Method and device for calculating power range scale coefficient of pressurized water reactor before refueling and reactor starting
By simulating xenon oscillation before the pressurized water reactor is replaced and the core power distribution data is corrected, the accurate reference scale coefficient is calculated, which solves the problem of poor accuracy in the prior art and improves the safety and economics of the nuclear power unit. .
Patent Information
- Application Number
- CN202411533294.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-31
- Publication Date
- 2024-12-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing empirical methods calculate the power range scale coefficient of the external nuclear and measuring instrument system before the pressurized water reactor material change and start the reactor, which makes it difficult to meet the supervision requirements.
Simulate xenon oscillation under the current cycle loading scheme, and correct the simulated current through the core power distribution measurement data under the 50% FP power platform in the previous cycle, calculate the current cycle reference scale coefficient, and calculate the final Scale coefficient.
It improves the accuracy and stability of the power range scale coefficient before starting the stack, so that the nuclear power can meet the supervision requirements during the power increase process, avoids calibration, shortens the main line of overhaul power increase, and increases power generation and safety.
Smart Images

Figure CN119066323A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the field of nuclear power plant reactor physics technology, and specifically relates to a method and device for calculating a power range calibration coefficient before a pressurized water reactor is refueled and started. Background Art
[0002] The power range calibration coefficients (KH, KB, K) of the nuclear power plant's external nuclear instrumentation system (RPN) directly determine the accuracy of the display of the nuclear power Pr and axial power offset △I of the pressurized water reactor nuclear power unit. During the daily operation of the pressurized water reactor unit, the accurate calibration coefficients (KH, KB, K) can be calculated through regular external flux ionization chamber calibration tests. However, only the calibration coefficients of the power increase process can be preset before the refueling and starting the reactor. This is because the reactor has not yet started and cannot be directly obtained through experiments. The calibration coefficients of the preset power range can only be calculated through empirical methods.
[0003] The existing empirical method mainly uses the calibration coefficient of the 50% FP power platform of the previous cycle as the reference calibration coefficient, under the premise that the core loading scheme remains basically unchanged. The K factor of the reference calibration coefficient is corrected according to the theoretical power distribution of the 50% FP power platform of the current cycle and the previous cycle and the response factor of the peripheral components, and the KH and KB of the reference calibration coefficient are directly applied.
[0004] However, the accuracy of the power range calibration coefficient of the off-core nuclear instrumentation system calculated by the existing empirical method before refueling and start-up is poor, making it difficult for the nuclear power Pr and axial power offset △I to meet the supervision requirements. Summary of the invention
[0005] In view of this, the embodiments of the present application are dedicated to providing a method and device for calculating the power range calibration coefficient of a pressurized water reactor before refueling and starting up. The method simulates xenon oscillation under the current cycle loading scheme and corrects the simulated current through the core power distribution measurement data at the 50% FP power platform of the previous cycle, so as to solve the problem that the power range calibration coefficient of the off-core nuclear measurement instrument system calculated by the existing empirical method before refueling and starting up is poorly accurate, making it difficult for the nuclear power Pr and the axial power offset △I to meet the supervision requirements.
[0006] In a first aspect, the present application provides a method for calculating a power range calibration coefficient before a pressurized water reactor is refueled and started. The method for calculating a power range calibration coefficient before a pressurized water reactor is refueled and started includes:
[0007] Step 1: According to the core loading scheme of the current cycle, simulate and calculate the xenon oscillation caused by the moving rod under the 50% FP power platform to obtain the AO of different in-core axial power offsets in,j The first core power distribution P of the four quadrants of the core j (z);
[0008] Step 2: Using the detector response function w j (z) and the first core power distribution P of the four quadrants of the core j (z), the first off-core detector response current I is calculated using formula 1 i,j ,
[0009] Formula 1:
[0010] In formula 1, i represents each detector of the power range; j represents the four quadrants of the core, j=1, 2, 3, 4; z represents the height;
[0011] Step 3: The second core power distribution measured by physical test at 50% FP power platform in the previous cycle and the recorded second off-core detector response current , combined with formula 2, the sensitivity coefficient S of each detector in the power range of the out-of-core nuclear measurement system is calculated i,j ,
[0012] Formula 2:
[0013] Step 4: Combine formula 3 and use the sensitivity coefficient S i,j The first external detector responds to the current I i,j Correction is made to convert the corrected current Confirm that it is the current circulating real current.
[0014] Formula 3;
[0015] Step 5: According to the corrected current , calculate the current cycle base scale factor , and .
