Cable direct control type injection-production regulation and control method for oil-water well
By adjusting the internal, inter-plane, plane and pressure in the layer section correspondence and moisture content of oil and water wells, the problem of ineffective water circulation and water blocking layer selection in high-water oil wells is solved, and the effect of oil field development is improved and energy consumption is reduced.
Patent Information
- Application Number
- CN202310637660.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-31
- Publication Date
- 2024-12-03
AI Technical Summary
In the existing oil field development methods, interlayer contradictions in high-water oil wells lead to invalid water circulation, affecting the water flooding effect, increasing energy consumption and production costs, and it is difficult to effectively adjust the water blocking layer level.
By obtaining the corresponding relationship of the oil and water wells in the stratified sections and the actual moisture content and permeability of each layer, adjust the in-section, between layers, plane and pressure, optimize the injection and production relationship, and achieve targeted regulation of the injection of oil and water wells Purchase process.
Reduce conflicts between layers and planes, expand water injection waves and area, effectively tap the remaining oil potential, reduce moisture content, and improve development results.
Smart Images

Figure CN119062290A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of oil field petroleum exploitation, and in particular to an oil-water well cable direct-control injection and production regulation method. Background Art
[0002] The current development method of oil extraction is to inject water in a fine and detailed manner at the water well end, and to produce oil at the oil well end in a general manner, and only make plane adjustments from the water well end. Under this development model, there are the following problems: First, due to years of water injection development, interlayer contradictions are prominent, the water content of oil wells has increased, and the number of extremely high water-content wells has increased. The main oil layers with high pressure and high water content have seriously interfered and inhibited the production capacity of potential oil layers; second, as the water content gradually increases, invalid water circulation is serious, which not only affects the water drive effect, but also increases energy consumption and the production cost of crude oil, and the development effect is getting worse and worse; third, there are many multi-layer high water content phenomena in oil wells at present, which brings great difficulty to the selection of water plugging layers. The existing stratified water plugging technology in oil fields is difficult to achieve water plugging layer adjustment, and the operation success rate is low, which cannot meet the development adjustment needs. Summary of the invention
[0003] The present invention proposes a cable direct-controlled injection and production control method for oil and water wells to solve the problem that when the existing injection and production method is used for injection and production of high-water-content oil wells with prominent interlayer conflicts, there is invalid water circulation, which seriously affects the water drive effect and increases energy consumption and production costs.
[0004] According to one aspect of the present invention, a cable direct-controlled injection and production control method for oil and water wells is provided, comprising:
[0005] Obtain the correspondence between oil and water wells in the work area and the actual water content of each layer of the target oil well and the actual permeability of each small layer;
[0006] According to the correspondence between the oil and water wells in the stratified sections, the target oil well is adjusted within the stratum and / or between stratum sections and / or in the plane and / or in the pressure;
[0007] The intra-layer adjustment includes: adjusting the injection and production of each sub-layer in the target layer of the target oil well according to the corresponding relationship between the oil and water wells, so that the actual permeability of each sub-layer reaches the predetermined permeability;
[0008] The inter-layer adjustment includes: determining the water content level corresponding to each layer according to the actual water content of each layer, and selecting a corresponding adjustment method to adjust the injection and production of the layer according to the water content level, so that the actual water content of each layer reaches a first predetermined water content;
[0009] The plane adjustment includes: adjusting the injection-production relationship between the water injection end and each production end in the same plane according to the corresponding relationship between the oil and water wells, so that the water content of each production end reaches a second predetermined water content;
[0010] By performing the intra-layer and / or inter-layer and / or plane adjustment and / or pressure adjustment, the injection and production regulation of the target oil and water well is completed.
[0011] Preferably, the method for adjusting the injection and production of each sublayer in the target layer section of the target oil well according to the corresponding relationship between the oil and water wells comprises:
[0012] Determine the sub-layers whose actual permeability is less than the predetermined permeability among the sub-layers in the target layer section of the oil well;
[0013] According to the correspondence between the oil and water wells, the water well injection end corresponding to the small layer whose actual permeability is less than the predetermined permeability is determined, and the injection pressure of the corresponding water well injection end is increased to a first predetermined injection pressure. At the same time, the production end of the small layer whose actual permeability is less than the predetermined permeability is closed.
[0014] Preferably, the method for determining the corresponding water content level according to the actual water content of each layer segment includes:
[0015] The water content levels corresponding to the layer sections include: low aquifer, middle aquifer and high aquifer;
[0016] If the actual water content is less than 90%, the corresponding layer section is a low-water layer;
[0017] If the actual water content is greater than or equal to 90% and less than or equal to 95%, the corresponding layer segment is a middle aquifer;
[0018] If the actual water content is greater than 95%, the corresponding layer segment is a high water-containing layer.
