Power distribution network source network storage resource collaborative planning method, system, equipment and medium
By establishing a collaborative planning model for source network storage and Pelican optimization algorithm for the two-layer optimization target, the configuration of energy storage equipment is optimized, and the problem of insufficient photovoltaic absorption capacity is solved, achieving supply and demand balance and stable operation of the power system.
Patent Information
- Application Number
- CN202411045543.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-11-29
AI Technical Summary
The existing photo storage system planning research has failed to effectively consider the impact of uncertainty in distributed energy output on energy storage planning and the optimized operation of distribution networks, resulting in insufficient photovoltaic absorption capacity, resulting in unbalanced supply and demand and difficulty in real-time power balance.
Establish a collaborative planning model for source network storage with the minimum annual comprehensive construction cost and maximum photovoltaic consumption as the dual-layer optimization goal. Through the Pelican optimization algorithm, we can obtain the optimal energy storage configuration strategy of the distribution network and optimize the storage The location and capacity of the equipment.
It effectively solves the problem of supply and demand imbalance caused by insufficient photovoltaic absorption capacity, improves photovoltaic absorption capacity, reduces the voltage offset of the power grid, and ensures the continuous and stable operation of the power system.
Smart Images

Figure CN119047619A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of distribution network planning, and in particular to a distribution network source-network-storage resource collaborative planning method, system, computer equipment and storage medium. Background Art
[0002] With the large-scale access and increasing penetration of distributed renewable energy, the randomness, intermittency and volatility of its output limit the photovoltaic absorption capacity of the distribution network, increasing the difficulty of peak load regulation and frequency regulation of the power grid. The access of a high proportion of renewable energy to the power grid makes the planning problem more complicated, and energy storage as a flexible resource can effectively alleviate the fluctuation of renewable energy output and assist in achieving source-load matching to reduce the regulation pressure of the system. Based on this, the reasonable optimization of photovoltaic storage capacity configuration and operation strategy is of great significance for exploring the wide-area temporal and spatial complementary role of photovoltaic resources and ensuring the safety of new energy access to the grid.
[0003] Existing research on photovoltaic storage system planning mainly focuses on the optimal configuration model of distributed power sources and energy storage in active distribution networks, and mainly considers the optimization of access capacity and economic operation. There is little consideration of the impact of distributed energy output uncertainty on energy storage planning and distribution network optimization operation. There is a lack of research on the coordinated planning of multiple flexible resources of source, network and storage in distribution stations with the goal of improving photovoltaic absorption capacity. It is difficult to solve the problems of supply and demand imbalance and difficulty in real-time power balance caused by insufficient photovoltaic absorption capacity after distributed photovoltaics are connected to the distribution network, and it is impossible to effectively ensure the stable operation of the power system. Summary of the invention
[0004] The purpose of the present invention is to provide a method for collaborative planning of source-grid-storage resources in a distribution network. By taking the maximum absorption of intermittent energy, peak shaving and valley filling, peak and frequency regulation, improving the utilization rate of power equipment, delaying grid construction or improving power quality, etc. as the purpose, a source-grid-storage collaborative planning model with the minimum annual comprehensive construction cost of the distribution network and the maximum photovoltaic absorption capacity as double-layer optimization objectives is established, and the double-layer optimization model is solved by using the Pelican optimization algorithm to obtain the source-grid-storage collaborative planning of the optimal energy storage configuration strategy of the distribution network. It can simultaneously meet multiple optimization objectives such as safety, stability, reliability and economy, and effectively solve the problems of supply and demand imbalance and difficulty in real-time balance of electricity caused by insufficient photovoltaic absorption capacity after large-scale distributed photovoltaics are connected to the distribution network, improve the photovoltaic absorption capacity, reduce the grid voltage offset, and thus ensure the continuous and stable operation of the power system.
[0005] In order to achieve the above objectives, it is necessary to provide a distribution network source-grid-storage resource collaborative planning method, system, computer equipment and storage medium in response to the above technical problems.
[0006] In a first aspect, an embodiment of the present invention provides a method for collaborative planning of source, network and storage resources in a distribution network, the method comprising the following steps:
[0007] Pre-constructing a source-grid-storage collaborative planning model; the source-grid-storage collaborative planning model includes an upper-level planning model with minimizing the annual comprehensive construction cost of the distribution network as an optimization goal, and a lower-level operation model with maximizing the photovoltaic absorption capacity as an optimization goal;
[0008] The source-grid-storage collaborative planning model is solved by the Pelican optimization algorithm to obtain the optimal energy storage configuration strategy for the distribution network; the optimal energy storage configuration strategy includes the location and capacity of each energy storage device.
[0009] Furthermore, the step of pre-building a source-network-storage collaborative planning model includes:
[0010] Under the first preset constraint condition, the upper-level planning model is established with minimizing the annual comprehensive construction cost of the distribution network as the optimization goal; the objective function of the upper-level planning model is expressed as:
[0011] min f up =C DG +C ESS +C LA
[0012] In the formula, f up represents the annual comprehensive construction cost of the distribution network; C DG , C ESS and C LA They represent the distributed generation investment cost, energy storage investment and operation and maintenance cost, and flexible load call cost of the distribution network respectively;
[0013] Under the second preset constraint condition, the lower layer operation model is established with maximizing the photovoltaic consumption as the optimization goal; the objective function of the lower layer operation model is expressed as:
[0014] min f low =ω1R PV +ω2R VD
[0015] In the formula, f low It represents the comprehensive index value of the abandoned light rate and voltage deviation to reduce the photovoltaic absorption capacity; R PV and R VD They represent the light abandonment rate and voltage deviation rate respectively; ω1 and ω2 represent weight coefficients.
[0016] Furthermore, the distributed power source investment cost is expressed as:
[0017]
[0018] In the formula, C DGis the investment cost of distributed power generation in the distribution network; N is the number of distributed power generation; T is the planning evaluation period; d is the fixed annual interest rate; C D,i is the purchase and installation cost of the i-th distributed power source; C r,i is the annual operating cost of the i-th distributed generation; Represents the rated power of the i-th distributed generation.
[0019] Furthermore, the energy storage investment and operation and maintenance cost is expressed as:
[0020]
[0021] In the formula, C ESS represents the energy storage investment and operation and maintenance cost of the distribution network; M represents the number of energy storage devices; T is the planning period; d is the fixed annual interest rate; C p,j represents the purchase and installation cost of the jth energy storage device; represents the rated power of the jth energy storage device; C e,j represents the annual operating cost of the jth energy storage device; E ESS,j represents the rated capacity of the jth energy storage device.
[0022] Furthermore, the first preset constraint condition includes an energy storage output constraint and a distributed power supply capacity constraint; the energy storage output constraint is expressed as:
[0023]
[0024] Where P ESS,j (t) represents the charging or discharging power of the jth energy storage device at time t; E ESS,j (t) represents the capacity of the jth energy storage device at time t; and They represent the maximum power and minimum power of charging or discharging of the j-th energy storage device respectively; and They represent the maximum rated capacity and the minimum rated capacity of the j-th energy storage device respectively;
[0025] The distributed generation capacity constraint is expressed as:
[0026]
[0027] Where P G,i and Q G,i They represent the active power and reactive power of the i-th distributed generation respectively; represents the maximum active power of the i-th distributed generation; and They represent the minimum reactive power and minimum reactive power of distributed generation respectively.
