Renewable energy-containing power system transmission and distribution network collaborative optimization scheduling method, system and device based on risk probability, and storage medium

Through the coordinated optimization scheduling method of power system transmission and distribution network based on risk probability, the problem of coordination between the transmission and distribution network and insufficient utilization of renewable energy in the traditional scheduling method is solved, and the operating costs and risk management are achieved, ensuring the system resources Effective use.

CN119070399AInactive Publication Date: 2024-12-03XI AN JIAOTONG UNIV

Patent Information

Application Number
CN202411202928.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional power system scheduling methods are difficult to effectively coordinate the transmission and distribution network, resulting in insufficient utilization of renewable energy and increased operating costs. The feeding power between the transmission and distribution networks fluctuates violently, affecting the safety and stability of the system.

Method used

The coordinated optimization scheduling method of the transmission and distribution network of the power system containing renewable energy based on risk probability is adopted. By establishing a coordinated scheduling model of the transmission and distribution network, unbalanced power is allocated based on a linear affine strategy, and the distribution robust optimization method is used to quantify the risk of overlimits. And through second-order cone planning, the scheduling scheme is solved to achieve coordinated optimization of the transmission and distribution network.

Benefits of technology

It reduces the overall operating costs of the distribution network, improves operational risk management, alleviates the peak shaving pressure of generator sets, and ensures the coordination of system resources and the full utilization of renewable energy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119070399A_ABST
    Figure CN119070399A_ABST
Patent Text Reader

Abstract

The invention discloses a risk probability-based transmission and distribution network collaborative optimization scheduling method, system and device for a renewable energy-containing power system, and a storage medium. The method comprises the following steps of: establishing a transmission and distribution network collaborative scheduling model; distributing unbalanced power caused by the output prediction error of the wind-solar renewable energy source to each generator set in the transmission and distribution network collaborative scheduling model based on a linearized affine strategy; an opportunity constraint model of the transmission and distribution network cooperative scheduling model is established based on a distributed robust optimization method, and the out-of-limit risk of the transmission and distribution network cooperative scheduling model is quantified in real time through DRCC; establishing a renewable energy output joint probability distribution fuzzy set for an uncertainty set of prediction errors in the opportunity constraint model by adopting a distribution robust optimization method based on first and second moment information; linear conversion of the NP-hard opportunity constraint model is achieved based on convex optimization, the opportunity constraint model is converted into second-order cone programming, the second-order cone programming is solved, and a scheduling scheme is obtained.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of power system dispatching, and relates to a risk probability-based coordinated optimization dispatching method, system, equipment and storage medium for a power system transmission and distribution network containing renewable energy. Background Art

[0002] At present, the development trend of new power systems around the world is to connect a high proportion of renewable energy such as photovoltaics (PV) and wind turbines (WT) to the grid in the form of distributed power sources. This has led to a large number of distributed power sources connected to the distribution network, which has gradually turned the distribution network into an active state. The power flow in the transmission and distribution network is becoming more and more bidirectional, resulting in stronger coupling between the transmission and distribution networks, which affects safe and stable operation. Traditional dispatching strategies usually consider the transmission and distribution networks separately, making it difficult to coordinate system resources and ensure the full utilization of renewable energy. In addition, the feed power between the transmission and distribution networks may fluctuate violently, resulting in additional operating costs. Summary of the invention

[0003] The purpose of the present invention is to overcome the shortcomings of the above-mentioned prior art and provide a risk probability-based coordinated optimization scheduling method, system, equipment and storage medium for the transmission and distribution network of a power system containing renewable energy, so as to reduce the overall operating cost of the distribution network and better manage operational risks.

[0004] In order to achieve the above object, the present invention adopts the following technical solutions:

[0005] A risk probability-based coordinated optimization dispatching method for transmission and distribution networks of a power system containing renewable energy includes the following processes:

[0006] S1, establish a coordinated dispatching model for the transmission and distribution network;

[0007] S2, based on the linearized affine strategy, distributes the unbalanced power caused by the output forecast error of wind and solar renewable energy to each generator set in the transmission and distribution network coordinated scheduling model;

[0008] S3, based on the distributed robust optimization method, establishes the opportunity constraint model of the transmission and distribution network coordinated scheduling model, and quantifies the over-limit risk of the transmission and distribution network coordinated scheduling model in real time through DRCC;

[0009] S4, for the uncertainty set of prediction errors in the chance constraint model, a distributed robust optimization method based on first- and second-order moment information is used to establish the fuzzy set of joint probability distribution of renewable energy output;

[0010] S5, based on convex optimization, realizes the linear transformation of the NP-hard chance constraint model, transforms the chance constraint model into a second-order cone programming, solves the second-order cone programming, and obtains the scheduling plan.

