Comprehensive utilization method of wastewater and waste gas in sodium modification vanadium extraction

Through acidic and alkaline wastewater leaching technology, the utilization problem of waste gas and wastewater during sodium vanadium extraction is solved, and efficient recycling of vanadium and sodium salts is achieved, reducing production costs and meeting environmental protection requirements.

CN119075635APending Publication Date: 2024-12-06CHENGDE YANBEI METALLURGY MATERIAL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411182983.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-27
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

The waste gas and wastewater generated during sodium vanadium extraction cannot be effectively utilized, resulting in excessive flue gas and increased vanadium loss.

Method used

The first leaching and the second leaching of alkaline vanadium sedimentation wastewater are used to perform acid vanadium sedimentation wastewater after deamination, and vanadium recycling and sodium salt recycling are carried out respectively. Flue gas purification and resource recovery are achieved through multi-stage leaching and gas-liquid contact.

Benefits of technology

The flue gas purification is achieved, vanadium loss is reduced, production costs are reduced, and sodium salt is recovered through evaporation and crystallization, meeting environmental protection requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure BDA0005012741460000091
    Figure BDA0005012741460000091
Patent Text Reader

Abstract

The invention relates to a comprehensive utilization method of waste water and waste gas in sodium modification vanadium extraction, in particular to the field of waste water and waste gas treatment.The comprehensive utilization method comprises the steps that flue gas generated by sodium modification vanadium extraction is sequentially subjected to first leaching and second leaching, and qualified tail gas is obtained; in the first leaching step, acidic vanadium precipitation wastewater is adopted for leaching; carrying out vanadium recovery on leacheate obtained by the first leaching; in the second leaching step, the deaminated alkaline vanadium precipitation wastewater is used for leaching; and carrying out sodium salt recovery on the leacheate obtained by the second leaching. According to the comprehensive utilization method provided by the invention, the waste gas and the waste liquid generated in sodium modification vanadium extraction are reasonably utilized, the waste gas generated in sodium modification vanadium extraction is purified, valuable components in the waste gas and the waste liquid are recycled, and valuable resources are efficiently recycled.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of wastewater and waste gas treatment, and in particular to a comprehensive utilization method of wastewater and waste gas in sodium vanadium extraction. Background Art

[0002] At present, vanadium pentoxide is widely used in metallurgy, chemical industry and other industries, mainly used for smelting ferrovanadium, vanadium nitrogen alloy and other deep-processing products. The production raw material is vanadium slag refined by converter, and the main production equipment is rotary kiln and three-step melting furnace.

[0003] For example, CN112575138A discloses a method for extracting vanadium from a converter to reduce the residual vanadium content. The method for extracting vanadium from a converter provided by the present invention comprises the following steps: adding molten iron containing vanadium into a converter, shaking the converter, blowing CO2 from the bottom of the converter, and simultaneously using an oxygen lance to blow O2 from the top, adding a coolant within 2 minutes of starting the blowing, switching the bottom blowing CO2 to N2 at 3-4 minutes of starting the blowing, and blowing to the end point to obtain vanadium slag.

[0004] CN113913620A discloses a method for extracting vanadium from vanadium slag by sodiumization, which belongs to the field of hydrometallurgical technology. The method comprises the following steps: a. mixing sodium bisulfate and vanadium slag in a molar ratio of Na:V=(1-3):1, mixing them evenly, and calcining them in an oxidizing atmosphere for 1-3h to obtain clinker; b. leaching the clinker at a liquid-solid ratio (mL / g)=(1-3):1 at a temperature of 80-100°C, filtering to obtain a vanadium-containing solution and vanadium-extracting tailings; c. detecting the residual vanadium content of the vanadium-extracting tailings, and calculating the vanadium extraction rate; d. extracting vanadium from the vanadium-containing solution, and disposing of the vanadium-extracting tailings.

[0005] In the process of sodium vanadium extraction, the rotary kiln and the three-step melting furnace use converter gas as fuel. After the flue gas is treated by cyclone dust removal and bag dust removal, some particulate matter and nitrogen oxides are discharged from the chimney, resulting in the flue gas exceeding the emission standard and failing to meet the emission standard. The discharge of vanadium-containing particulate matter increases vanadium loss. At the same time, the vanadium precipitation process in the process will produce a large amount of vanadium precipitation wastewater. Summary of the invention

[0006] In view of the problems existing in the prior art, the purpose of the present invention is to provide a method for comprehensive utilization of waste water and waste gas in sodium vanadium extraction, so as to solve the defect that the waste gas and waste water generated in the sodium vanadium extraction process cannot be effectively utilized.

