Completely-automatic start sequence control method for cold end system of air separation device
Through the fully automated startup sequence control method of the cold end system of the air-dividing device, the use of status data and automated control, the safety risks and operation complexity problems during the startup process are solved, and the safe and efficient startup and process stability of single-person operations are achieved.
Patent Information
- Application Number
- CN202411258020.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-09
- Publication Date
- 2024-11-29
AI Technical Summary
During the startup process, the air-dividing device faces high safety risks, complex operation and requires multiple people to cooperate, which leads to unstable start-up process, especially when starting in cold state, the reflux and low-temperature medium may overflow and equipment interlocking parking.
Provide a fully automated start-up sequence control method for the cold end system of the air-dividing device. By obtaining the status data of the cold box system, automatically adjusting the solenoid valve, PID output and pressure difference, realizing the automatic control of the cold box system, ensuring safe start and smooth process. .
The automatic start of the cold-end system can be completed by a single person operation, which reduces labor productivity, improves the safety and reliability of the device, and avoids safety risks during the startup process and equipment interlocking parking problems.
Smart Images

Figure CN119042933A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to an air separation device, and in particular to a fully automatic start-up sequential control method for a cold end system of an air separation device. Background Art
[0002] Compared with general chemical plants, air separation plants have one thing in common, that is, during the process of starting up and changing operating conditions, the plant involves more process safety risks due to the large range of changes in material status and process indicators. Especially during the temporary shutdown stage of the air separation plant, when there is a large amount of liquid in the main condenser evaporator, during the process of the plant's resumption of startup, there are process safety risks such as rapid evaporation of liquid in the main condenser evaporator, and the drastic change in the heat exchange conditions of the heat exchanger, which may cause the reflux low-temperature medium to accidentally overflow into the hot end, causing the carbon steel pipeline to become cold and brittle. In addition, during the cold start of the air separation plant, the heat exchange system and distillation system in the cold box are the core process units. The monitoring of harmful substances in the raw air from the front-end air purification system of the air separation plant is also an important process point. Automatic identification of the front-end process material status through the control system is an important condition for the cold box startup and is also a very important link. If the air separation plant is expected to resume production safely, efficiently and quickly, the operator needs to be very skilled and master many operations such as material matching and equipment switching. In the past, most domestic enterprises (more than 98%) had experienced operators in the team complete the equipment commissioning and process establishment during the startup process of the air separation unit. The startup process of the air separation unit is often completed by many process operators to coordinate the operation of related equipment in this process. Especially for the internal compression process air separation unit, which involves many equipment and complex processes, if the operation coordination is improper, it will lead to unexpected interlocking and stopping during the startup process, which will have an adverse effect on the resumption of production. Summary of the invention
[0003] The purpose of the present invention is to provide a fully automated startup sequence control method for a cold end system of an air separation unit, which avoids various safety risks during the startup process, improves labor productivity, and enhances the reliability of the unit under variable operating conditions.
[0004] In order to achieve the above object, the present invention provides the following technical solution: a fully automated startup sequential control method for a cold end system of an air separation unit, comprising the following steps:
[0005] S01, obtaining status data of the cold box system, and judging whether the current cold box system meets the sequential execution condition based on the status data, and if so, executing the next step;
[0006] S02. Execute judgment based on the state data and select execution logic:
[0007] S21, automatically energize the solenoid valves of the flow path regulating valves related to the inlet and outlet of the cold box;
[0008] S22, PIC1626B put into automatic mode;
[0009] S23, sequential control starts to determine the pressure difference between the pressure after the molecular sieve purifier and the pressure of the lower tower;
[0010] S24, when the opening degree of the main air valve HIC1296A exceeds a predetermined threshold, the full closing feedback of the main air valve HV1296A disappears, and the cold box system is adjusted;
[0011] S25, when the PID outputs corresponding to FIC1556, FIC1557 and FIC1558 are all greater than the preset threshold, the solenoid valves corresponding to FV1537 and FV1536 are automatically energized;
[0012] S03. After the expander is started, the cold air at the cold end of the upper tower is vented and the corresponding PIC1626B is restored to the initial state.
[0013] Preferably, the status data of the cold box system collected in step S01 includes:
[0014] The low-pressure air pressure PI1294 of the cold box after the purifier is greater than the lower tower pressure PI1602;
[0015] The normal temperature and low temperature water flow FI1038 and FI1028 of the precooling system are greater than the lower limit alarm value;
[0016] The liquid level LI1601 in the lower tower is not high;
[0017] The upper tower pressure PI1622 is less than 30KPA;
[0018] The CO2 content in the cold box inlet air is less than 1ppm AI1239;
[0019] The corresponding PID of all regulating valves in the system from the lower tower to the upper tower and from the lower tower to the argon tower is in zero state;
[0020] LIC1601 manual zeroing, HIC1601 zeroing, FIC1656 manual zeroing, HIC1656 zeroing, FIC1657 manual zeroing, HIC1657 zeroing, FIC1658 manual zeroing, HIC1658 zeroing, LIC1711 manual zeroing, HIC1712 zeroing, LIC1741 manual zeroing, FIC1731 manual zeroing, LIC1717 manual zeroing;
[0021] The medium pressure air to the bottom evaporator FV1562 of the lean krypton xenon tower is closed and in the zero state.
