Wall surface steel plate and steel door pocket integrated installation method and component of wall surface steel plate and steel door pocket integrated installation method

Through the cassette keel insertion and galvanized square tube fixing technology of integrated wall steel plate and steel door sleeve components, the gaps and falls in traditional decoration are solved, the stability and aesthetics of the wall are improved, and the stability and aesthetics of the wall are extended. Building life and simplify construction processes and reduce costs.

CN119062220APending Publication Date: 2024-12-03ZHONGYIFENG CONSTR GRP +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411260493.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-10
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

Traditional wall decoration and door cover installation have insufficient aesthetics and functionality, and are prone to gaps and falls, affecting the stability and life of the building.

Method used

The integrated components of the wall steel plate and steel door sleeve are adopted, and fixed by cassette keel plugging and galvanized square tubes to achieve a firm connection between the wall steel plate and door sleeve plate, simplifying the installation process, reducing closing problems, improving stability and Security.

Benefits of technology

It realizes a stable connection between the wall and door frame, avoids the generation of gaps, improves aesthetics and flatness, extends the life of the building, simplifies construction processes, reduces costs, and improves building quality and competitiveness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119062220A_ABST
    Figure CN119062220A_ABST
Patent Text Reader

Abstract

The invention relates to a wall surface steel plate and steel door pocket integrated installation method and a component thereof, a steel door pocket comprises a door frame and a door pocket plate, the wall surface steel plate and the door pocket plate are connected in an inserted mode through a clamping type keel, the clamping type keel is fixedly connected to a galvanized square tube, the door frame is fixedly connected to a wall body, and a door opening is formed between the wall bodies. The installation method sequentially comprises the steps of construction preparation, surveying and setting out, order placing and machining, steel door frame installation, heaven and earth rail installation, clamping groove type steel plate installation and the like. The wall surface steel plate and steel door pocket integrated component has the advantages of reducing closing openings, being integrally formed, improving stability and safety, reducing cost, prolonging service life and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of integrated installation of wall steel plates and steel door frames, in particular to an integrated installation method of wall steel plates and steel door frames and components thereof. Background Art

[0002] At present, the walls of the corridors and halls of office buildings need to be decorated. With the development of cities, hospitals are expanding in scale and the quality of hospital decoration is also improving. The wall decoration and door frame setting are of great significance to the aesthetics and functionality of the building. The traditional method often uses different materials and components for splicing, which not only affects the appearance, but also requires glue to seal the door frame edge in the later stage, and it is easy to produce gaps and fall off.

[0003] To this end, we have developed an integrated component of wall steel plates and steel door frames to solve the above problems. Summary of the invention

[0004] The purpose of the present invention is to overcome the shortcomings of the prior art and provide an integrated component of a wall steel plate and a steel door frame, which has the advantages of reducing closing, integral molding, improving stability and safety, reducing costs, and increasing lifespan.

