Application of unloading control system and method in steel silo
By designing a discharge control system in the steel plate bin, using the cooperation of scrapers, push rods, fans and vibration components, the problem of low efficiency of grain plate bonding and discharge is solved, the smooth discharge of grain and cleaning of the warehouse is achieved, and the improvement of the improvement of grain is improved. The efficiency of steel plate bins is used.
Patent Information
- Application Number
- CN202411276129.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-12
- Publication Date
- 2024-12-03
AI Technical Summary
When storing grain in the steel plate warehouse, due to the long-term gravity of the grain, it is easy to get clamped, resulting in a decrease in the discharge efficiency and the material in some areas cannot be discharged, which affects normal use.
A discharge control system is designed, including control components and vibration components. Through the cooperation of scrapers, push rods, springs and distance sensors, the material is discharged in real time, and the air pressure is controlled by fans and electronic valves to promote the material to loosen and discharge. , combine the vibration assembly to thoroughly clean the residue.
It effectively prevents material blockage and overturning, ensures smooth discharge of grain, improves the efficiency of steel plate bins, and avoids material accumulation and material discharge port blockage.
Smart Images

Figure CN119059120A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of material storage equipment, and in particular to an application of a material unloading control system and method in a steel silo. Background Art
[0002] As a commonly used material storage equipment, steel silos are mainly used for materials such as grain. Steel silos have the characteristics of light weight, small footprint and low cost. The inner and outer walls of the silo can also be processed and combined with two different materials to form a double-layer wall panel.
[0003] A steel plate silo with the function of preventing material compaction, with the announcement number CN114940314B, includes a support leg, two support legs are provided, the upper ends of the two support legs are fixedly connected to a shell, the upper end of the shell is fixedly connected to an arc cover, the lower right side of the shell is fixedly connected to a control terminal, the front end of the shell is fixedly connected to a feeding pipe through a connecting block, the feeding pipe is provided with an electromagnetic valve, the electromagnetic valve of the feeding pipe is electrically connected to the control terminal, and also includes a filling mechanism, the filling mechanism is provided at the upper end of the arc cover, the filling mechanism is used to rotate and fill the material, the filling mechanism is provided with a dewatering mechanism for cleaning the water droplets on the lower surface of the arc cover, a storage mechanism for layered support of the material is provided in the lower part of the shell, the storage mechanism is provided with a crushing mechanism for turning over and crushing the lower material in the shell, and a ventilation mechanism for ventilation is provided at the upper part of the shell, the storage mechanism supports the material in the shell in layers and then cooperates with the crushing mechanism to prevent the material in the shell from compacting, and the filling mechanism, the stirring mechanism and the ventilation mechanism are all electrically connected to the control terminal.
[0004] A unloading control method and system for steel silo with announcement number CN115303817A includes: determining the unloading point or unloading area corresponding to the maximum material level height and the minimum material level height; unloading the unloading point or unloading area corresponding to the maximum material level height until the material level height corresponding to the unloading point or unloading area is lower than the minimum material level height; re-determining the unloading point or unloading area corresponding to the maximum material level height until all unloading points or unloading areas except the unloading point or unloading area corresponding to the minimum material level height have completed one unloading.
[0005] Based on the above scheme, when the steel silo is storing grain, the grain stored in the steel silo is affected by its own gravity for a long time, and the grain at the bottom is prone to compaction, which affects the grain discharge efficiency. If the grain is compacted too much, the discharge port of the steel silo will be blocked, affecting the normal use of the steel silo. During the discharge process, the material in some areas will clump and cannot be discharged, resulting in excessive material in this area and tipping over. In the final stage of discharge, the remaining material will accumulate at the discharge port and cannot be completely discharged. Summary of the invention
[0006] The object of the present invention is to provide an application of a discharge control system and method in a steel silo to solve the problems raised in the above-mentioned background technology.