[0019] Preferably, the method of adjusting the injection and production of a layer by selecting a corresponding adjustment method according to the water cut level includes:
[0020] Obtain the actual pressure value of each layer section and determine whether the layer section is a high pressure layer, a balanced pressure layer or a low pressure layer;
[0021] If the layer section is a low-water-containing layer, the production end of the oil well in the layer section is fully opened. At the same time, if the layer section is a high-pressure layer, the water injection amount at the corresponding water well injection end is reduced to the first predetermined water injection amount or maintained at the original water injection amount. If it is a balanced pressure layer, the water injection amount at the corresponding water well injection end is maintained at the original water injection amount. If it is a low-pressure layer, the water injection amount at the corresponding water well injection end is increased to the second predetermined water injection amount.
[0022] If the layer section is a medium aquifer, the production end of the oil well in the layer section is opened to a predetermined opening. At the same time, if the layer section is a high-pressure layer, the water injection amount at the corresponding water well injection end is reduced to a third predetermined water injection amount or maintained at the original water injection amount. If it is a balanced pressure layer or a low pressure layer, the corresponding water well injection end is maintained at the original water injection amount.
[0023] If the layer section is a high water-containing layer, the production end of the oil well in the layer section will be shut down, and the corresponding water well will be injected to maintain the original water injection volume.
[0024] Preferably, the method for adjusting the injection-production relationship between the water injection end and each production end in the same plane according to the corresponding relationship between the oil and water wells comprises:
[0025] If in the same plane, the number of oil well production ends connected to the same water well is greater than or equal to 2, the oil well production end with an actual water content greater than or equal to the second predetermined water content is closed or opened to a predetermined opening.
[0026] Preferably, the pressure adjustment includes:
[0027] Among the multiple oil wells connected to the same target water well in the work area, the production end of the oil well with a relatively high average pressure in the inner layer of the oil well is closed, so that the pressure of the oil well with a relatively low average pressure is increased to a predetermined average pressure.
[0028] Preferably, it also includes:
[0029] Obtain the actual water content of the target oil wells in the work area;
[0030] Determine the water cut classification corresponding to the target oil well according to the actual water cut of the target oil well, wherein the water cut classification corresponding to the target oil well includes: high water cut well, medium water cut well and low water cut well;
[0031] According to the water cut classification of the target oil well and the actual water cut of each layer, one or more corresponding adjustment methods are selected for adjustment.
[0032] Preferably, the method of selecting one or more corresponding adjustment modes for adjustment according to the water cut classification of the target oil well and the actual water cut of each layer section includes:
[0033] If the target oil well is a high water-cut well, it is determined whether the actual water-cut difference between the layers in the target oil well is less than the predetermined difference. If so, the adjustment method is plane adjustment and / or intra-layer adjustment. If not, the adjustment method is inter-layer adjustment and / or plane adjustment and / or intra-layer adjustment.
[0034] If the target oil well is a medium water-containing well, it is determined whether the actual water content difference between the layers in the target oil well is less than the predetermined difference. If so, the adjustment method is plane adjustment and / or pressure adjustment and / or intra-layer adjustment; if not, the adjustment method is inter-layer adjustment and / or pressure adjustment;
[0035] If the target oil well is a low water content well, it is determined whether the actual water content difference between the layers in the target oil well is less than the predetermined difference. If so, the adjustment method is plane adjustment and / or pressure adjustment. If not, the adjustment method is inter-layer adjustment and / or pressure adjustment and / or plane adjustment.
[0036] The present invention has at least the following beneficial effects:
[0037] The present invention proposes a cable direct-controlled injection and production regulation method for oil and water wells. By obtaining the connectivity between oil wells and water wells in a work area and the water content information of each layer, targeted intra-layer and / or inter-layer and / or plane adjustments and / or pressure adjustments are performed on each oil and water well in the work area, thereby alleviating inter-layer and plane conflicts, expanding the water injection affected area, and further effectively tapping the remaining oil potential. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] The accompanying drawings herein are incorporated into and constitute a part of the specification. These drawings illustrate embodiments consistent with the present invention and, together with the specification, are used to explain the technical solutions of the present invention.
[0039] Figure 1 A flow chart of a cable direct-controlled injection and production control method for oil and water wells according to an embodiment of the present invention is shown. DETAILED DESCRIPTION
[0040] Various exemplary embodiments, features and aspects of the present invention will be described in detail below with reference to the accompanying drawings. The same reference numerals in the accompanying drawings represent elements with the same or similar functions. Although various aspects of the embodiments are shown in the accompanying drawings, the drawings are not necessarily drawn to scale unless otherwise specified.
[0041] The word “exemplary” is used exclusively herein to mean “serving as an example, example, or illustration.” Any embodiment described herein as “exemplary” is not necessarily to be construed as preferred or advantageous over other embodiments.