[0028] Furthermore, the abandoned light rate is expressed as:
[0029]
[0030] In the formula, R PV P represents the abandonment rate of the distribution network; Δ,t represents the abandoned optical power caused by the scheduling instruction at time t; P pv,t represents the total output of distributed photovoltaic power before optimal scheduling at time t; T is the planning evaluation duration;
[0031] The voltage deviation rate is expressed as:
[0032]
[0033] In the formula, R VD Indicates the voltage deviation rate of the distribution network; ΔU n,t Indicates the voltage deviation of the nth node in the distribution network; U n,max and U n,min They represent the highest voltage and the lowest voltage of the nth node respectively; N represents the number of nodes in the distribution network.
[0034] Furthermore, the second preset constraint condition includes voltage amplitude constraint, photovoltaic output constraint, energy storage charge state constraint, power balance constraint and flexible load constraint;
[0035] The voltage amplitude constraint is expressed as:
[0036] U n,min ≤U n,t ≤U n,max
[0037] Where U n,max and U n,min Respectively represent the highest voltage and the lowest voltage of the nth node in the distribution network; U n,t represents the voltage of the nth node at time t;
[0038] The photovoltaic output constraint is expressed as:
[0039] P pv,min ≤P pv (t)≤P pv,max
[0040] Where P pv,min and P pv,max Respectively represent the minimum and maximum values of photovoltaic output; P pv (t) represents the photovoltaic power output at time t;
[0041] The energy storage state of charge constraint is expressed as:
[0042] SOCESS,MIN <SOC ESS,j (t)<SOC ESS,MAX
[0043] In the formula, SOC ESS,j (t) represents the state of charge of the j-th energy storage device at time t; SOC ESS,MAX With SOC ESS,MIN Respectively represent the maximum state of charge value and the minimum state of charge value of the energy storage device;
[0044] The power balance constraint is expressed as:
[0045]
[0046] Where P n,t and Q n,t They represent the active injection power and reactive injection power of the nth node in the distribution network at time t respectively; U n,t represents the voltage of the nth node at time t; G nl and B nl Respectively represent the impedance and admittance of the branch corresponding to the nth node and the lth node; θ nl,t is the phase angle difference between the first and last nodes of the branch corresponding to the nth node and the lth node; P pv,n,t and P L,n,t They represent the photovoltaic active power output and load active power demand of the nth node in the distribution network at time t respectively; Q pv,n,t and Q L,n,t They represent the PV reactive power output and load reactive power demand of the nth node in the distribution network at time t respectively;
[0047] The flexible load constraint is expressed as:
[0048] Δp min <Δp(t)<Δp max
[0049] t min <t<t max
[0050] Where Δp(t) represents the change of flexible load during period t; Δp max and Δp min They represent the maximum and minimum adjustable amounts of the flexible load corresponding to the period t respectively; t max With t min They respectively represent the upper and lower limits of the flexible load transferable time range.
[0051] In a second aspect, an embodiment of the present invention provides a distribution network source network storage resource collaborative planning system, the system comprising:
[0052] A model building module is used to pre-build a source-grid-storage collaborative planning model; the source-grid-storage collaborative planning model includes an upper-level planning model with minimizing the annual comprehensive construction cost of the distribution network as the optimization goal, and a lower-level operation model with maximizing the photovoltaic absorption capacity as the optimization goal;
[0053] The strategy optimization module is used to solve the source-grid-storage collaborative planning model through the Pelican optimization algorithm to obtain the optimal energy storage configuration strategy of the distribution network; the optimal energy storage configuration strategy includes the location and capacity of each energy storage device.
[0054] Further, the model building module includes a planning model building unit and an operation model building unit;
[0055] The planning model building unit is used to establish the upper-level planning model under the first preset constraint condition with minimizing the annual comprehensive construction cost of the distribution network as the optimization goal; the objective function of the upper-level planning model is expressed as:
[0056] min f up =C DG +C ESS +C LA
[0057] In the formula, f up represents the annual comprehensive construction cost of the distribution network; C DG , C ESS and C LA They represent the distributed generation investment cost, energy storage investment and operation and maintenance cost, and flexible load call cost of the distribution network respectively;
[0058] The operation model building unit is used to establish the lower-level operation model under the second preset constraint condition with maximizing the photovoltaic absorption amount as the optimization goal; the objective function of the lower-level operation model is expressed as:
[0059] min f low =ω1R PV +ω2R VD
[0060] In the formula, f low It represents the comprehensive index value of the abandoned light rate and voltage deviation to reduce the photovoltaic absorption capacity; R PV and R VD They represent the light abandonment rate and voltage deviation rate respectively; ω1 and ω2 represent weight coefficients.
[0061] Furthermore, the distributed power source investment cost is expressed as:
[0062]
[0063] In the formula, C DGis the investment cost of distributed power generation in the distribution network; N is the number of distributed power generation; T is the planning evaluation period; d is the fixed annual interest rate; C D,i is the purchase and installation cost of the i-th distributed power source; C r,i is the annual operating cost of the i-th distributed generation; Represents the rated power of the i-th distributed generation.
[0064] Furthermore, the energy storage investment and operation and maintenance cost is expressed as:
[0065]
[0066] In the formula, C ESS represents the energy storage investment and operation and maintenance cost of the distribution network; M represents the number of energy storage devices; T is the planning period; d is the fixed annual interest rate; C p,j represents the purchase and installation cost of the jth energy storage device; represents the rated power of the jth energy storage device; C e,j represents the annual operating cost of the jth energy storage device; E ESS,j represents the rated capacity of the jth energy storage device.
[0067] Furthermore, the first preset constraint condition includes an energy storage output constraint and a distributed power supply capacity constraint; the energy storage output constraint is expressed as:
[0068]
[0069] Where P ESS,j (t) represents the charging or discharging power of the jth energy storage device at time t; E ESS,j (t) represents the capacity of the jth energy storage device at time t; and They represent the maximum power and minimum power of charging or discharging of the j-th energy storage device respectively; and They represent the maximum rated capacity and the minimum rated capacity of the j-th energy storage device respectively;
[0070] The distributed generation capacity constraint is expressed as:
[0071]
[0072] Where P G,i and Q G,i They represent the active power and reactive power of the i-th distributed generation respectively; represents the maximum active power of the i-th distributed generation; and They represent the minimum reactive power and minimum reactive power of distributed generation respectively.
[0073] Furthermore, the abandoned light rate is expressed as:
[0074]
[0075] In the formula, R PV P represents the abandonment rate of the distribution network; Δ,t represents the abandoned optical power caused by the scheduling instruction at time t; P pv,t represents the total output of distributed photovoltaic power before optimal scheduling at time t; T is the planning evaluation duration;
[0076] The voltage deviation rate is expressed as:
[0077]
[0078] In the formula, R VD Indicates the voltage deviation rate of the distribution network; ΔU n,t Indicates the voltage deviation of the nth node in the distribution network; U n,max and U n,min They represent the highest voltage and the lowest voltage of the nth node respectively; N represents the number of nodes in the distribution network.
