Intelligent bridge and tunnel joint structure based on traffic flow monitoring and counterweight adjusting method thereof
By setting up an intelligent structure and monitoring system at the joints of bridges and tunnels, and using traffic flow monitoring and counterweight adjustment, the problems of length extension of bridge and tunnel transition structures in deep water areas and large engineering volume are solved, and efficient and economical bridge and tunnel transitions are achieved, reducing the number of bridge and tunnel transitions in deep water areas. Energy consumption and cost.
Patent Information
- Application Number
- CN202411079498.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-12-03
AI Technical Summary
In the bridge and tunnel transition areas in deep-water areas, the prior art is difficult to effectively solve the problems of extended structural length, large engineering volume, high cost and high waterproof and anti-seepage requirements, especially when the water depth increases in marine engineering.
Adopt an intelligent bridge-tunnel joint structure based on vehicle flow monitoring, including caisson structure, bridge and immersive tube tunnel. A camera and weighing device are installed through the road monitoring area. The lifting platform and expandable bag are used to achieve a smooth transition of the vehicle, and through Traffic monitoring and counterweight adjustment optimize structural load.
It reduces the engineering volume and cost, improves vehicle conversion efficiency, reduces the energy consumption of the lifting and driving mechanism, extends the service life of structural components, and ensures the safety and economicality of the transition.
Smart Images

Figure CN119061774A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of marine engineering, and in particular to an intelligent bridge-tunnel junction structure based on vehicle flow monitoring and a counterweight adjustment method thereof. Background Art
[0002] The construction method of bridge-tunnel combination builds bridges in shallow water areas and tunnels in deep water areas according to the characteristics of the riverbed. It has obvious technical and economic benefits and has been widely used in various large-scale strait projects at home and abroad. The transition area between bridges and tunnels is usually realized by natural islands and artificial islands.
[0003] Artificial islands are land reclamation projects, which involve large amounts of ground treatment and land backfilling. Waste soil and fill not only occupy limited land area, but also consume a lot of time and resources for transportation. Especially in deep water areas, in order to ensure a smooth transition between bridges and tunnels, the length of the artificial island needs to be extended, further increasing the cost and construction difficulty.
[0004] Invention application publication number CN111485579A discloses a bridge-tunnel transition conversion structure between a suspended tunnel and a deep-water suspension bridge, but the transition elevation that can be adapted is limited, and a large-volume spiral approach bridge still needs to be built under deep-water conditions. Invention application publication number CN116024949A discloses an island-free cross-sea channel bridge-tunnel conversion structure and method, which uses a channel structure with a height difference as a bridge-tunnel conversion site. The structure still requires a long distance to meet driving requirements, and has high requirements for waterproofing and anti-seepage of the joints between the structures.
[0005] Although the above structures have a certain reduction in engineering workload compared to artificial islands, they are not suitable for bridge-tunnel transition areas in deep-water environments. At present, the maximum installation depth of offshore immersed tube tunnels is generally around 60m. As marine engineering develops into the deep sea, the water depth of some projects has reached nearly 100 meters. As the water depth deepens, the length of the structure needs to be extended in plane or space, there are many interferences in offshore construction, and high standards for waterproofing and anti-seepage are required, which further increases the project's construction period, cost, and construction difficulty. Summary of the invention
[0006] The present invention provides an intelligent bridge-tunnel junction structure based on vehicle flow monitoring and a counterweight adjustment method thereof, which solves the problem of road connection in the bridge-tunnel transition area.
[0007] In order to solve the above technical problems, the technical solution adopted by the present invention is: an intelligent bridge-tunnel junction structure based on traffic flow monitoring, including a caisson structure, a bridge and an immersed tube tunnel, a caisson and bridge docking transition section is provided at the docking point of the caisson structure and the bridge, a caisson and immersed tube docking transition section is provided at the docking point of the caisson structure and the immersed tube tunnel, a road monitoring area is provided near the caisson structure on the bridge and the immersed tube tunnel, monitoring cameras and road weighing devices arranged on the road surface are provided along the road monitoring area, a road weighing device is provided at the docking transition section between the caisson and the bridge and the docking transition section between the caisson and the immersed tube, the caisson structure is provided with a central sinking part, and a first lifting platform and a second lifting platform arranged side by side are provided in the central sinking part, and a first lifting cable chain is also provided, a driving wheel is provided at the upper end of the central sinking part, the middle part of the first lifting cable chain bypasses a connecting rod, one end of the first lifting cable chain is connected to the upper end of the first lifting platform, and the other end of the first lifting cable chain is connected to the upper end of the second lifting platform, and the first lifting platform and the second lifting platform can be raised and lowered to dock with the bridge or the immersed tube tunnel.
[0008] In a preferred embodiment, the first lifting platform and the second lifting platform include a central lifting frame, a vehicle loading platform is provided on the central lifting frame, the first chamber is provided in the vehicle loading platform of the first lifting platform, the second chamber is provided in the vehicle loading platform of the second lifting platform, a driving wheel is provided at the upper end of the central sinking part, a first lifting cable chain is wound around the driving wheel, one end of the first lifting cable chain is connected to the upper end of the vehicle loading platform of the first lifting platform, and the other end of the first lifting cable chain is connected to the upper end of the vehicle loading platform of the second lifting platform.