[0042] The term "and / or" herein is only a description of the association relationship of the associated objects, indicating that there may be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the term "at least one" herein represents any combination of at least two of any one or more of a plurality of. For example, including at least one of A, B, and C can represent including any one or more elements selected from the set consisting of A, B, and C.
[0043] In addition, in order to better illustrate the present invention, numerous specific details are provided in the following specific embodiments. It should be understood by those skilled in the art that the present invention can be implemented without certain specific details. In some examples, methods, means, components and circuits well known to those skilled in the art are not described in detail in order to highlight the subject matter of the present invention.
[0044] Figure 1 A flow chart of a method for direct-controlled injection and production of oil and water wells according to an embodiment of the present invention is shown. Figure 1 As shown, a cable direct-controlled injection and production control method for oil and water wells includes: step S01: obtaining the correspondence between oil and water wells in the stratified sections of the work area and the actual water content of each stratum of the target oil well and the actual permeability of each small layer; step S02: according to the correspondence between oil and water wells in the stratified sections, performing intra-segment and / or inter-segment and / or plane adjustment and / or pressure adjustment on the target oil well; the intra-segment adjustment includes: according to the correspondence between oil and water wells, adjusting the injection and production of each small layer in the target stratum of the target oil well, so that the actual permeability of each small layer reaches a predetermined permeability; the inter-segment adjustment includes: According to the actual water content of each layer segment, the water content level corresponding to each layer segment is determined; according to the water content level, a corresponding adjustment method is selected to adjust the injection and production of the layer segment, so that the actual water content of each layer segment reaches a first predetermined water content; the plane adjustment includes: according to the corresponding relationship between the oil and water wells, adjusting the injection and production relationship between the water injection end and each production end in the same plane, so that the water content of each production end reaches a second predetermined water content; step S03: completing the injection and production control of the target oil and water wells by performing the intra-layer and / or inter-layer and / or plane adjustments and / or pressure adjustments.
[0045] In the embodiment of the present invention, the cable direct control type is an electrically controlled oil and water well group built in the work area. The water well end uses the cable direct control type stratified water distribution technology to perform ground water volume measurement and adjustment, seal verification and back-end pressure monitoring without the need for testing instruments to be lowered into the well; the oil well end uses the cable direct control type stratified production allocation technology to carry out stratified mining, directly monitor the formation pressure on the ground and control the liquid production of each layer.
[0046] Cable direct-controlled stratified water distribution technology is suitable for stratified water injection in oilfield injection wells. It is mainly composed of communication cables, coupling protectors, cable washable well sealers, intelligent water distributors and other parts. The cable is connected to the ground controller through a high-voltage cable wellhead. The software is used to power the pre-set cables downhole through the ground and transmit signals and commands to control the intelligent water distributors at each layer of the downhole to automatically allocate water, verify the seal and perform pressure testing, so as to realize the ground graded control of the injection flow of each layer of the injection well, pipe string verification and real-time continuous monitoring of the pressure behind the nozzle and other functions.
[0047] Cable direct-controlled stratified production allocation technology is suitable for stratified production of oil wells in oil fields, including electric control production allocation device, ground controller, supporting tools (cable packer, cable, cable head, etc.) and computer operating software. The electric control production allocation device is equipped with pressure sensors, temperature sensors, motors, circuit boards, valve switches, etc. An electric control production allocation device is installed in each oil-producing layer, and the layers are separated by cable packers. The ground controller is connected to the downhole electric control production allocation device through cables to achieve two-way communication. The ground controller can read the temperature, pipe pressure, formation pressure and other parameters of each layer in the well at any time, change the valve opening size of the electric control production allocation device at will, and has the functions of online packer sealing and formation recovery pressure measurement. Without moving the pipe string, the production layer can be selected at any time according to the situation, realizing the purpose of arbitrary layer selection and direct acquisition of oil well stratification data, and providing real and accurate dynamic monitoring data for oilfield development.
[0048] The oil-water well cable direct-control injection and production control method provided in the embodiment of the present invention specifically comprises the following steps:
[0049] Step S01: Obtain the correspondence between the oil and water wells in the work area and the actual water content of each layer of the target oil well and the actual permeability of each small layer.
[0050] In the embodiment of the present invention, by collecting the oil and water well data, combining the multidisciplinary research results and various dynamic data, the corresponding relationship between the various layers of the oil and water wells in the work area is analyzed and obtained.
[0051] Based on the production data of oil and water wells, the injection volume and injection pressure of the water injection wells can be obtained; based on the annulus test data and multidisciplinary research results, the electric control production allocation technology is used to reasonably stratify the oil wells, and then through different switch combinations of the electric control production distributor, the liquid production, actual water content, pressure conditions and actual permeability of each layer of the oil wells in the work area can be clarified as a reference for subsequent adjustments.
