Fabricated house structure and method thereof
By designing docking devices in the prefabricated house structure, the precise docking between prefabricated walls and docking columns is solved, and the problems of inconvenience and safety hazards in the existing technology are improved, and the docking efficiency and stability are reduced, and the safety risks and risks are reduced. Maintenance cost.
Patent Information
- Application Number
- CN202411397500.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-09
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-10-09
AI Technical Summary
The existing prefabricated house structure requires staff to fine-tune when docking prefabricated walls, which is inconvenient to operate and poses safety risks.
A prefabricated house structure including prefabricated walls, mounting bases, and docking devices is designed. The precise docking of the prefabricated walls and docking columns is achieved through docking devices, including cardboards, fixed frames, clamping shafts, mobile rods, and mobile docking. Blocks, tooth blocks and detection devices avoid manual fine adjustments and reduce safety hazards.
The rapid and stable docking of prefabricated walls and docking columns is realized, which reduces safety hazards, improves docking efficiency, avoids wall tilt caused by environmental factors or incorrect operations, reduces friction and collision risks, and simplifies detection and maintenance. process.
Smart Images

Figure CN119062008A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of construction, and in particular to an assembled house structure and a method thereof. Background Art
[0002] Prefabricated houses are a type of building that is built by assembling and constructing prefabricated components on site. Their structure is different from that of traditional buildings. Their main features are factory production and on-site assembly, which improves construction efficiency. It is an increasingly popular construction method in the modern construction industry.
[0003] The patent with the patent announcement number CN110565795B relates to a prefabricated house structure, including a wall, a foundation plate and a floor plate, the key of which is that: the wall is vertically installed on the foundation plate, the floor plate cover is arranged on the top of the wall, the installation parts corresponding to the wall on the foundation plate and the floor plate are distributed with reserved holes, the reserved holes corresponding to the foundation plate and the floor plate on the upper and lower sides of the wall are provided with fixing columns, the fixing columns are arranged in the corresponding reserved holes and fixed by pouring fine mortar or fine stone concrete, the corner installation parts of the two adjacent walls are respectively provided with interlaced columns and interlaced holes, the interlaced columns are arranged in the corresponding interlaced holes and fixed by pouring fine mortar or fine stone concrete. This patent provides a prefabricated house structure with high assembly efficiency, the plates are positioned and cast and fixed by the penetration of columns and holes, and the node connection is more convenient.
[0004] In the above patent, fixed columns are arranged in corresponding reserved holes and fixed by pouring fine mortar or fine stone concrete. The corner mounting parts of the two adjacent walls are respectively provided with interlaced columns and interlaced holes. Positioning and pouring are performed by interpenetrating the columns and the holes. The node connection is more convenient. However, when docking the prefabricated walls, the staff is required to make fine adjustments, which is inconvenient to operate and may cause safety hazards. For this reason, an assembled house structure with a better docking device is designed. Summary of the invention
[0005] In view of the deficiencies in the prior art, the present invention provides a prefabricated house structure and a method thereof, which solve the problems raised in the above-mentioned background technology.
[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions: an assembled house structure, including a prefabricated wall, a mounting base and a docking column, a fixed plate is fixedly installed on the top of the mounting base, a receiving shaft is rotatably penetrated on the surface of the fixed plate, an adjusting rod is fixedly installed on the surface of the receiving shaft, and also includes: a docking device, the docking device includes a clamping plate, a fixed frame, a clamping shaft, a moving rod, a moving docking block, a tooth block 1 and a tooth block 2, in the process of the prefabricated wall moving downward, it contacts and squeezes the moving docking block to move in the direction away from the docking column, the movement of the moving docking block drives the moving rod to move, and the The clamping plate is fixedly mounted on the end of the adjusting rod away from the receiving shaft, the fixed frame is fixedly mounted on the outer wall of the prefabricated wall, the clamping shaft is fixedly penetrated through the inner and outer walls of the fixed frame, the moving rod slides through the mounting base, the moving docking block is fixedly mounted on the end of the moving rod away from the fixed plate, the tooth block 1 is fixedly mounted above the moving rod, the tooth block 2 is fixedly mounted on the circumferential surface of the receiving shaft, a docking groove is provided at the bottom of the prefabricated wall, and precise docking of the prefabricated wall and the docking column is achieved by moving the mobile docking block, without the need for manual fine-tuning by the staff, thereby reducing the safety hazards in the docking process of the prefabricated wall.
