Well type structure of coal-bed gas well and method for improving recovery efficiency
The low-yield wells are connected through side drilling horizontal well technology, which solves the problems of high cost of existing coalbed methane development wells and low reservoir permeability, and achieves the effect of reducing the cost of new wellbore construction and improving recovery.
Patent Information
- Application Number
- CN202310636170.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-31
- Publication Date
- 2024-12-03
AI Technical Summary
Most of the existing coalbed methane development wells are directional straight inclined wells, and vertical wells are vertical wells. New L-shaped horizontal wells require new well sites, which are high costs and low reservoir permeability, resulting in more overall low-yield wells and residual resources between wells. Underutilized.
Side drilling horizontal well technology is used to connect low-yield vertical wells with other low-yield vertical wells or horizontal wells, and form a new horizontal well type through side drilling, avoiding the cost of building new horizontal wells and increasing the output of existing wells. The specific steps include selecting two low-yield wells, determining the trajectory of the side drilling borehole, sealing the developed section, connecting the side drilling borehole with the low-yield well, and fracturing to improve the recovery rate.
The cost of building new horizontal well boreholes has been greatly reduced, the output and overall recovery of existing vertical wells have been increased, the well site resources have been fully utilized, and the degree of coalbed methane production has been improved.
Smart Images

Figure CN119062304A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of coalbed methane development, and in particular to a coalbed methane well structure and a method for improving recovery rate. Background Art
[0002] In the early stage of coalbed methane development in my country, vertical wells were the main method. Due to the low permeability of the reservoir, there were many low-yield wells and many residual resources between wells. With the maturity of horizontal well technology, especially the large-scale application of L-type horizontal well staged fracturing technology, the single-well production of coalbed methane has increased significantly, reaching more than 10,000-100,000 cubic meters. Moreover, field practice has shown that in the developed well network, deploying horizontal wells in areas with more residual resources between wells can achieve higher single-well production and greatly improve the overall recovery rate. This provides technical ideas and practical support for the use of low-yield vertical wells to transform into new well types, and then form a method to increase the production of low-yield vertical wells.
[0003] The utility model patent with application number: 201821093301.3 discloses a U-shaped horizontal well, which includes an L-shaped horizontal well and a vertical well, and is applied to the field of enhanced geothermal efficient development technology. Among them, the L-shaped horizontal well is a three-section wellbore structure of straight-increase-stable, and the straight section, the increase section and the stable section are sequentially connected to form an L-shaped horizontal well; the vertical well enters the stable formation below the bedrock vertically from the ground, and its end is connected to the end of the horizontal section of the L-shaped horizontal well to form a U shape.
[0004] Regarding the above-mentioned related technologies, the inventors believe that the vertical well in this method is a vertical well, while most of the existing coalbed methane development wells are directional vertical inclined wells; the L-shaped horizontal well in this method is a new well, which requires new drilling land and is costly. Summary of the invention
[0005] In order to reduce the cost of newly-built horizontal wells, increase the production of existing vertical wells, and thus improve the overall recovery rate, the present application provides a coalbed methane well type structure and a method for improving recovery rate.
[0006] The coalbed methane well structure provided in this application adopts the following technical solution:
[0007] A coalbed methane well structure includes a well A, a well B is opened on one side of the well A, a side-drilled horizontal well is opened between the well A and the well B, and the side-drilled horizontal well connects the well A and the well B.
[0008] By adopting the above technical solution, a new horizontal well type is formed by making full use of the well site and wellbore, thereby avoiding the cost of building a new horizontal well site and greatly reducing the cost of building a new horizontal wellbore; the well type structure provided can increase the production of existing wells, thereby improving the overall recovery rate.
[0009] Optionally, the well A may be a vertical well or a horizontal well, and the well B may be a vertical well or a horizontal well. When the well A and / or the well B are horizontal wells, the side-drilled horizontal well is located in the vertical well section of the common part of the well A and / or the well B.
