Operation scheduling method for centralized management and control of unmanned boarding bridge
Through the operation and scheduling method of centralized control of unmanned boarding bridges, the IGWO-IPSO algorithm is used to solve the problem of unbalanced scheduling of boarding bridges and control consoles in airports, and the efficient and smooth control of boarding bridges and resource optimization is achieved, which improves the efficiency and smooth control of boarding bridges and improves the Airport operation efficiency.
Patent Information
- Application Number
- CN202411168220.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-23
- Publication Date
- 2024-12-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The lack of centralized control and operation scheduling methods in the airports of unmanned boarding bridges has led to confusion in scheduling and matching rules between the boarding bridges and the control console, resulting in unbalanced operation and affecting efficiency and safety.
Adopt a centralized control and scheduling method for unmanned boarding bridges, including setting remote control processes, setting the number of consoles configured by task type or airport, establishing matching rules between consoles and boarding bridges, and passing IGWO-IPSO algorithm Solve the operation scheduling model to ensure smooth control of the boarding bridge.
It realizes smooth centralized control of unmanned boarding bridges, improves control efficiency and resource utilization, enhances optimization ability and convergence speed, and improves operating speed.
Smart Images

Figure CN119066313A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of airport application technology, and in particular to an operation scheduling method for centralized control of unmanned boarding bridges. Background Art
[0002] Unmanned boarding bridges are an important technological innovation in the airport field in recent years. They are a type of airport equipment that can achieve autonomous navigation, intelligent identification and automatic docking with aircraft doors. The application of unmanned boarding bridges has greatly improved the operating efficiency and safety of airports.
[0003] At present, in the actual application of unmanned boarding bridges, due to the lack of a centralized control operation scheduling method, the scheduling and matching rules between the boarding bridge and the control desk are often confused, resulting in unmanned control of the boarding bridge or uneven control of the control desk, which leads to confusion in the centralized control process and inability to implement centralized control efficiently, which is not conducive to the actual application of centralized control of unmanned boarding bridges. Therefore, it is of great significance to propose an operation scheduling method for centralized control of unmanned boarding bridges and clarify the operation scheduling model of centralized control of unmanned boarding bridges. At the same time, there is currently no solution method for the operation scheduling model of centralized control of unmanned boarding bridges. Summary of the invention
[0004] The purpose of the present invention is to provide an operation scheduling method for centralized control of unmanned boarding bridges, which can ensure a smooth process of centralized control of unmanned boarding bridges and improve control efficiency and resource utilization.
[0005] To achieve the above object, the present invention provides an operation scheduling method for centralized control of unmanned boarding bridges, comprising the following steps:
[0006] S1. Set up the remote control process of the unmanned boarding bridge;
[0007] The remote control process includes the pre-use test process, the bridge approach process and the bridge withdrawal process;
[0008] S2. Calculation method for the number of control desks configured by mission type or airport;
[0009] S21. Set the calculation method of the number of control consoles to be configured according to the task type;
[0010] S22. Calculation method for the number of control desks set up at airports;
[0011] S3. Establish matching rules between the control console and the unmanned boarding bridge;
[0012] S4. Under the matching rules of step S3, the objective function of the operation scheduling model for centralized control of unmanned boarding bridges is established based on the minimum number of flights docked at remote parking positions, the shortest distance for passengers to board the aircraft, the shortest transfer time, and the highest utilization rate of boarding bridges (lowest use cost);
[0013] S5. Solve the operation scheduling model of centralized control of unmanned boarding bridges through the IGWO-IPSO algorithm.
[0014] Preferably, in step S1, the pre-use test includes: basic function test, safety function test, intelligent function test, environmental adaptability test and comprehensive performance test;
[0015] Among them, basic function tests include docking accuracy test and motion performance test; safety performance tests include emergency braking test, braking performance test, stability test, collision avoidance test and safety equipment test; intelligent function tests include remote control test, connection test, function test, emergency test and automatic driving test; environmental adaptability test includes temperature adaptability test and humidity adaptability test; comprehensive performance tests include continuous work test and fault simulation test.
[0016] Preferably, in step S21, a method for calculating the number of control consoles is set according to the task type, and the specific operation is: according to the three types of tasks, namely, the pre-use test task of the unmanned boarding bridge, the bridge docking task and the bridge removal task, corresponding test control consoles, bridge docking control consoles and bridge removal control consoles are set;
[0017] The calculation method is to use the number of boarding bridges that are tested, docked, and withdrawn at the same time during the peak hours (5-minute periods) of each airport in previous years as the basic value of the number of control desks, and then increase the basic value of control desks in the same proportion according to the expected growth rate of airport transportation production. Finally, redundant control desks are reserved as emergency reserves in a certain proportion (the proportion is determined according to actual conditions).
[0018] Preferably, in step S22, a method for calculating the number of control desks configured at the airport is implemented, and the specific operations are as follows: a basic value for the number of aerobridge control desks at the airport (region) is configured according to the number of aerobridge support personnel during peak hours (in 5-minute periods) at each airport (region) over the years; the basic value of the control desks is increased in the same proportion according to the expected growth rate of the airport's transport production; and finally, redundant control desks are reserved as emergency reserves in a certain proportion (the proportion is determined according to actual conditions).
[0019] Preferably, in step S3, a matching rule between the control console and the unmanned boarding bridge is established, and the specific operations are:
[0020] The pre-use test and bridge docking and bridge withdrawal of the unmanned boarding bridge are set up independently, and the corresponding boarding bridge test operation table is equipped for remote manual testing before the boarding bridge is used. In addition, an unmanned bridge docking and bridge withdrawal control station is equipped for the control of the docking and withdrawal of the unmanned boarding bridge;
[0021] Each control station controls about 30 unmanned boarding bridges. The control stations are interconnected and matched through the control station dispatching system. After the boarding bridge issues an unmanned control request task, the dispatching system sends the request task to the recommended idle control station. The control station will receive the task first, and other idle control stations will also receive the task passively. When the recommended control station fails to receive the task in time, other control stations will actively receive the task or the dispatcher will manually assign the task to other control stations.
