Automatic monitoring system and monitoring method for stock bin flow

The automatic silo flow monitoring system addresses the inaccuracies of manual data collection by employing an integrated system with ZigBee technology for real-time, accurate silo flow monitoring, improving production efficiency and resource management.

CN119063789APending Publication Date: 2024-12-03WUXI SUNWAY AUTOMATION TECH CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411201703.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

Existing silo flow monitoring methods rely on manual data collection, which is cumbersome and inconsistent, leading to inaccurate silo flow measurements due to irregular timing and potential errors.

Method used

An automatic silo flow monitoring system utilizing an automatic timing collection unit, processing unit, and management unit, integrated with ZigBee technology for real-time data acquisition, processing, and control, ensuring consistent and accurate silo flow monitoring.

Benefits of technology

The system provides real-time, accurate, and reliable silo flow monitoring, enhancing production efficiency and resource utilization by minimizing measurement errors and ensuring consistent data collection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119063789A_ABST
    Figure CN119063789A_ABST
Patent Text Reader

Abstract

The invention discloses a flow monitoring system, belongs to the technical field of stock bin flow monitoring, and relates to an automatic stock bin flow monitoring system and a monitoring method.According to the flow monitoring system, data of a stock bin are collected regularly through an automatic timing collection unit, and environment changes around the stock bin are sensed; the collected information is converted into a digital signal to be sent to the processing unit; the processing unit is used for receiving, processing and analyzing the data of the automatic timing acquisition units in the stock bins, sending the acquired data to the management unit for display, receiving a control instruction sent by the management unit, and controlling each automatic timing acquisition unit; and the management unit receives the stock bin information sent by the processing unit, classifies, processes and displays the stock bin information, and controls the automatic timing acquisition unit of each stock bin, so that data is acquired through a plurality of sensors, the data is sent to a user side by utilizing a ZigBee wireless communication technology, and the acquired data is analyzed and preprocessed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention discloses a flow monitoring system, belongs to the technical field of silo flow monitoring, and specifically relates to an automatic silo flow monitoring system and a monitoring method. Background Art

[0002] Silo flow metering is a common measurement technology in industrial production processes, used to monitor and control the flow rate and total amount of materials in the silo. It involves the use of various sensors and instruments to measure the material in and out speed or material level changes inside the silo in real time to ensure the accuracy and stability of material supply during production. In silo flow metering, common technologies include:

[0003] Weight metering system: The weight change of the material in the silo is measured by a weighing sensor installed under the silo, thereby calculating the amount of material in and out.

[0004] Sonic or ultrasonic sensors: Used to measure the height or level changes of materials in the silo without contact, and calculate the rate of material inflow or outflow through the time difference.

[0005] Microwave Sensor: Similar to an acoustic sensor, but uses the properties of microwaves to measure the level and movement of material inside a silo.

[0006] Laser sensor: Accurately measures the height or level of materials in a silo, suitable for applications that require high measurement accuracy.

[0007] In the prior art, silo flow measurement is mostly monitored by sensors, and then the staff obtains the silo flow through on-site statistics. However, this method is cumbersome and requires staff to collect data on site at regular intervals. The uniformity of time cannot be guaranteed, resulting in certain errors in the collected data, which leads to inaccurate silo flow. Summary of the invention

[0008] Purpose of the invention: To provide a silo flow automatic monitoring system and monitoring method to solve the above-mentioned problems.

[0009] Technical solution:

[0010] In the first aspect, a silo flow automatic monitoring system is provided, the automatic monitoring system comprising:

[0011] The automatic timing collection unit is installed in each silo to collect various data of the silo and sense the changes in the environment around the silo at regular intervals, and convert the collected information into digital signals and send them to the processing unit;

[0012] The processing unit receives the data from the automatic timing collection unit in each silo, processes and analyzes it, sends each collected data to the management unit for display, and receives the control instructions issued by the management unit to control each automatic timing collection unit;

[0013] The management unit receives the silo information from the processing unit, classifies and displays it, and controls the automatic timing collection unit of each silo.