[0016] In a specific implementation of the present application, the above step five includes:
[0017] Step 51: According to the corrected current , combined with formula 4 and formula 5, the upper current is calculated and lower current ,
[0018] Formula 4:
[0019] Formula 5;
[0020] Step 52: According to the upper current , lower current Axial power offset from the core , External axial power offset , nuclear power The relationship between the formula 6, formula 7 and formula 8 is combined to obtain A by linear fitting calculation j , B j and C j ,
[0021] Formula 6:
[0022] Formula 7,
[0023] Formula 8;
[0024] Step 53: According to A j , B j and C j , combined with formula 11, formula 12 and formula 13, calculate the current cycle benchmark scale coefficient , and ,
[0025] Formula 11,
[0026] Formula twelve,
[0027] Formula 13.
[0028] In a specific embodiment of the present application, after the above step 5, the method for calculating the power range calibration coefficient of the pressurized water reactor before refueling and starting the reactor further includes:
[0029] Step 6: The power of the first peripheral component is simulated and calculated according to the current cycle loading scheme , the second peripheral component power Pr obtained from the actual 50% FP power platform core power distribution measurement test of the previous cycle n,j , and the detector response factor L to peripheral components n,j , combined with formula 14, calculate the ratio of the contribution of the peripheral components to each detector in the current cycle and the previous cycle ;
[0030] Formula 14;
[0031] Step 7: Combine Formula 15, Formula 16 and Formula 17 and use the contribution ratio F j Scale factor K j Correction is performed to obtain the final scale factor , , ,
[0032] Formula 15,
[0033] Formula 16,
[0034] Formula XVII.
[0035] In a specific embodiment of the present application, after the above step 7, the method for calculating the power range calibration coefficient of the pressurized water reactor before refueling and starting the reactor further includes:
[0036] Step 8: When the unit actually reaches the 50% FP power platform, use the final scale factor , , Calculate the nuclear power Pr j Deviation and axial power offset △I j to determine whether the supervision requirements are met.
[0037] The second aspect of the present application provides a computer device, which includes a processor and a memory. The processor is used to execute a method for calculating a power range calibration coefficient before a pressurized water reactor is refueled and started provided in the first aspect of the present application. The memory is used to store executable instructions of the processor.
[0038] The third aspect of the present application provides a computer-readable storage medium on which executable instructions of a computer are stored. When the executable instructions are executed by a processor, a method for calculating a power range calibration coefficient before a pressurized water reactor refueling start-up provided in the first aspect of the present application is implemented.
[0039] The fourth aspect of the present application provides a computer program product, including a computer program / instruction, which, when executed by a processor, implements a method for calculating a power range calibration coefficient before a pressurized water reactor is refueled and started up, as provided in the first aspect of the present application.
[0040] The beneficial effect of the technical solution of the present application is that: by proposing for the first time to simulate xenon oscillation under the current cycle loading scheme, and by measuring the core power distribution data under the 50% FP power platform of the previous cycle (such as the second core power distribution and the second off-core detector response current ) to correct the analog current and calculate the current cycle reference scale factor (K j , KH j KB j), verified by multi-unit multi-cycle data, the accuracy and stability of the current cycle reference calibration coefficient calculated by the calculation method of the power range calibration coefficient before the PWR refueling and start-up provided in the embodiment of the present application are significantly better than the existing empirical method, so that the nuclear power can meet the supervision requirements during the power increase process, effectively avoid the calibration of nuclear power during the power increase process, shorten the main line of overhaul power increase, increase the power generation of the PWR nuclear power unit, and improve the safety and economy of the PWR nuclear power unit. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] Figure 1 The figure is a flow chart of a method for calculating a power range calibration coefficient before a pressurized water reactor is refueled and started up, provided in one embodiment of the present application.
[0042] Figure 2 Shown is a schematic diagram of the response factor of the peripheral components of a core of a nuclear power unit provided in one embodiment of the present application. DETAILED DESCRIPTION
[0043] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0044] After careful study, it was found that the existing empirical method ignored the problem that the power range calibration coefficient of the 50%FP power platform of the previous cycle may have a certain deviation itself, and used it as the reference calibration coefficient. As a result, the power range calibration coefficient of the extra-core nuclear measurement instrument system before refueling and start-up was calculated with poor accuracy, making it difficult for the nuclear power Pr and axial power offset △I to meet the supervision requirements.
[0045] Based on this, at least one embodiment of the present application provides a method for calculating the power range calibration coefficient before the start-up of a pressurized water reactor. Figure 1 The method for calculating the power range calibration coefficient of the pressurized water reactor before refueling and starting up includes the following steps.