[0010] Optionally, the present application also provides a method for improving the recovery rate of coalbed methane wells, providing
[0011] The following construction steps:
[0012] S01, select two wells;
[0013] S02, determining the wellbore trajectory of the sidetracking horizontal well according to the distance between well A and well B and the position of the target layer, and the position where the wellbore trajectory of the sidetracking horizontal well begins to deviate from the wellbore trajectory of well A is the sidetracking point;
[0014] S03, plugging the developed layer of Well A to ensure the integrity of the wellbore and reduce the occurrence of lost circulation during the sidetracking process;
[0015] S04, using the borehole of well A to side-drill a horizontal well, the spatial distance between the end borehole of the horizontal well and the borehole of the low-yield well B is less than a predetermined threshold;
[0016] S05, the borehole diameter of the sidetracked horizontal well is less than or equal to the borehole diameter of the well A;
[0017] S06, connecting the side-drilled horizontal well bore to the low-yield well B, performing fracturing in the wellbore of the low-yield well B, and connecting the side-drilled horizontal well and the low-yield well B through the fracturing cracks;
[0018] S07, fracturing the side-drilled horizontal well;
[0019] S08, lower the drainage equipment into well B to drain water and reduce pressure; the original drainage equipment can be retained in well A for early drainage.
[0020] Optionally, in S01, well A and well B are preferably low-yield wells, the current production of well A and well B is lower than the efficient development production of the region where they are located, and the cumulative gas production of a single well is lower than a certain proportion of the well-controlled recoverable reserves, there are a large amount of surplus resources between the wells, and the distance between well A and well B is greater than the horizontal section of the side-drilling horizontal well.
[0021] Optionally, in S02, in S02, the wellbore trajectory of the side-drilling horizontal well should be kept monotonously smooth, and the wellbore trajectory passes through a high remaining resource distribution area.
[0022] Optionally, in S02, if well A is a horizontal well, its horizontal well development layer is the same as the target layer, and the minimum angle between the wellbore trajectory direction of the side-drilled horizontal well and the wellbore trajectory of the original horizontal well is greater than 50°.
[0023] Optionally, in S05, if all the casings above the sidetracking point are free casings, all the free casings are cut and removed, and then the horizontal well is sidetracked using a drill bit with the same diameter as that of well A.
[0024] Optionally, in S05, if the sidetracking point and above have been cemented, a window may be opened at the sidetracking point, and a drill bit smaller than the casing diameter of well A may be used to sidetrack the horizontal well.
[0025] Optionally, in S06, the borehole expansion tool may be used to expand the wellbore of the low-yield well B so that the side-drilled horizontal well and the low-yield well B are connected.
[0026] Optionally, the well with a relatively high altitude in the same target layer is well A, and the well with a relatively low altitude is well B.
[0027] In summary, the present application includes at least one of the following beneficial technical effects:
[0028] 1. By making full use of the vertical well site and wellbore to form a new horizontal well type, the cost of building a new horizontal well site is avoided and the cost of building a new horizontal wellbore is greatly reduced; the well type structure provided can increase the production of existing vertical wells, thereby improving the overall recovery rate. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a structural schematic diagram of a coalbed methane well type structure in an embodiment of the present application when well A and well B are vertical wells.
[0030] Figure 2 It is a structural schematic diagram of a coalbed methane well type structure in an embodiment of the present application when well A, well B and well C are vertical wells;
[0031] Figure 3 It is a structural schematic diagram of a coalbed methane well type structure in an embodiment of the present application when well A, well B and well C are horizontal wells;
[0032] Figure 4 It is a flow chart of a method for increasing production of a coalbed methane well type in an embodiment of the present application.
[0033] Explanation of the accompanying drawings: 1. Well A; 2. Well B; 3. Well C; 4. Side-drilling horizontal well. DETAILED DESCRIPTION
[0034] The following is combined with Figure 1-3 This application is described in further detail.
[0035] The present application discloses a coalbed methane well structure and a method for improving the recovery rate. Figure 1 , Figure 2A coalbed methane well structure includes a well A, a well B is opened on one side of the well A, the well with a relatively high altitude in the same target layer is well A, and the well with a relatively low altitude in the same target layer is well B.
[0036] A side-drilled horizontal well is also drilled on the side wall of Well A, which connects Well A and Well B.
[0037] Wherein, well A can be a vertical well or a horizontal well, and well B can be a vertical well or a horizontal well. When well A and / or well B are horizontal wells, a horizontal well is side-drilled in a well section that is a common part of well A and / or well B.
[0038] Reference Figure 1 , Figure 3 The present application also discloses a method for improving the recovery rate of coalbed methane wells, and the construction steps are as follows:
[0039] S01, two low-yield wells are preferred (the current production of well A and well B is lower than the efficient development production in their regions, and the cumulative gas production of a single well is lower than a certain proportion of the well-controlled recoverable reserves, and there are a large number of surplus resources between the wells. Generally, the cumulative production of a single well is lower than 40% of the well-controlled recoverable reserves, that is, the surplus resources are more than 60%).