[0009] In the preferred solution, an outer frame lifting frame is provided on the outer side of each vehicle loading platform, and a second fixed pulley and a second lifting cable chain connected to the second fixed pulley are also provided on the upper port of the central sunken part, one end of the second lifting cable chain is connected to the central lifting frame, and the other end of the second lifting cable chain is connected to the outer frame lifting frame, and a variable counterweight device is provided on the outer frame lifting frame.
[0010] In a preferred solution, a platform is provided on the outer frame lifting frame, a powered roller is provided at the bottom of the central sinking part, a basic counterweight is provided on the powered roller, and the powered roller drives the basic counterweight to be placed on the platform.
[0011] In the preferred solution, an expandable bag is provided on the outer frame lifting frame, the expandable bag can be filled with liquid, a liquid storage tank is provided at the bottom of the central sinking part, and a liquid pump is also provided, and the liquid storage tank is connected to the expandable bag through the liquid pump.
[0012] In a preferred embodiment, the expandable bags are distributed in a ring shape on the outer frame lifting frame. The expandable bags include multiple independent segments and a rotary valve. The rotary valve includes a fixed cylinder. A rotatable rotating shaft is provided in the fixed cylinder. The rotating shaft is a hollow structure. A plurality of blade structures are provided on the inner wall of the fixed cylinder along the circumferential direction. The blade structure divides the rotating shaft and the fixed cylinder into multiple separation chambers, and a connecting hole is provided between one of the separation chambers and the inside of the rotating shaft.
[0013] In the preferred scheme, a vertical frame is also provided, an upper connecting frame and a lower connecting frame are provided on the inner wall of the central sunken part, the upper connecting frame and the lower connecting frame are connected to the vertical frame so that the inner side forms an up-and-down traveling space, the outer frame lifting frame is provided with a transverse connecting frame, the transverse connecting frame passes through the up-and-down traveling space, a linear track is provided on the inner wall of the central sunken part and the vertical frame, and the outer ends of the central lifting frame and the outer frame lifting frame are provided with first and second traveling wheels arranged orthogonally, and the first and second traveling wheels roll against the linear track.
[0014] The traveling components are arranged at two opposite end faces, and the linear track can be made of I-beam.
[0015] In the preferred embodiment, Plan and arrange road monitoring areas on bridges and immersed tube tunnels to monitor the traffic volume per unit time; Arrange waiting areas of equal area near the caisson structure on bridges and immersed tube tunnels; Only vehicles in the forward traffic waiting area and the reverse traffic waiting area are allowed to enter the first lifting platform and the second lifting platform at a time.
[0016] Since the first lift and the second lift are counterweights to each other, the access gate divides the road into waiting areas. The road surface area in the single-vehicle flow direction of the waiting area is similar to the parking area of the vehicles inside the first lift, so that all vehicles can enter the first lift and the second lift at one time. Due to the particularity that there is no bifurcated road at the junction of the bridge and the tunnel, two means of visual analysis and vehicle weight monitoring are set up along the road. Only vehicles with roughly equal total vehicle weight are allowed to enter the waiting area in each time period. During the lifting of the first and second lifts, only all vehicles in the waiting area are allowed to enter the internal loading space of the first and second lifts, so that the load of the lifting drive mechanism can be minimized and energy consumption can be saved as much as possible. At the same time, reducing the load can also extend the service life of each component.
[0017] The preferred solution includes a vehicle flow visual monitoring method: Capture live video streams via cameras; Perform necessary preprocessing on the video stream, such as scaling, cropping, grayscale, etc., to meet the requirements of model input; Perform vehicle detection on each frame of the image, output information including the location and category of the vehicle, and track the vehicle; Define counting lines / areas: define one or more virtual lines or areas in the image to distinguish the driving directions of vehicles. When a vehicle's bounding box crosses the counting line for the first time, count the number of vehicles. According to the direction of vehicle movement, count the number of vehicles entering and leaving respectively; Evaluate traffic density based on the number of vehicles passing through per unit time, count traffic volume in different time periods, and identify peak hours.
[0018] Before making adaptive weight adjustments, traffic flow monitoring can be performed for a long period of time and peak hours can be recorded. Based on the temporal distribution of traffic flow, historical data can be used to predict traffic flow and facilitate pre-adjustment of weight distribution.
[0019] In the preferred solution, a road weighing device and monitoring cameras arranged along the road are provided in the road monitoring area to record the total number and total weight of vehicles per unit time; According to the difference in the total weight of vehicles in the forward and reverse traffic flows, the number of basic counterweight blocks on the outer frame lifting frames of the first lifting platform and the second lifting platform is adjusted in advance and recorded; Weighing sensors are arranged at the transition section between the caisson and the bridge and the transition section between the caisson and the immersed tube to monitor the total weight of vehicles entering the first chamber and the second chamber respectively; Inclination sensors are installed in the first chamber and the second chamber, and the amount of liquid in each segment of the expandable bag of the first lifting platform and the second lifting platform is adjusted according to the weight difference between the first chamber and the second chamber and the tilt condition of the first chamber and the second chamber to improve the tilt condition of the first chamber and the second chamber.