[0022] There is no high limit alarm signal for the sealing gas pressure of the cold box interlayer, and two out of three of PI2164, PI2165 and PI2166 are not high;
[0023] ET01CE leakage detection is normal, and DCS has not received LAH7429 signal;
[0024] ET02CE leakage detection is normal, and DCS has not received LAH7529 signal;
[0025] ET03CE leakage detection is normal, and DCS has not received LAH8529 signal;
[0026] Upper tower pressure PIC1626C is in automatic mode;
[0027] According to the requirements of the corresponding purifier sequential control program, the status of each three-rod valve of the purifier is in the position required by the program, and the DCS valve feedback signal is received;
[0028] PIC1213 is in automatic control mode;
[0029] If one of the tanks of the molecular sieve purifier is in the heating state, the purifier program is in the running state;
[0030] The cold box system has no interlocking shutdown conditions, including that the upper tower pressure PI1622, PI1626, PI1703 three-choice two has never exceeded the high-high interlocking value, the cold box interlayer sealing gas pressure PI2164, PI2165, PI2166 three-choice two is lower than the high-high interlocking value, the cold box inlet temperature TI1294 has never exceeded the high-high value, and the cold box inlet temperature TI1506 has never been lower than the low-low value, etc.;
[0031] The temperature TI1505 of the dirty nitrogen gas out of E01 is higher than the lower limit interlock value;
[0032] The atmospheric pressure nitrogen outlet temperature TI1502 of E01 is higher than the lower limit interlock value;
[0033] The temperature of the dirty nitrogen gas out of E06 TI1583 is higher than the lower limit interlock value;
[0034] E06 Inlet air temperature TI1582 is higher than the low limit interlock value;
[0035] E01 Inlet air temperature TI1506 is higher than the low limit interlock value;
[0036] E01 inlet high pressure air temperature TI1507 is higher than the low limit interlock value;
[0037] The main cooling non-condensable gas discharge manual valve is in the closed state.
[0038] Preferably, the judgment result in step S02 is: the main cooling oxygen side temperature TI1684 is lower than or equal to minus 50°C, the upper tower middle temperature TI1601 is lower than or equal to minus 50°C, the main cooling E02 liquid level LI1661 is higher than the full immersion value +500mm or lower than 100mm, the booster C02 is in a loading state, the upper tower pressure PI1626 and the lower tower pressure PI1602 are both greater than 5KPA, the high-temperature expander ET01 expansion end inlet manual valves ZSH7416 and ZSH7417 are fully open feedback signals received, and the cold box inlet air valves HV1296A, HV1296B, FV1536, FV1537, HV1582 are fully closed feedback ZAL1296A, 1296B, 1536, 1537, 1582 are all received;
[0039] Then executing the execution logic includes:
[0040] S21, the solenoid valves of the flow path regulating valves related to the inlet and outlet of the cold box are automatically energized, and the solenoid valves include HV1296A, HV1296B, HV1582, HV1583, FV1502A, FV1213, and PV1626A;
[0041] S22, PIC1626B is put into automatic mode, 20KPA is closed, 30KPA is opened, and the set value is 38KPA;
[0042] S23, Sequential control starts to determine whether the pressure difference between the pressure after the molecular sieve purifier and the pressure of the lower tower, PI1294-PI1602 is greater than 80KPA:
[0043] If it exceeds 80KPA, HIC1296B will open directly to 10%, and then open in a ramp manner (3% / S);
[0044] If the differential pressure between PI1294 and PI1602 is less than 80KPA and greater than 50KPA, the main valve will open in a ramp corresponding to HIC1296A (1.5% / S);
[0045] If the differential pressure between PI1294 and PI1602 is less than 50KPA, the main valve corresponding to HIC1296A will open in a ramp manner (3% / S);
[0046] S24. When the opening of the main air valve HIC1296A exceeds 70%, and the full-close feedback of the main air valve HV1296A disappears, if the main cold liquid level LI1661 is greater than the lower alarm value, the lower tower liquid air level LIC1601 will be directly put into automatic mode (set value 800mm), otherwise LV1601 will open corresponding to LIC1601 climbing (2% / S) to 80%; at the same time, the lower tower to upper tower regulating valves FV1657, FV1656, FV1658 will open corresponding to FIC1657 / FIC1656 / FIC1658 climbing (2% / S) to 60%, HIC1601 / HI C1656 / HIC1657 / HIC1658 starts to ramp up (5% / S) to 70%. At the same time, when the upper tower pressure PI1626 exceeds 30KPA (triggered by increasing from less than 30KPA to more than 30KPA), if the molecular sieve purifier program is in the non-heating stage (including parallel, pressure equalization, pressure relief, cold blowing), the dirty nitrogen to purifier system regeneration regulating valve FV1213 corresponds to FIC1213 output 5%, and then ramps up (1% / S) until the FIC1213 flow rate reaches 30000nm3 / h, FIC1213 ramps up, and the purifier program timing automatically "continues" to run;
[0047] S24. When the PID outputs corresponding to FIC1556 / FIC1557 and FIC1558 are both greater than 40%, the corresponding solenoid valves of FV1537 and FV1536 are automatically energized, and the corresponding FIC1537 and FIC1536 climb (1% / S) and open to 6%. When the output of FIC1537 reaches 6%, the corresponding ET01 starts automatically, the ET01 emergency shut-off valve opens, and the ET01 nozzle climbs 2% / S until the minimum operating speed of the expander is passed and the nozzle climbing ends.
[0048] Preferably, in step 24, if the upper tower pressure PI1626 exceeds 30KPA, the atmospheric pressure nitrogen to the water-cooling tower release valve starts to climb 1% / S to 20%.
[0049] Preferably, the judgment result in step S02 is: the main cooling oxygen side temperature TI1684 is higher than minus 50°C or the upper tower middle temperature TI1601 is higher than minus 50°C, the main cooling E02 liquid level LI1661 is less than 50mm, the full-close feedback ZAL1296A, 1296B, 1536, FV1537 and HV1582 of the cold box inlet air valves HV1296A, HV1296B, FV1536, FV1537 and HV1582 are all received, the booster C02 is in an unloading state, and the purifier sequential control program timer is in a running state;
[0050] Then executing the execution logic includes:
[0051] S21, the solenoid valves of the flow path regulating valves related to the inlet and outlet of the cold box are automatically energized, and the solenoid valves include HV1296A, HV1296B, HV1582, HV1583, FV1502A, FV1213, and PV1626A;
[0052] S22, PIC1626B put into automatic mode, set value 30KPA;
[0053] S23, Sequential control starts to determine whether the pressure difference between the pressure after the molecular sieve purifier and the pressure of the lower tower, PI1294-PI1602 is greater than 50KPA:
[0054] If it exceeds 50KPA, HIC1296B will open directly to 5%, and then open in a ramp manner (1.5% / S);
[0055] If the differential pressure between PI1294 and PI1602 is less than 50KPA, the main valve corresponding to HIC1296A will open in a ramp manner (1% / S);
[0056] S24, when the opening degree of the air main valve HIC1296A exceeds 90%, and the full-close feedback of the air main valve HV1296A disappears, HIC1296B closes and starts to climb (5% / S), the lower tower liquid air to upper tower regulating valve LV1601 corresponding to LIC1601 executes climbing opening (3% / S) to 100%, the lower tower to upper tower regulating valves FV1657, FV1656, FV1658 climb and open (2% / S) to 100%, HIC1601 / HIC1656 / HIC1657 / HIC1658 start to climb (3% / S) to 100%, if the upper tower pressure PI1626 When the data exceeds 30KPA (triggered by an increase from below 30KPA to above 30KPA), the atmospheric nitrogen to water cooling tower vent regulating valve FV1502A corresponds to FIC1502A and ramps up to 15% and the atmospheric nitrogen vent valve FV1502B corresponds to FIC1502B and ramps up to 15%, the lower tower liquid air to crude argon condenser regulating valve LV1711 corresponds to LIC1711 and ramps up to 100%, HIC1712 starts to ramp up (2% / S) to 100%, and LIC1741 and FIC1731 start to ramp up (2% / S) to 100%.
