Complex geological pile foundation combined hole-forming construction method

By using deformed steel casing, steel support and high-definition camera technologies under complex geological conditions, the problems of low efficiency and difficult to ensure the quality of traditional pile foundations are solved, efficient and safe pile foundation construction is achieved, and construction quality is improved. Security.

CN119061926AActive Publication Date: 2024-12-03ZHEJIANG JIAOGONG UNDERGROUND ENG CO LTD +1

Patent Information

Application Number
CN202411188487.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-12-03
Estimated Expiration
2044-08-28

AI Technical Summary

Technical Problem

Under complex geological conditions, traditional pile foundation construction methods are difficult to improve construction efficiency and quality, and there are problems that steel casing deformation and poured concrete quality are difficult to ensure.

Method used

Complex geological pile foundation combination hole construction method, including deformed steel casing, steel support, hanging beam, salvage device and high-definition camera hanging device, the core-cut submerged hole hammered into holes and steel casing injection Slurry reinforcement, high-definition camera quality inspection and other steps to achieve efficient and safe pile foundation construction.

Benefits of technology

The deformation treatment efficiency of steel casing and the accuracy of hole formation quality detection are improved, construction risks and costs are reduced, and pile foundation construction quality and safety under complex geological conditions are ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119061926A_ABST
    Figure CN119061926A_ABST
Patent Text Reader

Abstract

The invention relates to a complex geological pile foundation combined hole forming construction method, which adopts a hanging type operation platform steel casing deformation treatment technology, a plurality of profile steel supports are arranged at different heights in a deformed steel casing at intervals, and a hanging type operation platform is arranged for treating a steel casing deformation accident in a pile foundation construction process in a complex environment. The profile steel support can be repeatedly used, so that the construction efficiency and economical efficiency of accident treatment are improved; a salvage technology for coping with drill falling in a down-the-hole hammer hole is provided, a drill bit salvage device is designed, the success probability of drill bit capturing is improved, and a water passing hole and a water draining opening are formed in the salvage device and used for reducing water buoyancy of the whole device; the lowering position of the wireless high-definition camera can be adjusted according to the diameter of the cast-in-place pile and the position of the detection hole, and high-definition camera shooting of the pile foundation concrete pouring quality is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of pile foundation construction under complex geological conditions, and in particular relates to a combined hole-forming construction method for pile foundations under complex geological conditions. Background Art

[0002] With the continuous increase of large-scale projects, the construction environment is becoming increasingly complex, and the geological conditions are diverse and changeable. Complex geological conditions such as soft soil, contaminated soil, rock, pebble layer, boulder layer, etc. frequently appear. These complex geological conditions have brought great challenges to the traditional pile foundation construction methods, such as high construction difficulty, low efficiency, high cost, and many safety hazards.

[0003] Under complex geological conditions, a single construction method is often difficult to work. In addition, due to the particularity of the geology, the steel casing is prone to deformation during the construction process. In addition, under such geological conditions, the quality of concrete pouring construction is particularly important.

[0004] Based on the actual requirements of complex construction conditions, high construction quality and tight construction period of engineering projects, an innovative method of combined hole construction for complex geological pile foundations with high construction efficiency, excellent construction quality and low safety risk is of great significance for improving the construction quality of bored piles under complex geological conditions. Summary of the invention

[0005] The purpose of the present invention is to overcome the deficiencies in the prior art and provide a method for construction of a pile foundation combination hole in a complex geological environment.

[0006] Complex geological pile foundation combined hole construction system, including deformed steel casing, steel support, hanging beam, hanging operation platform, salvage device, cast-in-place piles, wireless high-definition camera and camera hanging device;

[0007] The steel support is fixed at different heights in the deformed steel casing, the hanging beam is fixed at the top of the deformed steel casing, the hanging operation platform is hung in the deformed steel casing, and the top of the hanging operation platform is connected to the hanging beam;

[0008] A drill rod is provided on the inner side of the bottom of the salvage device through a spring. The salvage device is inserted on the upper end of the drill bit, and the drill rod is embedded in the drill groove of the drill bit to realize the drill bit salvage.

[0009] The camera hanging device is installed on the top of the cast-in-place pile, and the camera hanging device hangs the wireless high-definition camera in the detection hole of the cast-in-place pile through a hanging rope.