[0011] Preferably, in S1, the goal of the transmission and distribution network coordinated scheduling model is to minimize the operating cost of the transmission and distribution network, and transmission and distribution network hierarchical power balance constraints, energy storage operation constraints and renewable energy output constraints are set.

[0012] Preferably, the specific process of S2 is: establishing an actual power model of the unit in each time period, using the joint prediction error of WT and PV prediction to represent the unbalanced power caused by uncertainty in each time period; the unbalanced power is transmitted to the transmission network through the substation, and the transmission network distributes the unbalanced power fluctuations to each generator set.

[0013] Preferably, in S3, the opportunity constraint model includes the distributed robust opportunity constraints of the output of the transmission and distribution network units and the distributed robust opportunity constraints of the transmission and distribution network line capacity.

[0014] Furthermore, according to the distributed robustness constraints of the transmission and distribution network line capacity, the power over-limit risk of the transmission and distribution network lines in each period is controlled within the confidence level.

[0015] Preferably, in S4, the joint probability distribution fuzzy set includes all possible probability distribution forms of the prediction error, and represents the probability distribution of all prediction error random vectors as a set.

[0016] Preferably, in S5, a characterization method of temporal coupling error is adopted to transform the chance constraint model into second-order cone programming.

[0017] A risk probability-based coordinated optimization dispatching system for transmission and distribution networks of power systems containing renewable energy, comprising:

[0018] Model building module, used to build a transmission and distribution network coordinated dispatching model;

[0019] The unbalanced power allocation module is used to allocate the unbalanced power caused by the output prediction error of wind and solar renewable energy to each generator set in the transmission and distribution network coordinated scheduling model based on the linearized affine strategy;

[0020] The opportunity constraint module is used to establish the opportunity constraint model of the transmission and distribution network coordinated scheduling model based on the distributed robust optimization method, and to quantify the over-limit risk of the transmission and distribution network coordinated scheduling model in real time through DRCC;

[0021] The probability distribution fuzzy set module is used to establish the fuzzy set of joint probability distribution of renewable energy output by using the distributed robust optimization method based on first- and second-order moment information for the uncertainty set of prediction errors in the chance constraint model;

[0022] The scheduling solution module is used to realize the linear transformation of the NP-hard opportunity constraint model based on convex optimization, transform the opportunity constraint model into a second-order cone programming, solve the second-order cone programming, and obtain the scheduling solution.

[0023] A computer device comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the steps of the risk probability-based coordinated optimization scheduling method for a power transmission and distribution network containing renewable energy are implemented.

[0024] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the risk probability-based coordinated optimization scheduling method for a power system transmission and distribution network containing renewable energy.

[0025] Compared with the prior art, the present invention has the following beneficial effects:

[0026] The present invention proposes a transmission and distribution network coordinated scheduling model based on probabilistic risk to quantitatively analyze the impact of uncertainty on the transmission and distribution network coordinated scheduling decision, thereby reducing the overall operating cost of the distribution network and better managing operational risks. In addition, the present invention considers two types of exogenous uncertainties in renewable energy output and establishes a moment-based probability distribution fuzzy set for uncertainty. The real-time transmission and distribution network coordinated scheduling model quantifies the over-limit risk by distributing robust opportunity constraints, and uses a linearized affine strategy to allocate uncertainty, effectively alleviating the peak-shaving pressure of generator sets. Based on the moment information of the distribution set, the DRCC model can be converted into a second-order cone programming problem for direct solution. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 The present invention is a flowchart of a risk probability-based coordinated optimization scheduling method for a power system transmission and distribution network containing renewable energy.

[0028] Figure 2 This is a topological diagram of an example of the transmission and distribution network in the present invention.

[0029] Figure 3 This is the operating status diagram of the 6-node transmission network units in the present invention.

[0030] Figure 4 This is the operation strategy diagram of the 9-node distribution network units in the present invention.