[0079] Furthermore, the second preset constraint condition includes voltage amplitude constraint, photovoltaic output constraint, energy storage charge state constraint, power balance constraint and flexible load constraint;
[0080] The voltage amplitude constraint is expressed as:
[0081] U n,min ≤U n,t ≤U n,max
[0082] Where U n,max and U n,min Respectively represent the highest voltage and the lowest voltage of the nth node in the distribution network; U n,t represents the voltage of the nth node at time t;
[0083] The photovoltaic output constraint is expressed as:
[0084] P pv,min ≤P pv (t)≤P pv,max
[0085] Where P pv,min and P pv,max Respectively represent the minimum and maximum values of photovoltaic output; P pv (t) represents the photovoltaic power output at time t;
[0086] The energy storage state of charge constraint is expressed as:
[0087] SOCESS,MIN <SOC ESS,j (t)<SOC ESS,MAX
[0088] In the formula, SOC ESS,j (t) represents the state of charge of the j-th energy storage device at time t; SOC ESS,MAX With SOC ESS,MIN Respectively represent the maximum state of charge value and the minimum state of charge value of the energy storage device;
[0089] The power balance constraint is expressed as:
[0090]
[0091] Where P n,t and Q n,t They represent the active injection power and reactive injection power of the nth node in the distribution network at time t respectively; U n,t represents the voltage of the nth node at time t; G nl and B nl Respectively represent the impedance and admittance of the branch corresponding to the nth node and the lth node; θ nl,t is the phase angle difference between the first and last nodes of the branch corresponding to the nth node and the lth node; P pv,n,t and P L,n,t They represent the photovoltaic active power output and load active power demand of the nth node in the distribution network at time t respectively; Q pv,n,t and Q L,n,t They represent the PV reactive power output and load reactive power demand of the nth node in the distribution network at time t respectively;
[0092] The flexible load constraint is expressed as:
[0093] Δp min <Δp(t)<Δp max
[0094] t min <t<t max
[0095] Where Δp(t) represents the change of flexible load during period t; Δp max and Δp min They represent the maximum and minimum adjustable amounts of the flexible load corresponding to the period t respectively; t max With t min They respectively represent the upper and lower limits of the flexible load transferable time range.
[0096] In a third aspect, an embodiment of the present invention further provides a computer device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the above method when executing the computer program.
[0097] In a fourth aspect, an embodiment of the present invention further provides a computer-readable storage medium having a computer program stored thereon, wherein the computer program implements the steps of the above method when executed by a processor.
[0098] The above-mentioned application provides a distribution network source-grid-storage resource collaborative planning method, system, computer equipment and storage medium. The method is used to pre-construct a source-grid-storage collaborative planning model that includes an upper-level planning model with the optimization goal of minimizing the annual comprehensive construction cost of the distribution network and a lower-level operation model with the optimization goal of maximizing photovoltaic absorption. The source-grid-storage collaborative planning model is solved by the Pelican optimization algorithm to obtain a technical solution for the optimal energy storage configuration strategy of the distribution network including the location and capacity of each energy storage device. Compared with the existing technology, the distribution network source-grid-storage resource collaborative planning method aims to maximize the absorption of intermittent energy, peak shaving and valley filling, peak and frequency regulation, improve the utilization rate of power equipment, delay grid construction or improve power quality, etc., and establishes a source-grid-storage collaborative planning model with the minimum annual comprehensive construction cost of the distribution network and the maximum photovoltaic absorption as double-layer optimization goals to optimize the configuration strategy of distribution network energy storage equipment. It can ensure that the obtained optimal energy storage configuration strategy meets multiple optimization goals such as safety, stability, reliability and economy at the same time, and effectively solves the problems of supply and demand imbalance and difficulty in real-time power balance caused by insufficient photovoltaic absorption capacity after large-scale distributed photovoltaics are connected to the distribution network. While improving the photovoltaic absorption capacity, it can also reduce the grid voltage offset, thereby providing reliable guarantee for the continuous and stable operation of the power system. BRIEF DESCRIPTION OF THE DRAWINGS
[0099] Figure 1 It is a flow chart of a method for collaborative planning of power distribution network source, network and storage resources in an embodiment of the present invention;
[0100] Figure 2 Schematic diagram of the architecture of the source-network-storage collaborative planning model in an embodiment of the present invention;
[0101] Figure 3 is a flow chart of using the Pelican optimization algorithm to solve a two-layer optimization model in an embodiment of the present invention;
[0102] Figure 4 It is a flowchart of solving a source-network-storage collaborative planning model using the Pelican optimization algorithm in an embodiment of the present invention;
[0103] Figure 5 Schematic diagram of the structure of the distribution network source network storage resource collaborative planning system in an embodiment of the present invention;
[0104] Figure 6 It is a diagram of the internal structure of a computer device in an embodiment of the present invention. DETAILED DESCRIPTION
[0105] In order to make the purpose, technical scheme and beneficial effects of the present application clearer, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. Obviously, the embodiments described below are part of the embodiments of the present invention and are only used to illustrate the present invention, but are not used to limit the scope of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0106] The distribution network source-grid-storage resource collaborative planning method provided by the present invention can be understood as a method for realizing the maximum absorption of intermittent energy, peak shaving and valley filling, peak and frequency regulation, improving the utilization rate of power equipment, delaying grid construction or improving power quality, etc., based on the fact that the existing distribution network resource planning method does not consider the impact of the uncertainty of distributed energy output and the demand for the improvement of photovoltaic absorption capacity, which leads to the application defects of imbalance of supply and demand and difficulty in real-time balance of electricity due to insufficient photovoltaic absorption capacity after the distributed photovoltaic is connected to the distribution network. A source-grid-storage collaborative planning model with the double-layer optimization objectives of minimizing the annual comprehensive construction cost of the distribution network and maximizing the photovoltaic absorption capacity is established, and the double-layer optimization model is solved by using the Pelican optimization algorithm to obtain the source-grid-storage collaborative planning method of the distribution network with the optimal energy storage configuration strategy. The following embodiments will explain the distribution network source-grid-storage resource collaborative planning method of the present invention in detail.
[0107] In one embodiment, Figure 1 As shown, a method for collaborative planning of source, network and storage resources of a distribution network is provided, comprising the following steps:
[0108] S11. Pre-construct a source-grid-storage collaborative planning model; wherein the source-grid-storage collaborative planning model can be understood as a two-layer optimization model for joint planning and operation optimization of multiple flexible resources in the three aspects of source, grid and storage. In order to ensure that the demand for improving photovoltaic absorption capacity is taken into account while considering the impact of the uncertainty of distributed energy output, in this embodiment, preferably, the source-grid-storage collaborative planning model includes an upper-level planning model with the optimization goal of minimizing the annual comprehensive construction cost of the distribution network, and a lower-level operation model with the optimization goal of maximizing photovoltaic absorption.
[0109] Specifically, the step of pre-building a source-network-storage collaborative planning model includes:
[0110] Under the first preset constraint condition, the upper-level planning model is established with minimizing the annual comprehensive construction cost of the distribution network as the optimization goal; the objective function of the upper-level planning model is expressed as:
[0111] min f up =C DG +C ESS +C LA
[0112] In the formula, f up represents the annual comprehensive construction cost of the distribution network; C DG , C ESS and C LA They respectively represent the distributed generation investment cost of the distribution network, the energy storage investment and operation and maintenance cost, and the flexible load calling cost.
[0113] In order to ensure the comprehensiveness and reliability of the calculation of the distributed power generation investment cost of the distribution network, this embodiment preferably considers the purchase and installation cost and the annual operation and maintenance cost of each distributed power generation at the same time; specifically, the distributed power generation investment cost is expressed as:
[0114]
[0115] In the formula, C DG is the investment cost of distributed power generation in the distribution network; N is the number of distributed power generation; T is the planning evaluation time, which is set according to the actual application requirements; d is the fixed annual interest rate, which is set according to the actual situation; C D,i is the purchase and installation cost of the i-th distributed power source, including purchase cost and installation cost; C r,i is the annual operating cost of the i-th distributed generation, which is set according to the actual situation; Represents the rated power of the i-th distributed generation.