[0007] According to the above technical solution, the surface of the movable docking block is set as a bevel surface 1. When the prefabricated wall moves downward, the movable docking block is driven to move under the action of the movement of the bevel surface. The surface of the movable docking block is provided with an arc groove, and the arc groove on the surface of the movable docking block contacts the docking column.
[0008] According to the above technical solution, a sliding plate is slidably installed on the surface of the supporting shaft, a limiting rod is fixedly installed on the side of the sliding plate close to the fixed plate, and a limiting groove is provided on the side of the fixed plate close to the sliding plate. The movement of the sliding plate drives the limiting rod to move, and the limiting rod moves to contact and limit the limiting groove, thereby fixing the docking angle and avoiding subsequent tilting of the wall due to environmental factors or incorrect operation.
[0009] The stabilizing device comprises a sliding groove and a receiving rod, wherein the sliding groove is arranged on the surface of the mobile docking block, and the receiving rod is arranged inside the sliding groove. The stabilizing device also comprises a receiving block, a moving block and a receiving roller. Then the receiving block continues to move downward, and the moving block moves downward under the action of the sliding groove. The receiving block is arranged inside the sliding groove, and a sliding groove is arranged on the surface of the receiving block. The moving block is slidably installed inside the sliding groove, and the receiving roller is rotatably installed on the circumferential surface of the receiving rod. The receiving rod rotates and penetrates the left and right walls of the moving block. The receiving rod moves downward to drive the receiving roller to contact and roll with the inner wall of the sliding groove, thereby converting the sliding friction into rolling friction, which can effectively reduce the friction generated by the contact between the prefabricated wall and the mobile docking block.
[0010] According to the above technical solution, a telescopic elastic rod is fixedly installed on the inner wall of the slide groove, and the free end of the telescopic elastic rod is fixedly connected to the moving block. The receiving block moves downward to squeeze the telescopic elastic rod to contract, which can effectively avoid direct contact and collision between the prefabricated wall and the moving docking block.
[0011] According to the above technical solution, a detection device for detecting the docking angle of the prefabricated wall is arranged inside the movable docking block, and the detection device includes a fixed groove and a movable plate, wherein the fixed groove is arranged inside the movable docking block, and the movable plate is slidably installed inside the fixed groove, and the detection device also includes a baffle rod, a connecting rod, a detection plate and a level detector, during the movement of the receiving rod, the baffle rod is contacted and squeezed to move in a direction away from the receiving rod, the baffle rod is fixedly passed through the inner wall of the movable docking block, the connecting rod is fixedly installed on the side of the movable plate away from the movable rod, the detection plate is rotatably installed on the end of the connecting rod away from the movable plate, the level detector is fixedly installed on the outer wall of the detection plate, and a guide groove is arranged on the surface of the movable plate, and the staff can observe whether the prefabricated wall is vertical by means of the level detector passing through the surface of the detection plate.
[0012] According to the above technical solution, a spring is arranged between the movable plate and the inner wall of the fixed groove, and the spring can drive the movable plate to move and contact the prefabricated wall. The inner wall of the fixed groove is fixedly installed with two telescopic elastic rods, and the free end of the two telescopic elastic rods is fixedly connected to the baffle rod. The two telescopic elastic rods can drive the baffle rod to reset, and the end of the baffle rod close to the receiving rod is provided with a second bevel surface.
[0013] According to the above technical solution, a fixed block is fixedly installed on one side of the movable plate close to the spring, and the surface of the fixed block is set as bevel surface three. The fixed block moves to contact and squeeze the baffle rod to move. After the baffle rod moves, it passes through the guide groove and re-limits the movable plate.
[0014] A method for using a prefabricated house structure, using a prefabricated house structure of the above technical solution, comprises the following steps:
[0015] Step 1: Fix the mounting base on the ground, and then move the arc groove on the surface of the docking block to contact the docking column;
[0016] Step 2: When the prefabricated wall is butted against the butt joint column by hoisting, the prefabricated wall contacts and squeezes the butt joint block to move away from the butt joint column during the downward movement;
[0017] Step 3: The moving rod moves through the movement of gear block 1 and gear block 2 to drive the receiving shaft to rotate, and the rotation of the receiving shaft drives the adjusting rod to rotate with the receiving shaft as the center;
[0018] Step 4: The adjustment rod rotates to drive the card plate to rotate and contact the card shaft on the surface of the fixed frame to achieve docking. At this time, the docking groove under the prefabricated wall is docked with the docking column, thereby achieving rapid and stable docking between the prefabricated wall and the docking column.
