Cross beam for connecting laminated slabs, cross beam construction method and beam cage formwork construction method for cross beam

By placing barriers and lifting ribs in the beam mold groove, the installation of steel cages is simplified and the installation position is formed on the cross beam, the convenience and stability of the connection between the stacked plate and the beam is solved, and efficient construction process and cost reduction are achieved. effect.

CN119062106APending Publication Date: 2024-12-03GUIZHOU CONSTR ENG GRP NO 5 CONSTR ENG CO
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411251375.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-07
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

In the prior art, after the laminated plate is connected to the beam, it is difficult to achieve convenient and stable connection, and the construction cost is high and the support system is complex.

Method used

The beam mold groove preparation method is adopted. By placing barriers and lifting ribs in the beam mold groove, the installation process of the steel cage is simplified, and after the beam is poured, an installation position is formed on the beam, which facilitates the installation and connection of the laminated plates and reduces the Construction difficulty and cost.

Benefits of technology

It realizes convenient connection between the laminated plate and the beam, improves connection stability, simplifies the construction process, reduces the construction cost and the complexity of the support system, shortens the construction cycle, and ensures construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119062106A_ABST
    Figure CN119062106A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of laminated slab installation and construction, in particular to a cross beam for connecting laminated slabs, a cross beam construction method and a beam cage formwork construction method for the cross beam, a beam formwork construction process is improved, a barrier piece is introduced and installed on a side plate used by a beam formwork groove, meanwhile, a reinforcement cage construction process is improved, and when a reinforcement cage is placed in the beam formwork groove, the barrier piece is installed on the side plate used by the beam formwork groove. The cantilever ribs are inserted, and construction and installation between the blocking pieces and the cantilever ribs are combined, so that the installation difficulty of the reinforcement cage in the beam cage mold is simplified, and the labor intensity is reduced; besides, after concrete is poured into the formed beam mold grooves, structures with cantilever ribs exposed out of the cross beams can be formed on the left side and the right side of the beam correspondingly, and after beam column frame structures are formed after beam pouring is completed, composite slabs can be installed in frames constructed by the cross beams conveniently, and the composite slabs can be connected with a reinforcement cage system in the beam into a whole advantageously.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of installation and construction of composite plates, and in particular to a crossbeam for connecting composite plates, a crossbeam construction method, and a beam cage mold construction method for the crossbeam. Background Art

[0002] With the rapid development of prefabricated building construction, the construction of composite slabs has been extensively studied and promoted, and a large number of composite slab construction technologies have been formed.

[0003] For example: In order to solve the defects of long tower crane occupancy time, low composite plate installation efficiency, high labor intensity and high cost, the patent announcement number is CN110700418B, and the patent name is a construction process of a composite plate installation trolley cooperating with a tower crane to install the composite plate, which discloses the following steps: the trolley moves to the designated area below the installation position of the composite plate; the top support is adjusted to rise above the top surface of the beam-column structure, the tower crane lifts the composite plate, and places the composite plate on the top surface of the top support; the trolley moves to fine-tune the position of the composite plate; vertical poles are erected under the four corners of the composite plate; the top support descends, and the beam-column structure and the poles catch the composite plate; the top support continues to descend, the top support is separated from the composite plate, and the trolley moves to the bottom of the installation position of the next composite plate; steps one to five are repeated until the last composite plate of the floor; the tower crane lifts the trolley away from the construction floor; the tower crane lifts the last composite plate, and manually assists in installing it to the designated position.

[0004] Another example: In order to reduce the steel pipes and wooden planks required for the on-site support system, reduce labor, and save material and engineering costs, the patent announcement number is CN106193589B, and the patent name is Concrete super-high and heavy beam and composite plate combined structure support method, which discloses the following: installing super-high and super-heavy frame beam support frames and installing composite plate support frames; using Bailey frames for super-high and super-heavy frame beam formwork support frames; installing frame beam bottom formworks and installing frame beam side formworks; setting composite plate support rods on both sides of the frame beam side formworks; installing composite plate support frames after the beam reinforcement is tied; installing composite plate special support rods; and installing composite plate supporting I-beams on the top of the special support rods for composite plates.

[0005] Another example: in order to solve the problem that after the steel cage is tied outside the prefabricated composite slab beam, the tied steel cage cannot be put into the prefabricated composite slab beam; the main bars of the steel cage are arranged up and down along the reserved steel bars, and the steel cage has been tied before it reaches the bottom of the prefabricated composite slab beam, which solves the problem of inconvenient tying the steel bars at the bottom of the prefabricated composite slab beam. The patent publication number is CN116201373A, and the patent name is a prefabricated composite slab system beam erecting device and its construction method. It discloses a vertical lifting mechanism, and a transverse telescopic mechanism for supporting the main bars of the prefabricated composite slab beam is provided on the lifting end of the vertical lifting mechanism; two groups of the main bars are arranged up and down along the reserved steel bars, and beam stirrups are provided on the two groups of main bars arranged up and down to form a steel cage of the prefabricated composite slab beam.

