Virtual-real combined wind power plant maximum power output control method and system
Through the wind farm maximum power output control method combined with virtual and real wind farm, the information interaction between virtual and real wind farms is used to correct the wake model and optimize the wind turbine status, the problems of wind farm power generation loss and load imbalance are solved, and wind power is realized Improvement of overall power generation in the field and optimization of efficiency.
Patent Information
- Application Number
- CN202410975115.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-12-03
AI Technical Summary
The existing wind farm maximum power output control method ignores wind speed uncertainty and volatility, dynamic characteristics, and time delay characteristics of wake effect, resulting in power generation loss and load imbalance, and it is impossible to achieve overall power generation increase.
Using a combination of virtual and real methods, through the interaction of information between virtual and real wind farms, the engineering wake model is corrected, and the problem of dynamic maximum power generation control of wind farms is solved, and the control instructions are generated to optimize the state of wind turbines, taking into account the wake delay time, and dynamically improve it. Overall power generation.
The overall power generation of the wind farm has been dynamically improved, the mechanical state of the wind turbine is optimized, fatigue load is reduced, and power generation efficiency and economic benefits are improved.
Smart Images

Figure CN119070374A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of wind power generation, and in particular relates to a virtual-real combined maximum power output control method and system for a wind farm. Background Art
[0002] The rapid development of wind power technology has attracted worldwide attention. As the scale of wind farms continues to increase, the industry faces many challenges in scientific research and industrial applications. One of the most serious problems is the wake effect, which can lead to power generation loss and load imbalance in wind farms. The existence of the wake effect causes complex aerodynamic coupling between upstream and downstream wind turbines. Changes in the mechanical state of the upstream wind turbine will directly affect the inflow wind speed of the downstream wind turbine. In order to increase the overall power generation of the wind farm, it is necessary to coordinate the control of multiple wind turbines.
[0003] At present, a large number of studies regard wind speed as a constant value and express the power output of wind turbines with mathematical formulas, thereby converting the maximum power generation control of wind farms into a high-dimensional nonlinear non-convex problem, which is solved by heuristic algorithms or distributed iterative algorithms. This approach not only ignores the uncertainty and volatility of wind speed, and cannot always achieve the optimal under conditions of changing wind speed; it also ignores the dynamic characteristics of wind turbines, which may cause a sudden increase in fatigue loads on wind turbines. In addition, few studies have considered the time delay characteristics of the wake effect, which will cause the optimal control quantity of the downstream wind turbine to not match the current inflow wind speed, and cannot achieve the effect of increasing overall power generation. This characteristic makes it impossible for the wake effect caused by the change in the mechanical state of the upstream wind turbine to immediately affect the downstream wind turbine, and the downstream unit state information required for optimal control cannot be measured in real time. In summary, in the current field of wind farm operation optimization and control, there is an urgent need for a wind farm maximum power output control method that is suitable for dynamic inflow wind speed and takes into account the dynamic characteristics of wind turbines. At the same time, it solves the problem that the downstream unit status information required for optimization control cannot be measured in real time due to the wake delay characteristics, thereby providing a more suitable method for dynamically improving the overall power generation of wind farms. Summary of the invention
[0004] Technical problem to be solved by the present invention: In view of the above-mentioned problems in the prior art, a method and system for controlling the maximum power output of a wind farm combining virtual and real power are provided. The present invention aims to dynamically improve the overall power generation of a wind farm through information interaction between a virtual wind farm and a real wind farm.
[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is: A virtual-real combined wind farm maximum power output control method comprises the following steps: S1, collecting and storing the wind speed measurement value and thrust coefficient of each real wind turbine in the real wind farm, and the status information of each virtual wind turbine in the virtual wind farm corresponding to the real wind farm; S2, correcting the parameters in the engineering wake model according to the wind speed measurements of each real wind turbine; S3, solve the dynamic maximum power generation control problem of the wind farm and issue control instructions to the real wind farm based on the solution results to make it generate power according to the maximum power generation, calculate the wind speed prediction value based on the engineering wake model with corrected parameters and generate control instructions to be issued to the virtual wind farm.
[0006] Optionally, the virtual wind farm in step S1 includes virtual wind turbines formed by digital models corresponding to real wind turbines, and the number and spatial arrangement of the virtual wind turbines are consistent with the real wind turbines; there is a simulated virtual wake effect in the virtual wind farm, and the virtual wake effect is simulated as a wind speed prediction value calculated according to the engineering wake model after the correction parameters as a virtual wind speed without considering the wake delay time, and the state information of the downstream virtual wind turbine at the current moment is determined based on the following formula to reflect the future state information of the corresponding real wind turbine: , in, is the i-th virtual wind turbine in the virtual wind farm. Status information at all times, is the real wind turbine in the real wind farm. Status information at all times, is the wake delay time, and: , in, is the geographical distance along the wind direction between the first real wind turbine and the i-th real wind turbine in the real wind farm, is the average inflow wind speed.
[0007] Optionally, when correcting the parameters in the engineering wake model in step S2, the function expression of the wake model correction optimization problem is: , In the above formula, is the number of real wind turbines in the real wind farm, is the thrust coefficient of each real wind turbine calculated based on the Jensen wake model for the i-th real wind turbine. The wind speed forecast at the time, is the real wind turbine generator set obtained in The wind speed measurement at time is the delay time required for the wake effect generated by the real wind turbine i to propagate to the real wind turbine n; the correction of the parameters in the engineering wake model according to the wind speed measurement values of each real wind turbine refers to correcting the optimization problem of the wake model and correcting the optimal wake expansion coefficient of the Jensen wake model in the engineering wake model.