[0020] The beneficial effects of the present invention are as follows: the structure occupies a small area and has a small engineering volume, which greatly reduces the construction cost. Compared with the artificial island, it has significant economic advantages; it effectively improves the conversion efficiency of vehicles between tunnels and bridges, and the vehicles do not need to rotate to go uphill and downhill, which improves the comfort of vehicle drivers; a camera is used to analyze the cumulative volume of traffic per unit time through image recognition, and dynamically guides the number of vehicles entering the waiting area to ensure that the first and second lifts can accommodate each batch of vehicles; a weighing device is used to record the cumulative weight of each batch of vehicles, and time is reserved for pre-adjustment of the counterweight system; a double lift table structure with mutual counterweights is adopted, and the counterweight adjustment is completed at a low position through the outer frame lift frame, and the weight difference of two-way traffic is balanced with less energy consumption, which reduces the load of the lifting drive mechanism and reduces the driving energy consumption; the expandable bag separation chamber is arranged in sections to accurately adjust the horizontality of the lift table, reduce the overload wear of the lifting cable chain, and ensure the safety of lifting. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0022] Figure 1 It is a schematic diagram of the layout of the road monitoring area of the present invention.
[0023] Figure 2 It is a schematic diagram of the layout area of road weighing devices.
[0024] Figure 3 This is a schematic diagram of the bridge-tunnel junction.
[0025] Figure 4 It is a top view of the integral caisson structure of the lifting platform.
[0026] Figure 5 It is a cross-sectional view of the integral caisson structure of the lifting platform.
[0027] Figure 6 It is the caisson wall structure.
[0028] Figure 7 It is a schematic diagram of the transition section between the caisson and the immersed tube.
[0029] Figure 8 It is a schematic diagram of the transition section between the caisson and the bridge.
[0030] Fig. 9 It is a schematic diagram of a split lift platform.
[0031] Fig.10 It is a side view of the interference structure of the outer frame lifting frame.
[0032] Fig.11 This is a schematic diagram of the walking component.
[0033] Fig.12 This is a schematic diagram of basic counterweight adjustment.
[0034] Fig.13 It is the connection diagram of the pulley system of the central lifting frame and the outer frame lifting frame.
[0035] Fig.14 It is a schematic diagram of the arrangement of the expandable bag partition chamber.
[0036] Fig.15 This is the structural diagram of the rotary valve.
[0037] In the figure: caisson structure 1; first chamber 101; second chamber 102; central sinking part 103; edge sinking cavity 104; wall steel plate 105; vertical ribs 106; diaphragm 107; truss 108; bridge 2; caisson and bridge docking transition section 201; immersed tube tunnel 3; caisson and immersed tube docking transition section 301; foundation counterweight block 4; first lifting cable chain 5; connecting rod 501; drive shaft 502; lifting motor 503; driving wheel 504; first fixed pulley 505; bevel gear set 506; central lifting frame 6; outer frame lifting frame 7; horizontal connecting frame 701; table plate 702; belt power roller 703; load Platform 8; vertical frame 9; upper connecting frame 901; lower connecting frame 902; up and down travel space 903; travel assembly 10; linear track 1001; first travel wheel 1002; second travel wheel 1003; first lifting platform 11; second lifting platform 12; second lifting cable chain 13; second fixed pulley 1301; expandable bag 14; liquid storage tank 1401; liquid pump 1402; segment 1403; rotary valve 1404; rotating shaft 1405; partition chamber 1406; connecting hole 1407; fixed cylinder 1408; road weighing device 15; first weighing area 1501; second weighing area 1502. DETAILED DESCRIPTION
[0038] Embodiment 1: like Figure 1-15 In the invention, an intelligent bridge-tunnel junction structure based on traffic flow monitoring includes a caisson structure 1, a bridge 2 and an immersed tube tunnel 3. A caisson-bridge docking transition section 201 is provided at the docking point of the caisson structure 1 and the bridge 2. A caisson-immersed tube docking transition section 301 is provided at the docking point of the caisson structure 1 and the immersed tube tunnel 3. A road monitoring area is provided near the caisson structure 1 on the bridge 2 and the immersed tube tunnel 3. Surveillance cameras and road weighing devices 15 arranged on the road surface are provided along the road monitoring area. The caisson-bridge docking transition section 201 and the caisson-immersed tube docking transition section 301 are provided. There is a road weighing device 15, and the caisson structure 1 is provided with a central sunken part 103. The central sunken part 103 is provided with an independent first lifting platform 11 and a second lifting platform 12 arranged side by side, and a first lifting cable chain 5 is also provided. A driving wheel 504 is provided at the upper end of the central sunken part 103. The middle part of the first lifting cable chain 5 bypasses the connecting rod 501. One end of the first lifting cable chain 5 is connected to the upper end of the first lifting platform 11, and the other end of the first lifting cable chain 5 is connected to the upper end of the second lifting platform 12. The first lifting platform 11 and the second lifting platform 12 can be raised and lowered to dock with the bridge 2 or the immersed tube tunnel 3.