[0007] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a material unloading control system, comprising a storage bin, a control assembly is provided in the middle of the inner wall of the storage bin, the inner wall of the control assembly is provided with four first sleeves arranged in a circumference, a push rod is slidably connected to the inside of each of the first sleeves, a spring is provided between the push rod and the first sleeve, a scraper is fixedly connected to the upper end of each push rod, and the cross section of each scraper is in the shape of an inverted "7", a distance sensor is provided on the upper surface of each scraper, a second sleeve is provided at the lower end of each of the first sleeves, an electronic valve is provided between the first sleeve and the second sleeve, and a vibration assembly is provided on the inner bottom wall of each of the second sleeves;
[0008] The control assembly includes a control ring, and the outer surface of the control ring is provided with four first sliding grooves arranged in a circle, and a baffle is slidably connected to the interior of each of the first sliding grooves, and a side of each of the baffles away from the axis of the storage bin is inclined, and two symmetrical springs are slidably connected between the baffle and the first sliding groove, and a vent hole is provided between each of the first sliding grooves and the first sleeve.
[0009] Through the cooperation of the scraper, push rod and spring, each scraper can always be in contact with the upper end of the material inside the storage bin, so that the material unloading speed in each area can be detected through the distance sensor to see if there is any abnormality. The opening of the air storage ring can be freely opened or closed through the control component. When closed, under the action of air pressure, each baffle can be moved closer to the center to squeeze the internal material to loosen it, making it more convenient to discharge the material. When opened, under the constraint of the opening, a long strip of wind is formed, which can clean up the material adsorbed on the inner wall to avoid the occurrence of leftover material.
[0010] Preferably, an air storage ring is provided on the bottom surface of the control component, and a group of second slide grooves arranged at equal distances are provided on the inner wall of the air storage ring, and a push plate is slidably connected to the interior of each second slide groove.
[0011] Preferably, a support seat is provided below the storage bin, a discharge hopper is provided at the upper end of the support seat, and the upper end of the discharge hopper is fixedly connected to the lower end of the storage bin, a valve is provided at the lower end of the discharge hopper, and two symmetrical fans are provided on the upper surface of the support seat, and the output end of the fan extends to the inside of the air storage ring.
[0012] Preferably, a mounting frame is provided in the middle of the inner wall of the control component, a motor is provided on the upper surface of the mounting frame, the output shaft of the motor is fixedly connected to a spiral push plate, and the lower end of the spiral push plate is rotatably connected to the upper surface of the support seat.
[0013] Preferably, the vibration component includes a rotating shaft, a fan blade is provided at the upper end of the rotating shaft, two symmetrical positioning rings are provided on the outer surface of the rotating shaft, a group of circularly arranged slots are opened on the outer surface of each positioning ring, an impact block is slidably connected to the inside of each slot, and a spring is provided between each slot and the impact block.
[0014] Preferably, the inner wall of each of the second sleeves is provided with two groups of circumferentially arranged limit blocks, and each group of limit blocks corresponds to the impact block.
[0015] The present invention also provides a method for using a discharge control system, and the specific operation steps are as follows:
[0016] S1. First, open the valve to completely open the discharge hopper to achieve the purpose of discharging materials, start the motor to drive the spiral push plate to rotate, and avoid blockage during the discharge process;
[0017] S2. Secondly, under the action of gravity, the four scrapers continue to descend with the material, and the four distance sensors detect the discharge speed of the four areas to prevent the overturning of a certain area due to untimely discharge of materials;
[0018] S3. Then, when one of the areas deviates, the fan increases the pressure inside the air storage ring, pushing each push plate closer to the center, loosening the material inside the storage bin, making it easier to discharge. When the air pressure inside the air storage ring rises to the threshold, the baffle can be opened to allow the gas to be quickly discharged, hitting the material adsorbed on the inner wall above, causing it to fall off.
[0019] S4. Finally, the electronic valve is opened to connect the first sleeve with the second sleeve, so that the gas can flow and the vibration component rotates to generate vibration, so that the remaining residues in the storage bin are completely cleaned through vibration.
[0020] The invention also provides an application of a discharge control system in a steel silo.
[0021] Technical effects of the present invention:
[0022] 1. The present invention can make each scraper always contact with the upper end of the material inside the storage bin through the cooperation of the scraper, the push rod and the spring, so that the distance sensor can be used to detect whether the material inside each area is blocked and cannot be discharged, and make corresponding adjustments according to the actual situation to prevent excessive accumulation of materials in a certain area and cause overturning.
