following defects:

[0004] The external wall installation accuracy of the double-sided composite shear wall of the substation is insufficient and the edges of the prefabricated wall panels of the double-sided composite shear wall of the substation are easily damaged. Summary of the invention

[0005] In order to solve the defects in the prior art, the present invention proposes a construction method for the double-sided composite shear wall of the substation. According to the axis relationship on the construction drawing of the double-sided composite shear wall of the substation, the outer wall positioning line of the double-sided composite shear wall of the substation is released, and the outer wall installation control line of the double-sided composite shear wall of the substation is released at the same time to ensure the accuracy of the outer wall installation; the wall panels of the double-sided composite shear wall of the power station are hoisted with a hoisting beam, and a reasonable lifting point is set according to the position of the lifting ring of the prefabricated wall panel. After the steel wire rope is connected to the reserved lifting ring of the outer wall panel through the shackle, it is lifted to 500mm from the ground, and the appearance quality of the component and the connection of the lifting ring are checked to be correct and then the lifting is continued. Before lifting, 500mm wide full-length multi-layer boards are nailed to the lower side of the prefabricated wall panels and lifted at a uniform speed to ensure that the edges of the prefabricated wall panels are not damaged, effectively avoiding the lack of accuracy in the external wall installation of the double-sided composite shear wall of the substation and the defects of easy damage to the edges of the prefabricated wall panels of the double-sided composite shear wall of the substation.

[0006] The present invention uses the following technical solutions.

[0007] A construction method for a double-sided composite shear wall of a substation, comprising:

[0008] Step 1: Before constructing and installing the double-sided composite shear wall of the substation at the set location of the substation, use a laser theodolite to check the elevation of the bottom plate guide wall of the double-sided composite shear wall of the substation;

[0009] Step 2: Clean the foundation surface of the outer wall of the double-sided superimposed shear wall of the substation to ensure that there is no ash or oil stain on the contact surface with the joint;

[0010] Step 3: Release the outer wall positioning line of the double-sided superimposed shear wall of the substation according to the axis relationship on the construction drawing of the double-sided superimposed shear wall of the substation, and release the outer wall installation control line of the double-sided superimposed shear wall of the substation at the same time;

[0011] Step 4: According to the construction drawings of the double-sided composite shear wall of the substation, accurately grasp the elevation of the joints of the prefabricated components of the exterior wall and use gaskets for leveling;

[0012] Step 5: The prefabricated wall panels of the double-sided composite shear wall of the substation are hoisted with hoisting beams. Reasonable lifting points are set according to the positions of the lifting rings of the prefabricated wall panels. The steel wire ropes are connected to the reserved lifting rings of the prefabricated wall panels as the exterior wall panels through the shackles, and then hoisted to a height of 500mm from the ground. After checking the appearance quality of the components and the correct connection of the lifting rings, continue hoisting;

[0013] Step 6: Move the prefabricated wall panel smoothly to 800mm from the floor and stop descending. The operator holds the exterior wall panel to guide the descent and uses a mirror to observe whether the reserved connecting steel bars are aligned with the bottom of the prefabricated wall. The operator stops descending after it reaches the gasket.

[0014] Preferably, in step 1, the method for conducting the review and disposal specifically includes: filling the parts whose elevations do not meet the requirements with cement mortar.

[0015] Preferably, in step 2, when the ambient temperature is high and dry, the foundation surface of the outer wall of the double-sided composite shear wall of the substation is cleaned and then sprayed with water for wetting treatment. The ends of the connecting steel bars of the outer wall of the cleaned double-sided composite shear wall of the substation shall not have warping that affects the installation, the surface of the connecting steel bars shall not be rusted, and shall not be sticky with dirt, cement mortar or oil that affects the connection performance.

