Major network scheduling switching operation network command issuing system
Through intelligent ticketing system and multiple security and error verification, the problems of manual ticketing efficiency and high error operation rate in main network scheduling turnover operation are solved, efficient and accurate network orders are achieved, and the security of the power grid is improved. reliability.
Patent Information
- Application Number
- CN202411041173.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2044-07-31
AI Technical Summary
The existing main network scheduling relies on manual drafting of operation tickets in reverse operation, which is inefficient and prone to errors. Traditional manual orders have pronunciation deviations and risk of disconnection, resulting in high error rate of network scheduling, affecting the safety and reliability of the power grid.
Design a main network scheduling reverse operation network order system, including intelligent ticketing system, remote security and error prevention system before operation, network command system and remote status review system after operation, through automatic generation of operation tickets, simulation rehearsals and multiple Security and error verification are ensured to ensure efficient and accurate orders.
It improves the working efficiency and accuracy of power grid scheduling, enhances safety and reliability, and reduces the risk of misoperation through full-process calibration and review.
Smart Images

Figure CN119050990A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of power grid dispatching, and in particular relates to a main grid dispatching switching operation network command system. Background Art
[0002] Electrical equipment is divided into three states: operation, standby, and maintenance. The process of changing the equipment from one state to another is called switching. Operating the disconnector, circuit breaker, and hanging or removing the grounding wire to change the electrical equipment from one state to another or changing the system's operating mode is called switching operation. Switching operations must be carried out according to the operation ticket system and work supervision system.
[0003] Among them, the operation ticket refers to the written basis for electrical operations in the power system, including dispatch instruction tickets and substation operation tickets. In the specific implementation, firstly, the traditional main network dispatch still uses manual drafting to prepare a large number of main network operation tickets when issuing orders. Not only is the work efficiency low, but the manually drafted text operation tickets cannot accurately match the operation equipment objects, and more rely on the experience of the dispatchers, which is easy to cause errors in the writing of operation tickets. Secondly, the entire process of issuing orders still uses traditional manual methods such as telephones. Telephone orders not only have the risk of pronunciation deviation and distortion of audio transmission by telephones and disconnection, but also consume manpower, and the personnel carrying capacity has reached its limit. Furthermore, with the rapid development of the power grid, the equipment involved in power dispatching is increasing, and the complexity is increasing, resulting in a gradual increase in the error rate of network dispatching orders, affecting the safety and reliability of power grid dispatching.
[0004] Therefore, in order to solve the above problems, it is necessary to develop a main grid dispatching switching operation network command system. Summary of the invention
[0005] The purpose of the present invention is to overcome the shortcomings of the prior art and to provide a main grid dispatching switching operation network command system that automatically generates operation tickets and performs simulation rehearsals. At the same time, multiple safety and anti-error checks are set up to ensure that network commands are efficient and accurate, effectively improving the safety and reliability of power grid dispatching.
[0006] The objective of the present invention is achieved as follows: a main grid dispatching switching operation network command system, comprising an intelligent ticket-making system, a remote safety and error prevention system before operation, a network command system and a remote status review system after operation, wherein, after the dispatching end completes the draft ticket through the intelligent ticket-making system, the formal operation ticket formed is subjected to error prevention detection by the remote safety and error prevention system before operation, and after the detection is passed, it is transferred to the network command system for command operation, and after the operation is completed, the dispatching end performs a post-operation re-review detection through the remote status review system after operation.
[0007] It also includes a communication system for communication connection between the dispatching end and the plant end and between the dispatching end and multiple target substations, and an information archiving system for storing and retrieving operation information in the entire system.
[0008] Among them, the intelligent ticket-making system includes an operation ticket drafting unit and a simulation rehearsal unit. After the operation ticket drafting unit completes the drafting of the ticket, it performs a simulation rehearsal through the simulation rehearsal unit. After the simulation rehearsal is completed, it is transferred to the remote safety error prevention system before operation for error prevention detection; the operation ticket drafting unit includes an instruction ticket generation module and an operation ticket conversion module. The instruction ticket generation module generates an instruction ticket for switching operation according to the dispatch instruction, and then converts the instruction ticket for switching operation into an operation ticket through the operation ticket conversion module, and then performs a simulation rehearsal operation on the obtained specific operation sequence through the simulation rehearsal unit. After the simulation rehearsal is successful, the final formal operation ticket is formed.