[0023] 2. The present invention adjusts the direction of rotation of the fan to increase or decrease the gas inside the air storage ring, thereby enabling the push plate to move freely. When the push plate moves toward the center, it can squeeze the internal material to loosen it, making it more convenient to discharge the material. When the push plate moves outward, the material accumulated near the push plate is redispersed, making it more convenient to discharge the material.
[0024] 3. The present invention can make corresponding adjustments according to actual conditions through the cooperation between the control component and the fan. When the air pressure inside the air storage ring reaches a threshold, the air storage ring can be opened, and the material adsorbed on the inner wall of the storage bin can be removed by the compressed wind force. When the air storage ring bayonet and the scraper are closed, the gas can enter the second sleeve to prompt the vibration component to operate, so that the material under the storage bin vibrates and the remaining material is completely discharged. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0026] Figure 2 This is a schematic diagram of the cross-sectional structure of the storage bin of the present invention;
[0027] Figure 3 This is a schematic diagram of the cross-sectional structure of the control ring of the present invention;
[0028] Figure 4 This is a schematic diagram of the control loop structure of the present invention;
[0029] Figure 5 is a schematic cross-sectional view of a top view of a control ring of the present invention;
[0030] Figure 6 This is a schematic diagram of the cross-sectional structure of the air storage ring of the present invention;
[0031] Figure 7 It is a schematic diagram of the rotating shaft structure of the present invention;
[0032] Figure 8 It is a schematic diagram of the cross-sectional structure of the rotating shaft of the present invention.
[0033] In the figure: 1. storage bin; 2. control component; 201. control ring; 202. first slide; 203. baffle; 204. vent; 3. first sleeve; 4. push rod; 5. scraper; 6. second sleeve; 7. vibration component; 701. rotating shaft; 702. fan blade; 703. positioning ring; 704. slot; 705. impact block; 706. limit block; 8. air storage ring; 9. second slide; 10. push plate; 11. support seat; 12. discharge hopper; 13. fan; 14. mounting frame; 15. motor; 16. spiral push plate. DETAILED DESCRIPTION
[0034] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0035] First embodiment
[0036] The present invention provides Figures 1 to 8 A material discharge control system shown includes a storage bin 1. A control component 2 is provided in the middle of the inner wall of the storage bin 1. The control component 2 can freely open or close the opening of the air storage ring 8. When the opening is closed, under the action of air pressure, each push plate 10 can move toward the center to squeeze the internal material to loosen it, making the discharge more convenient. When the opening is opened, under the constraint of the opening, a long strip of wind is formed, thereby cleaning the material adsorbed on the inner wall to avoid residual material.
[0037] The control assembly 2 includes a control ring 201, and the outer surface of the control ring 201 is provided with four first slide grooves 202 arranged in a circle, and each first slide groove 202 is slidably connected to the inside with a baffle 203, and each baffle 203 is inclined on one side away from the axis of the storage bin 1, and the baffle 203 can move along the trajectory of the first slide groove 202. When the baffle 203 is subjected to wind force from below, the baffle 203 can slide into the first slide groove 202 under the pressure of the inclined surface, so that the opening above the air storage ring 8 is opened, so that the gas can be quickly discharged from the opening, and the cross-section of the opening is rectangular, which can make the discharged gas rectangular, making it easier to clean the materials adsorbed on the inner wall of the storage bin 1, and avoiding the situation where too much material in a certain area causes overturning. The baffle 203 and the first slide groove 202 There are two symmetrical springs slidingly connected between them. The springs are in the initial state at this time. When the baffle 203 is opened, the spring can be compressed to generate a restoring elastic force, and under the action of the spring, the opening can only be opened when the gas inside the air storage ring 8 reaches a certain level, so as to avoid the opening from automatically opening as soon as air is supplied. A vent 204 is provided between each first slide groove 202 and the first sleeve 3. When the scraper 5 that should be lowered above the opening of the air storage ring 8 is closed again, the subsequent gas can enter the first sleeve 3 through the vent 204, so as to achieve the purpose of gas transmission. The vent 204 can make each group of scrapers 5 always contact the upper end of the material inside the storage bin 1 through the cooperation of the scraper 5, the push rod 4 and the spring, so that the speed of material discharge in each area can be detected through the distance sensor to see whether there is any abnormality.
