Box-type double-sided laminated shear wall suitable for nuclear power plant and method
By using the connection method of box cavity wall panel module and tie ribs combined with UHPC in the shear wall of nuclear power plants, the problems of low construction efficiency and poor connection performance are solved, and high efficiency, strength and seismic resistance are improved. Improved aesthetics.
Patent Information
- Application Number
- CN202411418012.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-11
- Publication Date
- 2024-12-03
AI Technical Summary
The construction efficiency of the shear walls of existing nuclear power plants is low. The multiple pouring of concrete results in too long curing time and the connection performance cannot be guaranteed. The welding nodes are easily damaged under the action of earthquakes, and the prominent steel plates affect the aesthetics.
The wall panel module with box cavity is adopted, and the connection is established through the tie ribs on the internal stiffener and UHPC. The box cavity inside the wall panel module is vertically connected and then filled with concrete together to reduce the number of poured concrete. Maintenance time, improve connection performance, and strengthen strength and seismic performance through reinforcement cages and structural reinforcement.
It improves the construction efficiency and connection performance of the shear wall, reduces maintenance time, enhances the overall strength and seismic resistance of the shear wall, and does not require traditional scaffolding support, which improves the aesthetics.
Smart Images

Figure CN119062035A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of shear walls, and in particular to a box-type double-sided composite shear wall and a method suitable for a nuclear power plant. Background Art
[0002] Nuclear power plants mainly use shear walls as their structural form. Due to the large earthquake effects and radiation shielding requirements of nuclear power plants, the thickness of the shear walls is large, and the diameter of the selected steel bars is large and the number of layers is large. If the steel bars are tied manually on site, the construction efficiency is extremely low. In addition, due to the large diameter of the main bars, it is extremely difficult to bend and adjust the steel bars on site, the spacing of the steel bars is difficult to control, the positioning accuracy is poor, and the quality and consistency of the tying are difficult to guarantee. Therefore, prefabricated and assembled shear walls are suitable for the application scenarios of nuclear power plants. However, due to the high floor height and large plate thickness of the shear walls in nuclear power plants, if the whole is prefabricated, the load is too large and the hoisting capacity cannot be guaranteed. The structural form of double-sided composite shear walls can provide a solution to the insufficient hoisting capacity. The conventional prefabricated double-sided composite shear wall connection method is mainly to insert the bars into the cavity, and then pour concrete into the cavity to connect the upper and lower walls into a whole.
[0003] In view of the structural characteristics of the shear walls of nuclear power plants, there are currently various structural forms of double-sided composite shear wall connections, but there are still some defects that make it difficult to meet the shear wall requirements of nuclear power plants. A Chinese patent (publication number: CN115419196A) proposes a UHPC wet joint prefabricated double-sided composite shear wall and method for nuclear power plants. A UHPC horizontal joint is set in the middle section of the composite shear wall, and vertical structural steel bars are arranged. In the actual construction process, the lower composite shear wall needs to be cast and cured to reach the specified strength first, and then UHPC is cast at the horizontal joint, and then concrete is cast within the upper composite shear wall. The three pourings of concrete require too long a curing time, and the connection performance at the interface of the two pourings of concrete cannot be guaranteed; currently, the prefabricated composite shear wall is welded to the bottom embedded parts, but its welding nodes are easily damaged under the action of earthquakes; in addition, when the upper composite shear wall is in place, it is extremely difficult to align the lower composite shear wall, and the steel plate protruding from the wall surface as a template for the wet joint affects the appearance. Summary of the invention
[0004] The purpose of the present invention is to provide a box-type double-sided composite shear wall and method suitable for nuclear power plants in view of the defects of the prior art. The wall panel module with a box-type cavity is adopted. The connection can be established horizontally through the tie bars on the internal stiffening ribs combined with UHPC. The box-type cavities inside the wall panel module can be connected vertically and then filled with concrete together, thereby reducing the problem of long curing time caused by multiple pouring of concrete and improving the connection performance to ensure the strength of the entire shear wall.
