Sensor monitoring device for preventing second lining concrete from disengaging

By designing a semicircular annular air-removing detection belt and sensor group on the second lining vault of the tunnel, the problems of fewer points, easy interference and low reuse efficiency in the prior art are solved, and efficient monitoring of the tunnel concrete pouring process is achieved. Accurate detection of air removal conditions improves structural strength and waterproofness.

CN119043414APending Publication Date: 2024-11-29CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411116080.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-14
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

The existing tunnel two-lined vault anti-air removal monitoring device has fewer set points, complex working environment, sensors are easily disturbed, lack protection, low reuse efficiency, and lack of repair and de-empty structure, resulting in poor de-empty effect.

Method used

A sensor monitoring device including a de-empty detection belt is designed. The detection belt is in a semicircular annular array, equipped with a C-shaped groove rod, a support belt, a membrane-through rotary rod and a protective film. The sensor group is evenly distributed, and is supported by the support side plate and the connecting frame. The sealed pipe is formed to support wire and signal delivery, and the sensor group includes temperature and pressure sensors, supporting bevel blocks and connecting frames to ensure protection and reuse of the sensor group.

Benefits of technology

Real-time monitoring of the concrete pouring process is realized, timely reflects concrete changes, detects air leakage, improves monitoring accuracy and structural strength, enhances waterproofness, and improves the number of reuses of the sensor group, ensuring the continuity of the monitoring process. and reliability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119043414A_ABST
    Figure CN119043414A_ABST
Patent Text Reader

Abstract

The invention discloses a sensor monitoring device for preventing secondary lining concrete from disengaging, which comprises disengaging detection belts arranged on a waterproof plate clamped between a primary support and a secondary lining, the disengaging detection belts are uniformly distributed in a semi-annular array, each disengaging detection belt comprises a C-shaped groove rod, a protective support film is arranged on the vacant side surface of each C-shaped groove rod, and the protective support film is arranged on the side surface of each C-shaped groove rod. A supporting belt is slidably connected to the middle of the C-shaped groove rod, a plurality of sensor sets which are evenly distributed at equal intervals are installed on the side, close to the protection supporting film, of the supporting belt, and a plurality of film penetrating rotating rods which are evenly distributed at equal intervals are elastically hinged to the groove bottom of the C-shaped groove rod to protect the sensor sets against damage. The change condition of concrete in each area is monitored and reflected through numerical value change, so that whether the concrete in each area is void or not in the solidification process is detected, the reuse frequency of the sensor group is increased, the supporting belt and the sensor group can be protected before grouting, the grouting process is not hindered, and the continuous and reliable monitoring process is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel concrete pouring detection, in particular to a sensor monitoring device for preventing secondary lining concrete from falling out. Background Art

[0002] During the tunnel excavation and construction process, the tunnel needs to be initially supported to ensure the safety of the construction, which is called "primary support". After the primary support is completed, the tunnel needs to be reinforced for the second time, which is called "secondary lining". Due to the combined influence of various factors, voids are easily formed in parts such as the arch crown or side wall arch waist, affecting the quality of the secondary lining.

[0003] The patent document with publication number CN115788586A discloses a monitoring method for preventing the secondary lining vault from de-airing in a tunnel. A secondary lining de-airing prevention monitoring system is installed at the front, middle and rear positions of the top of the secondary lining trolley. The monitoring depth of the secondary lining de-airing prevention monitoring system is adjusted according to the needs of secondary linings of different thicknesses required for different surrounding rock grades to ensure accurate alarm when the concrete has reached a full state. The secondary lining de-airing prevention monitoring system includes multiple sensor installation units, and the multiple sensor installation units are respectively arranged at the front, middle and rear positions of the top of the secondary lining trolley, and the multiple sensor installation units are all telecommunication-connected to a monitoring control box.

[0004] The above-mentioned device has the following shortcomings: there are fewer setting points when using the above-mentioned device, the working environment is complex, and it is easy to interfere with the operation of the sensor. In addition, the above-mentioned device lacks protection for the sensor, the efficiency of repeated use is low, and the wire is lacking in protection, which can easily cause detection interruption. At the same time, the above-mentioned device lacks structure and measures to repair air gaps, and the effect of solving air gap problems is not good. Summary of the invention

[0005] The purpose of the present invention is to provide a sensor monitoring device for preventing secondary lining concrete from falling out in order to address the above-mentioned problems and shortcomings, thereby improving the overall work efficiency.