[0014] In a further embodiment, the automatic timing acquisition unit includes: a temperature and humidity acquisition module, a weight acquisition module, a timing module, a timing start and stop module, an information acquisition card and a control module;

[0015] The temperature and humidity collection module and the weight collection module collect the temperature and humidity of the silo and the weight of the material flowing out within a specified time;

[0016] The information acquisition card is respectively connected to the temperature and humidity acquisition module and the weight acquisition module to receive the acquisition signals output by the temperature and humidity acquisition module and the weight acquisition module and send them to the control module;

[0017] The timing module is connected to the control module and the weight collection module at the same time, and is used to time the weight collection module, so as to collect the flow rate of the silo within a specified time;

[0018] The timing start-stop module is connected to the control module, the weight acquisition module, and the temperature and humidity acquisition module at the same time, and is used to start the temperature and humidity acquisition module and the weight acquisition module at regular intervals to collect data;

[0019] The control module is connected to the processing unit.

[0020] In a further embodiment, the processing unit includes a controller, a signal processing module, an AD conversion module and a wireless transceiver module;

[0021] The signal processing module receives various detection data from the information acquisition card in the automatic timing acquisition unit, and performs signal amplification and filtering and sends the signal to the AD conversion module;

[0022] The AD conversion module receives the signal from the signal processing module, converts the analog signal into a digital signal and sends it to the controller;

[0023] The controller converts the signal into an actual value after calculation, and sends the information to the management unit through the wireless transceiver module.

[0024] In a further embodiment, the wireless transceiver module adopts a ZigBee module with a built-in RF transceiver and a control module. The controller exchanges data with the ZigBee module through a USART interface and sends the collected weight and temperature and humidity information data to the ZigBee gateway.

[0025] In a further embodiment, the management unit manages the automatic timing acquisition unit, the processing unit and the ZigBee gateway in a unified manner. By real-time monitoring of the working status and environmental information of multiple devices, the device whose silo flow exceeds the threshold is processed and alarmed, so as to realize the monitoring and control of the stable operation of the whole system; the management unit includes a login management module, a statistical analysis module, a system management module, a metering management module and an information management module.

[0026] In a second aspect, a method for automatically monitoring silo flow is implemented by the above-mentioned automatic silo flow monitoring system, and the automatic monitoring method comprises:

[0027] Step 1: The control module in the automatic timing acquisition unit sends a timing acquisition signal to the timing module and the timing start-stop module, and the timing module and the timing start-stop module control the temperature and humidity acquisition module and the weight acquisition module to work. The acquisition signals of the temperature and humidity acquisition module and the weight acquisition module are integrated into a data packet through the information acquisition card and sent to the processing unit:

[0028] Step 2: The processing unit processes the weight, temperature and humidity in the data packet, and sends the collected weight, temperature and humidity information data to the ZigBee gateway through the wireless transceiver module.

[0029] Step 3: The ZigBee gateway communicates with the management unit, and the management unit displays, analyzes, and stores the collected data.

[0030] In a further embodiment, the ZigBee unit in the wireless transceiver module can be set as a router node or a terminal node through controller instructions according to the distribution of silo equipment to ensure the reasonable distribution of router nodes and improve the reliability and stability of the data transmission path;

[0031] After the processing unit is powered on, it first determines whether to start the Zigbee wireless transceiver module; when starting the wireless transceiver module, the ZigBee module first initializes the Z-Stack protocol stack, then scans the ZigBee network status, searches for a network that can be joined and sends a network access application, and after successful network access, sends a terminal binding request to the gateway, and after successful binding, sends a network ready signal to the main controller; the main controller can transmit the collected weight information and temperature and humidity detection information to the gateway after successful network access.

