New energy multi-level resource coordination safety and stability control system
By building a multi-level resource coordination security and stability control system for new energy, and using a three-layer control system for new energy main stations, sub-stations, and execution stations, the refined management of new energy resources is achieved, and the resource shortage problem during large disturbances in the power grid is solved. , improves the stability of the power grid and the utilization rate of new energy resources.
Patent Information
- Application Number
- CN202411286138.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-13
- Publication Date
- 2024-11-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
When existing new energy power stations face large disturbances in the power grid, regional system stabilization control devices tend to directly cut off new energy stations, resulting in weakening of local reactive voltage stability, long grid connection recovery time, and insufficient utilization of new energy. Power modulation capability affects the overall power supply reliability and stability of the power grid.
Design a new energy multi-level resource coordination security and stability control system, build a three-layer control system for new energy main station, sub-station, and execution station, and use the upper-level strategy main station, regional new energy main station and multiple new energy sub-stations and execution The station works collaboratively, generates and executes quick-cut instructions and quick-tuning instructions, and achieves refined and precise control of new energy resources.
It effectively solves the problem of regional stable control resource shortage, improves resource utilization efficiency and flexibility, quickly responds to power grid faults and power generation fluctuations, suppresses fault propagation and power oscillation, and ensures the safe and stable operation of the power grid.
Smart Images

Figure CN119051014A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of energy control, and more specifically, to a new energy multi-level resource coordinated safe and stable control system. Background Art
[0002] In the field of renewable energy power generation, with the continuous advancement of technology, my country has achieved rapid power control of renewable energy power stations, especially photovoltaic power stations. The core of this control technology lies in the new energy rapid control device installed in the photovoltaic power station, which can receive rapid adjustment commands from the system safety and stability control device, and quickly transmit these commands to each inverter through an efficient internal communication network. The inverter adjusts its output power in real time according to the received command, thereby realizing the rapid regulation of the overall power generation power of the photovoltaic power station by "control instead of cutting". This technology enables photovoltaic power stations to respond quickly and contribute their rapid power modulation capabilities when the power grid faces large disturbances, which helps to maintain the power angle stability, frequency stability and voltage stability of the power grid, but there are still obvious deficiencies in the regional system stability control level.
[0003] Specifically, when facing a large disturbance in the power grid, the current regional system stabilization device tends to take measures to directly cut off the outgoing lines of the new energy station. Although this method can ensure the overall security of the power grid to a certain extent, its disadvantages are also obvious:
[0004] First, the local reactive power voltage stability is weakened: directly removing the new energy station will cause a gap in the reactive power supply in the regional power grid, thereby weakening the reactive power voltage stability of the local power grid. This will not only increase the difficulty of restoring the stability of the power grid, but may also have an adverse impact on the power supply of surrounding users.
[0005] Second, the grid connection recovery time is long: Since it takes a long time to directly cut off the new energy site to re-establish the grid connection and restore the power generation capacity, the grid connection recovery time will be extended. This will not only affect the power generation efficiency and economy of the new energy power station, but may also have a negative impact on the overall power supply reliability and stability of the power grid.
[0006] Third, the rapid power modulation capability of new energy sources has not been fully utilized: the cut-off measures have not fully utilized the rapid power modulation capability of regional new energy power stations. When the power grid faces a large disturbance, if the rapid response capability of new energy power stations can be fully utilized through more refined control strategies, it will help to restore the stability of the power grid more quickly and reduce power outage losses.
[0007] Based on this, the present application provides a new energy multi-level resource control solution to solve the problem of regional stable control resource shortage and realize refined and precise control. Summary of the invention
[0008] In view of this, the present application provides a new energy multi-level resource coordinated safe and stable control system, establishes a three-layer control system of new energy master station, substation and execution station, coordinates and integrates regional new energy fast-cut control and rapid modulation control resources, solves the problem of shortage of regional stable control resources, and realizes refined and precise control.