[0022] The scheduling system sends the request task to the recommended idle control station according to the recommendation rule: the control station with the least number of completed tasks on the day is given priority.
[0023] Preferably, in step S4, the input of the objective function includes: flight information, boarding bridge information, airport operation standards and passenger flow prediction;
[0024] Among them, flight information includes flight number, estimated arrival time, estimated departure time, aircraft type and number of passengers;
[0025] The boarding bridge information includes the number, location, capacity and current status of the boarding bridges;
[0026] Among them, capacity refers to the aircraft types that the boarding bridge can accommodate; current status includes idle, occupied and maintenance;
[0027] Airport operation standards include flight take-off and landing time intervals and boarding bridge usage regulations;
[0028] Passenger flow forecasting is to predict the passenger flow distribution in the future based on historical data and real-time information;
[0029] In step S4, the input of the objective function is also preprocessed to obtain preprocessed data.
[0030] The preprocessing is routine and will not be elaborated in detail here.
[0031] Preferably, in step S5, the IGWO-IPSO algorithm specifically includes the following sub-steps:
[0032] S51, constructing an initial wolf pack;
[0033] S52, processing the initial wolf pack based on a differential evolution algorithm to obtain an optimized initial wolf pack;
[0034] S53, initializing the position speed of all particles, the convergence factor a and the values of two random adaptive coefficient vectors A and C, and randomly determining α wolf, β wolf and δ wolf;
[0035] S54, improving the convergence factor a to obtain a new convergence factor a1;
[0036] S55, calculating the fitness function values of all particles;
[0037] S56, updating the three particles with the smallest fitness function values to α wolf, β wolf and δ wolf in sequence;
[0038] S57, updating the fitness value of wolf α to a new global optimal value;
[0039] S58, judging whether the termination condition is met;
[0040] When the termination condition is met, the global optimal value is output and the iteration ends;
[0041] When the termination condition is not met, the inertia weight is updated, and then the velocity and position of the particle are updated, and steps S55 to S58 are repeated until the termination condition is met.
[0042] Preferably, step S52, processing the initial wolf pack based on the differential evolution algorithm to obtain an optimized initial wolf pack, specifically operates as follows:
[0043] S521. Construct the parent population based on the initial wolf pack;
[0044] S522, inputting the parent population and the preprocessed data into the operation scheduling model of the centralized control of the unmanned boarding bridge, and calculating the population objective function value of the parent population;
[0045] S523, using a differential evolution algorithm to perform crossover and mutation processing on the parent population to obtain a child population;
[0046] S524, inputting the offspring population and the preprocessed data into the operation scheduling model of the centralized control of the unmanned boarding bridge, and calculating the population objective function value of the offspring population;
[0047] S525, judging whether the population objective function value of the offspring population is greater than the population objective function value of the parent population, and obtaining a first judgment result;
[0048] If the first judgment result is yes, the parent population is updated to the child population;
[0049] If the first judgment result is no, the parent population is retained;
[0050] The value of the second iteration number is increased by 1, and the process returns to step S323 until the second iteration number reaches the second iteration number threshold, and the parent population is determined as the optimized initial wolf pack.
[0051] Preferably, in step S54, the convergence factor a is improved to obtain a new convergence factor a1, and the calculation formula is:
[0052] a1=a c -(a c -a z )rand()+σrand()
[0053] Among them, a c is the initial value of the convergence factor a; a z is the termination value of the convergence factor a; rand() is a random number uniformly distributed between [0,1]; σ is the variance; rand() is a random number that obeys the normal distribution.
[0054] Preferably, in step S58, the inertia weight is updated, and the updating formula is as follows:
[0055] ω=μ min +(μ max -μ min )×rand()+σ1randn()
[0056] Among them, ω is the updated inertia weight; μ min is the minimum value of inertia weight; μ max is the maximum value of the inertia weight; σ1 is the standard deviation.
[0057] Therefore, the present invention adopts the above-mentioned operation scheduling method of centralized control of unmanned boarding bridge, and the technical effects are as follows:
[0058] (1) It can ensure the smooth process of centralized control of unmanned boarding bridges and improve control efficiency and resource utilization;
[0059] (2) The IGWO-IPSO algorithm has a stronger optimization capability, can escape from the local optimum to a certain extent, and converges quickly; in addition, the running time is also shorter, that is, the running speed is improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0060] Figure 1 This is a flow chart of an operation scheduling method for centralized control of an unmanned boarding bridge according to the present invention;
[0061] Figure 2 This is the flow chart of the IGWO-IPSO algorithm. DETAILED DESCRIPTION
[0062] The technical solution of the present invention is further described below through the accompanying drawings and embodiments.
[0063] Unless otherwise defined, technical or scientific terms used in the present invention shall have the common meanings understood by one having ordinary skills in the field to which the present invention belongs.
[0064] Embodiment 1
[0065] like Figure 1 FIG. 1 is a flow chart of an operation scheduling method for centralized control of an unmanned boarding bridge according to the present invention, comprising the following steps:
[0066] S1. Set up the remote control process of the unmanned boarding bridge;
[0067] The remote control process includes the pre-use test process, the bridge approach process and the bridge withdrawal process;
[0068] The purpose of setting up a pre-use test process is to ensure the safety performance, operational efficiency, technical feasibility and compliance of the equipment. The specific test contents include: basic function test, safety function test, intelligent function test, environmental adaptability test and comprehensive performance test. The following is a detailed description:
[0069] (1) Basic functional testing
[0070] Basic functional tests include docking accuracy test and motion performance test.
[0071] 1.1. Docking accuracy test content: Verify the docking accuracy between the unmanned boarding bridge and the aircraft cabin door to ensure that it can dock with the aircraft cabin door accurately and quickly;
[0072] Test method: Use high-precision measuring equipment (laser rangefinder) to measure the docking position of the boarding bridge and the aircraft door, and record and analyze the docking error;
[0073] Static docking test:
[0074] Adjust the boarding bridge to its initial position and fix the position of the cabin door of the simulator or actual aircraft. Start the boarding bridge docking procedure and slowly move the boarding bridge toward the cabin door until it reaches the docking position. Use high-precision measuring equipment to measure the docking distance and position between the boarding bridge and the cabin door and record the data. Repeat the test multiple times to obtain stable test results.