[0038] The inner wall of the control component 2 is provided with four first sleeves 3 arranged in a circle. The first sleeves 3 can constrain the position of the push rod 4 so that the scraper 5 can rise or fall smoothly to avoid misalignment. At the same time, multiple first sleeves 3 are provided to divide the area into four parts evenly, so that the detection is more accurate and it is possible to promptly detect whether a certain area is stuck. A push rod 4 is slidably connected to the inside of each first sleeve 3. A spring is provided between the push rod 4 and the first sleeve 3. The spring is in a stretched state at this time. When the internal material descends, the scraper 5 can always be in contact with the material under the tension of the spring. At the same time, it has a certain pressure and can partially adsorb part of it on the inner wall of the storage bin 1 for cleaning to avoid residual material. The upper end of each push rod 4 is fixedly connected with a scraper 5, and the cross-section of each scraper 5 is in the shape of an inverted "7". Under the special shape of the scraper 5, it can In order to collect the materials adsorbed on the inner wall of the storage bin 1 during its descent, to avoid the occurrence of leftover materials, a distance sensor is provided on the upper surface of each scraper 5, which can monitor the distance between the distance sensor and the inner top wall of the storage bin 1 in real time. When the distance detected by one of the distance sensors is smaller than the other distances, it indicates that the material under the scraper 5 is blocked and the scraper 5 cannot move to the specified position. A second sleeve 6 is provided at the lower end of each first sleeve 3, and an electronic valve is provided between the first sleeve 3 and the second sleeve 6. The electronic valve can be opened or closed freely, so that the first sleeve 3 and the second sleeve 6 can be connected at an appropriate time. A vibration component 7 is provided on the inner bottom wall of each second sleeve 6. When the vibration component 7 is started, it can generate vibration, which causes the material accumulated under the storage bin 1 to vibrate, to avoid the material being adsorbed on the inner wall and the occurrence of leftover materials.
[0039] An air storage ring 8 is provided on the bottom surface of the control component 2. Gas can be added inside the air storage ring 8. When the gas gradually increases, under the action of air pressure, each push plate 10 can be pushed toward the center to squeeze the internal material to loosen it, making it more convenient to discharge the material. A group of second chutes 9 arranged at equal distances are provided on the inner wall of the air storage ring 8. A push plate 10 is slidably connected inside each second chute 9. Each push plate 10 can move along the trajectory of the second chute 9. When the gas inside the air storage ring 8 is extracted, under the action of negative pressure, each push plate 10 can be restored to its original position. By continuously moving the push plates 10, the materials accumulated near the push plates 10 can be redispersed, making it more convenient to discharge the material.
[0040] A support base 11 is provided below the storage bin 1, which can effectively play a supporting role, making the storage bin 1 more convenient to use. A discharge hopper 12 is provided at the upper end of the support base 11, and the upper end of the discharge hopper 12 is fixedly connected to the lower end of the storage bin 1. The discharge hopper 12 can effectively gather the materials in one place, making it more convenient to discharge the materials, avoiding excessive dispersion of the materials and spilling during filling. A valve is provided at the lower end of the discharge hopper 12, and the valve can be opened freely to achieve the purpose of discharging and cutting off the materials. Two symmetrical fans 13 are provided on the upper surface of the support base 11, and the output end of the fan 13 extends to the inside of the air storage ring 8. When the fan 13 is started, it can generate wind power, and transmit the gas to the inside of the air storage ring 8 through the output end. When the fan 13 rotates in the opposite direction, suction can be generated to quickly discharge the gas inside the air storage ring 8. A mounting bracket 14 is provided in the middle of the inner wall of the control component 2. The mounting bracket 14 can fix the position of the motor 15 to prevent the position of the motor 15 from changing due to gravity during the material adding process. The upper surface of the mounting bracket 14 is provided with a motor 15. The output shaft of the motor 15 is fixedly connected with a spiral push plate 16, and the lower end of the spiral push plate 16 is rotatably connected to the upper surface of the support seat 11. When the motor 15 is powered on and rotated, it can drive the spiral push plate 16 below to operate. Under the push of the spiral push plate 16, the agglomerated material can be re-broken up to avoid blockage during material discharge.