[0005] To achieve the above object, the technical solution adopted by the present invention is: an installation method of an integrated component of a wall steel plate and a steel door frame, the steel door frame includes a door frame and a door frame plate, the wall steel plate and the door frame plate are plugged through a card keel, the card keel is fixedly connected to a galvanized square tube, the door frame is fixedly connected to a wall, and a door opening is provided between the walls. The installation method is realized by an installation component, and the installation method includes the following steps: S10. Construction preparation: prepare galvanized angle brackets, galvanized expansion bolts, steel plates, dry hanging parts, card-type keel parts and equipment; S20. Measurement and setting out: S201. Surveyors enter the site and use the 1m elevation line set by the passenger elevator on the floor as the basis for the elevation line of the entire floor. They use a steel tape measure and theodolite to lead the 1m control line from the original elevator hall into the corridor and mark it; S202. After the 1m control line in the corridor is verified, the corridor axis is placed. The corridor axis is placed according to the wall layout and floor tile layout. First, the entire central axis of the corridor is placed and marked on the wall and floor; S203. After the central axis of the corridor is laid out, the dividing lines of the walls and door openings are laid out; S30. Layout, deepening and order processing: Different from the deepening order of other decorative surfaces, it is not necessary to measure and order after the decorative surface base is completed. It is only necessary to layout according to the actual size of the on-site layout, which greatly speeds up the progress; the steel plate surface is layout numbered, and a barcode is established for each plate surface, so that the positioning and installation can be quickly found on site, accurately and without deviation; S40.Steel door frame installation: Different from the conventional installation sequence, the steel door frame is installed first. According to the door opening installation position and size, an impact drill is used to drill holes in the concrete door opening. The drilling depth and diameter need to be carried out according to the requirements of the expansion bolts. The expansion tube is put into the connector and knocked into the drilled hole. The connector is firmly connected to the steel door frame ribs. A wooden wedge or rubber hammer is used to adjust the verticality and horizontality of the door frame to ensure that it meets the requirements. Use foam glue to fill the gap between the door frame and the concrete door opening to ensure that the door frame is stable and does not shake. S50. Install the top and bottom rails: The installers of the steel ceiling keels first draw the line in the installation area to control the in and out relationship between the ceiling keels and the wall surface line, which also provides an important basis for the flatness of the wall panels. In the construction area of ​​the wall panels, the top surface has reserved an 18mm thick flame retardant board as the foundation of the ceiling keel. After positioning, the installers use special screws to fix it. The floor keels are fixed to the concrete floor with φ6mm expansion bolts. S60. Slot-type steel plate installation: When installing the wall steel plate, the steel plate edge is buckled with the slots of the vertical keel. According to the layout diagram, the finished steel plate of the corresponding size is inserted into the vertical keel slots on both sides. Once it is inserted, it is not easy to slip and can be disassembled at any time. The horizontal and vertical control standard points should be determined, and the horizontal and vertical control points should be placed using an infrared theodolite. When choosing the horizontal direction for installation, the horizontal support should be set in advance for installation operations; two people work together to lift the coated steel plate to the installation position, and adjust the coated steel plate in time to make its flatness and straightness meet the national standards or above; S70. Installation of steel door frame: Finally install the door frame between the steel plate and the door frame, insert one side of the door frame into the vertical card keel, and insert the other side into the card slot of the door frame to complete the entire installation.

[0006] Due to the application of the above technical solution, the present invention has the following advantages compared with the prior art: The integrated component of the wall steel plate and the steel door frame described in the present invention, after adopting this integrated component installation method, the connection between the walkway wall steel plate and the steel door frame is more firm and stable, which can effectively reduce the closing problem, and the decorative surface is formed in one piece without the need for repair; the flatness and aesthetics of the wall are improved; at the same time, this method can also enhance the stability and safety of the wall and extend the service life of the building; in addition, this method can also simplify the construction process, reduce construction costs, and improve the competitiveness of the enterprise; this integrated component installation method can better coordinate with the surrounding environment. BRIEF DESCRIPTION OF THE DRAWINGS

[0007] Figure 1 The figure is a schematic diagram of the structure of an indoor sliding door of the integrated component of the wall steel plate and the steel door frame according to the present invention.

[0008] Figure 2 For the present invention Figure 1 Cross-sectional view at AA in the middle.

[0009] Figure 3 For the present invention Figure 1 Cross-sectional view at the middle BB.

[0010] Figure 4 This is a schematic diagram of the door frame structure of the present invention.

[0011] Figure 5 The figure is a schematic diagram of the outdoor hidden door structure of the integrated component of the wall steel plate and the steel door frame according to the present invention.

[0012] Figure 6 For the present invention Figure 5 Side view of.

[0013] Figure 7 For the present invention Figure 5 Top view of the .

[0014] Figure 8 It is a structural schematic diagram of the C-shaped hollow door frame of the present invention.

[0015] Fig. 9 It is a structural schematic diagram of the manual sliding door of the present invention. DETAILED DESCRIPTION

[0016] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0017] Figures 1 to 9In the invention, a wall steel plate and a steel door cover integrated component is provided, wherein the steel door cover comprises a door frame 20 and a door cover plate 30, wherein the wall steel plate 55 and the door cover plate 30 are plugged in through a cassette keel 50, wherein the cassette keel 50 is fixedly connected to a galvanized square tube 40, wherein the specification of the galvanized square tube 40 is 20*40mm, wherein the door frame 20 is fixedly connected to a wall 100, wherein a door opening 109 is provided between the walls 100, wherein a wall plate 55 is provided outside the cassette keel 50, wherein the wall plate 55 is arranged flush with the door cover plate 30, wherein the installation method thereof is realized by an installation component, wherein the installation method thereof comprises the following steps: S10. Construction preparation: prepare galvanized angle code 45, impact drill to drill expansion bolt holes in the wall, and special diamond hole drill to expand the holes. Φ10 galvanized expansion bolt 60, 1.2 thick steel plate, dry hanging parts, cassette keel 50 parts and equipment preparation, steel tape measure to measure the steel plate; equipment preparation includes preparing electric welder, impact drill, bench drill, hand hammer, brush, electric saw, level, steel tape measure, ruler, ink fountain, special diamond hole drill, cutter, rubber hammer, suction cup, theodolite. Use 2 rows of galvanized expansion bolts 60 for C-type empty door frame. Use bench drill to drill holes in angle steel. Cutter to cut galvanized square tube and door frame.

