Multi-working-state three-phase motor driver and fault-tolerant control method thereof
By combining three-phase, six-switch, two-level drivers and boost topology in the motor drive system, stable operation and fault tolerance in different working states are achieved, and the traditional inverter is solved in complex environments and fault conditions. The problem of instability improves the stability and fault tolerance of the system.
Patent Information
- Application Number
- CN202411185644.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-08-27
AI Technical Summary
Traditional two-level inverters are difficult to operate normally under complex and changeable external environment or their own unstable factors, especially in the case of insufficient DC power supply or failure, resulting in instability of the motor drive system.
Using three-phase six-switch two-level driver combined with boost topology, the switch control of the two-way thyristor can realize the ordinary three-phase six-switch, variable boost ratio three-phase six-switch and boost three-phase four-switch topology. Switch to ensure that the motor operates stably under different working conditions and switch to fault-tolerant mode in case of failure.
It realizes the multi-working state operation of the motor drive system, improves the stability and fault tolerance of the system, reduces the size, cost and complexity of the system, and ensures that the motor can still operate stably under different power supply and fault conditions.
Smart Images

Figure CN119070690A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of motor drive control, and in particular relates to a three-phase motor driver with multiple working states and a control method thereof. Background Art
[0002] With the development of power semiconductor devices such as IGBT and MOSFET, and the advancement of power electronics technology, the application scenarios of inverters have shifted from medium and low voltage motor drives such as fans and compressors to high power and large capacity motor drives, and are widely used in many fields such as electric vehicles, wind power generation, industrial control, and automation equipment, such as the rapidly developing new energy electric vehicle motor drive system and wind power generation variable pitch motor drive system. Therefore, the drive and control of the motor plays a pivotal role. The traditional two-level inverter has been widely used in the field of motor drive, but due to its single working state, facing the complex and changeable external environment or its own unstable factors, it may not operate normally under different circumstances, such as insufficient power supply of the DC power supply system, and single-tube or single-phase faults.
[0003] Therefore, based on the wide application background of motor drivers and their commonly used structures, an application strategy combining boost drive topology with ordinary three-phase six-switch topology is adopted to obtain a driver combining multiple working states to cope with complex and changeable situations. In normal operation, a three-phase six-switch is used to drive the motor. When the DC power supply cannot meet the full power of the motor, a variable boost ratio three-phase six-switch is used to drive the motor. When the driver fails, the boost topology quickly intervenes and switches to boost three-phase four-switch operation to ensure that the motor can still operate stably. This driver can not only operate in multiple working states, but also has a single-stage DC-AC driver with boost function. It is superior to a two-stage driver in terms of size, cost, weight and complexity of the entire system. The paper "Three-Phase Split-Source Inverter (SSI): Analysis and Modulation" analyzes the working mode and modulation method of the split source inverter SSI. However, there is currently no research on a driver that combines a boost topology with an ordinary three-phase six-switch driver and can achieve multiple working states. Therefore, the proposal of this driver is of great significance to improving the stability of the entire motor drive system, and also has high social and economic value. Summary of the invention
[0004] The present invention aims to provide a three-phase motor driver with multiple working states and a control method thereof.
[0005] The technical solution to achieve the purpose of the present invention is: a multi-working state three-phase motor driver, which is composed of a three-phase six-switch two-level drive converter and an additional boost topology and a switch device for topology reconstruction, wherein:
[0006] (1) Three-phase six-switch two-level drive inverter:
[0007] Each phase of the three-phase six-switch two-level drive inverter consists of two upper and lower bridge arms. There are six bridge arms in total for the three phases A, B, and C. The six bridge arms are composed of six IGBT power switch tubes S1~S6 and six diodes D1~D6 connected in parallel with the power switch tubes. The upper and lower bridge arms of each phase of the three phases A, B, and C are connected in series with a fast fuse, and a total of 6 fast fuses F1~F6 are used; the DC power supply U In The positive electrode is first connected to the bidirectional thyristor S7 and then to the upper bridge arms of the three-phase bridge arms A, B, and C. The DC power supply U In The negative pole is connected to the lower bridge arm of the three-phase bridge arm A phase, B phase, and C phase respectively. The midpoints of the upper and lower bridge arms of the three-phase A, B, and C phases are connected to the a, b, and c phase winding ends of the permanent magnet synchronous motor respectively. a 、i b 、i c is the current flowing through the a, b, and c phase winding ends of the motor;
[0008] (2) Additional boost topology and switching devices for topology reconstruction:
[0009] Two capacitors C f The positive electrode of the series capacitor is connected to the bidirectional thyristor S8, and then connected to the bidirectional thyristor S7. The negative electrode of the series capacitor is connected to the DC power supply U In The negative poles are connected, and the two capacitors C f The midpoint of is connected to the midpoints of the upper and lower bridge arms of the three phases A, B, and C respectively through three bidirectional thyristors TR1, TR2, and TR3, and then connected to the a, b, and c three-phase winding ends of the permanent magnet synchronous motor respectively; the DC power supply U In The positive electrode is first connected to the bidirectional thyristor S9 and then to the inductor L1. The other end of the inductor L1 is connected to the positive electrodes of the diodes D7, D8 and D9. The negative electrodes of the diodes D7, D8 and D9 are connected to the three-phase winding ends a, b and c respectively.
[0010] Further, when operating normally, the bidirectional thyristor S7 is turned on, and the bidirectional thyristor S8 and the bidirectional thyristor S9 are turned off, operating in a common three-phase six-switch topology;
[0011] When the DC power supply cannot meet the full power of the motor, the bidirectional thyristor S7 is turned off, and the bidirectional thyristor S8 and the bidirectional thyristor S9 are turned on, and the topology is switched from the ordinary three-phase six-switch topology to the variable step-up ratio three-phase six-switch topology;
[0012] When a short circuit fault occurs in a bridge arm IGBT power switch tube of the driver and the corresponding fast fuse blows, or a direct open circuit fault occurs, the bidirectional thyristor S7 is turned off, the bidirectional thyristor S8 and the bidirectional thyristor S9 are turned on, and the bidirectional thyristor TR1, TR2 or TR3 connected to the corresponding phase of the faulty IGBT power switch tube is turned on, switching to a boost type three-phase four-switch topology structure.
[0013] Furthermore, a three-phase motor driver with multiple working states adopts a speed outer loop and a current inner loop for double closed-loop operation, wherein the speed loop uses the motor speed obtained by the acquisition as a difference input to the PI regulator with the reference speed, and outputs a q-axis current reference value; the current loop uses the zero d-axis as the d-axis current reference value, and then acquires the three-phase current and the motor electrical angle, obtains the d and q-axis currents through Park transformation, and respectively inputs the PI regulator with the difference input to the d and q-axis current reference values, and outputs the d and q-axis voltage reference values, and obtains the α and β-axis voltage reference values U through Park inverse transformation. α , U β ;Change U α , U β , input into the normal SVPWM control module, variable boost SVPWM control module and fault-tolerant SVPWM control module corresponding to different working states, generate a signal to control the on and off of the IGBT gate, and the gate signal is input into the topology corresponding to different working states.
[0014] A control method for a three-phase motor driver with multiple working states, based on the three-phase motor driver with multiple working states, comprises:
[0015] (1) Normal SVPWM control
[0016] During normal operation, the bidirectional thyristor S7 is turned on, and the bidirectional thyristor S8 and the bidirectional thyristor S9 are turned off, and the operation is carried out in the common three-phase six-switch topology. The normal SVPWM control first determines the basic voltage vector of the synthetic reference vector of each sector during the normal operation of the common three-phase six-switch topology, as well as the action order and action time of the basic voltage vector. Then, according to the action order and action time of the basic voltage vector, the action time of the switch state of the IGBT power switch tube is determined, and 6 PWM signals are generated to control the on and off of the IGBT power switch tube, thereby completing the control of the normal three-phase motor driver.
[0017] (2) Variable boost SVPWM control
[0018] When the DC power supply cannot meet the full power of the motor, the bidirectional thyristor S7 is turned off, the bidirectional thyristor S8 and the bidirectional thyristor S9 are turned on, and the three-phase six-switch topology with variable step-up ratio is switched. This topology converts the DC power supply U In The energy is fed back to the front-end capacitor C fIn order to achieve the boost effect, the variable boost SVPWM control first determines the inductor discharge time and inductor charging time, defines the duty cycle and boost gain, and then recalculates the action time of the basic voltage vector of each sector based on the boost control strategy. Then, according to the action order and action time of the basic voltage vector, the action time of the IGBT power switch tube switching state is determined, and 6 PWM signals are generated. The IGBT controls the power switch tube on and off, and completes the control of the variable boost ratio three-phase motor driver.