[0041] The vibration component 7 includes a rotating shaft 701, which can rotate freely. A fan blade 702 is arranged at the upper end of the rotating shaft 701. When the fan blade 702 is subjected to wind force, it can rotate itself, thereby driving the rotating shaft 701 to rotate, thereby achieving the purpose of power transmission. Two symmetrical positioning rings 703 are arranged on the outer surface of the rotating shaft 701. The outer surface of each positioning ring 703 is provided with a group of circumferentially arranged card grooves 704. The interior of each card groove 704 is slidably connected with a collision block 705. The collision block 705 can move along the trajectory of the card groove 704. When the rotating shaft 701 rotates, the collision block 705 is extended outward under the action of centrifugal force. When it hits the limit block 70 6, thereby being able to generate vibration, and through the vibration accumulation under the storage bin 1, vibration is generated to prevent the material from being adsorbed on the inner wall and the occurrence of residual material. A spring is provided between each slot 704 and the impact block 705. When the impact block 705 hits the limit block 706, under the action of extrusion, the impact block 705 is retracted into the slot 704, and the spring is compressed to generate a reset elastic force. When the impact block 705 passes the limit block 706, under the action of the spring, the impact block 705 can be quickly reset and hit the inner wall of the second sleeve 6, generating vibration again, making it convenient to clean the residual material. The inner wall of each second sleeve 6 is provided with two groups of limit blocks 706 arranged in a circle, and each group of limit blocks 706 corresponds to the impact block 705.
[0042] In actual use, the transport vehicle is moved to the position directly below the discharge hopper 12, the valve is opened to allow the storage bin 1 to start discharging materials, and the motor 15 is started. Under the action of the output shaft of the motor 15, the spiral push plate 16 can be driven to rotate. Under the push of the spiral push plate 16, the agglomerated materials can be broken up again to avoid blockage during the discharge process. The material inside the storage bin 1 gradually decreases, and under the action of the spring and gravity, the four scrapers 5 gradually descend along with the surface of the material. During the gradual descent of the scraper 5, the upper part of the inner wall of the storage bin 1 can be cleaned to avoid residual material being adsorbed on the inner wall. At the same time, under the action of the scraper 5, the push rod 4 below is driven to move downward to compress the gas inside the first sleeve 3.
[0043] When the four distance sensors detect distance errors, it indicates that the inner wall of a certain area absorbs too much material and the scraper 5 cannot move to the specified position. The following adjustments are required:
[0044] Start the fan 13 to make it rotate forward to generate wind force, introduce gas into the air storage ring 8, so that the gas inside the air storage ring 8 gradually increases, and the air pressure inside the air storage ring 8 increases. Under the action of pressure, each push plate 10 is forced to move closer to the center, squeeze the internal material to loosen it, and discharge the material more conveniently. When the push plate 10 moves to the maximum end, the air pressure inside the air storage ring 8 increases again. Under the action of pressure and inclined surface, each baffle 203 can be pushed to slide into the first slide groove 202, so that the opening above the air storage ring 8 is opened, so that the gas can be discharged from The gas is discharged quickly from the opening, and the cross-section of the opening is rectangular, so that the discharged gas is rectangular, so that it can clean the material adsorbed on the inner wall of the storage bin 1. At the same time, part of the wind can push the scraper 5 above to move upward. When the wind disappears, under the action of gravity, the scraper 5 can be reset, so that it can quickly hit the material adsorbed on the inner wall to avoid excessive viscosity of the material and inability to clean it thoroughly. When the adsorbed material is cleaned, under the action of gravity, the scraper 5 that has not moved to the specified position can move again, so that the values detected by the four distance sensors remain consistent.