[0019] The present invention provides a prefabricated house structure having the following beneficial effects:
[0020] (1) When docking, the prefabricated wall moves downward to drive the movable docking block and the movable rod to move, and then the bearing shaft is driven to rotate under the action of the tooth block 1 and the tooth block 2, and the docking with the prefabricated wall is completed under the action of the adjustment rod and the clamping plate. There is no need for workers to manually fine-tune, which reduces the safety hazards in the docking process of the prefabricated wall. At the same time, after the docking is completed, the adjustment rod is fixed by the sliding plate and the limit rod to avoid the subsequent tilting of the wall due to environmental factors or erroneous operation, maintain the stability of the subsequent docking work, further reduce the subsequent safety hazards, and improve the efficiency of docking.
[0021] (2) In the prefabricated house structure, when the prefabricated wall moves downward, it can achieve buffering through the receiving block and the telescopic elastic rod, and convert the sliding friction into rolling friction under the action of the receiving rod and the receiving roller, which can effectively reduce the friction generated by the contact between the prefabricated wall and the movable docking block, maintain the stability of the prefabricated wall during the docking process, and effectively avoid the collision caused by the direct contact between the prefabricated wall and the movable docking block, effectively disperse and reduce the stress concentration caused by the collision, and reduce the risk of wall cracking or damage.
[0022] (3) In the prefabricated house structure, the receiving rod moves through the stop rod to release the limit on the movable plate, and the detection plate is brought into contact with the prefabricated wall under the action of the spring. Then, the staff can observe whether the prefabricated wall is vertical through the level detector that penetrates the surface of the detection plate. When the prefabricated wall is tilted, it can be finely adjusted through the adjustment rod, further improving the accuracy of the prefabricated wall docking. There is no need for the staff to additionally detect the tilt, reducing the staff's work intensity. At the same time, it is easy to reset under the action of the fixed block, reducing the subsequent maintenance cost and improving the docking efficiency of the prefabricated wall. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0024] Figure 2 It is a schematic diagram of the position structure of the adjusting rod and the movable docking block of the present invention;
[0025] Figure 3 For the present invention Figure 2 The enlarged structural diagram of part A in the middle;
[0026] Figure 4This is a schematic diagram of the position structure of the mobile docking block and the receiving block of the present invention;
[0027] Figure 5 It is a schematic diagram of the position structure of the receiving block and the receiving roller of the present invention;
[0028] Figure 6 This is a schematic diagram of the position structure of the mobile docking block and the detection plate of the present invention;
[0029] Figure 7 It is a schematic diagram of the position structure of the connecting rod and the fixing block of the present invention.
[0030] In the figure: 1, prefabricated wall; 2, installation base; 3, fixed plate; 4, receiving shaft; 5, adjusting rod; 6, clamping plate; 7, fixed frame; 8, clamping shaft; 9, moving rod; 10, moving docking block; 101, arc groove; 11, tooth block one; 12, tooth block two; 13, docking column; 14, sliding plate; 15, limiting rod; 16, limiting groove; 171, sliding groove; 172, receiving rod; 173, receiving block; 174, moving block; 175, receiving roller; 176, sliding groove; 177, telescopic spring rod one; 181, fixed groove; 182, moving plate; 183, stop rod; 184, connecting rod; 185, detection plate; 186, level detector; 187, guide groove; 188, spring; 189, telescopic spring rod two; 1810, fixed block. DETAILED DESCRIPTION
[0031] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0032] See also Figure 1-Figure 7One embodiment of the present invention is: an assembled house structure, including a prefabricated wall 1, a mounting base 2 and a docking column 13, a fixing plate 3 is fixedly installed on the top of the mounting base 2, a receiving shaft 4 is rotatably penetrated on the surface of the fixing plate 3, an adjusting rod 5 is fixedly installed on the surface of the receiving shaft 4, and also includes: a docking device, the docking device includes a clamping plate 6, a fixing frame 7, a clamping shaft 8, a moving rod 9, a moving docking block 10, a tooth block 11 and a tooth block 2 12, the prefabricated wall 1 contacts and squeezes the moving docking block 10 to move in a direction away from the docking column 13 during the downward movement, the moving docking block 10 moves to drive the moving rod 9 to move, the clamping plate 6 It is fixedly installed on the end of the adjusting rod 5 away from the receiving shaft 4, the fixed frame 7 is fixedly installed on the outer wall of the prefabricated wall 1, the clamping shaft 8 is fixedly passed through the inner and outer walls of the fixed frame 7, the moving rod 9 slides through the mounting base 2, the mobile docking block 10 is fixedly installed on the end of the moving rod 9 away from the fixed plate 3, the tooth block 11 is fixedly installed above the moving rod 9, and the tooth block 2 12 is fixedly installed on the circumferential surface of the receiving shaft 4. A docking groove is opened at the bottom of the prefabricated wall 1. The movement of the mobile docking block 10 can achieve precise docking of the prefabricated wall 1 and the docking column 13. There is no need for staff to perform manual fine-tuning, thereby reducing the safety hazards during the docking process of the prefabricated wall 1.