[0006] It can be seen that a large number of technical studies have been carried out in the prior art during the installation and construction of composite panels, which has led to effective support for composite panels when installed between beam frame structures, reducing the raw materials of the support system, reducing labor intensity, and then reducing costs. At the same time, the technical obstacles that make it difficult to put the steel cage in the beam when installing the steel cage in the beam after the composite panel is installed have also been studied and solved. However, in the prior art, there are no relevant reports on how to ensure that the connection between the composite panel and the beam is more convenient and the connection stability is better when the composite panel is installed between the frames formed by beams and columns after the beam construction is completed in advance, and after the composite panel is installed, the post-beam concrete layer construction process is carried out. Summary of the invention

[0007] Based on the above technical problems, the research team of the invention has conducted a project research from the perspectives of improving the convenience and stability of installation and construction between beams and composite plates, reducing construction costs and simplifying the support system, by pre-casting the beam-column frame structure and then installing the composite plates between the beam frames. The project provides a new construction process for the beam construction process and beam cage mold construction in the process of connecting composite plates and beams, and then provides beams for connecting composite plates, beam construction methods, and beam cage mold construction methods.

[0008] The specific technical solution is:

[0009] One of the purposes of the invention is to provide: a construction method for a beam cage mold for connecting a composite plate cross beam, comprising the following steps:

[0010] S1: Preparation of beam mold groove: Cut the template for concrete pouring into a side plate, open a plurality of through holes near the top of the side plate, and the through holes are radially perpendicular to the direction from the left side to the right side of the side plate, and the through holes are arranged along the length direction of the side plate; Cut the template for concrete pouring or foam board into a barrier, and the barrier is provided with a connection position and a positioning hole, the connection position is arranged corresponding to the through hole, and the positioning hole is opened on the side of the barrier, and the height from the bottom end of the barrier to the connection position is ≤ half of the height from the top end to the bottom end of the side plate; Cut the template for concrete pouring into a bottom plate, and connect the bottom end of the side plate with the upper surface of the bottom plate near the end to form a beam mold groove;

[0011] S2: Take a number of main bars and a number of annular bars for a concrete beam, and tie the main bars and the annular bars into a steel cage; prepare cantilever bars by cutting steel, and the length of the cantilever bars is greater than the width of the steel cage;

[0012] S3: Place the steel cage in step S2 into the beam mold groove in step S1, and at the same time, insert a number of the pick bars into the steel cage, and the pick bars are inserted in a direction perpendicular to the main bars; place the barrier in the beam mold groove, insert the end of the pick bar into the positioning hole, and then align the connection position with the through hole, and use the connecting piece to pass through the through hole to connect the connection position.

[0013] By improving the construction process of the beam mold groove, a barrier is introduced and installed on the side plate used for the beam mold groove. At the same time, by improving the construction process of the steel cage, when the steel cage is placed in the beam mold groove, the cantilever reinforcement is used for insertion, and the construction and installation relationship between the barrier and the cantilever reinforcement is combined, which simplifies the difficulty of installing the steel cage in the beam cage mold and reduces the labor intensity; and also makes it possible for the formed beam mold groove to form a structure in which the cantilever reinforcement exposes the cross beam on the left and right sides of the beam after the concrete is poured, so that after the cross beam is poured to form a beam-column frame structure, the composite plate can be installed between the frames constructed by the cross beam, which helps to connect the composite plate with the steel cage system in the beam into a whole.

[0014] In order to reduce the cost of the raw materials for the beam mold groove template, the present invention creates the concrete pouring template including but not limited to one of a wooden board, an iron board, and a plastic board, as long as the corresponding requirements for the template material for the construction site are met.

[0015] In order to ensure that the structural size specifications of the installation position formed by subsequent casting are met, and to ensure that the cantilever reinforcement can be exposed from the installation position on the beam to facilitate connection when the composite plate is subsequently installed, preferably, in step S3, after the connecting member passes through the through hole to connect the connecting position, the blocking member can be close to the inner wall of the beam mold groove.

[0016] In order to simplify the beam mold groove construction process and reduce the cost of raw materials, preferably, the connecting piece is a nail or a steel needle. Or the connecting piece is a bolt, and the connecting position is provided with an internal threaded hole that can match the bolt, and the bolt can pass through the through hole and be screwed into the internal threaded hole.

[0017] In order to enhance the stability of the connection between the side plate and the barrier member and avoid displacement; and to prevent the connecting member from falling off the side plate, thereby facilitating the storage and transportation of the side plate, preferably, the through hole is provided with an internal thread that can match the bolt.

[0018] In order to facilitate the connection between the side plate and the bottom plate to form a beam mold groove structure, preferably, the bottom of the side plate is provided with a plurality of fixing holes, and the fixing holes are arranged along the length direction of the side plate, and the axial direction of the fixing holes is along the height direction of the side plate; the bottom plate is provided with a plurality of fixing positions that can match the fixing holes, and the fixing positions are connected to the fixing holes through connecting pieces; the connecting pieces are bolts, and the fixing positions are provided with internal threads that can match the bolts; the fixing positions are through holes that can penetrate the upper and lower surfaces of the bottom plate, and the bolts can pass through the through holes. More preferably, the through holes are provided with internal threads that match the bolts.

