Nuclear power station overhaul delay work order management and control system and method

A digital system automates and streamlines nuclear power plant overhaul management, reducing manual work time and enhancing efficiency by digitizing the process and enabling real-time tracking and monitoring of work orders.

CN119067580APending Publication Date: 2024-12-03CNNC NUCLEAR POWER OPERATION MANAGEMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310647499.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-06-02
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

Current nuclear power plant overhaul management methods face inefficiencies, large resource investments, and difficulties in managing and controlling delayed work orders, leading to significant delays and disruptions in the overhaul process.

Method used

A digital system and method for managing and controlling overhaul extension work orders using a client, server, and platform, incorporating modules for receiving, verifying, allocating, and querying information to automate and streamline the process, reducing manual intervention and enhancing data analysis and visualization.

Benefits of technology

The system digitizes the overhaul process, reducing manual work time from hours to minutes, improving efficiency, accuracy, and enabling real-time tracking and monitoring of work orders, thus enhancing management and control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119067580A_ABST
    Figure CN119067580A_ABST
Patent Text Reader

Abstract

The invention provides a nuclear power station overhaul delay work order management and control system, which comprises clients, a server, a responsibility examination and approval department branch end and a platform end, and is characterized in that the server is connected with the clients, the branch end and the platform end through a network, and the server comprises a receiving module used for receiving a delay application form sent by each client, the delay application form must meet information elements required by the system; and the automatic distribution module is used for distributing the delay application form to a to-do pool of the corresponding network side and the platform side by the server side. The invention further provides a nuclear power station overhaul delay work order management and control method. According to the invention, on the basis of the original business, the paper process of the overhaul delay work order is electronized by means of an informatization technology, the development of functions such as interactive broadcasting of information, data burying, data analysis, optimization iteration and auxiliary management and control is completed, and high efficiency and transparency of the process are realized; and management and control are refined and rationalized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of nuclear power plant overhaul postponement work order management and control, and in particular to a nuclear power plant overhaul postponement work order management and control system and method. Background Art

[0002] Nuclear power plant shutdown overhaul is an activity that involves shutting down the unit as planned and carrying out centralized maintenance after a fuel cycle is completed. Nuclear power plant overhauls are characterized by many tasks, tight deadlines, and large resource requirements, so work delays during overhauls are inevitable. Historical statistics show that the proportion of delayed work orders for a single overhaul is 10%-20%, and the proportion of delayed work orders for key personnel is as high as 40%. The proportion of delayed work orders among major contractors is more than 60%. Therefore, the number of delayed work orders in overhauls is not only large, but also affects a wide range of personnel. Taking the standard annual overhaul as an example, out of a total of more than 7,000 work orders, delayed work orders account for more than 1,000. In addition, the delay of important work and the superposition of delayed work will affect the critical path of the overhaul, which has an adverse impact on the progress control of the overhaul.

[0003] The current management method for overhaul delay work orders is a management form of manual transmission of paper forms and approval at each level, which causes the work leaders to be exhausted and takes up on-site work time to a certain extent; professional approvers do not strictly control on-site abnormalities and matters that need to be resolved urgently, and lack specificity; plan approval personnel need to devote a lot of energy to the review, entry, and status tracking of delayed work orders; cross-departmental communication has poor timeliness; overhaul delay work order data cannot be structured, and there is no complete data for data analysis and iterative optimization; management and control are difficult to refine.

[0004] It can be seen that with the promotion and implementation of refined management, the original management form of manual transmission of paper forms and step-by-step approval for overhaul extension work orders can no longer meet the needs of high efficiency and strong control in nuclear power plant overhaul. Summary of the invention

[0005] The present invention provides a nuclear power plant overhaul extension work order management and control system and method, which solves the problems of low efficiency, large resource investment and great difficulty in management and control tracking of the original nuclear power plant overhaul extension work order management and control.