[0019] (3) Fault-tolerant SVPWM control
[0020] When a short-circuit fault occurs in a power switch tube of a bridge arm of the driver, the corresponding fast fuse blows, or a direct open-circuit fault occurs, it switches to a boost-type three-phase four-switch topology. The fault-tolerant SVPWM control uses a new modulation algorithm similar to six switches. First, the basic voltage vector in the case of a single-tube or single-phase fault is reconstructed, and a virtual vector is synthesized; then the action vector is selected to be re-divided into 6 sectors, and the action order and action time of the action vector of the synthetic reference vector of each sector are determined; then the action time of the virtual vector is allocated to the four basic voltage vectors, and the action order and action time of the basic voltage vector of the synthetic reference vector of each sector are determined; finally, according to the action order and action time of the basic voltage vector, the action time of the switching state of the IGBT power switch tube is determined, thereby generating 4 PWM signals to control the on and off of the IGBT power switch tube to complete the fault-tolerant control of the boost-type motor driver.
[0021] Further, (1) normal SVPWM control, the specific method is:
[0022] Determine the basic voltage vector during normal operation:
[0023] The common three-phase six-switch topology has a total of 8 voltage state combinations, i.e., 8 switch states, corresponding to 8 basic voltage vectors, namely: V0 (000), V1 (100), V2 (110), V3 (010), V4 (011), V5 (001), V6 (101), V7 (111), among which V0 (000) and V7 (111) are zero vectors, and the other six V1 (100), V2 (110), V3 (010), V4 (011), V5 (001), V6 (101) are valid vectors. The function value "1" in the brackets indicates that the upper bridge arm switch tube of the phase is turned on, and the function value "0" indicates that the lower bridge arm switch tube of the phase is turned on. The first function value indicates the switch state of phase A, the second function value indicates the switch state of phase B, and the third function value indicates the switch state of phase C.
[0024] The basic voltage vector that determines the synthetic reference vector for each sector is:
[0025] Taking the α axis as the reference, rotate 60° counterclockwise to obtain 6 sectors I, II, III, IV, V, and VI. In sector I, the basic voltage vectors V0(000), V1(100), V2(110), and V7(111) are used to synthesize the reference vector. In sector II, the basic voltage vectors V0(000), V2(110), V3(010), and V7(111) are used to synthesize the reference vector. In sector III, the basic voltage vectors V0(000), V3(010), and V7(111) are used to synthesize the reference vector. The basic voltage vectors V0(000), V4(011), V5(001), V7(111) are used as the synthetic reference vectors in sector IV; the basic voltage vectors V0(000), V5(001), V6(101), V7(111) are used as the synthetic reference vectors in sector V; the basic voltage vectors V0(000), V6(101), V1(100), V7(111) are used as the synthetic reference vectors in sector VI;
[0026] According to the basic voltage vector of each sector's synthetic reference vector and the seven-segment vector synthesis principle, the action order of the basic voltage vector of each sector is obtained:
[0027] Sector I: V0(000)V1(100)V2(110)V7(111)V2(110)V1(100)V0
[0028] (000), Sector II: V0(000)V3(010)V2(110)V7(111)V2(110)V3(010)V0(000), Sector III: V0(000)V3(010)V4(011)V7(111)V4(011)V3(010)V0(000), Sector IV: V0(000)V5(001)V4(0 11)V7(111)V4(011)V5(001)V0(000), sector V: V0(000)V5(001)V6(101)V7(111)V6(101 )V5(001)V0(000), sector VI: V0(000)V1(100)V6(101)V7(111)V6(101)V1(100)V0(000);
[0029] Determine the action time of the basic voltage vector of each sector:
[0030] Define T1, T2, and T0 as the action time of two effective vectors and zero vector in the basic voltage vector of the synthetic reference vector within one cycle:
[0031]
[0032] Among them, T sis the sampling period, that is, in sector I, the action time of the basic voltage vector V1(100) is T1, the action time of V2(110) is T2, the action time of V0(000) is T0 / 2, and the action time of V7(111) is T0 / 2; in sector II, the action time of the basic voltage vector V2(110) is T1, the action time of V3(010) is T2, the action time of V0(000) is T0 / 2, and the action time of V7(111) is T0 / 2; in sector III, the action time of the basic voltage vector V3(010) is T1, the action time of V4(011) is T2, the action time of V0(000) is T0 / 2, and the action time of V7(111) is T0 / 2; in sector IV, the action time of the basic voltage vector V4 (011) is T1, the action time of V5 (001) is T2, the action time of V0 (000) is T0 / 2, and the action time of V7 (111) is T0 / 2; in sector V, the action time of the basic voltage vector V5 (001) is T1, the action time of V6 (101) is T2, the action time of V0 (000) is T0 / 2, and the action time of V7 (111) is T0 / 2; in sector VI, the action time of the basic voltage vector V6 (101) is T1, the action time of V1 (100) is T2, the action time of V0 (000) is T0 / 2, and the action time of V7 (111) is T0 / 2;
[0033] According to the action order and action time of the basic voltage vector, the action time of the switching state of the IGBT power switch tube is determined, and 6 PWM signals are generated to control the on and off of the IGBT power switch tube, thereby completing the control of the normal three-phase motor driver.
[0034] Furthermore, (2) variable boost SVPWM control switches the variable boost ratio three-phase six-switch topology according to the DC power supply situation, recalculates the action time of the basic voltage vector of each sector, and then according to the basic voltage vector action order and the basic voltage vector action time, the specific method is as follows:
[0035] Determine the inductor discharge time and inductor charging time:
[0036] The seven switching states corresponding to the basic voltage vectors V0 (000), V1 (100), V2 (110), V3 (010), V4 (011), V5 (001), and V6 (101) are inductor charging states, and the corresponding conduction time is the inductor charging time. The switching state corresponding to the basic voltage vector V7 (111) is the inductor discharging state, and the corresponding conduction time is the discharging time.
[0037] Define the duty cycle D:
[0038]
[0039] Where, T u is the inductor discharge time, T w is the inductor charging time, T s is the sampling cycle time;
[0040] Define the boost gain X:
[0041] When the inductor is charged, the capacitor is discharged to supply power to the back-end load. When the inductor is discharged, the capacitor is charged to store energy. During the sampling period, the two capacitors C after the boost are determined according to the inductor volt-second balance principle. f The voltage across the terminals is:
[0042]
[0043] From the above formula, we know that when the time proportion of the charge and discharge switch state is changed, the boost ratio can be changed. The boost gain X is now defined as:
[0044]
[0045] Based on the boost control strategy, the action time of the zero vector is redistributed:
[0046] Changing the time of the basic voltage vector V7 (111) in the inductor discharge state can change the boost ratio. Let the action time of the V7 (111) state be T n , then the action time of V7(111) is:
[0047]
[0048] That is, the action time of the basic voltage vector of each sector after adjustment is obtained. In sector I, the action time of the basic voltage vector V1 (100) is T1, the action time of V2 (110) is T2, and the action time of V0 (000) is T0-T n , the action time of V7(111) is T n In sector II, the basic voltage vector V2 (110) is used for a duration of T1, the duration of V3 (010) is T2, and the duration of V0 (000) is T0-T n , the action time of V7(111) is T n ; In sector III, the action time of the basic voltage vector V3 (010) is T1, the action time of V4 (011) is T2, and the action time of V0 (000) is T0-T n , the action time of V7(111) is T n ; The action time of the basic voltage vector V4 (011) used in sector IV is T1, the action time of V5 (001) is T2, and the action time of V0 (000) is T0-Tn , the action time of V7(111) is T n ; The action time of the basic voltage vector V5 (001) used in sector V is T1, the action time of V6 (101) is T2, and the action time of V0 (000) is T0-T n , the action time of V7(111) is T n ; The action time of the basic voltage vector V6 (101) used in sector VI is T1, the action time of V1 (100) is T2, and the action time of V0 (000) is T0-T n , the action time of V7(111) is T n ;
[0049] According to the basic voltage vector action sequence and basic voltage vector action time, the action time of the IGBT power switch state is determined, and 6 PWM signals are generated. The IGBT controls the on and off of the power switch to complete the control of the variable boost ratio three-phase motor driver.
