Electric energy router and control method thereof
By using AC-DC bidirectional conversion module, bidirectional buck conversion module and controllable switch in the power router, combined with real-time monitoring and adjustment of the controller, the complex structure and high cost of the power router are solved, and efficient energy management is achieved and The effect of reducing costs.
Patent Information
- Application Number
- CN202411093187.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-12-03
AI Technical Summary
The topology and hardware circuits of existing power routers are complex and costly, making it difficult to achieve efficient energy management and optimization.
The AC-DC bidirectional conversion module, the bidirectional boost and buck conversion module and controllable switch are adopted to monitor the charge and discharge current and voltage of the energy storage device in real time through the controller, and optimize the control algorithm to simplify the hardware circuit structure and reduce costs.
It realizes efficient control and energy management of the power router, reduces the complexity and cost of hardware circuits, and improves the safety and reliability of the system.
Smart Images

Figure CN119070313A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of microgrid and energy Internet, and in particular to a power router and a control method thereof. Background Art
[0002] Energy Internet is a peer-to-peer exchange and sharing network with bidirectional energy flow, which can realize bidirectional on-demand transmission and dynamic balance of energy. Microgrid refers to a small power generation and distribution system composed of distributed power sources, energy storage devices, energy conversion devices, loads, monitoring and protection devices, etc. Microgrid is an important part of Energy Internet. It is a small-scale, autonomous local energy network that can operate in an isolated island or in grid connection. Microgrid can digest and balance distributed power sources locally, and can also exchange energy with large power grids.
[0003] The power router is one of the core devices of the microgrid. It refers to a device that can realize the multi-directional flow of electric energy and the active control of power flow. The power router is not only responsible for internal energy management and optimization, but also for energy exchange with the external large power grid. The power router ensures the effective management of energy flow and information flow, and realizes the efficient operation and intelligent management of the microgrid.
[0004] In the related art, the power router controls the energy exchange and capacity management of the microgrid through the networking structure of the DC bus, DC / DC converter, etc. A bidirectional DC / DC module is connected between the energy storage port and the DC bus of the power router to control the charging and discharging of the energy storage device. However, this method has the problem that the topological structure and hardware circuit of the power router are relatively complex and the cost is relatively high. Summary of the invention
[0005] In order to solve the deficiencies of the prior art, the purpose of the present application is to provide a power router and a control method thereof, which can optimize the control algorithm and hardware circuit of the power router, simplify the structure of the hardware circuit by optimizing the control algorithm, and reduce its cost.
[0006] To achieve the above objectives, this application adopts the following technical solutions:
[0007] In a first aspect, the present application provides an electric energy router, the electric energy router includes at least one of an AC port, a DC port and an energy storage port, and the electric energy router also includes: a DC bus; an AC / DC bidirectional conversion module, the AC / DC bidirectional conversion module is connected between the DC bus and the AC port; a bidirectional buck-boost conversion module, the bidirectional buck-boost conversion module is connected between the DC bus and the DC port; a controllable switch, the controllable switch is connected between the DC bus and the energy storage port; a controller, the controller is electrically connected to the DC bus and is used to detect the DC bus voltage, and the controller is connected to the AC / DC bidirectional conversion module, the bidirectional buck-boost conversion module and the controllable switch through a communication bus; wherein the controller configures a maximum charging current, a maximum discharging current and a reference voltage according to an energy storage device connected to the energy storage port, the controller obtains the charging and discharging current flowing through the energy storage port in real time, and compares the charging and discharging current with the maximum charging current and the maximum discharging current respectively, and controls the controllable switch to be turned on or off according to the comparison result, and when the controllable switch is turned on, the controller adjusts the reference voltage, and the AC / DC bidirectional conversion module and / or the bidirectional buck-boost conversion module adjusts the DC bus voltage according to the reference voltage.
[0008] Furthermore, the power router also includes a current detection circuit, which is connected between the DC bus and the energy storage port to detect the charging and discharging current. The controllable switch is turned off under any of the following working conditions: the charging current is greater than or equal to the maximum charging current, and the discharging current is greater than or equal to the maximum discharging current.