[0019] In order to ensure that after the subsequent casting of the cross beam to form the installation position, the size of the installation position can meet the connection and installation of the composite plate, and improve the convenience of the connection and installation between the composite plate and the beam, preferably, the length of the barrier along the length direction of the side plate is at least 8 cm; the width of the barrier along the width direction from the left side to the right side of the side plate is less than the distance between the edge of the steel cage and the inner wall of the beam mold groove, and the width of the barrier along the width direction from the left side to the right side of the side plate is at least 2 cm.

[0020] In order to avoid exposed reinforcement in the steel cage formed by casting and ensure that the concrete completely wraps the steel cage, preferably, the difference between the distance between the edge of the steel cage and the inner wall of the beam mold groove and the width of the barrier along the left to right width direction of the side plate is at least 0.5 cm.

[0021] The second purpose of the present invention is to provide a construction method for connecting composite slab crossbeams, including steps S1, S2 and S3 described in the above-mentioned beam cage formwork construction method; and also including step S4: pouring concrete into the beam cage formwork structure obtained by the beam cage formwork construction method, and removing the beam formwork groove and the barrier after curing, so that the barrier is detached from the cantilever reinforcement to form an installation position, thereby obtaining a crossbeam.

[0022] After the construction of the beam cage formwork, barrier pieces are set on the side plates of the beam formwork groove and cantilever bars are inserted in the steel cage to form a beam cage formwork structure for pouring the beam. After the concrete is poured to form the beam, a number of installation positions can be formed on the beam, and the installation positions have cantilever bars for connecting the composite plates. After the beam is poured, the composite plates are installed in the beam frame so that the composite plates are cantilevered on the left and right sides of the beam. At the same time, a groove-shaped installation position structure is formed on the beam, and then the plate bars are tied and a concrete layer is poured on the upper surface of the composite plate. This helps to form a whole at the connection between the composite plate and the beam, thereby improving the installation stability of the composite plate. It can also help to reduce the supporting force required by the bottom support system of the composite plate, thereby improving construction safety.

[0023] The third purpose of the invention is to provide a crossbeam for connecting composite panels, which is constructed according to the above crossbeam construction method. The crossbeam structure includes a plurality of installation positions, and the installation positions are arranged along the length direction of the crossbeam; the crossbeam is formed by placing a steel cage in a beam mold groove and pouring concrete. When the composite panel is connected to the crossbeam through the installation position, the composite panel and the steel cage in the crossbeam can be integrally connected to ensure stability.

[0024] Specifically, when the crossbeam structure and the composite plate are installed, the construction method is:

[0025] A fixed rib structure corresponding to the installation position is led out on the composite plate, the fixed rib is connected to the steel bars in the composite plate (for example, in contact, hooked, tied) as a whole, and it is ensured that the fixed rib is not easy to fall off the composite plate, and then the composite plate is hoisted into the frame constructed by the beam by a crane, so that the fixed rib is located in the installation position, and the fixed rib is connected to the cantilever bars in the installation position by welding or tying. At the same time, a support system (such as scaffolding and other supports) is used at the bottom of the composite plate. After the composite plate in the entire frame constructed by the entire beam is hoisted and pressed, the plate surface steel bars are tied on the upper surface of the composite plate so that the plate surface steel bars can be connected to the fixed ribs and cantilever bars, and then the concrete covering layer is poured to complete the installation of the composite plate and the construction of the plate surface. This allows the composite slab to be hung on the left and right sides of the beam by the cantilever ribs, avoiding the need for too many scaffolding or other supporting systems to support the connection between the composite slab and the beam, helping to reduce the cost of scaffolding raw materials and other costs, improving construction efficiency, and ensuring that the subsequently installed composite slab can be connected to the beam as a whole, helping to improve stability.

[0026] In order to ensure that the installation positions are spaced at reasonable intervals and to enhance the stability of the connection between the composite plate and the crossbeam, preferably, the spacing between adjacent installation positions on the crossbeam is 15-40 cm.

[0027] Preferably, the length of the installation position along the length direction of the beam is at least 8 cm; the width of the installation position along the width direction of the beam is at least 2 cm, and the width of the installation position along the width direction of the beam is less than the thickness of the concrete from the edge of the beam to the edge of the steel cage.

[0028] Preferably, the difference between the thickness of the concrete between the edge of the beam and the edge of the steel cage and the width of the installation position along the width direction of the beam is at least 0.5 cm.

[0029] In order to ensure the strength of the connection point between the installation position and the composite plate and to improve the connection stability between the pick-up ribs and the composite plate, preferably, at least two pick-up ribs are provided in the installation position.

[0030] Compared with the prior art, the technical effects created by the present invention are embodied in:

[0031] Through the improvement of the beam cage formwork construction process, the installation of cantilever reinforcement and barrier parts can be realized, the beam cage formwork construction process is simplified, and the construction process is reduced; at the same time, it can ensure that after the beam is cast using the beam cage formwork, an installation position that is convenient for the connection and installation of the composite plate can be formed on the beam, ensuring that after the beam casting construction is completed, when the composite plate is installed between the frames constructed by the beam, the overall stability of the connection between the composite plate and the beam is guaranteed, avoiding the need to build too many scaffolding support systems at the bottom of the composite plate, shortening the construction period, and ensuring construction safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] The present invention is convenient for those skilled in the art to fully understand the technical solution of the present invention. In combination with the content of the technical solution and the provided drawings, the following description is made for the provided drawings. The directional words described in the present invention, such as: up, down, front, back, left, right, etc., are all descriptions made in combination with and facing the following drawings for easy understanding, and are not limitations on the technical solution of the present invention.