[0039] The road weighing device 15 can be a plurality of devices distributed in the first weighing area 1501 and the second weighing area 1502. The first weighing area 1501 and the second weighing area 1502 are arranged at intervals along the length of the road. The driving direction of the vehicle can be determined by the triggering sequence. The weight records of the vehicles traveling in the direction of the caisson structure 1 within a period of time are counted and the total weight of the vehicles is accumulated and uploaded to the server. A waiting area can be divided near the caisson structure 1, and visual analysis is performed based on the weighing records of the weighing sensor and the images collected by the monitoring camera. On the premise that the overall footprint of the vehicle meets the internal space of the first lifting platform 11 and the second lifting platform 12, the weight of the vehicles in the forward traffic waiting area and the reverse traffic waiting area is roughly the same. Therefore, the weight of the vehicles entering the first lifting platform 11 and the second lifting platform 12 each time is roughly the same, reducing the load of the lifting drive mechanism.
[0040] In the preferred embodiment, the first lifting platform 11 and the second lifting platform 12 include a central lifting frame 6, on which a vehicle loading platform 8 is provided, a first chamber 101 is provided in the vehicle loading platform 8 of the first lifting platform 11, and a second chamber 102 is provided in the vehicle loading platform 8 of the second lifting platform 12, and a driving wheel 504 is provided at the upper end of the central sinking portion 103, and a first lifting cable chain 5 is wound around the driving wheel 504, one end of the first lifting cable chain 5 is connected to the upper end of the vehicle loading platform 8 of the first lifting platform 11, and the other end of the first lifting cable chain 5 is connected to the upper end of the vehicle loading platform 8 of the second lifting platform 12.
[0041] The first lifting platform 11 and the second lifting platform 12 have the same structure and the same weight, and can be balanced by counterweights. The lifting motor 503 only needs to carry the difference in weight of the vehicles in the first chamber 101 and the second chamber 102 .
[0042] In the preferred solution, an outer frame lifting frame 7 is provided on the outer side of each vehicle loading platform 8, and a second fixed pulley 1301 and a second lifting cable chain 13 wound around the second fixed pulley 1301 are also provided on the upper port of the central sunken portion 103, one end of the second lifting cable chain 13 is connected to the central lifting frame 6, and the other end of the second lifting cable chain 13 is connected to the outer frame lifting frame 7, and a variable counterweight device is provided on the outer frame lifting frame 7.
[0043] On the basis that the first lifting platform 11 and the second lifting platform 12 serve as counterweights for each other, each outer frame lifting frame 7 also serves as its own counterweight.
[0044] In order to ensure the closed loop, a cable chain and a fixed pulley are also required to be arranged at the lower ends of the central lifting frame 6 and the outer frame lifting frame 7. The second lifting cable chain 13 does not need to be provided with a driving device, but adopts a follow-up mode. Since it is connected to the central lifting frame 6, when the vehicle platform 8 rises, the outer frame lifting frame 7 falls. A variable counterweight device can be arranged on the outer frame lifting frame 7, and the counterweight can be increased or decreased according to the specific vehicle flow in both directions.
[0045] In the preferred solution, a platform 702 is provided on the outer frame lifting frame 7, a powered roller 703 is provided at the bottom of the central sinking part 103, a basic counterweight block 4 is provided on the powered roller 703, and the powered roller 703 drives the basic counterweight block 4 to be placed on the platform 702.
[0046] The variable counterweight device includes a powered roller 703 and a basic counterweight block 4.
[0047] The powered roller 703 is outside the outer frame lifting frame 7 and does not interfere with its up and down movement. The length of the powered roller 703 is greater than the width of the basic counterweight 4, so when the outer frame lifting frame 7 descends, the basic counterweight 4 does not interfere with the outer frame lifting frame 7 on the powered roller 703.
[0048] According to historical data, the approximate difference between the forward traffic flow and the reverse traffic flow can be known in advance, and the basic counterweight block 4 can be placed in advance on the outer frame lifting frame 7 of the first lifting platform 11 or the second lifting platform 12 on the side with larger traffic flow.
[0049] When the outer frame lifting frame 7 descends to the same height as the platform 702 and the powered roller 703, the powered roller 703 drives the basic counterweight block 4 to move horizontally to the platform 702. At this time, the outer frame lifting frame 7 rises and can take away the platform 702, which is equivalent to an increase in the total weight of the outer frame lifting frame 7. Therefore, the pulling force on the central lifting frame 6 increases, and the counterweight effect increases.
[0050] In the preferred embodiment, an expandable bag 14 is provided on the outer frame lifting frame 7, and the expandable bag 14 can be filled with liquid. A liquid storage tank 1401 is provided at the bottom of the central sinking part 103, and a liquid pump 1402 is also provided. The liquid storage tank 1401 is connected to the expandable bag 14 through the liquid pump 1402.
[0051] The liquid storage tank 1401 can be made of local materials and filled with seawater. The liquid pump 1402 can be used to fill the expandable bag 14 with seawater or pump seawater from the expandable bag 14 into the liquid storage tank 1401 in reverse order to adjust the total weight of the outer frame lifting frame 7.
[0052] Weighing sensors are installed at the transition section 201 between the caisson and the bridge and the transition section 301 between the caisson and the immersed tube to record the total weight of the vehicles entering the first chamber 101 and the second chamber 102 .