[0008] Optionally, the function expression for delaying the wind speed measurement value of each real wind turbine generator set is: , , in, is the real wind turbine in the real wind farm. The thrust coefficient at time, The i-th real wind turbine in the real wind farm used to correct the parameters in the engineering wake model is The thrust coefficient at time, To obtain the real wind turbine of the i-th real wind farm after delayed processing The wind speed measurement at the time, The i-th real wind turbine in the real wind farm used to correct the parameters in the engineering wake model is The wind speed measurement at the time, is the wake delay time, the superscript R represents the measured data of the real wind farm, and the superscript C represents the data used to correct the parameters in the engineering wake model.
[0009] Optionally, solving the dynamic maximum power generation control problem of the wind farm in step S3 and issuing a control instruction to the real wind farm according to the solution result so that the wind farm generates power according to the maximum power generation includes: S3.1, establish the state space model of the virtual wind turbine as shown in the following formula: , in, is the state matrix of the i-th virtual wind turbine The derivative of the state matrix of the i-th virtual wind turbine for , the control matrix of the i-th virtual wind turbine , is the speed change of the generator of the i-th virtual wind turbine, is the change in electromagnetic torque of the i-th virtual wind turbine, is the pitch angle variation of the i-th virtual wind turbine, is the control instruction for the change of electromagnetic torque of the i-th virtual wind turbine. is the control instruction for the pitch angle change of the i-th virtual wind turbine, is the change in the inflow wind speed of the i-th virtual wind turbine, , , and is the coefficient matrix of the i-th virtual wind turbine, and has: , , , , in, is the gearbox ratio, is the equivalent mass of the wind rotor and generator, is the mechanical torque of the impeller of the i-th virtual wind turbine, is the generator speed of the i-th virtual wind turbine, is the time constant of the generator, is the time constant of the pitch mechanism, is the pitch angle of the i-th virtual wind turbine, is the mechanical torque of the i-th virtual wind turbine, is the electromagnetic torque of the i-th virtual wind turbine; , in, is the state matrix of the virtual wind farm The derivative of the virtual wind farm state matrix The matrix is composed of the state matrix of each virtual wind turbine, and the control matrix of the virtual wind farm The matrix composed of the control matrix of each virtual wind turbine, the wind speed change of the virtual wind farm is the matrix composed of the inflow wind speed changes of each virtual wind turbine. , , and are matrices composed of coefficient matrices of each virtual wind turbine; S3.3, taking the thrust coefficient of the i-th virtual wind turbine and inflow velocity The incremental form of constructing the Jensen wake model for the variables is as follows: , in, is the change in the wake wind speed caused by the i-th virtual wind turbine to the n-th virtual wind turbine, is the wake wind speed caused by the i-th virtual wind turbine to the n-th virtual wind turbine, is the change in thrust coefficient of the i-th virtual wind turbine, is the inflow wind speed of the i-th virtual wind turbine The change of , and: , , in, To correct the optimal wake expansion coefficient of the Jensen wake model in the engineering wake model, is the distance between the ith virtual wind turbine and the nth virtual wind turbine along the wind direction, is the impeller radius, is the wake coverage area, is the impeller swept area; S3.4, the inflow wind speed of the i-th virtual wind turbine , the wake wind speed caused by the i-th virtual wind turbine to the n-th virtual wind turbine Write out the incremental form of the energy conservation wake superposition model for the variable, and in parallel with the incremental form of the Jensen wake model to obtain the predicted value of the inflow wind speed of the nth virtual wind turbine Incremental form: , in, is the set of virtual wind turbines that cause wake impact on virtual wind turbine n; S3.5, based on the predicted value of the inflow wind speed of the nth virtual wind turbine The incremental form of the predicted value of the inflow wind speed from the i-th virtual wind turbine to the n-th virtual wind turbine is determined as follows: , in, and is a coefficient matrix, and has: , , Among them, the coefficient matrix and The expression for any element in is: , ; Based on the coefficient matrix is a lower triangular matrix with all diagonal elements being 0. The incremental form of the predicted inflow wind speed from the ith virtual wind turbine to the nth virtual wind turbine is simplified as: ; S3.6, substitute the incremental form of the predicted inflow wind speed from the ith virtual wind turbine to the nth virtual wind turbine into the state space model of the virtual wind farm to obtain the control equation of the virtual wind farm: ; S3.7, construct the maximum power generation control problem based on the control equation of the virtual wind farm: , in, is the rated power of the wind farm, is the number of real wind turbines in the real wind farm, is the initial value of electromagnetic power of virtual wind turbine i, is the initial value change rate of electromagnetic power of virtual wind turbine i, and are the control matrices at time k and time k-1 respectively; determine the constraints of the maximum power generation control problem, including the constraints to prevent the wind turbine from over-operating and the constraints to avoid the risk of overload or shutdown. The function expression of the constraint to prevent the wind turbine from over-operating is: , in, and are the electromagnetic torque increment and pitch angle increment of the i-th real wind turbine, and are the initial values of the electromagnetic torque and pitch angle of the i-th real wind turbine, and are the upper limits of each control change of electromagnetic torque and pitch angle, and are the upper limits of electromagnetic torque and pitch angle respectively; the functional expression of the constraint to avoid overload or shutdown risk is:
[0010] in, is the power lower limit matrix, is the rated power matrix, , ,in is the lower power limit, is the rated power, It is an n×1 dimensional matrix whose elements are all 1; is the power sensitivity matrix, , ; S3.8, convert the incremental form of the virtual wind farm and the maximum power generation control problem into a standard quadratic programming problem for rapid solution, and obtain the optimal control quantity and It is directly allocated to the virtual wind farm and then allocated to the real wind farm after delayed processing combined with the wake delay time.
