Ventilation method for ballast tank of semi-submerged ship

Through precise ventilation hole layout and phased ventilation strategies, combined with air duct inspection and air purification devices, the problem of poor ventilation of semi-submersible ship ballast tanks is solved, the safety and efficiency of the construction environment are improved, and the health of construction personnel is ensured. Quality of ship construction.

CN119058937AActive Publication Date: 2024-12-03GUANGZHOU SHIPYARD INTERNATIONAL LTD

Patent Information

Application Number
CN202411073880.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-07
Publication Date
2024-12-03
Estimated Expiration
2044-08-07

AI Technical Summary

Technical Problem

The semi-submersible ship ballast tank is poorly ventilated during construction, resulting in poor air quality in the construction environment, affecting construction safety and efficiency, and may accumulate smoke and harmful gases, threatening the health and safety of construction personnel.

Method used

Accurate and systematic ventilation hole layout and phased ventilation strategies are adopted to carry out targeted operations at different construction stages through air supply and exhaust devices, and combined with air duct integrity inspection, air quality monitoring and purification devices to ensure the ballast tank. Air circulation and convection, optimize ventilation paths and energy utilization.

Benefits of technology

It significantly improves ventilation efficiency and construction environment safety, effectively eliminates smoke and harmful gases, reduces redundant operations and energy waste, improves construction efficiency and quality, and protects the health of construction workers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119058937A_ABST
    Figure CN119058937A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of ship construction, and particularly relates to a ventilation method for a ballast tank of a semi-submerged ship. The ventilation method comprises the steps that in the dock building process, after a bottom ballast tank is formed and a closed space is formed, air is supplied through a first ventilation hole in an outer bottom plate by using an air supply device, meanwhile, an air draft device is arranged in a second ventilation hole in a double-layer bottom plate to extract the air, and convection is formed. Along with formation of the ship body, air is continuously supplied through the first ventilation holes, air draft equipment is arranged in each ballast tank, and regional air convection is achieved through the manholes. And after construction is completed, related ventilation holes are closed, it is ensured that all ballast tanks are in a closed state, and smoke dust and harmful gas are effectively exhausted by accurately controlling air supply and air suction. Ventilation schemes of different construction stages are formulated, the ventilation flow direction is defined, the temporary working holes and the permanent manholes are utilized, the air supply device and the air draft device are used, and ventilation is conducted on the ballast tank, so that the construction environment is improved, and the construction operation efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of shipbuilding, and in particular relates to a ventilation method for a ballast tank of a semi-submersible ship. Background Art

[0002] Semi-submersible vessels are widely used in marine transportation, deep-sea exploration and military fields due to their unique design and functions. This type of ship has multiple ballast tanks, which are usually located at the bottom, middle and top of the main hull, running through the upper, middle and lower layers. During the construction of the ship, the ballast tanks usually have poor ventilation due to their closed space characteristics, which directly affects the construction safety and efficiency.

[0003] The traditional ventilation method is mainly carried out through the air supply and exhaust equipment on the tank deck and the main deck, and the air is circulated through the manholes and passages in the ballast tank. However, this method has several significant problems:

[0004] 1. The ventilation direction is unclear, resulting in unsatisfactory ventilation effect and affecting the air quality of the construction environment.

[0005] 2. The layout of the ventilation device during the construction process was unclear, and the temporary process holes and channel holes were not effectively utilized, resulting in insufficient ventilation of the ballast tanks, which increased the additional workload and time cost during the construction period.

[0006] In addition, smoke and harmful gases may accumulate inside the ballast tank, which not only poses a threat to the health of construction workers, but also may violate safety regulations and affect the construction quality and safety of the ship. Therefore, developing an efficient ballast tank ventilation method to improve the construction environment and ensure the health and safety of construction workers has become an important demand in ship construction. Summary of the invention

[0007] 1. Technical issues to be resolved

[0008] The present invention mainly aims at the above problems and proposes a ventilation method for a ballast tank of a semi-submersible vessel, the purpose of which is to solve the problems of low ventilation efficiency and insufficient safety of the construction environment in existing ventilation schemes.

[0009] (II) Technical solution

[0010] To achieve the above object, the first aspect of the present invention provides a ventilation method for a ballast tank of a semi-submersible vessel, the ventilation method comprising the following steps:

[0011] During the dock construction process, when the bottom ballast tank is initially formed and a closed space is formed, an air supply device is used to supply air into the bottom ballast tank through the first ventilation hole preset on the outer bottom plate. At the same time, an exhaust device is arranged at the second ventilation hole of the double bottom plate to extract the air in the bottom ballast tank, so that the air inside the bottom ballast tank forms convection;