[0033] The surface of the mobile docking block 10 is set as a bevel surface 1. When the prefabricated wall 1 moves downward, the mobile docking block 10 is driven to move under the action of the movement of the bevel surface. An arc groove 101 is opened on the surface of the mobile docking block 10, and the arc groove 101 on the surface of the mobile docking block 10 contacts the docking column 13.
[0034] A sliding plate 14 is slidably installed on the surface of the supporting shaft 4, and a limiting rod 15 is fixedly installed on the side of the sliding plate 14 close to the fixed plate 3. A limiting groove 16 is provided on the side of the fixed plate 3 close to the sliding plate 14. The movement of the sliding plate 14 drives the limiting rod 15 to move, and the limiting rod 15 moves to contact and limit the limiting groove 16, thereby fixing the docking angle, avoiding subsequent wall tilting due to environmental factors or incorrect operation, maintaining the stability of subsequent docking work, further reducing subsequent safety hazards, and improving the efficiency of docking.
[0035] A method for using a prefabricated house structure, using a prefabricated house structure of the above technical solution, comprises the following steps:
[0036] Step 1: The mounting base 2 is fixedly mounted on the ground, and then the arc groove 101 on the surface of the moving docking block 10 is brought into contact with the docking column 13;
[0037] Step 2: When the prefabricated wall 1 is docked with the docking column 13 by hoisting, the prefabricated wall 1 contacts and squeezes the docking block 10 to move away from the docking column 13 during the downward movement;
[0038] Step 3: The moving rod 9 moves through the gear block 11 and the gear block 2 12 to drive the receiving shaft 4 to rotate, and the receiving shaft 4 rotates to drive the adjusting rod 5 to rotate with the receiving shaft 4 as the center;
[0039] Step 4: The adjusting rod 5 rotates to drive the clamping plate 6 to rotate and contact the clamping shaft 8 on the surface of the fixed frame 7 to achieve docking. At this time, the docking groove below the prefabricated wall 1 is docked with the docking column 13, thereby achieving rapid and stable docking between the prefabricated wall 1 and the docking column 13.
[0040] When this embodiment is working: the mounting base 2 is fixedly mounted on the ground, and then the arc groove 101 on the surface of the mobile docking block 10 contacts the docking column 13. When the prefabricated wall 1 is docked with the docking column 13 by hoisting, the prefabricated wall 1 contacts and squeezes the mobile docking block 10 in the process of moving downward to move away from the docking column 13. The movement of the mobile docking block 10 drives the moving rod 9 to move. The movement of the moving rod 9 drives the gear block 11 to move. The gear block 11 moves to contact the gear block 2 12 and drives it to rotate. The rotation of the gear block 2 12 drives the receiving shaft 4 to rotate. The rotation of the receiving shaft 4 drives the adjusting rod 5 to rotate with the receiving shaft 4 as the center. The rotation of the adjusting rod 5 drives the clamping plate 6 to rotate. The clamping plate 6 rotates to contact the clamping shaft 8 on the surface of the fixed frame 7 and realizes Docking, at this time, the docking groove at the bottom of the prefabricated wall 1 is docked with the docking column 13, thereby realizing the rapid and stable docking of the prefabricated wall 1 and the docking column 13, and the precise docking of the prefabricated wall 1 and the docking column 13 is realized by moving the docking block 10, without the need for manual fine-tuning by the staff, thereby reducing the safety hazards in the docking process of the prefabricated wall 1. At the same time, when the docking is completed, the sliding plate 14 is moved in the direction close to the fixed plate 3, and the movement of the sliding plate 14 drives the limit rod 15 to move, and the limit rod 15 moves to contact and limit the limit groove 16, thereby fixing the docking angle, avoiding subsequent tilting of the wall due to environmental factors or incorrect operation, maintaining the stability of subsequent docking work, further reducing subsequent safety hazards, and improving the efficiency of docking.