[0011] Optionally, when the wake delay time is delayed and allocated to the real wind farm in step S3.7, the function expression of the wake delay time delay is: , , in, For the i-th virtual wind turbine The change of electromagnetic torque at time For the i-th virtual wind turbine The change of electromagnetic torque at time For the i-th virtual wind turbine The pitch angle change at the moment, For the i-th virtual wind turbine The pitch angle change at the moment.
[0012] Optionally, in step S3, calculating the wind speed prediction value according to the engineering wake model after the correction parameters and sending it to the virtual wind farm means that the wind speed prediction value of the ith real wind turbine calculated according to the thrust coefficient of each real wind turbine and the Jensen wake model is calculated. Wind speed forecast at the time Sent to the virtual wind farm.
[0013] In addition, the present invention also provides a virtual-real combined wind farm maximum power output control system, comprising an interconnected microprocessor and a memory, wherein the microprocessor is programmed or configured to execute the virtual-real combined wind farm maximum power output control method.
[0014] In addition, the present invention also provides a computer-readable storage medium, in which a computer program or instruction is stored. The computer program or instruction is programmed or configured to execute the virtual-real combined wind farm maximum power output control method through a processor.
[0015] In addition, the present invention also provides a computer program product, including a computer program or an instruction, wherein the computer program or the instruction is programmed or configured to execute the virtual-real combined wind farm maximum power output control method through a processor.
[0016] Compared with the prior art, the present invention mainly has the following advantages: the present invention includes collecting and storing the wind speed measurement value and thrust coefficient of each real wind turbine set in the real wind farm, and the status information of each virtual wind turbine set in the virtual wind farm corresponding to the real wind farm; correcting the parameters in the engineering wake model according to the wind speed measurement value of each real wind turbine set; solving the dynamic maximum power generation control problem of the wind farm and issuing control instructions to the real wind farm according to the solution result so that it generates power according to the maximum power generation; calculating the wind speed prediction value according to the engineering wake model after the correction of the parameters and generating the control instructions to send to the virtual wind farm; the present invention can dynamically improve the overall power generation of the wind farm by interacting the information between the virtual wind farm and the real wind farm. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 Schematic diagram of the basic flow of the method of the embodiment of the present invention.
[0018] Figure 2 It is a simulation system structure diagram of a simulation case in an embodiment of the present invention.
[0019] Figure 3 It is a working principle diagram of the simulation system of the simulation case in the embodiment of the present invention.
[0020] Figure 4 This is a simulation verification diagram of the overall power generation improvement of the wind farm of the present invention.
[0021] Figure 5 This is a comparison chart of the power output of real wind turbines 1 to 6 under different control strategies of the present invention.
[0022] Figure 6 It is a comparison diagram of fatigue load of a real wind turbine 1 under different control strategies of the present invention.
[0023] Figure 7 It is a comparison diagram of fatigue loads of a real wind turbine 6 under different control strategies of the present invention.
[0024] Figure 8 The figure shows the mechanical status comparison of the same wind turbine set between the virtual wind farm of the present invention and the real wind farm. DETAILED DESCRIPTION
[0025] like Figure 1 As shown, the virtual-real combined wind farm maximum power output control method of this embodiment includes the following steps: S1, collecting and storing the wind speed measurement value and thrust coefficient of each real wind turbine in the real wind farm, and the status information of each virtual wind turbine in the virtual wind farm corresponding to the real wind farm; S2, correcting the parameters in the engineering wake model according to the wind speed measurements of each real wind turbine; S3, solve the dynamic maximum power generation control problem of the wind farm and issue control instructions to the real wind farm based on the solution results to make it generate power according to the maximum power generation, calculate the wind speed prediction value based on the engineering wake model with corrected parameters and generate control instructions to be issued to the virtual wind farm.
[0026] like Figure 2 and Figure 3 As shown, the real wind farm includes real wind turbines, which are used to provide the data acquisition and storage module with the wind speed measurement value and thrust coefficient of each real wind turbine, and receive the control command of the active wake control module; the real wind farm has the following characteristics: the real wind farm includes real wind turbines, collector lines, medium-voltage transformers, high-voltage transformers, and external power grids; there is a real wake effect in the real wind farm, and it takes a certain time for the real wake effect to propagate from the upstream real wind turbine to the downstream real wind turbine, that is, the real wake effect has the characteristic of time delay; the real wind farm also includes a state information measurement system, which measures the inflow wind speed and thrust coefficient of each real wind turbine in real time; the real wind farm performs operation control by receiving the control command issued by the active wake control module.