[0010] Preferably, an orifice reinforcement hoop is provided at the top of the deformed steel casing, a hanging beam is provided on the orifice reinforcement hoop, a fixing plate is provided at the end of the hanging beam, the fixing plate and the orifice reinforcement hoop are connected by bolts, a pad is provided in the gap between the fixing plate and the orifice reinforcement hoop, a slide rail is provided on the top surface of the hanging beam, several synchronous motors are provided on the slide rail, and ropes are provided under the synchronous motors for connecting to the hanging operating platform.

[0011] Preferably, multiple steel supports are arranged inside the deformed steel casing, and the steel supports include standardized steel supports, connecting sleeves and rear support rods. The length of the rear support rods is determined according to the deformation of the deformed steel casing. An ear plate is provided at the lower part of the hanging beam, the rope passes through the ear plate and a buffer hook is provided at the bottom, a hanging operating platform is provided under the buffer hook, and a slag receiving platform is provided at the lowest part of the steel casing. An outer arc channel steel is provided on the outer side of the standardized steel support, and an inner arc steel pipe is provided on the inner side. A stiffening plate is provided between the outer arc channel steel and the inner arc steel pipe.

[0012] Preferably, a cover plate is provided on the top of the salvage device, a joint and a water hole are provided on the cover plate, a rear bell mouth is connected to the lower part of the salvage device through a fixing ring, a drain port is provided on the rear bell mouth, the salvage device is in the shape of a regular hexagonal straight cylinder, a groove is provided on the inner side of the bottom, a spring is provided in the groove, a drill connecting round rod is provided at the end of the spring, a rotating rod is provided on the drill connecting round rod, a side slide plate is provided on the rotating rod, and the drill connecting round rod is embedded in the drill bit groove of the drill bit to realize drill bit salvage.

[0013] Preferably, a detection hole is provided on the cast-in-place pile, a hanging auxiliary track is provided on the outer side of the cast-in-place pile, a groove is provided on the hanging auxiliary track to form a track, a column is provided on the track, a steel distribution beam is provided on the column, a beam limiting plate is provided on the steel distribution beam, a double-channel steel beam is provided between the beam limiting plates, the double-channel steel beam extends to above the detection hole, a pulley baffle is provided on the double-channel steel beam in the extension direction, a channel steel baffle is provided at the end of the double-channel steel beam, a motor base and a hanging rope buffer plate are provided on the end of the channel steel baffle away from the detection hole, a hanging rope motor is provided on the motor base, and a diagonal brace is provided between the column and the motor base.

[0014] Preferably, the hanging rope motor is used to pull the hanging rope, and a forward and backward moving square steel is provided on the double-channel steel beam. One end of the hanging rope is connected to the hanging rope motor, and the other end passes through the hanging rope buffer plate on the channel steel baffle plate and extends into the forward and backward moving square steel and then vertically downward. A wireless high-definition camera is provided at the bottom of the hanging rope, and a pulley is provided at the bottom of the forward and backward moving square steel, and the pulley moves between the pulley baffles.

[0015] The complex geological pile foundation combined hole construction method carried out by this construction system includes the following steps:

[0016] Step 1: Cluster annular cutting and coring with a down-the-hole hammer to form a pile hole;

[0017] Step 2: lower the steel casing into the pile hole, perform grouting reinforcement around the deformed steel casing, install a hanging beam on the top of the deformed steel casing, lower the hanging operation platform, and install the steel support; set up a slag connection platform below the deformed section, cut the deformed section of the deformed steel casing, and chisel out the grouting to chisel the pile into a circle. After the circumference is qualified, connect the circular steel plate to complete the steel casing;

[0018] Step 3: Grout the steel casing to obtain a bored pile, construct a detection hole, then install the camera hanging device, adjust the camera hanging device according to the position of the detection hole, drop the wireless high-definition camera into the detection hole, and conduct a hole quality inspection.

[0019] Preferably, after the drill bit of the down-the-hole hammer falls, a salvage device is installed on the drill rod, the salvage device is connected to the drill rod through a joint, and the salvage device falls with the drill rod and covers the top of the drill bit. During the falling process, the spring carries the drill receiving round rod into the drill bit groove to complete the capture of the drill bit, and the drill rod is lifted to realize the salvage of the drill bit.

[0020] The beneficial effects of the present invention are:

[0021] 1) The present invention adopts a hanging operating platform steel casing deformation treatment technology, multiple steel supports are arranged at different heights in the deformed steel casing, and a hanging operating platform is provided to deal with steel casing deformation accidents during pile foundation construction in complex environments. The steel supports are reusable, which improves the construction efficiency and economy of accident treatment.