[0050] Furthermore, in (3) fault-tolerant SVPWM control, the basic voltage vector when a single tube or single phase fails is reconstructed and a virtual vector is synthesized. The specific method is as follows:
[0051] Reconstruct the basic voltage vector when a single tube or single phase fault occurs:
[0052] After a single-tube or single-phase fault occurs, the motor winding of the faulty phase is connected to the midpoint of the capacitor through the opened bidirectional thyristor, and only the four power switch tubes IGBT of the upper and lower bridge arms of the other two non-faulty phases work normally. The boost three-phase motor driver is controlled and operated by the four IGBT power switch tubes. There are 4 voltage state combinations, that is, 4 switch states, corresponding to 4 basic voltage vectors, namely: V1(00), V2(10), V3(11), V4(01), and the four basic voltage vectors are all valid vectors; after a phase among the three phases A, B, and C fails, the four basic voltage vectors V1(00), V2(10), V3(11), and V4(01) are arranged in a clockwise order in the plane, and each adjacent vector is 90° apart. There are four sectors in the plane. In order to simplify the calculation of the reference vector after the failure of each phase, the positive direction of the coordinate axes α and β is set as the positive direction of the basic voltage vectors V1(00) and V2(10). The reference vector V ref The projection on the α and β axes is U α , U β ;
[0053] Synthesize virtual vectors, including virtual effective vectors and virtual zero vectors:
[0054] The virtual effective vector V is synthesized using the basic voltage vectors V1(00) and V2(10). 12, the basic voltage vectors V2(10) and V3(11) are combined into a virtual effective vector V 23 , the basic voltage vectors V3(11) and V4(01) are combined into a virtual effective vector V 34 , the basic voltage vectors V4(01) and V1(00) are combined into a virtual effective vector V 41 , the synthesis principle is:
[0055]
[0056] The four basic voltage vectors are all effective vectors, and the virtual vector V 12 、V 23 、V 34 、V 41 is a valid vector; the virtual zero vector needs to select two of the four basic voltage vectors for synthesis, and the synthesis principle is:
[0057]
[0058] Furthermore, in (3) fault-tolerant SVPWM control, the action vector is selected to re-divide the six sectors, and the action order and action time of the action vector of each sector are determined. The specific method is as follows:
[0059] Re-divide into 6 sectors:
[0060] The four basic space vectors V1(00) and V3(11) are combined with the four virtual effective vectors V 12 、V 23 、V 34 、V 41 and virtual zero vector V 00 As the action vector of the synthetic reference vector, V1(00), V3(11), V 12 、V 23 、V 34 、V 41 The six action vectors have equal amplitudes, are symmetrical to each other, and differ from each other by 60° in space. Taking the α axis as the reference, they rotate 60° counterclockwise in sequence to obtain six sectors I, II, III, IV, V, and VI.
[0061] According to the seven-segment vector synthesis principle, the order of action of the action vectors of the synthetic reference vectors of each sector is determined:
[0062] First sector: V 00 V1 V 12 V 00 V 12 V1 V 00 ; Second sector: V 00 V 23 V 12 V00 V 12 V 23 V 00 ; The third sector: V 00 V 23 V3 V 00 V3 V 23 V 00 ; The fourth sector: V 00 V 34 V3 V 00 V3 V 34 V 00 ; Fifth sector: V 00 V 34 V 41 V 00 V 41 V 34 V 00 ; Sector 6: V 00 V1 V 41 V 00 V 41 V1 V 00 ;
[0063] Determine the action time of each sector action vector:
[0064] Define T x , T y , T z They are the action time of two adjacent effective vectors and virtual zero vector equivalent to each other in one cycle:
[0065]
[0066] That is, the action vectors of the first sector are V1, V 12 、V 00 , the action time is T x , T y , T z ; The action vector of the second sector is V 12 、V 23 、V 00 , the action time is T x , T y , T z ; The action vector of the third sector is V 23 , V3, V 00 , the action time is T x , T y , T z ; The action vectors of the fourth sector are V3, V 34 、V 00 , the action time is T x , Ty 、T z ; The action vector of the fifth sector is V 34 、V 41 、V 00 , the action time is T x 、T y 、T z ; The action vector of the sixth sector is V 41 , V1, V 00 , the action time is T x 、T y 、T z .
[0067] Furthermore, (3) fault-tolerant SVPWM control allocates the action time of the virtual vector to the four basic voltage vectors, and determines the action order and action time of the basic voltage vectors of the synthetic reference vector of each sector. The specific method is as follows:
[0068] The action time of the virtual vector is distributed to the four basic voltage vectors, and the action time of the basic voltage vector of the synthetic reference vector of each sector is determined:
[0069] According to the synthesis principle of virtual effective vector and virtual zero vector, the action time of virtual vector is reallocated to four basic voltage vectors, and the time of four basic voltage vectors V1(00), V2(10), V3(11), and V4(01) are defined as T1, T2, T3, and T4 respectively:
[0070] The basic voltage vectors used in the first sector are V1(00), V2(10), and V3(11), and their corresponding action times are
[0071]
[0072] The basic voltage vectors used in the second sector are V1(00), V2(10), and V3(11), and their corresponding action times are
[0073]
[0074] The basic voltage vectors used in the third sector are V1(00), V2(10), and V3(11), and their corresponding action times are
[0075]
[0076] The basic voltage vectors used in the fourth sector are V1(00), V4(01), and V3(11), and their corresponding action times are
[0077]
[0078] The basic voltage vectors used in the fifth sector are V1(00), V4(01), and V3(11), and their corresponding action times are
[0079]
[0080] The basic voltage vectors used in the sixth sector are V1(00), V4(01), and V3(11), and their corresponding action times are
[0081]
[0082] Determine the action time of the basic voltage vector:
[0083] Taking into account the minimum switching loss, according to the five-segment vector synthesis principle, the basic voltage vector action order of the boost three-phase four-switch topology is determined as:
[0084] The first, second, and third sectors: V1(00), V2(10), V3(11), V2(10), V1(00)
[0085] The fourth, fifth and sixth sectors: V1(00), V4(01), V3(11), V4(01), V1(00).
[0086] According to the action order and action time of the basic voltage vector, the action time of the switching state of the IGBT power switch tube is determined, and 4 PWM signals are generated to control the on and off of the IGBT power switch tube, thereby completing the fault-tolerant control of the boost motor driver.
[0087] Furthermore, according to the action order and action time of the basic voltage vector, the action time of the switch state of the IGBT power switch tube is determined, a PWM signal is generated, the on and off of the IGBT power switch tube is controlled, and the control of the normal three-phase motor driver is completed. The specific method is:
[0088] According to the action order and action time of the basic voltage vector and the switching point of the conduction time of the IGBT power switch tube, the action time of the switch state of the IGBT power switch tube is determined. The DPWM technology is used to modulate the switch state action time of the IGBT power switch tube with a triangular carrier whose frequency is the switching frequency of the IGBT power switch tube. At the same time, the on-off time of the IGBT power switch tube is added with the dead time to generate a PWM signal, which controls the on-off of the IGBT power switch tube to complete the control of the three-phase motor driver in multiple working states.
[0089] A control system for a three-phase motor driver with multiple working states implements the control method for the three-phase motor driver with multiple working states to achieve control of the driver in different working states.
[0090] A computer device comprises a memory, a processor and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the control method of a three-phase motor driver capable of multiple working states is implemented.
[0091] A computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the variable boost ratio three-phase motor driver fault-tolerant control method is implemented.
[0092] Compared with the prior art, the present invention has the following significant advantages: 1) The proposed topology realizes the combination of the common six-switch driver and the boost topology when only the bidirectional thyristor switch is added, and the new driver can realize multiple working states. By using fewer passive components and adding three additional bidirectional thyristors, the fault-tolerant function of the single-stage boost driver can be realized by changing the topology and control algorithm, and the size, cost, weight and complexity of the system can be reduced. 2) After switching the boost topology, the boost ratio is changed by changing the action time of the zero vector, and a variable boost ratio motor drive control method is realized. 3) After a fault occurs, the driver topology can be switched to a boost type three-phase four-topology and a corresponding control algorithm. The proposed new six-sector divided SVPWM modulation algorithm increases the DC side voltage without reducing the rated power, so that the system can still operate stably when the four switches are working in the fault-tolerant state. 4) In the fault-tolerant state, fault-tolerant control can be completed for all single-tube open circuit faults, all single-phase open circuit faults, all single-tube short circuit faults, and all single-phase short circuit faults, and the control difficulty is relatively low. BRIEF DESCRIPTION OF THE DRAWINGS
[0093] Figure 1 This is the topology diagram of a three-phase motor driver with multiple working states.
[0094] Figure 2 It is the control block diagram of the three-phase motor driver topology with multiple working states.
[0095] Figure 3(a) is a schematic diagram of the space vector circle of the ordinary three-phase six-switch and boost three-phase six-switch inverters; Figure 3(b) is a schematic diagram of the vector circle divided into six sectors when switching to the boost three-phase four-switch fault-tolerant topology in the event of a fault.
[0096] Figure 4 This is a variable step-up ratio three-phase six-motor driver topology and current flow diagram.