[0116] Similarly, in order to ensure the comprehensiveness and reliability of the calculation of the energy storage investment and operation and maintenance cost of the distribution network, this embodiment preferably considers the purchase and installation cost of each energy storage device and the annual operation and maintenance cost; specifically, the energy storage investment and operation and maintenance cost is expressed as:
[0117]
[0118] In the formula, C ESS represents the energy storage investment and operation and maintenance cost of the distribution network; M represents the number of energy storage devices; T is the planning period; d is the fixed annual interest rate; C p,j represents the purchase and installation cost of the jth energy storage device; represents the rated power of the jth energy storage device; C e,j represents the annual operating cost of the jth energy storage device; E ESS,j represents the rated capacity of the jth energy storage device.
[0119] According to the flexible load response type, it can be divided into peak shaving load and valley filling load. In this embodiment, the flexible load call cost is preferably calculated based on the peak shaving load and valley filling load. Specifically, the flexible load call cost is expressed as:
[0120]
[0121] In the formula, C LA represents the calling cost of flexible load; P d+,t and P d-,t They represent the valley-filling demand response and peak-shaving demand response of the system demand side at time t respectively; C x and C t They represent the compensation prices for unit peak shaving demand response and unit valley filling demand response respectively.
[0122] In order to ensure the rationality of the upper-level planning model setting, this embodiment preferably considers the energy storage device output and the distributed power supply capacity to formulate corresponding optimization constraints; specifically, the first preset constraint includes the energy storage output constraint and the distributed power supply capacity constraint; wherein, the energy storage output constraint is expressed as:
[0123]
[0124] Where P ESS,j (t) represents the charging or discharging power of the jth energy storage device at time t; E ESS,j (t) represents the capacity of the jth energy storage device at time t; and They represent the maximum power and minimum power of charging or discharging of the j-th energy storage device, respectively, and can be set according to the actual application; and They respectively represent the maximum rated capacity and minimum rated capacity of the j-th energy storage device, and can be set according to actual application conditions.
[0125] The distributed generation capacity constraint is expressed as:
[0126]
[0127] Where P G,i and Q G,i They represent the active power and reactive power of the i-th distributed generation respectively; It represents the maximum active power of the ith distributed power source, which can be set according to the actual application situation; and They respectively represent the minimum reactive power and minimum reactive power of the distributed power source, and can be set according to actual application conditions.
[0128] Under the second preset constraint condition, the lower-level operation model is established with maximizing the photovoltaic absorption as the optimization goal; wherein, based on the fact that maximizing the photovoltaic absorption in actual applications is essentially equivalent to minimizing the abandonment rate and voltage deviation that will reduce the photovoltaic absorption, based on this, the optimization goal of maximizing the photovoltaic absorption can be replaced by the optimization goal of minimizing the comprehensive index of abandonment rate and voltage deviation; that is, the objective function of the lower-level operation model is expressed as:
[0129] min f low =ω1R PV +ω2R VD
[0130] In the formula, f low It represents the comprehensive index value of the abandoned light rate and voltage deviation to reduce the photovoltaic absorption capacity; R PV and R VD They represent the abandonment rate and voltage deviation rate respectively; ω1 and ω2 represent weight coefficients, satisfying ω1+ω2=1, and both are positive numbers.
[0131] Specifically, the abandoned light rate is expressed as:
[0132]
[0133] In the formula, R PV P represents the abandonment rate of the distribution network; Δ,t represents the abandoned optical power caused by the scheduling instruction at time t; P pv,t represents the total output of distributed photovoltaic power before optimal scheduling at time t; T is the planning evaluation duration.
[0134] The voltage deviation rate is expressed as:
[0135]
[0136] In the formula, R VD Indicates the voltage deviation rate of the distribution network; ΔU n,t represents the voltage deviation of the nth node in the distribution network at time t; U n,max and U n,min They represent the highest voltage and the lowest voltage of the nth node respectively and can be set according to the actual application. N represents the number of nodes in the distribution network.
[0137] In order to ensure the rationality of the optimization of the lower-level operation model, this embodiment preferably considers multiple constraints such as the voltage amplitude, photovoltaic output, energy storage charge state, power balance and flexible load of the distribution network system at the same time; specifically, the second preset constraint condition includes voltage amplitude constraint, photovoltaic output constraint, energy storage charge state constraint, power balance constraint and flexible load constraint; wherein, the voltage amplitude constraint is expressed as:
[0138] Un,min ≤U n,t ≤U n,max
[0139] Where U n,max and U n,min They represent the highest voltage and lowest voltage of the nth node in the distribution network, respectively, and can be set according to the actual application; U n,t Represents the voltage of the nth node at time t.
[0140] The photovoltaic output constraint is expressed as:
[0141] P pv,min ≤P pv (t)≤P pv,max
[0142] Where P pv,min and P pv,max Respectively represent the minimum and maximum values of photovoltaic output, which can be set according to actual application conditions; P pv (t) represents the photovoltaic power output at time t.
[0143] The energy storage state of charge constraint is expressed as:
[0144] SOC ESS,MIN <SOC ESS,j (t)<SOC ESS,MAX
[0145] In the formula, SOC ESS,j (t) represents the state of charge of the j-th energy storage device at time t; SOC ESS,MAX With SOC ESS,MIN They respectively represent the maximum state of charge value and the minimum state of charge value of the energy storage device, and are set according to the actual application situation.
[0146] The power balance constraint is expressed as:
[0147]
[0148] Where P n,t and Q n,t They represent the active injection power and reactive injection power of the nth node in the distribution network at time t respectively; U n,t represents the voltage of the nth node at time t; G nl and B nl Respectively represent the impedance and admittance of the branch corresponding to the nth node and the lth node; θ nl,t is the phase angle difference between the first and last nodes of the branch corresponding to the nth node and the lth node; P pv,n,t and P L,n,t They represent the photovoltaic active power output and load active power demand of the nth node in the distribution network at time t respectively; Qpv,n,t and Q L,n,t They represent the PV reactive power output and load reactive power demand of the nth node in the distribution network at time t respectively;
[0149] The flexible load constraint is expressed as:
[0150] Δp min <Δp(t)<Δp max
[0151] t min <t<t max
[0152] Where Δp(t) represents the change of flexible load during period t; Δp max and Δp min They represent the maximum and minimum adjustable amounts of the flexible load corresponding to the time period t, which can be set according to the actual application situation; t max With t min They respectively represent the upper and lower limits of the flexible load transferable time range and can be set according to actual application requirements.