[0057] Preferably, the step S24 executes the hot start-up of the hollow cooling box with one-key start sequence control execution end mark: LIC1601 climbs to 100%, with a delay of 1 minute.
[0058] Preferably, in the step S02, the judgment result is: the lower tower liquid level LI1601 is less than 50 mm, the crude argon tower condenser liquid level LI1711 is lower than 50 mm, the crude argon tower liquid level LI1701 is lower than 50 mm, the E19 liquid level LI1717 is lower than 50 mm, the refined argon tower condenser LI1741 is lower than 50 mm, the refined argon tower evaporator LI1726 is lower than 50 mm, the lean krypton xenon tower bottom evaporator liquid level LI1570 is lower than 50 mm, the liquid oxygen adsorber R30 / R31 liquid level LI5001 / 5002 liquid level is lower than 50 mm, and at the same time, the booster is in a stopped state, the cold box inlet air valve and the high-pressure liquid air valve are fully closed feedback ZAL1296A, 1296B, 1536, 1537 and 1582 are all received, and the main cold liquid level LI1601 is delayed for 6 hours from being higher than 50 mm to lower than 50 mm;
[0059] Then executing the execution logic includes:
[0060] S21, the solenoid valves of the flow path regulating valves related to the inlet and outlet of the cold box are automatically energized, and the solenoid valves include HV1296A, HV1296B, HV1582, HV1583, FV1502A, FV1213, and PV1626A;
[0061] S22, PIC1626B put into automatic mode, set value 33KPA;
[0062] S23, Sequential control starts to determine whether the pressure difference between the pressure after the molecular sieve purifier and the pressure of the lower tower, PI1294-PI1602 is greater than 50KPA:
[0063] If it exceeds 50KPA, HIC1296B will open directly to 5%, and then open in a ramp manner (1.5% / S);
[0064] If the differential pressure between PI1294 and PI1602 is less than 50KPA, the main valve corresponding to HIC1296A will open in a ramp manner (1% / S);
[0065] S24, when the opening degree of the air main valve HIC1296A exceeds 90%, and the full-close feedback of the air main valve HV1296A disappears, HIC1296B closes and starts to climb (2% / S), the lower tower liquid air to upper tower regulating valve LV1601 corresponding to LIC1601 executes climbing opening (0.5% / S) to 30%, the lower tower to upper tower regulating valves FV1657, FV1656, FV1658 climb and open (0.5% / S) to 30%, the lower tower liquid air to crude argon condenser regulating valve LV1711 corresponding to LIC1711 climbs and opens (0.2% / S) to 3 0%, HIC1712 / HIC1601 / HIC1656 / HIC1657 / HIC1658 start climbing (2% / S) to 80%, LIC1741 and FIC1731 start climbing (2% / S) to 60%, HV1720 fully open, at the same time, if the upper tower pressure PI1626 exceeds 30KPA, the atmospheric nitrogen to the water-cooled tower vent regulating valve FV1502A corresponds to FIC1502A climbing and opening (1% / S) to 15%, and the atmospheric nitrogen vent valve FV1502B corresponds to FIC1502B climbing and opening (1% / S) to 15%.
[0066] Preferably, the step S02 is executed until FIC1556, 1557, 1558 and LIC1601 all reach 30%, and then the operation is stopped.
[0067] In the above technical solution, the present invention provides a fully automated startup sequence control method for the cold end system of an air separation unit, which has the following beneficial effects:
[0068] 1. It can be completed by one operator in the team. Through the one-button start mode implemented by this intelligent air separation unit based on the cold end status, the operator only needs to give a start instruction for the start-up process of the cold end unit of the air separation unit. All equipment and related regulating valves in the cold end system are automatically controlled step by step through the designed sequential control program. The operator only needs to observe the execution process of the program and keep records.
[0069] 2. The design can automatically identify the cold end status, automatically identify the start-up completion mark of the front-end hot end process system, and execute the corresponding automatic control programs for the three automatic start-up sequence control modes designed for the cold end of the air separation unit.
[0070] 3. The operation interface is friendly and clear, and the program judgment instructions and conditions of automatic control are clarified. It has the characteristics of high degree of automation, high reliability, and simple operation instruction setting. BRIEF DESCRIPTION OF THE DRAWINGS
[0071] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.
[0072] Figure 1 A schematic diagram of the structure provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0073] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be further described in detail below with reference to the accompanying drawings.