[0006] In order to achieve the above object, the present invention provides the following technical solutions:

[0007] A nuclear power plant overhaul extension work order management and control system includes a client, a server, a responsible approval department outlet, and a platform. The server is connected to the client, outlet, and platform through a network. The server includes:

[0008] Receiving module: used for the server to receive extension application forms sent by various clients. Extension application forms must meet the information elements required by the system;

[0009] Automatic allocation module: used by the server to allocate extension application forms to the corresponding branch and platform to-do pools.

[0010] The server also includes a verification module: used to verify whether the data packet information transmitted by the client, branch, and platform is missing or meets the requirements.

[0011] The verification module is used to verify whether the information is accurate, whether the format meets the requirements, whether the approval path exists, and whether the interface address is correct.

[0012] The server also includes a query module: the server receives query requests from the client and the platform, and feeds back query information in order to query information related to the extension application record.

[0013] The server also includes a feedback processing module: when the server finds an error in information transmission, it triggers an exception feedback to the corresponding technical support personnel for quick processing.

[0014] Furthermore, the feedback processing module sends the feedback information to the designated staff mailbox to achieve the purpose of monitoring and early warning.

[0015] Furthermore, the automatic allocation module allocates the extension application to the to-do pool of the approval responsible person of the corresponding department on the branch side according to the responsible department code, allocates the extension application to the to-do pool of the corresponding planning engineer on the platform side according to the scheduling group, and distributes the relevant information of the extension application approval result to the mobile phone and client of the work supervisor according to the contact number field of the work supervisor.

[0016] A method for controlling a nuclear power plant overhaul delay work order comprises the following steps:

[0017] The server receives extension application forms sent by various clients;

[0018] The server allocates the application form to the pending pool of the professional department outlet according to the professional department code and the professional approval responsible person information;

[0019] After the approval is completed, the information is sent back to the server;

[0020] The server distributes the extension application form to the to-do pool of each responsible planning engineer on the platform according to the work order scheduling group information;

[0021] After the approval is completed, the extension application form is closed, and the corresponding extension work order is entered into the extension work order tracking and control library.

[0022] Furthermore, before initiating an application, the client accesses and obtains the EAM work order database information according to the reported work order task number.

[0023] The method for controlling the delayed work order of the nuclear power plant overhaul specifically includes:

[0024] S10: Initiate an extension application on the client;

[0025] S20: The client verifies the extension application to be submitted to determine whether it meets the requirements. If so, it proceeds to S30. If not, it is revised again.

[0026] S30: The client calls the interface to send the extension application to the server to determine whether the call is successful. If successful, it proceeds to S40. If unsuccessful, it reports an exception and sends it to the backend technical support personnel for processing;

[0027] S40: The server receives the extension application;

[0028] S50: The server allocates the application form to the to-do pool of the person in charge of approval corresponding to the branch end corresponding to the responsible department code;

[0029] S60: After the approval is completed at the branch end, the extension application information is returned to the server end;

[0030] S70: The service end distributes the approved extension applications at the outlet end to the agent pool of responsible plan engineers at the platform end;

[0031] S80: The planning engineer approves the extension application on the platform;

[0032] S90: The approved deferred work order is assigned to the platform tracking library;

[0033] S100: The server sends a text message to notify the person responsible for the work and sends the extension time back to EAM.

[0034] Compared with the prior art, the nuclear power plant overhaul extension work order management and control system and method provided by the present invention has the following beneficial effects:

[0035] Based on the original business foundation, the present invention uses information technology to digitize the paper process of overhaul extension work orders, completes the development of functions such as interactive broadcasting of information, data embedding, data analysis, optimization iteration, and auxiliary management and control, and realizes efficient and transparent processes; refined and rational management and control.

[0036] The present invention uses information technology and database technology to develop an overhaul postponement work order management and control system platform to achieve precise and efficient management and control of overhaul postponement work orders.