[0031] Figure 5 This is the operation strategy diagram of the 7-node distribution network units in the present invention.

[0032] Figure 6 This is the real-time adjustment diagram of the linearized affine strategy for the 9-node distribution network in the present invention.

[0033] Figure 7 This is the real-time adjustment diagram of the linearized affine strategy for the 7-node distribution network in the present invention. DETAILED DESCRIPTION

[0034] The embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.

[0035] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "multiple" is two or more, unless otherwise clearly and specifically defined.

[0036] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by technicians in the technical field to which the present invention belongs. The terms "installed", "connected", and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or can communicate with each other; it can be directly connected or indirectly connected through an intermediate medium, and it can be the internal connection of two elements or the interaction relationship between two elements. The term "and / or" used in this article includes any and all combinations of one or more related listed items. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances. The terms used in the specification of the present invention herein are only for the purpose of describing specific embodiments and are not intended to limit the present invention.

[0037] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0038] The disclosure below provides many different embodiments or examples to realize different structures of the present invention. In order to simplify the disclosure of the present invention, the parts and settings of specific examples are described below. Of course, they are only examples, and the purpose is not to limit the present invention. In addition, the present invention can repeat reference numbers and / or reference letters in different examples, and this repetition is for the purpose of simplicity and clarity, which itself does not indicate the relationship between the various embodiments and / or settings discussed. In addition, the present invention provides various specific examples of processes and materials, but those of ordinary skill in the art can be aware of the application of other processes and / or the use of other materials.

[0039] like Figure 1 As shown, it is a flow chart of the risk probability-based coordinated optimization scheduling method of the transmission and distribution network of the power system containing renewable energy of the present invention. While establishing the coordinated optimization scheduling model of the transmission and distribution network, the linearized affine strategy is used to allocate uncertainty, which effectively alleviates the peak-shaving pressure of the generator set. The real-time transmission and distribution network coordinated scheduling model quantifies the over-limit risk through DRCC. Considering the exogenous uncertainty output characteristics of wind and solar power, a fuzzy set of uncertainty probability distribution based on the moment information distribution robust optimization method is established. Based on the convex optimization method to process the first and second order moment information distribution robust sets, the DRCC model can be converted into a SOCP problem. The effectiveness of this method is verified through example analysis.

[0040] The specific steps include:

[0041] S1, establish a transmission and distribution network coordinated dispatching model to fully dispatch the transmission network and distribution network generators, make full use of the dispatchable resources of the power grid to ensure the balance of supply and demand in each period of the power grid, and thus improve the overall efficiency:

[0042] A transmission and distribution network coordinated dispatching model is established. The objective function aims to minimize the operating cost of the transmission and distribution network, including the generator operating cost, operating cost and penalty cost of abandoning renewable energy in the distribution network.

[0043]

[0044] Where T is the scheduling time period, N Dist The output cost of thermal power units is about the output of thermal power units. The quadratic function of n , b n and c n is the corresponding cost coefficient of each order. is the start-stop variable, is the start-stop cost coefficient. They are defined as power equipment connected to the distribution network, namely gas turbines (GT), distributed wind turbines (WT) and distributed photovoltaics (PV). and is the corresponding equipment operation cost coefficient. and is the cost of wind and solar power curtailment, and is the corresponding unit penalty cost.

[0045] Establish transmission and distribution network coordinated operation constraints. Consider the operating characteristics and dynamic response characteristics of different regulation resources in the transmission and distribution network to fully cope with the uncertainty challenges of wind power and photovoltaic power generation. In order to fully coordinate the source and load resources of power grids at all levels and improve the overall operation level of the power grid, it is necessary to carry out transmission and distribution network coordinated operation. The constraints are as follows:

[0046] Transmission and distribution network hierarchical power balance constraints:

[0047]

[0048] In the formula, is the transmission grid load, For distribution substation load, and They represent the charging and discharging power of energy storage in the distribution network respectively.

[0049] Formulas (6)-(7) represent the power balance equations of the transmission and distribution networks. Connectivity.

[0050] Energy storage operation constraints:

[0051]

[0052] Among them, the charging power of energy storage and discharge power Limited by Energy storage capacity at each time period Follow and Changes are also limited by the upper limit of energy storage capacity and lower limit

[0053] Formulas (8)-(12) represent the energy storage operation constraints in the distribution network. By using energy storage devices, the distribution network can adjust source and load fluctuations, which also enhances the flexibility of the system.