[0053] Since the counterweights of the first lifting platform 11 and the second lifting platform 12 have been roughly adapted to the vehicle flow by adjusting the basic counterweight block 4 in advance, the balance on both sides can be adjusted more accurately by the expandable bag 14 at this time.
[0054] The expandable bag 14 and the liquid storage tank 1401 usually store a medium amount of seawater. There are four types of weight adjustment: The first one is that the first lifting platform 11 is at the lower position, the outer frame lifting frame 7 of the first lifting platform 11 is at the upper position, the second lifting platform 12 is at the upper position, the outer frame lifting frame 7 of the second lifting platform 12 is at the lower position, and the total weight of the vehicle in the first chamber 101 is greater than the total weight of the vehicle in the second chamber 102. At this time, part of the seawater is pumped out from the expandable bag 14 of the second lifting platform 12 at the lower position into the liquid storage tank 1401. Since the weight of one of the counterweight outer frame lifting frames 7 of the second lifting platform 12 is reduced, the equivalent weight of its own system is equivalent to an increase, and the weight is equivalent to an increase when it is used as a counterweight for the first lifting platform 11. Therefore, the first lifting platform 11 and the second lifting platform 12 are restored to balance.
[0055] The second type is that the first lifting platform 11 is in the lower position, the outer frame lifting frame 7 of the first lifting platform 11 is in the upper position, the second lifting platform 12 is in the upper position, the outer frame lifting frame 7 of the second lifting platform 12 is in the lower position, and the total weight of the vehicle in the first chamber 101 is less than the total weight of the vehicle in the second chamber 102. At this time, seawater needs to be filled into the expandable bag 14 of the second lifting platform 12 from the liquid storage tank 1401.
[0056] The third type is that the first lifting platform 11 is in the upper position, the outer frame lifting frame 7 of the first lifting platform 11 is in the lower position, the second lifting platform 12 is in the lower position, and the outer frame lifting frame 7 of the second lifting platform 12 is in the upper position, and the total weight of the vehicle in the first chamber 101 is greater than the total weight of the vehicle in the second chamber 102. At this time, seawater is filled into the expandable bag 14 of the first lifting platform 11 from the liquid storage tank 1401, and the weight of the outer frame lifting frame 7 in one of the counterweights of the first lifting platform 11 increases, and the overall weight of the first lifting platform 11 is equivalently reduced, and the balance with the second lifting platform 12 is restored.
[0057] The fourth type is that the first lifting platform 11 is in the upper position, the outer frame lifting frame 7 of the first lifting platform 11 is in the lower position, the second lifting platform 12 is in the lower position, the outer frame lifting frame 7 of the second lifting platform 12 is in the upper position, and the total weight of the vehicle in the first chamber 101 is less than the total weight of the vehicle in the second chamber 102. At this time, seawater is filled into the liquid storage tank 1401 from the expandable bag 14 of the first lifting platform 11.
[0058] Since the pumping in and pumping back of seawater always occurs when the expandable bag 14 is in the lower position, at this time, the height of the liquid storage tank 1401 is equivalent to that of the expandable bag 14, and there is almost no need to overcome gravity to do work, so the energy consumption of adjusting the variable counterweight is very low. However, since the counterweight is adjusted to be balanced, the energy consumed by the lifting motor 503 is reduced, and the reduction is greater than the energy consumption of the liquid pump 1402, so overall, the energy consumption is reduced.
[0059] Although the peak periods of forward and reverse traffic flow are different, from a large time scale, the total amount of forward and reverse traffic flow generally remains equal as a whole. Therefore, the proportion of seawater capacity in the expandable bag 14 and the liquid storage tank 1401 will not be extreme. In addition, the capacity of the expandable bag 14 is relatively large. During the peak period, when the water is discharged in one direction, it can be ensured that the expandable bag 14 will not be emptied or filled. During the reverse peak period, the balance will be restored without manual intervention.
[0060] In the preferred embodiment, the expandable bag 14 is distributed in a ring shape on the outer frame lifting frame 7. The expandable bag 14 includes multiple independent segments 1403 and a rotary valve 1404. The rotary valve 1404 includes a fixed cylinder 1408. A rotatable rotating shaft 1405 is provided in the fixed cylinder 1408. The rotating shaft 1405 is a hollow structure. The inner wall of the fixed cylinder 1408 is provided with multiple blade structures along the circumferential direction. The blade structure divides the rotating shaft 1405 and the fixed cylinder 1408 into multiple separation chambers 1406, and a connecting hole 1407 is provided between one of the separation chambers 1406 and the rotating shaft 1405.
[0061] Tilt sensors are installed at four corners of the first chamber 101 and the second chamber 102 to monitor the overall tilt angle.
[0062] The rotating shaft 1405 is connected to the external on-off valve through a rotating joint, and its main shaft is driven by a motor synchronous belt mechanism. When the connecting hole 1407 rotates to connect with a certain partition chamber 1406, the on-off valve opens, and water can be filled or pumped into the segment 1403. Adjust the overall levelness of the vehicle platform 8 to avoid excessive weight on one side causing serious wear of the mechanism on that side.