[0033] Figure 1 A construction flow diagram is created for the present invention.

[0034] Figure 2 Schematic diagram of the steel cage structure.

[0035] Figure 3 for Figure 2 Schematic diagram of the three-dimensional structure.

[0036] Figure 4 This is a structural schematic diagram of the steel cage installed in the beam mold groove.

[0037] Figure 5 Schematic diagram of the side panel structure.

[0038] Figure 6 for Figure 5Schematic diagram of the cross-sectional structure along the AA axis.

[0039] Figure 7 This is a schematic diagram of the composite slab structure installed after the beam casting is completed.

[0040] Figure 8 for Figure 7 Another schematic diagram of the structure of the embodiment.

[0041] Fig. 9 for Figure 7 or Figure 8 Another schematic diagram of the structure of the embodiment.

[0042] Fig.10 This is a schematic diagram of the structure looking down after the composite plates are installed between the beams.

[0043] 1-main reinforcement 2-ring reinforcement 3-cantilever reinforcement 4-side plate 5-bottom plate 6-barrier 7-connector 8-positioning hole 9-through hole 10-connection position 11-fixing hole 12-column reinforcement cage 13-concrete column 14-cross beam 15-installation position 16-extension reinforcement 17-composite plate 18-truss 19-fixing reinforcement 20-fixing part 21-chamfered mouth 22-matching position. DETAILED DESCRIPTION

[0044] In order to facilitate those skilled in the art to correctly understand the present invention and to fully understand the technical content of the present invention, the technical scheme of the present invention is further elaborated below in conjunction with specific implementation methods, but the elaboration does not limit the scope of protection required for the present invention. The scope of protection of the present invention by those skilled in the art cannot be limited to the following elaboration. Any equivalent substitutions or changes made by any those skilled in the art or persons familiar with the technology in the art based on the present invention and the technical scheme and inventive concept thereof should be covered within the scope of protection of the present invention.

[0045] like Figure 1 and Figure 4 and Figure 5 and Figure 6 As shown, in certain embodiments, the present invention provides a method for constructing a beam cage formwork for connecting composite plate cross beams, comprising the following steps:

[0046] S1: Take a template for concrete pouring (for example: a wooden board, an iron board, an aluminum board, a plastic board, etc.) and cut it into a side plate 4, and open a plurality of through holes 9 near the top of the side plate 4, and the through holes 9 are radially perpendicular to the direction from the left side to the right side of the side plate 4, and the through holes 9 are arranged along the length direction of the side plate 4; take a template for concrete pouring (for example: a wooden board, an iron board, an aluminum board, a plastic board, etc.) or a foam board and cut it into a barrier 6, and the barrier 6 is provided with a connecting position 10 and a positioning hole 8, the connecting position 10 is arranged corresponding to the through hole 9, and the positioning hole 8 is opened on the side of the barrier 6, and the height from the bottom end of the barrier 6 to the connecting position 10 is ≤ one half of the height from the top end to the bottom end of the side plate 4 (for example Figure 4 , Figure 5 and Figure 6 Take a concrete pouring template (such as a wooden board, iron board, aluminum board, plastic board, etc.) and cut it into a bottom plate 5, connect the bottom end of the side plate 4 with the upper surface of the bottom plate 5 near the end to form a beam mold groove (such as Figure 4 and installing the beam mold groove by using scaffolding support;

[0047] S2: Take a number of main reinforcement 1 and annular reinforcement 2 for the concrete beam, as shown in the following figure. Figure 2 , Figure 3 and Figure 4 As shown, the main reinforcement 1 and the annular reinforcement 2 are tied to form a steel cage; the same material as the main reinforcement 1 or the annular reinforcement 2 or other steel bars are cut into pick-up reinforcement 3, and the length of the pick-up reinforcement 3 is greater than the width of the steel cage;

[0048] S3: Place the steel cage formed by binding in step S2 into the beam mold groove described in step S1, and insert a plurality of the pick bars 3 into the steel cage, and the pick bars 3 are inserted in a direction perpendicular to the main bars 1; place the barrier 6 in the beam mold groove so that the end of the pick bar 3 is inserted into the positioning hole 8, and then align the connecting position 10 with the through hole 9, and use a connecting member 7 (such as a nail, etc.) to pass through the through hole 9 to connect the connecting position 10, so that the barrier 6 is fixedly installed on the side plate 4, and the following can be formed. Figure 4 As for this embodiment, other matters not covered can be constructed by referring to the prior art or common knowledge known to those skilled in the art, and conventional technical means can be used, such as: steel cage binding and forming, cutting methods when cutting side plates 4, bottom plates 5, and barrier members 6, and beam mold grooves are supported by scaffolding.