[0054] Renewable energy output constraints:

[0055]

[0056] In the formula, and They are the predicted values ​​of wind and solar power output in each period.

[0057] S2, based on the linearized affine strategy, allocates the unbalanced power caused by the forecast error of wind and solar renewable energy output to the flexible units of the transmission and distribution network, fully considers the spillover effect of wind and solar output uncertainty, achieves the internal balance of the uncertain distribution network, and guarantees the overall transmission network for the overflow part:

[0058] Establish the actual power model of the unit in each period. Since there are errors in the forecast of renewable energy generation, it is necessary to balance the errors in real time. The joint forecast error of WT and PV forecast is used to represent the unbalanced power caused by uncertainty in each period. The actual power output of each unit in the transmission and distribution network is as follows:

[0059]

[0060]

[0061] in, and are the wind power and photovoltaic prediction errors, respectively. is a sum vector with all elements equal to 1. The wind-solar combined unbalanced power error of each distribution network is w k,t . and are the unit participation adjustment factors respectively.

[0062] Formulas (15)-(16) represent the actual output of wind power and photovoltaic power in the distribution network in each period considering the prediction error, and derive the joint prediction error in (17). Formulas (18)-(20) adopt a linearized affine prediction strategy to allocate unbalanced power to the dispatching units of the transmission and distribution network according to their respective participation adjustment coefficients.

[0063] Participating adjustment factor constraints:

[0064]

[0065] in k k,t =w k,t / w 0,tWhen the prediction imbalance error is obtained, k k,t is a constant.

[0066] Formula (21) indicates that the fluctuation of the distribution network is balanced by the internal GT, and the remaining unbalanced power is transmitted to the transmission network through the substation. Formula (22) indicates that the transmission network distributes the unbalanced power fluctuation to each generator set. The above two formulas can be further simplified to formulas (23) and (24).

[0067] S3, based on the distributed robust optimization method, establishes the opportunity constraint model of the transmission and distribution network coordinated scheduling model, and quantifies the over-limit risk of the transmission and distribution network coordinated scheduling model through DRCC:

[0068] The distribution constraints of the output of the transmission and distribution network units are:

[0069]

[0070]

[0071] Where P(·) represents the probability operator, 1-ε i Represents the lower limit of the risk probability of DRCC, also known as the confidence level. k represents the uncertainty set of the prediction errors of each distribution network, Ψ0 is the total set of prediction errors; and are the upper and lower limits of the generator output power, and Limits the power adjustment of the generator set at different time periods; and It is the upper and lower limits of GT output.

[0072] Formulas (25)-(30) use DRCC to ensure flexible operation of equipment connected to the transmission and distribution grid to cope with unbalanced power fluctuations caused by uncertainties in different time periods.

[0073] Distribution constraints on transmission and distribution network line capacity:

[0074]

[0075] In the formula represents the power transfer allocation coefficient of the transmission and distribution network, and Represents the line capacity of the transmission and distribution network.

[0076] Formulas (31)-(34) can be used to ensure that the power over-limit risk of the transmission and distribution network lines in each period is controlled within the confidence level, thereby improving the overall economic benefits.

[0077] S4, based on the fact that the real probability distribution of the two exogenous uncertainties of wind and solar output cannot accurately obtain the impact, the distributed robust optimization method based on the first and second order moment information is used to establish the fuzzy set of the joint probability distribution of wind and solar output:

[0078] Distributed robust probability set based on moment information. The uncertainty set describes all possible probability distributions of random forecast errors. These distributions not only affect the transformation and solution of the dispatch model, but also affect the conservatism of the decision results. The output of renewable energy is affected by the meteorological environment, and its error probability distribution cannot be predicted in advance. However, based on historical information, the first-order and second-order moment information of the probability distribution can be observed.

[0079] Taking the kth distribution network as an example, formula (35) lists all possible probability distribution forms of wind and solar power output prediction errors. k represents the first-order moment (i.e., mean) of the prediction error vector, w k Represents the second-order moment (i.e., covariance matrix) of the same vector. Σ k represents the second-order moment (i.e., covariance matrix) of the same vector.