[0074] Embodiment 1
[0075] like Figure 1 As shown, a fully automated startup sequential control method for a cold end system of an air separation unit comprises the following steps:
[0076] S01, obtaining the status data of the cold box system, and judging whether the current cold box system meets the sequential execution condition based on the status data, and if so, executing the next step;
[0077] S02. Execute judgment based on status data and select execution logic:
[0078] S21, automatically energize the solenoid valves of the flow path regulating valves related to the inlet and outlet of the cold box;
[0079] S22, PIC1626B put into automatic mode;
[0080] S23, sequential control starts to determine the pressure difference between the pressure after the molecular sieve purifier and the pressure of the lower tower;
[0081] S24, when the opening degree of the main air valve HIC1296A exceeds the predetermined threshold, and the full closing feedback of the main air valve HV1296A disappears, the cold box system is adjusted;
[0082] S25, when the PID outputs corresponding to FIC1556, FIC1557 and FIC1558 are all greater than the preset threshold, the solenoid valves corresponding to FV1537 and FV1536 are automatically energized;
[0083] S03. After the expander is started, the cold air at the cold end of the upper tower is vented and the corresponding PIC1626B is restored to the initial state.
[0084] Specifically, the status data of the cold box system collected in the above embodiment includes:
[0085] The low-pressure air pressure PI1294 of the cold box after the purifier is greater than the lower tower pressure PI1602;
[0086] The normal temperature and low temperature water flow FI1038 and FI1028 of the precooling system are greater than the lower limit alarm value;
[0087] The liquid level LI1601 in the lower tower is not high;
[0088] The upper tower pressure PI1622 is less than 30KPA;
[0089] The CO2 content in the cold box inlet air is less than 1ppm AI1239;
[0090] The corresponding PID of all regulating valves in the system from the lower tower to the upper tower and from the lower tower to the argon tower is in zero state;
[0091] LIC1601 manual zeroing, HIC1601 zeroing, FIC1656 manual zeroing, HIC1656 zeroing, FIC1657 manual zeroing, HIC1657 zeroing, FIC1658 manual zeroing, HIC1658 zeroing, LIC1711 manual zeroing, HIC1712 zeroing, LIC1741 manual zeroing, FIC1731 manual zeroing, LIC1717 manual zeroing;
[0092] The medium pressure air to the bottom evaporator FV1562 of the lean krypton xenon tower is closed and in the zero state.
[0093] There is no high limit alarm signal for the sealing gas pressure of the cold box interlayer, and two out of three of PI2164, PI2165 and PI2166 are not high;
[0094] ET01CE leakage detection is normal, and DCS has not received LAH7429 signal;
[0095] ET02CE leakage detection is normal, and DCS has not received LAH7529 signal;
[0096] ET03CE leakage detection is normal, and DCS has not received LAH8529 signal;
[0097] Upper tower pressure PIC1626C is in automatic mode;
[0098] According to the requirements of the corresponding purifier sequential control program, the status of each three-rod valve of the purifier is in the position required by the program, and the DCS valve feedback signal is received;
[0099] PIC1213 is in automatic control mode;
[0100] If one of the tanks of the molecular sieve purifier is in the heating state, the purifier program is in the running state;
[0101] The cold box system has no interlocking shutdown conditions, including that the upper tower pressure PI1622, PI1626, PI1703 three-choice two has never exceeded the high-high interlocking value, the cold box interlayer sealing gas pressure PI2164, PI2165, PI2166 three-choice two is lower than the high-high interlocking value, the cold box inlet temperature TI1294 has never exceeded the high-high value, and the cold box inlet temperature TI1506 has never been lower than the low-low value, etc.;
[0102] The temperature TI1505 of the dirty nitrogen gas out of E01 is higher than the lower limit interlock value;
[0103] The atmospheric pressure nitrogen outlet temperature TI1502 of E01 is higher than the lower limit interlock value;
[0104] The temperature of the dirty nitrogen gas out of E06 TI1583 is higher than the lower limit interlock value;
[0105] E06 Inlet air temperature TI1582 is higher than the low limit interlock value;
[0106] E01 Inlet air temperature TI1506 is higher than the low limit interlock value;
[0107] E01 inlet high pressure air temperature TI1507 is higher than the low limit interlock value;
[0108] The main cooling non-condensable gas discharge manual valve is in the closed state.
[0109] Among the above-mentioned ones, PI1622, PI1626, PI1703, PI2164, PI2165, PI2166, TI1294, TI1506, TI1505, TI1502, TI1583, TI1582, TI1507, TI1506, FIC1556, FIC1557, FIC1558, FV1537 and FV1536 are all solenoid valves.
[0110] The above technology can be completed by one operator in the team. Through the one-button start mode implemented by this intelligent air separation unit based on the cold end status, the operator only needs to give a start instruction for the start-up process of the cold end unit of the air separation unit. All equipment and related regulating valves in the cold end system are automatically controlled step by step through the designed sequential control program. The operator only needs to observe the execution process of the program and keep records.