[0049] The invention is based on the research on the construction method of the beam cage formwork. During the construction of the beam cage formwork, when the steel cage is placed into the beam mold groove, the pick reinforcement 3 is inserted, and the length of the pick reinforcement 3 is greater than the width of the steel cage, so that the left and right ends of the pick reinforcement 3 can be extended from the steel cage; in the process of installing the beam mold groove, a barrier 6 is made and installed on the side plate 4, and a positioning hole 8 is set on the barrier 6. The end of the pick reinforcement 3 is inserted into the positioning hole 8 so that the pick reinforcement 3 is fixed. At the same time, the barrier 6 is installed on the side of the side plate 4, so that a number of protrusions can be formed on the side plate 4 into the beam mold groove, so that after the casting of the beam is completed, a mounting position 15 (such as Figure 7 and Figure 8 and Fig. 9 and Fig.10 The construction method is simple, the construction process is simple, easy to operate and the cost is low. The materials of the main reinforcement 1, the annular reinforcement 2 and the cantilever reinforcement 3 used in the above embodiment can be selected by those skilled in the art according to the needs during the crossbeam construction process.

[0050] In certain embodiments of the present invention, after the installation of the beam cage formwork is completed according to the above-mentioned beam cage formwork construction method, the construction of the beam that is convenient for the connection and installation of the composite plate can be completed by pouring concrete, so that a number of installation positions 15 that are convenient for the installation of the composite plate can be formed on the poured beam, which helps to reduce the difficulty of the installation construction of the composite plate and ensure the stability of the connection between the composite plate and the beam.

[0051] like Figure 4 As shown, in some embodiments, the connecting member 7 is a bolt, and the connecting position 10 is provided with an internal thread hole that can match the bolt; the bolt is screwed into the connecting position 10, so that the bolt matches the internal thread in the internal thread hole, so that the barrier 6 is fixed to the side plate 4. Improve the convenience of construction and installation, and ensure stability. In some embodiments, if the barrier 6 is made of foam material, it is more appropriate to use nails, steel needles, etc. as the connecting member 7, so that the steel needle or nail is inserted into the connecting position 10 through the through hole 9 to complete the connection. In some embodiments, the through hole 9 is provided with an internal thread that can match the bolt, so that the bolt as the connecting member 7 is screwed into the through hole 9, and after the thread matching connection, it is screwed into the internal thread hole on the connecting position 10, thereby enhancing the connection stability between the barrier 6 and the side plate 4. At the same time, it can also enable the bolt as the connecting member 7 and the side plate 4 to maintain integrity when stored, avoid the defect that loss causes the need to be re-equipped during construction, and help to improve the construction progress and reduce the cost of construction materials.

[0052] like Figure 4 and Figure 6 As shown, in some embodiments, the bottom of the side plate 4 (such as Figure 4 , Figure 5and Figure 6 As shown, located at the bottom of the figure) is provided with a plurality of fixing holes 11, and the fixing holes 11 are arranged along the length direction of the side plate 4, and the axial direction of the fixing holes 11 is along the height direction of the side plate 4 (as shown Figure 4 , Figure 5 and Figure 6 As shown, in the direction from the lower end to the upper end); the bottom plate 5 is provided with a plurality of fixing positions that can match the fixing holes 11, and the fixing positions are connected to the fixing holes 11 through the connector 7, so that the bottom plate 5 and the side plate 4 are connected as a whole. This embodiment belongs to the connection method commonly used by technicians in the field of beam mold groove construction and installation, but the invention has made the following improvements to this: by setting a plurality of fixing holes 11 at the bottom of the side plate 4, the side plate 4 and the bottom plate 5 are connected to the fixing positions through the fixing holes 11 through the connector 7, which helps to reduce the construction difficulty and improve the convenience, and ensure the accuracy of installation. In some embodiments, the connector 7 is a bolt, and the fixing position is a through hole that passes through the upper and lower surfaces of the bottom plate 5. The fixing hole 11 is provided with an internal thread that matches the bolt. The bolt passes through the through hole and is screwed into the internal thread to achieve the connection between the side plate 4 and the bottom plate 5, which improves the convenience of installation and construction and helps to improve construction efficiency. In some other embodiments, the through hole is provided with an internal thread matching the bolt, which helps to store the bolt and the bottom plate 5 as a whole, avoids the defect of losing parts and needing to be re-equipped during construction, and also improves the stability of the connection between the bottom plate 5 and the side plate 4. In this embodiment, after the bottom plate 5 and the side plate 4 are combined into a beam mold groove, it is common knowledge and conventional technical means well known to those skilled in the art to support the beam mold groove with a scaffold, so it can be constructed according to the existing technology of supporting the beam mold groove with an existing scaffold or common knowledge and conventional technical means.

[0053] like Figure 4 and Figure 5 and Figure 6 As shown, in some embodiments, the length of the barrier 6 along the length direction of the side plate 4 is at least 8 cm. After the beam cage mold is constructed, a protrusion at least 8 cm long along the length direction of the side plate 4 is formed in the beam mold groove, so that when pouring concrete, a protrusion is formed. Figure 7-10 After the cross beam 14 is formed, a mounting position 15 of at least 8 cm long is formed along the length direction of the side plate 4 to ensure that the composite plate and the beam are connected and installed conveniently, and to ensure that after the beam and the composite plate are installed, they can form a bite assembly along the length direction of the side plate 4 after the concrete is poured, thereby improving stability. Figure 4 and Figure 5 and Figure 6As shown, in some embodiments, the width of the barrier 6 along the width direction of the side plate 4 (from the left to the right) is at least 2 cm, and the width of the barrier 6 along the width direction of the side plate 4 (from the left to the right) is less than the distance between the edge of the steel cage and the inner wall of the beam mold groove; this can avoid the formation of the following when pouring concrete: Figure 7-10 When the cross beam 14 structure is shown, the main reinforcement 1 or the ring reinforcement 2 in the steel cage is exposed, which affects the force bearing performance of the cross beam 14. In some embodiments, the absolute value of the difference between the width of the barrier 6 along the width direction of the side plate 4 (from the left to the right) and the distance between the edge of the steel cage and the inner wall of the beam mold groove is at least 0.5 cm, so that after the concrete is poured, it can be Figure 7-10 The installation position 15 shown is wrapped with a steel cage to prevent the steel cage from exposing its steel bars.