[0007] To achieve this object, the present invention adopts the following technical solutions:

[0008] The present invention provides a method for comprehensive utilization of waste water and waste gas in sodium vanadium extraction, the comprehensive utilization method comprising:

[0009] The flue gas generated by sodium vanadium extraction is subjected to a first leaching and a second leaching in sequence to obtain qualified tail gas;

[0010] The first elution includes eluting with acidic vanadium precipitation wastewater; the elution liquid obtained by the first elution is used to recover vanadium;

[0011] The second elution includes eluting with alkaline vanadium precipitation wastewater after deammoniation; and the elution liquid obtained by the second elution is used to recover sodium salt.

[0012] The comprehensive utilization method provided by the present invention reasonably utilizes the waste gas and waste liquid generated in the sodium vanadium extraction, realizes the purification of the waste gas generated in the sodium vanadium extraction, and simultaneously realizes the recovery of valuable components in the waste gas and waste liquid, thereby realizing the efficient recovery of valuable resources.

[0013] As a preferred technical solution of the present invention, the acidic vanadium precipitation wastewater used in the first elution includes the acidic vanadium precipitation wastewater produced by the vanadium precipitation process of sodium vanadium extraction.

[0014] Preferably, the pH value of the acidic vanadium precipitation wastewater used in the first elution is 1.5-2.5.

[0015] As a preferred technical solution of the present invention, the deaminated alkaline vanadium precipitation wastewater used in the second elution includes the wastewater obtained after deammoniation of the acidic vanadium precipitation wastewater produced in the vanadium precipitation process of sodium vanadium extraction.

[0016] Preferably, the pH value of the deammoniation alkaline vanadium precipitation wastewater used in the second elution is 10-12.

[0017] As a preferred technical solution of the present invention, the first elution includes at least three stages of elution.

[0018] As a preferred technical solution of the present invention, the liquid-gas ratio L / Nm in the elution equipment in the first elution 3 It is (5-10):1.

[0019] As a preferred technical solution of the present invention, the gas-liquid contact time in the elution device in the first elution is 6-8s.

[0020] As a preferred technical solution of the present invention, the second elution includes at least three stages of elution.

[0021] As a preferred technical solution of the present invention, the liquid-gas ratio in the elution equipment in the second elution is L / Nm 3 It is (5-10):1.

[0022] As a preferred technical solution of the present invention, the gas-liquid contact time in the elution device during the second elution is 6-8s.

[0023] As a preferred technical solution of the present invention, the method of recovering the sodium salt from the eluent obtained by the second elution includes evaporation and crystallization.

[0024] Compared with the prior art solutions, the present invention has the following beneficial effects:

[0025] (1) Both acid washing and alkaline washing use production wastewater, and no separate wastewater is generated, which greatly reduces production costs.

[0026] (2) Use acid washing to recover vanadium from flue gas and reduce vanadium loss.

[0027] (3) Evaporating and crystallizing the wastewater to recover sodium salt and realize comprehensive utilization of resources.

[0028] (4) The flue gas meets the emission standards and environmental protection requirements after acid washing and alkali washing and spraying. DETAILED DESCRIPTION

[0029] To better illustrate the present invention and facilitate understanding of the technical solution of the present invention, typical but non-limiting embodiments of the present invention are as follows:

[0030] This embodiment provides a method for comprehensive utilization of wastewater and waste gas in sodium vanadium extraction, and the comprehensive utilization method comprises:

[0031] The flue gas generated by sodium vanadium extraction is subjected to a first leaching and a second leaching in sequence to obtain qualified tail gas;

[0032] The first elution includes eluting with acidic vanadium precipitation wastewater; the elution liquid obtained by the first elution is used to recover vanadium;

[0033] The second elution includes eluting with alkaline vanadium precipitation wastewater after deammoniation; and the elution liquid obtained by the second elution is used to recover sodium salt.

[0034] Wherein, the acidic vanadium precipitation wastewater used in the first elution includes the acidic vanadium precipitation wastewater generated by the vanadium precipitation process of sodium vanadium extraction.