[0005] The first object of the present invention is to provide a box-type double-sided composite shear wall suitable for a nuclear power plant, which adopts the following scheme:
[0006] The invention comprises a wall panel module, wherein the wall panel module comprises wall panels arranged at intervals and stiffening ribs connecting adjacent wall panels, wherein the stiffening ribs and the wall panels form a box-shaped cavity; a filling cavity is formed between the stiffening ribs of different wall panel modules on both sides of a vertical joint, and tie bars are arranged on the stiffening ribs, wherein the tie bars extend to the outside of the wall panel module and pass through the vertical joint, and the filling cavity where the tie bars are located is filled with UHPC; the different wall panel modules on both sides of a transverse joint are connected to each other, and the corresponding box-shaped cavities are connected to be filled with concrete together.
[0007] Furthermore, the stiffening ribs are located between adjacent wall panels corresponding to the same wall panel module, the wall panel module is provided with at least two stiffening ribs distributed at intervals, and the box-shaped cavity is located between adjacent stiffening ribs of the same wall panel module.
[0008] Furthermore, a steel cage is provided in the box-shaped cavity, and the steel cage vertically extends into the box-shaped cavity of the different wall panel modules so that the steel cage is filled in the concrete;
[0009] Adjacent wall panels of the same wall panel module are connected with shear reinforcement bars.
[0010] Furthermore, the reinforcing ribs extend vertically to the transverse joints, the longitudinal wall bars in the wall panel extend vertically to the transverse joints, and the longitudinal wall bars of the wall panel modules corresponding to the transverse joints overlap each other.
[0011] Furthermore, structural steel bars and protective layers are extended vertically from the ends of the wall panels, the structural steel bars between the wall panel modules corresponding to the transverse joints are overlapped, the overlapping areas of the structural steel bars are filled with concrete, the protective layer is flush with the side of the wall panel away from the stiffening ribs, restricting the filling range of the concrete, and the structural steel bars are located on the inner side of the protective layer.
[0012] Furthermore, a template is connected to the outer side of the wall panel, and the template seals the transverse seam.
[0013] Furthermore, a corbel is provided on one side of the wall panel connecting the stiffening rib, the corbel is connected to the connecting steel bar, and the connecting steel bar passes through the transverse joint and extends to another wall panel module.
[0014] Furthermore, the box-shaped cavity and the filling cavity formed by the wall panel module serve as a storage space for reserved reinforcement bars of the foundation. Vertically, the wall panel module at the bottom is fixed to the foundation, and floor slab anchor bars and connectors are installed at the wall panel nodes.
[0015] The second object of the present invention is to provide a construction method of a box-type double-sided composite shear wall suitable for a nuclear power plant as described in the first object, comprising:
[0016] Lifting wall panel modules;
[0017] In the horizontal direction, a filling cavity is formed between adjacent wall panel modules, and the tie bars on different stiffening ribs are arranged in a staggered manner in the filling cavity. UHPC is poured into the filling cavity to establish a connection between adjacent wall panel modules in the horizontal direction;
[0018] In the vertical direction, adjacent wall panel modules are connected to each other, and the corresponding box-shaped cavities are connected and filled with concrete to establish the vertical connection between the adjacent wall panel modules.
[0019] Furthermore, a steel cage is installed in part of the box-shaped cavity, passes through the box-shaped cavities corresponding to the plurality of wall panel modules, and then filled with concrete.