[0075] Dynamic docking test (if applicable): If conditions permit, a dynamic docking test can be conducted, which simulates the docking of the boarding bridge during the docking and take-off of the aircraft. In the dynamic docking test, special attention should be paid to the stability and docking accuracy of the boarding bridge during movement. High-precision measuring equipment is also used to measure the docking distance and position, and the data is recorded.
[0076] 1.2. Motion performance test content: Test the operating performance of the boarding bridge under different working conditions, including the stability and accuracy of walking, rotating, lifting and other movements;
[0077] Test method: Simulate the actual movement process of the boarding bridge in a safe venue, observe and record its movement trajectory, speed, acceleration and other parameters, and evaluate whether its movement performance meets the requirements.
[0078] Basic sports performance test:
[0079] Walking test: Let the boarding bridge move at a predetermined speed on the test path, and observe and record its movement trajectory, speed stability, turning ability, etc.
[0080] Rotation test: Test the rotation performance of the boarding bridge, including rotation speed, rotation radius, rotation stability, etc.
[0081] Lifting test: Test the lifting performance of the boarding bridge, including lifting speed, lifting height, stability during lifting, etc.
[0082] Complex working condition test (if applicable):
[0083] Simulate the motion performance under different load conditions and verify the stability and reliability of the boarding bridge under different loads.
[0084] Simulate sports performance under different environmental conditions such as wind speed, temperature, humidity, etc., and evaluate its environmental adaptability.
[0085] (2) Safety function test
[0086] 2.1 Emergency brake test:
[0087] Test content: Verify the braking performance of the boarding bridge in an emergency situation to ensure that it can stop movement in the shortest time and ensure safety.
[0088] Test method: During the test, emergency situations (such as sudden failures, obstacles, etc.) are simulated, the emergency braking system is triggered, and parameters such as braking distance and braking time are observed and recorded.
[0089] Simulate an emergency situation:
[0090] Simulate an emergency situation by setting up obstacles or using a remote control system to trigger the emergency braking system of the boarding bridge.
[0091] 2.2. Braking performance test:
[0092] Observe and record key parameters such as braking distance and braking time during emergency braking of the boarding bridge.
[0093] Evaluate whether the response speed and braking effect of the braking system meet the design requirements and usage needs.
[0094] 2.3. Stability test:
[0095] During emergency braking, observe whether the movement of the boarding bridge is stable and whether there are any unsafe situations such as skidding or overturning.
[0096] Multiple tests:
[0097] In order to obtain stable test results, it is necessary to perform multiple tests and take the average value or perform statistical analysis.
[0098] 2.4. Anti-collision test:
[0099] Test content: Test the anti-collision performance of the boarding bridge with surrounding objects, including the anti-collision capability with aircraft, ground facilities, other boarding bridges, etc.
[0100] Test method: Use simulated obstacles or actual objects to conduct collision tests, and observe and record the boarding bridge's obstacle avoidance action, collision force and other parameters.
[0101] 2.5. Sensor performance test:
[0102] First, the anti-collision sensor is tested for performance to verify its accuracy, stability and reliability. This includes measuring key parameters such as the sensor's detection range, detection accuracy, and response time.
[0103] 2.6. Anti-collision system test:
[0104] Connect the anti-collision sensor to the control system of the boarding bridge and activate the anti-collision system.
[0105] Allow the boarding bridge to travel along a predetermined path and speed, while the operator or control system simulates unexpected situations (such as the sudden appearance of an obstacle) and observes and records the response of the anti-collision system.
[0106] Evaluate whether the anti-collision system can identify obstacles in a timely and accurate manner and take corresponding obstacle avoidance measures (such as emergency braking, changing driving path, etc.).
[0107] Multiple tests and data analysis:
[0108] In order to obtain stable test results, it is necessary to perform multiple tests and take the average or perform statistical analysis.
[0109] Organize and analyze the data recorded during the test to evaluate whether the performance and stability of the anti-collision system meet the design requirements and usage needs.
[0110] 2.7. Safety equipment testing:
[0111] Test content: Verify the working status and reliability of various safety equipment on the boarding bridge (such as light curtain switches, safety boots, rolling doors, etc.).
[0112] Test method: Test the function and response speed of each safety device separately to ensure that it can play a role and ensure safety at critical moments.
[0113] 2.8. Emergency brake system test:
[0114] Simulate emergency situations, such as sudden obstacles or intrusion of people, and observe and record the response time and braking effect of the emergency braking system.
[0115] Evaluate whether the emergency braking system can quickly and accurately stop the equipment from running to ensure the safety of personnel and facilities.
[0116] 2.9. Anti-collision system test:
[0117] As mentioned previously, use the collision avoidance sensors to simulate obstacle detection and observe how the collision avoidance system responds.
[0118] Evaluate whether the anti-collision system can identify obstacles in time and take appropriate obstacle avoidance measures.
[0119] 2.10. Safety warning equipment test:
[0120] Test whether safety warning lights, sirens and other equipment can work properly when needed to alert people around to the operating status of the equipment.
[0121] Emergency stop button test:
[0122] Test the response time and effectiveness of the emergency stop button to ensure that the equipment can be stopped quickly in an emergency.
[0123] 2.11、System linkage test:
[0124] Test the linkage effect between various safety devices to ensure that an effective safety protection mechanism can be formed in emergency situations.
[0125] (3) Intelligent functional testing
[0126] Intelligent functional testing includes remote control testing, connection testing, functional testing, emergency testing and autonomous driving testing.
[0127] Remote control test:
[0128] Test content: Verify the remote control function of the unmanned boarding bridge, including remote start, stop, parameter adjustment, etc.
[0129] Test method: Operate the boarding bridge through the remote control system in the control room, and observe and record its response speed and control accuracy.
[0130] Connection test:
[0131] First, a connection test is conducted between the remote control device and the unmanned boarding bridge control system to ensure unimpeded communication between the two.