[0032] In a further embodiment, after the ZigBee gateway is powered on, it first initializes the protocol stack, scans the spatial channel status after successful initialization, selects the appropriate channel and network identifier to establish a network, and after the network is successfully established, other nodes join the network as network sub-nodes; after the sub-node scans the network established by the gateway, it sends a network access request to the gateway, and the gateway determines whether the sub-node can join the network based on the network status and the sub-node request information, and sends a request response; after receiving the request response, if the gateway allows the sub-node to join, it will obtain a 16-bit network short address assigned by the gateway as an identity in the ZigBee network, if not allowed to join, the sub-node will continue to scan available networks; the controller establishes communication with the gateway through the RS232 interface or the network interface, and queries the network status, sets the weighing unit parameters, and collects the measurement information through the gateway.

[0033] Beneficial effect: The automatic silo flow monitoring system and monitoring method of the present invention are used in combination with sensors and data processing systems to monitor the flow of materials in the silo in real time, and perform automatic control through the ZigBee gateway and management unit as needed. The accuracy of the silo flow metering system of the present invention is of great significance to material management and cost control in the industrial production process, and can help enterprises improve production efficiency and resource utilization to ensure that the final measurement results are accurate and reliable. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 It is a schematic diagram of the automatic monitoring system for silo flow of the present invention.

[0035] Figure 2 It is a schematic diagram of the automatic timing acquisition unit of the present invention.

[0036] Figure 3 It is a schematic diagram of a processing unit of the present invention.

[0037] Figure 4 It is a schematic diagram of the management unit of the present invention.

[0038] Figure 5 It is a working schematic diagram of the automatic monitoring method of the present invention.

[0039] Figure 6 It is the working flow chart of the ZigBee module of the present invention.

[0040] Figure 7 It is the working flow chart of the ZigBee gateway of the present invention. DETAILED DESCRIPTION

[0041] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0042] Embodiment 1:

[0043] A silo flow automatic monitoring system and monitoring method, such as Figure 1 As shown, the automatic monitoring system comprises:

[0044] The automatic timing collection unit is installed in each silo to collect various data of the silo and sense the changes in the environment around the silo at regular intervals, and convert the collected information into digital signals and send them to the processing unit;

[0045] The processing unit receives the data from the automatic timing collection unit in each silo, processes and analyzes it, sends each collected data to the management unit for display, and receives the control instructions issued by the management unit to control each automatic timing collection unit;

[0046] The management unit receives the silo information from the processing unit, classifies and displays it, and controls the automatic timing collection unit of each silo.

[0047] In one embodiment, Figure 2 As shown, the automatic timing acquisition unit includes: a temperature and humidity acquisition module, a weight acquisition module, a timing module, a timing start and stop module, an information acquisition card and a control module;

[0048] The temperature and humidity collection module and the weight collection module collect the temperature and humidity of the silo and the weight of the material flowing out within a specified time;

[0049] The information acquisition card is respectively connected to the temperature and humidity acquisition module and the weight acquisition module to receive the acquisition signals output by the temperature and humidity acquisition module and the weight acquisition module and send them to the control module;

[0050] The timing module is connected to the control module and the weight collection module at the same time, and is used to time the weight collection module, so as to collect the flow rate of the silo within a specified time;

[0051] The timing start-stop module is connected to the control module, the weight acquisition module, and the temperature and humidity acquisition module at the same time, and is used to start the temperature and humidity acquisition module and the weight acquisition module at regular intervals to collect data;

[0052] The control module is connected to the processing unit.

[0053] In one embodiment, Figure 3 As shown, the processing unit includes a controller, a signal processing module, an AD conversion module and a wireless transceiver module;

[0054] The signal processing module receives various detection data from the information acquisition card in the automatic timing acquisition unit, and performs signal amplification and filtering and sends the signal to the AD conversion module;

[0055] The AD conversion module receives the signal from the signal processing module, converts the analog signal into a digital signal and sends it to the controller;

[0056] The controller converts the signal into an actual value after calculation, and sends the information to the management unit through the wireless transceiver module.

[0057] In one embodiment, Figure 3 As shown, the wireless transceiver module adopts a ZigBee module, which has a built-in RF transceiver and a control module. The controller exchanges data with the ZigBee module through a USART interface and sends the collected weight and temperature and humidity information data to the ZigBee gateway.