[0153] It should be noted that the power of photovoltaic, load and energy storage at each moment in the planning evaluation period involved in the above-mentioned source-grid-storage collaborative planning model can be understood as the prediction and deduction of the typical power model established by analyzing the relevant power data on the cloud platform that collects new energy operation data. The specific method of constructing the typical power model will not be described in detail here. Figure 2 The double-layer optimization model for collaborative planning of source-grid-storage flexible resources shown in the figure can realize decision optimization of the site selection and capacity of the photovoltaic storage system (energy storage equipment) in the distribution network through the upper-layer planning model with the goal of minimizing the annual comprehensive construction cost of the distribution network, and use the site selection and capacity of the photovoltaic storage system (energy storage equipment) output by the upper-layer planning model as the input of the lower-layer operation model, and optimize the charging and discharging power and flexible load calling capacity of the energy storage equipment in the distribution network in each period with the maximum photovoltaic absorption (minimum voltage offset and minimum abandonment rate) as the optimization goal. It can be seen that the double-layer model constructed in this embodiment takes into account both the planning stage and the operation stage, and can be used to optimize the site selection and capacity configuration of each energy storage equipment that needs to be deployed in the distribution network system, which can ensure that while improving the photovoltaic absorption capacity, it can also reduce the investment cost and the damage to the power grid caused by the unstable output of distributed energy.
[0154] S12. Solve the source-grid-storage collaborative planning model through the Pelican Optimization Algorithm to obtain the optimal energy storage configuration strategy of the distribution network; the optimal energy storage configuration strategy includes the location and capacity of each energy storage device; wherein the Pelican Optimization Algorithm (POA) is a heuristic optimization algorithm that simulates the foraging behavior of pelicans; the specific process of using the Pelican Optimization Algorithm to solve the double-layer optimization model is as follows Figure 3 As shown:
[0155] 1) Input optimization problem information, determine the pelican population (N1), number of iterations (T1), and problem dimension (M1);
[0156] 2) Initialize the pelican position and calculate the objective function value
[0157] X k,m = l m +rand·(u m -l m ),k=1,2,...,N1,m=1,2,...,M1
[0158] Where, X k,m is the position of the kth pelican in the mth dimension; rand is a random number in the range [0,1]; u m and l m They represent the upper and lower bounds of the mth dimension of the problem to be solved respectively;
[0159] 3) Pelican performs the first stage of the solution, randomly generating prey locations in the search space:
[0160]
[0161] In the formula, is the position of the mth dimension of the kth pelican after the first stage update; rand is a random number in the range [0,1]; I is a random integer of 0 or 2; p m is the m-th dimension position of the prey; F p is the objective function value of the prey;
[0162] 4) Update the optimal solution after the first stage search;
[0163] 5) Pelican conducts the second stage of solution:
[0164]
[0165] In the formula, is the position of the mth dimension of the kth pelican after the update based on the second stage; rand is a random number in the range [0,1]; R is a random integer of 0 or 2; t is the current iteration number; T1 is the maximum iteration number;
[0166] 6) Update the optimal solution after the second stage search;
[0167] 7) Determine whether the maximum number of iterations has been reached. If so, output the optimal solution. Otherwise, repeat step (3).
[0168] In this embodiment, if Figure 4 As shown in the figure, the process of solving the proposed source-grid-storage collaborative optimization model based on the Pelican optimization algorithm is as follows:
[0169] Step 1: Based on the new energy cloud platform, obtain the annual historical data of photovoltaic output, node load timing characteristics, flexible load call status, and energy storage charging and discharging; perform cluster analysis on the annual historical data to obtain the typical daily output curve of photovoltaic power generation in different seasons, and simulate the photovoltaic configuration scenario based on the Monte Carlo method. Input the photovoltaic output data, node load timing data, flexible load call capacity constraints, and energy storage charging and discharging constraints (energy storage charging and discharging constraints include discharge power constraints and state of charge (SOC) constraints, etc.) in typical daily scenarios of each season; the corresponding energy storage charging and discharging constraints can be obtained based on the installed capacity of the energy storage equipment, and the flexible load call capacity constraints can be mined based on the flexible load call historical data and the analysis of node load historical data to explore the capacity that can participate in the call;
[0170] Step 2: Initialize the location of the pelican population, i.e. the location and capacity of the energy storage equipment in the planning layer, and use it as the input of the operation layer;
[0171] Step 3: Using the optimization objectives and constraints of the operation layer as input, initialize the flexible load call status and energy storage operation power of the operation layer, calculate the objective function of the operation layer, and use the Pelican algorithm to optimize the flexible load and energy storage output in each period, and feed back to the planning layer;
[0172] Step 4: The planning layer receives feedback data from the operation layer, calculates the constraints and objective function of the planning layer, and optimizes and updates the flexible load call status, location and capacity of energy storage;
[0173] Step 5: Check whether the termination condition is reached in each iteration. If so, stop the iteration and output the final result, otherwise continue the iteration.
[0174] The embodiment of the present application pre-constructs a source-grid-storage collaborative planning model including an upper-level planning model with minimizing the annual comprehensive construction cost of the distribution network as an optimization target, and a lower-level operation model with maximizing the photovoltaic absorption amount as an optimization target, and solves the source-grid-storage collaborative planning model through the Pelican optimization algorithm to obtain a solution for the optimal energy storage configuration strategy of the distribution network including the location and capacity of each energy storage device, so as to maximize the absorption of intermittent energy, peak shaving and valley filling, peak and frequency regulation, improve the utilization rate of power equipment, delay the construction of the power grid or improve the power quality, etc., and establishes a source-grid-storage collaborative planning model with the minimization of the annual comprehensive construction cost of the distribution network and the maximization of the photovoltaic absorption amount as double-layer optimization targets to optimize the configuration strategy of the distribution network energy storage equipment, so as to ensure that the obtained optimal energy storage configuration strategy meets multiple optimization targets such as safety, stability, reliability and economy at the same time, and effectively solves the problems of supply and demand imbalance and difficulty in real-time power balance caused by insufficient photovoltaic absorption capacity after large-scale distributed photovoltaics are connected to the distribution network, and improves the photovoltaic absorption capacity while reducing the grid voltage offset, thereby providing reliable guarantee for the continuous and stable operation of the power system.
[0175] It should be noted that although the steps in the above flowchart are shown in sequence according to the arrows, these steps are not necessarily executed in the order indicated by the arrows. Unless otherwise specified in this document, there is no strict order restriction for the execution of these steps, and these steps can be executed in other orders.
[0176] In one embodiment, Figure 5 As shown, a distribution network source network storage resource collaborative planning system is provided, and the system includes:
[0177] Model building module 1, used to pre-build a source-grid-storage collaborative planning model; the source-grid-storage collaborative planning model includes an upper-level planning model with minimizing the annual comprehensive construction cost of the distribution network as the optimization goal, and a lower-level operation model with maximizing the photovoltaic consumption as the optimization goal;
[0178] Strategy optimization module 2 is used to solve the source-grid-storage collaborative planning model through the Pelican optimization algorithm to obtain the optimal energy storage configuration strategy of the distribution network; the optimal energy storage configuration strategy includes the location and capacity of each energy storage device.
[0179] In one embodiment, a distribution network source-grid-storage resource collaborative planning system is provided, wherein the model building module includes a planning model building unit and an operation model building unit;
[0180] The planning model building unit is used to establish the upper-level planning model under the first preset constraint condition with minimizing the annual comprehensive construction cost of the distribution network as the optimization goal; the objective function of the upper-level planning model is expressed as:
[0181] min fup =C DG +C ESS +C LA
[0182] In the formula, f up represents the annual comprehensive construction cost of the distribution network; C DG , C ESS and C LA They represent the distributed generation investment cost, energy storage investment and operation and maintenance cost, and flexible load call cost of the distribution network respectively;
[0183] The operation model building unit is used to establish the lower-level operation model under the second preset constraint condition with maximizing the photovoltaic absorption amount as the optimization goal; the objective function of the lower-level operation model is expressed as:
[0184] min f low =ω1R PV +ω2R VD
[0185] In the formula, f low It represents the comprehensive index value of the abandoned light rate and voltage deviation to reduce the photovoltaic absorption capacity; R PV and R VD They represent the light abandonment rate and voltage deviation rate respectively; ω1 and ω2 represent weight coefficients.