[0132] Functional testing:
[0133] The operator sends instructions to the unmanned boarding bridge through a remote controller or computer to observe whether it can execute accurately. This includes testing of key functions such as movement, rotation, and docking.
[0134] During the test, special attention was paid to observing the operating status of the unmanned boarding bridge, such as speed, accuracy, stability, etc., and recording relevant data.
[0135] Emergency test:
[0136] Simulate emergency situations (such as sudden power outages, communication interruptions, etc.) to test the emergency response capabilities of the unmanned boarding bridge and the stability of the remote control system.
[0137] Evaluate whether the remote control system can quickly take over control and take effective emergency measures in an emergency.
[0138] Safety Testing:
[0139] Verify whether the remote control system has the necessary security protection functions, such as permission management, data encryption, etc., to prevent unauthorized access and malicious attacks
[0140] Autonomous driving testing:
[0141] Test content: Verify the stability and accuracy of the boarding bridge in the automatic driving mode, including automatic path planning, automatic obstacle avoidance, automatic docking and other functions.
[0142] Test method: Set up a test scenario in a safe venue, let the boarding bridge complete a series of tasks (such as automatically docking with the aircraft door) in the automatic driving mode, and observe and record its completion status and performance indicators.
[0143] (4) Environmental adaptability test
[0144] Environmental adaptability tests include temperature adaptability tests and humidity adaptability tests.
[0145] 4.1. Temperature adaptability test:
[0146] Test content: Verify the working performance of the boarding bridge in different temperature environments, including extreme conditions such as high temperature and low temperature.
[0147] Test method: Test the boarding bridge in a simulated high or low temperature environment, and observe and record its working status and performance indicators.
[0148] High temperature test:
[0149] The unmanned boarding bridge is placed in a high temperature environment to simulate operation in high summer temperatures or tropical climate conditions.
[0150] Test the performance and stability of key components such as control systems, power systems, and transmission systems of equipment under high temperatures.
[0151] Observe and record the working status of the equipment in a high temperature environment, such as whether there are any abnormal conditions such as overheating or shutdown.
[0152] Low temperature test:
[0153] The unmanned boarding bridge is placed in a low-temperature environment to simulate operation in severe winter or polar climate conditions.
[0154] Test the starting performance, operating stability and flexibility of mechanical parts of the equipment at low temperatures.
[0155] Observe and record the working status of the equipment in a low-temperature environment, such as whether there are problems such as difficulty in starting or poor operation.
[0156] Temperature alternation test:
[0157] Simulates situations where temperature changes rapidly in actual use, such as areas with large temperature differences between day and night or changeable climatic conditions.
[0158] Test the equipment's adaptability and stability when the temperature changes rapidly.
[0159] 4.2. Humidity adaptability test:
[0160] Test content: Verify the working performance of the boarding bridge in different humidity environments, including high humidity, low humidity, etc.
[0161] Test method: Test the boarding bridge in a simulated high humidity or low humidity environment, and observe and record its working status and performance indicators.
[0162] High humidity test:
[0163] Expose the unmanned boarding bridge to a high humidity environment to simulate operation in humid or tropical climate conditions.
[0164] Test the moisture resistance and stability of key components such as control systems, electronic components, and transmission systems of equipment under high humidity.
[0165] Observe and record the working status of the equipment in a high humidity environment, such as whether there are electrical failures, rust on mechanical parts, etc.
[0166] Low humidity test (although low humidity environments are relatively rare, some specific environments such as desert areas still need to be considered):
[0167] The unmanned airbridge is placed in a low humidity environment to simulate operation in dry or desert climate conditions.
[0168] Test the electrostatic protection performance of the equipment and the lubrication of mechanical parts under low humidity.
[0169] Observe and record the working status of the equipment in a low humidity environment, such as whether there is static interference, mechanical parts jamming, etc.
[0170] Humidity alternation test:
[0171] Simulates the rapid change of humidity in actual use, such as the change from rainy day to sunny day or the change of humidity from night to day.
[0172] Test the equipment's adaptability and stability to rapid changes in humidity.
[0173] (5) Comprehensive performance test
[0174] Comprehensive performance testing includes continuous operation testing and fault simulation testing.
[0175] 5.1 Continuous working test:
[0176] Test content: Verify the stability and reliability of the boarding bridge under continuous working conditions.
[0177] Test method: Let the boarding bridge run in continuous working state for a period of time (such as several hours or days), observe and record the changes in its working state and performance indicators.
[0178] Continuous working time: Set a certain continuous working time, such as 24 hours, 48 hours or longer, to simulate the continuous working scenario of the device in actual use.
[0179] Workload: Set a reasonable workload based on the design specifications and usage requirements of the equipment to ensure that the equipment is in normal working condition during the test.
[0180] Monitoring parameters: During the test, various parameters of the equipment are monitored and recorded in real time, including but not limited to temperature, humidity, vibration, current, voltage, etc.
[0181] Fault record: Record in detail any faults or abnormal conditions that occur in the equipment during the test, including fault phenomenon, occurrence time, and treatment measures.
[0182] 5.2. Fault simulation test:
[0183] Test content: Simulate various fault conditions that the boarding bridge may encounter (such as power failure, sensor failure, etc.) to verify its fault detection, alarm and emergency handling capabilities.
[0184] Test method: Artificially set fault points or simulate fault conditions, observe and record the fault response and handling process of the boarding bridge.
[0185] Preset fault testing: Based on the design specifications and usage experience of the equipment, preset a series of possible failure modes, such as power failure, communication failure, sensor failure, actuator failure, etc., simulate these failure conditions and observe the response of the equipment.
[0186] Random fault testing: During the test, some unexpected faults are randomly introduced to test the equipment’s fault identification capability and its ability to cope with unknown faults.
[0187] Fault combination test: simulates the situation where multiple faults occur simultaneously to evaluate the stability and reliability of the equipment in a complex fault environment.
[0188] The purpose of setting up the bridge docking process is to enhance safety, improve operational efficiency, realize automation and intelligence, and optimize passenger experience.
[0189] The specific process of bridge docking is as follows:
[0190] 1. Preparation
[0191] Remote console preparation: In the control center, the operator prepares for the bridge docking operation through the remote console. The remote console is equipped with a real-time video monitoring system, allowing the operator to clearly see the real-time status of the bridge and the aircraft.