[0022] 2) The present invention adopts the clustered annular cutting coring down-the-hole hammer technology, which has the characteristics of high efficiency, low energy consumption, no pollution, and high hole-forming quality. It also proposes a salvage technology to deal with drill bits dropped in the down-the-hole hammer hole, designs a drill bit salvage device, and improves the success rate of drill bit capture. Water holes and drain ports are arranged on the salvage device to reduce the water buoyancy of the entire device.

[0023] 4) The present invention has developed a camera hanging device, which can adjust the lowering position of the wireless high-definition camera according to the diameter of the bored pile and the position of the detection hole, thereby realizing high-definition video recording of the quality of the pile foundation concrete pouring, and can assist in pile body defect identification and pile length detection based on the imaging expansion diagram. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a three-dimensional schematic diagram of the deformation treatment of steel casing;

[0025] Figure 2 It is a vertical diagram of the deformation treatment of steel casing;

[0026] Figure 3 This is a schematic diagram of the deformation treatment of steel casing;

[0027] Figure 4 It is a schematic diagram of the structure of the hanging operating platform;

[0028] Figure 5 It is a schematic diagram of the standardized steel support;

[0029] Figure 6 It is a schematic diagram of the salvage device;

[0030] Figure 7 It is a top view of the salvage device;

[0031] Figure 8 is a schematic cross-sectional view of a salvage device;

[0032] Fig. 9 It is a schematic diagram of the hanging device of the high-definition waterproof camera;

[0033] Fig.10 It is a schematic diagram of the end of a double-channel steel beam;

[0034] Fig.11 It is a schematic diagram of the square steel moving forward and backward.

[0035] Among them: 1. Deformed steel casing 2. Hole reinforcement hoop 3. Synchronous motor 4. Slide rail 5. Shaped steel support 6. Connecting sleeve 7. Fixed plate 8. Pad 9. Hanging beam 10. Rope 11. Rear support rod 12. Ear plate 13. Buffer hook 14. Hanging operation platform 15. Slag receiving platform 16. Inner arc steel pipe 17. Stiffening plate 18. Outer arc channel steel 19. Drill bit 20. Rear bell mouth 21. Fixed ring 22. Salvage device 23. Water hole 24. Joint 25. Drill bit groove 26. Drain port 27. Drill rod 28. Side slide 29. Rotating rod 30. Spring 31. Cast-in-place pile 32. Suspension auxiliary rail 33. Detection hole 34. Wireless HD camera 35. Rail 36. Suspension rope 37. Front and rear moving square steel 38. Pulley 39. Suspension rope motor 40. Column 41. Double-channel steel beam 42. Pulley baffle 43. Suspension rope buffer plate 44. Motor base 45. Channel steel baffle 46. Beam limit plate 47. Diagonal brace 48. Steel distribution beam. DETAILED DESCRIPTION

[0036] The present invention is further described below in conjunction with embodiments. The description of the following embodiments is only used to help understand the present invention. It should be noted that for ordinary persons in the art, without departing from the principle of the present invention, the present invention can also be modified in some ways, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.

[0037] Embodiment 1

[0038] As an example, Figures 1 to 11 As shown, this complex geological pile foundation combined hole construction system includes a deformable steel casing 1, a steel support, a hanging beam 9, and a hanging operating platform 14.

[0039] The steel support is fixed at different heights in the deformed steel casing 1, the hanging beam 9 is fixed at the top of the deformed steel casing 1, the hanging operation platform 14 is hung in the deformed steel casing 1, and the top of the hanging operation platform 14 is connected to the hanging beam 9;

[0040] A drill rod 27 is provided on the inner side of the bottom of the salvage device 22 through a spring 30. The salvage device 22 is inserted into the upper end of the drill bit 19, and the drill rod 27 is embedded in the drill bit groove 25 of the drill bit 19 to realize the salvage of the drill bit 19.

[0041] The camera hanging device is installed on the top of the cast-in-place pile 31 , and the camera hanging device hangs the wireless high-definition camera 34 in the detection hole 33 of the cast-in-place pile 31 through a hanging rope 36 .

[0042] A hole mouth reinforcement hoop 2 is arranged on the deformed steel casing 1, a hanging beam 9 is arranged on the hole mouth reinforcement hoop 2, a fixing plate 7 is arranged at the end of the hanging beam, and is connected to the hole mouth reinforcement hoop 2 by bolts, a cushion block 8 is arranged in the gap between the two, a slide rail 4 is arranged on the top surface of the hanging beam 9, two synchronous motors 3 are arranged on the slide rail, and a rope 10 is arranged under the synchronous motor.