[0054] like Figure 2 , Figure 3 , Figure 4 , Figure 7 , Figure 8 , Fig. 9 and Fig.10 As shown, in some embodiments, the length of the pick-up bar 3 inserted into the positioning hole 8 is equal to the depth of the positioning hole 8 along the width direction of the barrier 6, so that the pick-up bar 3 can be tightly fixed by the barrier 6 to avoid displacement during the concrete pouring process.

[0055] like Figure 4 As shown, in some embodiments, the positioning hole 8 is through-hole along the width direction of the barrier 6, that is, the positioning hole 8 passes through the left side to the right side of the barrier 6; this enables the rib 3 to be set to a longer length, ensuring that when the composite board is subsequently installed, the rib 3 is used to connect and install with the composite board, thereby improving the installation stability.

[0056] like Figure 2 and Figure 3 As shown, in some embodiments, the pick ribs 3 are arranged in a direction perpendicular to the main ribs 1, and the pick ribs 3 are arranged in a horizontal direction.

[0057] like Figure 2 and Figure 3 As shown, in some embodiments, the pick reinforcement 3 is arranged between the adjacent ring reinforcements 2, and a plurality of reinforcing ribs are also provided between the adjacent ring reinforcements 2. This helps to improve the overall stability of the steel cage and ensure strength. In some embodiments, a plurality of reinforcing ribs are provided between the adjacent main reinforcements 1 to improve the overall strength and stability of the steel cage.

[0058] like Figure 2 and Figure 3As shown, in some embodiments, at least two cantilever bars 3 are arranged between the adjacent ring bars 2. This facilitates the subsequent installation of the composite plate, and the steel bars are drawn out from the composite plate to connect them into a whole, thereby reducing the difficulty of connecting the composite plate with the beam, improving the convenience and stability of the construction of the connection between the composite plate and the beam, and reducing the construction difficulty.

[0059] like Figure 5 As shown, in some embodiments, the spacing between two adjacent barrier members 6 installed on the side plate 4 is 15-40 cm. Figure 7-10 After the beam 14 is shown, the spacing between adjacent installation positions 15 on the beam 14 is at an appropriate distance, which ensures the stability of the installation of the composite plate and the beam and improves the formation of an interlocking component with appropriate density at the installation position 15 after the concrete is poured, thereby improving the stability of the connection between the composite plate and the beam.

[0060] The researchers who created the present invention have conducted a research project on the connection structure between the composite plates and the beams, and have achieved improvements in the stability and convenience of the connection between the composite plates and the beams, thereby reducing the construction difficulty and cost of the connection between the composite plates and the beams.

[0061] The invention is created during the research process, taking into account the particularity of the beam-column structure, that is: Figure 7-10 As shown, the beam-column structure is usually formed by a concrete column 13 and a crossbeam 14 erected on the concrete column 13, so that the building body is a frame structure. In order to be able to continuously increase the height upward, a column reinforcement cage 12 is arranged inside the concrete column 13, and the column reinforcement cage 12 is continuously connected and extended upward to achieve the purpose of raising the concrete column 13, and then building a high-rise building; and when the frame structure is built to the floor height, it is necessary to construct a crossbeam 14 structure, so it is necessary to cross-install the reinforcement cage located in the crossbeam 14 with the column reinforcement cage 12, and then pour concrete to form a structure as shown in FIG. Figure 7-10 The beam-column structure shown. The composite slab is usually installed in a frame surrounded by a crossbeam 14. Therefore, the connection between the crossbeam 14 and the composite slab 17 will be a technical problem that technicians in this field need to overcome. When installing the traditional composite slab 17, a truss 18 is set up, and the truss 18 is fixedly connected to the steel structure in the top concrete layer that needs to be cast in place, while the composite slab 17 and the crossbeam 14 are only close together, resulting in the need to set up a large number of scaffolding at the bottom to support the composite slab 17. Therefore, based on this technical defect, the research members of this research team proposed the consideration of the connection structure between the composite slab 17 and the crossbeam 14, and then formed the construction technical scheme and several corresponding structural technical schemes created by the present invention. Compared with the prior art, the improvements in the structural technical scheme specifically include:

[0062] like Figure 2 and Figure 3As shown, the steel cage for connecting the composite slab cross beams includes: main reinforcement 1 and annular reinforcement 2, and the main reinforcement 1 is tied and fixed into a whole by the annular reinforcement 2; the steel cage is inserted with cantilever reinforcement 3, and the cantilever reinforcement 3 is inserted in a direction perpendicular to the main reinforcement 1, and the cantilever reinforcement 3 is arranged horizontally. By using the structure of inserting cantilever reinforcement in the steel cage, after the concrete is poured into the cross beam, the structure of the composite slab can be cantilevered on both sides of the cross beam, which is convenient for the subsequent connection and installation of the composite slab and the cross beam.