[0192] Flight information confirmation: The operator first confirms the flight information, including aircraft model, door position, etc., to ensure that the subsequent docking operation is accurate.
[0193] 2. Bridge Permit and Status Display
[0194] Docking permission button: In the flight support process, after the operator confirms that all preparations are ready, he presses the docking permission button to start the docking procedure.
[0195] Boarding bridge status display: Through the boarding bridge status display system, operators can understand the movement status and position information of the boarding bridge in real time to ensure the safety and accuracy of the bridge docking process.
[0196] 3. Automatic bridge
[0197] Binocular positioning system guidance: The unmanned boarding bridge relies on the binocular positioning system for guidance and motion control. The binocular positioning system provides precise docking guidance for the boarding bridge by capturing the contour position of the aircraft door and refreshing the data in real time.
[0198] Anti-collision measures: During the automatic docking process, the boarding bridge is equipped with various sensors such as ultrasonic, millimeter-wave radar, and laser radar to detect and measure obstacles, height, distance, angle and other data around the boarding bridge in real time. These anti-collision redundant designs ensure that the boarding bridge will not have any scratches or collisions with apron equipment, aircraft, etc. during the docking process.
[0199] Light curtain switch and safety boots: Light curtain switches are installed in the boarding bridge channel to monitor in real time and prevent unauthorized personnel from entering the boarding bridge in motion. At the same time, the safety boots and rolling shutter doors of the boarding bridge are transformed into electric lifting, further improving the safety when docking aircraft.
[0200] 4. Docking completion and status check
[0201] Docking completed: Under the precise guidance of the binocular positioning system, the unmanned boarding bridge successfully docked with the aircraft door. At this time, the operator confirmed the docking status through the remote control console and checked whether all parameters were normal.
[0202] Status check: The operator performs a status check on various functions of the boarding bridge, including the power system, communication system, control system, etc., to ensure that the boarding bridge can operate normally during subsequent use.
[0203] 5. Subsequent Operations
[0204] Passenger boarding: After confirming that the boarding bridge is correctly connected and in good condition, passengers can enter the aircraft through the boarding bridge for boarding operations.
[0205] Preparation for bridge withdrawal: After the flight ends, the operator starts the bridge withdrawal procedure through the remote control console, separating the boarding bridge from the aircraft door and returning it to the designated position.
[0206] Maintenance and care: Regular maintenance and care work is carried out on the unmanned boarding bridge, including checking sensors, cleaning dust, replacing worn parts, etc., to ensure its long-term stable operation and efficient service.
[0207] The specific process of bridge removal is as follows:
[0208] 1. Preparation
[0209] Confirming the end of the flight: After the flight ends, the operator first confirms that all passengers and crew have left the aircraft and the cabin door has been closed.
[0210] Remote console preparation: In the control center, the operator prepares to retract the boarding bridge through the remote console.
[0211] 2. Bridge withdrawal permission and status inspection
[0212] Bridge withdrawal permission button: After confirming that all preparations are ready, the operator presses the bridge withdrawal permission button to start the bridge withdrawal procedure.
[0213] Boarding bridge status check: Before retracting the bridge, the operator will check the status of various functions of the boarding bridge, including the power system, communication system, control system, etc., to ensure that the boarding bridge can operate normally during the retraction process.
[0214] 3. Automatic bridge withdrawal
[0215] Automatic control system starts: The unmanned boarding bridge relies on its automatic control system to perform the bridge withdrawal operation. The system automatically plans the bridge withdrawal path and controls the boarding bridge to slowly withdraw along the predetermined path.
[0216] Sensor monitoring: During the process of withdrawing the bridge, various sensors equipped on the boarding bridge (such as ultrasonic, millimeter-wave radar, lidar, etc.) will continuously monitor the environment around the boarding bridge to ensure that there will be no collision with apron equipment, aircraft, etc. during the process of withdrawing the bridge.
[0217] Light curtain switches and safety devices: The light curtain switches in the boarding bridge channel will continuously monitor and prevent unauthorized personnel from entering the moving boarding bridge. At the same time, safety devices such as safety boots and rolling doors will also be on standby to prevent accidents.
[0218] 4. Completion and finishing work of bridge withdrawal
[0219] Bridge withdrawal completed: When the boarding bridge is successfully withdrawn from the aircraft and returned to the designated position, the system will automatically stop the bridge withdrawal operation and send a bridge withdrawal completion signal.
[0220] Status confirmation: The operator confirms through the remote console that the boarding bridge has been successfully returned to the specified position and checks whether all parameters are normal.
[0221] Finishing work: After completing the bridge withdrawal operation, the operator needs to carry out a series of finishing work, including shutting down related equipment, tidying up the work area, etc. At the same time, regular maintenance and upkeep of the boarding bridge is also required to ensure its long-term stable operation and efficient service.
[0222] S2. Calculation method for the number of control desks configured by mission type or airport;
[0223] S21. Set the calculation method of the number of control consoles to be configured according to the task type;
[0224] According to the three types of tasks, namely, the pre-use test task of the unmanned boarding bridge, the bridge docking task and the bridge removal task, corresponding test control desks, bridge docking control desks and bridge removal control desks are set up, or the docking control desk and the evacuation control desk are merged into the docking and evacuation control desk);
[0225] The calculation method is to use the number of boarding bridges that are tested, docked, and withdrawn at the same time during the peak hours (5-minute periods) of each airport in previous years as the basic value of the number of control desks, and then increase the basic value of control desks in the same proportion according to the expected growth rate of airport transportation production. Finally, redundant control desks are reserved as emergency reserves in a certain proportion (the proportion is determined according to actual conditions).