[0012] The dock construction continues. When the bottom ballast tank, the middle ballast tank and the top ballast tank gradually form a closed space, the air supply device is used to continue to supply air through the first ventilation hole of the outer bottom plate; an exhaust device is arranged in the permanent manhole on the main deck, and a third ventilation hole is arranged on the top of the middle ballast tank. The exhaust device is used to exhaust the bottom ballast tank, the middle ballast tank and the top ballast tank, so that the air in the bottom ballast tank, the middle ballast tank and the top ballast tank area forms convection;

[0013] After the construction of the bottom ballast tank is completed, all the first ventilation holes and the second ventilation holes of the bottom ballast tank are closed to make the bottom ballast tank completely closed; the construction of the middle ballast tank and the top ballast tank continues; an exhaust device is arranged at the permanent manhole of the main deck to exhaust the middle ballast tank and the top ballast tank; during the use of the exhaust device, air is sent in from the permanent manhole of the middle ballast tank passage to form air convection between the middle ballast tank and the top ballast tank;

[0014] After the construction of the middle ballast tank has been completed, all the third ventilation holes are closed to make the middle ballast tank in a completely closed state; the construction of the top ballast tank continues, and an exhaust device and an air supply device are arranged at the permanent manhole on the main deck outside the top ballast tank, one for extracting the air in the top ballast tank, and the other for supplying fresh air, so that the air inside the top ballast tank forms convection.

[0015] Furthermore, the air supply device is a blower.

[0016] Furthermore, the air extraction device is an exhaust fan.

[0017] Furthermore, the air supply device and the air exhaust device are both equipped with speed regulators for adjusting the air volume and wind speed according to the construction environment.

[0018] Furthermore, the ventilation method also includes an air duct integrity and sealing inspection performed before the start of each construction stage.

[0019] Furthermore, the ventilation method also includes using an air quality monitoring device to monitor the air quality in the ballast tank in real time during the ventilation process.

[0020] Furthermore, the ventilation method also includes using an air purification device during the ventilation process.

[0021] Furthermore, the ventilation method also includes setting up multi-point temperature and humidity sensors inside the ballast tank to monitor environmental changes in various areas.

[0022] (III) Beneficial effects

[0023] Compared with the prior art, the present invention provides a ventilation method for the ballast tank of a semi-submersible ship, which significantly improves the ventilation efficiency and the safety of the construction environment through precise and systematic ventilation holes and device layout, as well as phased ventilation strategies. This method ensures the effective circulation and convection of air inside the ballast tank by performing targeted air supply and exhaust operations on the ballast tank at different construction stages, thereby effectively removing smoke and harmful gases. In addition, by timely closing and opening specific ventilation holes, the present invention optimizes the ventilation path, reduces redundant operations and energy waste, and at the same time ensures the air quality during construction, meeting the requirements of safe production. This orderly and segmented ventilation method not only improves the ventilation effect, but also further protects the health of construction workers by improving the working environment, and improves the overall efficiency and quality of shipbuilding. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 This is a schematic diagram of a ventilation method for the bottom ballast tank forming stage disclosed in this application.

[0025] Figure 2 This is a schematic diagram of a ventilation method for the main hull forming stage of dock construction disclosed in this application.

[0026] Figure 3 This is a schematic diagram of a ventilation method for a bottom ballast tank during the completion stage of dock construction disclosed in this application.

[0027] Figure 4 This is a schematic diagram of a ventilation method for a ballast tank during the completion stage of dock construction disclosed in this application.

[0028] Reference numerals shown in the figure: 100, bottom ballast tank; 200, middle ballast tank; 300, top ballast tank; 10, air supply device; 11, outer bottom plate; 12, first ventilation hole; 13, double bottom plate; 14, second ventilation hole; 15, exhaust device; 16, main deck; 17, permanent manhole; 18, third ventilation hole; 19, passage. DETAILED DESCRIPTION

[0029] The present invention will be described in detail below in conjunction with the accompanying drawings, and the technical solutions in the embodiments of the present invention will be clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0030] See also Figure 1-Figure 4As shown, this embodiment provides a ventilation method for the ballast tank of a semi-submersible ship. For the enclosed ballast tank space formed during the ship construction process, the exhaust device 15 and the air supply device 10 are used to ventilate the ballast tank through the permanent manhole 17 of the ship and the first ventilation hole 12, the second ventilation hole 14 and the third ventilation hole 18, so as to improve the construction working environment, improve the working efficiency and ensure the health of the workers. The method includes a bottom ballast tank forming stage, a main hull forming stage of dock construction, a bottom ballast tank completion stage of wharf construction and a ballast tank completion stage of wharf construction.

[0031] Bottom ballast tank forming stage: When the bottom ballast tank 100 is initially formed and forms a closed space, the air supply device 10 is used to supply air into the bottom ballast tank 100 through the first ventilation holes 12 preset on the outer bottom plate 11. At the same time, the exhaust device 15 is arranged in the second ventilation holes 14 of the double bottom plate 13 to extract the air in the bottom ballast tank 100, so that the air inside the bottom ballast tank 100 forms convection, such as Figure 1 Arrow shown.