[0035] Among them, the pH value of the acidic vanadium precipitation wastewater used in the first elution is 1.5-2.5, for example, it can be 1.5, 1.6, 1.7, 1.8, 1.9, 2, 2.1, 2.2, 2.3, 2.4 or 2.5, but is not limited to the listed values, and other unlisted values ​​within this range also meet the requirements.

[0036] The deaminated alkaline vanadium precipitation wastewater used in the second elution includes the acidic vanadium precipitation wastewater produced in the vanadium precipitation process of sodium vanadium extraction and obtained by deammoniation.

[0037] Among them, the pH value of the alkaline vanadium precipitation wastewater after deammoniation used in the second elution is 10-12, for example, it can be 10, 10.2, 10.4, 10.6, 10.8, 11, 11.2, 11.4, 11.6, 11.8 or 12, but is not limited to the listed values, and other unlisted values ​​within the range also meet the requirements.

[0038] Among them, the first elution includes at least 3 levels of elution, for example, it can be level 3, level 4, level 5 or level 6, but is not limited to the listed values, and other unlisted values ​​within the range also meet the requirements.

[0039] Among them, the liquid-to-gas ratio in the elution equipment during the first elution is L / Nm 3 The ratio is (5-10):1, for example, 5:1, 5.5:1, 6:1, 6.5:1, 7:1, 7.5:1, 8:1, 8.5:1, 9:1, 9.5:1 or 10:1, but is not limited to the listed values, and other values ​​not listed within the range also meet the requirements.

[0040] Among them, the gas-liquid contact time in the elution equipment in the first elution is 6-8s, for example, it can be 6s, 6.2s, 6.4s, 6.6s, 6.8s, 7s, 7.2s, 7.4s, 7.6s, 7.8s or 8s, but is not limited to the listed values, and other unlisted values ​​within the range also meet the requirements.

[0041] Wherein, the second elution includes at least 3 levels of elution, for example, it can be level 3, level 4, level 5 or level 6, etc., but is not limited to the listed values, and other unlisted values ​​within the range also meet the requirements.

[0042] Among them, the liquid-to-gas ratio in the elution equipment in the second elution is L / Nm3 (5-10):1, for example, it can be 5:1, 5.5:1, 6:1, 6.5:1, 7:1, 7.5:1, 8:1, 8.5:1, 9:1, 9.5:1 or 10:1, but is not limited to the listed values, and other unlisted values ​​within the range also meet the requirements.

[0043] Among them, the gas-liquid contact time in the elution equipment in the second elution is 6-8s, for example, it can be 6s, 6.2s, 6.4s, 6.6s, 6.8s, 7s, 7.2s, 7.4s, 7.6s, 7.8s or 8s, but is not limited to the listed values, and other unlisted values ​​within the range also meet the requirements.

[0044] Wherein, the method for recovering the sodium salt from the eluent obtained from the second elution includes evaporation and crystallization.

[0045] Furthermore, the process of recovering vanadium from the eluent obtained from the first elution is briefly as follows: vanadium in the flue gas enters the wastewater, and after the wastewater is treated by vanadium precipitation, the iron vanadate obtained by vanadium precipitation can enter the production system for further vanadium extraction.

[0046] Furthermore, the sodium salt recovery of the eluent obtained from the second elution can be carried out by using the primary decarbonization, the secondary hardness removal, the tertiary impurity removal and the MVR evaporation technology to recover the sodium salt, thereby realizing the efficient utilization of the salt in the eluent.

[0047] Further, in order to illustrate that the comprehensive utilization method of wastewater and waste gas in sodium vanadium extraction provided by the present invention can achieve good treatment effects, an actual example is used for illustration. In the following example, the particle content in the flue gas is 50 mg / L and the nitrogen oxide content is 150 mg / L, as follows:

[0048] Example 1

[0049] This embodiment provides a method for comprehensive utilization of wastewater and waste gas in sodium vanadium extraction, the comprehensive utilization method comprising:

[0050] The flue gas generated by sodium vanadium extraction is subjected to a first leaching and a second leaching in sequence to obtain qualified tail gas;

[0051] The first elution includes eluting with acidic vanadium precipitation wastewater;

[0052] The second elution includes eluting with alkaline vanadium precipitation wastewater after deammoniation;