[0052] Step S02: According to the correspondence between the oil and water wells in the layered sections, the target oil well is adjusted within the layer section and / or between the layer sections and / or in the plane and / or in the pressure.
[0053] In the present invention, the intra-layer adjustment includes: adjusting the injection and production of each sub-layer in the target layer of the target oil well according to the corresponding relationship between the oil and water wells, so that the actual permeability of each sub-layer reaches the predetermined permeability.
[0054] In the present invention, the method for adjusting the injection and production of each sublayer in the target layer section of the target oil well according to the correspondence between the oil and water wells includes: determining the sublayer whose actual permeability is less than the predetermined permeability among the sublayers in the target layer section of the oil well; determining the water well injection end corresponding to the sublayer whose actual permeability is less than the predetermined permeability according to the correspondence between the oil and water wells, increasing the injection pressure of the corresponding water well injection end to a first predetermined injection pressure, and at the same time, closing the production end of the sublayer whose actual permeability is less than the predetermined permeability.
[0055] In the embodiment of the present invention, within a certain layer section of the oil well, there may be a contradiction between the small layers, which is specifically manifested in that the permeability of one or several small layers within the same layer section is low, while the permeability of other small layers is high. In this case, if the injection pressure is increased during water injection, most of the water will still flow out from the small layers with higher permeability, and the small layers with lower permeability will never be effectively utilized.
[0056] By closing the production end valve of the small layer with higher actual permeability, that is, the small layer with actual permeability greater than the predetermined permeability, and at the same time, increasing the injection pressure of the water well injection end connected to the layer section where the small layer is located to the first predetermined pressure; because the production end of the small layer with actual permeability greater than the predetermined permeability has been closed, pressure is formed, so that water flows to the small layer with actual permeability lower than the predetermined permeability. After a period of time, the small layer with low permeability is started, the contradiction between the small layers in the layer section is improved, the water storage rate of each small layer is increased, the affected volume is increased, and the original water injection flow line is changed. Among them, the predetermined permeability can be set according to the actual permeability, can be set according to the highest actual permeability among the small layers in the target layer section, can also be an average value or an intermediate value, and can be set specifically according to the difference in the contradiction between each small layer and production needs; the first predetermined water injection pressure needs to be greater than the original water injection pressure, but cannot exceed the reservoir fracture pressure.
[0057] In the present invention, the inter-layer adjustment includes: determining the water cut level corresponding to each layer according to the actual water cut of each layer, and selecting the corresponding adjustment method to adjust the injection and production of the layer according to the water cut level, so that the actual water cut of each layer reaches the first predetermined water cut.
[0058] In the present invention, the method for determining the water-cut level corresponding to each layer segment according to the actual water content of each layer segment includes: the water-cut levels corresponding to the layer segments include: low aquifer, middle aquifer and high aquifer; if the actual water content is less than 90%, the corresponding layer segment is a low aquifer; if the actual water content is greater than or equal to 90% and less than or equal to 95%, the corresponding layer segment is a middle aquifer; if the actual water content is greater than 95%, the corresponding layer segment is a high aquifer.
[0059] In the present invention, the method for adjusting the injection and production of a layer segment by selecting a corresponding adjustment method according to the water content level includes: obtaining the actual pressure value of each layer segment, determining whether the layer segment is a high-pressure layer, a balanced pressure layer, or a low-pressure layer; if the layer segment is a low-water-content layer, the production end of the oil well in the layer segment is fully opened, and at the same time, if the layer segment is a high-pressure layer, the water injection amount at the corresponding water well injection end is reduced to a first predetermined water injection amount or maintained at the original water injection amount; if it is a balanced pressure layer, the water injection amount at the corresponding water well injection end is maintained at the original water injection amount; if If it is a low-pressure layer, the water injection amount at the corresponding water well injection end will be increased to the second predetermined water injection amount; if the layer section is a medium-water-bearing layer, the oil well production end of the layer section will be opened to the predetermined opening, and at the same time, if the layer section is a high-pressure layer, the water injection amount at the corresponding water well injection end will be reduced to the third predetermined water injection amount or maintain the original water injection amount; if it is a balanced pressure layer or a low-pressure layer, the corresponding water well injection end will maintain the original water injection amount; if the layer section is a high-water-bearing layer, the oil well production end of the layer section will be shut down, and the corresponding water well injection will maintain the original water injection amount.
[0060] In the embodiment of the present invention, the adjustment between the layers is mainly achieved by adjusting the liquid volume at the oil well end and the water volume at the water well end to adjust the injection-production relationship, pressure difference and water content difference between the layers. During the adjustment process, it is necessary to consider the water content and pressure of each layer and make joint adjustments, with the water content being the main adjustment and the pressure adjustment being taken into consideration. Based on the principle of high water content and high flow pressure, and low water content and low flow pressure, the output of the high water content layer is controlled, and the water injection volume of the low water content layer is increased, so that the pressure difference between the layers is adjusted.