[0009] A new energy multi-level resource coordination safety and stability control system, consisting of an upper-layer strategy master station, a regional new energy master station, multiple regional new energy substations, and multiple new energy execution stations;
[0010] The plurality of regional new energy substations are connected to the regional new energy main station, and each of the regional new energy substations is provided with and connected to a plurality of the new energy execution stations;
[0011] The upper-layer strategy master station analyzes and determines the control measures to be taken for each control resource in the region based on the regional switchable quantity and the regional adjustable quantity sent by the regional new energy master station, generates a fast switch instruction and a fast adjustment instruction, and sends them to the regional new energy master station;
[0012] The regional new energy master station collects the regional switchable quantity and the regional adjustable quantity sent by each regional new energy substation, and sends them to the upper-layer strategy master station, receives the fast switch instruction and the fast adjustment instruction sent by the upper-layer strategy master station, and forwards them to each regional new energy substation;
[0013] The regional new energy substation collects the switchable quantities and adjustable quantities sent by the subordinate new energy execution stations, generates regional switchable quantities and regional adjustable quantities and sends them to the regional new energy master station, receives the fast switching instructions and the fast adjustment instructions forwarded by the regional new energy master station and sends them to the subordinate new energy execution stations;
[0014] The new energy execution station sends the switchable quantity and adjustable quantity to the corresponding regional new energy substation, and executes the quick switching instruction and the quick adjustment instruction issued by the regional new energy substation.
[0015] Optionally, the regional new energy substation is provided with a new energy control mode flag for controlling a data uploading mode or a command downloading mode;
[0016] The process of the regional new energy substation collecting the cuttable quantities and adjustable quantities sent by the subordinate new energy execution stations, generating regional cuttable quantities and regional adjustable quantities and sending them to the regional new energy master station, receiving the fast cut instruction and the fast adjustment instruction forwarded by the regional new energy master station and sending them to the subordinate new energy execution stations includes:
[0017] Determine the corresponding data upload mode and instruction sending mode according to the new energy control form flag;
[0018] Gather the cuttable quantities and adjustable quantities sent by the respective new energy execution stations to generate regional cuttable quantities and regional adjustable quantities;
[0019] Based on the data uploading mode, the regional cuttable quantity and the regional adjustable quantity are transmitted to the regional new energy master station;
[0020] Receiving the quick switching instruction and the quick adjustment instruction forwarded by the regional new energy master station;
[0021] The quick switching instruction and the quick adjustment instruction are forwarded to each of the new energy execution stations based on the instruction issuing mode.
[0022] Optionally, determining a corresponding data upload mode and instruction delivery mode according to the new energy control form flag bit includes:
[0023] If the new energy control form flag indicates that the control object is exited, it is determined that both the data sending mode and the command sending mode are silent operation;
[0024] If the new energy control form flag indicates control of the switchable quantity, the data upload mode is determined to be to only upload the switchable quantity in the area, and the instruction sending mode is determined to only send the fast switching instruction;
[0025] If the new energy control form flag indicates control of the adjustable quantity, the data upload mode is determined to be only the regional adjustable quantity, and the instruction sending mode is determined to be only the fast adjustment instruction.
[0026] If the new energy control form flag indicates the simultaneous control of the switchable quantity and the adjustable quantity, the data upload mode is determined to be the simultaneous upload of the regional switchable quantity and the regional adjustable quantity, and the instruction sending mode is determined to be the simultaneous sending of the quick switching instruction and the quick adjustment instruction.
[0027] Optionally, the new energy execution station is provided with an uploading control word for uploading the control of the new energy control quantity;
[0028] The process of the new energy execution station sending the cuttable quantity and the adjustable quantity to the corresponding regional new energy substation includes:
[0029] If the control word sent up indicates that the control object is exited, the new energy execution station does not send the cuttable quantity and adjustable quantity to the corresponding new energy substation in the area;
[0030] If the control word sent up represents the sent up renewable energy cuttable quantity, the renewable energy execution station sends the cuttable quantity to the corresponding regional renewable energy substation;
[0031] If the control word sent up represents sending up the adjustable amount of new energy, then the new energy execution station sends the adjustable amount to the corresponding new energy substation in the region;
[0032] If the sent control word indicates that the switchable quantity and adjustable quantity of the new energy are sent simultaneously, the new energy execution station sends the switchable quantity and adjustable quantity to the corresponding regional new energy substation.
[0033] Optionally, the regional new energy substation is provided with a new energy maximum control quantity constant;
[0034] When the regional new energy substation detects that the cumulative control amount of instructions received within a preset time period before the current moment or the cumulative value of the control amount sent by each new energy execution station exceeds the maximum control amount set value of the new energy, it stops sending or sending operations.