[0037] The present invention shortens the original offline paper process of 1-2 hours to 5-10 minutes, greatly reducing the burden on work supervisors to run the process and freeing up the energy spent on auditing and tracking by managers. It also realizes dynamic tracking and monitoring of overhaul deferred work orders, information analysis and screening, real-time interactive broadcasting, targeted push, importance judgment, data analysis and visualization and other functions.

[0038] Furthermore, the present invention can accurately distribute and deliver corresponding application information to corresponding personnel through the automatic allocation module on the server side, reducing the time-consuming screening process of personnel, making the process more efficient, improving the efficiency of application processing, and the system's automatic allocation is more accurate than manual application.

[0039] Furthermore, the present invention can transmit the process status of the extension application to the person in charge of the work in the first time through the SMS trigger function of the server, realize the real-time information, and reduce the time lag and the waste of resources caused by it. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0041] Figure 1 An overall block diagram of a nuclear power plant overhaul extension work order management and control system provided by an embodiment of the present invention;

[0042] Figure 2 A structural block diagram of a nuclear power plant overhaul extension work order management and control system provided by an embodiment of the present invention;

[0043] Figure 3 A flow chart of a method for controlling a nuclear power plant overhaul delay work order provided by an embodiment of the present invention;

[0044] Figure 4 A business flow chart of a method for controlling a nuclear power plant overhaul extension work order provided by an embodiment of the present invention;

[0045] Figure 5 The present invention provides a flowchart of a method for controlling a nuclear power plant overhaul delay work order according to an embodiment of the present invention.

[0046] Description of reference numerals:

[0047] 100-client side; 200-network side; 300-server side; 400-platform side;

[0048] 101-information acquisition and filling module; 102-client verification module; 103-client query module; 301-verification module; 302-receiving module; 303-automatic allocation module; 304-server query module; 305-feedback processing module; 401-platform query module. DETAILED DESCRIPTION

[0049] The following is further explained in detail through specific implementation methods.

[0050] The present invention provides a nuclear power plant overhaul extension work order control system, including a client, a service end, a responsible approval department outlet end and a platform end. The service end is connected to the client, the outlet end and the platform end through a network, wherein the client, the outlet end and the platform end are all provided with an overhaul extension work order control subsystem. The system is a UI human-computer interaction support software system for a nuclear power plant overhaul extension work order control system, and is a component of a nuclear power plant overhaul extension work order control system. Users can call various functions of the client, the service end, the outlet end and the platform end through this software. At the same time, the client, the outlet end and the platform end are all provided with an interactive module for interactive communication; the service end further includes:

[0051] The receiving module is used by the server to receive application requests, approval information, etc. sent by the client, branch and platform. The transmitted information must contain the aforementioned mandatory field tags;

[0052] The allocation module is used by the server to distribute different types of information received to different target users, including: allocating the extension application to the to-do pool of the approval responsible person of the corresponding department on the branch side according to the responsible department code, allocating the extension application to the to-do pool of the corresponding planning engineer on the platform side according to the scheduling group, and distributing the information related to the extension application approval result to the mobile phone and client of the work supervisor according to the contact phone field of the work supervisor.

[0053] The server also includes a verification module, which is used to perform verification operations before the server receives relevant information requests. The verification operations mainly include: whether the information is true, whether the format meets the requirements, whether the approval path exists, and whether the interface address is correct.

[0054] The server also includes: a feedback processing module, which is used to trigger corresponding feedback information after an error occurs when calling the information transmission interface on the client, branch or platform side, and send the feedback information to the designated staff mailbox to achieve the purpose of monitoring and early warning.

[0055] The client, server and platform in this method are all equipped with a query module for fuzzy query of information related to the extension application.