[0009] The pre-operation remote safety error prevention system includes an operation ticket content input and analysis unit, a monitoring camera unit, a key matching unit, an equipment status detection unit, an error prevention verification unit, an alarm unit, and a result output unit; the operation ticket content input and analysis unit is used to access the operation ticket content and parse and list the substations involved in the current operation ticket and the equipment to be operated; the monitoring camera unit is respectively connected to multiple target substations for communication and is used to open the monitoring screen of the current target substation; the key matching unit is used to check whether it is the current target substation to prevent the non-target substation from being mistakenly entered, and the key matching unit includes a key generation module, a key storage module, a key unlocking module and a key matching module; the equipment status detection unit detects whether the status of the equipment operation involved in the target substation in the operation ticket meets the equipment safety operation requirements based on the power SCADA system data; the error prevention verification unit uses error prevention verification rules to verify the operation ticket content; the alarm unit includes a key error alarm module and a verification error alarm module, and the verification results in the result output unit include verification success, key error and verification failure.
[0010] Among them, the post-operation remote status review system includes a monitoring camera unit connected to the target substation, an equipment status data acquisition unit based on the power SCADA system data, and an equipment status review unit. The current target substation monitoring screen is opened through the monitoring camera unit, the equipment status information after the operation is collected through the equipment status data acquisition unit, and the equipment status review unit re-checks it, and the verification ends after success.
[0011] Furthermore, the network command system includes an electronic pre-command unit and an electronic direct order unit; the electronic pre-command unit includes a pre-identity authentication module and a pre-command issuance process management module, the identity authentication module is used for operator identity identification and verification before each operation in the pre-command issuance process, and the steps of the pre-command issuance process in the pre-command issuance process management module include pre-command issuance, pre-command repetition, pre-command receipt and pre-command confirmation; the electronic direct order unit includes an identity authentication module and a direct order issuance process management module, the identity authentication module is used for operator identity identification and verification before each operation in the direct order issuance process, and the steps of the direct order issuance process in the direct order issuance process management module include dispatching command, plant station repetition, dispatching confirmation, plant station return command, dispatching receipt command and plant station confirmation.
[0012] Furthermore, the instruction ticket generation module in the operation ticket drafting unit makes inferences and judgments based on the dispatching instructions, according to the equipment type, operating mode, constant and break points in the graphic system, etc., and automatically infers and generates the power grid dispatching operation instruction ticket based on the power grid topology analysis and calculation.
[0013] Furthermore, the operation ticket conversion module in the operation ticket drafting unit performs reasoning conversion on the instruction ticket in combination with the real-time section of the power grid, the topological structure of the power grid and the rules of the system knowledge base.
[0014] Furthermore, the operation ticket drafting unit establishes an operation ticket database based on the real-time operation data of the power grid in the EMS system.
[0015] Furthermore, the simulation rehearsal unit forms a constraint guidance mechanism for the correctness of the operation sequence in the operation ticket through the real-time section of the power grid, the topological structure of the power grid and the operation rules of the power grid equipment.
[0016] Furthermore, the preview mode of the simulation preview unit includes automatic preview and manual preview, wherein the automatic preview is that the system automatically selects all the operation instructions for a one-time simulation preview, and the manual preview is that the user manually operates the preview, executes the operation instructions step by step, or selects to preview the first n steps of the operation instructions, wherein n=1, 2, 3….
[0017] Furthermore, the error prevention verification rules of the error prevention verification unit in the remote safety error prevention system before operation are based on the five-protection rules of the substation and are established according to the logical relationship between the operating equipment and the electrical equipment associated with it.
[0018] Furthermore, the identity authentication module is implemented using a facial recognition module.
[0019] Due to the adoption of the above technical solution, the beneficial effects of the present invention are: (1) By establishing an automatic operation ticket generation system based on the real-time operation data of the power grid in the EMS system, the operation ticket is automatically generated according to the dispatch instructions, and a simulation rehearsal is performed to ensure the accuracy of the operation ticket and improve work efficiency; (2) By using the relevant rules to simulate and rehearse the generated operation ticket before issuing the command on the network, it is safer and more reliable; (3) By setting up multiple security and error prevention systems, operation verification is realized. During the operation verification process, the substation monitoring camera and key matching unit are used to check whether it is the current target substation, and multiple verifications are performed to prevent errors, thereby improving the accuracy of the network command process. The entire process from the generation of the operation ticket to its issuance to the completion of the operation is verified and reviewed, further improving the safety and reliability of power grid dispatching. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a principle block diagram of the present invention.