[0035] It can be seen from the above technical scheme that the embodiment of the present application provides a new energy multi-level resource coordination safety and stability control system, which is composed of an upper-level strategy master station, a regional new energy master station, multiple regional new energy substations and multiple new energy execution stations. Multiple regional new energy substations are connected to the regional new energy master station, and each of the regional new energy substations is equipped with and connected to several of the new energy execution stations. Among them, the upper-level strategy master station is responsible for overall coordination and decision-making, and formulates the optimal control measures according to the operating status and the information sent up. The regional new energy master station is responsible for aggregating data and uploading and issuing it, collecting the regional cuttable quantities and regional adjustable quantities sent by the regional new energy substations, and sending them to the upper-level strategy master station, receiving the adjustable commands and cuttable commands of the upper-level strategy master station and forwarding them to the regional new energy substation. The regional new energy substation performs fine-grained regulation based on the instructions issued by the upper-level strategy master station and the characteristics of local new energy resources. The new energy execution station directly executes specific measures according to the instructions. By building a three-layer control system of new energy master station, substation and execution station, the centralized management and coordinated integration of diversified control methods such as new energy fast-cut control and fast modulation control resources in the region are realized, and the refined management and precise control of new energy resources are realized. This hierarchical management model effectively solves the problem of shortage of regional stable control resources and improves the efficiency and flexibility of resource use.
[0036] In addition, when faced with emergencies such as power grid failures or large fluctuations in renewable energy power generation, the multi-level control system of this application can respond quickly, effectively suppress fault propagation and power oscillations through rapid switching and modulation, and ensure the safe and stable operation of the power grid. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying any creative work.
[0038] Figure 1 A schematic diagram of a new energy multi-level resource coordination safety and stability control system disclosed in an embodiment of the present application;
[0039] Figure 2 This is another schematic diagram of a new energy multi-level resource coordinated safety and stability control system disclosed in an embodiment of the present application. DETAILED DESCRIPTION
[0040] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0041] Next, the present application scheme is introduced. The present application proposes the following technical scheme, please see below for details.
[0042] Figure 1 This is a schematic diagram of a new energy multi-level resource coordinated safety and stability control system disclosed in an embodiment of the present application.
[0043] like Figure 1 As shown, the new energy multi-level resource control system is composed of an upper-layer strategy master station, a regional new energy master station, multiple regional new energy substations and multiple new energy execution stations. The multiple regional new energy substations are connected to the regional new energy master station, and each of the regional new energy substations is equipped with and connected to a number of the new energy execution stations.
[0044] The new energy multi-level resource control system achieves comprehensive coverage and fine management of new energy resources through the multi-level collaborative work of the upper-level strategy master station, regional new energy master station, regional new energy substation and new energy execution station. The system can quickly respond to changes in the operating status of the power grid, and effectively suppress power grid fluctuations and improve power grid stability through rapid switching and modulation control methods. At the same time, the system improves the utilization rate and economy of new energy resources through precise control strategies and optimization algorithms, and promotes the sustainable development of new energy.
[0045] The following is a detailed description of the components of the system and their functions:
[0046] Upper strategy master station:
[0047] The upper-level strategy master station analyzes and determines the control measures to be taken for each control resource in the region based on the regional switchable quantity and regional adjustable quantity sent by the regional new energy master station, generates fast switching instructions and fast adjustment instructions and sends them to the regional new energy master station.
[0048] Specifically, the upper-level strategy master station is responsible for global strategy formulation and decision-making. It conducts in-depth data analysis and prediction based on the regional cuttable and regional adjustable quantity information uploaded by the regional new energy master station to determine the optimal control measures to be taken for each control resource in the entire region. For example, it calculates the stability of the power grid under Type II disturbances (parallel double-circuit tripping, DC bipolar interlocking and other faults), analyzes the stability problems existing after Type II disturbances in the regional system, and proposes corresponding safety and stability control measures for the existing stability problems (cutting off traditional units, cutting off new energy units, and rapidly modulating new energy power). The upper-level strategy master station has multiple control strategies, and different control strategies can take control measures for different control resources in the region (cutting off traditional units, cutting off new energy units, and rapidly modulating new energy power).