[0041] See also Figure 1-Figure 7On the basis of the above embodiment, in another embodiment of the present invention, a stabilizing device for improving the docking stability of the prefabricated wall 1 is provided on the surface of the mobile docking block 10, and the stabilizing device includes a sliding groove 171 and a receiving rod 172. The sliding groove 171 is provided on the surface of the mobile docking block 10, and the receiving rod 172 is provided inside the sliding groove 171. The stabilizing device also includes a receiving block 173, a moving block 174 and a receiving roller 175. Then, the receiving block 173 continues to move downward, and the moving block 174 moves downward under the action of the sliding groove 171. Movement, the receiving block 173 is arranged inside the sliding groove 171, and a sliding groove 176 is opened on the surface of the receiving block 173. The moving block 174 is slidably installed inside the sliding groove 176. The receiving roller 175 is rotatably installed on the circumferential surface of the receiving rod 172. The receiving rod 172 rotates and penetrates the left and right walls of the moving block 174. The receiving rod 172 moves downward to drive the receiving roller 175 to contact and roll with the inner wall of the sliding groove 171, converting the sliding friction into rolling friction, which can effectively reduce the friction generated by the contact between the prefabricated wall 1 and the moving docking block 10.
[0042] A telescopic elastic rod 177 is fixedly installed on the inner wall of the slide groove 176, and the free end of the telescopic elastic rod 177 is fixedly connected to the moving block 174. The receiving block 173 moves downward to squeeze the telescopic elastic rod 177 to contract, which can effectively avoid the prefabricated wall 1 from directly contacting and colliding with the moving docking block 10, effectively disperse and reduce the stress concentration caused by the collision, and reduce the risk of wall cracking or damage.
[0043] The interior of the mobile docking block 10 is provided with a detection device for detecting the docking angle of the prefabricated wall 1, the detection device includes a fixed groove 181 and a movable plate 182, the fixed groove 181 is opened inside the mobile docking block 10, and the movable plate 182 is slidably installed inside the fixed groove 181, and the detection device also includes a baffle 183, a connecting rod 184, a detection plate 185 and a level detector 186, and the receiving rod 172 contacts and squeezes the baffle 183 to move away from the receiving rod 172 during the movement, and the baffle 183 is fixedly penetrated through the inner wall of the mobile docking block 10, and the connecting rod 184 is fixedly installed on the mobile docking block 10. The movable plate 182 is on the side away from the movable rod 9, and the detection plate 185 is rotatably installed on the end of the connecting rod 184 away from the movable plate 182. The level detector 186 is fixedly installed on the outer wall of the detection plate 185. A guide groove 187 is provided on the surface of the movable plate 182. The staff can observe whether the prefabricated wall 1 is vertical through the level detector 186 that penetrates the surface of the detection plate 185. When the prefabricated wall 1 is tilted, it can be finely adjusted through the adjusting rod 5, thereby further improving the accuracy of the docking of the prefabricated wall 1. There is no need for the staff to additionally detect the inclination, thereby reducing the work intensity of the staff.
[0044] A spring 188 is arranged between the movable plate 182 and the inner wall of the fixed groove 181. The spring 188 can drive the movable plate 182 to move and contact the prefabricated wall 1. A telescopic elastic rod 189 is fixedly installed on the inner wall of the fixed groove 181. The free end of the telescopic elastic rod 189 is fixedly connected to the blocking rod 183. The telescopic elastic rod 189 can drive the blocking rod 183 to reset. The end of the blocking rod 183 close to the receiving rod 172 is provided with a beveled surface 2.