[0186] In one embodiment, a distribution network source-grid-storage resource collaborative planning system is provided, wherein the distributed power source investment cost is expressed as:
[0187]
[0188] In the formula, C DG is the investment cost of distributed power generation in the distribution network; N is the number of distributed power generation; T is the planning evaluation period; d is the fixed annual interest rate; C D,i is the purchase and installation cost of the i-th distributed power source; C r,i is the annual operating cost of the i-th distributed generation; Represents the rated power of the i-th distributed generation.
[0189] In one embodiment, a distribution network source-grid-storage resource collaborative planning system is provided, wherein the energy storage investment and operation and maintenance cost is expressed as:
[0190]
[0191] In the formula, C ESS represents the energy storage investment and operation and maintenance cost of the distribution network; M represents the number of energy storage devices; T is the planning period; d is the fixed annual interest rate; C p,j represents the purchase and installation cost of the jth energy storage device; represents the rated power of the jth energy storage device; C e,j represents the annual operating cost of the jth energy storage device; E ESS,j represents the rated capacity of the jth energy storage device.
[0192] In one embodiment, a distribution network source-grid-storage resource collaborative planning system is provided, wherein the flexible load call cost is expressed as:
[0193]
[0194] In the formula, C LA represents the calling cost of flexible load; P d+,t and P d-,t They represent the valley-filling demand response and peak-shaving demand response of the system demand side at time t respectively; C x and C t They represent the compensation prices for unit peak shaving demand response and unit valley filling demand response respectively.
[0195] In one embodiment, a distribution network source-grid-storage resource collaborative planning system is provided, wherein the first preset constraint condition includes an energy storage output constraint and a distributed power supply capacity constraint; the energy storage output constraint is expressed as:
[0196]
[0197] Where P ESS,j (t) represents the charging or discharging power of the jth energy storage device at time t; E ESS,j (t) represents the capacity of the jth energy storage device at time t; and They represent the maximum power and minimum power of charging or discharging of the j-th energy storage device respectively; and They represent the maximum rated capacity and the minimum rated capacity of the j-th energy storage device respectively;
[0198] The distributed generation capacity constraint is expressed as:
[0199]
[0200] Where P G,i and Q G,i They represent the active power and reactive power of the i-th distributed generation respectively; represents the maximum active power of the i-th distributed generation; and They represent the minimum reactive power and minimum reactive power of distributed generation respectively.
[0201] In one embodiment, a distribution network source-grid-storage resource collaborative planning system is provided, wherein the abandoned light rate is expressed as:
[0202]
[0203] In the formula, R PV P represents the abandonment rate of the distribution network; Δ,t represents the abandoned optical power caused by the scheduling instruction at time t; P pv,t represents the total output of distributed photovoltaic power before optimal scheduling at time t; T is the planning evaluation duration;
[0204] The voltage deviation rate is expressed as:
[0205]
[0206] In the formula, R VD Indicates the voltage deviation rate of the distribution network; ΔU n,t Indicates the voltage deviation of the nth node in the distribution network; U n,max and U n,min They represent the highest voltage and the lowest voltage of the nth node respectively; N represents the number of nodes in the distribution network.
[0207] In one embodiment, a distribution network source-grid-storage resource collaborative planning system is provided, wherein the second preset constraint condition includes a voltage amplitude constraint, a photovoltaic output constraint, an energy storage charge state constraint, a power balance constraint, and a flexible load constraint;
[0208] The voltage amplitude constraint is expressed as:
[0209] U n,min ≤U n,t ≤U n,max
[0210] Where U n,max and U n,min Respectively represent the highest voltage and the lowest voltage of the nth node in the distribution network; U n,t represents the voltage of the nth node at time t;
[0211] The photovoltaic output constraint is expressed as:
[0212] P pv,min ≤P pv (t)≤P pv,max
[0213] Where P pv,min and P pv,max Respectively represent the minimum and maximum values of photovoltaic output; P pv (t) represents the photovoltaic power output at time t;
[0214] The energy storage state of charge constraint is expressed as:
[0215] SOC ESS,MIN <SOC ESS,j (t)<SOC ESS,MAX
[0216] In the formula, SOC ESS,j (t) represents the state of charge of the j-th energy storage device at time t; SOC ESS,MAX With SOC ESS,MIN Respectively represent the maximum state of charge value and the minimum state of charge value of the energy storage device;
[0217] The power balance constraint is expressed as:
[0218]
[0219] Where P n,t and Q n,t They represent the active injection power and reactive injection power of the nth node in the distribution network at time t respectively; U n,t represents the voltage of the nth node at time t; G nl and B nl Respectively represent the impedance and admittance of the branch corresponding to the nth node and the lth node; θ nl,t is the phase angle difference between the first and last nodes of the branch corresponding to the nth node and the lth node; P pv,n,t and P L,n,t They represent the photovoltaic active power output and load active power demand of the nth node in the distribution network at time t respectively; Q pv,n,t and Q L,n,t They represent the PV reactive power output and load reactive power demand of the nth node in the distribution network at time t respectively;
[0220] The flexible load constraint is expressed as:
[0221] Δp min <Δp(t)<Δp max
[0222] t min <t<t max
[0223] Where Δp(t) represents the change of flexible load during period t; Δp max and Δp min They represent the maximum and minimum adjustable amounts of the flexible load corresponding to the period t respectively; t max With t min They respectively represent the upper and lower limits of the flexible load transferable time range.
[0224] For the specific limitations of the distribution network source-grid-storage resource collaborative planning system, please refer to the limitations of the distribution network source-grid-storage resource collaborative planning method above. The corresponding technical effects can also be equivalently obtained, which will not be repeated here. Each module in the above-mentioned distribution network source-grid-storage resource collaborative planning system can be implemented in whole or in part through software, hardware and a combination thereof. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.
[0225] Figure 6 FIG. 1 shows an internal structure diagram of a computer device in an embodiment, and the computer device may specifically be a terminal or a server. Figure 6 As shown, the computer device includes a processor, a memory, a network interface, a display, a camera and an input device connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a method for collaborative planning of distribution network source network storage resources is implemented. The display screen of the computer device can be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device can be a touch layer covered on the display screen, or a button, trackball or touchpad set on the computer device housing, or an external keyboard, touchpad or mouse, etc.
[0226] It can be understood by those skilled in the art that Figure 6 The structure shown in the figure is only a block diagram of a part of the structure related to the present application scheme, and does not constitute a limitation on the computer device to which the present application scheme is applied. The specific computing device may include more or fewer components than shown in the figure, or combine certain components, or have the same component arrangement.
[0227] In one embodiment, a computer device is provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the steps of the above method are implemented when the processor executes the computer program.
[0228] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the steps of the above method are implemented.