[0043] A plurality of steel supports are arranged inside the steel casing 1, and the steel supports are composed of a shaped steel support 5, a connecting sleeve 6, and a rear support rod 11. The length of the rear support rod is determined according to the deformation of the steel casing. The rope 10 passes through the ear plate 12 at the lower part of the hanging beam, a buffer hook 13 is arranged at the bottom, and a hanging operation platform 14 is arranged under the buffer hook. A slag receiving platform 15 is arranged at the lower part of the steel casing 1. The outer side of the shaped steel support 5 is an outer arc channel steel 18, the inner side is an inner arc steel pipe 16, and a stiffening plate 17 is arranged in the middle.

[0044] Embodiment 2

[0045] As another embodiment, this embodiment 2 proposes, on the basis of the embodiment 1, a more specific complex geological pile foundation combination hole construction system, including a salvage device 22.

[0046] The salvaging device 22 is used for salvaging the drill bit 19 of a down-the-hole hammer. A cover plate is arranged on the top of the salvaging device 22. A joint 24 and a water hole 23 are arranged on the cover plate. The lower part is connected to the rear bell mouth 20 through a fixing ring 21. A drain port 26 is arranged on the rear bell mouth. The salvaging device 22 is a regular hexagon. A groove is arranged on the inner side of the bottom. A spring 30 is arranged in the groove. A drill connecting rod 27 is arranged at the end of the spring 30. A rotating rod 29 is arranged on the drill connecting rod 27. A side slide plate 28 is arranged on the rotating rod 29. The drill connecting rod 27 is embedded in the drill groove 25 of the drill bit 19 to realize the salvage of the drill bit 19.

[0047] It should be noted that the parts in this embodiment that are the same or similar to those in the first embodiment can be referenced to each other and will not be described in detail in this application.

[0048] Embodiment 3

[0049] As another embodiment, this embodiment three proposes, on the basis of embodiment one, a more specific complex geological pile foundation combination hole construction system, including cast-in-place piles 31, wireless high-definition cameras 34 and camera hanging devices.

[0050] The cast-in-place pile 31 is provided with a detection hole 33, the outer side of the cast-in-place pile 31 is provided with a hanging auxiliary track 32, the hanging auxiliary track is provided with a track 35 groove, a column 40 is provided on the track 2=35, a steel distribution beam 48 is provided on the column, a beam limiting plate 46 is provided on the steel distribution beam 48, a double-channel steel beam 41 is provided in the beam limiting plate, a pulley baffle 42 is provided on the double-channel steel beam 41, a channel steel baffle 45 is provided at the end of the double-channel steel beam 41, a motor base 44 and a hanging rope buffer plate 43 are provided on the channel steel baffle 45, a hanging rope motor 39 is provided on the motor base, and a diagonal brace 47 is provided between the column 40 and the motor base 44.

[0051] The rope motor 39 is used to pull the hanging rope 36, along the double channel steel beam 41 of the hanging rope 36 to the front and rear moving square steel, two rows of 6 rope buffer plates 43 are set in the front and rear moving square steel 37, one end of the hanging rope 36 is connected to the hanging rope motor 39, and the other end passes through the rope buffer plate 43 on the channel steel baffle 45 and extends to the front and rear moving square steel 37 and then vertically downward, a wireless high-definition camera 34 is set at the bottom of the hanging rope, and a pulley 38 is set at the bottom of the front and rear moving square steel 37, and the pulley 38 moves between the pulley baffles 42. This component can move forward and backward and around the cast-in-place pile in a circular manner, and is used for high-definition photography of the detection holes 33 at various positions.

[0052] Embodiment 4

[0053] As another embodiment, this embodiment 4 proposes, on the basis of embodiments 1 to 3, a method for constructing a complex geological pile foundation combination hole by using this construction system:

[0054] Clustered annular cutting coring DTH hammer drilling construction: high-pressure air drives the piston in the impactor to make high-frequency reciprocating motion, driving the sub-hammer to break the rock formation. During the drilling process, the sub-hammer forms an annular groove in the rock formation, and the columnar rock core in the annular groove is taken out as a whole through the clamping device inside the DTH hammer to form a pile hole. At the same time, the rock slag partially broken in the annular groove is collected into the slag container through the slag return channel to achieve efficient slag discharge.