[0018] S20. Measurement and setting out: S201. Surveyors enter the site and use the 1m elevation line set by the passenger elevator on the floor as the basis for the elevation line of the entire floor. They use a steel tape measure and theodolite to lead the 1m control line from the original elevator hall into the corridor and mark it. The brush is cleaned to facilitate ink marking.

[0019] S202. After the 1m control line in the aisle is checked and confirmed, start laying out the aisle axis. The aisle axis is laid out according to the wall layout and floor tile layout. First, lay out the entire central axis of the aisle and mark it on the walls and floors.

[0020] S203. After the central axis of the aisle is laid out, start laying out the dividing lines of the walls and door openings. The dividing line takes into account the center division of the card-type keel, which serves as the dividing line of the finished surface to ensure the uniformity of the large surface size, and the end size is placed at the ends on both sides.

[0021] S30. Layout, deepening and order processing: Different from the deepening order of other decorative surfaces, it is not necessary to measure and order after the decorative surface base is completed. It is only necessary to layout according to the actual size of the on-site layout, which greatly speeds up the progress; the steel plate surface is layout and numbered, and a barcode is established for each plate surface, so that the site can quickly find the location and install it accurately; configure integrated components, including wall steel plates, steel door frames and connectors to ensure the strength and stability of the components.

[0022] S40.Steel door frame installation: Different from the conventional installation sequence, the steel door frame is installed first. According to the installation position and size of the door opening, an impact drill is used to drill holes in the concrete door opening. The drilling depth and diameter need to be based on the requirements of the expansion bolts. The expansion tube is put into the connector and knocked into the drilled hole. The connector is firmly connected to the steel door frame ribs. Use a wooden wedge or rubber hammer to adjust the verticality and horizontality of the door frame to ensure that it meets the requirements. Use foam glue to fill the gap between the door frame and the concrete door opening to ensure that the door frame is stable and does not shake. If it is a steel frame door opening, the steel door frame connector is directly connected to the steel frame column, and there is no need to drill an expansion tube.

[0023] S50. Install the top and bottom rails: The sizes of steel ceiling and floor keels are 30*1.2mm, 50*1.2mm and 60*1.2mm. The installers will first draw a line through the installation area to control the in and out relationship between the ceiling and floor keels and the wall finish line, which also provides an important basis for the flatness of the wall panels. In the wall panel construction area, an 18mm thick flame-retardant board has been reserved on the top surface as the basis for the ceiling keel. After positioning, the installers will fix it with special screws, and the floor keels will be fixed to the concrete floor with φ6mm expansion bolts.

[0024] S60. Slot-type steel plate installation: To install the steel plate on the wall, the steel plate edge is angled and the slots of the vertical keel are interlocked. According to the layout diagram, the finished steel plate of the corresponding size is inserted into the vertical keel slots on both sides. Once it is inserted, it is not easy to slip. The installation is simple and convenient and can be disassembled at any time. In order to better control the straightness and flatness, the horizontal and vertical control standard points should be determined, and the horizontal and vertical control points should be placed using an infrared theodolite. When the horizontal direction is selected for installation, the horizontal support should be set in advance to facilitate the installation operation; two people work together to lift the coated steel plate to the installation position, and adjust the coated steel plate in time to make its flatness and straightness meet the national standards or above; after the installation is completed, use a 2-meter ruler to check, and then use a suction cup and rubber hammer to make fine adjustments.

[0025] S70. Installation of steel door frame: Finally install the door frame between the steel plate and the door frame, insert one side of the door frame into the vertical card keel, and insert the other side into the card slot of the door frame to complete the entire installation.

[0026] An installation component of an installation method for an integrated component of a wall steel plate and a steel door frame includes a door frame 20, a door frame plate 30 and a card-type keel 50. A door frame card slot 205 is provided at one end of the door frame 20. One end of the door frame plate 30 is plugged into the door frame card slot 205, and the other end is plugged into the card-type keel 50. The card-type keel 50 is fixedly connected to a galvanized square tube 40 through an angle steel 45. The door frame 20 is fixedly connected to a wall 100 through at least one galvanized expansion bolt 60. The galvanized expansion bolt 60 and the door frame 20 are welded by an electric welder.