[0097] Figure 5 This is the topology and current flow diagram of the boost three-phase four-switch motor driver when phase A fails.
[0098] Figure 6(a) is a schematic diagram of the three-phase current of the motor when the boost topology is operating normally; Figure 6(b) is a schematic diagram of the motor speed when the boost topology is operating normally; Figure 6(c) is a schematic diagram of the electromagnetic torque of the motor when the boost topology is operating normally; Figure 6(d) is a schematic diagram of the DC power supply voltage U when the boost topology is operating normally In With the DC link capacitor voltage U dc Schematic diagram; Figure 6 (e) shows the DC power supply voltage U after changing the boost ratio during normal operation of the boost topology In With the DC link capacitor voltage U dc Schematic diagram;
[0099] Figure 7(a) is a schematic diagram of the three-phase current of the motor when the A-phase switch tube is operating at fault; Figure 7(b) is a schematic diagram of the electromagnetic torque of the motor when the A-phase switch tube is operating at fault; Figure 7(c) is a schematic diagram of the motor speed when the A-phase switch tube is operating at fault.
[0100] Figure 8(a) is a schematic diagram of the three-phase current of the motor when the A-phase switch tube is in fault-tolerant operation; Figure 8(b) is a schematic diagram of the electromagnetic torque of the motor when the A-phase switch tube is in fault-tolerant operation; Figure 8(c) is a schematic diagram of the motor speed when the A-phase switch tube is in fault-tolerant operation; Figure 8(d) is a schematic diagram of the DC power supply voltage U when the A-phase switch tube is in fault-tolerant operation In With the DC link capacitor voltage U dc Schematic diagram. DETAILED DESCRIPTION
[0101] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0102] Figure 1 It is a topological diagram of a motor driver with multiple working states and fault-tolerant function. It consists of a three-phase six-switch two-level drive inverter, a boost topology and several switching devices. Each phase of the three-phase six-switch consists of two upper and lower bridge arms. There are six bridge arms in total for the three phases. The six bridge arms are composed of six IGBT power switch tubes S1~S6 and six diodes D1~D6 connected in parallel with the power switch tubes. Each of the upper and lower bridge arms of the three phases A, B, and C is connected in series with a fast fuse, and a total of 6 fast fuses F1~F6 are used; the DC power supply U In The positive electrode is first connected to the bidirectional thyristor S7 and then to the upper bridge arms of the three-phase bridge arms A, B, and C. The DC power supply U In The negative pole is connected to the lower bridge arm of the three-phase bridge arm A phase, B phase, and C phase respectively. The midpoints of the upper and lower bridge arms of the three-phase A, B, and C phases are connected to the a, b, and c phase winding ends of the permanent magnet synchronous motor respectively. a 、i b 、i cis the current flowing through the a, b, and c phase winding ends of the motor.
[0103] Two capacitors C f The positive electrode of the series capacitor is connected to the bidirectional thyristor S8, and then connected to the bidirectional thyristor S7. The negative electrode of the series capacitor is connected to the DC power supply U In The negative poles are connected, and the two capacitors C f The midpoint of is connected to the midpoints of the upper and lower bridge arms of the three phases A, B, and C respectively through three bidirectional thyristors TR1, TR2, and TR3, and then connected to the a, b, and c three-phase winding ends of the permanent magnet synchronous motor respectively; the DC power supply U In The positive electrode is first connected to the bidirectional thyristor S9 and then to the inductor L1. The other end of the inductor L1 is connected to the positive electrodes of the diodes D7, D8 and D9. The negative electrodes of the diodes D7, D8 and D9 are connected to the three-phase winding ends a, b and c respectively.
[0104] Figure 2 It is a control block diagram of a motor driver with multiple working states and fault-tolerant function. In normal operation, the bidirectional thyristor S7 is turned on, the bidirectional thyristor S8 and the bidirectional thyristor S9 are turned off, and the operation is in the ordinary three-phase six-switch topology; when the DC power supply cannot meet the full power of the motor, the bidirectional thyristor S7 is turned off, the bidirectional thyristor S8 and the bidirectional thyristor S9 are turned on, and the topology is switched from the ordinary three-phase six-switch topology to the variable step-up ratio three-phase six-switch topology; when a short-circuit fault occurs in a bridge arm IGBT power switch tube of the driver, the corresponding fast fuse blows, or a direct open-circuit fault occurs, the bidirectional thyristor S7 is turned off, the bidirectional thyristor S8 and the bidirectional thyristor S9 are turned on, and the bidirectional thyristor TR1, TR2 or TR3 connected to the corresponding phase of the faulty IGBT power switch tube is turned on, and the switch is switched to the boost-type three-phase four-switch topology.
[0105] The multi-working state three-phase motor driver adopts double closed-loop operation of speed outer loop and current inner loop. The speed loop uses the motor speed obtained by the acquisition, and inputs the difference with the reference speed into the PI regulator to output the q-axis current reference value; the current loop uses the zero d-axis as the d-axis current reference value, and then collects the three-phase current and the motor electrical angle, obtains the d and q-axis currents through Park transformation, and respectively inputs the difference with the d and q-axis current reference values into the PI regulator, outputs the d and q-axis voltage reference values, and obtains the α and β-axis voltage reference values U through Park inverse transformation. α , U β ;Change U α , U β , input into the normal SVPWM control module, variable boost SVPWM control module and fault-tolerant SVPWM control module corresponding to different working states, generate a signal to control the on and off of the IGBT gate, and the gate signal is input into the topology corresponding to different working states.
[0106] In view of the above-mentioned circuit topology and control block diagram thereof, the multi-working state three-phase motor driver and control method thereof of the present invention include the following:
[0107] (1) Normal SVPWM control, the specific method is:
[0108] Step 1, determine the basic voltage vector during normal operation:
[0109] FIG3(a) is a schematic diagram of the space vector circle of the common three-phase six-switch inverter and the boost three-phase six-switch inverter. The common three-phase six-switch topology has a total of 8 voltage state combinations in the three-phase six bridge arms, that is, 8 switch states, corresponding to 8 space voltage vectors, namely: V0 (000), V1 (100), V2 (110), V3 (010), V4 (011), V5 (001), V6 (101), V7 (111), where V0 (000), V1 (100), V2 (110), V3 (010), V4 (011), V5 (001), V6 (101), V7 (111). V7 (111) is the zero vector, and the other six V1 (100), V2 (110), V3 (010), V4 (011), V5 (001), and V6 (101) are valid vectors. The function value "1" in the brackets indicates that the upper bridge arm switch of the phase is turned on, and the function value "0" indicates that the lower bridge arm switch of the phase is turned on. The first function value indicates the switching state of phase A, the second function value indicates the switching state of phase B, and the third function value indicates the switching state of phase C.
[0110] Step 2: Determine the basic voltage vector of the synthetic reference vector of each sector:
[0111] Taking the α axis as the reference, rotate 60° counterclockwise to obtain 6 sectors I, II, III, IV, V, and VI. In sector I, the basic voltage vectors V0(000), V1(100), V2(110), and V7(111) are used to synthesize the reference vector. In sector II, the basic voltage vectors V0(000), V2(110), V3(010), and V7(111) are used to synthesize the reference vector. In sector III, the basic voltage vectors V0(000), V3(010), and V7(111) are used to synthesize the reference vector. The basic voltage vectors V0(000), V4(011), V5(001), V7(111) are used as the synthetic reference vectors in sector IV; the basic voltage vectors V0(000), V5(001), V6(101), V7(111) are used as the synthetic reference vectors in sector V; the basic voltage vectors V0(000), V6(101), V1(100), V7(111) are used as the synthetic reference vectors in sector VI;
[0112] Step 3: According to the basic voltage vector of each sector's synthetic reference vector and the seven-segment vector synthesis principle, the action order of the basic voltage vector of each sector is obtained as shown in Table 1:
[0113] Table 1 Basic voltage vector action order table for each sector
[0114] Sector Number Basic voltage vector action sequence I <![CDATA[V0(000)V1(100)V2(110)V7(111)V2(110)V1(100)V0(000)]]> II <![CDATA[V0(000)V3(010)V2(110)V7(111)V2(110)V3(010)V0(000)]]> III <![CDATA[V0(000)V3(010)V4(011)V7(111)V4(011)V3(010)V0(000)]]> IV <![CDATA[V0(000)V5(001)V4(011)V7(111)V4(011)V5(001)V0(000)]]> V <![CDATA[V0(000)V5(001)V6(101)V7(111)V6(101)V5(001)V0(000)]]> VI <![CDATA[V0(000)V1(100)V6(101)V7(111)V6(101)V1(100)V0(000)]]>
[0115] Step 4, determine the action time of the basic voltage vector of each sector:
[0116] Define T1, T2, and T0 as the action time of two effective vectors and zero vector in the basic voltage vector of the synthetic reference vector within one cycle:
[0117]
[0118] Among them, T s is the sampling period, and the action time of the basic voltage vector of each sector is shown in Table 2:
[0119] Table 2 Basic voltage vector action schedule
[0120]
[0121]
[0122] Step 5, according to the action order and action time of the basic voltage vector, determine the action time of the switching state of the IGBT power switch tube, generate 6 PWM signals, control the on and off of the IGBT power switch tube, and complete the control of the normal three-phase motor driver.