[0009] Furthermore, when the voltage difference between the DC bus voltage and the voltage of the energy storage device is less than a set threshold, the controllable switch can be turned on or off according to the comparison result.
[0010] Furthermore, the ratio between the threshold value and the voltage of the energy storage device is set to be less than 0.05.
[0011] Furthermore, the average current of the DC bus corresponding to the energy storage port and the charge and discharge current satisfy the following relationship:
[0012]
[0013] Among them, I_BUS_BAT represents the average current of the DC bus, I_BAT represents the charge and discharge current, and T represents a detection cycle;
[0014] Furthermore, a portion of the DC bus connected to the AC / DC bidirectional conversion module is defined as a first branch, and a portion of the DC bus connected to the bidirectional buck-boost conversion module is defined as a second branch. When the average current of the DC bus is substantially consistent with the charge and discharge current, the DC bus voltage and the voltage of the energy storage port remain substantially unchanged, and the average current of the DC bus corresponding to the energy storage port satisfies the following relationship:
[0015]
[0016] Wherein, I_BUS_ACDC_i represents the average current of the i-th first branch, and I_BUS_DCDC_i represents the average current of the i-th second branch.
[0017] Furthermore, the controller obtains the charge state of the energy storage device through the communication bus, and adjusts the reference voltage according to the charge state.
[0018] Furthermore, when the state of charge is greater than the discharge threshold, the controller adjusts the reference voltage so that the DC bus voltage is less than the voltage of the energy storage device, and the energy storage device only works in the discharge state; when the state of charge is less than the charge threshold, the controller adjusts the reference voltage so that the DC bus voltage is greater than the voltage of the energy storage device, and the energy storage device only works in the charging state; wherein the discharge threshold is greater than the charge threshold.
[0019] Further, when the state of charge is greater than or equal to a charging threshold and less than or equal to a discharging threshold, the energy storage device can switch between a charging state and a discharging state.
[0020] In a second aspect, the present application provides a control method, which is applicable to the power router of the first aspect, and the control method comprises the following steps:
[0021] The controller configures a maximum charging current, a maximum discharging current and a reference voltage according to an energy storage device connected to the energy storage port;
[0022] The controller obtains the charging and discharging current flowing through the energy storage port in real time;
[0023] The controller compares the charge and discharge currents with the maximum charge current and the maximum discharge current, respectively, and controls the controllable switch to turn on or off;
[0024] When the controllable switch is turned on, the controller adjusts the reference voltage, and the AC / DC bidirectional conversion module and / or the bidirectional buck-boost conversion module adjusts the DC bus voltage according to the reference voltage.
[0025] The power router provided by the present application electrically connects the controller to the DC bus by connecting the controllable switch between the DC bus and the energy storage port, and the controller is connected to the AC / DC bidirectional conversion module, the bidirectional buck-boost conversion module and the controllable switch through a communication bus; further, the controller configures the maximum charging current, the maximum discharging current and the reference voltage according to the energy storage device connected to the energy storage port, the controller obtains the charging and discharging current flowing through the energy storage port in real time, and compares the charging and discharging current with the maximum charging current and the maximum discharging current respectively, and controls the controllable switch to be turned on or off according to the comparison result. When the controllable switch is turned on, the controller adjusts the reference voltage, and the AC / DC bidirectional conversion module and / or the bidirectional buck-boost conversion module adjusts the DC bus voltage according to the reference voltage, thereby optimizing the control algorithm and the hardware circuit of the power router, and realizing the simplification of the structure of the hardware circuit by optimizing the control algorithm and reducing its cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 A schematic diagram of the structure of a power router provided by an embodiment of the present application;
[0027] Figure 2 A topological diagram of a power router provided in one embodiment of the present application;
[0028] Figure 3 A current diagram of a power router provided in accordance with an embodiment of the present application;
[0029] Figure 4 An ideal volt-ampere characteristic curve of a controllable switch provided in one embodiment of the present application;
[0030] Figure 5 A volt-ampere characteristic curve diagram of a controllable switch provided in one embodiment of the present application;
[0031] Figure 6 A judgment flow chart of a power router control process provided by an embodiment of the present application;
[0032] Figure 7 A flowchart of a control method for a power router provided in one embodiment of the present application. DETAILED DESCRIPTION
[0033] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the specific implementation manner of the present application will be clearly and completely described below in conjunction with the drawings in the implementation manner of the present application.