[0058] In one embodiment, Figure 4 As shown, the management unit manages the automatic timing collection unit, the processing unit and the ZigBee gateway in a unified manner. By real-time monitoring of the working status and environmental information of multiple devices, the device whose silo flow exceeds the threshold is processed and alarmed, so as to realize the monitoring and control of the stable operation of the whole system; the management unit includes a login management module, a statistical analysis module, a system management module, a metering management module and an information management module.

[0059] Embodiment 2:

[0060] like Figure 5 As shown, a method for automatically monitoring silo flow is characterized in that it is implemented by the above-mentioned automatic silo flow monitoring system, and the automatic monitoring method includes:

[0061] Step 1: The control module in the automatic timing acquisition unit sends a timing acquisition signal to the timing module and the timing start-stop module, and the timing module and the timing start-stop module control the temperature and humidity acquisition module and the weight acquisition module to work. The acquisition signals of the temperature and humidity acquisition module and the weight acquisition module are integrated into a data packet through the information acquisition card and sent to the processing unit:

[0062] Step 2: The processing unit processes the weight, temperature and humidity in the data packet, and sends the collected weight, temperature and humidity information data to the ZigBee gateway through the wireless transceiver module.

[0063] Step 3: The ZigBee gateway communicates with the management unit, and the management unit displays, analyzes, and stores the collected data.

[0064] In one embodiment, Figure 6 As shown, the ZigBee unit in the wireless transceiver module can be set as a router node or a terminal node through controller instructions according to the distribution of silo equipment to ensure the reasonable distribution of router nodes and improve the reliability and stability of the data transmission path;

[0065] After the processing unit is powered on, it first determines whether to start the Zigbee wireless transceiver module; when starting the wireless transceiver module, the ZigBee module first initializes the Z-Stack protocol stack, then scans the ZigBee network status, searches for a network that can be joined and sends a network access application, and after successful network access, sends a terminal binding request to the gateway, and after successful binding, sends a network ready signal to the main controller; the main controller can transmit the collected weight information and temperature and humidity detection information to the gateway after successful network access.

[0066] In one embodiment, Figure 7 As shown, the ZigBee gateway initializes the protocol stack first after powering on, scans the spatial channel status after successful initialization, selects the appropriate channel and network identifier to establish a network, and after the network is successfully established, other nodes join the network as network subnodes; after the subnode scans the network established by the gateway, it sends a network access request to the gateway, and the gateway determines whether the subnode can join the network according to the network status and the subnode request information, and sends a request response; after receiving the request response, if the gateway allows the subnode to join, it will obtain a 16-bit network short address assigned by the gateway as an identity in the ZigBee network, if not allowed to join, the subnode will continue to scan the available network; the controller establishes communication with the gateway through the RS232 interface or the network interface, and queries the network status, sets the weighing unit parameters, and collects the metering information through the gateway.

[0067] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.

Claims

1. A silo flow automatic monitoring system, characterized in that: The automatic monitoring system comprises: The automatic timing collection unit is installed in each silo to collect various data of the silo and sense the changes in the environment around the silo at regular intervals, and convert the collected information into digital signals and send them to the processing unit; The processing unit receives the data from the automatic timing collection unit in each silo, processes and analyzes it, sends each collected data to the management unit for display, and receives the control instructions issued by the management unit to control each automatic timing collection unit; The management unit receives the silo information from the processing unit, classifies and displays it, and controls the automatic timing collection unit of each silo.

2. The automatic silo flow monitoring system according to claim 1, characterized in that: The automatic timing acquisition unit includes: a temperature and humidity acquisition module, a weight acquisition module, a timing module, a timing start and stop module, an information acquisition card and a control module; The temperature and humidity collection module and the weight collection module collect the temperature and humidity of the silo and the weight of the material flowing out within a specified time; The information acquisition card is respectively connected to the temperature and humidity acquisition module and the weight acquisition module to receive the acquisition signals output by the temperature and humidity acquisition module and the weight acquisition module and send them to the control module; The timing module is connected to the control module and the weight collection module at the same time, and is used to time the weight collection module, so as to collect the flow rate of the silo within a specified time; The timing start-stop module is connected to the control module, the weight acquisition module, and the temperature and humidity acquisition module at the same time, and is used to start the temperature and humidity acquisition module and the weight acquisition module at regular intervals to collect data; The control module is connected to the processing unit.