[0016] Preferably, the device for performing the wet treatment by spraying water is a spray device, which comprises: a load-bearing platform, the four vertices of the lower wall of the load-bearing platform are pinned to the vertically arranged casters, the four vertices of the lower wall of the load-bearing platform close to the casters are pinned to the vertically arranged pneumatic piston 1, and the lower walls of two pairs of pneumatic pistons 1 are pinned to the transversely arranged plastic sheets, the outer surfaces of both ends of one side of the load-bearing platform are pinned to one end of the traction strip, and the circumferential outer surfaces of the other ends of a pair of traction strips are hooped with plastic rings, the upper side wall of the load-bearing platform is pinned to the vertically arranged load-bearing rod, and the middle of the upper wall of the load-bearing rod is pinned to the vertically arranged pneumatic piston 2, the upper wall of the pneumatic piston 2 is pinned to the exhaust machine protective shell, and the exhaust machine protective shell A groove is provided on both side walls of the shell, and the inner surfaces of a pair of grooves are pinned to protective grids, a rotating motor is pinned to the middle of one side wall of a protective grid, and a rotating rod of the rotating motor is pinned to one end of a horizontally arranged rotating roller, and the outer surface of the other end of the rotating roller is pinned to the exhaust fan, the inner surface of the other side of the upper part of the exhaust fan protective shell is pinned to the vertically arranged supporting sheet, and the lower wall of the supporting sheet is pinned to the inner surface of the other side of the lower part of the exhaust fan protective shell via a pin rod, a through hole is opened in the middle of one side of the supporting sheet, and the inner surface of the through hole is connected to the circumferential wall of the rotating roller via a slewing bearing, and the outer surfaces of both ends of one side of the upper part of the supporting platform close to the supporting rod are pinned to the vertically arranged supporting legs.

[0017] Preferably, the upper walls of a pair of supporting legs are pinned to a transverse baffle, and the middle of the lower wall of the baffle is pinned to a horn, the other side wall of the upper part of the supporting platform is pinned to a liquid storage tank storing deionized water, and the inner surface of the lower side of the liquid storage tank is pinned to a water level transmitter, a groove second is opened on the upper side wall of the liquid storage tank, and the inner surface of the groove second is pinned to a vertically arranged annular columnar liquid delivery channel, an outer threaded opening is opened on the upper circumferential wall of the liquid delivery channel, an inner threaded opening is opened on the inner surface of the cover body with an opening on the lower wall, the inner threaded opening and the outer threaded opening are threadedly connected, and the other side wall of the upper part of the liquid storage tank is pinned to a vertically arranged support handle.

[0018] Preferably, a pin is connected to a rotating motor 1 in the middle of the upper wall of the support handle, and a rotating rod pin of the rotating motor 1 is connected to a vertically arranged rotating roller 1, and a lower wall pin of the rotating roller 1 is connected to a circular rotating plate, a channel 1 is provided in the middle of one side wall of the support handle, and the inner surface of the channel 1 is connected to the rotating plate via a slewing bearing, a side wall pin of the rotating plate is connected to a vertically arranged support bar 4, and the upper wall of the support bar 4 is pivotally connected to one end of the support bar 1 via a hinge, a side of the support bar 4 is pivotally connected to one end of a pneumatic piston 4 via a hinge in the middle, and the outer surface of the other end of the pneumatic piston 4 is pivotally connected to the middle of the lower wall of the support bar 1 via a hinge, the outer surface of the other end of the support bar 1 is pinned to one end of a linear push rod, and the outer surface of the other end of the linear push rod is pinned to one end of a support bar 2, and the outer surface of the other end of the support bar 2 is pivotally connected to the support bar via a hinge 3. The middle of the lower wall of the support bar 2 is connected to one end of the pneumatic piston 3 via a hinge, and the outer surface of the other end of the pneumatic piston 3 is connected to the support bar 3 via a hinge. The lower wall pin of the support bar 3 is connected to the nozzle, and one side wall of the nozzle is connected to the annular columnar plastic passage. A groove 3 is provided in the middle of the upper wall of the liquid storage tank, and the inner surface of the groove 3 is connected to the vertically arranged annular columnar liquid inlet channel. The upper wall of the liquid inlet channel is pinned to the outer surface of the other end of the plastic passage via a pin rod, and the upper wall of one side of the liquid inlet channel is pinned to the water pumping motor. The middle of the lower part of the support platform is pinned to the battery. The rotary motor 1, the rotary motor 2, the pneumatic piston 1, the pneumatic piston 2, the pneumatic piston 3, the pneumatic piston 4 and the water pumping motor are all connected to the circuit breaker via cables, and the circuit breaker is connected to the battery via cables, and the water level transmitter is connected to the speaker via cables.

[0019] Preferably, in step 4, before the gaskets are leveled, the positions of the gaskets are marked with an ink fountain, and then all the marked points are recorded, that is, after the concrete pouring is completed, the axis and flatness are checked and confirmed to be correct, the elevation of the joints of the exterior wall prefabricated components is measured, and 30×2 gaskets are used for precise leveling. The gaskets are placed between 1 / 6 and 1 / 5 of the total horizontal dimension of the component end and in the middle.

[0020] Preferably, in step 5, a 500 mm wide full-length multi-layer board is nailed to the lower side of the prefabricated wall panel before lifting, and is lifted at a uniform speed.