[0056] The server is usually the center or main station for work order extension control, including but not limited to multiple service processing centers, data storage and authentication centers. The server mentioned in the present invention is more of a general processing center with work order control functions. The present invention also involves work order extension applications submitted by various clients. Since there are many major overhauls in nuclear power plants, it also involves multiple responsible professional outlets for processing extension applications. The outlets generally have processing centers and PC client terminals. The PC client terminal is used to process extension applications from outlets. In addition, the platform terminal is an overhaul extension work order control system platform developed by the present invention for extension business applications, which serves as a platform for overhaul planning engineers to apply for processing and control.

[0057] Based on the above-mentioned nuclear power plant overhaul extension work order management and control system, the present invention also provides a nuclear power plant overhaul extension work order management and control method, including the following steps: the server receives the extension application form sent by each client (i.e., AWT terminal), the application form includes information such as the professional department code, the professional department approval person in charge, the work order scheduling group, the work order number, etc. The server allocates the application form to the to-do pool of the professional department branch end according to the professional department code and the professional approval person information. After the professional department approval person in charge completes the approval, the information is transmitted back to the server. The server allocates the extension application form to the to-do pool of each responsible planning engineer of the overhaul extension work order management and control system platform (hereinafter referred to as the platform end) according to the work order scheduling group information. After the approval is completed, the extension application form is closed, and the corresponding extension work order enters the extension work order tracking and management library.

[0058] In one of the embodiments, according to the job division of the overhaul project business process, corresponding approval personnel data is configured in the database according to professional job responsibilities for subsequent client calls.

[0059] In one of the embodiments, before initiating an application, the client will access and obtain the EAM work order database information based on the work order task number filled in by the work supervisor, including but not limited to the following information: work content, planned start time, planned completion time, responsible team, work supervisor, work team, contact number, equipment code, primary isolation, work order task status. The client will automatically complete and verify the relevant information based on the fields covered on the application page.

[0060] In one of the embodiments, the client automatically associates supplementary information with the extension application form including: work content, work priority, work leader, work phone number, planned completion time, overhaul number, scheduling group, work team, expiration countdown, and approval path.

[0061] The client verifies the extension application information, including whether the extension application date is shorter than the originally planned completion date, whether the extension reason exceeds the character length, and whether the required items are empty.

[0062] In one of the embodiments, if the automatic association of the current approval path fails, the applicant is allowed to configure and select the corresponding approver on the client side.

[0063] In one of the embodiments, it also includes: after the server receives the request, it will send the application to the personal to-do pool of the approver at the corresponding department branch according to the professional department code and professional approval responsible person information in the application form. At the same time, the server obtains the email address and mobile phone information of the approver, and automatically triggers emails and text messages to remind the approver to go to the personal to-do pool to complete the approval.

[0064] In one of the embodiments, the department approver has the authority to modify the following contents in the deferred work application form information on the personal to-do page: application extension date, application extension reason.

[0065] In one of the embodiments, if the department approver rejects the extension application, the information is transmitted back to the server, and the server returns the form to the client and notifies the applicant by SMS. If the department approver approves the extension application, the form is delivered to the corresponding planning engineer to-do pool on the platform side through the original scheduling group code, and the application form is set to to-do status.

[0066] In one of the embodiments, the planning engineer approves the corresponding pending tasks in the overhaul extension work order management system platform. The approval operation involves: selecting the approval opinion (agree, reject, pay attention), modifying the extension time, creating message information, and checking the scope of personnel to be notified. The platform sends the relevant information back to the server through the interface, and the server distributes the approval results to the client and the corresponding department outlets, and triggers a text message reminder based on the contact phone field in the work order to send it to the mobile phone of the person in charge of the work.

[0067] In one of the embodiments, planning engineers can perform fuzzy queries on the overhaul delay work order management system platform, export work order lists to Excel, and select multiple tasks to be done. This part of the function is the platform's own function set up for the convenience of approval personnel and does not involve the transmission of information interfaces between the platform and the server.