[0049] The main tasks performed by the upper-level policy master station include:
[0050] 1. Receive and process data from regional new energy master stations, including regional cuttable quantities and regional adjustable quantities.
[0051] 2. Formulate quick-cutting and quick-adjusting instructions based on factors such as the grid operation status, new energy power generation forecast, and load demand.
[0052] 3. Send the formulated instructions to the regional new energy master station to realize the control of the lower-level substations and execution stations.
[0053] Regional new energy main station:
[0054] The regional new energy master station collects the regional cuttable quantities and regional adjustable quantities sent by each of the regional new energy substations, and sends them to the upper-level strategy master station, receives the quick cut instructions and the quick adjustment instructions sent by the upper-level strategy master station, and forwards them to each of the regional new energy substations.
[0055] Specifically, the regional new energy master station serves as the middle layer, responsible for connecting the upper-level strategy master station and multiple regional new energy substations. It collects and summarizes the regional cuttable and regional adjustable quantity data sent by the regional new energy substations, uploads them to the upper-level strategy master station, and receives control instructions issued by the upper-level strategy master station, and forwards them to the regional new energy substations for execution.
[0056] The main tasks performed by the regional new energy master station include:
[0057] 1. Collect and process the regional cuttable quantity and regional adjustable quantity data uploaded by the new energy substations in each region.
[0058] 2. Upload the summarized data to the upper-level strategy master station.
[0059] 3. Receive the quick switching instructions and quick adjustment instructions issued by the upper-level strategy master station, and forward them to the corresponding regional new energy substations.
[0060] Regional new energy substation:
[0061] The regional new energy substation collects the cuttable quantities and adjustable quantities sent by the subordinate new energy execution stations, generates regional cuttable quantities and regional adjustable quantities and sends them to the regional new energy main station, receives the quick cutting instructions and the quick adjustment instructions forwarded by the regional new energy main station and sends them to the subordinate new energy execution stations.
[0062] Specifically, the regional new energy substation directly manages multiple new energy execution stations, is responsible for collecting the information on the cuttable and adjustable quantities of the connected new energy execution stations, generating regional cuttable and adjustable quantity data, namely regional cuttable quantities and regional adjustable quantities, and receiving control instructions from the regional new energy main station, and sending them to each execution station for execution.
[0063] The main tasks performed by the regional new energy substation include:
[0064] 1. Collect and process the data on cuttable and adjustable quantities uploaded by the subordinate new energy execution stations.
[0065] 2. Generate regional data on cuttable and adjustable quantities and upload them to the regional new energy master station.
[0066] 3. Receive control instructions (quick cut instructions and quick adjustment instructions) from the regional new energy master station and forward them to the subordinate new energy execution stations.
[0067] New Energy Execution Station:
[0068] The new energy execution station sends the switchable quantity and adjustable quantity to the corresponding regional new energy substation, and executes the quick switching instruction and the quick adjustment instruction issued by the regional new energy substation.
[0069] Specifically, the new energy execution station is the bottom layer of the control system and is directly responsible for executing specific control actions. It adjusts the operating status of the new energy power generation equipment according to the received quick-cut instructions and quick-adjustment instructions to achieve fast switching and modulation control.
[0070] The main tasks performed by the New Energy Execution Station include:
[0071] 1. Real-time monitoring and reporting of its own cuttable and adjustable quantity information to the corresponding regional new energy substation.
[0072] 2. Receive and execute control instructions (quick cut instructions and quick adjustment instructions) from regional new energy substations to adjust the operating status of new energy power generation equipment.