[0123] (2) Variable boost SVPWM control: According to the DC power supply situation, the variable boost ratio three-phase six-switch topology is switched, the action time of the basic voltage vector of each sector is recalculated, and then the action order and action time of the basic voltage vector are calculated. The specific method is as follows:
[0124] Step 1, determine the inductor discharge time and inductor charging time:
[0125] The seven switching states corresponding to the basic voltage vectors V0 (000), V1 (100), V2 (110), V3 (010), V4 (011), V5 (001), and V6 (101) are inductor charging states, and the corresponding conduction time is the inductor charging time. The switching state corresponding to the basic voltage vector V7 (111) is the inductor discharging state, and the corresponding conduction time is the discharging time.
[0126] Step 2, define the duty cycle D:
[0127]
[0128] Where Tu is the inductor discharge time, Tw is the inductor charging time, and Ts is the sampling cycle time;
[0129] Step 3, define the boost gain X:
[0130] When the inductor is charged, the capacitor is discharged to supply power to the back-end load. When the inductor is discharged, the capacitor is charged to store energy. During the sampling period, the voltage across the two capacitors Cf after the boost is determined according to the inductor volt-second balance principle:
[0131]
[0132] From the above formula, we can know that when the time proportion of the charge and discharge switch state is changed, the boost ratio can be changed. The boost gain X is now defined as:
[0133]
[0134] Step 4: Based on the boost control strategy, reallocate the action time of the zero vector:
[0135] Changing the time of the basic voltage vector V7 (111) in the inductor discharge state can change the boost ratio. Let the action time of the V7 (111) state be T n , then the action time of V7(111) is:
[0136]
[0137] Sure:
[0138] That is, the action time of the basic voltage vector of each sector after adjustment is shown in Table 3:
[0139] Table 3 Basic voltage vector action schedule after modulation
[0140]
[0141] Step 5, according to the basic voltage vector action order and basic voltage vector action time, determine the action time of the IGBT power switch tube switch state, generate 6 PWM signals, IGBT control the power switch tube on and off, and complete the control of the variable boost ratio three-phase motor driver.
[0142] (3) Fault-tolerant SVPWM control reconstructs the basic voltage vector when a single tube or single phase fails and synthesizes a virtual vector. The specific method is as follows:
[0143] Step 1: Reconstruct the basic voltage vector when a single-tube or single-phase fault occurs:
[0144] When the A phase fails, it is controlled by the four switch tubes of the upper and lower bridge arms of the B and C phases. When the B phase fails, it is controlled by the four switch tubes of the upper and lower bridge arms of the C and A phases. When the C phase fails, it is controlled by the four switch tubes of the upper and lower bridge arms of the A and B phases. Since the faults include open circuit faults and short circuit faults, the bidirectional thyristor actions corresponding to the open circuit faults are shown in Table 4:
[0145] Table 4 Bidirectional thyristor actions corresponding to different switch tube open circuit faults
[0146]
[0147]
[0148] When a short circuit fault occurs in the switch tube, the fast fuse of the corresponding switch tube blows, converting the short circuit fault into an open circuit fault. The actions of the bidirectional thyristor and the fast fuse corresponding to the short circuit fault are shown in Table 5;
[0149] Table 5 Bidirectional thyristor and fast fuse actions corresponding to different switch tube short circuit faults
[0150]
[0151] After a single-tube or single-phase fault occurs, the motor winding of the faulty phase is connected to the midpoint of the capacitor through the opened bidirectional thyristor, and only the four power switch tubes IGBTs of the upper and lower bridge arms of the other two non-faulty phases work normally. Take the A phase fault as an example. Figure 5 As shown in FIG. 6 , the boost three-phase motor driver is controlled and operated by the four switch tubes IGBT. There are 4 voltage state combinations, namely 4 switch states, corresponding to 4 basic voltage vectors, namely: V1 (00), V2 (10), V3 (11), V4 (01), and the four basic voltage vectors are all valid vectors. The states of the switch tubes corresponding to different faults are shown in Table 6:
[0152] Table 6 The status of the switch tube corresponding to different faults
[0153]
[0154] In the table, Sa, Sb, and Sc respectively represent the switching states of the power devices on the three-phase bridge arms A, B, and C. The function value "1" indicates that the switch tube of the upper bridge arm of the phase is turned on, and the function value "0" indicates that the switch tube of the lower bridge arm of the phase is turned on.
[0155] After a fault occurs in one of the three phases A, B, and C, the four basic voltage vectors V1(00), V2(10), V3(11), and V4(01) are arranged in a clockwise order in the plane, and each adjacent vector is 90° apart. There are four sectors in the plane. In order to simplify the calculation of the reference vector after the fault of each phase, the positive direction of the coordinate axis α and β is set as the positive direction of the basic voltage vector V1(00) and V2(10). The reference vector V ref The projection on the α and β axes is U α , U β ;
[0156] Step 2, synthesize virtual vectors, including virtual effective vectors and virtual zero vectors:
[0157] The virtual effective vector V is synthesized using the basic voltage vectors V1(00) and V2(10). 12 , the basic voltage vectors V2(10) and V3(11) are combined into a virtual effective vector V 23 , the basic voltage vectors V3(11) and V4(01) are combined into a virtual effective vector V 34 , the basic voltage vectors V4(01) and V1(00) are combined into a virtual effective vector V 41 , the synthesis principle is:
[0158]
[0159] The four basic voltage vectors are all effective vectors, and the virtual vector V 12 、V 23 、V 34 、V 41 To be a valid vector, the virtual zero vector needs to select two of the four basic voltage vectors for synthesis. The synthesis principle is:
[0160]
[0161] Select the action vector to re-divide the sectors into 6 sectors, and determine the action order and action time of the action vectors in each sector. The specific method is as follows:
[0162] Step 3: Re-divide the partition into 6 sectors:
[0163] The four basic space vectors V1(00) and V3(11) are combined with the four virtual effective vectors V 12 、V 23 、V 34 、V 41 and virtual zero vector V 00 As the action vector of the synthetic reference vector, V1(00), V3(11), V 12 、V 23 、V 34 、V 41 The six action vectors have equal amplitudes, are symmetrical to each other, and differ from each other by 60° in space. Taking the α axis as the reference, they rotate 60° counterclockwise in sequence to obtain six sectors I, II, III, IV, V, and VI.
[0164] Step 4: According to the seven-segment vector synthesis principle, determine the action order of the action vectors of the synthetic reference vectors of each sector. The action order of the action vectors of each sector is shown in Table 7.
[0165] Table 7 Action order of action vectors
[0166]
[0167]
[0168] Step 5, determine the action time of each sector action vector:
[0169] Define T x , T y , T z They are the action time of two adjacent effective vectors and virtual zero vector equivalent to each other in one cycle:
[0170]
[0171] Where Ts is the sampling period;
[0172] That is, the action time of each sector action vector is shown in Table 8:
[0173] Table 8 Action vector action time table
[0174]
[0175] The action time of the virtual vector is allocated to the four basic voltage vectors, and the action order and action time of the basic voltage vectors of the synthetic reference vector of each sector are determined. The specific method is as follows:
[0176] Step 6: Allocate the action time of the virtual vector to the four basic voltage vectors, and determine the action time of the basic voltage vector of the synthetic reference vector of each sector:
[0177] According to the synthesis principle of virtual effective vector and virtual zero vector, the action time of virtual vector is reallocated to four basic voltage vectors, and the time of four basic voltage vectors V1(00), V2(10), V3(11) and V4(01) are defined as T1, T2, T3 and T4 respectively. The action time of basic voltage vector of each sector is shown in Table 9:
[0178] Table 9 Basic voltage vector action time of each sector
[0179]
[0180] Step 7, determine the action time of the basic voltage vector:
[0181] Taking into account the minimum switching loss, according to the five-segment vector synthesis principle, the basic voltage vector action order of the boost three-phase four-switch topology is determined as:
[0182] The first, second, and third sectors: V1(00), V2(10), V3(11), V2(10), V1(00)
[0183] The fourth, fifth and sixth sectors: V1(00), V4(01), V3(11), V4(01), V1(00);
[0184] Step 8, according to the action order and action time of the basic voltage vector, determine the action time of the switching state of the IGBT power switch tube, generate 4 PWM signals, control the on and off of the IGBT power switch tube, and complete the fault-tolerant control of the boost motor driver.