[0061] The method for determining whether each layer section is a high-pressure layer, a balanced pressure layer or a low-pressure layer according to the actual pressure value of each layer section includes: if the actual pressure value of the target layer section is greater than 1MPa, then the target layer section is a high-pressure layer; if the difference between the actual pressure value of the target layer section and the average pressure value of each layer section in the oil well where it is located is less than or equal to 1MPa, then the target layer section is a balanced pressure layer; if the actual pressure value of the target layer section is less than or equal to 1MPa, then the target layer section is a low-pressure layer.
[0062] When adjusting between layers, it is necessary to adjust the production mode of the oil well segment according to the water content level. For the low water content layer of the target oil well, all valves at the production end should be opened to release production capacity as much as possible; at the same time, if the low water content layer is also a high pressure layer, the corresponding water injection layer should control the water injection amount, that is, it is necessary to maintain the original water injection amount at the corresponding connected water well end or reduce it to the first predetermined water injection amount; if the low water content layer is also a balanced pressure layer, the corresponding water injection layer should ensure the current water injection amount, that is, it is necessary to maintain the original water injection amount at the corresponding connected water well end; if the low water content layer is also a low pressure layer, the corresponding water injection layer should increase the water injection amount, that is, it is necessary to increase the water injection amount at the corresponding connected water well end to the second predetermined water injection amount.
[0063] For the medium water-content layer section of the target oil well, it is necessary to adjust the liquid production appropriately according to the production demand, that is, adjust the valve opening at the production end of the layer section to the predetermined opening, such as adjusting the opening to 40% to 90%; at the same time, if the medium water-content layer section is also a high-pressure layer, the corresponding water injection layer section should control the water injection volume, that is, the water injection volume at the corresponding connected water well end needs to be reduced to the third predetermined water injection volume or maintain the original water injection volume; if the medium water-content layer section is also a balanced pressure layer or a low pressure layer, the corresponding water injection layer section should ensure the current water injection volume, that is, the original water injection volume needs to be maintained at the corresponding connected water well end.
[0064] For the high water-content layers of the target oil wells, measures are taken to close the valves at the production end to suppress output, and the original water injection volume should continue to be maintained in the corresponding water well layers.
[0065] The first predetermined water content can be set according to the highest actual water content of the layer section in the target oil well, and can also be set according to actual production requirements, with the ultimate goal of reducing the difference in water content between the layers.
[0066] In the present invention, the plane adjustment includes: adjusting the injection-production relationship between the water injection end and each production end in the same plane according to the corresponding relationship between the oil and water wells, so that the water content of each production end reaches a second predetermined water content.
[0067] In the present invention, the method for adjusting the injection-production relationship between the water injection end and each production end in the same plane according to the correspondence between the oil and water wells includes: if in the same plane, the number of oil well production ends connected to the same water well is greater than or equal to 2, then the oil well production end whose actual water content is greater than or equal to the second predetermined water content is closed or opened to a predetermined opening.
[0068] In the embodiment of the present invention, the same plane refers to the water wells and oil wells in the same sublayer that can be connected to each other. When the water well is injected with water, the water will flow in the sublayer toward the production ends of the multiple oil wells connected with it. In the same plane, if there is a certain difference in the water content of the multiple oil wells connected with the water well, such as one of the two connected oil wells has a relatively high water content, most of the injected water will flow to the oil well with a higher water content, which may cause an invalid injection-production cycle in the oil well with a higher water content, and the oil well with a relatively low water content cannot be effectively developed.
[0069] By keeping the original water injection plan unchanged at the water well end, and closing or adjusting the valve at the production end of the oil well with relatively high water content to a predetermined opening, more water is injected into the direction of the oil well with relatively low water content, thereby increasing the water content of the oil well and making the water content of the two oil wells roughly the same. Among them, the valves of the layers with low or no oil production in the target oil well can be directly closed.
[0070] By changing the injection direction to inject in the direction of low water content, the overall development effect can be improved and the effective use of injected water can be ensured. The first predetermined water content can be set according to the oil well with the highest water content in the same plane, or according to specific construction requirements.
[0071] In the present invention, the pressure adjustment includes: among multiple oil wells connected to the same target water well in the work area, closing the production end of the oil well with a relatively high average pressure in the inner layer of the oil well, so that the pressure of the oil well with a relatively low average pressure is increased to a predetermined average pressure.