[0063] For example, the expandable bag 14 is rectangular, and the first side of the expandable bag 14 can be arranged with A1 and A2, the second side with B1 and B2, the third side with C1 and C2, and the fourth side with D1 and D2. In this way, the weight of seawater in each direction can be accurately adjusted. The corresponding second lifting cable chains 13 are also eight in number, which are suspended at the corresponding positions through the pulley block. When a corner or side of the first lifting platform 11 tilts downward, the corresponding counterweight can be added.
[0064] In the preferred embodiment, a vertical frame 9 is further provided, and an upper connecting frame 901 and a lower connecting frame 902 are provided on the inner wall of the central sunken part 103. The upper connecting frame 901 and the lower connecting frame 902 are connected to the vertical frame 9 so that the inner side forms an up-and-down traveling space 903. The outer frame lifting frame 7 is provided with a transverse connecting frame 701, and the transverse connecting frame 701 passes through the up-and-down traveling space 903. A linear track 1001 is provided on the inner wall of the central sunken part 103 and the vertical frame 9, and the outer ends of the central lifting frame 6 and the outer frame lifting frame 7 are provided with first walking wheels 1002 and second walking wheels 1003 arranged orthogonally, and the first walking wheels 1002 and the second walking wheels 1003 roll against the linear track 1001.
[0065] The travel assembly 10 is arranged at two opposite end surfaces, and the linear track 1001 can be made of I-beam.
[0066] In the preferred embodiment, Road monitoring areas are planned and arranged on bridge 2 and immersed tube tunnel 3 to monitor the traffic volume per unit time; Arrange waiting areas of equal area near the caisson structure 1 on the bridge 2 and the immersed tube tunnel 3; Only vehicles in the forward traffic waiting area and the reverse traffic waiting area are allowed to enter the first lifting platform 11 and the second lifting platform 12 at a time.
[0067] Since the first lifting platform 11 and the second lifting platform 12 are counterweights to each other, the access gate can divide the road into waiting areas. The road surface area in the single-vehicle flow direction of the waiting area is similar to the vehicle parking area inside the first lifting platform 11, so that all vehicles can enter the first lifting platform 11 and the second lifting platform 12 at one time. Due to the particularity that there is no bifurcated road at the junction of the bridge and tunnel, two means of visual analysis and vehicle weight monitoring are set up along the road. In each time period, only vehicles with roughly equal total vehicle weight are allowed to enter the waiting area. During the lifting of the first lifting platform 11 and the second lifting platform 12, only all vehicles in the waiting area are allowed to enter the first lifting platform 11 and the second lifting platform 12. The internal loading space, thereby ensuring that the load of the lifting drive mechanism is minimized, saving energy as much as possible. At the same time, reducing the load can also extend the service life of each component.
[0068] The preferred solution includes a vehicle flow visual monitoring method: Capture live video streams via cameras; Perform necessary preprocessing on the video stream, such as scaling, cropping, grayscale, etc., to meet the requirements of model input; Perform vehicle detection on each frame of the image, output information including the location and category of the vehicle, and track the vehicle; Define counting lines / areas: define one or more virtual lines or areas in the image to distinguish the driving directions of vehicles. When a vehicle's bounding box crosses the counting line for the first time, count the number of vehicles. According to the direction of vehicle movement, count the number of vehicles entering and leaving respectively; Evaluate traffic density based on the number of vehicles passing through per unit time, count traffic volume in different time periods, and identify peak hours.
[0069] Before making adaptive weight adjustments, traffic flow monitoring can be performed for a long period of time and peak hours can be recorded. Based on the temporal distribution of traffic flow, historical data can be used to predict traffic flow and facilitate pre-adjustment of weight distribution.
[0070] In the preferred solution, a road weighing device 15 and monitoring cameras arranged along the road are provided in the road monitoring area to record the total number and total weight of vehicles per unit time; According to the difference in the total weight of the vehicles in the forward and reverse traffic flows, the number of basic counterweight blocks 4 on the outer frame lifting frames 7 of the first lifting platform 11 and the second lifting platform 12 is adjusted in advance and recorded; Weighing sensors are arranged on the transition section 201 between the caisson and the bridge and the transition section 301 between the caisson and the immersed tube to monitor the total weight of the vehicles entering the first chamber 101 and the second chamber 102 respectively; Tilt sensors are installed in the first chamber 101 and the second chamber 102. According to the weight difference between the first chamber 101 and the second chamber 102 and the tilt conditions of the first chamber 101 and the second chamber 102, the amount of liquid in each segment 1403 of the expandable bag 14 of the first lifting platform 11 and the second lifting platform 12 is adjusted to improve the tilt conditions of the first chamber 101 and the second chamber 102.
[0071] Embodiment 2: A caisson type elevator structure for a bridge-tunnel junction includes a caisson structure 1. The caisson structure 1 is provided with a lifting platform that can move up and down. The lifting platform is provided with a first chamber 101 and a second chamber 102. The upper end of the first side of the caisson structure 1 is connected to the bridge 2, and the lower end of the second side of the caisson structure 1 is connected to the immersed tube tunnel 3. The first chamber 101 and the second chamber 102 are respectively used for temporarily storing vehicles in two directions, and the lifting platform is used to transfer vehicles between the bridge 2 and the immersed tube tunnel 3.