[0046] Step 1: According to the core loading scheme of the current cycle, simulate and calculate the xenon oscillation caused by the moving rod under the 50% FP power platform to obtain the AO of different in-core axial power offsets in,j The first core power distribution P of the four quadrants of the core j (z).
[0047] Step 2: Using the detector response function w j (z) and the first core power distribution P of the four quadrants of the core j(z), the first off-core detector response current I is calculated using formula 1 i,j ,
[0048] Formula 1.
[0049] In formula 1, i represents each detector section of the power range, j represents the four quadrants of the core, j=1, 2, 3, 4, and z represents the height.
[0050] For example, if the number of detectors is 6, then i=1, 2, 3, 4, 5, 6.
[0051] Step 3: The second core power distribution measured by physical test at 50% FP power platform in the previous cycle and the recorded second off-core detector response current , combined with formula 2, the sensitivity coefficient S of each detector in the power range of the out-of-core nuclear measurement system is calculated i,j ,
[0052] Formula 2.
[0053] Step 4: Combine formula 3 and use the sensitivity coefficient S i,j The first external detector responds to the current I i,j Correction is made to convert the corrected current Confirm that it is the current circulating real current.
[0054] Formula three.
[0055] Step 5: According to the corrected current , calculate the current cycle base scale factor , and .
[0056] According to the technical solution provided in the embodiment of the present application, it is proposed for the first time to simulate xenon oscillation under the current cycle loading scheme, and through the core power distribution measurement data under the 50% FP power platform of the previous cycle (such as the second core power distribution and the second off-core detector response current ) to correct the analog current and calculate the current cycle reference scale factor (K j , KH j KB j), verified by multi-unit multi-cycle data, the accuracy and stability of the current cycle reference calibration coefficient calculated by the calculation method of the power range calibration coefficient before the PWR refueling and start-up provided in the embodiment of the present application are significantly better than the existing empirical method, so that the nuclear power can meet the supervision requirements during the power increase process, effectively avoid the calibration of nuclear power during the power increase process, shorten the main line of overhaul power increase, increase the power generation of the PWR nuclear power unit, and improve the safety and economy of the PWR nuclear power unit.
[0057] In at least one embodiment of the present application, the above step five includes the following steps fifty-one to fifty-three.
[0058] Step 51: According to the corrected current , combined with formula 4 and formula 5, the upper current is calculated and lower current ,
[0059] Formula 4.
[0060] Formula five.
[0061] Step 52: According to the upper current , lower current Axial power offset from the core , External axial power offset , nuclear power The relationship between the formula 6, formula 7 and formula 8 is combined to obtain A by linear fitting calculation j , B j and C j .
[0062] Formula six.
[0063] Formula seven.
[0064] Formula eight.
[0065] It should be noted that Formula 8 is based on the out-of-core axial power offset The definition of is substituted into Formula 6. The linear regression method is used to determine A for Formula 7 and Formula 8. j , B j and C j .
[0066] For example, the linear fit results in A j , B j and C j The values are shown in Table 1.
[0067] Table 1 A obtained by linear fitting j , B j and C j value.
[0068]
[0069] Step 53: According to A j , B j and C j , combined with formula 11, formula 12 and formula 13, calculate the current cycle reference scale factor K j , KH j and KB j .
[0070] Formula XI.
[0071] Formula twelve.
[0072] Formula 13.
[0073] It should be noted that due to the difference between the scale factor and the nuclear power Pr j and axial power offset △I j The calculation formulas are as follows: Formula 9 and Formula 10.
[0074] Formula 9;
[0075] Formula ten.
[0076] Among them, G is a known constant term.
[0077] Therefore, according to Formula 7, Formula 8, Formula 9 and Formula 10, Formula 11, Formula 12 and Formula 13 can be derived.
[0078] For example, the current cycle reference scale coefficient calculated by Formula 11, Formula 12 and Formula 13 is shown in Table 2 below.
[0079] Table 2 Current cycle benchmark scale factors ( , and ).
[0080]
[0081] In at least one embodiment of the present application, after the above step five, the method for calculating the power range calibration coefficient of the pressurized water reactor before refueling and starting up further includes the following steps six and seven.
[0082] Step 6: The power of the first peripheral component is simulated and calculated according to the current cycle loading scheme , the second peripheral component power Pr obtained from the actual 50% FP power platform core power distribution measurement test of the previous cycle n,j , and the detector response factor L to peripheral components n,j , combined with formula 14, calculate the ratio of the contribution of the peripheral components to each detector in the current cycle and the previous cycle .
[0083] Formula 14.