[0027] like Figure 2 and Figure 3 As shown, the virtual wind farm includes virtual wind turbines, which are used to provide the data acquisition and storage module with the status information of each virtual wind turbine, the status information including but not limited to generator speed, electromagnetic torque, pitch angle, electromagnetic power, etc., and receive the control instructions of the active wake control module. The virtual wind farm includes virtual wind turbines, which are high-precision digital models of real wind turbines. The number and spatial arrangement of the virtual wind turbines are consistent with the real wind turbines; there are virtual wake effects in the virtual wind farm, and the virtual wake effects are simulated as virtual wind speeds provided by the active wake control module. The virtual wind speeds are calculated by the modified engineering wake model without considering the wake delay time, that is, the virtual wake effect does not have a time delay characteristic; because the virtual wake effect does not have a time delay characteristic, the status information of the downstream virtual wind turbines at the current moment can reflect the future status information of the corresponding real wind turbines, that is: , in, is the i-th virtual wind turbine in the virtual wind farm. Status information at all times, is the real wind turbine in the real wind farm. Status information at all times, is the wake delay time, and: , in, is the geographical distance along the wind direction between the first real wind turbine and the i-th real wind turbine in the real wind farm, is the average inflow wind speed. The virtual wind farm in step S1 of this embodiment includes virtual wind turbines formed by digital models corresponding to real wind turbines, and the number and spatial arrangement of the virtual wind turbines are consistent with the real wind turbines; there is a simulated virtual wake effect in the virtual wind farm, and the virtual wake effect is simulated as a wind speed prediction value calculated according to the engineering wake model after the correction parameters as the virtual wind speed without considering the wake delay time, and based on the above formula, it can be determined that the state information of the downstream virtual wind turbine at the current moment can reflect the future state information of the corresponding real wind turbine.
[0028] Figure 2 : is a simulation system structure diagram of the simulation case in this embodiment. The simulation system in the simulation case in this embodiment also includes: a wake model correction module, which is used to correct the parameters in the engineering wake model and provide the optimized parameters to the active wake control module to improve the wind speed prediction accuracy of the engineering wake model; the active wake control module is used to solve the dynamic maximum power generation control problem of the wind farm, calculate the wind speed prediction value according to the corrected engineering wake model, and issue control instructions to the virtual wind farm and the real wind farm; the data acquisition and storage module is used to collect and store the data of the real wind farm and the virtual wind farm, provide the wind speed measurement value and thrust coefficient of each real wind turbine to the wake model correction module, and provide the status information of each virtual wind turbine to the active wake control module.
[0029] The wind speed prediction value is calculated based on the thrust coefficient of each real wind turbine provided by the data acquisition and storage module and the Jensen wake model V pre , and then according to the wind speed measurement values of each real wind turbine provided by the data acquisition and storage module V meas , construct an optimization model. Specifically, when correcting the parameters in the engineering wake model in step S2 of this embodiment, the function expression of the wake model correction optimization problem is: , In the above formula, is the number of real wind turbines in the real wind farm, is the thrust coefficient of each real wind turbine calculated based on the Jensen wake model for the i-th real wind turbine. The wind speed forecast at the time, is the real wind turbine generator set obtained in The wind speed measurement at time The delay time required for the wake effect generated by the real wind turbine i to propagate to the real wind turbine n; the correction of the parameters in the engineering wake model according to the wind speed measurement values of each real wind turbine refers to the correction optimization problem of the wake model, and the optimal wake expansion coefficient of the Jensen wake model in the engineering wake model is corrected. Solve the interface of the upper wake model correction optimization problem to obtain the optimal wake expansion coefficient of the Jensen wake model k , and provided to the active wake control module.
[0030] In this embodiment, the function expression for delaying the wind speed measurement value of each real wind turbine generator set is: , , in, is the real wind turbine in the real wind farm. The thrust coefficient at time, The i-th real wind turbine in the real wind farm used to correct the parameters in the engineering wake model is The thrust coefficient at time, To obtain the real wind turbine of the i-th real wind farm after delayed processing The wind speed measurement at the time, The i-th real wind turbine in the real wind farm used to correct the parameters in the engineering wake model is The wind speed measurement at the time, is the wake delay time, the superscript R represents the measured data of the real wind farm, and the superscript C represents the data used to correct the parameters in the engineering wake model.
[0031] In step S3 of this embodiment, solving the problem of controlling the dynamic maximum power generation of the wind farm and issuing a control instruction to the real wind farm according to the solution result to make it generate power according to the maximum power generation includes: S3.1, establish the state space model of the virtual wind turbine as shown in the following formula: , in, is the state matrix of the i-th virtual wind turbine The derivative of the state matrix of the i-th virtual wind turbine for , the control matrix of the i-th virtual wind turbine , is the speed change of the generator of the i-th virtual wind turbine, is the change in electromagnetic torque of the i-th virtual wind turbine, is the pitch angle variation of the i-th virtual wind turbine, is the control instruction for the change of electromagnetic torque of the i-th virtual wind turbine. is the control instruction for the pitch angle change of the i-th virtual wind turbine, is the change in the inflow wind speed of the i-th virtual wind turbine, , , and is the coefficient matrix of the i-th virtual wind turbine, and has: , , , , in, is the gearbox ratio, is the equivalent mass of the wind rotor and generator, is the mechanical torque of the impeller of the i-th virtual wind turbine, is the generator speed of the i-th virtual wind turbine, is the time constant of the generator, is the time constant of the pitch mechanism, is the pitch angle of the i-th virtual wind turbine, is the mechanical torque of the i-th virtual wind turbine, is the electromagnetic torque of the i-th virtual wind turbine; , in, is the state matrix of the virtual wind farm The derivative of the virtual wind farm state matrix The matrix is composed of the