3. The automatic silo flow monitoring system according to claim 2, characterized in that: The processing unit includes a controller, a signal processing module, an AD conversion module and a wireless transceiver module; The signal processing module receives various detection data from the information acquisition card in the automatic timing acquisition unit, and performs signal amplification and filtering and sends the signal to the AD conversion module; The AD conversion module receives the signal from the signal processing module, converts the analog signal into a digital signal and sends it to the controller; The controller converts the signal into an actual value after calculation, and sends the information to the management unit through the wireless transceiver module.

4. The automatic silo flow monitoring system according to claim 3 is characterized in that: The wireless transceiver module adopts a ZigBee module, which has a built-in RF transceiver and a control module. The controller exchanges data with the ZigBee module through a USART interface and sends the collected weight and temperature and humidity information data to the ZigBee gateway.

5. The automatic silo flow monitoring system according to claim 1, characterized in that: The management unit manages the automatic timing collection unit, the processing unit and the ZigBee gateway in a unified manner. By real-time monitoring of the working status and environmental information of multiple devices, the device whose silo flow exceeds the threshold is processed and alarmed, so as to realize the monitoring and control of the stable operation of the whole system; the management unit includes a login management module, a statistical analysis module, a system management module, a metering management module and an information management module.

6. A method for automatically monitoring silo flow, characterized in that: The automatic monitoring method is implemented by a silo flow automatic monitoring system according to any one of claims 1 to 5, and the automatic monitoring method comprises: Step 1: The control module in the automatic timing acquisition unit sends a timing acquisition signal to the timing module and the timing start-stop module, and the timing module and the timing start-stop module control the temperature and humidity acquisition module and the weight acquisition module to work. The acquisition signals of the temperature and humidity acquisition module and the weight acquisition module are integrated into a data packet through the information acquisition card and sent to the processing unit: Step 2: The processing unit processes the weight, temperature and humidity in the data packet, and sends the collected weight, temperature and humidity information data to the ZigBee gateway through the wireless transceiver module. Step 3: The ZigBee gateway communicates with the management unit, and the management unit displays, analyzes, and stores the collected data.

7. A method for automatically monitoring silo flow according to claim 6, characterized in that: The ZigBee unit in the wireless transceiver module can be set as a router node or a terminal node through controller instructions according to the distribution of silo equipment to ensure the reasonable distribution of router nodes and improve the reliability and stability of the data transmission path; After the processing unit is powered on, it first determines whether to start the Zigbee wireless transceiver module; when starting the wireless transceiver module, the ZigBee module first initializes the Z-Stack protocol stack, then scans the ZigBee network status, searches for a network that can be joined and sends a network access application, and after successful network access, sends a terminal binding request to the gateway, and after successful binding, sends a network ready signal to the main controller; the main controller can transmit the collected weight information and temperature and humidity detection information to the gateway after successful network access.

8. The method for automatically monitoring silo flow according to claim 6, characterized in that: After the ZigBee gateway is powered on, the protocol stack is first initialized. After successful initialization, the spatial channel status is scanned, and the appropriate channel and network identifier are selected to establish a network. After the network is successfully established, other nodes join the network as network sub-nodes; after the sub-node scans the network established by the gateway, it sends a network access request to the gateway. The gateway determines whether the sub-node can join the network according to the network status and the sub-node request information, and sends a request response; after receiving the request response, if the gateway allows the sub-node to join, it will obtain a 16-bit network short address assigned by the gateway as an identity in the ZigBee network. If it is not allowed to join, the sub-node will continue to scan available networks; the controller establishes communication with the gateway through the RS232 interface or the network interface, and queries the network status, sets the weighing unit parameters, and collects the measurement information through the gateway.

Citation Information

Cited By

  • Bin management method and system based on Bluetooth Mesh monitoring and control

    CN120264256A