[0080]

[0081] Among them, f(w k ) is the prediction error vector w k The joint probability density function of is, E(·) is the expectation operator. The probability set is an ellipsoid set, and γ1 and γ2 define the radius of the ellipsoid range.

[0082] Formula (35) represents the probability distribution of the prediction error random vector as a set. This method does not restrict the form of the probability distribution of the random vector and allows for possible deviations in the first-order and second-order moment estimates. Therefore, the above distribution set can more accurately represent the uncertainty of the probability distribution of the renewable energy output prediction error in the real-time scheduling model. This distribution set expression is more universal.

[0083] S5, based on convex optimization, realizes the linear transformation of NP-hard chance constraint model, and proposes a characterization method of timing coupling error, which transforms the above-mentioned robust optimization model of transmission and distribution network coordinated scheduling based on probabilistic risk into an easy-to-solve second-order cone programming form.

[0084] Model solution conversion method. Without loss of generality, the above DRCC model can be expressed as follows:

[0085]

[0086] Where a is the coefficient vector and b is the limit value.

[0087] If w kObeying the probability distribution set in formula (35), the convex optimization DRCC (36) has the following equivalent transformation theorem.

[0088]

[0089] Formula (37) transforms the NP-hard DRCC problem into an easy-to-solve SOCP form. The derivation process is illustrated by the DRCC opportunity constraints (25), (26) of the transmission network generator output and the opportunity constraints (29), (30) of the GT output.

[0090]

[0091] in, Σ 0,t and Σ k,t They are the covariance matrix of the total error of the transmission and distribution network system and the covariance matrix of each distribution network error in period t.

[0092] Time period coupling error processing method. It is worth noting that DRCC (27) and (28) vary with time. In order to solve the time coupling problem of prediction error, the time-related uncertainty vector is expressed as The corresponding covariance matrix Expressed as (42).

[0093]

[0094] According to the above theorem and error processing method, all the DRCC models proposed above can be converted into linear problems or SOCP problems through formulas (37) and (42). The real-time transmission and distribution coordinated scheduling model can be converted into a SOCP model and solved directly.

[0095] S6, comparing different methods to verify the effectiveness of the model proposed in the present invention.

[0096] In order to analyze and verify the effectiveness of the proposed real-time transmission and distribution network collaborative optimization model, an improved 6-node transmission network (PTN) is studied. The network has two connected 7-node and 9-node distribution networks (PDNs). The topology is shown in the attached figure. Figure 2 There are two generator sets in the transmission network, and the basic parameters of the generator sets are shown in Table 1. Each distribution network includes a GT and ESS unit, and renewable energy includes wind power and photovoltaic power. The distribution network unit parameters are shown in Tables 2 and 3.

[0097] Table 1 Basic parameter configuration of thermal power unit in the present invention

[0098]

[0099] Table 2 Basic parameter configuration of energy storage unit in the present invention

[0100]

[0101]

[0102] Table 3 Basic parameter configuration of distribution network units in the present invention

[0103]

[0104] During the dispatch period, the average value of the combined forecast error of wind power and photovoltaic power is μ k Set to 0, standard deviation Σ k Set to 20% of the joint prediction value. Other basic parameters are set to γ1 = 0.1, γ2 = 1.1 and 1-ε respectively. i =0.8.

[0105] All programs were programmed using MATLAB, installed on a desktop computer with 16GB of memory, and the solver was Gurobi9.1.

[0106] Attached Figure 3 , Attachment Figure 4 and attached Figure 5 The operation status of the units with coordinated real-time optimized scheduling of the transmission network and distribution network is demonstrated.

[0107] As attached Figure 3 As shown in the figure, in the transmission network, thermal power units are used to ensure the balance of power supply and demand and make up for the power gap of renewable energy grid connection. Due to its low operating cost, G2 usually operates at full load, while G1 is used for peak load regulation to smooth the fluctuation of unbalanced power in the system. The two distribution networks have different operating states. The 9-node distribution network has a low degree of dependence on the power of the transmission network, and can even be self-sufficient in some periods of time. In the 7-11 period, it can even provide the transmission network with excess power from renewable energy. In contrast, the 7-node distribution network is more dependent on the transmission network.