[0034] The present application embodiment provides a power router 100, such as Figure 1As shown, the power router 100 includes at least one of an AC port 11, a DC port 12, and an energy storage port 13. Exemplarily, the power router 100 can be connected to a wind turbine, an AC load, or a public power grid through the AC port 11, but not limited to, the power router 100 can be connected to a photovoltaic power generation system, a DC load, etc. through the DC port 12, but not limited to, the power router 100 can be connected to an energy storage device through the energy storage port 13, but not limited to. The power router 100 is used to perform bidirectional conversion and distribution management of electric energy, effectively integrate distributed energy to supply power to AC loads, DC loads, and public power grids, and the energy storage device is used to absorb excess energy or supplement insufficient energy.
[0035] It should be noted that the number of AC ports 11 may be zero or multiple; the number of DC ports 12 may be zero or multiple. Figure 2 As shown, it is a topological diagram of a power router 100 of the present application example. Among them, there are N AC ports 11 and M DC ports 12, and N and M are natural numbers. The power router 100 can be connected to a wind turbine, an AC load or a public power grid through multiple AC ports 11 at the same time, and the power router 100 can be connected to a photovoltaic power generation system, a DC load, etc. through multiple DC ports 12 at the same time.
[0036] More specifically, if Figure 1 and Figure 2 As shown, the power router 100 also includes a DC bus 14, an AC / DC bidirectional conversion module 15, a bidirectional buck-boost conversion module 16, a controllable switch 17, and a controller 18. The DC bus 14 can provide stable current and voltage inside the power router 100, and the DC bus 14 is mainly used for power transmission and distribution, energy management, etc.
[0037] The AC / DC bidirectional conversion module 15 is connected between the DC bus 14 and the AC port 11. The AC / DC bidirectional conversion module 15 can perform bidirectional conversion between AC and DC to support the access and output of different types of energy. The AC / DC bidirectional conversion module 15 can also adjust the DC bus voltage, the voltage, frequency, phase, etc. of the AC port 11. The AC / DC bidirectional conversion module 15 can also adjust the active power and reactive power of the public power grid, AC load, etc. connected to the AC port 11. Exemplarily, the AC / DC bidirectional conversion module 15 can be, but not limited to, an energy storage converter, a rectifier, an inverter, etc. For example, when the power router 100 is connected to the public power grid through the AC port 11, the AC / DC bidirectional conversion module 15 can be an energy storage converter; when the power router 100 is connected to an AC output source such as wind power generation through the AC port 11, the AC / DC bidirectional module can be a rectifier; when the power router 100 is connected to an AC load through the AC port 11, the AC / DC bidirectional module can be an inverter.
[0038] The bidirectional buck-boost conversion module 16 is connected between the DC bus 14 and the DC port 12. The bidirectional buck-boost conversion module 16 can convert DC to DC to realize bidirectional transmission of DC power. The bidirectional buck-boost conversion module 16 can be used to adjust the DC bus voltage and the voltage of the DC port 12. The bidirectional buck-boost conversion module 16 can also adjust the power of the DC load and energy storage device connected to the DC port 12. Exemplarily, the bidirectional buck-boost conversion module 16 can be, but not limited to, a single-phase converter, a bidirectional converter, etc. For example, when the power router 100 is connected to a DC output source such as photovoltaic power generation through the DC port 12, the bidirectional buck-boost conversion module 16 can be a unidirectional converter; when the power router 100 is connected to an energy storage device through the DC port 12, the bidirectional buck-boost conversion module 16 can be a bidirectional converter.
[0039] In practical applications, the AC / DC bidirectional conversion module 15 and the bidirectional buck-boost conversion module 16 can be configured differently according to specific requirements and the cost of the power router 100, and no limitation is made here.