[0006] The present invention solves at least one of the following technical problems:

[0007] (1) The above device has few setting points when in use, and the working environment is complex, which can easily interfere with the operation of the sensor;

[0008] (2) The above device lacks protection for the sensor, has low efficiency in repeated use, lacks protection for the wire, and is prone to cause detection interruption;

[0009] (3) The above device lacks structures and measures to repair air leakage, and the effect of solving air leakage is not good.

[0010] The object of the present invention can be achieved through the following technical scheme: a sensor monitoring device for preventing secondary lining concrete from de-airing, comprising a de-airing detection belt arranged on a waterproof board clamped by an initial support and a secondary lining, the de-airing detection belt being evenly distributed in a semicircular array, the de-airing detection belt comprising a C-shaped groove rod, a protective support membrane being provided on the vacant side of the C-shaped groove rod, a support belt being slidably connected to the middle part of the C-shaped groove rod, a plurality of sensor groups being evenly distributed at equal intervals being installed on one side of the support belt close to the protective support membrane, and a plurality of membrane-penetrating rotating rods being evenly distributed at equal intervals being elastically hinged on the groove bottom of the C-shaped groove rod.

[0011] As a further solution of the invention, adjacent C-shaped slot rods are connected end to end through a C-shaped connecting frame, and the ports of the C-shaped slot rods at the head and tail ends are fixedly connected to supporting pipe openings. Wires for transmitting power and signals are buried in the support belt. The sensor group is powered by the wires and sends out various signals and information to the outside.

[0012] As a further scheme of the invention, support side plates are installed on the sides of the groove walls on both sides of the C-shaped groove rod, a protective support membrane is provided on the side between the two support side plates away from the C-shaped groove rod, a support belt is slidably connected in the middle between the two support side plates, a number of equidistant and evenly distributed sensor groups are installed on the side of the support belt away from the C-shaped groove rod, a number of equidistant and evenly distributed membrane-penetrating rotating rods are provided between the two support side plates and on the other side of the support belt, the membrane-penetrating rotating rods are elastically hinged to the support side plates, the interior of the support pipe mouth is divided into two chambers corresponding to the C-shaped groove rod and the support side plates, and the chambers of the support pipe mouth are independently connected to the pipelines formed by the C-shaped groove rod and the support side plates.

[0013] As a further solution of the invention, mounting frames are installed on the inner side walls of the C-shaped slot rod and the supporting side plates, and the mounting frames correspond to the membrane-penetrating rotating rods one by one. The mounting frames are elastically hinged to the membrane-penetrating rotating rods through coil spring rotating shafts.

[0014] As a further solution of the invention, one end of the film-penetrating rotating rod close to the support belt is rotatably connected to the limiting roller, and one end of the film-penetrating rotating rod close to the limiting roller and the side away from the support belt is fixedly connected to a film-penetrating curved knife, and the tip of the film-penetrating curved knife points to the support belt.

[0015] As a further scheme of the invention, a first connecting frame and a second connecting frame are respectively provided on the inner side of the C-shaped connecting frame, and the protective support film is installed between the vacant side surfaces of the C-shaped groove rod and between the two support side plates through a support positioning frame. The end-to-end adjacent support side plates are connected end-to-end through the C-shaped connecting frame, the end-to-end adjacent support belts are connected end-to-end through the first connecting frame, and the end-to-end adjacent support positioning frames are connected end-to-end through the second connecting frame.

[0016] As a further solution of the invention, the outer arc surface of the secondary lining is divided into several squares with a side length of 30 cm, and each sensor group is located at the center of the square. Each sensor group is independent of each other and connected in parallel. A variety of sensors are embedded on the surface of the sensor group close to the secondary lining.

[0017] As a further solution of the invention, each sensor group is independent of each other and connected in parallel, and the sensor group is provided with a temperature sensor and a pressure sensor.

[0018] As a further solution of the invention, a plurality of support bevel blocks are installed between the outer peripheral side surface of the sensor group and the support belt.