[0108] Attached Figure 4 and attached Figure 5 The operation of units in two distribution networks with similar operating characteristics is shown. Renewable energy units are used to generate electricity at a lower operating cost, and in addition to the electricity purchased from the transmission grid, the distribution network uses gas turbines to ensure the balance of power supply and demand in the distribution network area. Energy storage equipment is used to charge during the 12-16 hours when renewable energy is sufficient, and discharge during the 18-21 hours when photovoltaic output is low, thereby reducing the overall operating cost of the distribution network.

[0109] Attached Figure 6 and attached Figure 7 A linearized affine strategy for uncertain power real-time balancing is presented.

[0110] In the attached Figure 6 and attached Figure 7 In the 1990s, the unbalanced power caused by the forecast error of wind and solar power output in the distribution network is balanced in real time by GT and thermal power units in the transmission network. In the 0-7 period, the transmission network is fully responsible for balancing the uncertainty. The thermal power unit G1 in the transmission network is responsible for the main peak-shaving task. In the 8-16 period with higher uncertainty errors, the GT in the distribution network and the thermal power units in the transmission network jointly smooth out the unbalanced power fluctuations in the distribution network. Compared with the 9-node distribution network system, the 7-node distribution network system has weaker self-adjustment ability and relies more on the transmission network to bear the responsibility of balancing the unbalanced power fluctuations in the 12-16 period.

[0111] Table 4 shows the changes in the total operating cost of the coordinated optimization scheduling of the transmission and distribution network and the renewable energy power abandonment rate with the risk confidence level proposed in this invention.

[0112] Table 4 Total cost and renewable energy curtailment rate change with risk confidence

[0113]

[0114] As shown in Table 4, with the increase of over-limit risk, the total operating cost and the rate of renewable energy curtailment both decrease. However, excessive operating risk will pose a challenge to the safe operation of the power system. Therefore, it is crucial to select an appropriate risk factor under the coordinated optimization of the transmission and distribution network to achieve a balance between risk and benefit.

[0115] The following are device embodiments of the present invention, which can be used to perform method embodiments of the present invention. For details not disclosed in the device embodiments, please refer to the method embodiments of the present invention.

[0116] In another embodiment of the present invention, a risk probability-based collaborative optimization scheduling system for a transmission and distribution network of a power system containing renewable energy is provided. The risk probability-based collaborative optimization scheduling system for a transmission and distribution network of a power system containing renewable energy can be used to implement the above-mentioned risk probability-based collaborative optimization scheduling method for a transmission and distribution network of a power system containing renewable energy. Specifically, the risk probability-based collaborative optimization scheduling system for a transmission and distribution network of a power system containing renewable energy includes a model building module, an unbalanced power allocation module, an opportunity constraint module, a probability distribution fuzzy set module and a scheduling scheme solving module.

[0117] Among them, the model building module is used to establish a coordinated scheduling model for the transmission and distribution network.

[0118] The unbalanced power allocation module is used to allocate the unbalanced power caused by the output prediction error of wind and solar renewable energy to each generator set in the transmission and distribution network coordinated scheduling model based on the linearized affine strategy.

[0119] The opportunity constraint module is used to establish the opportunity constraint model of the transmission and distribution network coordinated scheduling model based on the distributed robust optimization method, and to quantify the over-limit risk of the transmission and distribution network coordinated scheduling model in real time through DRCC.

[0120] The probability distribution fuzzy set module is used to establish the fuzzy set of joint probability distribution of renewable energy output by using the distributed robust optimization method based on first- and second-order moment information for the uncertainty set of prediction errors in the chance constraint model.

[0121] The scheduling solution module is used to realize the linear transformation of the NP-hard opportunity constraint model based on convex optimization, and proposes a characterization method for timing coupling errors, transforms the opportunity constraint model into a second-order cone programming, solves the second-order cone programming, and obtains the scheduling solution.