[0032] The main hull forming stage of the dock construction: the dock construction is continued. When the bottom ballast tank 100, the middle ballast tank 200, and the top ballast tank 300 gradually form a closed space, the air supply device 10 is used to continue to supply air through the first ventilation hole 12 of the outer bottom plate 11; the exhaust device 15 is arranged on the permanent manhole 17 on the main deck 16, and the third ventilation hole 18 is arranged on the top of the middle ballast tank 200. The exhaust device 15 is used to exhaust the bottom ballast tank 100, the middle ballast tank 200, and the top ballast tank 300, so that the air in the bottom ballast tank 100, the middle ballast tank 200, and the top ballast tank 300 area forms convection, such as Figure 2 Arrow shown.

[0033] Completion stage of bottom ballast tank construction at the wharf: after the construction of the bottom ballast tank 100 is completed, all the first ventilation holes 12 and the second ventilation holes 14 of the bottom ballast tank 100 are closed to make the bottom ballast tank 100 completely closed; the construction of the middle ballast tank 200 and the top ballast tank 300 is continued; the exhaust device 15 is arranged in the permanent manhole 17 of the main deck 16 to exhaust the middle ballast tank 200 and the top ballast tank 300; wherein, during the use of the exhaust device 15, air is supplied from the permanent manhole 17 of the passage 19 of the middle ballast tank 200 to form air convection between the middle ballast tank 200 and the top ballast tank 300, such as Figure 3 Arrow shown.

[0034] The middle ballast tank of the wharf is completed: after the middle ballast tank 200 has been constructed, all the third ventilation holes 18 are closed to make the middle ballast tank 200 completely closed; the top ballast tank 300 is constructed, and the exhaust device 15 and the air supply device 10 are arranged at the permanent manhole 17 of the main deck 16 outside the top ballast tank 300, one for extracting the air in the top ballast tank and the other for supplying fresh air, so that the air inside the top ballast tank 300 forms convection, such as Figure 4 shown.

[0035] The semi-submersible vessel ballast tank ventilation method of this embodiment significantly improves the ventilation effect and construction environment in the ballast tank by implementing orderly and special ventilation measures for different construction stages. During the formation of each closed ballast tank, the air supply device 10 and the exhaust device 15 are used in a timely manner to ensure continuous air circulation and convection, and effectively remove smoke and harmful gases. This precise ventilation strategy not only improves work efficiency and reduces construction risks, but also helps to protect the health of construction workers and ensure safety during the construction process. By setting the first ventilation hole 12, the second ventilation hole 14, the third ventilation hole 18 and the permanent manhole 17 at critical periods and locations, this method optimizes the ventilation path, reduces energy waste, and significantly improves the process quality and efficiency of the entire construction process.

[0036] In this embodiment, the air supply device 10 is a blower, and the air exhaust device 15 is an exhaust fan. Of course, this embodiment is not limited to the air supply device 10 being a blower and the air exhaust device 15 being an exhaust fan. Both devices are equipped with speed regulators. This configuration allows the air volume and wind speed to be flexibly adjusted according to the specific construction environment requirements, thereby ensuring that the ventilation efficiency inside the ballast tank is optimized. By adjusting the speed of the blower and the exhaust fan, the air flow in the ballast tank can be more accurately controlled, effectively responding to different environmental conditions and construction stage requirements, ensuring that the air quality at the construction site meets safety standards, and at the same time improving construction efficiency and the safety of operators.

[0037] In the semi-submersible vessel ballast tank ventilation method of the present invention, a step is added, that is, the integrity and sealing of the air duct is checked before each construction stage. By checking the integrity and sealing of the air duct, any problems that may cause air leakage or contamination can be prevented and repaired in time, thereby ensuring the efficiency of the air supply and exhaust equipment.

[0038] In the semi-submersible vessel ballast tank ventilation method of the present invention, the environmental monitoring and control functions are further enhanced, including using an air quality monitoring device to monitor the air quality in the ballast tank in real time, using an air purification device to improve the ventilation effect, and setting up multi-point temperature and humidity sensors inside the ballast tank to monitor environmental changes in various areas. The air quality monitoring device can detect the level of harmful gases and particulate matter in real time and adjust the ventilation and purification strategies in time. The air purification device effectively removes pollutants from the air and keeps the air clean. The arrangement of multi-point temperature and humidity sensors allows for detailed monitoring of the microenvironment of the ballast tank so that the ventilation equipment can be adjusted according to environmental changes.