[0045] A fixed block 1810 is fixedly installed on one side of the movable plate 182 close to the spring 188. The surface of the fixed block 1810 is set as a bevel surface three. The fixed block 1810 moves to contact and squeeze the blocking rod 183 to move. After the blocking rod 183 moves, it passes through the guide groove 187 and re-limits the movable plate 182, which is convenient for the subsequent detection work during the docking of the prefabricated wall 1, reduces the subsequent maintenance cost, and improves the docking efficiency of the prefabricated wall 1.
[0046] When this embodiment is working: when the prefabricated wall 1 moves downward, it first contacts the receiving block 173 and moves downward. The receiving block 173 moves downward to squeeze the telescopic elastic rod 177 to contract. Then the receiving block 173 continues to move downward. Under the action of the sliding groove 171, the moving block 174 moves downward. The moving block 174 moves downward to drive the receiving rod 172 to move downward. The receiving rod 172 moves downward to drive the receiving roller 175 to contact and roll with the inner wall of the sliding groove 171, converting the sliding friction into rolling friction, which can effectively reduce the friction force generated by the contact between the prefabricated wall 1 and the mobile docking block 10, maintain the stability of the prefabricated wall 1 during the docking process, and at the same time effectively avoid the prefabricated wall 1 from directly contacting the mobile docking block 10 to cause collision, effectively disperse and reduce the stress concentration caused by the collision, and reduce the risk of wall cracking or damage.
[0047] During the movement of the receiving rod 172, the blocking rod 183 is contacted and squeezed to move away from the receiving rod 172, and the blocking rod 183 moves into the guide groove 187 on the surface of the moving plate 182 and releases the limit on it. After the limit is released, the moving plate 182 moves in the direction close to the prefabricated wall 1 under the action of the spring 188, and the movement of the moving plate 182 drives the connecting rod 184 to move, and the movement of the connecting rod 184 drives the detection plate 185 to move, and the detection plate 185 moves to contact the prefabricated wall 1, and then the staff can observe whether the prefabricated wall 1 is vertical through the level detector 186 that penetrates the surface of the detection plate 185. When the prefabricated wall 1 tilts When it is inclined, the adjusting rod 5 can be used to achieve fine adjustments to it, further improving the accuracy of the docking of the prefabricated wall 1, without the need for additional staff to detect the inclination, reducing the work intensity of the staff, and at the same time, after the installation is completed, by moving the movable plate 182 in the direction close to the inner wall of the fixed groove 181, the movement of the movable plate 182 drives the fixed block 1810 to move, and the fixed block 1810 moves to contact and squeeze the blocking rod 183 to move. After the blocking rod 183 moves, it passes through the guide groove 187 and re-limits the movable plate 182, which is convenient for the subsequent detection work during the docking of the prefabricated wall 1, reduces the subsequent maintenance cost, and improves the docking efficiency of the prefabricated wall 1.
[0048] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. An assembled house structure, comprising a prefabricated wall (1), a mounting base (2) and a docking column (13), wherein a fixing plate (3) is fixedly mounted above the mounting base (2), a receiving shaft (4) is rotatably penetrated through the surface of the fixing plate (3), and an adjusting rod (5) is fixedly mounted on the surface of the receiving shaft (4), characterized in that: Also includes: A docking device, the docking device comprising a card plate (6), a fixed frame (7), a clamping shaft (8), a moving rod (9), a moving docking block (10), a tooth block 1 (11) and a tooth block 2 (12), the card plate (6) being fixedly mounted on an end of the adjusting rod (5) away from the receiving shaft (4), the fixed frame (7) being fixedly mounted on the outer wall of the prefabricated wall (1), the clamping shaft (8) being fixedly penetrated through the inner and outer walls of the fixed frame (7), the moving rod (9) being slidably penetrated through the mounting base (2), the moving docking block (10) being fixedly mounted on an end of the moving rod (9) away from the fixed plate (3), the tooth block 1 (11) being fixedly mounted above the moving rod (9), the tooth block 2 (12) being fixedly mounted on the circumferential surface of the receiving shaft (4), and a docking groove being provided below the prefabricated wall (1); The surface of the movable docking block (10) is provided with a stabilizing device for improving the docking stability of the prefabricated wall (1), the stabilizing device comprising a sliding groove (171) and a receiving rod (172), the sliding groove (171) being provided on the surface of the movable docking block (10), and the receiving rod (172) being provided inside the sliding groove (171); A detection device for detecting the docking angle of the prefabricated wall (1) is arranged inside the movable docking block (10), and the detection device comprises a fixed groove (181) and a movable plate (182), wherein the fixed groove (181) is arranged inside the movable docking block (10), and the movable plate (182) is slidably mounted inside the fixed groove (181).