[0019] As a further solution of the invention, the waterproof boards are evenly distributed in an array and sealed to each other, a waterproof cloth is provided between the waterproof boards and the initial support, and the initial support, waterproof cloth, waterproof boards and secondary lining are sealed to each other.

[0020] Beneficial effects of the present invention:

[0021] (1) Through the continuous monitoring of each sensor group, data is continuously output to the outside, reflecting the changes of concrete in the area in a timely manner. During the pouring process, as the concrete is filled, the value of the sensor group continues to rise, and further detects the vibration effect of the concrete until the value of the sensor group reaches the set range. At this time, concrete is no longer poured in this area. When the values ​​of all sensor groups reach the set range, it reflects that the pouring process of concrete for this section of secondary lining is completed. Subsequently, each sensor group continues to monitor the solidification process of concrete and continuously outputs the detected values. Through the change of values, the changes of concrete in each area are monitored and reflected, so as to find out whether the concrete in each area is hollow during the solidification process. If hollow, the concrete in this area The pressure value of the sensor group will be less than the set range, thus reflecting the real-time changes of concrete during each pouring process, providing detailed and accurate data for the subsequent improvement of the pouring process. After the support belt and sensor group are pulled out, the vacant side of the C-shaped groove rod is sealed by the secondary lining to form several tubular structures, which is convenient for grouting and protects the support membrane to protect the sensor group during detection, preventing concrete from contaminating the sensor group. At the same time, the temperature sensor in the sensor group is convenient to detect the real-time temperature through its own millimeter-level thermal conductivity advantage. After the membrane-penetrating rotating rod pierces, a channel is formed to guide the slurry into the gap, thereby cooperating with the solidification of the slurry to form a connection and support structure, while eliminating the degassing phenomenon, making the waterproof board and the secondary lining more closely connected, enhancing the overall structural strength and waterproofness;

[0022] (2) The upper end of the membrane-penetrating rotating rod is positioned by the mounting frame, and the coil spring rotating shaft and the membrane-penetrating rotating rod are conveniently and quickly replaced and repaired. The support belt is limited by the limiting roller, and the tip of the membrane-penetrating curved knife is prevented from contacting the support belt. When the support belt is dragged, the resistance of the support belt is reduced by the limiting roller. When the limiting roller is separated from the support belt, the membrane-penetrating rotating rod is rotated under the elastic force of the coil spring rotating shaft, driving the tip of the membrane-penetrating curved knife to penetrate the protective support membrane until the limiting roller and the membrane-penetrating curved knife abut against the concrete surface, thereby forming a tight bonding structure with the subsequent RPC slurry. The sensor group is kept perpendicular to the side surface of the support belt through the supporting inclined block, so that the sensor group is kept in the best posture for monitoring the state of concrete. At the same time, when the support belt is dragged and rolled up, the resistance of the sensor group is reduced by the support inclined block to avoid the support belt being stuck and broken during movement. The support belts in each empty detection belt are connected in series into two ropes that can be quickly dragged through the first connecting frame, so that each support belt together with the installed sensor group can be quickly dragged and rolled up before grouting, so as to facilitate repeated use and assembly. The second connecting frame makes the end-to-end adjacent support positioning frames sealed and connected, and the second connecting frame further seals and separates the pipeline formed by the C-shaped groove rod and the support side plate, so as to protect the sensor group from damage and increase the number of times the sensor group is reused. Therefore, the support belt and the sensor group can be protected before grouting without hindering the grouting process, ensuring the continuous and reliable monitoring process.

[0023] (3) During operation, the concrete pouring of the secondary lining is monitored through the support belt and the sensor group between the supporting side plates, and the RPC slurry is poured through the pipeline formed with the supporting side plates and the side chamber of the corresponding supporting pipe mouth. The poured RPC slurry is monitored by the support belt and the sensor group in the C-shaped groove rod to prevent the void phenomenon caused by the need to fill the gap during RPC pouring. When the RPC is poured through the pipeline formed by the supporting side plates, after the monitoring shows that there is a void, the RPC is poured again through the C-shaped groove rod, and the protective support membrane is penetrated at the RPC void by the membrane-piercing rotating rod, so as to fill the area that was not filled before, and fill the gap again, so as to fully eliminate the void and improve the connection tightness between the waterproof board and the secondary lining. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.