[0020] Compared with the prior art, the present invention has the following advantages and positive effects:
[0021] (1) In order to solve the problem that multiple pouring of concrete leads to long curing time and the connection performance at the interface cannot be guaranteed, the wall panel module with box-shaped cavity is adopted, which can facilitate the connection of adjacent wall panel modules in the horizontal and vertical directions. In the horizontal direction, the connection can be established by the tie bars on the internal stiffening ribs combined with UHPC. The box-shaped section formed by the stiffening ribs can achieve self-bearing. In the vertical direction, the box-shaped cavities inside the wall panel modules can be connected and filled with concrete together, reducing the problem of long curing time caused by multiple pouring of concrete, improving the connection performance to ensure the strength of the entire shear wall, and the connection at the vertical joints and horizontal joints are all connected with prefabricated wall panel modules as templates, without the need for traditional scaffolding formwork; prefabricated tie bars can be staggered in the filling cavity, without the need to tie steel bars, thereby improving construction efficiency.
[0022] (2) The box-shaped cavity can accommodate the installation of a steel cage. For corners or places with greater stress, the strength can be improved by installing a steel cage. The concrete filled in the box-shaped cavity can be selected to ensure that the strength requirements of the shear wall are met.
[0023] (3) In the vertical direction, the stiffening ribs can be used to extend the wall panel module, which can be used as segmented partitions of the transverse joints and play a supporting role. The structural steel bars are used to establish the connection between the upper and lower wall panel modules. The protective layer and the formwork are used as the blocking structure of the transverse joint position during pouring, which assists the process of pouring the box-type cavity to establish the vertical connection, and also ensures that there is no exposed steel plate at the transverse joints and vertical joints.
[0024] (4) In the vertical direction, a corbel can be arranged on the inner side of the wall panel to establish a connection between the upper and lower wall panel modules inside the box-shaped cavity; in addition, a foundation reserved steel bar is arranged on the foundation and inserted into the box-shaped cavity, so that the box-shaped cavity with a larger space is inserted to reduce the difficulty of docking, provide better resistance, and reduce the risk of node damage under earthquake action. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0026] Figure 1 It is a top view schematic diagram of a box-type double-sided composite shear wall suitable for a nuclear power plant in Embodiments 1 and 2 of the present invention.
[0027] Figure 2 It is a schematic diagram of arranging a steel cage for a box-type double-sided composite shear wall suitable for a nuclear power plant in Embodiments 1 and 2 of the present invention.
[0028] Figure 3 Schematic diagram of the connection between the wall panel module and the foundation in Examples 1 and 2 of the present invention.
[0029] Figure 4 It is a schematic diagram of a form of vertical connection of shear wall modules in embodiments 1 and 2 of the present invention.
[0030] Figure 5 It is a schematic diagram of another form of establishing vertical connection of shear wall modules in Examples 1 and 2 of the present invention.
[0031] Figure 6 It is a schematic diagram of another form of establishing vertical connection of shear wall modules in Examples 1 and 2 of the present invention.
[0032] Among them, 1. Horizontal reinforcement of the wall; 2. Longitudinal reinforcement of the wall; 3. Shear reinforcement; 4. Tie reinforcement; 5. Ordinary concrete of the precast layer; 6. Ultra-high performance concrete; 7. Steel cage; 8. Foundation concrete; 9. Reserved steel bars for the foundation; 10. Mechanical connectors for steel bars; 11. Anchor reinforcement for the floor slab; 12. Structural steel bars; 13. Formwork; 14. Bolts; 15. Connecting steel bars. DETAILED DESCRIPTION
[0033] Example 1
[0034] In a typical embodiment of the present invention, Figure 1-Figure 6 As shown, a box-type double-sided composite shear wall suitable for nuclear power plants is given.
[0035] During the construction process of traditional shear wall structures, it is often necessary to pour concrete multiple times, and maintenance is required after each pouring, resulting in a long total construction period, and the connection performance at the interface of the two pourings of concrete cannot be guaranteed. Based on this, this embodiment provides a box-type double-sided composite shear wall suitable for nuclear power plants, which uses a wall panel module with a box-type cavity, and can be connected horizontally through the tie bars 4 on the internal stiffening ribs combined with UHPC. In the vertical direction, the box-type cavities inside the wall panel module can be connected and filled with concrete together, reducing the problem of long maintenance time caused by multiple pourings of concrete, and improving the connection performance to ensure the strength of the entire shear wall.