[0063] like Figure 4 As shown, the beam cage mold structure for connecting the cross beams of the composite plate includes a beam mold groove and a steel cage, the steel cage is placed in the beam mold groove, and a plurality of protruding components are provided in the beam mold groove, and a pick-up bar 3 is inserted in the steel cage; the protruding components are arranged along the length direction of the beam mold groove, and the protruding components are close to the inner wall of the top of the beam mold groove; the protruding components are provided with positioning holes 8, and the pick-up bar 3 can be inserted into the positioning holes 8. In some embodiments, the protruding components are blocking members 6. After pouring concrete to form the cross beam 14, an installation position 15 can be formed on the cross beam 14 to facilitate the subsequent installation and connection of the composite plate 17.

[0064] like Figure 2-3 As shown in 7-10, the crossbeam of the connected composite slab includes a concrete layer and a steel cage, wherein the steel cage is located in the concrete layer, and a plurality of cantilever bars 3 are inserted into the steel cage, and a plurality of mounting positions 15 are provided at the top of the concrete layer, and the cantilever bars 3 are inserted from the mounting positions 15; specifically, the crossbeam structure is a crossbeam structure formed after pouring concrete through the above-mentioned beam cage mold structure.

[0065] When the crossbeam structure is used to install the composite board, a composite board structure compatible with it can be adopted, such as Figure 7-10 The structure of the composite plate 17 shown. The composite plate structure commonly used in the prior art can also be adopted. A hole corresponding to the installation position 15 is opened on the edge of the composite plate, and a steel bar is inserted into the hole as an extension bar 16. The depth of the hole can allow the extension bar 16 to be inserted into the composite plate by at least 5 cm. The hole is filled with post-cast concrete so that the extension bar 16 is fixed on the edge of the composite plate. The extension bar 16 is then aligned with the installation position 15 so that the extension bar 16 is inserted into the installation position 15, so that the extension bar 16 is fixedly connected to the cantilever bar 3, and the truss 18 at the top of the composite plate is fixedly connected to the steel bar structure in the post-cast concrete layer, and then post-cast concrete is performed, so that the connection between the composite plate and the beam 14 is more stable. At the same time, in the process of hoisting the composite plate, the connection between the cantilever bar 3 and the extension bar can be used to make the composite plate and the beam 14 cantilevered together, which helps to reduce the support force required for the bottom scaffolding support and ensure construction safety. It also ensures the integrity of the connection between the composite plate and the beam.

[0066] In addition, in order to not change the existing beam structure, the inventors of the present invention connected the composite plate and the beam into a whole by drilling holes and installing reinforcement bars on the beam structure, and the composite plate, the post-cast concrete layer and the beam were interlocked and connected by a post-cast concrete layer. Therefore, the composite plate structure that is convenient for connection to the beam is designed. Figure 7-10 , including a concrete layer and a matching position 22 set along the edge of the concrete layer, a plate steel bar is arranged in the concrete layer, a fixing bar 19 is arranged on the matching position 22, one end of the fixing bar 19 is connected to the plate steel bar, and a truss 18 is arranged on the top of the concrete layer, and the truss 18 is connected to the plate steel bar. When in use, firstly, holes are punched on both sides of the beam to install the pick bars corresponding to the matching position 22, and then the composite board in the embodiment is hoisted to the position by a crane, so that the pick bars are installed corresponding to the matching position 22, the pick bars are fixedly connected to the fixing bar 19, and then the truss 18 is connected and fixed to the steel bar structure in the post-cast concrete layer, and the concrete is poured, and the connection and installation of the composite board and the crossbeam are completed, which ensures the stability of the connection between the composite board and the crossbeam. At the same time, it can reduce the supporting force required for the scaffolding support at the bottom of the composite board during the construction process, and ensure construction safety. Specifically, the scaffolding construction and support during the installation process belong to the conventional technical means and common knowledge of those skilled in the art, and those skilled in the art can implement them according to the prior art or the common knowledge mastered by those skilled in the art, and conventional technical means.

[0067] In addition, the above-mentioned composite plate structure can also be installed in conjunction with the beam structure obtained in the invention. During installation, it is only necessary to install the matching position 22 and the installation position 15 correspondingly, so that the fixed reinforcement 19 and the cantilever reinforcement 3 are connected as a whole, and then the concrete is poured to complete the installation of the beam and the composite plate.

[0068] In some embodiments, when the connection length between the fixed rib 19 and the pick rib 3 is insufficient, the extension rib 16 can be fixedly connected to the fixed rib 19 or the pick rib 3, so that the fixed rib 19 and the pick rib 3 are connected as a whole. For the fixed connection in this embodiment, welding or binding and other technical means can be used.

[0069] In some embodiments, in order to facilitate construction, a fixing piece 20 is provided on the fixing rib 19 to facilitate the fixed connection between the fixing rib 19 and the cantilever rib 3, thereby improving the convenience of construction.

[0070] In some embodiments, the top edge of the matching position 22 is provided with a chamfer 21, which reduces the overall structural weight of the composite slab and helps to make the top of the matching position 22 fit closely with the post-cast concrete layer surface.