[0068] In one of the embodiments, the overhaul delay work order management and control system platform performs statistical analysis on the data related to the delay approval and makes a visual display, mainly involving: statistical display of the number of pending items, remaining delays, completed delays, rejected applications, and overdue work orders that have not been extended, a visual chart of the number of delay ticket statistics, a visual chart of the distribution of the number of delays by work team, a visual chart of the distribution of the delay situation of the responsible department, and a visual chart of the overall distribution of the number of delays.

[0069] Example

[0070] like Figure 1 and Figure 2 As shown, the present invention provides a nuclear power plant overhaul extension work order management and control system, including: a client 100, a network terminal 200, a service terminal 300, and a platform terminal 400. The server terminal 300 is connected to the client 100, the network terminal 200 and the platform terminal 400 through a network.

[0071] The client 100 is used by the work supervisor to initiate an extension application form for the overhaul work order, and provides real-time status viewing of the extension application form and reception of system-related information.

[0072] The branch terminal 200 is used by the person in charge of the approval of the professional department to review, modify, approve, reject and perform other operations on the extension application form of the overhaul work order.

[0073] The server 300 is used to receive and respond to various operation requests from the client, network point and platform.

[0074] The platform 400 is used by responsible planning engineers to review, modify, approve, reject and perform other operations on overhaul extension application forms, and to track the status of extension work orders and conduct data analysis.

[0075] The server 300 further includes:

[0076] Verification module 301: used to verify whether the data packet information transmitted by the client 100, the network end 200, and the platform end 400 is missing and whether it meets the requirements;

[0077] Receiving module 302: used for the server 300 to receive the extension application form sent by each client 100. The extension application form must meet the information elements required by the system.

[0078] Automatic allocation module 303: used for the service end 200 to allocate the extension application form to the corresponding waiting pool of the outlet end 200 and the platform end 400;

[0079] Query module 304: used for the server 200 to receive query requests from the client 100 and the platform 400, and to feedback query information, so as to query information related to the extension application record;

[0080] Feedback processing module: used by the server 200 to trigger an exception feedback to the corresponding technical support personnel for quick processing when an error occurs in information transmission.

[0081] The client in this embodiment is an AWT terminal, which has the same function as a PC client and can provide work order-related services to the person in charge of the work. The branch terminal in this embodiment is the PC client, mobile client, web client and terminal device with an EAM system of the department-related approval responsible person. The platform terminal in this embodiment mainly refers to the PC client, mobile client, web client, etc. of the overhaul extension work order management and control system platform used by planning engineers. The server terminal in this embodiment is a service terminal device that provides services to the client, branch terminal and platform terminal and stores relevant data, such as a server.

[0082] like Figure 3 As shown, the present invention provides a method for controlling a nuclear power plant overhaul extension work order, and the method specifically comprises:

[0083] S10: Initiate an extension application on the client;

[0084] S20: The client verifies the extension application to be submitted to determine whether it meets the requirements. If so, it proceeds to S30. If not, it is revised again (a reminder box pops up to prompt the revision);

[0085] S30: The client calls the interface to send the extension application to the server to determine whether the call is successful. If successful, it proceeds to S40. If unsuccessful, it reports an exception and sends it to the backend technical support personnel for processing;

[0086] S40: The server receives the extension application;

[0087] S50: The server allocates the application form to the to-do pool of the person in charge of approval corresponding to the branch end corresponding to the responsible department code;

[0088] S60: After the approval is completed at the branch end, the extension application information is returned to the server end;

[0089] S70: The service end distributes the approved extension applications at the outlet end to the agent pool of responsible plan engineers at the platform end;

[0090] S80: The planning engineer approves the extension application on the platform. If approved, proceed to S90. If not approved, the rejection information (rejector, message, approval time, etc.) of the extension work order is sent back to the server. The server sends a text message to notify the person in charge of the work of the rejection information, prompting him to modify the application.

[0091] S90: The approved deferred work order is assigned to the platform tracking library, and the approval information of the deferred work order (rejector, message, approval time, etc.) is sent back to the server;

[0092] S100: The server sends a text message to notify the person responsible for the work and sends the extension time back to EAM.