[0021] Figure 2 It is a principle block diagram of the intelligent ticketing system in the present invention.
[0022] Figure 3 It is a principle block diagram of the remote safety and error prevention system before operation in the present invention.
[0023] Figure 4 It is a principle block diagram of the electronic pre-order unit of the network order issuing system in the present invention.
[0024] Figure 5 It is a principle block diagram of the electronic command unit of the network command system in the present invention.
[0025] Figure 6 It is a principle block diagram of the post-operation remote status review system of the present invention. DETAILED DESCRIPTION
[0026] The technical solution of the present invention is further specifically described below through embodiments and in conjunction with the accompanying drawings.
[0027] like Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6As shown, a main grid dispatching switching operation network command system includes an intelligent ticket-making system, a remote safety and error prevention system before operation, a network command system and a remote status review system after operation, wherein, after the dispatching end completes the draft ticket through the intelligent ticket-making system, the formal operation ticket formed will be subjected to error prevention detection by the remote safety and error prevention system before operation, and after the detection is passed, it will be transferred to the network command system for command operation, and after the operation is completed, the dispatching end will conduct a post-operation re-review detection through the remote status review system after operation, and also includes a communication system for communication connection between the dispatching end and the plant end and the dispatching end and multiple target substations, as well as an information archiving system for storing and reviewing operation information in the entire system.
[0028] Among them, the intelligent ticket making system includes an operation ticket drafting unit and a simulation rehearsal unit. After the operation ticket drafting unit completes the ticket drafting, it will be simulated and rehearsed by the simulation rehearsal unit. After the simulation rehearsal is completed, it will be transferred to the remote safety error prevention system before operation for error prevention detection.
[0029] Specifically, the operation ticket drafting unit includes an instruction ticket generation module and an operation ticket conversion module. The instruction ticket generation module generates an instruction ticket for switching operation according to the dispatch instruction, and then converts the instruction ticket for switching operation into an operation ticket through the operation ticket conversion module. Then, the simulation rehearsal unit performs a simulation rehearsal operation on the obtained specific operation sequence. After the simulation rehearsal is successful, the final formal operation ticket is formed.
[0030] Specifically, the instruction ticket generation module establishes an operation ticket database based on the real-time operation data of the power grid in the EMS system, and performs reasoning and judgment according to the dispatching instructions, the equipment type, operation mode, constant and break points, etc. in the graphic system, and automatically generates power grid dispatching operation instruction tickets based on power grid topology analysis and calculation. The operation ticket conversion module performs reasoning and conversion on the instruction tickets in combination with the real-time power grid section, power grid topology structure and system knowledge base rules.
[0031] Specifically, the simulation rehearsal unit constitutes a constraint guidance mechanism for the correctness of the operation sequence in the operation ticket through the real-time section of the power grid, the power grid topology structure and the power grid equipment operation rules; the rehearsal mode of the simulation rehearsal unit includes automatic rehearsal and manual rehearsal, among which, the automatic rehearsal is that the system automatically selects all the operation instructions for a one-time simulation rehearsal, and the manual rehearsal is a manual operation rehearsal by the user, executing the operation instructions step by step, or selecting the first n steps of the rehearsal, where n=1, 2, 3...
[0032] Among them, the remote safety error prevention system before operation includes an operation ticket content input and analysis unit, a monitoring camera unit, a key matching unit, an equipment status detection unit, an error prevention verification unit, an alarm unit, and a result output unit.
[0033] Specifically, the operation ticket content input and parsing unit is used to access the operation ticket content and parse and list the substations involved in the current operation ticket and the equipment to be operated; the monitoring camera unit is respectively connected to multiple target substations and is used to open the monitoring screen of the current target substation; the key matching unit is used to check whether it is the current target substation to prevent mistaken entry into the non-target substation, and the key matching unit includes a key generation module, a key storage module, a key unlocking module and a key matching module; the equipment status detection unit detects whether the status of the equipment operation involved in the target substation in the operation ticket meets the equipment safety operation requirements based on the power SCADA system data; the anti-error verification unit uses the anti-error verification rules to verify the operation ticket content. Specifically, the anti-error verification rules of the anti-error verification unit in the pre-operation remote safety anti-error system are based on the five-defense rules of the substation and are established according to the logical relationship between the operating equipment and the electrical equipment associated with it; the alarm unit includes a key error alarm module and a verification error alarm module, and the verification results in the result output unit include verification success, key error and verification failure.