[0185] Among them, according to the action order and action time of the basic voltage vector, the action time of the IGBT power switch tube switch state is determined, a PWM signal is generated, the IGBT power switch tube is controlled to be on and off, and the control of the normal three-phase motor driver is completed. The specific method is:
[0186] According to the action order and action time of the basic voltage vector and the switching point of the conduction time of the IGBT power switch tube, the action time of the switch state of the IGBT power switch tube is determined. The DPWM technology is used to modulate the switch state action time of the IGBT power switch tube with a triangular carrier whose frequency is the switching frequency of the IGBT power switch tube. At the same time, the on-off time of the IGBT power switch tube is added with the dead time to generate a PWM signal, which controls the on-off of the IGBT power switch tube to complete the control of the three-phase motor driver in multiple working states.
[0187] A three-phase electric driver with multiple working states and a control system thereof are used to implement the three-phase electric motor driver control method with multiple working states.
[0188] A computer device comprises a memory, a processor and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the control method of a three-phase motor driver capable of multiple working states is implemented.
[0189] A computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the variable boost ratio three-phase motor driver fault-tolerant control method is implemented.
[0190] The present invention switches the topology to different working states according to different situations, and switches the corresponding control algorithm at the same time. In a fault state, by acquiring fault information and changing the corresponding system hardware topology and control algorithm, it can realize state recovery in the case of open circuit fault or short circuit fault of all single tubes or double tubes in the same bridge arm, achieve high power quality and full load fault-tolerant operation, and improve the reliability and stability of the motor drive system.
[0191] Example 1
[0192] In this implementation case, when the DC side power supply is insufficient, the DC voltage decreases, resulting in a decrease in power and failing to meet the operating requirements. The topology is switched to a three-phase six-switch topology with a variable boost ratio to achieve a boost in the DC side voltage. The boost effect is shown in FIG6(d). When the input DC power supply U In When the voltage is 100V, the DC side capacitor voltage U dc It can be increased to 250V, and the fluctuation of several volts is a normal phenomenon of capacitor charging and discharging. The three-phase current of the motor in normal operation after the topology change is shown in Figure 6(a). The current waveform is a normal sinusoidal current waveform without any distortion. The electromagnetic torque of the motor in normal operation after the topology change is shown in Figure 6(b). The electromagnetic torque is about 15N*m. The speed of the motor in normal operation after the topology change is shown in Figure 6(c). The speed is 60rad / s. It can be seen from the operating status of the torque and speed that the motor runs smoothly. Figure 6(e) shows that the boost ratio can be changed by controlling the above-mentioned boost factor. When the input DC power supply U In When the voltage is 100V, the DC side capacitor voltage U dc It can be increased to 340V. From the above, it can be seen that the variable boost ratio three-phase six-switch drive system can cope with the unstable system operation caused by different degrees of DC power supply voltage drop.
[0193] Example 2
[0194] In this implementation case, when a single-tube or single-phase fault occurs, the topology is switched to a boost three-phase four-switch fault-tolerant topology, and the fault-tolerant control method is operated. Taking the A-phase switch tube fault as an example, Figure 7(a) shows the three-phase current of the motor during fault operation after the A-phase switch tube fails. It can be seen from the figure that the amplitude of the three-phase current increases sharply, and the waveform is no longer a sinusoidal current waveform, and asymmetry and distortion occur; Figure 7(b) shows the electromagnetic torque of the motor during the A-phase fault operation, and it can be seen from the figure that the electromagnetic torque of the motor oscillates sharply; Figure 7(c) shows the motor speed during the A-phase fault operation, and it can be seen from the figure that the speed fluctuates violently. The motor is out of control at this time, and the entire system is in a state of collapse.
[0195] The three-phase current of the motor during operation after switching the fault-tolerant topology is shown in 8(a). It can be seen from the figure that the three-phase current basically recovers to the sinusoidal waveform state during normal operation; the electromagnetic torque of the motor during operation after switching the fault-tolerant topology is shown in 8(b). The electromagnetic torque also recovers to the state during normal operation. The electromagnetic torque is about 15N*m, and the motor runs smoothly; the motor speed during operation after switching the fault-tolerant topology is shown in 8(c). The motor speed recovers to the state during normal operation, and the speed is 60rad / s; the DC power supply voltage U In With the DC link capacitor voltage U dc As shown in Figure 8(d), when the input DC power supply U InWhen the voltage is 100V, the DC side capacitor voltage U dc It can be increased to about 250V.
[0196] From the above analysis results, it can be seen that the fault-tolerant control method of the variable boost ratio three-phase six-switch motor driver can play a good control role in the current, speed, torque, and DC side capacitor voltage after a single-tube or single-phase failure of the driver, thereby enhancing the reliability of the motor driver system and enabling the system to operate continuously and stably.
[0197] The above two embodiments show that the method proposed in the present invention can enable the motor drive system to switch different topologies under different circumstances and realize operation in multiple working states.
[0198] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0199] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.
Claims
1. A three-phase motor driver with multiple working states, characterized in that: It consists of a three-phase six-switch two-level drive converter, an additional boost topology, and a switch device for topology reconstruction, wherein: (1) Three-phase six-switch two-level drive inverter: Each phase of the three-phase six-switch two-level drive inverter consists of two upper and lower bridge arms. There are six bridge arms in total for the three phases A, B, and C. The six bridge arms are composed of six IGBT power switch tubes S1~S6 and six diodes D1~D6 connected in parallel with the power switch tubes. The upper and lower bridge arms of each phase of the three phases A, B, and C are connected in series with a fast fuse, and a total of 6 fast fuses F1~F6 are used; the DC power supply U In The positive electrode is first connected to the bidirectional thyristor S7 and then to the upper bridge arms of the three-phase bridge arms A, B, and C. The DC power supply U In The negative pole is connected to the lower bridge arm of the three-phase bridge arm A phase, B phase, and C phase respectively. The midpoints of the upper and lower bridge arms of the three-phase A, B, and C phases are connected to the a, b, and c phase winding ends of the permanent magnet synchronous motor respectively. a 、i b 、i c is the current flowing through the a, b, and c phase winding ends of the motor; (2) Additional boost topology and switching devices for topology reconstruction: Two capacitors C f The positive electrode of the series capacitor is connected to the bidirectional thyristor S8, and then connected to the bidirectional thyristor S7. The negative electrode of the series capacitor is connected to the DC power supply U In The negative poles are connected, and the two capacitors C f The midpoint of is connected to the midpoints of the upper and lower bridge arms of the three phases A, B, and C respectively through three bidirectional thyristors TR1, TR2, and TR3, and then connected to the a, b, and c three-phase winding ends of the permanent magnet synchronous motor respectively; the DC power supply U In The positive electrode is first connected to the bidirectional thyristor S9 and then to the inductor L1. The other end of the inductor L1 is connected to the positive electrodes of the diodes D7, D8 and D9. The negative electrodes of the diodes D7, D8 and D9 are connected to the three-phase winding ends a, b and c respectively.
2. The multi-working state three-phase motor driver according to claim 1, characterized in that: When operating normally, the bidirectional thyristor S7 is turned on, and the bidirectional thyristor S8 and the bidirectional thyristor S9 are turned off, operating in a common three-phase six-switch topology; When the DC power supply cannot meet the full power of the motor, the bidirectional thyristor S7 is turned off, and the bidirectional thyristor S8 and the bidirectional thyristor S9 are turned on, and the topology is switched from the ordinary three-phase six-switch topology to the variable step-up ratio three-phase six-switch topology; When a short circuit fault occurs in a bridge arm IGBT power switch tube of the driver and the corresponding fast fuse blows, or a direct open circuit fault occurs, the bidirectional thyristor S7 is turned off, the bidirectional thyristor S8 and the bidirectional thyristor S9 are turned on, and the bidirectional thyristor TR1, TR2 or TR3 connected to the corresponding phase of the faulty IGBT power switch tube is turned on, switching to a boost type three-phase four-switch topology structure.