[0045] When the fan 13 reverses, the gas inside the air storage ring 8 can be quickly discharged. When the air pressure inside the air storage ring 8 gradually decreases and is not enough to cause the baffle 203 to shrink in the first slide groove 202, under the action of the spring, the baffle 203 can re-close the opening of the air storage ring 8, so that negative pressure is generated inside the air storage ring 8, and each push plate 10 moves outward, so that a gap appears between the internal material and the push plate 10, and gaps appear between the stacked materials, so as to prevent the materials from piling up and forming lumps.
[0046] When the detection distance of each distance sensor reaches the threshold, it indicates that most of the materials in the storage bin 1 have been discharged, and a small part of the remaining materials are accumulated at the edge and cannot be completely discharged. The following adjustments are required:
[0047] Under the action of gravity, the lower ends of the four scrapers 5 can move to the upper surface of the control ring 201, just closing the opening above the air storage ring 8, and starting the fan 13 again to make it rotate forward to generate wind force, and introduce the gas into the air storage ring 8. When the push plate 10 moves to the maximum end, the air pressure inside the air storage ring 8 increases again. Under the action of pressure and inclined surface, each baffle 203 can be pushed to slide into the first slide groove 202, so that multiple air holes 204 are opened, so that the gas can quickly enter the first sleeve 3 from the air holes 204, and open the electronic valve to connect the first sleeve 3 with the second sleeve 6, so that the gas entering the first sleeve 3 enters the second sleeve 6 through the electronic valve. Under the blowing of wind, the fan blades 702 rotate, driving the rotating shaft below. The rotating shaft 701 rotates, and the cooperation between the rotating shaft 701 and the positioning ring 703 can drive the impact block 705 to rotate. Under the action of centrifugal force, the impact block 705 extends outward, and when it hits the limit block 706, it can generate vibration, which accumulates under the storage bin 1 to generate vibration, so as to avoid the material being adsorbed on the inner wall and the occurrence of residual material. When the impact block 705 hits the limit block 706, under the action of extrusion, the impact block 705 retracts into the slot 704, and at the same time, the spring is compressed to generate a reset elastic force. When the impact block 705 passes the limit block 706, under the action of the spring, the impact block 705 can be quickly reset and hit the inner wall of the second sleeve 6, generating vibration again, making it convenient to clean the residual material.
[0048] Second embodiment
[0049] The present invention also provides a method for using a discharge control system, and the specific operation steps are as follows:
[0050] S1. First, the discharge hopper 12 is completely opened by opening the valve to achieve the purpose of discharging the material, and the motor 15 is started to drive the spiral push plate 16 to rotate to avoid blockage during the material discharging process;
[0051] S2. Secondly, under the action of gravity, the four scrapers 5 continue to descend along with the material, and the four distance sensors detect the discharge speed of the four areas to prevent the overturning of a certain area due to untimely discharge of materials.
[0052] S3. Then when one of the areas deviates, the fan 13 is used to increase the volume inside the air storage ring 8, pushing each push plate 10 toward the center, loosening the material inside the storage bin 1 and making it easier to discharge the material. When the air pressure inside the air storage ring 8 rises to a threshold value, the baffle 203 can be opened to allow the gas to be discharged quickly, hitting the material adsorbed on the inner wall above and causing it to fall off.
[0053] S4. Finally, the electronic valve is opened to connect the first sleeve 3 and the second sleeve 6, so that the gas can flow and the vibration assembly 7 rotates to generate vibration, so that the remaining residues in the storage bin 1 are completely cleaned through the vibration.
[0054] Third embodiment
[0055] The present invention also provides an application of a material unloading control system in a steel silo, which is specifically applicable to the discharge of material from different areas inside the steel silo by real-time measurement of the material unloading amount in different areas inside the storage silo 1 to prevent a certain area from being blocked and unable to unload material, resulting in excessive material in that area and causing the storage silo 1 to tip over.