[0053] The acidic vanadium precipitation wastewater used in the first leaching is the acidic vanadium precipitation wastewater produced in the vanadium precipitation process of sodium vanadium extraction; the pH value of the acidic vanadium precipitation wastewater used in the first leaching is 2.2; the first leaching is a three-stage leaching; the liquid-gas ratio L / Nm in the leaching equipment in the first leaching is 3 is 8:1; the gas-liquid contact time in the elution device in the first elution is 7.5s;

[0054] The eluate obtained by the first elution is subjected to vanadium recovery;

[0055] The deaminated alkaline vanadium precipitation wastewater used in the second elution is the wastewater obtained by deammoniation of the acidic vanadium precipitation wastewater produced in the vanadium precipitation process of sodium vanadium extraction; the pH value of the deaminated alkaline vanadium precipitation wastewater used in the second elution is 11.5; the second elution is a 5-stage elution; the liquid-gas ratio in the elution equipment in the second elution is L / Nm 3 is 7:1; the gas-liquid contact time in the elution device in the second elution is 7s;

[0056] The sodium salt is recovered from the eluent obtained from the second elution; and the sodium salt is recovered from the eluent obtained from the second elution by evaporation and crystallization.

[0057] The composition of the obtained qualified tail gas and the vanadium recovery rate are shown in Table 1.

[0058] Example 2

[0059] This embodiment provides a method for comprehensive utilization of wastewater and waste gas in sodium vanadium extraction, the comprehensive utilization method comprising:

[0060] The flue gas generated by sodium vanadium extraction is subjected to a first leaching and a second leaching in sequence to obtain qualified tail gas;

[0061] The first elution includes eluting with acidic vanadium precipitation wastewater;

[0062] The second elution includes eluting with alkaline vanadium precipitation wastewater after deammoniation;

[0063] The acidic vanadium precipitation wastewater used in the first leaching is the acidic vanadium precipitation wastewater produced in the vanadium precipitation process of sodium vanadium extraction; the pH value of the acidic vanadium precipitation wastewater used in the first leaching is 2; the first leaching is a 5-stage leaching; the liquid-gas ratio L / Nm in the leaching equipment in the first leaching is 3 is 6:1; the gas-liquid contact time in the elution device in the first elution is 7s;

[0064] The eluate obtained by the first elution is subjected to vanadium recovery;

[0065] The deaminated alkaline vanadium precipitation wastewater used in the second elution is the wastewater obtained by deammoniation of the acidic vanadium precipitation wastewater produced in the vanadium precipitation process of sodium vanadium extraction; the pH value of the deaminated alkaline vanadium precipitation wastewater used in the second elution is 11; the second elution is a 4-stage elution; the liquid-gas ratio in the elution equipment in the second elution is L / Nm 3 is 8:1; the gas-liquid contact time in the elution device in the second elution is 6.5s;

[0066] The sodium salt is recovered from the eluent obtained from the second elution; and the sodium salt is recovered from the eluent obtained from the second elution by evaporation and crystallization.

[0067] The composition of the obtained qualified tail gas and the vanadium recovery rate are shown in Table 1.

[0068] Example 3

[0069] This embodiment provides a method for comprehensive utilization of wastewater and waste gas in sodium vanadium extraction, the comprehensive utilization method comprising:

[0070] The flue gas generated by sodium vanadium extraction is subjected to a first leaching and a second leaching in sequence to obtain qualified tail gas;

[0071] The first elution includes eluting with acidic vanadium precipitation wastewater;

[0072] The second elution includes eluting with alkaline vanadium precipitation wastewater after deammoniation;

[0073] The acidic vanadium precipitation wastewater used in the first leaching is the acidic vanadium precipitation wastewater produced in the vanadium precipitation process of sodium vanadium extraction; the pH value of the acidic vanadium precipitation wastewater used in the first leaching is 2.5; the first leaching is a three-stage leaching; the liquid-gas ratio L / Nm in the leaching equipment in the first leaching is 3 is 101; the gas-liquid contact time in the elution device in the first elution is 8s;

[0074] The eluate obtained by the first elution is subjected to vanadium recovery;

[0075] The deaminated alkaline vanadium precipitation wastewater used in the second elution is the wastewater obtained by deammoniation of the acidic vanadium precipitation wastewater produced in the vanadium precipitation process of sodium vanadium extraction; the pH value of the deaminated alkaline vanadium precipitation wastewater used in the second elution is 12; the second elution is a 4-stage elution; the liquid-gas ratio in the elution equipment in the second elution is L / Nm 3 is 5:1; the gas-liquid contact time in the elution device in the second elution is 6s;

[0076] The sodium salt is recovered from the eluent obtained by the second elution; and the sodium salt is recovered from the eluent obtained by the second elution by evaporation and crystallization.