[0226] S22. Calculation method for the number of control desks set up at airports;
[0227] The method for calculating the number of control desks set up at the airport is as follows: the basic value of the number of boarding bridge control desks at the airport (region) is configured according to the number of boarding bridge support personnel during peak hours (5-minute periods) at each airport (region) over the years, and then the basic value of the control desks is increased by the same proportion according to the expected growth rate of airport transportation production, and finally, redundant control desks are reserved as emergency reserves according to a certain proportion (the proportion is determined according to actual conditions);
[0228] S3. Establish matching rules between the control console and the unmanned boarding bridge;
[0229] The pre-use test and bridge docking and bridge withdrawal of the unmanned boarding bridge are set up independently, and the corresponding boarding bridge test operation table is equipped for remote manual testing before the boarding bridge is used. In addition, an unmanned bridge docking and bridge withdrawal control station is equipped for the control of the docking and withdrawal of the unmanned boarding bridge;
[0230] Each control station controls about 30 unmanned boarding bridges. The control stations are interconnected and matched through the control station dispatching system. After the boarding bridge issues an unmanned control request task, the dispatching system sends the request task to the recommended idle control station. The control station will receive the task first, and other idle control stations will also receive the task passively. When the recommended control station fails to receive the task in time, other control stations will actively receive the task or the dispatcher will manually assign the task to other control stations.
[0231] The scheduling system sends the request task to the recommended idle control station according to the recommendation rule: the control station with the least number of completed tasks on the day is given priority.
[0232] S4. Under the matching rules of step S3, based on the minimum number of flights docked at remote stands, the shortest distance for passengers to board the aircraft, the shortest transfer time and the highest utilization rate of the boarding bridge, an objective function of the operation scheduling model for centralized control of unmanned boarding bridges is established;
[0233] The inputs of the objective function include: flight information, boarding bridge information, airport operation standards and passenger flow forecast;
[0234] Among them, flight information includes flight number, estimated arrival time, estimated departure time, aircraft type and number of passengers;
[0235] The boarding bridge information includes the number, location, capacity and current status of the boarding bridges;
[0236] Among them, capacity refers to the aircraft types that the boarding bridge can accommodate; current status includes idle, occupied and maintenance;
[0237] Airport operation standards include flight take-off and landing time intervals and boarding bridge usage regulations;
[0238] Passenger flow forecasting is to predict the passenger flow distribution in the future based on historical data and real-time information.
[0239] In step S4, the input of the objective function is also preprocessed to obtain preprocessed data.
[0240] S5. Solve the operation scheduling model of centralized control of unmanned boarding bridges through the IGWO-IPSO algorithm.
[0241] The GWO algorithm (Grey Wolf Optimization Algorithm) and the PSO algorithm (Particle Swarm Optimization Algorithm) are two swarm intelligence optimization algorithms. The GWO algorithm is not easily affected by parameters, but the algorithm converges slowly in the later stage. The PSO algorithm converges quickly, but its ability to balance the overall situation is poor. Therefore, it is worth considering how to balance the defects of the two algorithms and maximize the advantages of the two algorithms. Therefore, the present invention proposes an IGWO-IPSO algorithm to solve the above problems, and applies the algorithm to the operation scheduling model solution of the centralized control of unmanned boarding bridges.
[0242] like Figure 2 As shown, the IGWO-IPSO algorithm specifically includes the following sub-steps:
[0243] S51, constructing an initial wolf pack;
[0244] S52, processing the initial wolf pack based on the differential evolution algorithm to obtain an optimized initial wolf pack, including the following sub-steps:
[0245] S521. Construct the parent population based on the initial wolf pack;
[0246] S522, inputting the parent population and the preprocessed data into the operation scheduling model of the centralized control of the unmanned boarding bridge, and calculating the population objective function value of the parent population;
[0247] S523, using a differential evolution algorithm to perform crossover and mutation processing on the parent population to obtain a child population;
[0248] S524, inputting the offspring population and the preprocessed data into the operation scheduling model of the centralized control of the unmanned boarding bridge, and calculating the population objective function value of the offspring population;
[0249] S525, judging whether the population objective function value of the offspring population is greater than the population objective function value of the parent population, and obtaining a first judgment result;
[0250] If the first judgment result is yes, the parent population is updated to the child population;
[0251] If the first judgment result is no, the parent population is retained;
[0252] The value of the second iteration number is increased by 1, and the process returns to step S323 until the second iteration number reaches the second iteration number threshold, and the parent population is determined as the optimized initial wolf pack.
[0253] S53, initializing the position speed of all particles, the convergence factor a and the values of two random adaptive coefficient vectors A and C, and randomly determining α wolf, β wolf and δ wolf;
[0254] S54, improving the convergence factor a to obtain a new convergence factor a1;
[0255] a1=a c -(a c -a z )rand()+σrand()
[0256] Among them, a c is the initial value of the convergence factor a; a z is the termination value of the convergence factor a; rand() is a random number uniformly distributed between [0,1]; σ is the variance; rand() is a random number that obeys the normal distribution.
[0257] Improving the convergence factor can balance the global and local search capabilities of the algorithm.
[0258] S55, calculating the fitness function values of all particles;
[0259] S56, updating the three particles with the smallest fitness function values to α wolf, β wolf and δ wolf in sequence;
[0260] S57, updating the fitness value of wolf α to a new global optimal value;
[0261] S58, judging whether the termination condition is met;
[0262] When the termination condition is met, the global optimal value is output and the iteration ends;
[0263] When the termination condition is not met, the inertia weight is updated, and then the velocity and position of the particle are updated, and steps S55 to S58 are repeated until the termination condition is met;
[0264] The inertia weight is calculated as follows:
[0265] ω=μ min +(μ max -μ min )×rand()+σ1randn()
[0266] Among them, ω is the updated inertia weight; μ min is the minimum value of inertia weight; μ max is the maximum value of the inertia weight; σ1 is the standard deviation.
[0267] Updating the inertia weight solves the problem of fixed inertia weight in traditional particle swarm algorithm. The updated inertia weight has a larger value in the early stage of the algorithm and a smaller value in the later stage of the algorithm. The search process can be well narrowed from global to local, which improves the convergence speed of the algorithm.
[0268] The IGWO-IPSO algorithm is simulated and compared with other algorithms (GWO, PSO, GW-IPSO) below, and the simulation experiment is repeated 50 times. The comparison results are shown in Table 1.
[0269] Table 1 Comparison results
[0270]
[0271] A more specific scheduling method is given below.