[0072] In an embodiment of the present invention, the predetermined average pressure can be set according to the oil well with the highest average pressure among other oil wells connected to the same water well, or it can be set according to specific construction requirements, so that the pressures between oil wells connected to the same water injection well are roughly the same, thereby preventing the problem that when the water injection well is injecting water, the pressure of a certain oil well connected to it is too high and the water injection pressure cannot be further increased, resulting in affecting the development effect of other oil wells.
[0073] The present invention also includes: obtaining the actual water cut of the target oil well in the work area; determining the water cut grade corresponding to the target oil well according to the actual water cut of the target oil well; and selecting one or more corresponding adjustment methods for adjustment according to the water cut grade of the target oil well and the actual water cut of each layer.
[0074] In the present invention, it is also included that the water cut classification corresponding to the target oil well includes: high water cut well, medium water cut well and low water cut well.
[0075] In an embodiment of the present invention, a method for determining the corresponding water cut level of a target oil well according to its actual water cut includes: the water cut levels of the oil wells include: low water cut wells, medium water cut wells and high water cut wells; wherein, if the actual water cut of the target oil well is less than 90%, the corresponding water cut level is a low water cut well; if the actual water cut of the target oil well is greater than or equal to 90% and less than or equal to 95%, the corresponding water cut level is a medium water cut well; if the actual water cut of the target oil well is greater than 95%, the corresponding water cut level is a high water cut well.
[0076] In the present invention, the method of selecting one or more corresponding adjustment methods for adjustment according to the water cut classification of the target oil well and the actual water cut of each layer section includes: if the target oil well is a high water cut well, judging whether the actual water cut difference between the layers in the target oil well is less than a predetermined difference, if so, the adjustment method is plane adjustment and / or intra-layer adjustment, if not, the adjustment method is inter-layer adjustment and / or plane adjustment and / or intra-layer adjustment; if the target oil well is a medium water cut well, judging whether the actual water cut difference between the layers in the target oil well is less than a predetermined difference, if so, the adjustment method is plane adjustment and / or intra-layer adjustment; if so, the adjustment method is inter-layer adjustment and / or plane adjustment and / or intra-layer adjustment; The difference in actual water content between each layer in the target oil well is less than the predetermined difference. If so, the adjustment method is plane adjustment and / or pressure adjustment and / or intra-layer adjustment; if not, the adjustment method is inter-layer adjustment and / or pressure adjustment; if the target oil well is a low water-content well, it is judged that the difference in actual water content between each layer in the target oil well is less than the predetermined difference. If so, the adjustment method is plane adjustment and / or pressure adjustment; if not, the adjustment method is inter-layer adjustment and / or pressure adjustment and / or plane adjustment.
[0077] In an embodiment of the present invention, if the actual water cut difference between each layer in the target oil well is less than the predetermined water cut, plane adjustment is a required option when selecting the adjustment method; if the actual water cut difference between each layer in the target oil well is greater than or equal to the predetermined water cut, inter-layer adjustment is a required option when selecting the adjustment method.
[0078] When adjusting a specific single well in the work area, the oil and water well end, whether it is adjustment within the layer, adjustment between layers, plane adjustment or pressure adjustment, is not isolated. When focusing on adjusting a prominent contradiction, it is also necessary to determine it based on the characteristics of the specific single well oil layer and the changes in dynamic data. Among them, the predetermined difference is 5%.
[0079] Step S03: completing injection and production control of the target oil and water wells by performing intra-layer and / or inter-layer and / or plane adjustment and / or pressure adjustment.
[0080] In the embodiment of the present invention, taking the target oil well X1 in the work area as an example, first determine the surrounding water wells connected to it, including X2, X3, and X4, a total of 3 wells. Before implementing the corresponding adjustment, the oil and water well data must first be recorded, and then combined with multidisciplinary research results and various dynamic data, the corresponding relationship between the oil and water wells, the sand body development and production status are analyzed, and then the corresponding relationship between the oil and water wells is determined. Table 1 below is a table of the corresponding situations between the target oil well X1 and its connected water wells.
[0081] Table 1: Correspondence between oil and water wells in X1 well group
[0082]
[0083] After determining the layer correspondence between the well X1 and the connected water wells, the cable direct-controlled downhole corresponding sub-control technology was implemented with the oil well X1 as the center and the three connected water injection wells, and the basic information and layer test data of the target oil well X1 were collected. The collection results are shown in Tables 2 and 3 below.
[0084] Table 2: X1 single well basic information table
[0085]
[0086] Table 3: X1 Well stratified section test table
[0087]
[0088] According to Table 3, it can be determined that the water content of the whole well has exceeded 95%, so the water content level of the target oil well is a high water content well, and the water content difference between each layer is less than 5%, so the selected adjustment method is plane adjustment.