[0025] Figure 1 It is a cross-sectional view of the internal structure of the present invention;

[0026] Figure 2 It is a side view of the overall structure of the present invention;

[0027] Figure 3 It is a side view of the internal structure of the present invention;

[0028] Figure 4 It is a partial structural cross-sectional view of the present invention;

[0029] Figure 5 for Figure 1 A magnified schematic diagram of the middle A area;

[0030] In the figure: 101, initial support; 102, secondary lining; 103, waterproof cloth; 104, waterproof board; 105, air gap detection belt; 201, C-shaped slot rod; 202, support belt; 203, membrane-penetrating rotating rod; 204, protective support membrane; 205, sensor group; 206, support pipe mouth; 207, C-shaped connecting frame; 208, mounting frame; 209, coil spring rotating shaft; 210, membrane-penetrating curved knife; 211, limiting roller; 212, support positioning frame; 213, support side plate; 214, support inclined block; 215, first connecting frame; 216, second connecting frame. DETAILED DESCRIPTION

[0031] In order to further explain the technical means and effects adopted by the present invention to achieve the predetermined invention purpose, the specific implementation mode, structure, characteristics and effects of the present invention are described in detail below in combination with the accompanying drawings and preferred embodiments.

[0032] See also Figure 1 and Figure 2 As shown: a sensor monitoring device for preventing secondary lining concrete from de-airing, comprising a de-airing detection belt 105 arranged on a waterproof board 104 sandwiched between an initial support 101 and a secondary lining 102, the waterproof boards 104 are evenly distributed in an array and are sealed and connected to each other, a waterproof cloth 103 is arranged between the waterproof board 104 and the initial support 101, and the initial support 101, the waterproof cloth 103, the waterproof board 104 and the secondary lining 102 are sealed and connected adjacently;

[0033] The hollow detection belt 105 is evenly distributed in a semicircular ring array, and includes a C-shaped slot rod 201. The vacant side of the C-shaped slot rod 201 is provided with a protective support film 204. The middle part of the C-shaped slot rod 201 is slidably connected with a support belt 202. A plurality of sensor groups 205 evenly distributed at equal intervals are installed on the side of the support belt 202 close to the protective support film 204. A plurality of membrane-penetrating rotating rods 203 evenly distributed at equal intervals are elastically hinged at the bottom of the slot of the C-shaped slot rod 201. Adjacent C-shaped slot rods 201 are connected end to end through a C-shaped connecting frame 207. The ports of the C-shaped slot rod 201 at the head and tail ends are fixedly connected with support pipe openings 206. Wires for transmitting power and signals are buried in the support belt 202. The sensor group 205 is powered by the wires and sends various signals and information to the outside.

[0034] When the present embodiment is working, the construction personnel install and attach the waterproof cloth 103 to the inner wall surface of the initial support 101 without puncture, and then install and attach the waterproof board 104 in an array evenly and without puncture on the waterproof cloth 103, and then install and attach each air gap detection belt 105 in an array evenly and without puncture on the waterproof board 104, and connect the C-shaped groove rods 201 adjacent to each other on each waterproof board 104 end to end through the C-shaped connecting frame 207, and at the same time install the support pipe opening 206 to the C-shaped groove rod 201 at the head and tail ends respectively. Port, so that a plurality of sensor groups 205 are evenly arranged in an array on the outer peripheral surface of the secondary lining 102. In this embodiment, the outer peripheral arc surface of each section of the secondary lining 102 is divided into a plurality of squares with a side length of 30 cm and each sensor group 205 is located at the center of the square. Each sensor group 205 is independent and connected in parallel. A variety of sensors are embedded on the surface of the sensor group 205 close to the secondary lining 102. Subsequently, the secondary lining 102 is poured with concrete. During the pouring process, the concrete gradually contacts each degassing detection zone 105. The sensor groups 205 are connected to each other, thereby triggering the induction of each sensor group 205 and generating data for external transmission. According to the data, the thickness of the concrete at each location of the secondary lining 102 during pouring is obtained, and according to the data of the sensor group 205, it is judged whether the concrete at the location of the sensor group 205 meets the quantity and quality requirements during the pouring process, and whether it is sufficiently thick and evenly distributed without bubbles and vacancies. When a section of the secondary lining 102 meets the requirements of the mold transfer and starts to move the template structure, each support belt 202 is pulled out from the support pipe mouth 206, and the sensor group 205 is connected to each sensor group 205. The membrane-piercing rotating rods 203 limited by the support belt 202 rotate one after another, cut the protective support membrane 204, and then inject grout into each C-shaped groove rod 201 through the support pipe opening 206. This embodiment adopts RPC grouting to fill each C-shaped groove rod 201 with slurry, and flow to the surrounding through the through-hole on the protective support membrane 204, filling the gap between the secondary lining 102 and the waterproof board 104 that is not tightly attached or even the empty area, so as to monitor the concrete state during the pouring process of the secondary lining and prevent the emptying phenomenon at the same time;