[0036] like Figure 1 As shown, the box-type double-sided composite shear wall suitable for nuclear power plants is formed by combining multiple wall panel modules. The multiple wall panel modules are spliced horizontally and vertically respectively. Adjacent wall panel modules are spliced horizontally to form vertical joints at the splicing positions. The vertical joints are formed by the end gaps of adjacent wall panel modules and are distributed vertically. Adjacent wall panel modules are spliced vertically to form transverse joints at the splicing positions. The transverse joints are formed by the top and bottom gaps of adjacent wall panel modules.
[0037] The transverse direction indicated in this embodiment refers to the direction in which adjacent wall panel modules are spliced and distributed in the horizontal direction, and the vertical direction refers to the direction in which adjacent wall panel modules are spliced and distributed in the height direction.
[0038] like Figure 1 and Figure 2 As shown in the figure, the wall panel module consists of wall panels arranged at intervals and stiffening ribs connecting adjacent wall panels. Two wall panels are arranged in parallel and at intervals, and the stiffening ribs are located in the interval between the two wall panels. The adjacent stiffening ribs serve as a set of opposite sides of the box structure, and the two wall panels serve as another set of opposite sides of the box structure, forming a box-shaped cavity together. This not only increases the strength and rigidity of the wall, but also facilitates the subsequent filling work.
[0039] For wall panel modules, except Figure 1 The one-line structure shown in Figure 2 In addition to the T-shaped wall panel structure shown, wall panel modules such as cross walls and L-shaped walls can also be used and allocated according to the layout position and required connection structure.
[0040] The box-shaped cavity enables the wall panel module to form a box-shaped section, which can achieve self-load-bearing. The connections at the vertical joints and transverse joints are all made of prefabricated wall panel modules as templates, without the need for traditional scaffolding formwork. The overall performance of the wall is enhanced by stiffening ribs.
[0041] A filling cavity is formed between the stiffening ribs of different wall panel modules on both sides of the vertical joint, and a tie bar 4 is provided on the stiffening rib, and the tie bar 4 extends outside the wall panel module and passes through the vertical joint. Figure 1 and Figure 2 As shown, the tie bars 4 also serve as beard bars. After the adjacent wall panel modules are spliced in the transverse direction, the tie bars 4 on the different stiffening ribs on both sides of the vertical joint are staggered, and the filling cavity where the tie bars 4 are located is filled with UHPC. UHPC is ultra-high performance concrete 6. UHPC has high strength and high durability, reduces the lap length, and can effectively enhance the connection between the wall panel modules.
[0042] In this embodiment, the wall modules are connected in the horizontal direction by tie bars 4 extending from the stiffening ribs, and vertical joints are formed between two adjacent wall modules in the horizontal direction. UHPC is poured between the stiffening ribs connected by the tie bars 4 to achieve the connection of adjacent wall modules in the horizontal direction. The vertical joints are smoothed with mortar.
[0043] By combining the tie bars 4 and UHPC, the connection performance between the wall panel modules is improved, and the problem of long curing time caused by multiple pouring of concrete is reduced.
[0044] like Figure 4 , Figure 5 and Figure 6 As shown, the different wall panel modules on both sides of the transverse joint are connected, and the corresponding box-shaped cavities are connected and filled with concrete together. It is understandable that beard ribs can also be reserved at the transverse joint of the wall panel modules, and they can be connected by overlapping, so that ordinary concrete can be used in the box-shaped cavity for one-time casting for the convenience of construction. By connecting the box-shaped cavities and filling them with concrete together, the construction process is simplified, the construction efficiency is improved, and the integrity and strength of the wall are guaranteed at the same time.
[0045] The box-shaped cavity design and the application of UHPC reduce the amount of concrete and the number of pourings, thus shortening the construction period. The addition of stiffeners and tie bars 4, as well as the use of UHPC, significantly improve the strength and rigidity of the wall, making it more suitable for places that require high safety, such as nuclear power plants.