[0111] Embodiment 2
[0112] Based on step S02 recorded in Example 1, the judgment result in this embodiment is: the main cooling oxygen side temperature TI1684 is lower than or equal to minus 50°C, the upper tower middle temperature TI1601 is lower than or equal to minus 50°C, the main cooling E02 liquid level LI1661 is higher than the full immersion value +500mm or lower than 100mm, the booster C02 is in a loading state, the upper tower pressure PI1626 and the lower tower pressure PI1602 are both greater than 5KPA, and the high temperature expander ET0 1. The full-open feedback signals of the manual valves ZSH7416 and ZSH7417 at the expansion end inlet are received, and the full-close feedback signals ZAL1296A, 1296B, 1536, 1537, and 1582 of the cold box inlet air valves HV1296A, HV1296B, FV1536, FV1537, and HV1582 are received. The operator presses the low-temperature cold start button of the air separation unit cold box in the DCS, and the low-temperature cold box start sequence control is activated. The execution logic includes:
[0113] S21, the solenoid valves of the flow path regulating valves related to the inlet and outlet of the cold box are automatically energized, and the solenoid valves include HV1296A, HV1296B, HV1582, HV1583, FV1502A, FV1213, and PV1626A;
[0114] S22, PIC1626B is put into automatic mode, 20KPA is closed, 30KPA is opened, and the set value is 38KPA;
[0115] S23, Sequential control starts to determine whether the pressure difference between the pressure after the molecular sieve purifier and the pressure of the lower tower, PI1294-PI1602 is greater than 80KPA:
[0116] If it exceeds 80KPA, HIC1296B will open directly to 10%, and then open in a ramp manner (3% / S);
[0117] If the differential pressure between PI1294 and PI1602 is less than 80KPA and greater than 50KPA, the main valve will open in a ramp corresponding to HIC1296A (1.5% / S);
[0118] If the differential pressure between PI1294 and PI1602 is less than 50KPA, the main valve corresponding to HIC1296A will open in a ramp manner (3% / S);
[0119] S24. When the opening of the main air valve HIC1296A exceeds 70%, and the full-close feedback of the main air valve HV1296A disappears, if the main cold liquid level LI1661 is greater than the lower alarm value, the lower tower liquid air level LIC1601 will be directly put into automatic mode (set value 800mm), otherwise LV1601 will open corresponding to LIC1601 climbing (2% / S) to 80%; at the same time, the lower tower to upper tower regulating valves FV1657, FV1656, FV1658 will open corresponding to FIC1657 / FIC1656 / FIC1658 climbing (2% / S) to 60%, HIC1601 / HI C1656 / HIC1657 / HIC1658 starts to ramp up (5% / S) to 70%. At the same time, when the upper tower pressure PI1626 exceeds 30KPA (triggered by increasing from less than 30KPA to more than 30KPA), if the molecular sieve purifier program is in the non-heating stage (including parallel, pressure equalization, pressure relief, cold blowing), the dirty nitrogen to purifier system regeneration regulating valve FV1213 corresponds to FIC1213 output 5%, and then ramps up (1% / S) until the FIC1213 flow rate reaches 30000nm3 / h, FIC1213 ramps up, and the purifier program timing automatically "continues" to run;
[0120] S24. When the PID outputs corresponding to FIC1556 / FIC1557 and FIC1558 are both greater than 40%, the corresponding solenoid valves of FV1537 and FV1536 are automatically energized, and the corresponding FIC1537 and FIC1536 climb (1% / S) and open to 6%. When the output of FIC1537 reaches 6%, the corresponding ET01 starts automatically, the ET01 emergency shut-off valve opens, and the ET01 nozzle climbs 2% / S until the expander passes the minimum operating speed and the nozzle climbing ends (the expander must meet all the allowable start conditions of the expander, and the one-button start program corresponding to the expander automatic start instruction will be executed).
[0121] Among them, in step 24, if the upper tower pressure PI1626 exceeds 30KPA, the atmospheric pressure nitrogen to the water cooling tower release valve starts to climb 1% / S to 20%.
[0122] The DCS logic uses these conditions and the cold box temporary stop cold start button to form an "AND" form. This output is used as the input of the cold box start / stop logic function block (RS trigger S terminal). After the operator clicks the "cold box temporary stop cold start" button, the cold box start / stop logic function block activates the output to the state of '1'
[0123] After the expander is started, the cold air at the cold end of the upper tower is vented and the corresponding PIC1626B returns to the normal logic control range.
[0124] After the high-temperature expander ET01 is started, the cold box low-temperature cold state one-button start sequence control program is completed, and the cold box cold state start sequence control program ends.
[0125] Embodiment 3
[0126] Based on step S02 recorded in Example 1, the judgment result in step S02 in this embodiment is: the main cooling oxygen side temperature TI1684 is higher than minus 50°C or the upper tower middle temperature TI1601 is higher than minus 50°C, the main cooling E02 liquid level LI1661 is less than 50mm, and the cold box inlet air valves HV1296A, HV1296B, FV1536, FV1537 and HV1582 are fully closed feedback ZAL1296A, 1296B, 1536, 1537 and 1582 are received, the booster C02 is in the unloading state, and the purifier sequential control program timer is in the running state; at this time, the operator presses the hot start button of the air separation cold box, and the expander no longer participates in the one-key start mode program of the cold box system. The expander can only be started by the operator, and the molecular sieve purifier dirty nitrogen regeneration gas flow automatic control dirty nitrogen regulating valve control, purifier sequential control timer activation, etc. all require manual operation by the operator, and the automatic activation mode is no longer set logically. Then the execution logic includes:
[0127] S21, the solenoid valves of the flow path regulating valves related to the inlet and outlet of the cold box are automatically energized, and the solenoid valves include HV1296A, HV1296B, HV1582, HV1583, FV1502A, FV1213, and PV1626A;
[0128] S22, PIC1626B put into automatic mode, set value 30KPA;
[0129] S23, Sequential control starts to determine whether the pressure difference between the pressure after the molecular sieve purifier and the pressure of the lower tower, PI1294-PI1602 is greater than 50KPA:
[0130] If it exceeds 50KPA, HIC1296B will open directly to 5%, and then open in a ramp manner (1.5% / S);
[0131] If the differential pressure between PI1294 and PI1602 is less than 50KPA, the main valve corresponding to HIC1296A will open in a ramp manner (1% / S);
[0132] S24, when the opening degree of the air main valve HIC1296A exceeds 90%, and the full-close feedback of the air main valve HV1296A disappears, HIC1296B closes and starts to climb (5% / S), the lower tower liquid air to upper tower regulating valve LV1601 corresponding to LIC1601 executes climbing opening (3% / S) to 100%, the lower tower to upper tower regulating valves FV1657, FV1656, FV1658 climb and open (2% / S) to 100%, HIC1601 / HIC1656 / HIC1657 / HIC1658 start to climb (3% / S) to 100%, if the upper tower pressure PI1626 When the data exceeds 30KPA (triggered by an increase from below 30KPA to above 30KPA), the atmospheric nitrogen to water cooling tower vent regulating valve FV1502A corresponds to FIC1502A and ramps up to 15% and the atmospheric nitrogen vent valve FV1502B corresponds to FIC1502B and ramps up to 15%, the lower tower liquid air to crude argon condenser regulating valve LV1711 corresponds to LIC1711 and ramps up to 100%, HIC1712 starts to ramp up (2% / S) to 100%, and LIC1741 and FIC1731 start to ramp up (2% / S) to 100%.
[0133] The hot start of the hollow cooling box with one-button start sequence control execution end mark: LIC1601 climbs to 100%, delaying 1 minute.