3. The multi-working state three-phase motor driver according to claim 2, characterized in that: The multi-working state three-phase motor driver adopts double closed-loop operation of speed outer loop and current inner loop. The speed loop uses the motor speed obtained by the acquisition, and inputs the difference with the reference speed into the PI regulator to output the q-axis current reference value; the current loop uses the zero d-axis as the d-axis current reference value, and then collects the three-phase current and the motor electrical angle, obtains the d and q-axis currents through Park transformation, and respectively inputs the difference with the d and q-axis current reference values into the PI regulator, outputs the d and q-axis voltage reference values, and obtains the α and β-axis voltage reference values U through Park inverse transformation. α , U β ;Change U α , U β , input into the normal SVPWM control module, variable boost SVPWM control module and fault-tolerant SVPWM control module corresponding to different working states, generate a signal to control the on and off of the IGBT gate, and the gate signal is input into the topology corresponding to different working states.
4. A control method for a three-phase motor driver in multiple working states, characterized in that: The control is completed based on the multi-working state three-phase electric drive according to any one of claims 1 to 3, including: (1) Normal SVPWM control During normal operation, the bidirectional thyristor S7 is turned on, and the bidirectional thyristor S8 and the bidirectional thyristor S9 are turned off, and the operation is carried out in the common three-phase six-switch topology. The normal SVPWM control first determines the basic voltage vector of the synthetic reference vector of each sector during the normal operation of the common three-phase six-switch topology, as well as the action order and action time of the basic voltage vector. Then, according to the action order and action time of the basic voltage vector, the action time of the switch state of the IGBT power switch tube is determined, and 6 PWM signals are generated to control the on and off of the IGBT power switch tube, thereby completing the control of the normal three-phase motor driver. (2) Variable boost SVPWM control When the DC power supply cannot meet the full power of the motor, turn off the bidirectional thyristor S7, turn on the bidirectional thyristor S8 and the bidirectional thyristor S9, and switch to the variable step-up ratio three-phase six-switch topology. In The energy is fed back to the front-end capacitor C f In order to achieve the boost effect, the variable boost SVPWM control first determines the inductor discharge time and inductor charging time, defines the duty cycle and boost gain, and then recalculates the action time of the basic voltage vector of each sector based on the boost control strategy. Then, according to the action order and action time of the basic voltage vector, the action time of the IGBT power switch tube switching state is determined, and 6 PWM signals are generated. The IGBT controls the power switch tube on and off, and completes the control of the variable boost ratio three-phase motor driver. (3) Fault-tolerant SVPWM control When a short-circuit fault occurs in a power switch tube of a bridge arm of the driver, the corresponding fast fuse blows, or a direct open-circuit fault occurs, it switches to a boost-type three-phase four-switch topology. The fault-tolerant SVPWM control uses a new modulation algorithm similar to six switches. First, the basic voltage vector in the case of a single-tube or single-phase fault is reconstructed, and a virtual vector is synthesized; then the action vector is selected to be re-divided into 6 sectors, and the action order and action time of the action vector of the synthetic reference vector of each sector are determined; then the action time of the virtual vector is allocated to the four basic voltage vectors, and the action order and action time of the basic voltage vector of the synthetic reference vector of each sector are determined; finally, according to the action order and action time of the basic voltage vector, the action time of the switching state of the IGBT power switch tube is determined, thereby generating 4 PWM signals to control the on and off of the IGBT power switch tube to complete the fault-tolerant control of the boost-type motor driver.
5. The control method of a three-phase motor driver with multiple working states according to claim 4, characterized in that: (1) Normal SVPWM control, the specific method is: Determine the basic voltage vector during normal operation: The common three-phase six-switch topology has a total of 8 voltage state combinations in the three-phase six-bridge arms, that is, 8 switch states, corresponding to 8 basic voltage vectors, namely: V0 (000), V1 (100), V2 (110), V3 (010), V4 (011), V5 (001), V6 (101), V7 (111), among which V0 (000) and V7 (111) are zero vectors, and the other six V1 (100), V2 (110), V3 (010), V4 (011), V5 (001), V6 (101) are valid vectors. The function value "1" in the brackets indicates that the upper bridge arm switch tube is turned on, and the function value "0" indicates that the lower bridge arm switch tube is turned on. The first function value indicates the switch state of phase A, the second function value indicates the switch state of phase B, and the third function value indicates the switch state of phase C. The basic voltage vector that determines the synthetic reference vector for each sector is: Taking the α axis as the reference, rotate 60° counterclockwise to obtain 6 sectors I, II, III, IV, V, and VI. In sector I, the basic voltage vectors V0(000), V1(100), V2(110), and V7(111) are used to synthesize the reference vector. In sector II, the basic voltage vectors V0(000), V2(110), V3(010), and V7(111) are used to synthesize the reference vector. In sector III, the basic voltage vectors V0(000), V3(010), and V7(111) are used to synthesize the reference vector. The basic voltage vectors V0(000), V4(011), V5(001), V7(111) are used as the synthetic reference vectors in sector IV; the basic voltage vectors V0(000), V5(001), V6(101), V7(111) are used as the synthetic reference vectors in sector V; the basic voltage vectors V0(000), V6(101), V1(100), V7(111) are used as the synthetic reference vectors in sector VI; According to the basic voltage vector of each sector's synthetic reference vector and the seven-segment vector synthesis principle, the action order of the basic voltage vector of each sector is obtained: Sector I: V0(000)V1(100)V2(110)V7(111)V2(110)V1(100)V0(000), Sector II: V0(000)V3(010)V2(110)V7(111)V2(110)V3(010)V0(000), Sector III: V0(000)V3(010)V4(011)V7(111)V4(011)V3(010)V0(000) , sector IV: V0(000)V5(001)V4(011)V7(111)V4(011)V5(001)V0(000), sector V: V0(000)V5(001)V6(101)V7(111)V6(101)V5(001)V0(000), sector VI: V0(000)V1(100)V6(101)V7(111)V6(101)V1(100)V0(000); Determine the action time of the basic voltage vector of each sector: Define T1, T2, and T0 as the action time of two effective vectors and zero vector in the basic voltage vector of the synthetic reference vector within one cycle: Among them, T s is the sampling period, that is, in sector I, the action time of the basic voltage vector V1(100) is T1, the action time of V2(110) is T2, the action time of V0(000) is T0 / 2, and the action time of V7(111) is T0 / 2; in sector II, the action time of the basic voltage vector V2(110) is T1, the action time of V3(010) is T2, the action time of V0(000) is T0 / 2, and the action time of V7(111) is T0 / 2; in sector III, the action time of the basic voltage vector V3(010) is T1, the action time of V4(011) is T2, the action time of V0(000) is T0 / 2, and the action time of V7(111) is T0 / 2; in sector IV, the action time of the basic voltage vector V4 (011) is T1, the action time of V5 (001) is T2, the action time of V0 (000) is T0 / 2, and the action time of V7 (111) is T0 / 2; in sector V, the action time of the basic voltage vector V5 (001) is T1, the action time of V6 (101) is T2, the action time of V0 (000) is T0 / 2, and the action time of V7 (111) is T0 / 2; in sector VI, the action time of the basic voltage vector V6 (101) is T1, the action time of V1 (100) is T2, the action time of V0 (000) is T0 / 2, and the action time of V7 (111) is T0 / 2; According to the action order and action time of the basic voltage vector, the action time of the switching state of the IGBT power switch tube is determined, and 6 PWM signals are generated to control the on and off of the IGBT power switch tube, thereby completing the control of the normal three-phase motor driver.
6. The control method of a three-phase motor driver with multiple working states according to claim 5, characterized in that: (2) Variable boost SVPWM control: According to the DC power supply situation, the variable boost ratio three-phase six-switch topology is switched, the action time of the basic voltage vector of each sector is recalculated, and then the action order and action time of the basic voltage vector are calculated. The specific method is as follows: Determine the inductor discharge time and inductor charging time: The seven switching states corresponding to the basic voltage vectors V0 (000), V1 (100), V2 (110), V3 (010), V4 (011), V5 (001), and V6 (101) are inductor charging states, and the corresponding conduction time is the inductor charging time. The switching state corresponding to the basic voltage vector V7 (111) is the inductor discharging state, and the corresponding conduction time is the discharging time. Define the duty cycle D: Where, T u is the inductor discharge time, T w is the inductor charging time, T s is the sampling cycle time; Define the boost gain X: When the inductor is charged, the capacitor is discharged to supply power to the back-end load. When the inductor is discharged, the capacitor is charged to store energy. During the sampling period, the two capacitors C after the boost are determined according to the inductor volt-second balance principle. f The voltage across the terminals is: From the above formula, we know that when the time proportion of the charge and discharge switch state is changed, the boost ratio can be changed. The boost gain X is now defined as: Based on the boost control strategy, the action time of the zero vector is redistributed: Changing the time of the basic voltage vector V7 (111) in the inductor discharge state can change the boost ratio. Let the action time of the V7 (111) state be T n , then the action time of V7(111) is: That is, the action time of the basic voltage vector of each sector after adjustment is obtained. In sector I, the action time of the basic voltage vector V1 (100) is T1, the action time of V2 (110) is T2, and the action time of V0 (000) is T0-T n , the action time of V7(111) is T n In sector II, the basic voltage vector V2 (110) is used for a duration of T1, the duration of V3 (010) is T2, and the duration of V0 (000) is T0-T n , the action time of V7(111) is T n ; In sector III, the action time of the basic voltage vector V3 (010) is T1, the action time of V4 (011) is T2, and the action time of V0 (000) is T0-T n , the action time of V7(111) is T n ; The action time of the basic voltage vector V4 (011) used in sector IV is T1, the action time of V5 (001) is T2, and the action time of V0 (000) is T0-T n , the action time of V7(111) is T n ; The action time of the basic voltage vector V5 (001) used in sector V is T1, the action time of V6 (101) is T2, and the action time of V0 (000) is T0-T n , the action time of V7(111) is T n ; The action time of the basic voltage vector V6 (101) used in sector VI is T1, the action time of V1 (100) is T2, and the action time of V0 (000) is T0-T n , the action time of V7(111) is T n ; According to the basic voltage vector action sequence and basic voltage vector action time, the action time of the IGBT power switch state is determined, and 6 PWM signals are generated. The IGBT controls the on and off of the power switch to complete the control of the variable boost ratio three-phase motor driver.