[0046] like Figure 1 As shown, the stiffening ribs are located between adjacent wall panels corresponding to the same wall panel module, which strengthens the connection between the wall panels and improves the overall stiffness of the wall. In addition, at least two spaced stiffening ribs are provided on the wall panel module. Through the arrangement of multiple stiffening ribs, the required box-shaped cavity is formed, which enhances the lateral force resistance of the wall and prevents the wall from deforming too much under horizontal load. The box-shaped cavity facilitates the subsequent filling work and enhances the thermal insulation performance of the wall.
[0047] In this embodiment, the tie bars 4 extend out of the concrete rib 13d, where d is the diameter of the tie bars 4. The tie bars 4 of adjacent wall panel modules are staggered in the horizontal direction, which is convenient for on-site hoisting. The vertical joints of the wall panel modules are closely spliced at the prefabricated layer. The distance between one end of the wall panel module and the nearest stiffening rib is 6.5d, where d is the diameter of the tie bars 4, to ensure the length of the tie bars 4 protruding into another wall panel block.
[0048] like Figure 1 and Figure 2 As shown, a steel cage 7 is provided in the box-shaped cavity. For nodes, corners or weak positions, the bearing capacity of the wall can be improved by adding the steel cage 7, and the seismic performance of the wall can be enhanced. The steel cage 7 vertically penetrates into the box-shaped cavity of different wall panel modules, so that the steel cage 7 can span multiple wall panel modules to form a continuous force system, thereby improving the overall performance of the wall.
[0049] In addition, if Figure 3 As shown, adjacent wall panels of the same wall panel module are connected with shear reinforcement 3, and the types of shear reinforcement 3 include but are not limited to truss reinforcement, tension reinforcement, T-type shear reinforcement, etc. The shear reinforcement 3 is cast in the stiffening ribs during the prefabrication stage, which improves the shear resistance between the wall panels and prevents the wall from being damaged under the shear load. The bearing capacity and seismic performance of the wall are improved, and the shear resistance between the wall panels is enhanced.
[0050] like Figure 1 and Figure 2 As shown, the wall panel module is a prefabricated structure, and the wall panel is pre-embedded with intersecting horizontal wall reinforcements 1 and longitudinal wall reinforcements 2, and the wall panel adopts a prefabricated layer of ordinary concrete 5.
[0051] In order to establish a stable connection between the wall modules in the vertical direction, this embodiment provides a variety of connection forms.
[0052] The stiffening ribs extend vertically to the transverse joints, so that the stiffening ribs can cross the transverse joints to enhance the integrity of the wall. The longitudinal reinforcement 2 in the wall panel extends vertically to the transverse joints. The extension of the longitudinal reinforcement 2 makes the force of the wall more continuous and improves the overall performance of the wall. The longitudinal reinforcement 2 of the wall panel modules corresponding to the transverse joints overlap each other, and the overlap of the longitudinal reinforcement 2 enhances the integrity and force continuity of the wall.
[0053] Based on the above structure, this embodiment provides a first structural form of stable connection of wall modules in the vertical direction, such as Figure 4 As shown, structural reinforcement 12 and a protective layer extend vertically from the end of the wall panel, the structural reinforcement 12 between the wall panel modules corresponding to the transverse joints overlap, the overlapping area of the structural reinforcement 12 is filled with concrete, the protective layer is flush with the side of the wall panel away from the stiffening ribs, restricting the filling range of the concrete, and the structural reinforcement 12 is located on the inner side of the protective layer.
[0054] The addition of structural reinforcement 12 improves the crack resistance of the wall, and the protective layer can protect the wall from erosion by the external environment. The overlap of structural reinforcement 12 further enhances the integrity and force continuity of the wall. The protective layer can restrict the filling range of concrete and prevent concrete overflow or uneven filling. The structural reinforcement 12 is located inside the protective layer to ensure the effective anchoring of the structural reinforcement 12 in the concrete. The crack resistance and durability of the wall are improved, the wall is protected from erosion by the external environment, and the filling range of concrete is restricted.