[0134] Embodiment 4
[0135] Based on step S02 recorded in Example 1, in this embodiment, the judgment result in step S02 is: the lower tower liquid level LI1601 is less than 50 mm, the crude argon tower condenser liquid level LI1711 is lower than 50 mm, the crude argon tower liquid level LI1701 is lower than 50 mm, the E19 liquid level LI1717 is lower than 50 mm, the refined argon tower condenser LI1741 is lower than 50 mm, the refined argon tower evaporator LI1726 is lower than 50 mm, the krypton-depleted xenon tower bottom evaporator liquid level LI1570 is lower than 50 mm, the liquid oxygen adsorber R30 / R31 liquid level LI5001 / 5002 liquid level is lower than 50 mm, and at the same time, the booster is in a stopped state, the cold box inlet air valve and the high-pressure liquid air valve are fully closed feedback ZAL1296A, 1296B, 1536, 1537 and 1582 are all received, and the main cooling liquid Position LI1601 drops from above 50mm to below 50mm and then delays for 6 hours; under normal maintenance conditions of the air separation unit, it is generally necessary to carry out a thorough thawing and major heating or overhaul once every three years; in addition, after the factory air separation is shut down for some reason, the air compressor cannot be started, or other reasons make it impossible to thaw after draining, and the unit is left for a period of time. Before the air separation is restarted, the factory hopes to thaw the unit before officially starting it, or during debugging, after the expansion machine is started, the unit enters the refrigeration stage, and the distillation tower is cooled to a temperature below the temperature required by the hot start mode of the cold box. However, due to an unexpected air separation unit interlocking triggering the shutdown, the manual discharge valves of the distillation tower and the heat exchanger in the cold box are in the open state, the distillation tower has not been effectively pressurized, and the distillation tower and the heat exchanger have unexpected freezing accidents, so this mode is set. This mode is rarely used. This button is set with engineer authority. After confirmation by the process supervisor and the factory instrument supervisor, during the commissioning period, the commissioning engineer has the authority and the engineer station password. After the unit is put into production and handed over to the factory, the commissioning engineer transfers the authority to the factory operation supervisor and issues operation instructions. When all the above basic conditions for starting the cold box are met and the molecular sieve purifier program is in operation, the DCS operator clicks the cold box defrosting, heating and blowing button. The execution logic includes:
[0136] S21, the solenoid valves of the flow path regulating valves related to the inlet and outlet of the cold box are automatically energized, and the solenoid valves include HV1296A, HV1296B, HV1582, HV1583, FV1502A, FV1213, and PV1626A;
[0137] S22, PIC1626B put into automatic mode, set value 33KPA;
[0138] S23, Sequential control starts to determine whether the pressure difference between the pressure after the molecular sieve purifier and the pressure of the lower tower, PI1294-PI1602 is greater than 50KPA:
[0139] If it exceeds 50KPA, HIC1296B will open directly to 5%, and then open in a ramp manner (1.5% / S);
[0140] If the differential pressure between PI1294 and PI1602 is less than 50KPA, the main valve corresponding to HIC1296A will open in a ramp manner (1% / S);
[0141] S24, when the opening degree of the air main valve HIC1296A exceeds 90%, and the full-close feedback of the air main valve HV1296A disappears, HIC1296B closes and starts to climb (2% / S), the lower tower liquid air to upper tower regulating valve LV1601 corresponding to LIC1601 executes climbing opening (0.5% / S) to 30%, the lower tower to upper tower regulating valves FV1657, FV1656, FV1658 climb and open (0.5% / S) to 30%, the lower tower liquid air to crude argon condenser regulating valve LV1711 corresponding to LIC1711 climbs and opens (0.2% / S) to 3 0%, HIC1712 / HIC1601 / HIC1656 / HIC1657 / HIC1658 start climbing (2% / S) to 80%, LIC1741 and FIC1731 start climbing (2% / S) to 60%, HV1720 fully open, at the same time, if the upper tower pressure PI1626 exceeds 30KPA, the atmospheric nitrogen to the water-cooled tower vent regulating valve FV1502A corresponds to FIC1502A climbing and opening (1% / S) to 15%, and the atmospheric nitrogen vent valve FV1502B corresponds to FIC1502B climbing and opening (1% / S) to 15%.
[0142] Preferably, step S02 is executed until FIC1556, 1557, 1558 and LIC1601 all reach 30%, and then the operation is stopped.
[0143] The above description is only by way of illustration of certain exemplary embodiments of the present invention. It is undoubted that those skilled in the art can modify the described embodiments in various ways without departing from the spirit and scope of the present invention. Therefore, the above drawings and descriptions are illustrative in nature and should not be construed as limiting the scope of protection of the claims of the present invention.
Claims
1. A fully automated startup sequence control method for the cold end system of an air separation unit, characterized in that: The following steps are involved: S01, obtaining status data of the cold box system, and judging whether the current cold box system meets the sequential execution condition based on the status data, and if so, executing the next step; S02. Execute judgment based on the state data and select execution logic: S21, automatically energize the solenoid valves of the flow path regulating valves related to the inlet and outlet of the cold box; S22, PIC1626B put into automatic mode; S23, sequential control starts to determine the pressure difference between the pressure after the molecular sieve purifier and the pressure of the lower tower; S24, when the opening degree of the main air valve HIC1296A exceeds a predetermined threshold, the full closing feedback of the main air valve HV1296A disappears, and the cold box system is adjusted; S25, when the PID outputs corresponding to FIC1556, FIC1557 and FIC1558 are all greater than the preset threshold, the solenoid valves corresponding to FV1537 and FV1536 are automatically energized; S03. After the expander is started, the cold air at the cold end of the upper tower is vented and the corresponding PIC1626B is restored to the initial state.