[0071] Other matters not covered by the present invention may be achieved by conventional technical means with reference to the prior art or common knowledge known to those skilled in the art, for example, the construction of scaffolding during the construction process.

Claims

1. A construction method for a beam cage formwork for connecting composite slab beams, characterized in that: The following steps are involved: S1: Preparation of beam mold groove: Take a template for concrete pouring and cut it to prepare a side plate (4), open a plurality of through holes (9) near the top of the side plate (4), and the through holes (9) are radially perpendicular to the left to right direction of the side plate (4), and the through holes (9) are arranged along the length direction of the side plate (4); Take a template for concrete pouring or a foam board and cut it to prepare a barrier (6), the barrier (6) is provided with a connection position (10) and a positioning hole (8), the connection position (10) is arranged corresponding to the through hole (9), and the positioning hole (8) is opened on the side of the barrier (6), and the height from the bottom end of the barrier (6) to the connection position (10) is ≤ half of the height from the top end to the bottom end of the side plate (4); Take a template for concrete pouring and cut it to prepare a bottom plate (5), connect the bottom end of the side plate (4) with the upper surface of the bottom plate (5) near the end to form a beam mold groove; S2: taking a plurality of main bars (1) and a plurality of annular bars (2) for a concrete beam, and tying the main bars (1) and the annular bars (2) into a steel cage; preparing pick bars (3) by cutting steel, and the length of the pick bars (3) is greater than the width of the steel cage; S3: Place the steel cage of step S2 into the beam mold groove of step S1, and at the same time, insert a plurality of the pick bars (3) into the steel cage, and insert the pick bars (3) in a direction perpendicular to the main bars (1); place the barrier (6) into the beam mold groove, insert the end of the pick bar (3) into the positioning hole (8), and then align the connection position (10) with the through hole (9), and use the connection member (7) to pass through the through hole (9) to connect the connection position (10).

2. The construction method of the beam cage formwork for connecting the composite slab cross beams as claimed in claim 1, characterized in that: In the step S3, after the connecting member (7) passes through the through hole (9) and connects to the connecting position (10), the blocking member (6) can be closely attached to the inner wall of the beam mold groove.

3. The construction method of the beam cage formwork for connecting the composite slab cross beams as claimed in claim 1 or 2, characterized in that: The connecting member (7) is a bolt, and an internal threaded hole that can match the bolt is provided in the connecting position (10), and the bolt can pass through the through hole (9) and be screwed into the internal threaded hole.

4. The construction method of the beam cage formwork for connecting the composite slab cross beams as claimed in claim 3, characterized in that: The through hole (9) is provided with an internal thread that can match the bolt.

5. The construction method of the beam cage formwork for connecting the composite slab cross beams as claimed in claim 1, characterized in that: The side plate (4) is provided with a plurality of fixing holes (11) at the bottom, and the fixing holes (11) are arranged along the length direction of the side plate (4), and the axial direction of the fixing holes (11) is along the height direction of the side plate (4); the bottom plate (5) is provided with a plurality of fixing positions that can match the fixing holes (11), and the fixing positions are connected to the fixing holes (11) through connecting members (7); the connecting members (7) are bolts, and the fixing positions (11) are provided with internal threads that can match the bolts; the fixing positions are through holes that can penetrate the upper surface and the lower surface of the bottom plate (5), and the bolts can pass through the through holes.

6. The construction method of the beam cage formwork for connecting the composite slab cross beams as claimed in claim 5, characterized in that: An internal thread matching the bolt is arranged in the through hole.

7. The construction method of the beam cage formwork for connecting the composite slab cross beams as claimed in claim 1, characterized in that: The length of the barrier (6) along the length direction of the side plate (4) is at least 8 cm; the width of the barrier (6) along the width direction from the left side to the right side of the side plate (4) is less than the distance between the edge of the steel cage and the inner wall of the beam mold groove, and the width of the barrier (6) along the width direction from the left side to the right side of the side plate (4) is at least 2 cm.

8. The construction method of the beam cage formwork for connecting the composite slab cross beams as claimed in claim 7, characterized in that: The difference between the distance between the edge of the steel cage and the inner wall of the beam mold groove and the width of the barrier (6) along the left side to the right side of the side plate (4) is at least 0.5 cm.

9. A construction method for connecting composite slab beams, characterized in that: It includes steps S1, S2 and S3 as described in the beam cage formwork construction method as described in any one of claims 1 to 8; and also includes step S4: pouring concrete in the beam cage formwork structure obtained by the beam cage formwork construction method, and removing the beam formwork groove and the barrier (6) after curing, so that the barrier (6) is detached from the reinforcement (3) to form a mounting position (15), thereby obtaining a crossbeam (14).

10. A cross beam for connecting composite plates, characterized in that: The crossbeam is constructed according to the crossbeam construction method of claim 9.

Citation Information

Patent Citations

  • Supporting method of concrete ultra-high heavy-duty beam and laminated slab composite structure

    CN106193589B

  • A construction process for installing composite slabs using a composite slab installation trolley in conjunction with a tower crane.

    CN110700418B

  • Prefabricated laminated slab system girder erection device and construction method thereof

    CN116201373A