[0021] Preferably, in step 6, after stopping the descent, use a control line to check whether the prefabricated wall is placed on the wall line; use a plumb line and a tape measure to check the verticality of the prefabricated wall installation, and use a plumb line to check at both ends of the prefabricated wall at the same time; after the adjustable diagonal support is well supported and the verticality and horizontality of the prefabricated wall are adjusted, the hook is unhooked, the verticality is controlled within 5mm, and the axis position of the prefabricated wall component is controlled within 8mm.

[0022] Preferably, the method for supporting the adjustable diagonal support and adjusting the verticality and horizontality of the prefabricated wall comprises:

[0023] The prefabricated wall is temporarily fixed with adjustable diagonal supports. The U-shaped brackets on the wall and board of the prefabricated wall panel are connected with diagonal support rods during the construction of the transition layer. During the construction of the standard layer, holes with a diameter of 30 mm are reserved on the composite board with adjustable diagonal support positions, and nuts are used to connect the adjustable diagonal supports and the board.

[0024] Then adjust the horizontal position and verticality of the prefabricated wall, that is, use the short steel tube diagonal brace adjustment rod to fine-tune the root of the wall panel to control the evening position; adjust the horizontal displacement of the upper part of the wall panel through the adjustable device on the long steel tube diagonal brace adjustment rod to control its verticality, finally tighten the diagonal support and remove the hook.

[0025] The beneficial effects of the present invention are that, compared with the prior art, the technical effects of the present invention include:

[0026] According to the axis relationship on the construction drawing of the double-sided superimposed shear wall of the substation, the outer wall positioning line of the double-sided superimposed shear wall of the substation is released, and the outer wall installation control line of the double-sided superimposed shear wall of the substation is released at the same time to ensure the accuracy of the outer wall installation; the wall panels of the double-sided superimposed shear wall of the power station are hoisted with hoisting beams, and reasonable hoisting points are set according to the position of the lifting rings of the prefabricated wall panels. After the steel wire rope is connected to the reserved lifting rings of the outer wall panels through the shackles, it is hoisted to 500mm above the ground, and the appearance quality of the components and the connection of the lifting rings are checked before continuing to hoist. Before hoisting, the 500mm wide full-length multi-layer board is nailed to the lower side of the prefabricated wall panel, and hoisted at a uniform speed to ensure that the edge of the prefabricated wall panel is not damaged, effectively avoiding the lack of accuracy of the outer wall installation of the double-sided superimposed shear wall of the substation and the defects of the prefabricated wall panel edge of the double-sided superimposed shear wall of the substation being easily damaged. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a partial flow chart of the construction method for the double-sided composite shear wall of a substation described in the present invention;

[0028] Figure 2 It is another partial flow chart of the construction method for the double-sided composite shear wall of a substation described in the present invention;

[0029] Figure 3 is a lateral internal schematic diagram of the spray device of the present invention;

[0030] Figure 4 is a schematic diagram of the exhaust machine described in the present invention;

[0031] Figure 5 It is a plan view of the liquid storage tank described in the present invention;

[0032] Figure 6 is a partial schematic diagram of the carrying platform described in the present invention;

[0033] Figure 7It is a plan view of the supporting platform described in the present invention. DETAILED DESCRIPTION

[0034] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely expressed in combination with the drawings in the embodiments of the present invention. The embodiments expressed in this application are only part of the embodiments of the present invention, not all of them. According to the spirit of the present invention, other embodiments obtained by ordinary technicians in this field without creative work are all within the protection scope of the present invention.

[0035] like Figure 1 and Figure 2 As shown, the construction method of the double-sided composite shear wall of a substation according to the present invention comprises:

[0036] Step 1: Before constructing and installing the double-sided composite shear wall of the substation at the set location of the substation, use a laser theodolite to verify the elevation of the bottom plate guide wall of the double-sided composite shear wall of the substation; the double-sided composite shear wall of the substation is the double-sided composite shear wall constructed and installed at the set location of the substation.

[0037] In a preferred but non-limiting embodiment of the present invention, in step 1, the method for conducting the review and disposal specifically includes: for the parts whose elevation does not meet the requirements, cement mortar is used to fill them, and the wallboard is installed after the cement mortar reaches the set strength. The elevation does not meet the requirements means that the elevation does not meet the specific set requirements.