state matrix of each virtual wind turbine, and the control matrix of the virtual wind farm The matrix composed of the control matrix of each virtual wind turbine, the wind speed change of the virtual wind farm is the matrix composed of the inflow wind speed changes of each virtual wind turbine. , , and are matrices composed of coefficient matrices of each virtual wind turbine; , , , , , , , in, ~ is the state matrix of each virtual wind turbine, ~ is the control matrix of each virtual wind turbine, ~ is the change in the inflow wind speed of each virtual wind turbine, ~ is the state coefficient matrix of each virtual wind turbine, ~ is the control coefficient matrix of each virtual wind turbine, ~ is the coefficient matrix of each virtual wind turbine, ~ The wind speed coefficient matrix of each virtual wind turbine; S3.3, taking the thrust coefficient of the i-th virtual wind turbine and inflow velocity The incremental form of constructing the Jensen wake model for the variables is as follows: , in, is the change in the wake wind speed caused by the i-th virtual wind turbine to the n-th virtual wind turbine, is the wake wind speed caused by the i-th virtual wind turbine to the n-th virtual wind turbine, is the change in thrust coefficient of the i-th virtual wind turbine, is the inflow wind speed of the i-th virtual wind turbine The change of , and: , , in, To correct the optimal wake expansion coefficient of the Jensen wake model in the engineering wake model, is the distance between the ith virtual wind turbine and the nth virtual wind turbine along the wind direction, is the impeller radius, is the wake coverage area, is the impeller swept area; S3.4, the inflow wind speed of the i-th virtual wind turbine , the wake wind speed caused by the i-th virtual wind turbine to the n-th virtual wind turbine Write out the incremental form of the energy conservation wake superposition model for the variable, and in parallel with the incremental form of the Jensen wake model to obtain the predicted value of the inflow wind speed of the nth virtual wind turbine Incremental form: , in, is the set of virtual wind turbines that cause wake impact on virtual wind turbine n; S3.5, based on the predicted value of the inflow wind speed of the nth virtual wind turbine The incremental form of the predicted value of the inflow wind speed from the i-th virtual wind turbine to the n-th virtual wind turbine is determined as follows: , in, and is a coefficient matrix, and has: , , Among them, the coefficient matrix and The expression for any element in is: , ; Based on the coefficient matrix is a lower triangular matrix with all diagonal elements being 0. The incremental form of the predicted inflow wind speed from the ith virtual wind turbine to the nth virtual wind turbine is simplified as: ; S3.6, substitute the incremental form of the predicted inflow wind speed from the ith virtual wind turbine to the nth virtual wind turbine into the state space model of the virtual wind farm to obtain the control equation of the virtual wind farm: ; S3.7, the maximum power generation control problem of the wind farm is as follows: , Where N is the total number of virtual wind turbines in the wind farm, P e,i For wind turbines i The electromagnetic power emitted is: , in, For power generation efficiency, is the generator speed, is the electromagnetic torque, and the wind turbine can be obtained i The increase in electromagnetic power emitted for: , in, w e 0 and Te 0 is the initial value of the generator speed and electromagnetic torque, and is the increment of generator speed and electromagnetic torque. Based on the above increments, the maximum power generation control problem can be constructed based on the control equation of the virtual wind farm: , in, is the rated power of the wind farm, is the number of real wind turbines in the real wind farm, is the initial value of electromagnetic power of virtual wind turbine i, is the initial value change rate of electromagnetic power of virtual wind turbine i, and are the control matrices at time k and time k-1 respectively; determine the constraints of the maximum power generation control problem, including the constraints to prevent the wind turbine from over-operating and the constraints to avoid the risk of overload or shutdown. The function expression of the constraint to prevent the wind turbine from over-operating is: , in, and are the electromagnetic torque increment and pitch angle increment of the i-th real wind turbine, and are the initial values of the electromagnetic torque and pitch angle of the i-th real wind turbine, and are the upper limits of each control change of electromagnetic torque and pitch angle, and are the upper limits of electromagnetic torque and pitch angle respectively; the functional expression of the constraint to avoid overload or shutdown risk is:
[0032] in, is the power lower limit matrix, is the rated power matrix, , ,in is the lower power limit, is the rated power, It is an n×1 dimensional matrix whose elements are all 1; is the power sensitivity matrix, , ; S3.8, convert the incremental form of the virtual wind farm and the maximum power generation control problem into a standard quadratic programming problem for rapid solution, and obtain the optimal control quantity and It is directly allocated to the virtual wind farm and then allocated to the real wind farm after delayed processing combined with the wake delay time.
[0033] In step S3.8 of this embodiment, when the delay time of the wake flow is combined and allocated to the real wind farm, the function expression of the delay time of the wake flow is: , , in, For the i-th virtual wind turbine The change of electromagnetic torque at time For the i-th virtual wind turbine The change of electromagnetic torque at time For the i-th virtual wind turbine The pitch angle change at the moment, For the i-th virtual wind turbine The pitch angle change at the moment.
[0034] In step S3 of this embodiment, the wind speed prediction value is calculated based on the engineering wake model after the parameters are corrected and sent to the virtual wind farm, which means that the wind speed prediction value of the ith real wind turbine calculated based on the thrust coefficient of each real wind turbine and the Jensen wake model is calculated. Wind speed forecast at the time The present embodiment specifically collects and stores the wind speed measured value and thrust coefficient of the real wind turbine and the status information of the virtual wind turbine; delays the wind speed measured value and thrust coefficient data of the real wind turbine according to the wake delay time, transmits the delayed real wind turbine data to the wake model optimization module, and transmits the virtual wind turbine data to the active wake control module.
[0035] In order to verify the effectiveness of the virtual-real combined wind farm maximum power output control method of this embodiment, SimWindFarm software and MATLAB / Simulink software built an engineering wake model dynamic correction simulation system based on wind farm wind speed measured data, such as Figure 2 As shown, its working principle is as follows Figure 3 As shown in the figure. This simulation system regards SimWindFarm as a real offshore wind farm, including 6×6 NREL 5MW wind turbines arranged along the wind direction, and the front and rear and lateral spacing of each wind turbine is 630 meters. The simulation environment is set to a time-varying wind condition with an average wind speed of 10m / s and a turbulence intensity of 10%.