[0272] Airport staff are divided into ground service personnel, remote boarding bridge controllers (each equipped with a control desk for full-time bridge testing and full-time bridge removal) and maintenance personnel.
[0273] Step 1: 20 minutes before the flight is expected to arrive, the system obtains the expected arrival signal from the production system, and sends a bridge test command to the control console. The bridge test task is displayed on the bridge test control console page (if the bridge already has a bridge test task, it will enter the waiting queue). Calculate the optimal scheduling plan based on the actual situation.
[0274] After the scheduling plan is determined, the remote controller of the boarding bridge receives the bridge test instruction, clicks to select the boarding bridge to be tested, and then enters the boarding bridge control page to be tested. After obtaining the control authority of the boarding bridge, the bridge is remotely tested according to the boarding bridge test standards. After the bridge test is completed, exit the bridge page, release the control authority of the bridge, and finally test other boarding bridges in the queue in turn or wait for subsequent bridge test tasks.
[0275] Step 2: After the aircraft is in position, the maintenance personnel complete various preparatory work such as placing wheel chocks, and compare the actual aircraft model with the model imported from the production system (if Vdgs is installed, the actual aircraft model can be compared with the model imported from the production system through the Vdgs system) to confirm whether the models are consistent.
[0276] If the aircraft models are the same, the maintenance personnel press the bridge docking notification command button.
[0277] If the aircraft models are inconsistent, the maintenance personnel manually enter the actual aircraft model in the automatic docking system and then press the docking notification command button.
[0278] Step 3. After completing steps 1 and 2, the dispatch system will allocate the bridge to an idle control desk (the corresponding boarding bridge will flash on the control desk) after receiving the instruction to apply for docking. The remote control personnel of the boarding bridge clicks on the bridge, enters the bridge control page, obtains control authority, and completes the automatic docking of the boarding bridge after observing that the aircraft in place, the boarding bridge channel and the walking area are correct.
[0279] During this process, if the remote controller of the boarding bridge does not click on the bridge, the system will issue an audible and visual prompt. If no action is taken after the reminder, the task will be assigned to other control desks.
[0280] After completing the automatic docking, for boarding bridges with bridge-mounted equipment installed, the maintenance personnel connect the bridge-mounted power supply and bridge-mounted air conditioning according to the bridge-mounted equipment operating procedures; for boarding bridges without bridge-mounted equipment installed, there is no bridge-mounted equipment operating procedure.
[0281] After step 4 and step 3 are completed, the door opening indicator light at the boarding bridge head lights up, and the ground service personnel knock on the door to inform the crew to open the door. At this time, the remote controller of the boarding bridge presses the safety boots release command, releases the safety boots, completes the bridge docking process, and the boarding bridge controller exits the bridge control page and releases the bridge control authority.
[0282] Step 5: Bridge removal process: After the ground service staff confirms that all passengers have boarded the aircraft, they arrive at the boarding bridge pick-up gate. Before the aircraft door is closed, the ground service staff presses the bridge removal notification button next to the boarding bridge operating console.
[0283] The dispatch system assigns the bridge to an idle control desk, and the corresponding boarding bridge on the control desk flashes. After receiving the signal, the remote controller of the boarding bridge clicks on the bridge to enter the control page. After obtaining control authority, he clicks to retract the safety boots. For boarding bridges equipped with bridge-mounted equipment, the maintenance personnel must retract the bridge-mounted air conditioner and bridge-mounted power supply according to the bridge-mounted equipment operation process, and then press the bridge removal notification command button under the bridge. After the cabin door is closed, the remote controller of the boarding bridge observes the aircraft, passageway and walking area, completes the bridge removal, and waits for the next task. For boarding bridges without bridge-mounted equipment installed, the boarding bridge controller does not need to wait for the notification command of the bridge removal notification button under the bridge, and the bridge can be removed after the aircraft cabin door is closed.
[0284] Therefore, the present invention has a stronger optimization ability through the above-mentioned IGWO-IPSO algorithm, can jump out of the local optimum to a certain extent, and has a fast convergence speed; in addition, the running time is also shorter, that is, the running rate is improved.
[0285] Therefore, the present invention adopts the above-mentioned operation scheduling method for centralized control of unmanned boarding bridges, which can ensure the smooth process of centralized control of unmanned boarding bridges and improve control efficiency and resource utilization.
[0286] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that they can still modify or replace the technical solution of the present invention with equivalents, and these modifications or equivalent replacements cannot cause the modified technical solution to deviate from the spirit and scope of the technical solution of the present invention.
Claims
1. A method for centralized control and operation scheduling of unmanned boarding bridges, characterized in that: The following steps are involved: S1. Set up the remote control process of the unmanned boarding bridge; The remote control process includes the pre-use test process, the bridge approach process and the bridge withdrawal process; S2. Calculation method for the number of control desks configured by mission type or airport; S21. Set the calculation method of the number of control consoles to be configured according to the task type; S22. Calculation method for the number of control desks set up at airports; S3. Establish matching rules between the control console and the unmanned boarding bridge; S4. Under the matching rules of step S3, based on the minimum number of flights docked at remote stands, the shortest distance for passengers to board the aircraft, the shortest transfer time and the highest utilization rate of the boarding bridge, an objective function of the operation scheduling model for centralized control of unmanned boarding bridges is established; S5. Solve the operation scheduling model of centralized control of unmanned boarding bridges through the IGWO-IPSO algorithm.
2. The method for centralized control and operation scheduling of an unmanned boarding bridge according to claim 1 is characterized in that: In step S1, the pre-use test includes: basic function test, safety function test, intelligent function test, environmental adaptability test and comprehensive performance test; Among them, basic function tests include docking accuracy test and motion performance test; safety performance tests include emergency braking test, braking performance test, stability test, collision avoidance test and safety equipment test; intelligent function tests include remote control test, connection test, function test, emergency test and automatic driving test; environmental adaptability test includes temperature adaptability test and humidity adaptability test; comprehensive performance tests include continuous work test and fault simulation test.