[0027] An L-shaped bending plate 201 is provided at one end of the door frame 20, and a U-shaped bending plate 203 is provided at the other end, and a U-shaped slot 202 is provided in the middle, and a door frame rubber strip 15 is clamped in the U-shaped slot 202. The door frame rubber strip 15 is crimped with the indoor sliding door 10, and an elastic support 16 is provided at the other end of the indoor sliding door 10. The indoor sliding door 10 is arranged on the inner side of the wall 100.

[0028] The door opening 109 is provided with an indoor sliding door 10, an outdoor hidden door 101 or a manual sliding door 103. The top of the indoor sliding door 10 is provided with a door head plate 11, and the top of the door head plate 11 is fixedly connected to the rectangular steel pipe 12 through an L-shaped connecting plate 13. When the outdoor hidden door 101 is installed, its top abuts against a first abutment plate 102. When the manual sliding door 103 is installed, the manual sliding door 103 is set on the outside of the wall 100, and abutment columns 70 are provided at both ends of the manual sliding door 103, and a second abutment plate 75 is fixedly connected to the inner wall of the abutment column 70. The abutment column 70 is fixedly connected to the wall panel, and the wall panel is plugged into the card-type keel 50.

[0029] The use of integrated component installation can effectively improve the quality and aesthetics of decoration. First of all, this method avoids the generation of splicing gaps and improves the flatness and aesthetics of the wall. It can reduce material waste. After the steel plates and doors are processed in the factory, they are installed on site as a whole. There is no need to construct the wall first and then the door frame, which improves construction efficiency. During use, if the wall is damaged or worn, it can be disassembled and replaced at any time, which is simple and convenient. Therefore, the research and promotion of this installation method has important practical significance and theoretical value, which brings the function and sensory perception of the finished on-site decoration construction to a higher level, is conducive to comprehensively improving the quality of construction and the overall level of construction, so that the comprehensive quality and function of the building can be improved, and it is conducive to improving energy conservation and emission reduction in the construction industry to protect the environment and reduce carbon emissions.

[0030] The above are only specific application examples of the present invention and do not constitute any limitation on the protection scope of the present invention. Any technical solution formed by equivalent transformation or equivalent replacement shall fall within the protection scope of the present invention.

Claims

1. A method for installing an integrated component of a wall steel plate and a steel door frame, characterized in that: The steel door frame comprises a door frame (20) and a door frame plate (30); the wall steel plate (55) and the door frame plate (30) are plugged into each other via a card-type keel (50); the card-type keel (50) is fixedly connected to a galvanized square tube (40); the door frame (20) is fixedly connected to a wall (100); a door opening (109) is provided between the walls (100); and an installation method thereof is implemented by an installation component, and the installation method thereof comprises the following steps: S10. Construction preparation: prepare galvanized angle brackets (45), galvanized expansion bolts (60), steel plates, dry hanging parts, card-type keels (50) and equipment; S20. Measurement and setting out: S201. Surveyors enter the site and use the 1m elevation line set by the passenger elevator on the floor as the basis for the elevation line of the entire floor. They use a steel tape measure and theodolite to lead the 1m control line from the original elevator hall into the corridor and mark it; S202. After the 1m control line in the corridor is verified, the corridor axis is placed. The corridor axis is placed according to the wall layout and floor tile layout. First, the entire central axis of the corridor is placed and marked on the wall and floor; S203. After the central axis of the corridor is laid out, the dividing lines of the walls and door openings are laid out; S30. Layout, deepening and order processing: Different from the deepening order of other decorative surfaces, it is not necessary to measure and order after the decorative surface base is completed. It is only necessary to layout according to the actual size of the on-site layout, which greatly speeds up the progress; the steel plate surface is layout numbered, and a barcode is established for each plate surface, so that the positioning and installation can be quickly found on site, accurately and without deviation; S40.Steel door frame installation: Different from the conventional installation sequence, the steel door frame is installed first. According to the door opening installation position and size, an impact drill is used to drill holes in the concrete door opening. The drilling depth and diameter need to be carried out according to the requirements of the expansion bolts. The expansion tube is put into the connector and knocked into the drilled hole. The connector is firmly connected to the steel door frame ribs. A wooden wedge or rubber hammer is used to adjust the verticality and horizontality of the door frame to ensure that it meets the requirements. Use foam glue to fill the gap between the door frame and the concrete door opening to ensure that the door frame is stable and does not shake. S50. Install the top and bottom rails: The installers of the steel ceiling keels first draw the line in the installation area to control the in and out relationship between the ceiling keels and the wall surface line, which also provides an important basis for the flatness of the wall panels. In the construction area of ​​the wall panels, the top surface has reserved an 18mm thick flame retardant board as the foundation of the ceiling keel. After positioning, the installers use special screws to fix it. The floor keels are fixed to the concrete floor with φ6mm expansion bolts. S60. Slot-type steel plate installation: When installing the wall steel plate, the steel plate edge is buckled with the slots of the vertical keel. According to the layout diagram, the finished steel plate of the corresponding size is inserted into the vertical keel slots on both sides. Once it is inserted, it is not easy to slip and can be disassembled at any time. The horizontal and vertical control standard points should be determined, and the horizontal and vertical control points should be placed using an infrared theodolite. When choosing the horizontal direction for installation, the horizontal support should be set in advance for installation operations; two people work together to lift the coated steel plate to the installation position, and adjust the coated steel plate in time to make its flatness and straightness meet the national standards or above; S70. Installation of steel door frame: Finally install the door frame between the steel plate and the door frame, insert one side of the door frame into the vertical card keel, and insert the other side into the card slot of the door frame to complete the entire installation.