[0040] The well with a relatively high altitude in the same target layer is Well A, and the well with a relatively low altitude is Well B. The distance between the two wells should be greater than the horizontal section of the sidetracking horizontal well, and the length of the horizontal wellbore in the target layer should be increased as much as possible to ensure that the horizontal section of the sidetracking horizontal well reaches a certain length.
[0041] S02, according to the distance between well A and well B and the position of the target layer, determine the wellbore trajectory of the sidetracking horizontal well, the position where the wellbore trajectory of the sidetracking horizontal well begins to deviate from the wellbore trajectory of well A is the sidetracking point, and ensure that the position of the sidetracking point is higher than all the developed layers of well A. If well A is a horizontal well, its horizontal well development layer is the same as the target layer, and the minimum angle between the wellbore trajectory direction of the sidetracking horizontal well and the wellbore trajectory of the original horizontal well is greater than 50°.
[0042] S03, plugging the developed layer of Well A to ensure the integrity of the wellbore and reduce the occurrence of lost circulation during the sidetracking process;
[0043] S04, use the wellbore of well A to side-drill a horizontal well in the direction of well B, the spatial distance between the end wellbore of the side-drilled horizontal well and the wellbore of the low-yield well B is less than the preset threshold, the wellbore trajectory should remain monotonously smooth, and the wellbore trajectory passes through the high remaining resource distribution area.
[0044] S05, the borehole diameter of the sidetracked horizontal well is less than or equal to the borehole diameter of the well A. If the sidetracked point and above are all free casings, all free casings are cut and removed, and then the horizontal well is sidetracked with a drill bit of the same diameter as that of well A. If the sidetracked point and above are cemented, a window can be opened at the sidetracked point, and a drill bit with a smaller diameter than that of the casing of well A can be used to sidetrack the horizontal well.
[0045] S06, connecting the side-drilled horizontal well borehole with the low-yield well B, and performing fracturing in the wellbore of the low-yield well B to connect the side-drilled horizontal well and the low-yield well B through the fracturing cracks, or using an expansion tool to expand the wellbore of the low-yield well B so that the side-drilled horizontal well and the low-yield well B are relatively connected.
[0046] S07, a screen and casing are run into the side-drilled horizontal wellbore for completion. After the casing is run, staged fracturing can be performed, or after the screen is run, general or temporary plugging fracturing can be performed.
[0047] S08, lowering drainage equipment into well B to drain water and reduce pressure; in well A, the original drainage equipment may be retained for early drainage, or the drainage equipment may not be retained.
[0048] At the same time, a low-yield well C whose target layer is located at a higher altitude than well B can be selected, and the above S02-S07 can be repeated to obtain a new well type.
[0049] According to the above construction steps, this application can further provide specific examples:
[0050] 1. According to the local average gas price and the total cost of gas per cubic meter, the economically recoverable production of vertical wells in the study area is calculated to be 500 cubic meters per day;
[0051] 2. Two adjacent low-yield vertical wells are preferred. The target layer of both wells is the 3# coal seam. The 3# coal seam of well A is 250m above sea level, and the 3# coal seam of well B is 200m above sea level. The distance between well A and well B is 800m. The cumulative gas production of well A is 1 million cubic meters, and the cumulative gas production of well B is 950,000 cubic meters. The well-controlled resources of well A and well B are both around 15 million cubic meters, and the recovery rate is less than 10%. There are a lot of surplus resources between the wells. The distance between well A and well B is 800m, which can ensure a horizontal section length of more than 600m.
[0052] 3. According to the distance between well A and well B and the position of the target layer, the wellbore trajectory of the side-drilling horizontal well is determined. The intersection of the wellbore trajectory and the wellbore of well A is the side-drilling point. The side-drilling point is located at an altitude of 750m. If all the free casings are above the side-drilling point, all the free casings are cut and removed. Well A is a two-opening structure, and the two-opening is drilled with a 139.7mm drill bit. Therefore, after removing all the free casings, a 139.7mm drill bit can be used to side-drill the horizontal well.
[0053] 4. The space distance between the end wellbore of the side-drilled horizontal well and the wellbore of the low-yield well B is about 1m.