[0122] In another embodiment of the present invention, a terminal device is provided, the terminal device includes a processor and a memory, the memory is used to store a computer program, the computer program includes program instructions, and the processor is used to execute the program instructions stored in the computer storage medium. The processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application specific integrated circuits (ASIC), field-programmable gate arrays (FPGAs), or other processors. GateArray, FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc., which are the computing core and control core of the terminal, which are suitable for implementing one or more instructions, and are specifically suitable for loading and executing one or more instructions to implement the corresponding method flow or corresponding function; the processor described in the embodiment of the present invention can be used for the operation of the coordinated optimization scheduling method of the transmission and distribution network of the power system containing renewable energy based on risk probability, including: S1, establishing a coordinated scheduling model of the transmission and distribution network; S2, based on the linearized affine strategy, the unbalanced power caused by the output prediction error of wind and solar renewable energy is distributed to each generator set in the coordinated scheduling model of the transmission and distribution network; S3, based on the distributed robust optimization method, an opportunity constraint model of the coordinated scheduling model of the transmission and distribution network is established, and the over-limit risk of the coordinated scheduling model of the transmission and distribution network is quantified in real time through DRCC; S4, for the uncertainty set of the prediction error in the opportunity constraint model, a distributed robust optimization method based on first- and second-order moment information is used to establish a fuzzy set of joint probability distribution of renewable energy output; S5, based on convex optimization, a linear transformation of the NP-hard opportunity constraint model is realized, the opportunity constraint model is transformed into a second-order cone programming, and the second-order cone programming is solved to obtain a scheduling plan.

[0123] In another embodiment, the present invention further provides a computer-readable storage medium (Memory), which is a memory device in a terminal device for storing programs and data. It is understandable that the computer-readable storage medium here can include both the built-in storage medium in the terminal device and the extended storage medium supported by the terminal device. The computer-readable storage medium provides a storage space, which stores the operating system of the terminal. In addition, one or more instructions suitable for being loaded and executed by the processor are also stored in the storage space, and these instructions can be one or more computer programs (including program codes). It should be noted that the computer-readable storage medium here can be a high-speed RAM memory or a non-volatile memory, such as at least one disk memory.

[0124] One or more instructions stored in a computer-readable storage medium can be loaded and executed by a processor to implement the corresponding steps of the risk probability-based coordinated optimization scheduling method for the transmission and distribution network of a power system containing renewable energy in the above-mentioned embodiment; one or more instructions in the computer-readable storage medium are loaded by the processor and execute the following steps: S1, establishing a coordinated scheduling model for the transmission and distribution network; S2, based on a linearized affine strategy, allocating the unbalanced power caused by the output prediction error of wind and solar renewable energy to each generator set in the coordinated scheduling model for the transmission and distribution network; S3, based on a distributed robust optimization method, establishing an opportunity constraint model for the coordinated scheduling model for the transmission and distribution network, and quantifying the over-limit risk of the coordinated scheduling model for the transmission and distribution network in real time through DRCC; S4, for the uncertainty set of the prediction error in the opportunity constraint model, a distributed robust optimization method based on first- and second-order moment information is used to establish a fuzzy set of joint probability distribution of renewable energy output; S5, based on convex optimization, a linear transformation of the NP-hard opportunity constraint model is realized, the opportunity constraint model is transformed into a second-order cone programming, the second-order cone programming is solved, and a scheduling plan is obtained.

[0125] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0126] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0127] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0128] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0129] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0130] It should be understood that the above description is for illustration and not for limitation. Many embodiments and many applications beyond the examples provided will be apparent to those skilled in the art upon reading the above description. Therefore, the scope of this patent should not be determined with reference to the above description, but rather with reference to the preceding claims and the full scope of equivalents to which such claims are entitled. For the purpose of comprehensiveness, all articles and references, including disclosures of patent applications and publications, are incorporated herein by reference. The omission of any aspect of the subject matter disclosed herein in the preceding claims is not intended to be a waiver of such subject matter, nor should it be considered that the applicant has not considered such subject matter to be part of the disclosed inventive subject matter.

Claims

1. A risk probability-based coordinated optimization scheduling method for transmission and distribution networks of power systems containing renewable energy, characterized in that: The process includes: S1, establish a coordinated dispatching model for the transmission and distribution network; S2, based on the linearized affine strategy, distributes the unbalanced power caused by the output forecast error of wind and solar renewable energy to each generator set in the transmission and distribution network coordinated scheduling model; S3, based on the distributed robust optimization method, establishes the opportunity constraint model of the transmission and distribution network coordinated scheduling model, and quantifies the over-limit risk of the transmission and distribution network coordinated scheduling model in real time through DRCC; S4, for the uncertainty set of prediction errors in the chance constraint model, a distributed robust optimization method based on first- and second-order moment information is used to establish the fuzzy set of joint probability distribution of renewable energy output; S5, based on convex optimization, realizes the linear transformation of the NP-hard chance constraint model, transforms the chance constraint model into a second-order cone programming, solves the second-order cone programming, and obtains the scheduling plan.