[0034] Among them, the network command system includes an electronic pre-command unit and an electronic direct command unit. Specifically, the electronic pre-command unit includes an identity authentication module and a pre-command issuance process management module. The identity authentication module is used for operator identity identification and verification before each operation in the pre-command issuance process. The identity authentication module can be implemented by a facial recognition module. The steps of the pre-command issuance process in the pre-command issuance process management module include pre-command issuance, pre-command recitation, pre-command receipt and pre-command confirmation.
[0035] Specifically, in the pre-order issuance process management module, the dispatching end issues the pre-order, the plant station end receives the operation ticket information, and the signing personnel performs the pre-order repetition module. After the repetition is completed correctly, the pre-order signing is completed, and the dispatching end gives feedback, and the dispatching end confirms the pre-order; before each operation, the identity of the operator is verified and compared through the identity authentication module and archived.
[0036] Specifically, the electronic order unit includes an identity authentication module and an order issuance process management module. The identity authentication module is used for operator identity identification and verification before each operation in the order issuance process. The identity authentication module can be implemented using a facial recognition module. The steps of the order issuance process in the order issuance process management module include dispatching orders, plant and station repetition, dispatching confirmation, plant and station return orders, dispatching order receipt and plant and station confirmation.
[0037] Specifically, the dispatching end issues a formal dispatching order based on the feedback information of the pre-order receipt, the plant and station end receives the actual order information and repeats it, and feeds back to the dispatching end after the correct repetition is completed. The dispatching end completes the dispatching confirmation. After the dispatching confirmation, the plant and station end performs on-site operations according to the content of the formal order, and after the execution is completed, it returns the order to the dispatching end to complete the operation. After receiving the return order and confirming that the operation is correct, the dispatching end sends a receipt order information to the plant and station end. After receiving the receipt order, the plant and station end confirms and feeds back to the dispatching end. Before each operation, the identity of the operator is verified and compared through the identity authentication module and archived.
[0038] Among them, the post-operation remote status review system includes a monitoring camera unit connected to the target substation, an equipment status data acquisition unit based on the power SCADA system data, and an equipment status review unit. The current target substation monitoring screen is opened through the monitoring camera unit, and the equipment status information after the operation is collected through the equipment status data acquisition unit, and re-checked through the equipment status review unit, specifically including the switch status and the knife switch status, and the verification ends after successful verification.
[0039] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art should understand that the specific implementation modes of the present invention can still be modified or replaced by equivalents, and any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be included in the scope of the claims of the present invention.
Claims
1. A main grid dispatching switching operation network command system, characterized by: It includes an intelligent ticketing system, a remote safety and error prevention system before operation, a network command system and a remote status review system after operation. After the dispatching end completes the draft ticket through the intelligent ticketing system, the formal operation ticket formed will be tested for error prevention through the remote safety and error prevention system before operation. After the test is passed, it will be transferred to the network command system for command operation. After the operation is completed, the dispatching end will conduct a post-operation re-review test through the remote status review system after operation; it also includes a communication system for communication connection between the dispatching end and the plant and station end, and between the dispatching end and multiple target substations, and an information archiving system for storing and retrieving operation information in the entire system; The intelligent ticketing system includes an operation ticket drafting unit and a simulation rehearsal unit. After the operation ticket drafting unit completes the ticket drafting, the simulation rehearsal unit performs a simulation rehearsal. After the simulation rehearsal is completed, the operation ticket is transferred to the remote safety error prevention system before operation for error prevention detection. The operation ticket drafting unit includes an instruction ticket generation module and an operation ticket conversion module. The instruction ticket generation module generates an instruction ticket for switching operation according to the dispatch instruction, and then converts the instruction ticket for switching operation into an operation ticket through the operation ticket conversion module. Then, the simulation rehearsal unit performs a simulation rehearsal operation on the obtained specific operation sequence. After the simulation rehearsal is successful, a final formal operation ticket is formed. The pre-operation remote safety error prevention system includes an operation ticket content input and analysis unit, a monitoring camera unit, a key matching unit, an equipment status detection unit, an error prevention verification unit, an alarm unit, and a result output unit. The operation ticket content input and analysis unit is used to access the operation ticket content and parse and list the substations involved in the current operation ticket and the equipment to be operated. The monitoring camera unit is respectively connected to multiple target substations for communication and is used to open the monitoring screen of the current target substation. The key matching unit is used to check whether it is the current target substation to prevent the non-target substation from being mistakenly entered. The key matching unit includes a key generation module, a key storage module, a key unlocking module and a key matching module. The equipment status detection unit detects whether the status of the equipment operation involved in the target substation in the operation ticket meets the equipment safety operation requirements based on the power SCADA system data. The error prevention verification unit uses error prevention verification rules to verify the operation ticket content. The alarm unit includes a key error alarm module and a verification error alarm module. The verification results in the result output unit include verification success, key error and verification failure. The post-operation remote status review system includes a monitoring camera unit connected to the target substation, an equipment status data acquisition unit based on the power SCADA system data, and an equipment status review module. The monitoring screen of the current target substation is opened through the monitoring camera unit, the equipment status information after the operation is collected through the equipment status data acquisition unit, and the equipment status review unit re-checks it, and the verification ends after successful verification.