[0040] The controllable switch 17 is connected between the DC bus 14 and the energy storage port 13. The controllable switch 17 is mainly used to control the charging and discharging process of the energy storage device. For example, the controllable switch 17 can be, but is not limited to, a unidirectional controllable switch or a bidirectional controllable switch. The controllable switch 17 can also be an electronic controllable switch, a power switch device, or a combination of power switch devices.
[0041] The controller 18 is electrically connected to the DC bus 14 for detecting the voltage of the DC bus 14. The controller 18 communicates with the DC bus 14 via a communication bus ( Figure 2 The blue dotted line shown in the figure is used to represent the communication bus) and is connected to the AC / DC bidirectional conversion module 15, the bidirectional buck-boost conversion module 16 and the controllable switch 17. The controller 18 is used to collect system information and implement control strategies. The controller 18 controls the charging and discharging process of the energy storage device by collaboratively controlling the AC / DC bidirectional conversion module 15, the bidirectional buck-boost conversion module 16 and the controllable switch 17.
[0042] It should be noted that, although the controller 18 is recorded in the embodiment of the present application as being used to detect the voltage of the DC bus 14, including but not limited to the controller 18 being directly or indirectly connected to the input end of the voltage of the DC bus 14, the indirect connection method includes but is not limited to connecting transformers such as an AC / DC bidirectional conversion module 15 and / or a bidirectional buck-boost conversion module 16 between the controller 18 and the input end of the voltage of the DC bus 14. The voltage at the input end is rectified or stepped down by the transformer and then transmitted to the controller 18, and then the voltage of the DC bus 14 is detected by the controller 18, or the voltage of the DC bus 14 is characterized.
[0043] Specifically, the controller 18 configures the maximum charging current, the maximum discharging current and the reference voltage according to the energy storage device connected to the energy storage port 13. For example, the maximum charging current, the maximum discharging current and the reference voltage can be configured according to the capacity, chemical properties, etc. of the energy storage device. The controller 18 can monitor and obtain the charging and discharging current flowing through the energy storage port 13 in real time through a sensor or other device. The controller 18 compares the charging and discharging current with the maximum charging current and the maximum discharging current respectively. Further, the controller 18 controls the controllable switch 17 to turn on or off according to the comparison result of the two, thereby controlling the charging and discharging process of the energy storage device.
[0044] More specifically, when the controllable switch 17 is turned on, the controller 18 adjusts the reference voltage to ensure effective distribution of electric energy. The AC / DC bidirectional conversion module 15 and / or the bidirectional buck-boost conversion module 16 adjusts the DC bus voltage according to the reference voltage, thereby adjusting the working state of the system or device connected to the AC / DC bidirectional conversion module 15 and / or the bidirectional buck-boost conversion module 16 to maintain the voltage stability of the system or device connected to the power router 100, thereby optimizing the control algorithm of the power router 100.
[0045] According to the above description, the power router 100 of this embodiment connects the controllable switch 17 between the DC bus 14 and the energy storage port 13, electrically connects the controller 18 to the DC bus 14, and the controller 18 is connected to the AC / DC bidirectional conversion module 15, the bidirectional buck-boost conversion module 16 and the controllable switch 17 through the communication bus; further, the controller 18 configures the maximum charging current, the maximum discharging current and the reference voltage according to the energy storage device connected to the energy storage port 13, and the controller 18 obtains the charging and discharging current flowing through the energy storage port 13 in real time, and compares the charging and discharging current with the maximum charging current and the maximum discharging current respectively, and controls the controllable switch 17 to be turned on or off according to the comparison result. Under the condition that the controllable switch 17 is turned on, the controller 18 adjusts the reference voltage, and the AC / DC bidirectional conversion module 15 and / or the bidirectional buck-boost conversion module 16 adjusts the DC bus voltage according to the reference voltage to regulate the charging and discharging state of the energy storage device, so that the power router 100 of this embodiment optimizes the control algorithm, and simplifies the structure of the hardware circuit by optimizing the control algorithm, thereby reducing the cost of the power router 100.