[0055] Treatment of steel casing deformation: After the steel casing is deformed, grouting reinforcement is carried out around the pile immediately. A standardized steel support 5 is made according to the deformation situation and the diameter of the deformed steel casing 1. The hole reinforcement hoop 2 is installed on the top of the deformed steel casing 1, and then the hanging beam 9 is installed. After filling the pad, it is fixed with a fixed plate. After installing the synchronous motor, the rope 10 and the hanging operating platform 14 are installed. The hanging operating platform 14 is pulled down by the synchronous motor. After falling to the appropriate position, the standardized steel support 5 is installed, and then the rear support rod 11 is installed in the connecting sleeve 6. According to the deformation situation, the length of the rear support rod 11 is cut off and welded to the deformed steel casing 1. One is set every 600mm, and a slag receiving platform 15 is set at the end of the deformation. After the support is set, the deformed steel casing is gradually cut, and the grouting is chiseled off to chisel the pile into a circle. After the circumference is qualified, the circular steel plate is connected to complete the steel casing, and the broken slag falls to the slag receiving platform 15 and is centrally processed.

[0056] When a drill bit 19 of a down-the-hole hammer is dropped into a hole, a salvage device 22 is installed on the drill rod and connected to the drill rod through a joint 24. The salvage device 22 falls along with the drill rod, and the side slide 28 first contacts the drill bit 19, and then falls along the side slide 28 of the drill bit 19 structure along the rotating rod, thereby increasing the success rate of capturing the drill bit 19. During the falling process, the spring 30 tightens the drill receiving round rod 27, and after the drill receiving round rod 27 captures the drill bit groove 25, the spring 30 pops out immediately, i.e., the capture of the drill bit 19 is completed, and the drill rod is lifted to realize the salvage of the drill bit 19. The bell mouth 20 is used to increase the success rate of capturing the drill bit 19.

[0057] High-definition waterproof camera for hole quality inspection: After the concrete is poured, a bored pile 31 is formed, a detection hole is constructed, and then the auxiliary hanging track 32 is installed. The column 40, the distribution beam 48, the double-slot steel beam 41 with the motor base 44 and the diagonal brace 47 are installed in sequence, and then the hanging rope motor 39 is installed. At the same time, the front and rear movable square steel 37 with the pulley 38 is installed at the end of the double-slot steel beam 41, and then the hanging rope 36 is inserted to ensure that the hanging rope 36 is completely inserted into the rope buffer plate 43. Then, the wireless high-definition camera 34 is installed under the hanging rope 36, and the position of the column 40 and the movable square steel 37 is adjusted according to the position of the detection hole 33, and the wireless high-definition camera 34 is slowly dropped into the detection hole 33 to realize high-definition photography in the hole, and the image data is transmitted to the computer to realize hole quality inspection.

[0058] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.

Claims

1. A complex geological pile foundation combined hole construction system, characterized in that: It includes deformed steel casing, steel support, hanging beam, hanging operation platform, salvage device, cast-in-place piles, wireless high-definition camera and camera hanging device; The steel support is fixed at different heights in the deformed steel casing, the hanging beam is fixed at the top of the deformed steel casing, the hanging operation platform is hung in the deformed steel casing, and the top of the hanging operation platform is connected to the hanging beam; A drill rod is provided on the inner side of the bottom of the salvage device through a spring. The salvage device is inserted on the upper end of the drill bit, and the drill rod is embedded in the drill groove of the drill bit to realize the drill bit salvage. The camera hanging device is installed on the top of the cast-in-place pile, and the camera hanging device hangs the wireless high-definition camera in the detection hole of the cast-in-place pile through a hanging rope.

2. The complex geological pile foundation combined hole construction system according to claim 1 is characterized in that: A hole mouth reinforcement hoop is arranged at the top of the deformed steel casing, a hanging beam is arranged on the hole mouth reinforcement hoop, a fixing plate is arranged at the end of the hanging beam, the fixing plate and the hole mouth reinforcement hoop are connected by bolts, a pad is arranged in the gap between the fixing plate and the hole mouth reinforcement hoop, a slide rail is arranged on the top surface of the hanging beam, several synchronous motors are arranged on the slide rail, and ropes are arranged under the synchronous motor for connecting to the hanging operating platform.