[0073] It can be seen from the above technical scheme that the embodiment of the present application provides a new energy multi-level resource coordination safety and stability control system, which is composed of an upper-level strategy master station, a regional new energy master station, multiple regional new energy substations and multiple new energy execution stations. Multiple regional new energy substations are connected to the regional new energy master station, and each of the regional new energy substations is equipped with and connected to several of the new energy execution stations. Among them, the upper-level strategy master station is responsible for overall coordination and decision-making, and formulates the optimal control measures according to the operating status and the information sent up. The regional new energy master station is responsible for aggregating data and uploading and issuing it, collecting the regional cuttable quantities and regional adjustable quantities sent by the regional new energy substations, and sending them to the upper-level strategy master station, receiving the adjustable commands and cuttable commands of the upper-level strategy master station and forwarding them to the regional new energy substation. The regional new energy substation performs fine-grained regulation based on the instructions issued by the upper-level strategy master station and the characteristics of local new energy resources. The new energy execution station directly executes specific measures according to the instructions. By building a three-layer control system of new energy master station, substation and execution station, the centralized management and coordinated integration of diversified control methods such as new energy fast-cut control and fast modulation control resources in the region are realized, and the refined management and precise control of new energy resources are realized. This hierarchical management model effectively solves the problem of shortage of regional stable control resources and improves the efficiency and flexibility of resource use.
[0074] In addition, when faced with emergencies such as power grid failures or large fluctuations in renewable energy power generation, the multi-level control system of this application can respond quickly, effectively suppress fault propagation and power oscillations through rapid switching and modulation, and ensure the safe and stable operation of the power grid.
[0075] In some embodiments of the present application, the regional new energy substation is provided with a new energy control mode flag for controlling a data upload mode or a command delivery mode.
[0076] The new energy control mode flag plays a vital role in the sending of control data and the sending of instructions. This flag allows the substation to flexibly switch the data sending mode and the instruction sending mode according to the current system status or operation requirements, thereby ensuring the efficient operation and accurate response of the entire control system.
[0077] On this basis, the regional new energy substation collects the switchable quantities and adjustable quantities sent by the subordinate new energy execution stations, generates regional switchable quantities and regional adjustable quantities and sends them to the regional new energy master station, receives the fast switching instructions and the fast adjustment instructions forwarded by the regional new energy master station and sends them to the subordinate new energy execution stations, including:
[0078] S1. Determine the corresponding data upload mode and instruction sending mode according to the new energy control form flag;
[0079] S2, collecting the cuttable quantities and adjustable quantities sent by the respective new energy execution stations, and generating regional cuttable quantities and regional adjustable quantities;
[0080] S3, based on the data uploading mode, uploading the regional cuttable quantity and the regional adjustable quantity to the regional new energy master station;
[0081] S4, receiving the quick switching instruction and the quick adjustment instruction forwarded by the regional new energy master station;
[0082] S5. Forward the quick switching instruction and the quick adjustment instruction to each of the new energy execution stations based on the instruction issuing mode.
[0083] It should be emphasized that in the present application, there is no particular order between the uploading process and the downloading process, and data uploading and instructions downloading can be performed simultaneously in a regional new energy substation.
[0084] Specifically, first, the regional new energy substation will determine the current data upload mode and instruction issuance mode to be adopted according to the internally set new energy control form flag. This step is the basis for all subsequent operations, ensuring that the transmission of data and instructions can be carried out in a predetermined manner. Next, the substation will collect the data of the cuttable and adjustable quantities uploaded by each new energy execution station under it. These data reflect the current controllable resources and adjustment capabilities of each execution station, and are the basis for generating regional cuttable and adjustable quantities. After collecting enough data, the substation will generate regional cuttable and adjustable quantities based on these data, and upload these data to the regional new energy master station through the data upload mode determined based on step S1. Subsequently, the regional new energy substation will receive the fast-cut instructions and fast-adjustment instructions forwarded from the regional new energy master station. These instructions are formulated by the upper-level strategy master station based on the global situation, and are intended to guide each substation and execution station to perform corresponding control operations. Finally, the substation will forward the received quick-cut instructions and quick-adjust instructions to its subordinate new energy execution stations according to the instruction issuance mode determined in step S1. The control instructions can be transmitted to the execution level quickly and accurately, thereby realizing the rapid regulation of new energy resources in the entire area.
[0085] Figure 2 This is another schematic diagram of a new energy multi-level resource coordinated safety and stability control system disclosed in an embodiment of the present application.
[0086] Further, the corresponding data upload mode and instruction sending mode are determined according to the new energy control form flag bit. Figure 2 Four situations are introduced respectively.
[0087] Case 1: Control object exits
[0088] If the new energy control mode flag indicates that the control object is exited, it is determined that both the data sending mode and the instruction sending mode are silent operation.