[0055] Specifically, Figure 4 As shown, in the vertical direction, a horizontal joint is formed between adjacent wall modules, and the stiffening ribs of the wall modules extend outward and extend into the horizontal joint. At the same time, the structural steel bars 12 and the protective layer extend vertically from the ends of the wall panels. The structural steel bars 12 corresponding to the horizontal joint positions between adjacent wall modules overlap, and the protective layer is flush with the outer side of the wall panels, serving as a blocking structure at the horizontal joint position. After the wall modules are aligned vertically, concrete is poured into the box-shaped cavity of the wall modules, and the poured concrete covers the overlapping area of the structural steel bars 12, and the concrete is cast in one step. The exposed gaps of the horizontal joints are smoothed with mortar.
[0056] It can be understood that the reinforcing ribs can be inserted into another wall module to establish a connection, and at the same time, the length of the structural reinforcement 12 and the protective layer is equal to the overlap length of the wall longitudinal reinforcement 2.
[0057] On the basis of the above structure, this embodiment also provides a second structural form of stable connection of wall modules in the vertical direction, such as Figure 5 As shown, the difference between it and the previous connection form is that no structural reinforcement 12 and protective layer are used, but the template 13 is directly connected to the outside of the wall panel. The template 13 is fixed to the wall panel by bolts 14, and the transverse joints are sealed by the template 13 to form a space between the wall panel modules to accommodate the exposed cavity longitudinal reinforcement.
[0058] In this embodiment, a third structural form of stable connection of wall modules in the vertical direction is also provided, such as Figure 6 As shown, a corbel is arranged on the inner side of the wall panel to establish a connection between the upper and lower wall panel modules inside the box-shaped cavity.
[0059] A corbel is provided on one side of the wall panel connected to the stiffening rib, which can strengthen the connection between the wall panel and the stiffening rib and improve the overall performance of the wall. A connecting steel bar 15 is connected to the corbel, and multiple connecting steel bars 15 extend through the transverse joint to another wall panel module. When pouring concrete, the connecting steel bars 15 can reinforce the transverse joint position. The corbel is arranged at the top of the wall panel, and multiple connecting steel bars 15 can be inserted into the box-shaped cavity at the bottom of another wall panel module.
[0060] like Figure 3As shown, the box-shaped cavity and the filling cavity formed by the wall panel module serve as the accommodation space for the foundation reserved steel bars 9. One end of the foundation reserved steel bars 9 is buried in the foundation concrete 8, and the other end extends into the box-shaped cavity. In addition, the foundation reserved steel bars 9 avoid the stiffening ribs. The foundation reserved steel bars 9 are arranged on the foundation and inserted into the box-shaped cavity. The insertion into the box-shaped cavity with a larger space reduces the difficulty of docking, provides better resistance, and reduces the risk of node damage under earthquake action.
[0061] like Figure 3 As shown, floor anchor ribs 11 and connectors 10 are installed at the wall panel nodes. The floor anchor ribs 11 extend into the box-shaped cavity of the wall panel module, and the other end is connected to a steel bar mechanical connector 10. The connector 10 can be connected to the reserved steel bars of the floor structure. The addition of the floor anchor ribs 11 and connectors 10 can enhance the connection performance between the wall and the floor.
[0062] The use of wall panel modules with box-shaped cavities can facilitate the establishment of connections between adjacent wall panel modules in the horizontal and vertical directions. In the horizontal direction, the connection can be established through the tie bars 4 on the internal stiffening ribs in combination with UHPC. The box-shaped section formed by the stiffening ribs can be self-load-bearing. In the vertical direction, the box-shaped cavities inside the wall panel modules can be connected and filled with concrete together, thereby reducing the problem of long curing time caused by multiple pouring of concrete, improving the connection performance to ensure the strength of the entire shear wall, and the connections at the vertical joints and the horizontal joints are all made of prefabricated wall panel modules as templates 13, without the need for traditional scaffolding formwork; the prefabricated tie bars 4 can be staggered in the filling cavity, without the need to tie steel bars, thereby improving construction efficiency.