2. The method for installing the integrated component of the wall steel plate and the steel door frame according to claim 1 is characterized in that: In step S10, the equipment preparation includes preparing an electric welder, an impact drill, a bench drill, a hand hammer, a brush, an electric saw, a level, a steel measuring tape, a ruler, an ink fountain, a special diamond hole drill, a cutter, a rubber hammer, a suction cup, and a theodolite.

3. The method for installing the integrated component of the wall steel plate and the steel door frame according to claim 1 is characterized in that: In step S203, the dividing line is considered to be the middle division of the card-type keel as the dividing line of the finished surface, to ensure the uniformity of the large surface size, and the end size is placed at the ends on both sides.

4. The method for installing the integrated component of the wall steel plate and the steel door frame according to claim 1 is characterized in that: In step S30, an integrated component is configured, including a wall steel plate, a steel door frame and connectors, to ensure the strength and stability of the component.

5. The method for installing the integrated component of the wall steel plate and the steel door frame according to claim 1 is characterized in that: In step S40, if the steel door frame connector of the steel frame door opening is directly connected to the steel frame column, there is no need to install an expansion tube.

6. The method for installing the integrated component of the wall steel plate and the steel door frame according to claim 1 is characterized in that: In step S50, the sizes of the steel ceiling and top keels are 30*1.2mm, 50*1.2mm and 60*1.2mm.

7. The method for installing the integrated component of the wall steel plate and the steel door frame according to claim 1 is characterized in that: In step S60, after the installation is completed, it is checked with a 2-meter ruler, and then fine-tuned with a suction cup and a rubber hammer.

8. An installation component for the installation method of the integrated component of the wall steel plate and the steel door frame according to any one of claims 1 to 7, characterized in that: The invention comprises a door frame (20), a door cover plate (30) and a card-type keel (50); a door frame card slot (205) is provided at one end of the door frame (20); one end of the door cover plate (30) is plugged into the door frame card slot (205), and the other end is plugged into the card-type keel (50); the card-type keel (50) is fixedly connected to a galvanized square tube (40) via an angle steel (45); and the door frame (20) and the wall (100) are fixedly connected via at least one galvanized expansion bolt (60).

9. The installation component of the installation method of the wall steel plate and steel door frame integrated component according to claim 8, characterized in that: An L-shaped bending plate (201) is provided at one end of the door frame (20), and a U-shaped bending plate (203) is provided at the other end, and a U-shaped slot (202) is provided at the middle position, and the U-shaped slot (202) is engaged with a door frame rubber strip (15).

10. The installation component of the installation method of the wall steel plate and steel door frame integrated component according to claim 8, characterized in that: The door opening (109) is provided with an indoor sliding door (10), an outdoor hidden door (101) or a manual sliding door (103).

Citation Information

Patent Citations

  • Steel door frame assembly installation structure

    CN203701834U

  • Steel door cover with adjustable

    CN207194708U

  • Door pocket

    CN213510126U

  • Novel metal corrugated wall plate connecting structure with separating type inserting-connecting structure

    CN219587105U