[0036] Figure 4The comparison effect of the total power generation of the wind farm of the method of this embodiment and the other three control methods is shown, among which the "proposed strategy" is the maximum power output control method of the wind farm of this embodiment, the "uncorrected" strategy is the maximum power output control method of the wind farm without wake correction, the "static control" is a constant power coefficient control method solved by the particle swarm algorithm, and the "greedy control" is that all wind turbines work in the maximum power point tracking mode. Taking the greedy control method as the benchmark, it can be seen that the proposed strategy and the uncorrected strategy both bring significant improvements to the total power generation of the wind farm. However, since the engineering wake model used by the uncorrected strategy is not accurate enough, the power generation improvement brought by it is lower than that of the proposed strategy, and the two increase by 7.74% and 4.75% respectively. The static control strategy cannot match the ever-changing wind speed, so it leads to a 2.72% reduction in the total power generation of the wind farm.
[0037] Figure 5 The power generation of wind turbines 1 to 6 in the method of this embodiment is shown. It can be seen that compared with the greedy control strategy, the proposed strategy actively reduces the power generation of the first two wind turbines, while the power generation of the last four wind turbines is increased. Under the static control strategy, the power generation of the wind turbines fluctuates severely. This is because the static control gives the wind turbines a constant power coefficient control under variable wind speed, resulting in the control instructions being unable to match the wind speed most of the time.
[0038] Figure 6 and Figure 7 The fatigue load conditions of wind turbines 1 and 6 of the method of this embodiment are shown respectively. It can be seen from the figure that under the greedy control strategy, the main shaft torque and tower bending moment amplitudes of wind turbine 1 are the largest, and those of wind turbine 6 are the smallest. The proposed control strategy and the uncorrected strategy both reduce the load amplitude of wind turbine 1 and increase the load amplitude of wind turbine 6. This is because wind turbine 1 actively reduces the output power, while the output power of wind turbine 6 is improved. In addition, since the uncorrected strategy uses an inaccurate engineering wake model, the output power of wind turbine 1 is reduced too much. Under the static control strategy, because the control instructions cannot match the wind speed, the load fluctuation is quite serious, which will seriously affect the safe operation of the wind turbine.
[0039] Figure 8The mechanical state comparison diagram of wind turbines 1 and 6 between the virtual wind farm and the real wind farm of the present embodiment method is shown, wherein (a) is the comparison of the generator speed of the real wind turbines 1 and 6 and the virtual wind turbines 1 and 6 after the wake model is corrected, (b) is the comparison of the thrust coefficient of the real wind turbines 1 and 6 and the virtual wind turbines 1 and 6 after the wake model is corrected, (c) is the comparison of the generator speed of the real wind turbines 1 and 6 and the virtual wind turbines 1 and 6 without the wake model correction, and (d) is the comparison of the thrust coefficient of the real wind turbines 1 and 6 and the virtual wind turbines 1 and 6 without the wake model correction. It can be seen that before the wake model is corrected, due to the large difference between the inflow wind speed of the real wind turbine and the inflow wind speed of the virtual wind turbine, the difference between the generator speed and the thrust coefficient is also large; after the wake model is corrected, the above difference is significantly reduced, making the control method of the present embodiment method by solving the maximum power output problem of the virtual wind farm and delaying the allocation of control instructions to the real wind farm more reasonable. This is also the reason why the proposed strategy is more effective in increasing the total power of wind farms than the uncorrected strategy.
[0040] In summary, the virtual-real combined wind farm maximum power output control method of this embodiment includes: based on the real wind farm and its corresponding virtual wind farm and the data acquisition and storage module, collecting and storing the data of the real wind farm and the virtual wind farm, providing the wind speed measurement value and thrust coefficient of each real wind turbine group to the wake model correction module, and providing the status information of each virtual wind turbine group to the active wake control module, wherein the real wind turbine group is used to provide the wind speed measurement value and thrust coefficient of each real wind turbine group to the data acquisition and storage module, and receive the control instruction of the active wake control module; the virtual wind farm includes the virtual wind turbine group, which is used to provide the status information of each virtual wind turbine group to the data acquisition and storage module. The system obtains state information including but not limited to generator speed, electromagnetic torque, pitch angle, electromagnetic power, etc., and receives control instructions from an active wake control module; then uses a wake model correction module to correct parameters in the engineering wake model, and provides the optimized parameters to the active wake control module to improve the wind speed prediction accuracy of the engineering wake model; uses the active wake control module to solve the dynamic maximum power generation control problem of the wind farm, calculates the wind speed prediction value according to the corrected engineering wake model, and issues control instructions to the virtual wind farm and the real wind farm, so that the overall power generation of the wind farm can be dynamically improved under the influence of the wake effect, so as to bring higher economic benefits to the operator.
[0041] In addition, the present embodiment further provides a virtual-real combined wind farm maximum power output control system, comprising a microprocessor and a memory connected to each other, wherein the microprocessor is programmed or configured to execute the virtual-real combined wind farm maximum power output control method. In addition, the present embodiment further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program or instruction, wherein the computer program or instruction is programmed or configured to execute the virtual-real combined wind farm maximum power output control method through a processor. In addition, the present embodiment further provides a computer program product, comprising a computer program or instruction, wherein the computer program or instruction is programmed or configured to execute the virtual-real combined wind farm maximum power output control method through a processor.