[0054] 5. Use the expansion tool to cut the casing and coal seam at the target layer in the vertical well B, so that the side-drilled horizontal well is connected with the low-yield well B; by injecting clean water into well A and observing the changes in the dynamic liquid level in well B, determine whether the two are connected.
[0055] 6. The reservoir permeability in this area is low, so casing is run into the side-drilled horizontal wellbore for completion and staged fracturing.
[0056] 7. Lower the drainage equipment into Well B to drain water and reduce pressure.
[0057] The implementation principle of a coalbed methane well type structure and a method for improving recovery rate in an embodiment of the present application is: by making full use of the vertical well site and wellbore to form a new horizontal well type, the cost of building a new horizontal well site is avoided, and the cost of building a new horizontal wellbore is greatly reduced; the well type structure provided by the present invention can increase the production of existing vertical wells, thereby improving the overall recovery rate.
[0058] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A coalbed methane well structure, characterized by: The invention comprises a well A, a well B is opened on one side of the well A, a side-drilled horizontal well is opened between the well A and the well B, and the side-drilled horizontal well connects the well A and the well B.
2. A coalbed methane well structure according to claim 1, characterized in that: The well A may be a vertical well or a horizontal well, and the well B may be a vertical well or a horizontal well. When the well A and / or the well B are horizontal wells, the side-drilled horizontal well is located in the well section of the common part of the well A and / or the well B.
3. A method for improving the recovery rate of coalbed methane wells, characterized in that: Applied to a coalbed methane well structure as claimed in any one of claims 1-2, the method comprises: providing the following construction steps: S01, select two wells; S02, determining the wellbore trajectory of the sidetracking horizontal well according to the distance between well A and well B and the position of the target layer, and the position where the wellbore trajectory of the sidetracking horizontal well begins to deviate from the wellbore trajectory of well A is the sidetracking point; S03, plugging the developed layer section of Well A to ensure the integrity of the wellbore; S04, using the borehole of well A to side-drill a horizontal well, the spatial distance between the end borehole of the horizontal well and the borehole of the low-yield well B is less than a predetermined threshold; S05, the borehole diameter of the sidetracked horizontal well is less than or equal to the borehole diameter of the well A; S06, connecting the side-drilled horizontal well bore to the low-yield well B, performing fracturing in the wellbore of the low-yield well B, and connecting the side-drilled horizontal well and the low-yield well B through the fracturing cracks; S07, fracturing the side-drilled horizontal well; S08, lower the drainage equipment into well B to drain water and reduce pressure; the original drainage equipment can be retained in well A for early drainage.
4. A method for improving the recovery rate of coalbed methane wells according to claim 3, characterized in that: In S01, Well A and Well B are preferably low-yield wells, the current production of Well A and Well B is lower than the efficient development production in the region where they are located, and the cumulative gas production of a single well is lower than a certain proportion of the well-controlled recoverable reserves, there are a large amount of surplus resources between the wells, and the distance between Well A and Well B is greater than the horizontal section of the side-drilling horizontal well.
5. A method for improving the recovery rate of coalbed methane wells according to claim 3, characterized in that: The well with a relatively high altitude for the same target layer is Well A, and the well with a relatively low altitude is Well B.
6. A method for improving the recovery rate of coalbed methane wells according to claim 3, characterized in that: In S02, the wellbore trajectory of the sidetracked horizontal well should be kept monotonously smooth, and the wellbore trajectory passes through a high remaining resource distribution area.
7. A method for improving the recovery rate of coalbed methane wells according to claim 3, characterized in that: In S02, if well A is a horizontal well, the development layer of the horizontal well is the same as the target layer, and the minimum angle between the wellbore trajectory direction of the sidetracked horizontal well and the wellbore trajectory of the original horizontal well is greater than 50°.
8. A method for improving the recovery rate of coalbed methane wells according to claim 3, characterized in that: In S05, if all the casings above the sidetracking point are free casings, all the free casings are cut and removed, and then the horizontal well is sidetracked using a drill bit with the same diameter as that of well A.
9. A method for improving the recovery rate of coalbed methane wells according to claim 3, characterized in that: In S05, if the sidetracking point and above have been cemented, a window may be opened at the sidetracking point, and a drill bit smaller than the casing diameter of well A may be used to sidetrack the horizontal well.
10. A method for improving the recovery rate of coalbed methane wells according to claim 3, characterized in that: In S06, the borehole expansion tool may be used to expand the wellbore of the low-yield well B so that the side-drilled horizontal well and the low-yield well B are connected.