[0093] Before S10, the work supervisor would usually determine whether it was necessary to initiate an extension application in advance based on the progress of the on-site work. If the work order was still not completed beyond the planned completion time, the overhaul extension work order management system platform would automatically trigger a text message to remind the work supervisor to initiate an extension application.

[0094] In S20, the work leader logs in to the personal page on the client and fills in the extension application information, part of which is filled in manually and the rest is automatically filled in by the client information acquisition and filling module, see Table 1 for details.

[0095] Table 1 How to fill in the extension application information

[0096] Application Information Fields Filling method Work order task number Manual filling Work Priorities Autofill Overhaul Autofill Job Description Autofill Job Responsible Person Autofill Scheduling Group Autofill Work Phone Autofill Team Autofill Extension Date Manual filling Planned completion time Autofill Countdown to expiration Autofill Reason for extension Manual filling Approval Path Autofill

[0097] After the work leader completes filling in the information, the client background automatically performs step S20. If the verification is incorrect, it will prompt for modification. After the verification module verifies that there are no errors, the extension application generation module will generate an extension application data packet and perform step S30 to send the data packet to the server. If an exception occurs during the transmission, the exception will be fed back through the feedback processing module of the server.

[0098] In S50, the server will assign the extension application form to the branch corresponding to the responsible department code for approval. If the professional approval person chooses to reject the extension, the work order extension application process ends here. The communication module of the server will return the approval result to the client and send a text message reminder to the person in charge of the work.

[0099] In actual application, Figure 4 As shown, the business process of the embodiment (nuclear power plant overhaul work order extension control business process) mainly includes:

[0100] Step A1: If the person in charge of the work cannot complete the work order before the originally planned completion time due to various reasons, he / she must apply for an extension of the work order and reapply for a new work completion time. The application for extension must be initiated by the holder of the work order, i.e. the person in charge of the work;

[0101] Step A2: After the work leader initiates the extension application, the relevant person in charge of the corresponding professional department will review the information in the extension application and confirm whether to approve it in combination with the relevant professional work arrangements;

[0102] Step A3: After the extension application is approved by the professional department, it will be reviewed by the corresponding overhaul planning engineer based on the work order scheduling group information to confirm whether the extension of the work order will affect the progress of the overhaul project, and the final approval result of the extension will be given based on the current progress of the project, and a new work completion time will be assigned.

[0103] Step A4: After the extension approval is completed, in order to facilitate the management of extension work orders, these work orders are specially placed in the overhaul extension work order management library for subsequent tracking management and experience feedback.

[0104] like Figure 5 As shown, based on the business process of the above embodiment, the method for controlling the nuclear power plant overhaul extension work order includes the following steps:

[0105] Step B1: The person in charge of the work fills in the application form for extension of the overhaul work order on the client (AWT terminal) and initiates the approval process;

[0106] Step B2: The client automatically obtains other information fields in the extension application and extension approval path information from the EAM database according to the work order number filled in by the work supervisor through the interface with the EAM database;

[0107] Step B3: The service end allocates the extension application to the pending pool of the branch end corresponding to the professional responsibility department;

[0108] Step B4: After the branch end completes the approval, the server will allocate the extension application to the to-do library of each responsible plan engineer in the overhaul extension work order management and control system platform for processing;

[0109] Step B5: After the responsible person processes the extension application, the corresponding work order will be entered into the overhaul extension work order tracking and control library.

[0110] In step B1, due to various reasons, the work supervisor is unable to complete the work before the originally planned completion time and needs to initiate a work order extension application on the AWT terminal, i.e. the client. The specific operation process is as follows: the work supervisor selects the work order that needs to be extended in his or her personal work interface, and a work order task extension application page will pop up. The client's information acquisition and supplement module will automatically fill in the field information specified in the industry by extracting it from the database. The work supervisor only needs to click on the standard extension reason or enter a specific personal reason, and choose when to apply for an extension to complete the work. The client will automatically match the approval path from the database according to the professional team in the extension content. The work supervisor only needs to click Submit to complete the work order extension application.