[0042] Those skilled in the art should understand that the embodiments of the present application can be provided as methods, systems, or computer program products. Therefore, the present application can take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present application can take the form of a computer program product implemented on one or more computer-readable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code. The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the process Figure 1 A process or multiple processes and / or boxes Figure 1 These computer program instructions can also be stored in a computer-readable memory that can guide a computer or other programmable data processing device to work in a specific way, so that the instructions stored in the computer-readable memory produce a product including an instruction device, which implements the functions specified in the process. Figure 1 A process or multiple processes and / or boxes Figure 1 These computer program instructions can also be loaded onto a computer or other programmable data processing device, so that a series of operation steps are executed on the computer or other programmable device to produce a computer-implemented process, so that the instructions executed on the computer or other programmable device provide for implementing the process in the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0043] The above is only a preferred embodiment of the present invention, and the protection scope of the present invention is not limited to the above embodiments. All technical solutions under the concept of the present invention belong to the protection scope of the present invention. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the present invention should also be regarded as the protection scope of the present invention.
Claims
1. A virtual-real combined wind farm maximum power output control method, characterized in that: The steps include: S1, collecting and storing the wind speed measurement value and thrust coefficient of each real wind turbine in the real wind farm, and the status information of each virtual wind turbine in the virtual wind farm corresponding to the real wind farm; S2, correcting the parameters in the engineering wake model according to the wind speed measurements of each real wind turbine; S3, solve the dynamic maximum power generation control problem of the wind farm and issue control instructions to the real wind farm based on the solution results to make it generate power according to the maximum power generation, calculate the wind speed prediction value based on the engineering wake model with corrected parameters and generate control instructions to be issued to the virtual wind farm.
2. The virtual-real combined wind farm maximum power output control method according to claim 1 is characterized in that: The virtual wind farm in step S1 includes virtual wind turbines formed by digital models corresponding to real wind turbines, and the number and spatial arrangement of the virtual wind turbines are consistent with the real wind turbines; there is a simulated virtual wake effect in the virtual wind farm, and the virtual wake effect is simulated as a wind speed prediction value calculated according to the engineering wake model after the correction parameters as a virtual wind speed without considering the wake delay time, and the state information of the downstream virtual wind turbine at the current moment is determined based on the following formula to reflect the future state information of the corresponding real wind turbine: , in, is the i-th virtual wind turbine in the virtual wind farm. Status information at all times, is the real wind turbine in the real wind farm. Status information at all times, is the wake delay time, and: , in, is the geographical distance along the wind direction between the first real wind turbine and the i-th real wind turbine in the real wind farm, is the average inflow wind speed.
3. The virtual-real combined wind farm maximum power output control method according to claim 1 is characterized in that: When correcting the parameters in the engineering wake model in step S2, the function expression of the wake model correction optimization problem is: , In the above formula, is the number of real wind turbines in the real wind farm, is the thrust coefficient of each real wind turbine calculated based on the Jensen wake model for the i-th real wind turbine. The wind speed forecast at the time, is the real wind turbine generator set obtained in The wind speed measurement value at time is the delay time required for the wake effect generated by the real wind turbine i to propagate to the real wind turbine n; The correcting of the parameters in the engineering wake model according to the wind speed measurement values of each real wind turbine generator set refers to correcting the optimal wake expansion coefficient of the Jensen wake model in the engineering wake model for the wake model correction optimization problem.
4. The virtual-real combined wind farm maximum power output control method according to claim 3 is characterized in that: The function expression for delaying the wind speed measurement value of each real wind turbine is: , , in, is the real wind turbine in the real wind farm. The thrust coefficient at time, The i-th real wind turbine in the real wind farm used to correct the parameters in the engineering wake model is The thrust coefficient at time, To obtain the real wind turbine of the i-th real wind farm after delayed processing The wind speed measurement at the time, The i-th real wind turbine in the real wind farm used to correct the parameters in the engineering wake model is The wind speed measurement at the time, is the wake delay time, the superscript R represents the measured data of the real wind farm, and the superscript C represents the data used to correct the parameters in the engineering wake model.