[0072] The lifting platform can be a whole or two parts. For the integral structure, such as Figure 2 The lifting platform is raised to the same height as the bridge 2, and the forward traffic on the bridge 2 enters the first chamber 101 through the transition section 201 where the caisson and the bridge are connected. The integral lifting platform is lowered to the same height as the immersed tube tunnel 3, and the forward traffic in the first chamber 101 enters the immersed tube tunnel 3; while the reverse traffic enters the second chamber 102 from the immersed tube tunnel 3 at this time, the integral lifting platform rises back to the same height as the bridge 2, and the reverse traffic enters another lane on the bridge 2 from the second chamber 102.
[0073] In the preferred scheme, the caisson structure 1 is provided with a central sunken part 103, the lifting platform is arranged in the central sunken part 103, edge sinking cavities 104 are provided on both sides of the central sunken part 103, a liftable foundation counterweight block 4 is provided in the edge sinking cavity 104, a driving wheel 504 is provided at the upper end of the central sunken part 103, a first lifting cable chain 5 is wound around the driving wheel 504, one end of the first lifting cable chain 5 is connected to the upper end of the lifting platform, and the other end of the first lifting cable chain 5 is connected to the upper end of the foundation counterweight block 4.
[0074] The first lifting cable chain 5 can be a chain or a steel cable, the corresponding driving wheel 504 can be a sprocket or a pulley, a load-bearing partition wall can be set between the central sinking part 103 and the edge sinking cavity 104, and a driving wheel 504 and a first lifting cable chain 5 are arranged at intervals on the load-bearing partition wall.
[0075] The load-bearing partition wall mainly consists of a wall steel plate 105 , vertical ribs 106 , a transverse partition 107 and a truss 108 .
[0076] In the preferred embodiment, there are multiple driving wheels 504, and a connecting rod 501 is also provided. The connecting rod 501 is sleeved with each driving wheel 504, and a lifting motor 503 is also provided. The lifting motor 503 is provided with a driving shaft 502, and the driving shaft 502 and one end of the connecting rod 501 are provided with a meshing bevel gear set 506.
[0077] The lifting motor 503 can adopt a worm gear reduction drive motor with a dual drive shaft, which can synchronously drive all the driving wheels 504 on both sides to rotate synchronously through the connecting rod 501. In order to adapt to the width of the partition wall, a first fixed pulley 505 or a freely rotating sprocket can be installed on the edge of the partition wall.
[0078] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limiting the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.
Claims
1. An intelligent bridge-tunnel junction structure based on traffic flow monitoring, characterized by: The invention comprises a caisson structure (1), a bridge (2) and an immersed tube tunnel (3); a caisson-bridge docking transition section (201) is provided at the docking point between the caisson structure (1) and the bridge (2); a caisson-immersed tube docking transition section (301) is provided at the docking point between the caisson structure (1) and the immersed tube tunnel (3); a road monitoring area is provided near the caisson structure (1) on the bridge (2) and the immersed tube tunnel (3); cameras and a road weighing device (15) arranged on the road surface are provided along the road monitoring area; the caisson-bridge docking transition section (201) and the caisson-immersed tube docking transition section (301) are provided with a road weighing device (15); and the caisson structure (1) A central sinking part (103) is provided, wherein a first lifting platform (11) and a second lifting platform (12) are independently arranged side by side in the central sinking part (103), and a first lifting cable chain (5) is also provided. A driving wheel (504) is provided at the upper end of the central sinking part (103). The middle part of the first lifting cable chain (5) bypasses a connecting rod (501). One end of the first lifting cable chain (5) is connected to the upper end of the first lifting platform (11), and the other end of the first lifting cable chain (5) is connected to the upper end of the second lifting platform (12). The first lifting platform (11) and the second lifting platform (12) can be raised and lowered to dock with a bridge (2) or an immersed tube tunnel (3).
2. The intelligent bridge-tunnel junction structure based on traffic flow monitoring according to claim 1 is characterized by: The first lifting platform (11) and the second lifting platform (12) comprise a central lifting frame (6), a vehicle loading platform (8) is provided on the central lifting frame (6), a first chamber (101) is provided in the vehicle loading platform (8) of the first lifting platform (11), and a second chamber (102) is provided in the vehicle loading platform (8) of the second lifting platform (12), a driving wheel (504) is provided at the upper end of the central sinking part (103), a first lifting cable chain (5) is wound around the driving wheel (504), one end of the first lifting cable chain (5) is connected to the upper end of the vehicle loading platform (8) of the first lifting platform (11), and the other end of the first lifting cable chain (5) is connected to the upper end of the vehicle loading platform (8) of the second lifting platform (12).
3. The intelligent bridge-tunnel junction structure based on traffic flow monitoring according to claim 2 is characterized by: An outer frame lifting frame (7) is provided on the outside of each vehicle loading platform (8); a second fixed pulley (1301) and a second lifting cable chain (13) wound around the second fixed pulley (1301) are also provided at the upper end of the central sinking portion (103); one end of the second lifting cable chain (13) is connected to the central lifting frame (6); the other end of the second lifting cable chain (13) is connected to the outer frame lifting frame (7); and a variable counterweight device is provided on the outer frame lifting frame (7).