[0035] During operation, the device continuously outputs data to the outside through the continuously monitored sensor groups 205, and timely reflects the changes in the concrete in the area. During the pouring process, as the concrete is filled, the value of the sensor group 205 continues to rise, and further detects the vibration effect of the concrete until the value of the sensor group 205 reaches the set range. At this time, concrete is no longer poured in this area. When the values ​​of all sensor groups 205 reach the set range, it reflects that the concrete pouring process of this section of secondary lining 102 is completed. Subsequently, each sensor group 205 continues to monitor the solidification process of the concrete, and continuously outputs the detected values. The changes in the concrete in each area are monitored and reflected through the changes in the values, so as to find out whether the concrete in each area is empty during the solidification process. If empty, the sensor group 205 in the area The pressure value will be smaller than the set range, thus reflecting the real-time changes of concrete during each pouring process, providing detailed and accurate data for the subsequent improvement of the pouring process. After the support belt 202 and the sensor group 205 are pulled out, the vacant side of the C-shaped groove rod 201 is sealed by the secondary lining 102 to form a number of tubular structures, which is convenient for grouting and protects the support membrane 204. When detecting, it protects the sensor group 205 and prevents concrete from contaminating and adhering to the sensor group 205. At the same time, the temperature sensor in the sensor group 205 detects the real-time temperature through its own thermal conductivity advantage of millimeter level thickness. After the membrane-penetrating rotating rod 203 pierces, a channel is formed to guide the slurry into the gap, thereby cooperating with the solidification of the slurry to form a connection and support structure. While eliminating the degassing phenomenon, the waterproof board 104 and the secondary lining 102 are connected more closely, thereby enhancing the overall structural strength and waterproofness.

[0036] In this embodiment, a temperature sensor and a pressure sensor are selected as the combination of the sensor group 205. A camera and a light bead may be added according to the actual construction environment and design requirements, and acid, alkali or other types of sensors may also be installed.

[0037] See also Figure 3 As shown, support side plates 213 are installed on the sides of the groove walls on both sides of the C-shaped groove rod 201, a protective support film 204 is provided on the side between the two support side plates 213 away from the C-shaped groove rod 201, a support belt 202 is slidably connected in the middle between the two support side plates 213, a plurality of sensor groups 205 evenly distributed at equal distances are installed on the side of the support belt 202 away from the C-shaped groove rod 201, a plurality of membrane-penetrating rotating rods 203 evenly distributed at equal distances are provided between the two support side plates 213 and on the other side of the support belt 202, the membrane-penetrating rotating rods 203 are elastically hinged to the support side plates 213, the interior of the support pipe opening 206 is evenly divided into two chambers corresponding to the C-shaped groove rod 201 and the support side plates 213, and the chambers of the support pipe opening 206 are independently connected to the pipelines formed by the C-shaped groove rod 201 and the support side plates 213;

[0038] When the present embodiment is working, the concrete pouring of the secondary lining 102 is monitored by the support belt 202 and the sensor group 205 between the support side plates 213, and the RPC slurry is poured through the pipeline formed with the support side plates 213 and the side chamber of the corresponding support pipe mouth 206. The poured RPC slurry is monitored by the support belt 202 and the sensor group 205 in the C-shaped groove rod 201 to prevent the void phenomenon caused by the need to fill the gap during RPC pouring. When RPC is poured through the pipeline formed by the support side plates 213, after the monitoring shows that there is a void, the RPC is poured again through the C-shaped groove rod 201, and the protective support membrane 204 is penetrated at the RPC void by the membrane-penetrating rotating rod 203, so as to fill the area that was not filled before, and fill the void again, so as to fully eliminate the void and improve the connection tightness between the waterproof board 104 and the secondary lining 102.