[0038] Step 2: Clean the foundation surface of the outer wall of the double-sided superimposed shear wall of the substation to ensure that there is no ash or oil stain on the contact surface with the joint;

[0039] In a preferred but non-restrictive embodiment of the present invention, in step 2, when the ambient temperature is high (higher than 38 degrees Celsius) and dry (dryness greater than four), the foundation surface of the outer wall of the double-sided composite shear wall of the substation is cleaned and sprayed with water for moistening, but water shall not accumulate. The ends of the connecting steel bars of the outer wall of the double-sided composite shear wall of the clean substation shall not have warping that affects installation, the surface of the connecting steel bars shall not have severe rust, and shall not be sticky with dirt, cement mortar or oil stains that affect the connection performance.

[0040] The devices that perform the wet treatment by spraying water are generally spray devices, but it is generally difficult to change the spray arc of current spray devices.

[0041] So through improvements, such as Figures 3 to 7As shown, in a preferred but non-limiting embodiment of the present invention, the device for performing a wet treatment by spraying water is a spray device, which includes: a load-bearing platform 7, four vertices of the lower wall of the load-bearing platform 7 are pinned to the vertically arranged casters 5, four vertices of the lower wall of the load-bearing platform 7 close to the casters 5 are pinned to the vertically arranged pneumatic pistons 3, and the lower walls of two pairs of pneumatic pistons 3 are pinned to the transversely arranged plastic sheets 4, the outer surfaces of both ends of one side of the load-bearing platform 7 are pinned to one end of a traction strip 8, and the circumferential outer surfaces of the other ends of a pair of traction strips 8 are hooped with a plastic ring 9, one side wall of the upper part of the load-bearing platform 7 is pinned to the vertically arranged load-bearing rod 2, and the middle of the upper wall of the load-bearing rod 2 is pinned to the vertically arranged pneumatic piston 2 10, the upper wall of the pneumatic piston 2 10 is pinned to the exhaust machine protective shell 21, and the exhaust machine Both side walls of the protective shell 21 are provided with grooves, and the inner surfaces of a pair of grooves are pinned to the protective grid pieces 44, the middle of one side wall of a protective grid piece 44 is pinned to the rotating motor 46, and the rotating rod of the rotating motor 46 is pinned to one end of the horizontally arranged rotating roller 45, and the outer surface of the other end of the rotating roller 45 is pinned to the exhaust fan 31, the inner surface of the other side of the upper part of the exhaust fan protective shell 21 is pinned to the vertically arranged supporting piece 43, and the lower wall of the supporting piece 43 is pinned to the inner surface of the other side of the lower part of the exhaust fan protective shell 21 via a pin rod, a through hole is opened in the middle of one side of the supporting piece 43, and the inner surface of the through hole is connected to the circumferential wall of the rotating roller 45 via a slewing bearing, and the outer surfaces of both ends of the upper part of the supporting platform 7 close to the supporting rod 2 are pinned to the vertically arranged supporting legs 24.

[0042] In a preferred but non-restrictive embodiment of the present invention, the upper walls of a pair of supporting legs 24 are pinned to a laterally arranged baffle 22, and the middle of the lower wall of the baffle 22 is pinned to the horn 23, the other side wall of the upper part of the supporting platform 7 is pinned to a liquid storage tank 47 storing deionized water, and the inner surface of the lower side of the liquid storage tank 47 is pinned to the water level transmitter 6, a groove 2 is opened on the upper side wall of the liquid storage tank 47, and the inner surface of the groove 2 is pinned to a vertically arranged annular columnar liquid delivery channel 41, an outer threaded opening is opened on the upper circumferential wall of the liquid delivery channel 41, an inner threaded opening is opened on the inner surface of the cover body 40 with an open lower wall, the inner threaded opening and the outer threaded opening are threadedly connected, and the other side wall of the upper part of the liquid storage tank 47 is pinned to a vertically arranged support handle 39.