[0063] Example 2
[0064] In another typical embodiment of the present invention, Figure 1-Figure 6 As shown, a construction method of a box-type double-sided composite shear wall suitable for a nuclear power plant is provided, using the box-type double-sided composite shear wall suitable for a nuclear power plant as in Example 1.
[0065] A construction method for a box-type double-sided composite shear wall suitable for a nuclear power plant, comprising:
[0066] Lifting wall panel modules;
[0067] In the horizontal direction, a filling cavity is formed between adjacent wall panel modules, and the tie bars 4 on the different stiffening ribs are arranged in a staggered manner in the filling cavity, and UHPC is poured into the filling cavity to establish a connection between adjacent wall panel modules in the horizontal direction;
[0068] In the vertical direction, adjacent wall panel modules are connected to each other, and the corresponding box-shaped cavities are connected and filled with concrete to establish the vertical connection between the adjacent wall panel modules.
[0069] Specifically, Figure 1-Figure 6 As shown in the figure, the construction methods of box-type double-sided composite shear walls suitable for nuclear power plants include:
[0070] Tie the horizontal reinforcement and longitudinal reinforcement 2 (on both sides) of the wall, then tie the shear reinforcement 3 and tie reinforcement 4, the tie reinforcement 4 extends out of the stiffening rib 13d, as shown in Figure 1 Install the floor anchor reinforcement 11 and the reinforcement mechanical connector 10 at the slab wall node, as Figure 2 When the prefabricated vertical wall module is located above, it is also necessary to tie the structural steel bars 12 at the transverse joints, such as Figure 4 As shown; then install the lifting lugs for later lifting;
[0071] Set up the formwork 13 and pour the precast layer of ordinary concrete 5. Figure 1 In the calculation, d1 can be 100mm-120mm, d2 can be set according to actual needs, and t1 can be 50mm-80mm. Figure 4 The t2 can be 50mm-60mm, and then the inner wall is roughened (if the template 13 has a groove, the roughening can be omitted), and the Figure 1 , Figure 2 , Figure 4 Wall panel module shown.
[0072] The foundation is roughened on site, covering the contact surface between the foundation and the box-type double-sided composite shear wall suitable for nuclear power plants. The reserved foundation steel bars 9 (1 times the overlap length) reserved for the foundation can be checked using 3D scanning technology to ensure that the reserved foundation steel bars 9 are inside the box-type double-sided composite shear wall during hoisting.
[0073] According to the wall layout, first hoist one wall panel module into place, and then hoist the other wall panel module. For the convenience of construction, vertical positioning can be carried out first, and horizontal positioning can be carried out after the second wall panel module is hoisted 300mm-500mm from the bottom surface.
[0074] According to actual needs, a steel cage 7 can be placed at corners or places with greater stress, and then concrete is poured into the box-shaped cavity of the wall panel module (different grades of concrete can be poured in different cavities according to calculation needs. In principle, the elevation of the post-poured concrete should be higher than that of the precast concrete). UHPC is poured at the vertical joints and cured to the specified strength, and then the vertical joints are smoothed with mortar.
[0075] When hoisting the upper wall panel module, when the distance to the lower wall panel module is only 100mm, the falling speed should be slowed down and calibrated while lowering until the hoisting is completed. In the vertical direction, adjacent wall panel modules should be connected, and the corresponding box-shaped cavities should be connected and filled with concrete together to establish the vertical connection between adjacent wall panel modules. Then, multiple wall panel modules under this height layer should be spliced to complete the horizontal assembly and pouring.
[0076] The box-type double-sided composite shear wall suitable for nuclear power plants is completed.