[0039] See also Figure 3 and Figure 4 As shown, the inner side walls of the C-shaped groove rod 201 and the supporting side plate 213 are both installed with mounting frames 208, and the mounting frames 208 correspond to the membrane-penetrating rotating rod 203 one by one. The mounting frames 208 are elastically hinged to the membrane-penetrating rotating rod 203 through the coil spring rotating shaft 209. The upper end of the membrane-penetrating rotating rod 203 is positioned by the mounting frames 208, and the coil spring rotating shaft 209 and the membrane-penetrating rotating rod 203 are conveniently and quickly replaced and repaired.

[0040] See also Figure 4 and Figure 5 As shown, one end of the membrane-penetrating rotating rod 203 close to the support belt 202 is rotatably connected to the limiting roller 211, and one end of the membrane-penetrating rotating rod 203 close to the limiting roller 211 and away from the side of the support belt 202 is fixedly connected with a membrane-penetrating curved knife 210, and the tip of the membrane-penetrating curved knife 210 points to the support belt 202. When working, the support belt 202 is limited by the limiting roller 211, and at the same time, the tip of the membrane-penetrating curved knife 210 is prevented from contacting the support belt 202. When the support belt 202 is dragged, the resistance of the support belt 202 is reduced by the limiting roller 211. When the limiting roller 211 is separated from the support belt 202, the membrane-penetrating rotating rod 203 is rotated under the elastic force of the coil spring shaft 209, driving the tip of the membrane-penetrating curved knife 210 to penetrate the protective support membrane 204 until the limiting roller 211 and the membrane-penetrating curved knife 210 abut against the concrete surface, thereby forming a tight connection structure with the subsequent RPC slurry.

[0041] See also Figure 5As shown, the inner side of the C-shaped connecting frame 207 is respectively provided with a first connecting frame 215 and a second connecting frame 216, the protective support film 204 is installed between the vacant side surfaces of the C-shaped groove rod 201 and between the two support side plates 213 through the support positioning frame 212, the end-to-end adjacent support side plates 213 are connected end-to-end through the C-shaped connecting frame 207, the end-to-end adjacent support belts 202 are connected end-to-end through the first connecting frame 215, and the end-to-end adjacent support positioning frames 212 are connected end-to-end through the second connecting frame 216, and a plurality of support inclined blocks 214 are installed between the outer peripheral side surface of the sensor group 205 and the support belt 202;

[0042] During operation, the sensor group 205 maintains its axis perpendicular to the side surface of the support belt 202 through the support bevel 214, so that the sensor group 205 maintains the best posture for monitoring the state of concrete. At the same time, when the support belt 202 is dragged and rolled up, the support bevel 214 reduces the resistance of the sensor group 205 to avoid jamming and breaking of the support belt 202 during movement. The first connecting frame 215 connects the support belts 202 in each empty detection belt 105 in series into two ropes that can be quickly dragged, so that it is convenient to quickly drag and roll up each support belt 202 together with the installed sensor group 205 before grouting, so as to facilitate repeated use and assembly. The second connecting frame 216 makes the end-to-end adjacent support positioning frames 212 sealed and connected, and the second connecting frame 216 further seals and separates the pipeline formed by the C-shaped groove rod 201 and the support side plate 213, thereby protecting the sensor group 205 from damage and increasing the number of times the sensor group 205 is reused.