[0056] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A material discharging control system, comprising a storage bin (1), characterized in that: A control assembly (2) is provided in the middle of the inner wall of the storage bin (1), and four first sleeves (3) are arranged in a circumference on the inner wall of the control assembly (2), and a push rod (4) is slidably connected to the interior of each of the first sleeves (3), and a spring is provided between the push rod (4) and the first sleeve (3), and a scraper (5) is fixedly connected to the upper end of each push rod (4), and the cross section of each scraper (5) is in the shape of an inverted "7", and a distance sensor is provided on the upper surface of each scraper (5), and a second sleeve (6) is provided at the lower end of each of the first sleeves (3), and an electronic valve is provided between the first sleeve (3) and the second sleeve (6), and a vibration assembly (7) is provided on the inner bottom wall of each of the second sleeves (6); The control assembly (2) comprises a control ring (201), the outer surface of the control ring (201) is provided with four first slide grooves (202) arranged in a circumference, each of the first slide grooves (202) is slidably connected to the inside thereof with a baffle (203), the side of each baffle (203) away from the axis of the storage bin (1) is an inclined surface, two symmetrical springs are slidably connected between the baffle (203) and the first slide groove (202), and a vent hole (204) is provided between each of the first slide grooves (202) and the first sleeve (3).
2. The unloading control system according to claim 1, characterized in that: The bottom surface of the control component (2) is provided with an air storage ring (8), and the inner wall of the air storage ring (8) is provided with a group of second slide grooves (9) arranged at equal distances, and each second slide groove (9) is slidably connected to a push plate (10) inside.
3. A discharge control system according to claim 1, characterized in that: A support base (11) is provided below the storage bin (1), a discharge hopper (12) is provided at the upper end of the support base (11), and the upper end of the discharge hopper (12) is fixedly connected to the lower end of the storage bin (1), a valve is provided at the lower end of the discharge hopper (12), and two symmetrical fans (13) are provided on the upper surface of the support base (11), and the output end of the fan (13) extends to the inside of the air storage ring (8).
4. A discharge control system according to claim 3, characterized in that: A mounting frame (14) is provided in the middle of the inner wall of the control component (2), and a motor (15) is provided on the upper surface of the mounting frame (14). The output shaft of the motor (15) is fixedly connected to a spiral push plate (16), and the lower end of the spiral push plate (16) is rotatably connected to the upper surface of the support seat (11).
5. A discharge control system according to claim 1, characterized in that: The vibration component (7) comprises a rotating shaft (701), a fan blade (702) is provided at the upper end of the rotating shaft (701), two symmetrical positioning rings (703) are provided on the outer surface of the rotating shaft (701), a group of circumferentially arranged slots (704) are opened on the outer surface of each positioning ring (703), an impact block (705) is slidably connected inside each slot (704), and a spring is provided between each slot (704) and the impact block (705).
6. A material discharging control system according to claim 5, characterized in that: The inner wall of each of the second sleeves (6) is provided with two groups of circumferentially arranged limiting blocks (706), and each group of limiting blocks (706) corresponds to a collision block (705).
7. The method for using a discharge control system according to claim 4, characterized in that: The method comprises the following steps: S1. First, the discharge hopper (12) is completely opened by opening the valve to discharge the material, and the motor (15) is started to drive the spiral push plate (16) to rotate to avoid blockage during the discharge process; S2. Secondly, under the action of gravity, the four scrapers (5) continue to descend along with the material, and the four distance sensors detect the discharge speed of the four areas to prevent the overturning of a certain area due to untimely discharge of the material; S3, when one of the areas deviates, the air inside the air storage ring (8) is increased by the fan (13), pushing each push plate (10) toward the center, so that the material inside the storage bin (1) is loosened, making it easier to discharge the material. When the air pressure inside the air storage ring (8) rises to a threshold, the baffle (203) can be opened, so that the gas is discharged quickly and hits the material adsorbed on the inner wall above, causing it to fall off; S4. Finally, the electronic valve is opened to connect the first sleeve (3) and the second sleeve (6) to allow the gas to flow, and the vibration component (7) is rotated to generate vibration, so that the residual material remaining in the storage bin (1) is completely cleaned through the vibration.
8. Application of a discharge control system as claimed in claim 1 in a steel silo.
Citation Information
Cited By
Efficient blockage removing device for conical discharging bin
CN119429422A
Efficient unblocking device for conical blanking bin
CN119429422B