[0111] In step B2, when the work leader fills out the extension application form on the client, the client will extract various information from the EAM database to ensure that all fields in the application form are not empty and the application data is consistent with the data in the database. The extension approval path data is updated in the database by professionals through a specific setting page to ensure that the approval path of different batches of overhauls is always correct.

[0112] In step B3, the server delivers the extension application to the to-do pool of the professional department branch according to the professional responsible department code in the extension application, and at the same time triggers the to-do reminder of the company's email system and EAM system, and sends emails and EAM system to-do reminders to the corresponding professional responsible approvers to ensure that they approve the extension application in the to-do pool in time.

[0113] In step B4, after the professional responsible approver completes the approval at the departmental outlet, the server will distribute the extension application related information (including the information submitted by the work leader and the approval information of the professional responsible approver) to the to-do library of each corresponding responsible plan engineer of the overhaul extension work order management and control system platform according to the scheduling group field in the extension application information. In the to-do library of the overhaul extension work order management and control system platform, all other information carried by the extension application, such as "main isolation", "plan start", "plan completion", "work content", etc., will be displayed. At the same time, the platform will provide the plan engineer with three operation options: "Agree", "Reject", and "Follow". After clicking "Agree", a pop-up window will be displayed to remind the plan engineer to give the extension completion time, and the message information can be filled in and the relevant content of the extension application information can be checked to be sent to the person in charge of the corresponding professional department; after clicking "Reject", a pop-up window will be displayed to remind the plan engineer that the application will be rejected to avoid misoperation, and a message function will be provided; after clicking "Follow", the overhaul extension work order management and control system platform will track the status of this work order in the background. Once the status changes, the change information will be sent to the mailbox of the follower through the company's mail system.

[0114] In step B5, after the planning engineer completes the approval of the work order extension on the overhaul extension work order management system platform, the platform will store all the deferred work orders in the extension database, and query and synchronously refresh the work order status information in the EAM database at a frequency of 5 minutes. After the work order is stored in the platform extension database, a convenient quick query function is also provided to facilitate the management of the work order by the planning engineer.

[0115] Therefore, the present invention sets up multiple clients at the work site, and users can complete the application of the corresponding process simply and efficiently by initiating an electronic extension application on the client. During the operation, users only need to fill in a few fields, and the rest are all automatically completed by the client by searching the database. This avoids cumbersome filling and manual processes that are time-consuming and labor-intensive, and is more user-friendly, allowing data to run the process instead of the person in charge of the work.

[0116] The present invention ensures the dynamic change of approval responsible persons in different project management through the autonomous configuration of corresponding responsible persons in the background approval path. It can be dynamically and autonomously configured according to different overhauls, which is flexible and accurate, and reduces the errors and burdens of the work responsible persons' self-operation.

[0117] The present invention performs data verification on the extension application submitted by the client through the server, which effectively avoids the occurrence of errors, ensures the accuracy of the source information of the business process, and lays a foundation for subsequent extension application information addressing and efficient business approval process.

[0118] The present invention makes all extension applications clearly visible through the extension management and control system platform on the platform side, and adds a clear display of the relevant information of the extension application, so that planning engineers can have a more comprehensive and profound understanding of the information behind the extension application, which is convenient for accurate review and approval, and through the extension tracking library of the platform, the real-time status of the extension work order can be easily queried and tracked, avoiding the time-consuming and labor-intensive manual tracking, and greatly improving efficiency.

[0119] In the present invention, the person in charge of the work can view the information and process processing status related to the extension application in real time on the client, so that the whole process is real-time and transparent, meeting the use needs of the person in charge of the work.