[0084] For example, the peripheral component response factor of a nuclear power unit core is Figure 2 shown. Figure 2 The center is the 1 / 4 quadrant, that is, j=4. When j=4 and the peripheral component is at coordinate n=(07, A), the response factor L n,j =0.025.
[0085] Step 7: Combine Formula 15, Formula 16 and Formula 17 and use the contribution ratio F j Scale factor K j Correction is performed to obtain the final scale factor , , .
[0086] Formula 15.
[0087] Formula XVI.
[0088] Formula XVII.
[0089] For example, the contribution ratio F is calculated according to Formula 14: j and use the contribution ratio F j Scale factor K j Correction is performed to obtain the final scale factor ( , , ) as shown in Table 3.
[0090] Table 3 Final scale factor ( , , ).
[0091]
[0092] In the above embodiment, the difference in power distribution of 50% FP in the previous cycle and the current cycle is further considered. For the first time, it is proposed to correct the reference calibration coefficient according to the difference in actual core power distribution of 50% FP simulation calculation of the current cycle loading scheme and 50% FP power platform in the previous cycle, and calculate the final calibration coefficient. , , .
[0093] In at least one embodiment of the present application, after the above step 7, the method for calculating the power range calibration coefficient before the pressurized water reactor refueling and starting up further includes step 8. Thus, through step 8, the accuracy of the nuclear power and axial power offset can be checked in time, which is also conducive to timely adjustment when the deviation is large.
[0094] Step 8: When the unit actually reaches the 50% FP power platform, use the final scale factor , , Calculate the nuclear power Pr j Deviation and axial power offset △I j to determine whether the supervision requirements are met.
[0095] For example, the inspection results are shown in Table 4 below.
[0096] Table 4 Nuclear power Pr calculated from the calibration coefficient j Deviation and axial power offset △I j deviation.
[0097]
[0098] The above data processing results show that the calculation method of the power range calibration coefficient of the PWR before refueling and starting the reactor has a high accuracy of the RPN power range calibration coefficient before refueling and starting the reactor. j and axial power offset △I j The deviations from the true values can meet the supervision requirements and can realize effective supervision of the reactor power during the power increase process of the PWR unit. Therefore, the calculation method of the power range calibration coefficient before the PWR refueling start-up is credible and its accuracy meets the requirements of actual engineering applications.
[0099] At least one embodiment of the present application further provides a computer device, which includes a processor and a memory. The processor is used to execute a method for calculating a power range calibration coefficient before a pressurized water reactor is refueled and started, provided in any of the above embodiments of the present application. The memory is used to store executable instructions of the processor, such as application programs. The number of processors can be one or more. The application program stored in the memory may include one or more modules, each of which corresponds to a set of instructions. In addition, the processor is configured to execute instructions to execute the above-mentioned method for calculating a power range calibration coefficient before a pressurized water reactor is refueled and started.
[0100] The computer device may also include a power supply component configured to manage power of the computer device, a wired or wireless network interface configured to connect the computer device to a network, and an input / output (I / O) interface. The computer device may operate based on an operating system stored in the memory, such as Windows Server 2003. TM , Mac OSX TM , Unix TM , Linux TM , FreeBSD TM or similar.
[0101] At least one embodiment of the present application further provides a computer-readable storage medium on which executable instructions of a computer are stored. When the executable instructions are executed by a processor, a method for calculating a power range calibration coefficient before a pressurized water reactor refueling start-up is implemented as provided in any of the above embodiments of the present application.
[0102] A non-transitory computer-readable storage medium, when the instructions in the storage medium are executed by the processor of the above-mentioned computer device, enables the above-mentioned computer device to execute the above-mentioned method for calculating the power range calibration coefficient before the refueling and starting of the pressurized water reactor. The method for calculating the power range calibration coefficient before the refueling and starting of the pressurized water reactor is executed by an agent program.
[0103] Those of ordinary skill in the art will appreciate that the algorithmic steps of each example described in conjunction with the embodiments disclosed in this application can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0104] At least one embodiment of the present application further provides a computer program product, including a computer program / instruction, which, when executed by a processor, implements a method for calculating a power range calibration coefficient before a pressurized water reactor is refueled and started, provided in any of the above embodiments of the present application.
[0105] If the above functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a computer program product, which is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, server, or network device, etc.) to execute all or part of the steps of the method for calculating the power range scale coefficient before the start-up of the pressurized water reactor refueling in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM), random access memory (RAM), disk or optical disk, etc., and other media that can store program check codes.
[0106] It should be noted that the combination of the various technical features in the embodiments of the present application is not limited to the combination described in the embodiments of the present application or the combination described in the specific embodiments, and all technical features described in the present application can be freely combined or combined in any way unless there is a contradiction between them.