5. The virtual-real combined wind farm maximum power output control method according to claim 1 is characterized in that: Solving the dynamic maximum power generation control problem of the wind farm in step S3 and issuing control instructions to the real wind farm according to the solution result to make it generate power according to the maximum power generation includes: S3.1, establish the state space model of the virtual wind turbine as shown in the following formula: , in, is the state matrix of the i-th virtual wind turbine The derivative of the state matrix of the i-th virtual wind turbine for , the control matrix of the i-th virtual wind turbine , is the speed change of the generator of the i-th virtual wind turbine, is the change in electromagnetic torque of the i-th virtual wind turbine, is the pitch angle variation of the i-th virtual wind turbine, is the control instruction for the change of electromagnetic torque of the i-th virtual wind turbine. is the control instruction for the pitch angle change of the i-th virtual wind turbine, is the change in the inflow wind speed of the i-th virtual wind turbine, , , and is the coefficient matrix of the i-th virtual wind turbine, and has: , , , , in, is the gearbox ratio, is the equivalent mass of the wind rotor and generator, is the mechanical torque of the impeller of the i-th virtual wind turbine, is the generator speed of the i-th virtual wind turbine, is the time constant of the generator, is the time constant of the pitch mechanism, is the pitch angle of the i-th virtual wind turbine, is the mechanical torque of the i-th virtual wind turbine, is the electromagnetic torque of the i-th virtual wind turbine; S3.2, constructing a state space model of a virtual wind farm based on the state space model of the virtual wind turbine: , in, is the state matrix of the virtual wind farm The derivative of the virtual wind farm state matrix The matrix is composed of the state matrix of each virtual wind turbine, and the control matrix of the virtual wind farm The matrix composed of the control matrix of each virtual wind turbine, the wind speed change of the virtual wind farm is the matrix composed of the inflow wind speed changes of each virtual wind turbine. , , and are matrices composed of coefficient matrices of each virtual wind turbine; S3.3, taking the thrust coefficient of the i-th virtual wind turbine and inflow velocity The incremental form of constructing the Jensen wake model for the variables is as follows: , in, is the change in the wake wind speed caused by the i-th virtual wind turbine to the n-th virtual wind turbine, is the wake wind speed caused by the i-th virtual wind turbine to the n-th virtual wind turbine, is the change in thrust coefficient of the i-th virtual wind turbine, is the inflow wind speed of the i-th virtual wind turbine The change of , and: , , in, To correct the optimal wake expansion coefficient of the Jensen wake model in the engineering wake model, is the distance between the ith virtual wind turbine and the nth virtual wind turbine along the wind direction, is the impeller radius, is the wake coverage area, is the impeller swept area; S3.4, the inflow wind speed of the i-th virtual wind turbine , the wake wind speed caused by the i-th virtual wind turbine to the n-th virtual wind turbine Write out the incremental form of the energy conservation wake superposition model for the variable, and in parallel with the incremental form of the Jensen wake model to obtain the predicted value of the inflow wind speed of the nth virtual wind turbine Incremental form: , in, is the set of virtual wind turbines that cause wake impact on virtual wind turbine n; S3.5, based on the predicted value of the inflow wind speed of the nth virtual wind turbine The incremental form of the predicted value of the inflow wind speed from the i-th virtual wind turbine to the n-th virtual wind turbine is determined as follows: , in, and is a coefficient matrix, and has: , , Among them, the coefficient matrix and The expression for any element in is: , ; Based on the coefficient matrix is a lower triangular matrix with all diagonal elements being 0. The incremental form of the predicted inflow wind speed from the ith virtual wind turbine to the nth virtual wind turbine is simplified as: ; S3.6, substitute the incremental form of the predicted inflow wind speed from the ith virtual wind turbine to the nth virtual wind turbine into the state space model of the virtual wind farm to obtain the control equation of the virtual wind farm: ; S3.7, construct the maximum power generation control problem based on the control equation of the virtual wind farm: , in, is the rated power of the wind farm, is the number of real wind turbines in the real wind farm, is the initial value of electromagnetic power of virtual wind turbine i, is the initial value change rate of electromagnetic power of virtual wind turbine i, and are the control matrices at time k and time k-1 respectively; determine the constraints of the maximum power generation control problem, including the constraints to prevent the wind turbine from over-operating and the constraints to avoid the risk of overload or shutdown. The function expression of the constraint to prevent the wind turbine from over-operating is: , in, and are the electromagnetic torque increment and pitch angle increment of the i-th real wind turbine, and are the initial values of the electromagnetic torque and pitch angle of the i-th real wind turbine, and are the upper limits of each control change of electromagnetic torque and pitch angle, and are the upper limits of electromagnetic torque and pitch angle respectively; the functional expression of the constraint to avoid overload or shutdown risk is: in, is the power lower limit matrix, is the rated power matrix, , ,in is the lower power limit, is the rated power, It is an n×1 dimensional matrix whose elements are all 1; is the power sensitivity matrix, , ; S3.8, convert the incremental form of the virtual wind farm and the maximum power generation control problem into a standard quadratic programming problem for rapid solution, and obtain the optimal control quantity and It is directly allocated to the virtual wind farm and then allocated to the real wind farm after delayed processing combined with the wake delay time.
6. The virtual-real combined wind farm maximum power output control method according to claim 5 is characterized in that: When the wake delay time is combined with the delayed processing in step S3.8 and allocated to the real wind farm, the function expression combined with the delayed processing of the wake delay time is: , , in, For the i-th virtual wind turbine The change of electromagnetic torque at time For the i-th virtual wind turbine The change of electromagnetic torque at time For the i-th virtual wind turbine The pitch angle change at the moment, For the i-th virtual wind turbine The pitch angle change at the moment.
7. The virtual-real combined wind farm maximum power output control method according to claim 3 is characterized in that: In step S3, the wind speed prediction value is calculated based on the engineering wake model after the correction parameters and sent to the virtual wind farm, which means that the wind speed prediction value of the ith real wind turbine calculated based on the thrust coefficient of each real wind turbine and the Jensen wake model is calculated. Wind speed forecast at the time Sent to the virtual wind farm.
8. A virtual-real combined wind farm maximum power output control system, comprising an interconnected microprocessor and a memory, characterized in that: The microprocessor is programmed or configured to execute the virtual-real combined wind farm maximum power output control method as described in any one of claims 1 to 7.
9. A computer-readable storage medium having a computer program or instruction stored therein, characterized in that: The computer program or instruction is programmed or configured to execute the virtual-real combined wind farm maximum power output control method as described in any one of claims 1 to 7 through a processor.
10. A computer program product comprising a computer program or instructions, characterized in that The computer program or instruction is programmed or configured to execute the virtual-real combined wind farm maximum power output control method as described in any one of claims 1 to 7 through a processor.
Citation Information
Cited By
Dual-mode dynamic active wake flow control method and system for wind power plant and medium
CN119664578A
A Dual-Mode Dynamic Active Wake Control Method, System and Medium for Wind Farms
CN119664578B
A method and system for predicting wind farm power considering wake propagation time delay
CN122740103A