3. The method for centralized control and operation scheduling of an unmanned boarding bridge according to claim 2 is characterized in that: In step S21, a method for calculating the number of control consoles is set according to the task type. The specific operation is: according to the three types of tasks, namely, the pre-use test task of the unmanned boarding bridge, the bridge docking task and the bridge removal task, corresponding test control consoles, bridge docking control consoles and bridge removal control consoles are set; The calculation method is to use the number of boarding bridges that are tested, docked, and withdrawn at the same time during the peak hours of each airport in previous years as the basic value of the number of control desks, and then increase the basic value of control desks in the same proportion according to the expected growth rate of airport transportation production. Finally, redundant control desks are reserved as emergency reserves.
4. The method for centralized control and operation scheduling of an unmanned boarding bridge according to claim 3 is characterized in that: In step S22, a method for calculating the number of control desks configured at the airport is used. The specific operation is as follows: a basic value for the number of aerobridge control desks at the airport is configured according to the number of aerobridge support personnel during peak periods at each airport over the years; the basic value of the control desks is increased by the same proportion based on the expected growth rate of the airport's transport production; and finally, redundant control desks are reserved as emergency reserves.
5. The method for centralized control and operation scheduling of an unmanned boarding bridge according to claim 4 is characterized in that: In step S3, a matching rule between the control console and the unmanned boarding bridge is established, and the specific operations are as follows: The pre-use test and bridge docking and bridge withdrawal of the unmanned boarding bridge are set up independently, and the corresponding boarding bridge test operation table is equipped for remote manual testing before the boarding bridge is used. In addition, an unmanned bridge docking and bridge withdrawal control station is equipped for the control of the docking and withdrawal of the unmanned boarding bridge; Each control station controls 30 unmanned boarding bridges respectively. The control stations are interconnected and matched through the control station dispatching system. After the boarding bridge issues an unmanned control request task, the dispatching system sends the request task to the recommended idle control station. The control station will receive the task first, and other idle control stations will also receive the task passively. When the recommended control station fails to receive the task in time, other control stations will actively receive the task or the dispatcher will manually assign the task to other control stations. The scheduling system sends the request task to the recommended idle control station according to the recommendation rule: the control station with the least number of completed tasks on the day is given priority.
6. The method for centralized control and operation scheduling of an unmanned boarding bridge according to claim 5 is characterized in that: In step S4, the input of the objective function includes: flight information, boarding bridge information, airport operation standards and passenger flow prediction; Among them, flight information includes flight number, estimated arrival time, estimated departure time, aircraft type and number of passengers; The boarding bridge information includes the number, location, capacity and current status of the boarding bridges; Airport operation standards include flight take-off and landing time intervals and boarding bridge usage regulations; In step S4, the input of the objective function is also preprocessed to obtain preprocessed data.
7. The method for centralized control and operation scheduling of an unmanned boarding bridge according to claim 6 is characterized in that: In step S5, the IGWO-IPSO algorithm specifically includes the following sub-steps: S51, constructing an initial wolf pack; S52, processing the initial wolf pack based on a differential evolution algorithm to obtain an optimized initial wolf pack; S53, initializing the position speed of all particles, the convergence factor a and the values of two random adaptive coefficient vectors A and C, and randomly determining α wolf, β wolf and δ wolf; S54, improving the convergence factor a to obtain a new convergence factor a1; S55, calculating the fitness function values of all particles; S56, updating the three particles with the smallest fitness function values to α wolf, β wolf and δ wolf in sequence; S57, updating the fitness value of wolf α to a new global optimal value; S58, judging whether the termination condition is met; When the termination condition is met, the global optimal value is output and the iteration ends; When the termination condition is not met, the inertia weight is updated, and then the velocity and position of the particle are updated, and steps S55 to S58 are repeated until the termination condition is met.
8. The method for centralized control and operation scheduling of an unmanned boarding bridge according to claim 7 is characterized in that: Step S52, processing the initial wolf pack based on the differential evolution algorithm to obtain an optimized initial wolf pack, the specific operations are as follows: S521. Construct the parent population based on the initial wolf pack; S522, inputting the parent population and the preprocessed data into the operation scheduling model of the centralized control of the unmanned boarding bridge, and calculating the population objective function value of the parent population; S523, using a differential evolution algorithm to perform crossover and mutation processing on the parent population to obtain a child population; S524, inputting the offspring population and the preprocessed data into the operation scheduling model of the centralized control of the unmanned boarding bridge, and calculating the population objective function value of the offspring population; S525, judging whether the population objective function value of the offspring population is greater than the population objective function value of the parent population, and obtaining a first judgment result; If the first judgment result is yes, the parent population is updated to the child population; If the first judgment result is no, the parent population is retained; The value of the second iteration number is increased by 1, and the process returns to step S323 until the second iteration number reaches the second iteration number threshold, and the parent population is determined as the optimized initial wolf pack.
9. The method for centralized control and operation scheduling of an unmanned boarding bridge according to claim 8 is characterized in that: In step S54, the convergence factor a is improved to obtain a new convergence factor a1, which is calculated as follows: a1=a c -(a c -a z )rand()+σrand() Among them, a c is the initial value of the convergence factor a; a z is the termination value of the convergence factor a; rand() is a random number uniformly distributed between [0,1]; σ is the variance; rand() is a random number that obeys the normal distribution.
10. The method for centralized control and operation scheduling of an unmanned boarding bridge according to claim 9, characterized in that: In step S58, the inertia weight is updated, and the updating formula is as follows: ω=μ min +(m max -m min )×rand()+σ1randn() Among them, ω is the updated inertia weight; μ min is the minimum value of inertia weight; μ max is the maximum value of the inertia weight; σ1 is the standard deviation.
Citation Information
Patent Citations
Air bridge and automatic abutting method therefor
CN103419944A
Automatic abutting system and method for boarding bridge
CN106697322A
Driverless train energy consumption prediction method and system and storage medium
CN112734097A
Panorama camera and laser radar fusion method for unmanned boarding bridge obstacle avoidance
CN117011656A
Imaging system for a passenger bridge or the like for docking automatically with an aircraft
CN1639003A
Cited By
Boarding bridge remote airport pickup detection system and method
CN120721414A