[0043] When the present invention is in use, the staff installs and attaches the waterproof cloth 103 to the inner wall surface of the initial support 101 without puncture, and then installs and attaches the waterproof board 104 to the waterproof cloth 103 in an array evenly and without puncture, and then installs and attaches each void detection belt 105 to the waterproof board 104 in an array evenly and without puncture, and connects the C-shaped groove rods 201 adjacent to each other on each waterproof board 104 end to end through a C-shaped connecting frame 207, and at the same time, the supporting pipe mouth 206 is respectively installed to the ports of the C-shaped groove rod 201 at the head and tail ends, so that a plurality of sensor groups 205 are evenly arranged in an array on the outer peripheral surface of the secondary lining 102, and then concrete is poured for the secondary lining 102. During the pouring process, the concrete gradually abuts against each void detection belt 105, thereby triggering the induction of each sensor group 205 and generating data for external transmission, so as to obtain the concrete pressure at various locations of the secondary lining 102 during pouring according to the data. The thickness of the concrete during pouring is determined according to the data of the sensor group 205. The concrete at the location of the sensor group 205 is judged according to the data of the sensor group 205 whether the concrete meets the quantity and quality requirements during pouring, whether the concrete is sufficiently thick and evenly distributed without bubbles or vacancies. When a certain section of the secondary lining 102 meets the requirements of the mold transfer and starts to move the template structure, each support belt 202 is pulled out from the support pipe mouth 206, and the sensor group 205 is pulled out at the same time, so that the membrane-penetrating rotating rods 203 limited by the support belt 202 rotate one after another, cut the protective support membrane 204, and then inject grout into each C-shaped groove rod 201 through the support pipe mouth 206. In this embodiment, RPC grouting is used to fill each C-shaped groove rod 201 with slurry, and the slurry flows to the surroundings through the through-hole on the protective support membrane 204, filling the gaps between the secondary lining 102 and the waterproof board 104 that are not tightly attached, or even the empty areas, so that the concrete state during the pouring of the secondary lining can be monitored and the emptying phenomenon can be prevented at the same time.

[0044] The upper end of the membrane-penetrating rotating rod 203 is positioned by the mounting frame 208, and the coil spring rotating shaft 209 and the membrane-penetrating rotating rod 203 are conveniently and quickly replaced and repaired. The support belt 202 is limited by the limiting roller 211, and the tip of the membrane-penetrating curved knife 210 is prevented from contacting the support belt 202. When the support belt 202 is dragged, the resistance of the support belt 202 is reduced by the limiting roller 211. When the limiting roller 211 is separated from the support belt 202, the membrane-penetrating rotating rod 203 is rotated under the elastic force of the coil spring rotating shaft 209, driving the tip of the membrane-penetrating curved knife 210 to penetrate the protective support membrane 204 until the limiting roller 211 and the membrane-penetrating curved knife 210 abut against the concrete surface, thereby forming a tight bonding structure with the subsequent RPC slurry. The sensor group 205 keeps its own axis perpendicular to the side surface of the support belt 202 through the supporting inclined block 214, so that the sensor group 205 is kept at the best monitoring position for concrete. The support belt 202 is connected to the sensor group 205 through the first connecting frame 215, and the support belt 202 in each empty detection belt 105 is connected in series into two ropes that can be quickly dragged, so that each support belt 202 together with the installed sensor group 205 can be quickly dragged and rolled up before grouting, so as to facilitate repeated use and assembly. The second connecting frame 216 makes the end-to-end adjacent support positioning frames 212 sealed and connected, and the second connecting frame 216 further seals and separates the pipeline formed by the C-shaped groove rod 201 and the support side plate 213, so as to protect the sensor group 205 from damage and increase the number of reuse of the sensor group 205. It can protect the support belt 202 and the sensor group 205 before grouting without hindering the grouting process, ensuring the continuous and reliable monitoring process.

[0045] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technical personnel in this field can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any simple modification, equivalent change and modification made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solution of the present invention still fall within the scope of the technical solution of the present invention.

Claims

1. A sensor monitoring device for preventing secondary lining concrete from degassing, comprising a degassing detection belt (105) arranged on a waterproof board (104) sandwiched between an initial support (101) and a secondary lining (102), characterized in that: The air gap detection belt (105) is evenly distributed in a semicircular ring array, and comprises a C-shaped groove rod (201), a protective support film (204) is provided on the vacant side of the C-shaped groove rod (201), a support belt (202) is slidably connected to the middle of the C-shaped groove rod (201), a plurality of sensor groups (205) evenly distributed at equal distances are installed on one side of the support belt (202) close to the protective support film (204), and a plurality of membrane-penetrating rotating rods (203) evenly distributed at equal distances are elastically hinged on the groove bottom of the C-shaped groove rod (201).