[0107] As shown in this application and claims, unless the context clearly indicates an exception, the words "a", "an" and / or "the" do not refer to the singular and may also include the plural. Generally speaking, the term "comprising" only indicates that the steps and elements that have been clearly identified are included, and these steps and elements do not constitute an exclusive list. The method or device may also include other steps or elements.
[0108] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features.
[0109] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions, etc. made within the spirit and principles of the present application shall be included in the protection scope of the present application.
Claims
1. A method for calculating the power range calibration coefficient before the start-up of a pressurized water reactor refueling, characterized in that: include: Step 1: According to the core loading scheme of the current cycle, simulate and calculate the xenon oscillation caused by the moving rod under the 50% FP power platform to obtain the AO of different in-core axial power offsets in,j The first core power distribution P of the four quadrants of the core j (z); Step 2: Using the detector response function w j (z) and the first core power distribution P of the four quadrants of the core j (z), the first off-core detector response current I is calculated using formula 1 i,j , Formula 1: In formula 1, i represents each detector of the power range; j represents the four quadrants of the core, j=1, 2, 3, 4, and z represents the height; Step 3: The second core power distribution measured by physical test at 50% FP power platform in the previous cycle and the recorded second off-core detector response current , combined with formula 2, the sensitivity coefficient S of each detector in the power range of the out-of-core nuclear measurement system is calculated i,j , Formula 2: Step 4: Combine formula 3 and use the sensitivity coefficient S i,j The first external detector responds to the current I i,j Correction is made to convert the corrected current Confirm that it is the current circulating real current. Formula 3; Step 5: According to the corrected current , calculate the current cycle base scale factor , and .
2. The method for calculating the power range calibration coefficient before the start-up of a pressurized water reactor refueling according to claim 1 is characterized in that: Step five includes: Step 51: According to the corrected current , combined with formula 4 and formula 5, the upper current is calculated and lower current , Formula 4: Formula 5; Step 52: According to the upper current , lower current Axial power offset from the core , External axial power offset , nuclear power The relationship between the formula 6, formula 7 and formula 8 is combined to obtain A by linear fitting calculation j , B j and C j , Formula 6: Formula 7, Formula 8; Step 53: According to A j , B j and C j , combined with formula 11, formula 12 and formula 13, calculate the current cycle benchmark scale coefficient , and , Formula 11, Formula 12, Formula 13.
3. The method for calculating the power range calibration coefficient before the start-up of a pressurized water reactor refueling according to claim 1 is characterized in that: After step five, it also includes: Step 6: The power of the first peripheral component is simulated and calculated according to the current cycle loading scheme , the second peripheral component power Pr obtained from the actual 50% FP power platform core power distribution measurement test of the previous cycle n,j , and the detector response factor L to peripheral components n,j , combined with formula 14, calculate the ratio of the contribution of the peripheral components to each detector in the current cycle and the previous cycle ; Formula 14; Step 7: Combine Formula 15, Formula 16 and Formula 17 and use the contribution ratio F j Scale factor K j Correction is performed to obtain the final scale factor , , , Formula 15, Formula 16, Formula XVII.
4. The method for calculating the power range calibration coefficient before the start-up of a pressurized water reactor refueling according to claim 3 is characterized in that: After step seven, it also includes: Step 8: When the unit actually reaches the 50% FP power platform, use the final scale factor , , Calculate the nuclear power Pr j Deviation and axial power offset △I j to determine whether the supervision requirements are met.
5. A computer device, characterized in that: include: A processor, configured to execute the method for calculating the power range calibration coefficient of a pressurized water reactor before refueling and starting the reactor according to any one of claims 1 to 4; as well as A memory is used to store executable instructions of the processor.
6. A computer-readable storage medium having computer executable instructions stored thereon, characterized in that: When the executable instructions are executed by the processor, the method for calculating the power range calibration coefficient of a pressurized water reactor before refueling and starting the reactor according to any one of claims 1 to 4 is implemented.
7. A computer program product comprising a computer program / instructions, characterized in that The computer program / instructions, when executed by a processor, implements the method for calculating the power range calibration coefficient of a pressurized water reactor before refueling and starting the reactor according to any one of claims 1 to 4.
Citation Information
Patent Citations
Method for calibrating out-of-pile nuclear measurement ionization chamber
CN107195347A
Method, system and device for acquiring scale coefficient of out-of-pile detector, and storage medium
CN113936823A
Cited By
Calibration method and device for nuclear reactor out-of-pile detector
CN121171663A