[0229] In summary, the embodiment of the present invention provides a distribution network source-grid-storage resource collaborative planning method and system, wherein the distribution network source-grid-storage resource collaborative planning method realizes the pre-construction of a source-grid-storage collaborative planning model including an upper-level planning model with minimizing the annual comprehensive construction cost of the distribution network as the optimization goal, and a lower-level operation model with maximizing the photovoltaic absorption amount as the optimization goal, and solves the source-grid-storage collaborative planning model through the Pelican optimization algorithm to obtain a technical solution for the optimal energy storage configuration strategy of the distribution network including the location and capacity of each energy storage device. The method can maximize the absorption of intermittent energy, peak shaving and valley filling, peak and frequency regulation, and improve the utilization of power equipment. With the purpose of reducing the rate, delaying the construction of the power grid or improving the power quality, a source-grid-storage collaborative planning model with the dual optimization objectives of minimizing the annual comprehensive construction cost of the distribution network and maximizing the photovoltaic absorption capacity is established to optimize the configuration strategy of the distribution network energy storage equipment. This can ensure that the obtained optimal energy storage configuration strategy meets multiple optimization objectives such as safety, stability, reliability and economy at the same time, and effectively solve the problems of supply and demand imbalance and difficulty in real-time power balance caused by insufficient photovoltaic absorption capacity after large-scale distributed photovoltaics are connected to the distribution network. While improving the photovoltaic absorption capacity, it can also reduce the grid voltage offset, thereby providing reliable guarantee for the continuous and stable operation of the power system.
[0230] Each embodiment in this specification is described in a progressive manner, and the same or similar parts of each embodiment can be directly referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment. It should be noted that the technical features of the above-mentioned embodiments can be combined arbitrarily. In order to make the description concise, all possible combinations of the technical features in the above-mentioned embodiments are not described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0231] The above-mentioned embodiments only express several preferred implementation modes of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for ordinary technicians in the technical field, several improvements and substitutions can be made without departing from the technical principles of the present invention, and these improvements and substitutions should also be regarded as the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be based on the protection scope of the claims.
Claims
1. A method for collaborative planning of distribution network source, network and storage resources. It is characterized in that The method comprises the following steps: Pre-constructing a source-grid-storage collaborative planning model; the source-grid-storage collaborative planning model includes an upper-level planning model with minimizing the annual comprehensive construction cost of the distribution network as an optimization goal, and a lower-level operation model with maximizing the photovoltaic absorption capacity as an optimization goal; The source-grid-storage collaborative planning model is solved by the Pelican optimization algorithm to obtain the optimal energy storage configuration strategy for the distribution network; the optimal energy storage configuration strategy includes the location and capacity of each energy storage device.
2. The method for collaborative planning of distribution network source, network and storage resources according to claim 1, It is characterized in that The step of pre-building a source-network-storage collaborative planning model includes: Under the first preset constraint condition, the upper-level planning model is established with minimizing the annual comprehensive construction cost of the distribution network as the optimization goal; the objective function of the upper-level planning model is expressed as: min f up =C DG +C ESS +C LA In the formula, f up represents the annual comprehensive construction cost of the distribution network; C DG , C ESS and C LA They represent the distributed generation investment cost, energy storage investment and operation and maintenance cost, and flexible load call cost of the distribution network respectively; Under the second preset constraint condition, the lower layer operation model is established with maximizing the photovoltaic consumption as the optimization goal; the objective function of the lower layer operation model is expressed as: min f low =ω 1 R PV +oh 2 R VD In the formula, f low It represents the comprehensive index value of the abandoned light rate and voltage deviation to reduce the photovoltaic absorption capacity; R PV and R VD Respectively represent the light abandonment rate and voltage deviation rate; ω 1 and ω 2 Represents the weight coefficient.
3. The method for collaborative planning of distribution network source, network and storage resources according to claim 2, It is characterized in that The distributed power generation investment cost is expressed as: In the formula, C DG is the investment cost of distributed power generation in the distribution network; N is the number of distributed power generation; T is the planning evaluation time; d is the fixed annual interest rate; C D,i is the purchase and installation cost of the i-th distributed power source; C r,i is the annual operating cost of the i-th distributed generation; Represents the rated power of the i-th distributed generation.
4. The method for collaborative planning of distribution network source, network and storage resources according to claim 2, It is characterized in that The energy storage investment and operation and maintenance cost is expressed as: In the formula, C ESS represents the energy storage investment and operation and maintenance cost of the distribution network; M represents the number of energy storage devices; T is the planning period; d is the fixed annual interest rate; C p,j represents the purchase and installation cost of the jth energy storage device; represents the rated power of the jth energy storage device; C e,j represents the annual operating cost of the jth energy storage device; E ESS,j represents the rated capacity of the jth energy storage device.
5. The method for collaborative planning of distribution network source, network and storage resources according to claim 2, It is characterized in that The first preset constraint condition includes energy storage output constraint and distributed power supply capacity constraint; the energy storage output constraint is expressed as: Where P ESS,j (t) represents the charging or discharging power of the jth energy storage device at time t; E ESS,j (t) represents the capacity of the jth energy storage device at time t; and They represent the maximum power and minimum power of charging or discharging of the j-th energy storage device respectively; and They represent the maximum rated capacity and the minimum rated capacity of the j-th energy storage device respectively; The distributed generation capacity constraint is expressed as: Where P G,i and Q G,i They represent the active power and reactive power of the i-th distributed generation respectively; represents the maximum active power of the i-th distributed generation; and They represent the minimum reactive power and minimum reactive power of distributed generation respectively.
6. The method for collaborative planning of distribution network source, network and storage resources according to claim 2, It is characterized in that The light abandonment rate is expressed as: In the formula, R PV P represents the abandonment rate of the distribution network; Δ,t represents the abandoned optical power caused by the scheduling instruction at time t; P pv,t represents the total output of distributed photovoltaic power before optimal scheduling at time t; T is the planning evaluation duration; The voltage deviation rate is expressed as: In the formula, R VD Indicates the voltage deviation rate of the distribution network; ΔU n,t represents the voltage deviation of the nth node in the distribution network at time t; U n,max and U n,min They represent the highest voltage and the lowest voltage of the nth node respectively; N represents the number of nodes in the distribution network.
7. The method for collaborative planning of distribution network source, network and storage resources according to claim 2, It is characterized in that The second preset constraint condition includes voltage amplitude constraint, photovoltaic output constraint, energy storage charge state constraint, power balance constraint and flexible load constraint; The voltage amplitude constraint is expressed as: IN n,min ≤U n,t ≤U n,max Where U n,max and U n,min Respectively represent the highest voltage and the lowest voltage of the nth node in the distribution network; U n,t represents the voltage of the nth node at time t; The photovoltaic output constraint is expressed as: P pv,min ≤P pv (t)≤P pv,max Where P pv,min and P pv,max Respectively represent the minimum and maximum values of photovoltaic output; P pv (t) represents the photovoltaic power output at time t; The energy storage state of charge constraint is expressed as: SOC ESS,MIN <SOC ESS,j (t)<SOC ESS,MAX In the formula, SOC ESS,j (t) represents the state of charge of the j-th energy storage device at time t; SOC ESS,MAX With SOC ESS,MIN Respectively represent the maximum state of charge value and the minimum state of charge value of the energy storage device; The power balance constraint is expressed as: Where P n,t and Q n,t They represent the active injection power and reactive injection power of the nth node in the distribution network at time t respectively; U n,t represents the voltage of the nth node at time t; G nl and B nl Respectively represent the impedance and admittance of the branch corresponding to the nth node and the lth node; θ nl,t is the phase angle difference between the first and last nodes of the branch corresponding to the nth node and the lth node; P pv,n,t and P L,n,t They represent the photovoltaic active power output and load active power demand of the nth node in the distribution network at time t respectively; Q pv,n,t and Q L,n,t They represent the PV reactive power output and load reactive power demand of the nth node in the distribution network at time t respectively; The flexible load constraint is expressed as: Δp min <Δp(t)<Δp max t min <t<t max Where Δp(t) represents the change of flexible load during period t; Δp max and Δp min They represent the maximum adjustable amount and the minimum adjustable amount of the flexible load corresponding to the period t respectively; t max With t min They respectively represent the upper and lower limits of the flexible load transferable time range.