2. A sensor monitoring device for preventing secondary lining concrete from degassing according to claim 1, characterized in that: The adjacent C-shaped slot rods (201) are connected end to end via a C-shaped connecting frame (207); the ports of the C-shaped slot rods (201) at both ends are fixedly connected to support pipe openings (206); wires for transmitting power and signals are embedded in the support belt (202); the sensor group (205) is powered by the wires and sends out various signals and information.

3. A sensor monitoring device for preventing secondary lining concrete from degassing according to claim 2, characterized in that: Support side plates (213) are installed on the side surfaces of the groove walls on both sides of the C-shaped groove rod (201); a protective support film (204) is provided on the side between the two support side plates (213) away from the C-shaped groove rod (201); a support belt (202) is slidably connected to the middle between the two support side plates (213); a plurality of sensor groups (205) are installed on the side of the support belt (202) away from the C-shaped groove rod (201); and the two support side plates (213) are provided with a plurality of sensor groups (205) distributed evenly and at equal distances. ) and located on the other side of the support belt (202), a plurality of membrane-penetrating rotating rods (203) are arranged at equal intervals and evenly distributed, the membrane-penetrating rotating rods (203) are elastically hinged to the support side plates (213), the interior of the support pipe opening (206) is evenly divided into two chambers corresponding to the C-shaped groove rod (201) and the support side plates (213), and the chambers of the support pipe opening (206) are independently connected to the pipelines formed by the C-shaped groove rod (201) and the support side plates (213).

4. A sensor monitoring device for preventing secondary lining concrete from degassing according to claim 1, characterized in that: The inner side walls of the C-shaped groove rod (201) and the supporting side plate (213) are both equipped with mounting frames (208), and the mounting frames (208) correspond to the membrane-penetrating rotating rod (203) one by one. The mounting frames (208) are elastically hinged to the membrane-penetrating rotating rod (203) via a coil spring rotating shaft (209).

5. A sensor monitoring device for preventing secondary lining concrete from degassing according to claim 1, characterized in that: One end of the film-penetrating rotating rod (203) close to the support belt (202) is rotatably connected to the limiting roller (211), and one end of the film-penetrating rotating rod (203) close to the limiting roller (211) and the side away from the support belt (202) is fixedly connected to a film-penetrating curved knife (210), and the tip of the film-penetrating curved knife (210) points to the support belt (202).

6. A sensor monitoring device for preventing secondary lining concrete from falling out according to claim 2, characterized in that: A first connecting frame (215) and a second connecting frame (216) are respectively provided on the inner side of the C-shaped connecting frame (207); the protective supporting film (204) is installed between the vacant side surfaces of the C-shaped groove rod (201) and between the two supporting side plates (213) through a supporting positioning frame (212); the end-to-end adjacent supporting side plates (213) are connected end-to-end through the C-shaped connecting frame (207); the end-to-end adjacent supporting belts (202) are connected end-to-end through the first connecting frame (215); and the end-to-end adjacent supporting positioning frames (212) are connected end-to-end through the second connecting frame (216).

7. A sensor monitoring device for preventing secondary lining concrete from degassing according to claim 1, characterized in that: The outer circumferential arc surface of the secondary lining (102) is divided into a plurality of squares with a side length of thirty centimeters, and each sensor group (205) is located at the center of the square. Each sensor group (205) is independent of each other and connected in parallel. A variety of sensors are embedded on the surface of the sensor group (205) close to the secondary lining (102).

8. A sensor monitoring device for preventing secondary lining concrete from degassing according to claim 1, characterized in that: Each sensor group (205) is independent of each other and connected in parallel, and the sensor group (205) is provided with a temperature sensor and a pressure sensor.

9. A sensor monitoring device for preventing secondary lining concrete from degassing according to claim 1, characterized in that: A plurality of supporting inclined blocks (214) are installed between the outer peripheral side surface of the sensor group (205) and the supporting belt (202).

10. A sensor monitoring device for preventing secondary lining concrete from degassing according to claim 1, characterized in that: The waterproof plates (104) are evenly distributed in an array and are sealed and connected to each other. A waterproof cloth (103) is provided between the waterproof plates (104) and the initial support (101). The initial support (101), the waterproof cloth (103), the waterproof plates (104) and the secondary lining (102) are sealed and connected to each other.