2. A fully automated startup sequential control method for a cold end system of an air separation unit according to claim 1, characterized in that: The status data of the cold box system collected in step S01 includes: The low-pressure air pressure PI1294 of the cold box after the purifier is greater than the lower tower pressure PI1602; The normal temperature and low temperature water flow FI1038 and FI1028 of the precooling system are greater than the lower limit alarm value; The liquid level LI1601 in the lower tower is not high; The upper tower pressure PI1622 is less than 30KPA; The CO2 content in the cold box inlet air is less than 1ppm AI1239; The corresponding PID of all regulating valves in the system from the lower tower to the upper tower and from the lower tower to the argon tower is in zero state; LIC1601 manual zeroing, HIC1601 zeroing, FIC1656 manual zeroing, HIC1656 zeroing, FIC1657 manual zeroing, HIC1657 zeroing, FIC1658 manual zeroing, HIC1658 zeroing, LIC1711 manual zeroing, HIC1712 zeroing, LIC1741 manual zeroing, FIC1731 manual zeroing, LIC1717 manual zeroing; The medium pressure air to the bottom evaporator FV1562 of the lean krypton xenon tower is closed and in the zero state. There is no high limit alarm signal for the sealing gas pressure of the cold box interlayer, and two out of three of PI2164, PI2165 and PI2166 are not high; ET01CE leakage detection is normal, and DCS has not received LAH7429 signal; ET02CE leakage detection is normal, and DCS has not received LAH7529 signal; ET03CE leakage detection is normal, and DCS has not received LAH8529 signal; Upper tower pressure PIC1626C is in automatic mode; According to the requirements of the corresponding purifier sequential control program, the status of each three-rod valve of the purifier is in the position required by the program, and the DCS valve feedback signal is received; PIC1213 is in automatic control mode; If one of the tanks of the molecular sieve purifier is in the heating state, the purifier program is in the running state; The cold box system has no interlocking shutdown conditions, including that the upper tower pressure PI1622, PI1626, PI1703 three-choice two has never exceeded the high-high interlocking value, the cold box interlayer sealing gas pressure PI2164, PI2165, PI2166 three-choice two is lower than the high-high interlocking value, the cold box inlet temperature TI1294 has never exceeded the high-high value, and the cold box inlet temperature TI1506 has never been lower than the low-low value, etc.; The temperature of the dirty nitrogen gas at E01 TI1505 is higher than the lower limit interlock value; The atmospheric pressure nitrogen outlet temperature TI1502 of E01 is higher than the lower limit interlock value; The temperature of the dirty nitrogen gas out of E06 TI1583 is higher than the lower limit interlock value; E06 Inlet air temperature TI1582 is higher than the low limit interlock value; E01 Inlet air temperature TI1506 is higher than the low limit interlock value; E01 inlet high pressure air temperature TI1507 is higher than the low limit interlock value; The main cooling non-condensable gas discharge manual valve is in the closed state.
3. A fully automated startup sequence control method for a cold end system of an air separation unit according to claim 1, characterized in that: In the step S02, the judgment result is: the main cooling oxygen side temperature TI1684 is lower than or equal to minus 50°C, the upper tower middle temperature TI1601 is lower than or equal to minus 50°C, the main cooling E02 liquid level LI1661 is higher than the full immersion value +500mm or lower than 100mm, the booster C02 is in a loading state, the upper tower pressure PI1626 and the lower tower pressure PI1602 are both greater than 5KPA, the high-temperature expander ET01 expansion end inlet manual valves ZSH7416 and ZSH7417 are fully open feedback signals received, and the cold box inlet air valves HV1296A, HV1296B, FV1536, FV1537, HV1582 are fully closed feedback ZAL1296A, 1296B, 1536, 1537, 1582 are all received; Then executing the execution logic includes: S21, the solenoid valves of the flow path regulating valves related to the inlet and outlet of the cold box are automatically energized, and the solenoid valves include HV1296A, HV1296B, HV1582, HV1583, FV1502A, FV1213, and PV1626A; S22, PIC1626B is put into automatic mode, 20KPA is closed, 30KPA is opened, and the set value is 38KPA; S23, Sequential control starts to determine whether the pressure difference between the pressure after the molecular sieve purifier and the pressure of the lower tower, PI1294-PI1602 is greater than 80KPA: If it exceeds 80KPA, HIC1296B will open directly to 10%, and then open in a ramp manner (3% / S); If the differential pressure between PI1294 and PI1602 is less than 80KPA and greater than 50KPA, the main valve will open in a ramp corresponding to HIC1296A (1.5% / S); If the differential pressure between PI1294 and PI1602 is less than 50KPA, the main valve corresponding to HIC1296A will open in a ramp manner (3% / S); S24. When the opening of the main air valve HIC1296A exceeds 70%, and the full-close feedback of the main air valve HV1296A disappears, if the main cold liquid level LI1661 is greater than the lower alarm value, the lower tower liquid air level LIC1601 will be directly put into automatic mode (set value 800mm), otherwise LV1601 will open corresponding to LIC1601 climbing (2% / S) to 80%; at the same time, the lower tower to upper tower regulating valves FV1657, FV1656, FV1658 will open corresponding to FIC1657 / FIC1656 / FIC1658 climbing (2% / S) to 60%, HIC1601 / HI C1656 / HIC1657 / HIC1658 starts to ramp up (5% / S) to 70%. At the same time, when the upper tower pressure PI1626 exceeds 30KPA (triggered by increasing from less than 30KPA to more than 30KPA), if the molecular sieve purifier program is in the non-heating stage (including parallel, pressure equalization, pressure relief, cold blowing), the dirty nitrogen to purifier system regeneration regulating valve FV1213 corresponds to FIC1213 output 5%, and then ramps up (1% / S) until the FIC1213 flow rate reaches 30000nm3 / h, FIC1213 ramps up, and the purifier program timing automatically "continues" to run; S24. When the PID outputs corresponding to FIC1556 / FIC1557 and FIC1558 are both greater than 40%, the corresponding solenoid valves of FV1537 and FV1536 are automatically energized, and the corresponding FIC1537 and FIC1536 climb (1% / S) and open to 6%. When the output of FIC1537 reaches 6%, the corresponding ET01 starts automatically, the ET01 emergency shut-off valve opens, and the ET01 nozzle climbs 2% / S until the minimum operating speed of the expander is passed and the nozzle climbing ends.