7. The control method of a three-phase motor driver with multiple working states according to claim 4, characterized in that: (3) In fault-tolerant SVPWM control, the basic voltage vector when a single tube or single phase fails is reconstructed and a virtual vector is synthesized. The specific method is as follows: Reconstruct the basic voltage vector when a single tube or single phase fault occurs: After a single-tube or single-phase fault occurs, the motor winding of the faulty phase is connected to the midpoint of the capacitor through the opened bidirectional thyristor, and only the four power switch tubes IGBT of the upper and lower bridge arms of the other two non-faulty phases work normally. The boost three-phase motor driver is controlled and operated by four IGBT power switch tubes. There are 4 voltage state combinations, that is, 4 switch states, corresponding to 4 basic voltage vectors, namely: V1(00), V2(10), V3(11), V4(01), and the four basic voltage vectors are all valid vectors; after a phase among the three phases A, B, and C fails, the four basic voltage vectors V1(00), V2(10), V3(11), and V4(01) are arranged clockwise in the plane, and each adjacent vector is 90° apart. There are four sectors in the plane. In order to simplify the calculation of the reference vector after the failure of each phase, the positive direction of the coordinate axes α and β is set as the positive direction of the basic voltage vectors V1(00) and V2(10). The reference vector V ref The projection on the α and β axes is U α , U β ; Synthesize virtual vectors, including virtual effective vectors and virtual zero vectors: The virtual effective vector V is synthesized using the basic voltage vectors V1(00) and V2(10). 12 , the basic voltage vectors V2(10) and V3(11) are combined into a virtual effective vector V 23 , the basic voltage vectors V3(11) and V4(01) are combined into a virtual effective vector V 34 , the basic voltage vectors V4(01) and V1(00) are combined into a virtual effective vector V 41 , the synthesis principle is: The four basic voltage vectors are all effective vectors, and the virtual vector V 12 、V 23 、V 34 、V 41 is a valid vector; the virtual zero vector needs to select two of the four basic voltage vectors for synthesis, and the synthesis principle is:
8. The control method of a three-phase motor driver with multiple working states according to claim 7, characterized in that: (3) In fault-tolerant SVPWM control, the action vector is selected to re-divide the six sectors, and the action order and action time of the action vector of each sector are determined. The specific method is as follows: Re-divide into 6 sectors: The four basic space vectors V1(00) and V3(11) are combined with the four virtual effective vectors V 12 、V 23 、V 34 、V 41 and virtual zero vector V 00 As the action vector of the synthetic reference vector, V1(00), V3(11), V 12 、V 23 、V 34 、V 41 The six action vectors have equal amplitudes, are symmetrical to each other, and differ from each other by 60° in space. Taking the α axis as the reference, they rotate 60° counterclockwise in sequence to obtain six sectors I, II, III, IV, V, and VI. According to the seven-segment vector synthesis principle, the order of action of the action vectors of the synthetic reference vectors of each sector is determined: First sector: V 00 V1 V 12 V 00 V 12 V1 V 00 ; Second sector: V 00 V 23 V 12 V 00 V 12 V 23 V 00 ; The third sector: V 00 V 23 V3 V 00 V3 V 23 V 00 ; The fourth sector: V 00 V 34 V3 V 00 V3 V 34 V 00 ; Fifth sector: V 00 V 34 V 41 V 00 V 41 V 34 V 00 ; Sector 6: V 00 V1 V 41 V 00 V 41 V1 V 00 ; Determine the action time of each sector action vector: Define T x 、T y 、T z They are the action time of two adjacent effective vectors and virtual zero vector equivalent to each other in one cycle: That is, the action vectors of the first sector are V1, V 12 、V 00 , the action time is T x 、T y 、T z ; The action vector of the second sector is V 12 、V 23 、V 00 , the action time is T x 、T y 、T z ; The action vector of the third sector is V 23 , V3, V 00 , the action time is T x 、T y 、T z ; The action vectors of the fourth sector are V3, V 34 、V 00 , the action time is T x 、T y 、T z ; The action vector of the fifth sector is V 34 、V 41 、V 00 , the action time is T x 、T y 、T z ; The action vector of the sixth sector is V 41 , V1, V 00 , the action time is T x 、T y 、T z .
9. The control method of a three-phase motor driver with multiple working states according to claim 7, characterized in that: (3) Fault-tolerant SVPWM control, which allocates the action time of the virtual vector to the four basic voltage vectors, and determines the action order and action time of the basic voltage vectors of the synthetic reference vector of each sector. The specific method is as follows: The action time of the virtual vector is distributed to the four basic voltage vectors, and the action time of the basic voltage vector of the synthetic reference vector of each sector is determined: According to the synthesis principle of virtual effective vector and virtual zero vector, the action time of virtual vector is reallocated to four basic voltage vectors, and the time of four basic voltage vectors V1(00), V2(10), V3(11), and V4(01) are defined as T1, T2, T3, and T4 respectively: The basic voltage vectors used in the first sector are V1(00), V2(10), and V3(11), and their corresponding action times are The basic voltage vectors used in the second sector are V1(00), V2(10), and V3(11), and their corresponding action times are The basic voltage vectors used in the third sector are V1(00), V2(10), and V3(11), and their corresponding action times are The basic voltage vectors used in the fourth sector are V1(00), V4(01), and V3(11), and their corresponding action times are The basic voltage vectors used in the fifth sector are V1(00), V4(01), and V3(11), and their corresponding action times are The basic voltage vectors used in the sixth sector are V1(00), V4(01), and V3(11), and their corresponding action times are Determine the action time of the basic voltage vector: Taking into account the minimum switching loss, according to the five-segment vector synthesis principle, the basic voltage vector action order of the boost three-phase four-switch topology is determined as: The first, second, and third sectors: V1(00), V2(10), V3(11), V2(10), V1(00) The fourth, fifth, and sixth sectors: V1(00), V4(01), V3(11), V4(01), V1(00), According to the action order and action time of the basic voltage vector, the action time of the switching state of the IGBT power switch tube is determined, and 4 PWM signals are generated to control the on and off of the IGBT power switch tube, thereby completing the fault-tolerant control of the boost motor driver.
10. The control method of a three-phase motor driver with multiple working states according to claim 4, characterized in that: According to the basic voltage vector action sequence and action time, determine the action time of the IGBT power switch tube switch state, generate PWM signal, control the IGBT power switch tube on and off, and complete the control of the normal three-phase motor driver. The specific method is: According to the action order and action time of the basic voltage vector and the switching point of the conduction time of the IGBT power switch tube, the action time of the switch state of the IGBT power switch tube is determined. The DPWM technology is used to modulate the switch state action time of the IGBT power switch tube with a triangular carrier whose frequency is the switching frequency of the IGBT power switch tube. At the same time, the on-off time of the IGBT power switch tube is added with the dead time to generate a PWM signal, which controls the on-off of the IGBT power switch tube to complete the control of the three-phase motor driver in multiple working states.
Citation Information
Patent Citations
Two failure fault-tolerant methods of dual-input DC-AC converter
CN108448884A
Boost type three-phase electric driver and fault-tolerant control method thereof
CN115149884A
Full fault-tolerant ANPC three-level inverter and fault-tolerant control method thereof
CN116436324A
O-Z source grid-connected inverter with fault-tolerant control
CN116545290A
Motor-driven apparatus, and freezing and air conditioning apparatus
JP2014075976A