[0077] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A box-type double-sided composite shear wall suitable for a nuclear power plant, characterized in that: The invention comprises a wall panel module, wherein the wall panel module comprises wall panels arranged at intervals and stiffening ribs connecting adjacent wall panels, wherein the stiffening ribs and the wall panels form a box-shaped cavity; a filling cavity is formed between the stiffening ribs of different wall panel modules on both sides of a vertical joint, and tie bars are arranged on the stiffening ribs, wherein the tie bars extend to the outside of the wall panel module and pass through the vertical joint, and the filling cavity where the tie bars are located is filled with UHPC; the different wall panel modules on both sides of a transverse joint are connected to each other, and the corresponding box-shaped cavities are connected to be filled with concrete together.
2. The box-type double-sided composite shear wall suitable for a nuclear power plant as claimed in claim 1, characterized in that: The stiffening ribs are located between adjacent wall panels corresponding to the same wall panel module. The wall panel module is provided with at least two stiffening ribs distributed at intervals. The box-shaped cavity is located between adjacent stiffening ribs of the same wall panel module.
3. The box-type double-sided composite shear wall suitable for a nuclear power plant as claimed in claim 2, characterized in that: A steel cage is arranged in the box-shaped cavity, and the steel cage vertically extends into the box-shaped cavity of different wall panel modules so that the steel cage is filled in concrete; and shear-resistant steel bars are connected between adjacent wall panels of the same wall panel module.
4. The box-type double-sided composite shear wall suitable for a nuclear power plant as claimed in claim 1, characterized in that: The reinforcing ribs extend vertically to the transverse joints, the longitudinal wall bars in the wall panels extend vertically to the transverse joints, and the longitudinal wall bars of the wall panel modules corresponding to the transverse joints overlap each other.
5. The box-type double-sided composite shear wall suitable for a nuclear power plant as claimed in claim 4, characterized in that: Structural steel bars and protective layers extend vertically from the end of the wall panel, the structural steel bars between the wall panel modules corresponding to the transverse joints overlap, the overlapping area of the structural steel bars is filled with concrete, the protective layer is flush with the side of the wall panel away from the stiffening ribs, restricting the filling range of the concrete, and the structural steel bars are located on the inner side of the protective layer.
6. The box-type double-sided composite shear wall suitable for a nuclear power plant as claimed in claim 4, characterized in that: The outer side of the wall panel is connected with a template, and the template seals the transverse joint.
7. The box-type double-sided composite shear wall suitable for a nuclear power plant as claimed in claim 1, characterized in that: A corbel is provided on one side of the wall panel connecting the stiffening ribs, the corbel is connected to the connecting steel bars, and the connecting steel bars extend through the transverse joint to another wall panel module.
8. The box-type double-sided composite shear wall suitable for a nuclear power plant as claimed in claim 1, characterized in that: The box-shaped cavity and the filling cavity formed by the wall panel module serve as a storage space for reserved reinforcement bars of the foundation. Vertically, the wall panel module at the bottom is fixed to the foundation, and floor slab anchor bars and connectors are installed at the wall panel nodes.
9. A construction method for a box-type double-sided composite shear wall suitable for a nuclear power plant, using the box-type double-sided composite shear wall suitable for a nuclear power plant as claimed in any one of claims 1 to 8, characterized in that: include: Lifting wall panel modules; In the horizontal direction, a filling cavity is formed between adjacent wall panel modules, and the tie bars on different stiffening ribs are arranged in a staggered manner in the filling cavity. UHPC is poured into the filling cavity to establish a connection between adjacent wall panel modules in the horizontal direction; In the vertical direction, adjacent wall panel modules are connected to each other, and the corresponding box-shaped cavities are connected and filled with concrete to establish the vertical connection between the adjacent wall panel modules.
10. The construction method of the box-type double-sided composite shear wall applicable to a nuclear power plant as claimed in claim 9, characterized in that: A steel cage is installed in part of the box-shaped cavity, passes through the box-shaped cavities corresponding to a plurality of wall panel modules, and then filled with concrete.