4. The intelligent bridge-tunnel junction structure based on traffic flow monitoring according to claim 3 is characterized by: A platform (702) is provided on the outer frame lifting frame (7), a powered roller (703) is provided at the bottom of the central sinking portion (103), a basic counterweight (4) is provided on the powered roller (703), and the powered roller (703) drives the basic counterweight (4) to be placed on the platform (702).
5. The intelligent bridge-tunnel junction structure based on traffic flow monitoring according to claim 4 is characterized by: An expandable bag (14) is provided on the outer frame lifting frame (7), and the expandable bag (14) can be filled with liquid. A liquid storage tank (1401) and a liquid pump (1402) are provided at the bottom end of the central sinking part (103). The liquid storage tank (1401) is connected to the expandable bag (14) through the liquid pump (1402).
6. The intelligent bridge-tunnel junction structure based on traffic flow monitoring according to claim 5 is characterized by: The expandable bag (14) is distributed in a ring shape on the outer frame lifting frame (7). The expandable bag (14) includes a plurality of independent segments (1403) and is also provided with a rotary valve (1404). The rotary valve (1404) includes a fixed cylinder (1408). A rotatable rotating shaft (1405) is provided in the fixed cylinder (1408). The rotating shaft (1405) is a hollow structure. The inner wall of the fixed cylinder (1408) is provided with a plurality of blade structures along the circumferential direction. The blade structures divide the rotating shaft (1405) and the fixed cylinder (1408) into a plurality of separation chambers (1406). A connecting hole (1407) is provided between one of the separation chambers (1406) and the rotating shaft (1405).
7. The intelligent bridge-tunnel junction structure based on traffic flow monitoring according to claim 2 is characterized by: A vertical frame (9) is also provided. An upper connecting frame (901) and a lower connecting frame (902) are provided on the inner wall of the central sinking part (103). The upper connecting frame (901) and the lower connecting frame (902) are connected to the vertical frame (9) so that the inner side forms an up-and-down travel space (903). The outer frame lifting frame (7) is provided with a transverse connecting frame (701). The transverse connecting frame (701) passes through the up-and-down travel space (903). A linear track (1001) is provided on the inner wall of the central sinking part (103) and the vertical frame (9). The outer ends of the central lifting frame (6) and the outer frame lifting frame (7) are provided with a first running wheel (1002) and a second running wheel (1003) arranged orthogonally. The first running wheel (1002) and the second running wheel (1003) roll against the linear track (1001).
8. The method for adjusting the weight of an intelligent bridge-tunnel junction structure based on traffic flow monitoring according to claim 1 is characterized by: Planning and arranging road monitoring areas on the bridge (2) and the immersed tube tunnel (3) to monitor the traffic volume per unit time; Arranging waiting areas of equal area near the caisson structure (1) on the bridge (2) and the immersed tube tunnel (3); Only vehicles in the forward traffic waiting area and the reverse traffic waiting area are allowed to enter the first lifting platform (11) and the second lifting platform (12) at a time.
9. The method for adjusting the counterweight of an intelligent bridge-tunnel junction structure based on traffic flow monitoring according to claim 8 is characterized by: Including traffic visual monitoring methods: Capture live video streams via cameras; Perform necessary preprocessing on the video stream, such as scaling, cropping, grayscale, etc., to meet the requirements of model input; Perform vehicle detection on each frame of the image, output information including the location and category of the vehicle, and track the vehicle; Define a counting area, define one or more virtual lines or areas in the image to distinguish the driving direction of the vehicle, and count when a vehicle's bounding box crosses the counting area for the first time; According to the direction of vehicle movement, count the number of vehicles entering and leaving respectively; Evaluate traffic density based on the number of vehicles passing through per unit time, count traffic volume in different time periods, and identify peak hours.
10. The weight adjustment method for intelligent bridge-tunnel junction structure based on traffic flow monitoring according to claim 8 or 9 is characterized in that: A road weighing device (15) and surveillance cameras arranged along the road are provided in the monitoring area to record the total number and total weight of vehicles within a unit time; According to the difference in the total weight of vehicles in the forward and reverse traffic flows, the number of basic counterweight blocks (4) on the outer frame lifting frames (7) of the first lifting platform (11) and the second lifting platform (12) is adjusted in advance and recorded; Weighing sensors are arranged on the caisson and bridge docking transition section (201) and the caisson and immersed tube docking transition section (301) to monitor the total weight of vehicles entering the first chamber (101) and the second chamber (102) respectively; Inclination sensors are installed in the first chamber (101) and the second chamber (102), and the amount of liquid in each segment (1403) of the expandable bag (14) of the first lifting platform (11) and the second lifting platform (12) is adjusted according to the weight difference between the first chamber (101) and the second chamber (102) and the inclination of the first chamber (101) and the second chamber (102), thereby improving the inclination of the first chamber (101) and the second chamber (102).
Citation Information
Patent Citations
Bridge-tunnel transition structure between submerged floating tunnel (SFT) and deep-water suspension bridge
CN111485579A
Island-free cross-sea channel bridge-tunnel conversion structure and method
CN116024949A