[0046] In order to more accurately detect the charging and discharging current flowing through the energy storage port 13, in one embodiment, the power router 100 further includes a current detection circuit. Figure 3 As shown, the embodiment provided is based on Figure 2Current diagram of an example power router 100. Among them, the current flows to the energy storage port 13 through the DC bus 14, and the current detection circuit is connected between the DC bus 14 and the energy storage port 13 to detect the charging and discharging current, improve the accuracy of real-time monitoring of the charging and discharging current, so as to adjust the control strategy in time to ensure safe and stable operation. Furthermore, the controller 18 can also control the controllable switch 17 to turn off when the charging current is greater than or equal to the maximum charging current or the discharging current is greater than or equal to the maximum discharging current, thereby improving the safety of the energy management of the power router 100 and avoiding damage caused by excessive charging and discharging of the energy storage device.
[0047] In order to prevent the false triggering jitter of the controllable switch 17, in one embodiment, the power router 100 may also include a hysteresis comparator, and the controller 18 may compare the charge and discharge current with the maximum charge current and the maximum discharge current respectively through the hysteresis comparator, and control the controllable switch 17 to turn on or off according to the comparison result. The hysteresis comparator can be used to monitor the charge and discharge current of the energy storage device. Once the current exceeds the maximum charge current or the maximum discharge current, the hysteresis comparator immediately changes the state, and the controller 18 adjusts the controllable switch 17 accordingly to maintain the charge and discharge current of the energy storage device within a safe range, and avoid false triggering of the controllable switch 17 caused by noise or small current fluctuations. Among them, the hysteresis comparator can also be integrated in the current detection circuit to achieve the corresponding function.
[0048] In order to reduce the impact current of the controllable switch 17 and extend the service life of the controllable switch 17, in one embodiment, when the voltage difference between the DC bus voltage and the voltage of the energy storage device is less than a set threshold, the controllable switch 17 can be turned on or off according to the comparison result, thereby avoiding the controllable switch 17 from turning on or off when the voltage difference is too large, resulting in high impact current, and avoiding damage to components such as the energy storage device or the power router 100, thereby improving the safety and reliability of the circuit.
[0049] For example, Figure 4 As shown, an ideal volt-ampere characteristic curve of a controllable switch 17 provided in this embodiment can be used. By analyzing the ideal volt-ampere characteristic curve, the control strategy of the controllable switch 17 can be optimized to achieve higher system efficiency and reliability. The ideal volt-ampere characteristic curve of the controllable switch 17 includes a linear region and a nonlinear region. In the linear region, there is a linear relationship between the voltage and current of the controllable switch 17, that is, a small range change in voltage will not cause a sharp change in current. In contrast to the linear region is the nonlinear region, in which the relationship between voltage and current is more complicated, and a small voltage change may cause a large change in current.
[0050] Therefore, during the opening and closing process of the controllable switch 17, the linear region is a key working region, such as Figure 5As shown, it is the volt-ampere characteristic curve of the controllable switch 17 in the process of opening and closing based on the embodiment of the present application. When the controllable switch 17 is turned on, the controller 18 can adjust the voltage across the controllable switch 17 so that it slowly enters the linear region, which can reduce the current impact and voltage spike during the opening process of the controllable switch 17 and extend the service life of the controllable switch 17. In the process of turning off the controllable switch 17, the voltage can also be controlled to slowly exit the linear region to avoid damage to the controllable switch 17 due to sudden voltage or current changes. The controller 18 can also dynamically adjust the operating point of the controllable switch 17 according to the voltage or current data monitored in real time to ensure that the controllable switch 17 is in the best working state.
[0051] Furthermore, in one embodiment, the ratio between the threshold value and the voltage of the energy storage device is set to be less than 0.05. For example, if the voltage of the energy storage device is 100V, then the threshold value should be set to be less than 5V. Among them, the ratio may be different for the energy storage device being a battery or a supercapacitor, and the specific ratio can be determined according to the type of energy storage device, so as to ensure that they can work safely and efficiently under different charging and discharging conditions. Through this setting, more precise control of the controllable switch 17 and more precise control of the energy storage device can be achieved, reducing the impact of the inrush current of the controllable switch 17 on the circuit, and further improving the safety and reliability of the circuit.