2. The risk probability-based coordinated optimization scheduling method for transmission and distribution networks of power systems containing renewable energy according to claim 1 is characterized in that: In S1, the goal of the transmission and distribution network coordinated scheduling model is to minimize the operating cost of the transmission and distribution network, and it is equipped with transmission and distribution network hierarchical power balance constraints, energy storage operation constraints and renewable energy output constraints.

3. The risk probability-based coordinated optimization scheduling method for transmission and distribution networks of power systems containing renewable energy according to claim 1 is characterized in that: The specific process of S2 is as follows: establish the actual power model of the unit in each period, use the joint prediction error of WT and PV prediction to represent the unbalanced power caused by the uncertainty in each period; the unbalanced power is transmitted to the transmission network through the substation, and the transmission network distributes the unbalanced power fluctuations to each generator set.

4. The risk probability-based coordinated optimization scheduling method for transmission and distribution networks of power systems containing renewable energy according to claim 1 is characterized in that: In S3, the opportunity constraint model includes the distributed robust opportunity constraints of the output of the transmission and distribution network units and the distributed robust opportunity constraints of the transmission and distribution network line capacity.

5. The risk probability-based coordinated optimization scheduling method for transmission and distribution networks of power systems containing renewable energy according to claim 4 is characterized in that: According to the distributed robustness constraints of the transmission and distribution network line capacity, the power over-limit risk of the transmission and distribution network lines in each period is controlled within the confidence level.

6. The risk probability-based coordinated optimization scheduling method for transmission and distribution networks of power systems containing renewable energy according to claim 1 is characterized in that: In S4, the joint probability distribution fuzzy set includes all possible probability distribution forms of prediction errors, and represents the probability distribution of all prediction error random vectors as a set.

7. The risk probability-based coordinated optimization scheduling method for transmission and distribution networks of power systems containing renewable energy according to claim 1 is characterized in that: In S5, the characterization method of temporal coupling error is adopted to transform the chance constraint model into second-order cone programming.

8. A risk probability-based coordinated optimization dispatching system for transmission and distribution networks of power systems containing renewable energy, characterized in that: include: Model building module, used to build a transmission and distribution network coordinated dispatching model; The unbalanced power allocation module is used to allocate the unbalanced power caused by the output prediction error of wind and solar renewable energy to each generator set in the transmission and distribution network coordinated scheduling model based on the linearized affine strategy; The opportunity constraint module is used to establish the opportunity constraint model of the transmission and distribution network coordinated scheduling model based on the distributed robust optimization method, and to quantify the over-limit risk of the transmission and distribution network coordinated scheduling model in real time through DRCC; The probability distribution fuzzy set module is used to establish the fuzzy set of joint probability distribution of renewable energy output by using the distributed robust optimization method based on first- and second-order moment information for the uncertainty set of prediction errors in the chance constraint model; The scheduling solution module is used to realize the linear transformation of the NP-hard opportunity constraint model based on convex optimization, transform the opportunity constraint model into a second-order cone programming, solve the second-order cone programming, and obtain the scheduling solution.

9. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the risk probability-based coordinated optimization scheduling method for the transmission and distribution network of a power system containing renewable energy are implemented as described in any one of claims 1 to 7.

10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by the processor, the steps of the risk probability-based coordinated optimization scheduling method for the transmission and distribution network of a power system containing renewable energy are implemented as described in any one of claims 1 to 7.

Citation Information

Patent Citations

  • Transmission and distribution cooperative scheduling method and system under condition of uncertain probability distribution

    CN113162049A

Cited By

  • Statistically feasible distributed renewable energy joint opportunity constraint scheduling method, computer readable storage medium and program product

    CN119921385A

  • A statistically feasible distributed renewable energy joint opportunity-constrained scheduling method, computer-readable storage medium, and program product

    CN119921385B

  • Power distribution network piecewise linearization joint opportunity constraint optimization scheduling method based on sample data, computer readable storage medium and program product

    CN119944846A

  • Microgrid scheduling method and device, and storage medium

    WO2026153303A1