[0089] After the oil well X1 was put into the well, the four layers were tested for switch and the production status of the four layers was determined. The layered control data is shown in Table 4. It can be seen from Table 4 that the 1st, 2nd and 3rd layers are all high-water-containing layers, and the 4th layer is a low-yield high-water-containing layer. Through analysis, the injection volume of layer 7 of the water well X3 corresponding to the 4th layer of the oil well X1 is 20m 3 , the water injection volume is already high, but the No. 4 layer of oil well X1 still has no production. Combining the dynamic analysis of multidisciplinary geology and formations, it can be considered that this layer is a low permeability layer with no production capacity. The No. 1, 2, and 3 layers of oil well X1 are all high water-containing layers with small differences. Therefore, the plane adjustment is carried out according to the corresponding adjustment method of oil and water wells.
[0090] Table 4: X1 well post-plugging stratification control data table
[0091]
[0092]
[0093] According to the above situation, the well group made corresponding adjustments to the oil and water wells: the layer 4 of the X1 well was closed, and the valve opening of the 1st, 2nd and 3rd layers were adjusted to 80%. The corresponding water injection plan for the corresponding layer of the X4 well remained unchanged, and the production of the oil wells was tracked and observed. After the adjustment, the oil well X1 achieved better development results, with daily liquid production reduced by 5 tons, daily oil production increased by 0.1 tons, and water content decreased by 3.4 percentage points.
[0094] The present invention has carried out corresponding sub-control tests on three oil and water well groups, and used the cable direct control layered production allocation technology to calculate the single-layer production of the central oil well, and found out the production of liquid, oil, water content and pressure of the single-layer segment. Combined with geological multi-disciplinary and development dynamic data, the main contradictions of the oil well layers were found, and it was confirmed that the differences between the layers of well group 1 were not large, and plane adjustment was mainly used. The differences between the layers of well groups 2 and 3 were large, and the adjustment between the layers was mainly used while taking plane adjustment into account. After adjustment, the three well groups saw better development effects in the short term, with a cumulative decrease of 1,756 tons in liquid production, basically stable oil production, and a decrease of 3.2 percentage points in water content, achieving the goal of reducing liquid, stabilizing oil and reducing water content.
[0095] The method of the present invention is based on the stratified injection and production of oil and water wells. With the target oil well as the central well, the water injection wells connected to it are found for one-to-one stratified adjustment. When the water injection scheme is changed, the water injection well is used as the central well to observe the effects of the surrounding electrically controlled production wells and the oil wells that have not taken measures, and then take corresponding adjustment measures. The adjustment process of the oil and water well group is a long process. By applying the corresponding adjustment method of the present invention, the previous single development mode of oil wells and water wells that can only rely on plane adjustment has been changed. The main contradiction of the single well formation can be found, the low-pressure potential layer can be released, the interlayer and plane contradictions can be alleviated, the invalid water circulation can be controlled, the development effect of the oil field block is improved, and a means for multi-layer water drive development and potential tapping is provided.
[0096] It can be understood that the above-mentioned various method embodiments mentioned in the present invention can be combined with each other to form a combined embodiment without violating the principle logic. Due to space limitations, the present invention will not go into details.
[0097] Those skilled in the art will appreciate that, in the above method of specific implementation, the order in which the steps are written does not imply a strict execution order and does not constitute any limitation on the implementation process. The specific execution order of the steps should be determined by their functions and possible internal logic.
[0098] The embodiments of the present invention have been described above, and the above description is exemplary, not exhaustive, and is not limited to the disclosed embodiments. Many modifications and variations will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the described embodiments. The selection of terms used herein is intended to best explain the principles of the embodiments, practical applications, or technical improvements in the market, or to enable other persons of ordinary skill in the art to understand the embodiments disclosed herein.
Claims
1. A cable direct-controlled injection and production control method for oil and water wells, characterized in that: include: Obtain the correspondence between oil and water wells in the work area and the actual water content of each layer of the target oil well and the actual permeability of each small layer; According to the correspondence between the oil and water wells in the stratified sections, the target oil well is adjusted within the stratum and / or between stratum sections and / or in the plane and / or in the pressure; The intra-layer adjustment includes: adjusting the injection and production of each sub-layer in the target layer of the target oil well according to the corresponding relationship between the oil and water wells, so that the actual permeability of each sub-layer reaches the predetermined permeability; The inter-layer adjustment includes: determining the water content level corresponding to each layer according to the actual water content of each layer, and selecting a corresponding adjustment method to adjust the injection and production of the layer according to the water content level, so that the actual water content of each layer reaches a first predetermined water content; The plane adjustment includes: adjusting the injection-production relationship between the water injection end and each production end in the same plane according to the corresponding relationship between the oil and water wells, so that the water content of each production end reaches a second predetermined water content; By performing the intra-layer and / or inter-layer and / or plane adjustment and / or pressure adjustment, the injection and production regulation of the target oil and water well is completed.