[0052] In order to more accurately control the charge and discharge current of the energy storage device, in one embodiment, the average current of the DC bus 14 corresponding to the energy storage port and the charge and discharge current of the energy storage device satisfy the following relationship:
[0053]
[0054] Wherein, I_BUS_BAT represents the average current of the DC bus 14, I_BAT represents the charge and discharge current of the energy storage device, and T represents a detection cycle. By controlling the relationship between the average current of the DC bus 14 and the charge and discharge current of the energy storage device, the accuracy of controlling the charge and discharge current of the energy storage device is improved.
[0055] Further, in one embodiment, a portion of the DC bus 14 connected to the AC / DC bidirectional conversion module 15 is defined as a first branch, and a portion of the DC bus 14 connected to the bidirectional buck-boost conversion module 16 is defined as a second branch. When the average current of the DC bus 14 is substantially consistent with the charge and discharge current, the DC bus voltage and the voltage of the energy storage port 13 remain substantially unchanged, and the average current of the DC bus 14 corresponding to the energy storage port satisfies the following relationship:
[0056]
[0057] Wherein, I_BUS_ACDC_i represents the average current of the ith first branch, and I_BUS_DCDC_i represents the average current of the ith second branch. By controlling the relationship between the average current of the first branch and the average current of the second branch, the stability of the DC bus voltage and the voltage of the energy storage port 13 is improved.
[0058] In order to extend the life of the energy storage device, in one embodiment, the controller 18 obtains the state of charge of the energy storage device through the communication bus and adjusts the reference voltage according to the state of charge.
[0059] The state of charge is an indicator that measures the ratio of the remaining power of the energy storage device to its capacity in a fully charged state. The controller 18 adjusts the reference voltage according to the state of charge, which helps to improve the stability and safety of the circuit, thereby extending the service life of the energy storage device.
[0060] In order to extend the service life of the energy storage device, in one embodiment, when the state of charge is greater than the discharge threshold, the controller 18 adjusts the reference voltage so that the DC bus voltage is less than the voltage of the energy storage device, and the energy storage device only works in the discharge state; when the state of charge is less than the charging threshold, the controller 18 adjusts the reference voltage so that the DC bus voltage is greater than the voltage of the energy storage device, and the energy storage device only works in the charging state.
[0061] Among them, the discharge threshold is used to determine whether the energy storage device is in a suitable discharge state. The discharge threshold can be determined according to the maximum capacity and optimal working range of the energy storage device, and the discharge threshold can be set at 75% to 95%; the charging threshold is used to determine whether the energy storage device needs to be charged, and the charging threshold can be set at 10% to 30%. It is easy to understand that the discharge threshold is greater than the charging threshold to ensure that the energy storage device can replenish electricity in time when it needs to be charged, avoid overcharging and over-discharging of the energy storage device, and thus extend the service life of the energy storage device.
[0062] Specifically, the controller 18 can obtain the charge state of the energy storage device through the internal communication of the power router 100, and coordinately control the AC / DC bidirectional conversion module 15, the bidirectional buck-boost conversion module 16, and the controllable switch 17, so as to control the charge and discharge state of the energy storage device.
[0063] Through this configuration, the energy storage device operates in a safe and efficient state, while optimizing the distribution and utilization of electric energy, improving the refined management of the energy storage device, and improving the intelligent control level of the power router 100.
[0064] Furthermore, in one embodiment, when the state of charge is greater than or equal to a charging threshold and less than or equal to a discharging threshold, the energy storage device can switch between a charging state and a discharging state, thereby achieving flexible regulation of the energy storage device when the remaining capacity of the energy storage device is within an appropriate range.
[0065] In order to more clearly illustrate the implementation process of the control strategy of the power router 100 of the embodiment of the present application, in one embodiment, Figure 6 As shown, a judgment flow chart of the control process of the power router 100 is provided, which specifically includes the following steps:
[0066] Step S601, configuring the maximum charging current, the maximum discharging current and the reference voltage.