3. The complex geological pile foundation combined hole construction system according to claim 1 is characterized in that: A plurality of steel supports are arranged inside the deformed steel casing, and the steel supports include a shaped steel support, a connecting sleeve and a rear support rod. The length of the rear support rod is determined according to the deformation of the deformed steel casing. An ear plate is arranged at the lower part of the hanging beam, the rope passes through the ear plate and a buffer hook is arranged at the bottom, a hanging operation platform is arranged under the buffer hook, and a slag receiving platform is arranged at the lowest part of the steel casing. An outer arc channel steel is arranged on the outer side of the shaped steel support, and an inner arc steel pipe is arranged on the inner side, and a stiffening plate is arranged between the outer arc channel steel and the inner arc steel pipe.

4. The complex geological pile foundation combined hole construction system according to claim 1 is characterized in that: A cover plate is provided on the top of the salvage device, and a joint and a water hole are provided on the cover plate. The lower part of the salvage device is connected with a rear bell mouth through a fixing ring, and a drain port is provided on the rear bell mouth. The salvage device is in the shape of a regular hexagonal straight cylinder, and a groove is provided on the inner side of the bottom, and a spring is provided in the groove. A drill connecting round rod is provided at the end of the spring, a rotating rod is provided on the drill connecting round rod, and a side slide plate is provided on the rotating rod. The drill connecting round rod is embedded in the drill bit groove of the drill bit to realize drill bit salvage.

5. The complex geological pile foundation combined hole construction system according to claim 1 is characterized in that: A detection hole is provided on the cast-in-place pile, a hanging auxiliary track is provided on the outer side of the cast-in-place pile, a groove is provided on the hanging auxiliary track to form a track, a column is provided on the track, a steel distribution beam is provided on the column, a beam limiting plate is provided on the steel distribution beam, a double-channel steel beam is provided between the beam limiting plates, the double-channel steel beam extends to above the detection hole, a pulley baffle is provided on the double-channel steel beam in the extension direction, a channel steel baffle is provided at the end of the double-channel steel beam, a motor base and a hanging rope buffer plate are provided on the end of the channel steel baffle away from the detection hole, a hanging rope motor is provided on the motor base, and a diagonal brace is provided between the column and the motor base.

6. The complex geological pile foundation combined hole construction system according to claim 5 is characterized in that: The hanging rope motor is used to pull the hanging rope. A forward and backward moving square steel is movable on the double-channel steel beam. One end of the hanging rope is connected to the hanging rope motor, and the other end passes through the hanging rope buffer plate on the channel steel baffle plate and extends into the forward and backward moving square steel and then vertically downward. A wireless high-definition camera is arranged at the bottom of the hanging rope, and a pulley is arranged at the bottom of the forward and backward moving square steel, and the pulley moves between the pulley baffles.

7. The method for complex geological pile foundation combination hole construction by the construction system according to claim 1, characterized in that: The following steps are involved: Step 1: Cluster annular cutting and coring with a down-the-hole hammer to form a pile hole; Step 2: lower the steel casing into the pile hole, perform grouting reinforcement around the deformed steel casing, install a hanging beam on the top of the deformed steel casing, lower the hanging operation platform, and install the steel support; set up a slag connection platform below the deformed section, cut the deformed section of the deformed steel casing, and chisel out the grouting to chisel the pile into a circle. After the circumference is qualified, connect the circular steel plate to complete the steel casing; Step 3: Grout the steel casing to obtain a bored pile, construct a detection hole, then install the camera hanging device, adjust the camera hanging device according to the position of the detection hole, drop the wireless high-definition camera into the detection hole, and conduct a hole quality inspection.

8. The complex geological pile foundation combined hole construction method according to claim 7 is characterized in that: After the drill bit of the down-the-hole hammer falls, a salvage device is installed on the drill rod. The salvage device is connected to the drill rod through a joint. The salvage device falls with the drill rod and covers the top of the drill bit. During the falling process, the spring carries the drill rod into the groove of the drill bit to complete the capture of the drill bit. The drill rod is lifted to realize the salvage of the drill bit.

Citation Information

Patent Citations

  • Complex geological karst hole pile foundation construction process

    CN113445498A

  • Construction method of impact-rotary excavating combined pore-forming cast-in-place pile

    CN118292429A

  • Pile construction management method

    JP2018091132A

  • Ring-shaped tip metal and pile installation method by inner excavation using it

    JP2018204257A

  • Information sampling and design assist device and method in a PCB drawing using big data

    KR1020200114630A

Cited By

  • Complex karst geological pile foundation steel casing deformation comprehensive prevention and control system and construction method

    CN120119659A

  • Comprehensive prevention and control system and construction method for deformation of steel casing of pile foundation in complex karst geology

    CN120119659B