[0043] In a preferred but non-limiting embodiment of the present invention, a pin is connected to a rotary motor 28 at the middle of the upper wall of the support handle 39, and a rotating rod pin of the rotary motor 28 is connected to a vertically arranged rotary roller 29, and a lower wall pin of the rotary roller 29 is connected to a circular rotary plate 38, a channel 1 is provided at the middle of one side wall of the support handle 39, and the inner surface of the channel 1 is connected to the rotary plate 38 via a slewing bearing, and a pin is connected to a vertically arranged support bar 4 37 at one side wall of the rotary plate 38, and the support bar 4 37 The upper wall of the support bar 1 30 is pivotally connected to one end of the support bar 1 30 via a hinge, and the middle of one side of the support bar 4 37 is pivotally connected to one end of the pneumatic piston 4 36 via a hinge, and the outer surface of the other end of the pneumatic piston 4 36 is pivotally connected to the middle of the lower wall of the support bar 1 30 via a hinge, and the outer surface of the other end of the support bar 1 30 is pin-connected to one end of the linear push rod 31, and the outer surface of the other end of the linear push rod 31 is pin-connected to one end of the support bar 2 32, and the outer surface of the other end of the support bar 2 32 is pivotally connected to the lower wall of the support bar 1 30 via a hinge. The support bar 34 is provided at the middle of the lower wall of the support bar 2 32, and one end of the pneumatic piston 33 is connected to the support bar 34 via a hinge pivot, and the outer surface of the other end of the pneumatic piston 33 is connected to the support bar 34 via a hinge pivot, the lower wall of the support bar 34 is pinned to the nozzle 35, and one side wall of the nozzle 35 is pinned to the annular columnar plastic passage 27, a groove 3 is provided at the middle of the upper wall of the liquid storage tank 47, and the inner surface of the groove 3 is pinned to the vertically arranged annular columnar liquid inlet channel 26, and the upper wall of the liquid inlet channel 26 is pinned to the nozzle 35. The pin rod is pinned to the outer surface of the other end of the plastic passage 27, the upper wall of one side of the liquid introduction channel 26 is pinned to the water pumping motor 25, the middle of the lower part of the support platform 7 is pinned to the battery 48, the rotary motor 28, the rotary motor 46, the pneumatic piston 1 3, the pneumatic piston 2 10, the pneumatic piston 3 33, the pneumatic piston 4 36 and the water pumping motor 25 are all connected to the circuit breaker via cables, and the circuit breaker is connected to the battery via cables, and the water level transmitter 6 is connected to the speaker 23 via cables.

[0044] When in use, put down the pneumatic piston 13 and ground it, then the constructor needs to unscrew the cover 40 and fill the liquid storage tank 47 with ionized water. After filling, restore the pneumatic piston 13 and move the liquid storage tank toward the foundation surface of the outer wall of the double-sided overlapping shear wall of the substation via the casters 5 and the traction bar 8. Then the pneumatic water pumping motor 25 performs spraying. When spraying, the spraying arc of the nozzle is changed by changing the flexure span of the pneumatic piston 33, the pneumatic piston 436 and the linear push rod 31 through the circuit breaker. In addition, the rotary motor 128 can pull all the support bars to perform rotation, so that the range of change of the spraying arc is larger. Under the scorching sun, the constructor can be under the baffle 22 and operate the rotary motor 246 for cooling.

[0045] Combined with support bar one, support bar two, support bar three and support bar four, and connected via pneumatic piston three and pneumatic piston four, there is also a rescue consciousness that pulls all the support bars together and rotates through the rotary motor one, which can effectively change the curvature of the nozzle to achieve the function of changing the spray curvature. Combined with rotary motor two, exhaust fan and baffle, when the construction workers perform spraying operations outdoors, the baffle can block the sun's light stimulation for the construction workers, and the exhaust fan can cool down the construction workers to prevent the construction workers from fainting due to long-term exposure to the sun. It has a very efficient anti-exposure effect. Combined with the water level transmitter and the speaker, and the water level transmitter is connected to the speaker via a cable, when the water level in the liquid storage tank is too small, the water level transmitter will give the speaker an activation message to make the speaker sound, warning the construction workers to fill water into the liquid storage tank, which has the effect of effectively warning the construction workers to fill water.

[0046] Step 3: According to the axis relationship on the construction drawing of the double-sided superimposed shear wall of the substation, the outer wall positioning line of the double-sided superimposed shear wall of the substation is released, and at the same time, the outer wall installation control line of the double-sided superimposed shear wall of the substation is released to ensure the accuracy of the outer wall installation;

[0047] Step 4: According to the construction drawings of the double-sided composite shear wall of the substation, accurately grasp the elevation of the joints of the prefabricated components of the exterior wall and use gaskets for leveling;

[0048] In a preferred but non-limiting embodiment of the present invention, in step 4, before the gasket is leveled, an ink fountain is used to mark the position where the gasket is placed, and then all marked points are recorded for super measurement, that is, after the concrete pouring is completed, the axis and flatness are checked and confirmed to be correct, and the elevation of the joints of the exterior wall prefabricated components is measured, and 30×2 gaskets are used for precise leveling. The gaskets are generally placed between 1 / 6 and 1 / 5 of the total horizontal size of the component end and in the middle.