[0120] The present invention uses the platform to perform background statistical analysis and visual display of the relevant data of work order delays, and visualizes the delayed work orders based on different data dimensions. This makes it convenient for personnel at all levels to query, count, analyze, and evaluate information data, which is especially helpful for decision-making analysis at the project management level.

[0121] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. A nuclear power plant overhaul extension work order management and control system, It is characterized in that It includes the client, the service, the branch of the responsible approval department and the platform. The service is connected to the client, the branch and the platform through the network. The service includes: Receiving module: used for the server to receive extension application forms sent by various clients. Extension application forms must meet the information elements required by the system; Automatic allocation module: used by the server to allocate extension application forms to the corresponding branch and platform to-do pools.

2. The nuclear power plant overhaul extension work order management and control system according to claim 1, It is characterized in that The server also includes a verification module: used to verify whether the data packet information transmitted by the client, branch, and platform is missing or meets the requirements.

3. The nuclear power plant overhaul extension work order management and control system according to claim 2, It is characterized in that The verification module is used to verify whether the information is accurate, whether the format meets the requirements, whether the approval path exists, and whether the interface address is correct.

4. The nuclear power plant overhaul extension work order management and control system according to claim 1, It is characterized in that The server also includes a query module: the server receives query requests from the client and the platform, and feeds back query information in order to query information related to the extension application record.

5. The nuclear power plant overhaul extension work order management and control system according to claim 1, It is characterized in that The server also includes a feedback processing module: when the server finds an error in information transmission, it triggers an exception feedback to the corresponding technical support personnel for quick processing.

6. The nuclear power plant overhaul extension work order management and control system according to claim 5, It is characterized in that The feedback processing module sends the feedback information to the designated staff mailbox to achieve the purpose of monitoring and early warning.

7. The nuclear power plant overhaul extension work order management and control system according to claim 1, It is characterized in that The automatic allocation module allocates the extension application to the to-do pool of the approval responsible person in the corresponding department at the branch end according to the responsible department code, allocates the extension application to the to-do pool of the corresponding planning engineer on the platform end according to the scheduling group, and distributes the relevant information of the extension application approval result to the mobile phone and client of the work supervisor according to the contact number field of the work supervisor.

8. A method for controlling work orders for delayed overhaul of a nuclear power plant. It is characterized in that The following steps are involved: The server receives extension application forms sent by various clients; The server allocates the application form to the pending pool of the professional department outlet according to the professional department code and the professional approval responsible person information; After the approval is completed, the information is sent back to the server; The server distributes the extension application form to the to-do pool of each responsible planning engineer on the platform according to the work order scheduling group information; After the approval is completed, the extension application form is closed, and the corresponding extension work order is entered into the extension work order tracking and control library.

9. The method for controlling the delayed work order of a nuclear power plant overhaul according to claim 8, It is characterized in that Before initiating an application, the client accesses and obtains the EAM work order database information based on the work order task number filled in.

10. The method for controlling the delayed work order of a nuclear power plant overhaul according to claim 8, It is characterized in that Specifically include: S10: Initiate an extension application on the client; S20: The client verifies the extension application to be submitted to determine whether it meets the requirements. If so, it proceeds to S30. If not, it is revised again. S30: The client calls the interface to send the extension application to the server to determine whether the call is successful. If successful, it proceeds to S40. If unsuccessful, it reports an exception and sends it to the backend technical support personnel for processing; S40: The server receives the extension application; S50: The server allocates the application form to the to-do pool of the person in charge of approval corresponding to the branch end corresponding to the responsible department code; S60: After the approval is completed at the branch end, the extension application information is returned to the server end; S70: The service end distributes the approved extension applications at the outlet end to the agent pool of responsible plan engineers at the platform end; S80: The planning engineer approves the extension application on the platform; S90: The approved deferred work order is assigned to the platform tracking library; S100: The server sends a text message to notify the person responsible for the work and sends the extension time back to EAM.