[0067] Step S602: Obtain the charge and discharge current, the DC bus voltage, and the voltage of the energy storage device.
[0068] Step S603, determine whether the charging current is greater than or equal to the maximum charging current, or whether the discharging current is greater than or equal to the maximum discharging current; if the judgment result is yes, execute step S604, if the judgment result is no, execute step S605.
[0069] Step S604: the controller 18 adjusts the reference voltage, and the controller 18 controls the AC / DC bidirectional conversion module and / or the bidirectional buck-boost conversion module to remain unchanged.
[0070] Step S605, determine whether the voltage difference between the DC bus voltage and the voltage of the energy storage device is less than a set threshold; if the judgment result is yes, execute step S606, if the judgment result is no, execute step S607.
[0071] Step S606 : The controller 18 adjusts the reference voltage, and the controller 18 controls the AC / DC bidirectional conversion module 15 and / or the bidirectional buck-boost conversion module 16 to remain unchanged.
[0072] Step S607, determine whether the state of charge is less than the charging threshold; if the determination result is yes, execute step S608, if the determination result is no, execute step S609.
[0073] Step S608, the controller 18 adjusts the reference voltage. The controller 18 controls the AC / DC bidirectional conversion module 15 and / or the bidirectional buck-boost conversion module 16 to adjust the DC bus voltage according to the reference voltage, and controls the energy storage device to work only in the charging state.
[0074] Step S609, determine whether the state of charge is greater than the discharge threshold; if the determination result is yes, execute step S610, if the determination result is no, execute step S611.
[0075] Step S610, the controller 18 adjusts the reference voltage. The controller 18 controls the AC / DC bidirectional conversion module 15 and / or the bidirectional buck-boost conversion module 16 to adjust the DC bus voltage according to the reference voltage, so that the DC bus voltage is less than the voltage of the energy storage device, and the energy storage device only works in the discharge state.
[0076] Step S611, the controllable switch 17 is turned on, the controller 18 adjusts the reference voltage, the controller 18 controls the AC / DC bidirectional conversion module 15 and / or the bidirectional buck-boost conversion module 16 to adjust the DC bus voltage according to the reference voltage, and the energy storage device switches between the charging state and the discharging state.
[0077] It should be noted that if the communication between the AC / DC bidirectional conversion module 15 and / or the bidirectional buck-boost conversion module 16 and the controller 18 is abnormal, the controllable switch 17 is turned off. After waiting for the communication to be restored, the controller 18 re-controls the working state of the controllable switch 17 and the energy storage device according to the DC bus voltage to ensure that the power router 100 can operate normally.
[0078] Based on the same inventive concept, the embodiment of the present application also provides a control method for implementing the above-mentioned power router 100. The implementation scheme for solving the problem provided by the control method is similar to the implementation scheme recorded in the above-mentioned power router 100, so the specific limitations in the control method embodiment provided below can refer to the above-mentioned limitations on the power router 100, and will not be repeated here.
[0079] In one embodiment, Figure 7 As shown, a control method of the power router 100 is also provided, which is applicable to the power router 100 in any of the above embodiments. The control method includes the following steps:
[0080] Step S701 : The controller 18 configures a maximum charging current, a maximum discharging current and a reference voltage according to the energy storage device connected to the energy storage port 13 .
[0081] Step S702 : The controller 18 obtains the charging and discharging current flowing through the energy storage port 13 in real time.
[0082] Step S703 : The controller 18 compares the charge and discharge currents with the maximum charge current and the maximum discharge current, respectively, and controls the controllable switch 17 to turn on or off.
[0083] Step S704: When the controllable switch 17 is turned on, the controller 18 adjusts the reference voltage, and the AC / DC bidirectional conversion module 15 and / or the bidirectional buck-boost conversion module 16 adjusts the DC bus voltage according to the reference voltage.
[0084] It should be understood that, although the various steps in the flowcharts involved in the above-mentioned embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above-mentioned embodiments can include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily to be carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.
[0085] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0086] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.