[0049] Step 5: The prefabricated wall panels of the double-sided composite shear wall of the substation are hoisted with hoisting beams. Reasonable lifting points are set according to the positions of the lifting rings of the prefabricated wall panels. The steel wire ropes are connected to the reserved lifting rings of the prefabricated wall panels as the exterior wall panels through the shackles, and then hoisted to a height of 500mm from the ground. After checking the appearance quality of the components and the correct connection of the lifting rings, continue hoisting;

[0050] In a preferred but non-limiting embodiment of the present invention, in step 5, a 500 mm wide full-length multilayer board is nailed to the lower side of the prefabricated wall panel before lifting, and the board is lifted slowly and evenly to ensure that the edge of the prefabricated wall panel is not damaged.

[0051] Step 6: Move the prefabricated wall panel smoothly to about 800mm from the floor and stop descending. The operator holds the exterior wall panel to guide the descent and uses a mirror to observe whether the reserved connecting steel bars are aligned with the bottom of the prefabricated wall. The panel slowly descends to the gasket and stops descending.

[0052] In a preferred but non-limiting embodiment of the present invention, in step 6, after stopping the descent, use a control line to check whether the prefabricated wall is placed on the wall line; use a plumb line and a tape measure to check the verticality of the prefabricated wall installation, and use a plumb line to check at both ends of the prefabricated wall to ensure the verticality of the installation; after the adjustable diagonal support is well supported and the verticality and horizontality of the prefabricated wall are adjusted, the hook is unhooked, the verticality should be controlled within 5mm, and the axial position of the prefabricated wall component should be controlled within 8mm.

[0053] In a preferred but non-limiting embodiment of the present invention, the method for supporting the adjustable diagonal support and adjusting the verticality and horizontality of the prefabricated wall comprises:

[0054] The prefabricated wall is temporarily fixed with adjustable diagonal supports. The construction of the transition layer should first be carried out on the prefabricated wall panels and the floor. The U-shaped clamping ring installation component is fixed and slowly lowered to the gasket and stopped. The U-shaped brackets on the wall and the board of the prefabricated wall panel are immediately connected with the diagonal support rod; during the construction of the standard floor, a hole with a diameter of 30mm has been reserved on the composite board with adjustable diagonal support positions to facilitate the connection between the diagonal support and the board. The adjustable diagonal support and the board are connected with nuts; each prefabricated wall panel should have no less than 4 adjustable diagonal supports as temporary diagonal supports. The temporary diagonal support should be equipped with an adjustment device, and the adjustable length of the long and short bolts is ±100mm.

[0055] Then adjust the horizontal position and verticality of the prefabricated wall, that is, fine-tune the root of the wall panel through the short steel pipe diagonal brace adjustment rod to control the horizontal position; adjust the horizontal displacement of the upper part of the wall panel through the adjustable device on the long steel pipe diagonal brace adjustment rod to control its verticality, and finally tighten the diagonal brace and remove the hook. The long steel pipe diagonal brace adjustment rod is shorter than the short steel pipe diagonal brace adjustment rod. The diagonal support rod includes the long steel pipe diagonal brace adjustment rod and the short steel pipe diagonal brace adjustment rod.

[0056] The beneficial effects of the present invention are that, compared with the prior art, the technical effects of the present invention include:

[0057] According to the axis relationship on the construction drawing of the double-sided superimposed shear wall of the substation, the outer wall positioning line of the double-sided superimposed shear wall of the substation is released, and the outer wall installation control line of the double-sided superimposed shear wall of the substation is released at the same time to ensure the accuracy of the outer wall installation; the wall panels of the double-sided superimposed shear wall of the power station are hoisted with hoisting beams, and reasonable hoisting points are set according to the position of the lifting rings of the prefabricated wall panels. After the steel wire rope is connected to the reserved lifting rings of the outer wall panels through the shackles, it is hoisted to 500mm above the ground, and the appearance quality of the components and the connection of the lifting rings are checked before continuing to hoist. Before hoisting, the 500mm wide full-length multi-layer board is nailed to the lower side of the prefabricated wall panel, and hoisted at a uniform speed to ensure that the edge of the prefabricated wall panel is not damaged, effectively avoiding the lack of accuracy of the outer wall installation of the double-sided superimposed shear wall of the substation and the defects of the prefabricated wall panel edge of the double-sided superimposed shear wall of the substation being easily damaged.

[0058] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents, and any modifications or equivalent replacements that do not deviate from the spirit and scope of the present invention should be covered within the protection space of the claims of the present invention.