4. A fully automated startup sequence control method for a cold end system of an air separation unit according to claim 3, characterized in that: In step 24, if the upper tower pressure PI1626 exceeds 30KPA, the atmospheric pressure nitrogen to the water cooling tower release valve starts to climb 1% / S to 20%.
5. A fully automated startup sequential control method for a cold end system of an air separation unit according to claim 1, characterized in that: In the step S02, the judgment result is: the main cooling oxygen side temperature TI1684 is higher than minus 50°C or the upper tower middle temperature TI1601 is higher than minus 50°C, the main cooling E02 liquid level LI1661 is less than 50mm, the full-close feedback ZAL1296A, 1296B, 1536, FV1537 and HV1582 of the cold box inlet air valves HV1296A, HV1296B, FV1536, FV1537 and HV1582 are all received, the booster C02 is in the unloading state, and the purifier sequential control program timer is in the running state; Then executing the execution logic includes: S21, the solenoid valves of the flow path regulating valves related to the inlet and outlet of the cold box are automatically energized, and the solenoid valves include HV1296A, HV1296B, HV1582, HV1583, FV1502A, FV1213, and PV1626A; S22, PIC1626B put into automatic mode, set value 30KPA; S23, Sequential control starts to determine whether the pressure difference between the pressure after the molecular sieve purifier and the pressure of the lower tower, PI1294-PI1602 is greater than 50KPA: If it exceeds 50KPA, HIC1296B will open directly to 5%, and then open in a ramp manner (1.5% / S); If the differential pressure between PI1294 and PI1602 is less than 50KPA, the main valve corresponding to HIC1296A will open in a ramp manner (1% / S); S24, when the opening degree of the air main valve HIC1296A exceeds 90%, and the full-close feedback of the air main valve HV1296A disappears, HIC1296B closes and starts to climb (5% / S), the lower tower liquid air to upper tower regulating valve LV1601 corresponding to LIC1601 executes climbing opening (3% / S) to 100%, the lower tower to upper tower regulating valves FV1657, FV1656, FV1658 climb and open (2% / S) to 100%, HIC1601 / HIC1656 / HIC1657 / HIC1658 start to climb (3% / S) to 100%, if the upper tower pressure PI1626 When the data exceeds 30KPA (triggered by an increase from below 30KPA to above 30KPA), the atmospheric nitrogen to water cooling tower vent regulating valve FV1502A corresponds to FIC1502A and ramps up to 15% and the atmospheric nitrogen vent valve FV1502B corresponds to FIC1502B and ramps up to 15%, the lower tower liquid air to crude argon condenser regulating valve LV1711 corresponds to LIC1711 and ramps up to 100%, HIC1712 starts to ramp up (2% / S) to 100%, and LIC1741 and FIC1731 start to ramp up (2% / S) to 100%.
6. A fully automated startup sequence control method for a cold end system of an air separation unit according to claim 5, characterized in that: The step S24 executes the hot start-up of the hollow cooling box with one-key start sequence control execution end mark: LIC1601 climbs to 100%, delaying for 1 minute.
7. A fully automated startup sequence control method for a cold end system of an air separation unit according to claim 1, characterized in that: In the step S02, the judgment result is: the lower tower liquid level LI1601 is less than 50mm, the crude argon tower condenser liquid level LI1711 is lower than 50mm, the crude argon tower liquid level LI1701 is lower than 50mm, the E19 liquid level LI1717 is lower than 50mm, the refined argon tower condenser LI1741 is lower than 50mm, the refined argon tower evaporator LI1726 is lower than 50mm, the krypton-depleted xenon tower bottom evaporator liquid level LI1570 is lower than 50mm, the liquid oxygen adsorber R30 / R31 liquid level LI5001 / 5002 liquid level is lower than 50mm, and at the same time, the booster is in a stopped state, the cold box inlet air valve and high-pressure liquid air valve full-close feedback ZAL1296A, 1296B, 1536, 1537 and 1582 are all received, and the main cold liquid level LI1601 is delayed for 6 hours from higher than 50mm to lower than 50mm; Then executing the execution logic includes: S21, the solenoid valves of the flow path regulating valves related to the inlet and outlet of the cold box are automatically energized, and the solenoid valves include HV1296A, HV1296B, HV1582, HV1583, FV1502A, FV1213, and PV1626A; S22, PIC1626B put into automatic mode, set value 33KPA; S23, Sequential control starts to determine whether the pressure difference between the pressure after the molecular sieve purifier and the pressure of the lower tower, PI1294-PI1602 is greater than 50KPA: If it exceeds 50KPA, HIC1296B will open directly to 5%, and then open in a ramp manner (1.5% / S); If the differential pressure between PI1294 and PI1602 is less than 50KPA, the main valve corresponding to HIC1296A will open in a ramp manner (1% / S); S24, when the opening degree of the air main valve HIC1296A exceeds 90%, and the full-close feedback of the air main valve HV1296A disappears, HIC1296B closes and starts to climb (2% / S), the lower tower liquid air to upper tower regulating valve LV1601 corresponding to LIC1601 executes climbing opening (0.5% / S) to 30%, the lower tower to upper tower regulating valves FV1657, FV1656, FV1658 climb and open (0.5% / S) to 30%, the lower tower liquid air to crude argon condenser regulating valve LV1711 corresponding to LIC1711 climbs and opens (0.2% / S) to 3 0%, HIC1712 / HIC1601 / HIC1656 / HIC1657 / HIC1658 start climbing (2% / S) to 80%, LIC1741 and FIC1731 start climbing (2% / S) to 60%, HV1720 fully open, at the same time, if the upper tower pressure PI1626 exceeds 30KPA, the atmospheric nitrogen to the water-cooled tower vent regulating valve FV1502A corresponds to FIC1502A climbing and opening (1% / S) to 15%, and the atmospheric nitrogen vent valve FV1502B corresponds to FIC1502B climbing and opening (1% / S) to 15%.
8. A fully automated startup sequence control method for a cold end system of an air separation unit according to claim 7, characterized in that: The step S02 is executed until FIC1556, 1557, 1558 and LIC1601 all reach 30%, then the operation is stopped.
Citation Information
Cited By
Air purification skid system