[0089] Specifically, when the new energy control form flag indicates that the control object has exited, it means that the substation or some of its subordinate new energy execution stations do not need to participate in the control or regulation of the system temporarily. The data upload mode is silent operation, that is, the substation will not upload any data to the regional new energy master station, because there is no valid control object or data to upload at this time. The command issuance mode is also silent operation, and the substation will not issue any command to the new energy execution station, because the control object has exited and no control operation is required.
[0090] Case 2: Control of the amount of cuttable material
[0091] If the new energy control form flag indicates control over the switchable quantity, the data sending mode is determined to send only the switchable quantity in the area, and the instruction sending mode is determined to send only the fast switching instruction.
[0092] Specifically, when the new energy control form flag indicates that only the switchable quantity is controlled, it means that the system is currently mainly concerned with the fast switching capability of the new energy power generation equipment. The data upload mode is to only upload the regional switchable quantity. The substation will collect and summarize the switchable quantity data of each new energy execution station under it, generate the regional switchable quantity and upload it to the regional new energy master station, but does not include the adjustable quantity data. The instruction issuance mode is to only issue the fast switching instruction. After receiving the fast switching instruction forwarded by the regional new energy master station, the substation will issue it to the corresponding new energy execution station to perform a fast switching operation, but it does not involve modulation control.
[0093] Case 3: Control of adjustable quantity
[0094] If the new energy control form flag indicates control of the adjustable quantity, the data upload mode is determined to be only the regional adjustable quantity, and the instruction sending mode is determined to be only the fast adjustment instruction.
[0095] Specifically, when the new energy control form flag indicates that only the adjustable quantity is controlled, it means that the system is currently focusing on the rapid modulation capability of the new energy power generation equipment. The data upload mode is to upload only the regional adjustable quantity. The substation will collect and summarize the adjustable quantity data of each new energy execution station under it, generate the regional adjustable quantity and upload it to the regional new energy master station, but does not include the cuttable quantity data.
[0096] The instruction issuing mode is to issue only fast adjustment instructions. After receiving the fast adjustment instructions forwarded by the regional new energy master station, the substation will issue them to the corresponding new energy execution station to perform fast modulation operations, but it does not involve fast switching.
[0097] Case 4: Controlling the cuttable and adjustable quantities simultaneously
[0098] If the new energy control form flag indicates the simultaneous control of the switchable quantity and the adjustable quantity, the data upload mode is determined to be the simultaneous upload of the regional switchable quantity and the regional adjustable quantity, and the instruction sending mode is determined to be the simultaneous sending of the quick switching instruction and the quick adjustment instruction.
[0099] Specifically, when the new energy control form flag indicates that it is necessary to control both the switchable quantity and the adjustable quantity at the same time, it means that the system is currently paying attention to both the fast switching capability and the fast modulation capability of the new energy power generation equipment. The data upload mode is to upload the regional switchable quantity and the regional adjustable quantity at the same time. The substation will collect and summarize the switchable quantity and adjustable quantity data of each new energy execution station under it, generate the corresponding regional data, and upload them to the regional new energy master station together. The instruction issuance mode is to issue fast switching instructions and fast adjustment instructions at the same time. After receiving the fast switching instructions and fast adjustment instructions forwarded simultaneously by the regional new energy master station, the substation will send them to the corresponding new energy execution station respectively to perform fast switching and fast modulation operations at the same time.
[0100] like Figure 2 As shown, the new energy control mode flag "0" indicates that the control object exits, the new energy control mode flag "1" indicates control of the switchable quantity, the new energy control mode flag "2" indicates control of the adjustable quantity, and the new energy control mode flag "3" indicates control of both the switchable quantity and the adjustable quantity.
[0101] In some embodiments of the present application, the new energy execution station is provided with an uplink control word for uplink control of the new energy control quantity.
[0102] The sending control word is a flag used to control the new energy execution station to send control quantity data to the regional new energy substation. It determines how the execution station sends the cuttable and adjustable quantity data to the substation.
[0103] On this basis, the cuttable and adjustable quantities sent by the new energy execution station to the corresponding regional new energy substation include the following four methods:
[0104] Method 1: if the sent control word indicates that the control object is exiting, the new energy execution station does not send the cuttable quantity and adjustable quantity to the corresponding regional new energy substation.