Claims

1. A construction method for a double-sided composite shear wall in a substation, characterized in that: include: Step 1: Before constructing and installing the double-sided composite shear wall at the designated location of the substation, use a laser theodolite to verify the elevation of the bottom plate guide wall of the double-sided composite shear wall of the substation; Step 2: Clean the foundation surface of the outer wall of the double-sided shear wall of the substation to ensure that there is no ash or oil stain on the contact surface with the joint; Step 3: Lay out the outer wall positioning lines of the substation's double-sided composite shear wall according to the axis relationship on the substation's double-sided composite shear wall construction drawings, and at the same time lay out the outer wall installation control lines of the substation's double-sided composite shear wall; Step 4: According to the construction drawings of the double-sided composite shear wall of the substation, accurately determine the elevation of the joints of the prefabricated components of the exterior wall and use gaskets for leveling; Step 5: Use lifting beams to hoist the prefabricated wall panels of the substation's double-sided composite shear wall. Set reasonable lifting points based on the positions of the lifting rings on the prefabricated wall panels. Use shackles to connect the steel wire ropes to the reserved lifting rings of the prefabricated wall panels that serve as exterior wall panels. Lift the panels to a height of 500mm from the ground. Check the appearance quality of the components and the connection of the lifting rings to ensure they are correct before continuing to lift. Step 6: Move the prefabricated wall panel smoothly to 800mm from the floor and stop descending. The operator holds the outer wall panel to guide the descent and uses a mirror to observe whether the reserved connecting steel bars are aligned with the bottom of the prefabricated wall. The operator stops descending after landing on the gasket.

2. The construction method for double-sided composite shear wall of a substation according to claim 1, characterized in that: In step 1, the method of conducting the review and disposal specifically includes: filling the parts whose elevation does not meet the requirements with cement mortar.

3. The construction method for double-sided composite shear wall of a substation according to claim 1, characterized in that: In step 2, when the ambient temperature is high and dry, clean the foundation surface of the outer wall of the substation double-sided composite shear wall and then spray water to moisten it. The ends of the connecting steel bars of the outer wall of the clean substation double-sided composite shear wall shall not have warping that affects installation, and the surface of the connecting steel bars shall not be rusted, and shall not be contaminated with dirt, cement mortar or oil that affects the connection performance.

4. The construction method for a double-sided composite shear wall of a substation according to claim 3, characterized in that: The device for performing a wet treatment by spraying water is a spray device, which includes: a supporting platform, the four vertices of the lower wall of the supporting platform are pinned to the vertically arranged casters, the four vertices of the lower wall of the supporting platform close to the casters are pinned to the vertically arranged pneumatic piston 1, and the lower walls of two pairs of pneumatic pistons 1 are pinned to the horizontally arranged plastic sheets, the outer surfaces of both ends of one side of the supporting platform are pinned to one end of the traction strip, and the circumferential outer surfaces of the other ends of a pair of traction strips are clamped to the plastic ring, the upper side wall of the supporting platform is pinned to the vertically arranged supporting rod, and the middle of the upper wall of the supporting rod is pinned to the vertically arranged pneumatic piston 2, the upper wall of the pneumatic piston 2 is pinned to the exhaust machine protective shell, the exhaust machine protective shell Both side walls are provided with a groove path, and the inner surfaces of a pair of groove paths are pinned to protective grids. The middle of one side wall of a protective grid is pinned to a rotating motor 2, and the rotating rod pin of the rotating motor 2 is pinned to one end of the horizontally arranged rotating roller 2. The outer surface of the other end of the rotating roller 2 is pinned to the exhaust fan. The inner surface of the other side of the upper part of the exhaust fan protective shell is pinned to the vertically arranged supporting plate, and the lower wall of the supporting plate is pinned to the inner surface of the other side of the lower part of the exhaust fan protective shell via a pin rod. A through hole is opened in the middle of one side of the supporting plate, and the inner surface of the through hole is connected to the circumferential wall of the rotating roller 2 via a slewing bearing. The outer surfaces of both ends of the upper part of the supporting platform close to the supporting rod are pinned to the vertically arranged supporting legs.

5. The construction method for double-sided composite shear wall of a substation according to claim 4, characterized in that: The upper walls of a pair of supporting legs are pinned to a transverse baffle, and the middle of the lower wall of the baffle is pinned to a horn. The other side wall of the upper part of the supporting platform is pinned to a liquid storage tank storing deionized water, and the inner surface of the lower side of the liquid storage tank is pinned to a water level transmitter. A second groove is opened on the upper side wall of the liquid storage tank, and the inner surface of the second groove is pinned to a vertically arranged annular columnar liquid delivery channel. An outer threaded opening is opened on the upper circumferential wall of the liquid delivery channel, and an inner threaded opening is opened on the inner surface of the cover body with an open lower wall. The inner threaded opening and the outer threaded opening are threadedly connected. The other side wall of the upper part of the liquid storage tank is pinned to a vertically arranged support handle.