2. A main grid dispatching switching operation network command system according to claim 1, characterized in that: The network order issuing system comprises an electronic pre-order unit and an electronic order unit, wherein the electronic pre-order unit comprises an identity verification module and a pre-order issuing process management module, wherein the identity verification module is used for operator identity verification before each operation in the pre-order issuing process, and the steps of the pre-order issuing process in the pre-order issuing process management module include pre-order issuing, pre-order recitation, pre-order receipt and pre-order confirmation; The electronic order unit includes an identity authentication module and an order issuance process management module. The identity authentication module is used for operator identity identification and verification before each operation in the order issuance process. The steps of the order issuance process in the order issuance process management module include dispatch order, plant station repetition, dispatch confirmation, plant station return order, dispatch order receipt and plant station confirmation.
3. A main grid dispatching switching operation network command system according to claim 1, characterized in that: The instruction ticket generation module in the operation ticket drafting unit performs reasoning and judgment based on the dispatching instructions, according to the equipment type, operation mode, constant and break points in the graphic system, etc., and automatically generates the power grid dispatching operation instruction ticket based on the power grid topology analysis and calculation.
4. A main grid dispatching switching operation network command system according to claim 1, characterized in that: The operation ticket conversion module in the operation ticket drafting unit performs reasoning and conversion on the instruction ticket in combination with the real-time section of the power grid, the topological structure of the power grid and the rules of the system knowledge base.
5. A main grid dispatching switching operation network command system according to claim 1, characterized in that: The operation ticket drafting unit establishes an operation ticket database based on the real-time operation data of the power grid in the EMS system.
6. A main grid dispatching switching operation network command system according to claim 1, characterized in that: The simulation preview unit forms a constraint guidance mechanism for the correctness of the operation sequence in the operation ticket through the real-time section of the power grid, the topological structure of the power grid and the operation rules of the power grid equipment.
7. A main grid dispatching switching operation network command system according to claim 1, characterized in that: The preview mode of the simulation preview unit includes automatic preview and manual preview, wherein the automatic preview is that the system automatically selects all operation instructions for a one-time simulation preview, and the manual preview is that the user manually operates the preview, executes the operation instructions step by step, or selects to preview the first n steps of the operation instructions, wherein n=1, 2, 3….
8. A main grid dispatching switching operation network command system according to claim 1, characterized in that: The error prevention verification rules of the error prevention verification unit in the remote safety error prevention system before operation are based on the five-protection rules of the substation and are established according to the logical relationship between the operating equipment and the electrical equipment associated with it.
9. A main grid dispatching switching operation network command system according to claim 1, characterized in that: The identity verification module is implemented using a facial recognition module.
Citation Information
Patent Citations
Intelligent dispatching and mis-operation preventing management system and method
CN104600840A
Power grid scheduling integration error prevention system based on county regulation and control integration
CN107834699A
Sequence control system and method for switching operation of transformer substation
CN111614157A
System and method for realizing networked instruction issuing of scheduling instruction across security partitions
CN114157020A
Monitoring operation order forming and information interaction method based on dispatching network order issuing system
CN115333236A
Cited By
Operation ticket security check and anti-misoperation system
CN120675297A