2. The assembled house structure according to claim 1, characterized in that: The surface of the movable docking block (10) is arranged as a beveled surface 1, and an arc-shaped groove (101) is provided on the surface of the movable docking block (10).
3. The assembled house structure according to claim 2, characterized in that: A sliding plate (14) is slidably mounted on the surface of the receiving shaft (4); a limiting rod (15) is fixedly mounted on a side of the sliding plate (14) close to the fixed plate (3); and a limiting groove (16) is provided on a side of the fixed plate (3) close to the sliding plate (14).
4. The assembled house structure according to claim 3, characterized in that: The stabilizing device further comprises a receiving block (173), a moving block (174) and a receiving roller (175); the receiving block (173) is arranged inside the sliding groove (171); a sliding groove (176) is provided on the surface of the receiving block (173); the moving block (174) is slidably mounted inside the sliding groove (176); the receiving roller (175) is rotatably mounted on the circumferential surface of the receiving rod (172); and the receiving rod (172) is rotatably penetrated through the left and right walls of the moving block (174).
5. The assembled house structure according to claim 4, characterized in that: A telescopic elastic rod (177) is fixedly mounted on the inner wall of the slide groove (176), and a free end of the telescopic elastic rod (177) is fixedly connected to the moving block (174).
6. The assembled house structure according to claim 5, characterized in that: The detection device also includes a blocking rod (183), a connecting rod (184), a detection plate (185) and a level detector (186); the blocking rod (183) is fixedly inserted through the inner wall of the movable docking block (10); the connecting rod (184) is fixedly mounted on a side of the movable plate (182) away from the movable rod (9); the detection plate (185) is rotatably mounted on an end of the connecting rod (184) away from the movable plate (182); the level detector (186) is fixedly mounted on the outer wall of the detection plate (185); and a guide groove (187) is provided on the surface of the movable plate (182).
7. The assembled house structure according to claim 6, characterized in that: A spring (188) is provided between the movable plate (182) and the inner wall of the fixed groove (181); a second telescopic elastic rod (189) is fixedly installed on the inner wall of the fixed groove (181); a free end of the second telescopic elastic rod (189) is fixedly connected to a blocking rod (183); and a second beveled surface is provided at one end of the blocking rod (183) close to the receiving rod (172).
8. The assembled house structure according to claim 7, characterized in that: A fixing block (1810) is fixedly mounted on one side of the movable plate (182) close to the spring (188), and a surface of the fixing block (1810) is configured as a beveled surface three.
9. A method for using a prefabricated house structure, using the prefabricated house structure according to claim 8, characterized in that: The following steps are involved: Step 1: The mounting base (2) is fixedly mounted on the ground, and then the arc groove (101) on the surface of the moving docking block (10) is brought into contact with the docking column (13); Step 2: When the prefabricated wall (1) is butted against the butt joint column (13) by hoisting, the prefabricated wall (1) contacts and squeezes the butt joint block (10) in the process of moving downward, so that the butt joint block (10) moves away from the butt joint column (13); Step 3: The moving rod (9) moves through the movement of the gear block 1 (11) and the gear block 2 (12) to drive the receiving shaft (4) to rotate, and the rotation of the receiving shaft (4) drives the adjusting rod (5) to rotate with the receiving shaft (4) as the center of the circle; Step 4: The adjusting rod (5) rotates to drive the clamping plate (6) to rotate and contact the clamping shaft (8) on the surface of the fixed frame (7) to achieve docking. At this time, the docking groove below the prefabricated wall (1) and the docking column (13) are docked, thereby achieving rapid and stable docking of the prefabricated wall (1) and the docking column (13).
Citation Information
Patent Citations
Prefabricated house bearing structure and support principle thereof
CN112252480A
Suspension type overhead assembly building module with water storage counterweight structure
CN114482205A
Prefabricated wooden houses of the pillar and wall panel assembly devices
KR1020170038407A
Cited By
Prefabricated slab positioning device for garbage dump construction
CN120174988A