6. The construction method for double-sided composite shear wall of a substation according to claim 5, characterized in that: The pin in the middle of the upper wall of the support handle is connected to the rotating motor 1, and the rotating rod pin of the rotating motor 1 is connected to the vertically arranged rotating roller 1, and the lower wall pin of the rotating roller 1 is connected to the circular rotating piece. A channel 1 is provided in the middle of one side wall of the support handle, and the inner surface of the channel 1 is connected to the rotating piece via a slewing bearing, and the pin of one side wall of the rotating piece is connected to the vertically arranged support bar 4, and the upper wall of the support bar 4 is connected to one end of the support bar 1 via a hinge, and the middle of one side of the support bar 4 is connected to one end of the pneumatic piston 4 via a hinge, and the outer surface of the other end of the pneumatic piston 4 is pivoted to the middle of the lower wall of the support bar 1 via a hinge, the outer surface of the other end of the support bar 1 is pinned to one end of the linear push rod, and the outer surface of the other end of the linear push rod is pinned to one end of the support bar 2, and the outer surface of the other end of the support bar 2 is pivoted to the support bar 3 via a hinge. The middle of the lower wall of the support bar 2 is connected to one end of the pneumatic piston 3 via a hinge, and the outer surface of the other end of the pneumatic piston 3 is connected to the support bar 3 via a hinge. The lower wall pin of the support bar 3 is connected to the nozzle, and the side wall pin of the nozzle is connected to the annular plastic passage. A groove 3 is provided in the middle of the upper wall of the liquid storage tank, and the inner surface of the groove 3 is pinned to the vertically arranged annular liquid diversion channel. The upper wall of the liquid diversion channel is pinned to the outer surface of the other end of the plastic passage via a pin rod. The upper wall of one side of the liquid diversion channel is pinned to the water pumping motor. The middle of the lower part of the support platform is pinned to the battery. The rotary motor 1, rotary motor 2, pneumatic piston 1, pneumatic piston 2, pneumatic piston 3, pneumatic piston 4 and the water pumping motor are all connected to the circuit breaker via cables, and the circuit breaker is connected to the battery via cables. The water level transmitter is connected to the speaker via cables.

7. The construction method for double-sided composite shear wall of a substation according to claim 6, characterized in that: In step 4, use an ink fountain to mark the position of the gasket before leveling, and then record the super measurement of all marked points. That is, after the concrete pouring is completed and the axis and flatness are checked, the elevation of the joints of the exterior wall prefabricated components is measured, and 30×2 gaskets are used for precise leveling. The gaskets are placed between 1 / 6 and 1 / 5 of the total horizontal size of the component end and in the middle.

8. The construction method for double-sided composite shear wall of a substation according to claim 7, characterized in that: In step 5, before lifting, 500mm wide full-length multi-layer boards are nailed to the lower side of the prefabricated wall panels and lifted at a uniform speed.

9. The construction method for double-sided composite shear walls of a substation according to claim 8, characterized in that: In step 6, after stopping the descent, use the control line to check whether the prefabricated wall is placed on the wall line; use a plumb line and a tape measure to check the verticality of the prefabricated wall installation, and use the plumb line to check at both ends of the prefabricated wall at the same time; after the adjustable diagonal support is supported and the verticality and horizontality of the prefabricated wall are adjusted, the hook is unhooked, the verticality is controlled within 5mm, and the axis position of the prefabricated wall component is controlled within 8mm.

10. The construction method for double-sided composite shear walls of a substation according to claim 9, characterized in that: The method of providing support with adjustable diagonal bracing and adjusting the verticality and horizontality of the prefabricated wall includes: Adjustable diagonal supports are used to temporarily fix the prefabricated wall. During the construction of the transition layer, diagonal support rods are used to connect the U-shaped brackets on the wall and the board of the prefabricated wall panel. During the construction of the standard floor, holes with a diameter of 30mm are reserved on the composite panels where the adjustable diagonal supports are located. Nuts are used to connect the adjustable diagonal supports to the panels. Then adjust the horizontal position and verticality of the prefabricated wall, that is, use the short steel tube diagonal brace adjustment rod to fine-tune the root of the wall panel to control the horizontal position; use the adjustable device on the long steel tube diagonal brace adjustment rod to adjust the horizontal displacement of the upper part of the wall panel to control its verticality, finally tighten the diagonal support and remove the hook.