[0105] Specifically, the sent control word indicates that the control object is currently in the exit state. At this time, the new energy execution station will not send any cuttable and adjustable quantity data to the corresponding regional new energy substation. This usually occurs when the execution station fails, is under maintenance, or the system requires the execution station to temporarily not participate in control.
[0106] Method 2: if the sent control word indicates the sent new energy switchable quantity, the new energy execution station sends the switchable quantity to the corresponding regional new energy substation.
[0107] Specifically, the sent control word represents the need to send the data on the amount of renewable energy that can be cut (i.e. the amount of power generated that can be quickly reduced or increased). At this time, the renewable energy execution station will measure and calculate its current amount of power that can be cut, and then send this data to the corresponding regional renewable energy substation.
[0108] Method three: if the sent control word indicates sending the new energy adjustable quantity, the new energy execution station sends the adjustable quantity to the corresponding regional new energy substation.
[0109] Specifically, the control word sent indicates that the adjustable quantity data of the new energy needs to be sent. At this time, the new energy execution station will measure and calculate its current adjustable quantity (that is, the power generation that can be adjusted within a certain range), and then send this data to the corresponding regional new energy substation.
[0110] Method 4: if the sent control word indicates that the new energy switchable quantity and adjustable quantity are sent simultaneously, the new energy execution station sends the switchable quantity and adjustable quantity to the corresponding regional new energy substation.
[0111] Specifically, the control word representation needs to simultaneously transmit the data of the cuttable and adjustable quantities of the new energy. At this time, the new energy execution station will simultaneously measure and calculate its current cuttable and adjustable quantity data, and then transmit these data to the corresponding regional new energy substation.
[0112] like Figure 2 As shown, sending a control word "0" indicates that the control object exits, sending a control word "1" indicates that the new energy cuttable amount is sent, sending a control word "2" indicates that the new energy adjustable amount is sent, and sending a control word "3" indicates that both the new energy cuttable amount and the adjustable amount are sent.
[0113] In the new energy multi-level resource control system, the regional new energy substation, as a key transfer station, is not only responsible for the collection and upload of data, the reception and issuance of instructions, but also bears the important responsibility of ensuring the safe and stable operation of the system. To this end, in some embodiments of the present application, a maximum control value of new energy is set inside the regional new energy substation to limit the cumulative control value of the instructions received within a specific time period or the cumulative value of the control value sent by each new energy execution station, so as to prevent system instability or safety problems caused by excessive control amount.
[0114] The maximum control value of renewable energy is a preset threshold value, which is used to limit the maximum control amount that a regional renewable energy substation can handle within a certain period of time (such as within 5 seconds). This threshold value is set according to the actual operation of the system and safety requirements, and is intended to ensure that the system will not be overloaded or out of control at any time due to a sudden increase in control amount.
[0115] On this basis, when the regional new energy substation detects that the cumulative control amount of instructions received within the preset time period before the current moment or the cumulative value of the control amount sent by each new energy execution station exceeds the maximum control amount set value of the new energy, it stops sending or sending operations.
[0116] Specifically, the regional new energy substation will detect in real time the cumulative control amount of the instructions received within the preset time period (for example, within 5 seconds) before the current moment and the cumulative value of the control amount sent by each new energy execution station. Once any of these cumulative values exceeds the maximum control amount setting of the new energy, the substation will immediately stop the upload or download operation to avoid further increasing the control burden of the system or causing potential safety risks. By stopping the operation in time, the regional new energy substation can provide a buffer period for the system, allowing the system to have enough time to digest the existing control amount and return to a stable state.
[0117] By limiting the maximum value of the control amount and stopping the operation in time when it exceeds the limit, the regional new energy substation can effectively prevent various problems caused by excessive control of the system, ensuring that the new energy multi-level resource control system can operate continuously, stably and efficiently.
[0118] Finally, it should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.