[0039] Since the present invention provides a ventilation method for the ballast tank of a semi-submersible ship, the method fully considers the layout characteristics of the ballast tank of the semi-submersible ship and the physical characteristics of the rising smoke, and is equipped with exhaust and air supply devices to effectively realize the convection of air in the ballast tank, thereby significantly improving the construction environment and ensuring the health and safety of the workers. As a high value-added product, cabin ventilation of semi-submersible ships is a key process in shipbuilding. By implementing the ventilation method of the present invention, not only the company's core technological competitiveness in the field of high-end marine equipment and ship product construction is improved, but also valuable experience is accumulated, further improving the company's overall construction level and market competitiveness. This ventilation method ensures high efficiency and safety during the construction process by effectively delivering fresh air and exhausting smoke and harmful gases, and strongly supports the company's acceptance and execution of high-tech projects.

[0040] Therefore, no matter from which point of view, the embodiments should be regarded as illustrative and non-restrictive, and the scope of the present application is limited by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and range of equivalent elements of the claims are included in the present application. Any figure mark in the claims should not be regarded as limiting the claims involved. In addition, it is obvious that the word "comprising" does not exclude other units or steps, and the singular does not exclude the plural. The words first, second, etc. are used to indicate names, and do not indicate any particular order.

[0041] The above embodiments are only used to illustrate the technical solution of the present application and are not intended to limit it. Although the present application has been described in detail with reference to the preferred embodiments, a person skilled in the art should understand that the technical solution of the present application may be modified or replaced by equivalents without departing from the spirit and scope of the technical solution of the present application.

Claims

1. A ventilation method for a ballast tank of a semi-submersible vessel, characterized in that: The ventilation method comprises the following steps: During the dock construction process, when the bottom ballast tank is initially formed and a closed space is formed, an air supply device is used to supply air into the bottom ballast tank through the first ventilation hole preset on the outer bottom plate. At the same time, an exhaust device is arranged at the second ventilation hole of the double bottom plate to extract the air in the bottom ballast tank, so that the air inside the bottom ballast tank forms convection; The dock construction continues. When the bottom ballast tank, the middle ballast tank and the top ballast tank gradually form a closed space, the air supply device is used to continue to send air in through the first ventilation hole of the outer bottom plate; an exhaust device is arranged in the permanent manhole on the main deck, and a third ventilation hole is arranged on the top of the middle ballast tank. The exhaust device is used to exhaust the bottom ballast tank, the middle ballast tank and the top ballast tank, so that the air in the bottom ballast tank, the middle ballast tank and the top ballast tank area forms convection; After the construction of the bottom ballast tank is completed, all the first ventilation holes and the second ventilation holes of the bottom ballast tank are closed to make the bottom ballast tank completely closed; the construction of the middle ballast tank and the top ballast tank continues; an exhaust device is arranged at the permanent manhole of the main deck to exhaust the middle ballast tank and the top ballast tank; during the use of the exhaust device, air is sent in from the permanent manhole of the middle ballast tank passage to form air convection between the middle ballast tank and the top ballast tank; After the construction of the middle ballast tank has been completed, all the third ventilation holes are closed to make the middle ballast tank in a completely closed state; the construction of the top ballast tank continues, and an exhaust device and an air supply device are arranged at the permanent manhole on the main deck outside the top ballast tank, one for extracting the air in the top ballast tank, and the other for supplying fresh air, so that the air inside the top ballast tank forms convection.

2. A ventilation method for a ballast tank of a semi-submersible vessel according to claim 1, characterized in that: The air supply device is a blower.

3. A ventilation method for a ballast tank of a semi-submersible vessel according to claim 1, characterized in that: The air extraction device is an exhaust fan.

4. A ventilation method for a ballast tank of a semi-submersible vessel according to claim 1, characterized in that: The air supply device and the air exhaust device are both equipped with speed regulators for adjusting the air volume and wind speed according to the construction environment.

5. A ventilation method for a ballast tank of a semi-submersible vessel according to claim 1, characterized in that: The ventilation method also includes duct integrity and leak-tightness checks before each construction phase begins.

6. A ventilation method for a ballast tank of a semi-submersible vessel according to claim 1, characterized in that: The ventilation method also includes using an air quality monitoring device to monitor the air quality in the ballast tank in real time during the ventilation process.

7. A ventilation method for a ballast tank of a semi-submersible vessel according to claim 1, characterized in that: The ventilation method also includes using an air purification device during the ventilation process.

8. A ventilation method for a ballast tank of a semi-submersible vessel according to claim 1, characterized in that: The ventilation method also includes setting up multiple temperature and humidity sensors inside the ballast tank to monitor environmental changes in various areas.

Citation Information

Patent Citations

  • Ventilation method of ro-ro passenger ship building process and air draft fans

    CN110469937A

  • Temporary smoke exhaust arrangement method in ship building process

    CN115107951A

  • Arrangement for temporary opening hole and channel

    CN202449170U

Cited By

  • Temporary ventilation method for upper pipe tunnel in ship building process

    CN120268753A