2. The oil-water well cable direct control injection and production control method according to claim 1 is characterized in that: The method for adjusting the injection and production of each sublayer in the target layer section of the target oil well according to the oil-water well correspondence relationship comprises: Determine the sub-layers whose actual permeability is less than the predetermined permeability among the sub-layers in the target layer section of the oil well; According to the correspondence between the oil and water wells, the water well injection end corresponding to the small layer whose actual permeability is less than the predetermined permeability is determined, and the injection pressure of the corresponding water well injection end is increased to a first predetermined injection pressure. At the same time, the production end of the small layer whose actual permeability is less than the predetermined permeability is closed.
3. The oil and water well cable direct control injection and production control method according to claim 1 is characterized in that: The method for determining the corresponding water content level according to the actual water content of each layer segment includes: The water content levels corresponding to the layer sections include: low aquifer, middle aquifer and high aquifer; If the actual water content is less than 90%, the corresponding layer section is a low-water layer; If the actual water content is greater than or equal to 90% and less than or equal to 95%, the corresponding layer segment is a middle aquifer; If the actual water content is greater than 95%, the corresponding layer segment is a high water-containing layer.
4. The oil-water well cable direct control injection and production control method according to claim 3 is characterized in that: The method of adjusting the injection and production of the layer by selecting a corresponding adjustment method according to the water content level includes: Obtain the actual pressure value of each layer section and determine whether the layer section is a high pressure layer, a balanced pressure layer or a low pressure layer; If the layer section is a low-water-containing layer, the production end of the oil well in the layer section is fully opened. At the same time, if the layer section is a high-pressure layer, the water injection amount at the corresponding water well injection end is reduced to the first predetermined water injection amount or maintained at the original water injection amount. If it is a balanced pressure layer, the water injection amount at the corresponding water well injection end is maintained at the original water injection amount. If it is a low-pressure layer, the water injection amount at the corresponding water well injection end is increased to the second predetermined water injection amount. If the layer section is a medium aquifer, the production end of the oil well in the layer section is opened to a predetermined opening. At the same time, if the layer section is a high-pressure layer, the water injection amount at the corresponding water well injection end is reduced to a third predetermined water injection amount or maintained at the original water injection amount. If it is a balanced pressure layer or a low pressure layer, the corresponding water well injection end is maintained at the original water injection amount. If the layer section is a high water-containing layer, the production end of the oil well in the layer section will be shut down, and the corresponding water well will be injected to maintain the original water injection volume.
5. The oil-water well cable direct-control injection and production control method according to claim 1, characterized in that: The method for adjusting the injection-production relationship between the water injection end and each production end in the same plane according to the oil-water well correspondence relationship comprises: If in the same plane, the number of oil well production ends connected to the same water well is greater than or equal to 2, the oil well production end with an actual water content greater than or equal to the second predetermined water content is closed or opened to a predetermined opening.
6. The oil-water well cable direct control injection and production control method according to claim 1, characterized in that: The pressure adjustment includes: Among the multiple oil wells connected to the same target water well in the work area, the production end of the oil well with a relatively high average pressure in the inner layer of the oil well is closed, so that the pressure of the oil well with a relatively low average pressure is increased to a predetermined average pressure.
7. The oil-water well cable direct-control injection and production control method according to any one of claims 1 to 6, characterized in that: Also includes: Obtain the actual water content of the target oil wells in the work area; Determine the water cut classification corresponding to the target oil well according to the actual water cut of the target oil well, wherein the water cut classification corresponding to the target oil well includes: high water cut well, medium water cut well and low water cut well; According to the water cut classification of the target oil well and the actual water cut of each layer, one or more corresponding adjustment methods are selected for adjustment.
8. The oil-water well cable direct-control injection and production control method according to claim 7, characterized in that: The method of selecting one or more corresponding adjustment methods for adjustment according to the water cut classification of the target oil well and the actual water cut of each layer section includes: If the target oil well is a high water-cut well, it is determined whether the actual water-cut difference between the layers in the target oil well is less than the predetermined difference. If so, the adjustment method is plane adjustment and / or intra-layer adjustment. If not, the adjustment method is inter-layer adjustment and / or plane adjustment and / or intra-layer adjustment. If the target oil well is a medium water-containing well, it is determined whether the actual water content difference between the layers in the target oil well is less than the predetermined difference. If so, the adjustment method is plane adjustment and / or pressure adjustment and / or intra-layer adjustment; if not, the adjustment method is inter-layer adjustment and / or pressure adjustment; If the target oil well is a low water content well, it is determined whether the actual water content difference between the layers in the target oil well is less than the predetermined difference. If so, the adjustment method is plane adjustment and / or pressure adjustment. If not, the adjustment method is inter-layer adjustment and / or pressure adjustment and / or plane adjustment.