[0119] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
[0120] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A new energy multi-level resource coordination safety and stability control system, It is characterized in that It consists of an upper-level strategy master station, a regional new energy master station, multiple regional new energy substations, and multiple new energy execution stations; The plurality of regional new energy substations are connected to the regional new energy main station, and each of the regional new energy substations is provided with and connected to a plurality of the new energy execution stations; The upper-layer strategy master station analyzes and determines the control measures to be taken for each control resource in the region based on the regional switchable quantity and the regional adjustable quantity sent by the regional new energy master station, generates a fast switch instruction and a fast adjustment instruction, and sends them to the regional new energy master station; The regional new energy master station collects the regional switchable quantity and the regional adjustable quantity sent by each regional new energy substation, and sends them to the upper-layer strategy master station, receives the fast switch instruction and the fast adjustment instruction sent by the upper-layer strategy master station, and forwards them to each regional new energy substation; The regional new energy substation collects the switchable quantities and adjustable quantities sent by the subordinate new energy execution stations, generates regional switchable quantities and regional adjustable quantities and sends them to the regional new energy master station, receives the fast switching instructions and the fast adjustment instructions forwarded by the regional new energy master station and sends them to the subordinate new energy execution stations; The new energy execution station sends the switchable quantity and adjustable quantity to the corresponding regional new energy substation, and executes the quick switching instruction and the quick adjustment instruction issued by the regional new energy substation.
2. The system according to claim 1, It is characterized in that The regional new energy substation is provided with a new energy control mode flag for controlling a data uploading mode or a command downloading mode; The process of the regional new energy substation collecting the cuttable quantities and adjustable quantities sent by the subordinate new energy execution stations, generating regional cuttable quantities and regional adjustable quantities and sending them to the regional new energy master station, receiving the fast cut instruction and the fast adjustment instruction forwarded by the regional new energy master station and sending them to the subordinate new energy execution stations includes: Determine the corresponding data upload mode and instruction sending mode according to the new energy control form flag; Gather the cuttable quantities and adjustable quantities sent by the respective new energy execution stations to generate regional cuttable quantities and regional adjustable quantities; Based on the data uploading mode, the regional cuttable quantity and the regional adjustable quantity are transmitted to the regional new energy master station; Receiving the quick switching instruction and the quick adjustment instruction forwarded by the regional new energy master station; The quick switching instruction and the quick adjustment instruction are forwarded to each of the new energy execution stations based on the instruction issuing mode.
3. The system according to claim 2, It is characterized in that Determining the corresponding data upload mode and instruction issuance mode according to the new energy control form flag bit includes: If the new energy control form flag indicates that the control object is exited, it is determined that both the data sending mode and the command sending mode are silent operation; If the new energy control form flag indicates control of the switchable quantity, the data upload mode is determined to be to only upload the switchable quantity in the area, and the instruction sending mode is determined to only send the fast switching instruction; If the new energy control form flag indicates control of the adjustable quantity, the data upload mode is determined to be only the regional adjustable quantity, and the instruction sending mode is determined to be only the fast adjustment instruction. If the new energy control form flag indicates the simultaneous control of the switchable quantity and the adjustable quantity, the data upload mode is determined to be the simultaneous upload of the regional switchable quantity and the regional adjustable quantity, and the instruction sending mode is determined to be the simultaneous sending of the quick switching instruction and the quick adjustment instruction.
4. The system according to claim 1, It is characterized in that The new energy execution station is provided with an uploading control word for uploading the control of the new energy control quantity; The process of the new energy execution station sending the cuttable quantity and the adjustable quantity to the corresponding regional new energy substation includes: If the control word sent up indicates that the control object is exiting, the new energy execution station does not send the cuttable quantity and adjustable quantity to the corresponding new energy substation in the area; If the control word sent up represents the sent up renewable energy cuttable quantity, the renewable energy execution station sends the cuttable quantity to the corresponding regional renewable energy substation; If the control word sent up represents sending up the adjustable amount of new energy, then the new energy execution station sends the adjustable amount to the corresponding new energy substation in the region; If the sent control word indicates that the switchable quantity and adjustable quantity of the new energy are sent simultaneously, the new energy execution station sends the switchable quantity and adjustable quantity to the corresponding regional new energy substation.
5. The system according to claim 1, It is characterized in that The regional new energy substation is provided with a new energy maximum control quantity setting value; When the regional new energy substation detects that the cumulative control amount of instructions received within a preset time period before the current moment or the cumulative value of the control amount sent by each new energy execution station exceeds the maximum control amount set value of the new energy, it stops sending or sending operations.
Citation Information
Patent Citations
Source network load cooperative control system and method
CN112510763A
Frequency control method based on multi-level centralized regulation and control
CN114709835A