Claims
1. A power router, comprising at least one of an AC port, a DC port and an energy storage port, characterized in that: include: DC bus; An AC / DC bidirectional conversion module, wherein the AC / DC bidirectional conversion module is connected between the DC bus and the AC port; A bidirectional buck-boost conversion module, wherein the bidirectional buck-boost conversion module is connected between the DC bus and the DC port; A controllable switch, wherein the controllable switch is connected between the DC bus and the energy storage port; A controller, used for detecting the DC bus voltage, and the controller is connected to the AC / DC bidirectional conversion module, the bidirectional buck-boost conversion module and the controllable switch via a communication bus; Wherein, the controller configures a maximum charging current, a maximum discharging current and a reference voltage according to an energy storage device connected to the energy storage port, the controller obtains the charging and discharging current flowing through the energy storage port in real time, and compares the charging and discharging current with the maximum charging current and the maximum discharging current respectively, and controls the controllable switch to be turned on or off according to the comparison result. When the controllable switch is turned on, the controller adjusts the reference voltage, and the AC-DC bidirectional conversion module and / or the bidirectional buck-boost conversion module adjusts the DC bus voltage according to the reference voltage.
2. The power router according to claim 1, characterized in that: The power router further includes a current detection circuit, which is connected between the DC bus and the energy storage port to detect the charge and discharge current. The controllable switch is turned off under any of the following working conditions: The charging current is greater than or equal to the maximum charging current, and the discharging current is greater than or equal to the maximum discharging current.
3. The power router according to claim 1, characterized in that: When the voltage difference between the DC bus voltage and the voltage of the energy storage device is less than a set threshold, the controllable switch can be turned on or off according to the comparison result.
4. The power router according to claim 3, characterized in that: The ratio between the set threshold and the voltage of the energy storage device is less than 0.
05.
5. The power router according to claim 1, characterized in that: The average current of the DC bus corresponding to the energy storage port and the charge and discharge current satisfy the following relationship: Wherein, the I_BUS_BAT represents the average current of the DC bus, the I_BAT represents the charge and discharge current, and T represents a detection cycle.
6. The power router according to claim 5, characterized in that: The part of the DC bus connected to the AC / DC bidirectional conversion module is defined as the first branch, and the part of the DC bus connected to the bidirectional buck-boost conversion module is defined as the second branch. When the average current of the DC bus is substantially consistent with the charge and discharge current, the DC bus voltage and the voltage of the energy storage port are substantially unchanged, and the average current of the DC bus corresponding to the energy storage port satisfies the following relationship: The I_BUS_ACDC_i represents the average current of the i-th first branch, and the I_BUS_DCDC_i represents the average current of the i-th second branch.
7. The power router according to claim 1, characterized in that: The controller obtains the charge state of the energy storage device through the communication bus, and adjusts the reference voltage according to the charge state.
8. The power router according to claim 7, characterized in that: When the state of charge is greater than a discharge threshold, the controller adjusts the reference voltage so that the DC bus voltage is less than the voltage of the energy storage device, and the energy storage device only works in a discharge state; When the state of charge is less than a charging threshold, the controller adjusts the reference voltage so that the DC bus voltage is greater than the voltage of the energy storage device, and the energy storage device only works in a charging state; Wherein, the discharge threshold is greater than the charge threshold.
9. The power router according to claim 8, characterized in that: When the state of charge is greater than or equal to the charging threshold and less than or equal to the discharging threshold, the energy storage device can switch between the charging state and the discharging state.
10. A control method, applicable to the power router according to claims 1 to 9, characterized in that: The controller configures a maximum charging current, a maximum discharging current and a reference voltage according to an energy storage device connected to the energy storage port; The controller acquires the charging and discharging current flowing through the energy storage port in real time; The controller compares the charge and discharge current with the maximum charge current and the maximum discharge current respectively, and controls the controllable switch to turn on or off; When the controllable switch is turned on, the controller adjusts the reference voltage, and the AC / DC bidirectional conversion module and / or the bidirectional buck-boost conversion module adjusts the DC bus voltage according to the reference voltage.