8. A distribution network source network storage resource collaborative planning system, It is characterized in that The system comprises: A model building module is used to pre-build a source-grid-storage collaborative planning model; the source-grid-storage collaborative planning model includes an upper-level planning model with minimizing the annual comprehensive construction cost of the distribution network as the optimization goal, and a lower-level operation model with maximizing the photovoltaic absorption capacity as the optimization goal; The strategy optimization module is used to solve the source-grid-storage collaborative planning model through the Pelican optimization algorithm to obtain the optimal energy storage configuration strategy of the distribution network; the optimal energy storage configuration strategy includes the location and capacity of each energy storage device.
9. The distribution network source network storage resource collaborative planning system according to claim 8, It is characterized in that The model building module includes a planning model building unit and an operation model building unit; The planning model building unit is used to establish the upper-level planning model under the first preset constraint condition with minimizing the annual comprehensive construction cost of the distribution network as the optimization goal; the objective function of the upper-level planning model is expressed as: min f up =C DG +C ESS +C LA In the formula, f up represents the annual comprehensive construction cost of the distribution network; C DG , C ESS and C LA They represent the distributed generation investment cost, energy storage investment and operation and maintenance cost, and flexible load call cost of the distribution network respectively; The operation model building unit is used to establish the lower-level operation model under the second preset constraint condition with maximizing the photovoltaic absorption amount as the optimization goal; the objective function of the lower-level operation model is expressed as: min f low =ω 1 R PV +oh 2 R VD In the formula, f low It represents the comprehensive index value of the abandoned light rate and voltage deviation to reduce the photovoltaic absorption capacity; R PV and R VD Respectively represent the light abandonment rate and voltage deviation rate; ω 1 and ω 2 Represents the weight coefficient.
10. The distribution network source network storage resource collaborative planning system according to claim 9, It is characterized in that The distributed power generation investment cost is expressed as: In the formula, C DG is the investment cost of distributed power generation in the distribution network; N is the number of distributed power generation; T is the planning evaluation time; d is the fixed annual interest rate; C D,i is the purchase and installation cost of the i-th distributed power source; C r,i is the annual operating cost of the i-th distributed generation; Represents the rated power of the i-th distributed generation.
11. The distribution network source network storage resource collaborative planning system according to claim 9, It is characterized in that The energy storage investment and operation and maintenance cost is expressed as: In the formula, C ESS represents the energy storage investment and operation and maintenance cost of the distribution network; M represents the number of energy storage devices; T is the planning period; d is the fixed annual interest rate; C p,j represents the purchase and installation cost of the jth energy storage device; represents the rated power of the jth energy storage device; C e,j represents the annual operating cost of the jth energy storage device; E ESS,j represents the rated capacity of the jth energy storage device.
12. The distribution network source network storage resource collaborative planning system according to claim 9, It is characterized in that The first preset constraint condition includes energy storage output constraint and distributed power supply capacity constraint; the energy storage output constraint is expressed as: Where P ESS,j (t) represents the charging or discharging power of the jth energy storage device at time t; E ESS,j (t) represents the capacity of the jth energy storage device at time t; and They represent the maximum power and minimum power of charging or discharging of the j-th energy storage device respectively; and They represent the maximum rated capacity and the minimum rated capacity of the j-th energy storage device respectively; The distributed generation capacity constraint is expressed as: Where P G,i and Q G,i They represent the active power and reactive power of the i-th distributed generation respectively; represents the maximum active power of the i-th distributed generation; and They represent the minimum reactive power and minimum reactive power of distributed generation respectively.
13. The distribution network source network storage resource collaborative planning system according to claim 9, It is characterized in that The light abandonment rate is expressed as: In the formula, R PV P represents the abandonment rate of the distribution network; Δ,t represents the abandoned optical power caused by the scheduling instruction at time t; P pv,t represents the total output of distributed photovoltaic power before optimal scheduling at time t; T is the planning evaluation duration; The voltage deviation rate is expressed as: In the formula, R VD Indicates the voltage deviation rate of the distribution network; ΔU n,t represents the voltage deviation of the nth node in the distribution network at time t; U n,max and U n,min They represent the highest voltage and the lowest voltage of the nth node respectively; N represents the number of nodes in the distribution network.
14. The distribution network source network storage resource collaborative planning system according to claim 9, It is characterized in that The second preset constraint condition includes voltage amplitude constraint, photovoltaic output constraint, energy storage charge state constraint, power balance constraint and flexible load constraint; The voltage amplitude constraint is expressed as: IN n,min ≤U n,t ≤U n,max Where U n,max and U n,min Respectively represent the highest voltage and the lowest voltage of the nth node in the distribution network; U n,t represents the voltage of the nth node at time t; The photovoltaic output constraint is expressed as: P pv,min ≤P pv (t)≤P pv,max Where P pv,min and P pv,max Respectively represent the minimum and maximum values of photovoltaic output; P pv (t) represents the photovoltaic power output at time t; The energy storage state of charge constraint is expressed as: SOC ESS,MIN <SOC ESS,j (t)<SOC ESS,MAX In the formula, SOC ESS,j (t) represents the state of charge of the j-th energy storage device at time t; SOC ESS,MAX With SOC ESS,MIN Respectively represent the maximum state of charge value and the minimum state of charge value of the energy storage device; The power balance constraint is expressed as: Where P n,t and Q n,t They represent the active injection power and reactive injection power of the nth node in the distribution network at time t respectively; U n,t represents the voltage of the nth node at time t; G nl and B nl Respectively represent the impedance and admittance of the branch corresponding to the nth node and the lth node; θ nl,t is the phase angle difference between the first and last nodes of the branch corresponding to the nth node and the lth node; P pv,n,t and P L,n,t They represent the photovoltaic active power output and load active power demand of the nth node in the distribution network at time t respectively; Q pv,n,t and Q L,n,t They represent the PV reactive power output and load reactive power demand of the nth node in the distribution network at time t respectively; The flexible load constraint is expressed as: Δp min <Δp(t)<Δp max t min <t<t max Where Δp(t) represents the change of flexible load during period t; Δp max and Δp min They represent the maximum adjustable amount and the minimum adjustable amount of the flexible load corresponding to the period t respectively; t max With t min They respectively represent the upper and lower limits of the flexible load transferable time range.
15. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, It is characterized in that When the processor executes the computer program, the steps of the method according to any one of claims 1 to 7 are implemented.
16. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.
Citation Information
Cited By
Marketing data distributed collaborative storage system and method based on machine learning
CN119474109A
Distributed Collaborative Storage System and Method for Marketing Data Based on Machine Learning
CN119474109B
Active power distribution network optimization coordination control method and system
CN119921293A
An active distribution network optimization and coordination control method and system
CN119921293B
Power distribution network source network storage cooperative control method and system
CN120896211A