[0077] The composition of the obtained qualified tail gas and the vanadium recovery rate are shown in Table 1.

[0078] Example 4

[0079] This embodiment provides a method for comprehensive utilization of wastewater and waste gas in sodium vanadium extraction, the comprehensive utilization method comprising:

[0080] The flue gas generated by sodium vanadium extraction is subjected to a first leaching and a second leaching in sequence to obtain qualified tail gas;

[0081] The first elution includes eluting with acidic vanadium precipitation wastewater;

[0082] The second elution includes eluting with alkaline vanadium precipitation wastewater after deammoniation;

[0083] The acidic vanadium precipitation wastewater used in the first leaching is the acidic vanadium precipitation wastewater produced in the vanadium precipitation process of sodium vanadium extraction; the pH value of the acidic vanadium precipitation wastewater used in the first leaching is 1.5; the first leaching is a 5-stage leaching; the liquid-gas ratio L / Nm in the leaching equipment in the first leaching is 3 is 5:1; the gas-liquid contact time in the elution device in the first elution is 6s;

[0084] The eluate obtained by the first elution is subjected to vanadium recovery;

[0085] The deaminated alkaline vanadium precipitation wastewater used in the second elution is the wastewater obtained by deammoniation of the acidic vanadium precipitation wastewater produced in the vanadium precipitation process of sodium vanadium extraction; the pH value of the deaminated alkaline vanadium precipitation wastewater used in the second elution is 10; the second elution is a three-stage elution; the liquid-gas ratio in the elution equipment in the second elution is L / Nm 3 is 10:1; the gas-liquid contact time in the elution device in the second elution is 8s;

[0086] The sodium salt is recovered from the eluent obtained from the second elution; and the sodium salt is recovered from the eluent obtained from the second elution by evaporation and crystallization.

[0087] The composition of the obtained qualified tail gas and the vanadium recovery rate are shown in Table 1.

[0088] Comparative Example 1

[0089] The only difference from Example 1 is that the pH value of the acidic vanadium precipitation wastewater used is 4. The composition of the obtained qualified tail gas and the vanadium recovery rate are shown in Table 1.

[0090] Comparative Example 2

[0091] The only difference from Example 1 is that the pH value of the acidic vanadium precipitation wastewater after deammoniation is 8. The composition of the obtained qualified tail gas and the vanadium recovery rate are shown in Table 1.

[0092] In the present invention, the vanadium recovery rate is calculated based on the vanadium in the flue gas and the vanadium in the eluent obtained by the first elution.

[0093] Table 1

[0094]

[0095] As can be seen from Table 1, the solution provided by the present invention uses pentavalent vanadium as a strong acid medium, and its main existing form is V 5+ The use of acidic wastewater can better recover vanadium in flue gas. Nitrogen oxides are generally acidic groups. When the pH value of the aqueous solution is above 7.5, which is alkaline, nitrogen oxides can be effectively removed.

[0096] It is stated that the present invention illustrates the detailed structural features of the present invention through the above embodiments, but the present invention is not limited to the above detailed structural features, that is, it does not mean that the present invention must rely on the above detailed structural features to be implemented. Those skilled in the art should understand that any improvement of the present invention, equivalent replacement of the components selected by the present invention, addition of auxiliary components, selection of specific methods, etc., all fall within the protection scope and disclosure scope of the present invention.

[0097] The preferred embodiments of the present invention are described in detail above. However, the present invention is not limited to the specific details in the above embodiments. Within the technical concept of the present invention, a variety of simple modifications can be made to the technical solution of the present invention, and these simple modifications all belong to the protection scope of the present invention.

[0098] It should also be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable manner without contradiction. In order to avoid unnecessary repetition, the present invention will not further describe various possible combinations.

[0099] In addition, various embodiments of the present invention may be arbitrarily combined, and as long as they do not violate the concept of the present invention, they should also be regarded as the contents disclosed by the present invention.

Claims

1. A method for comprehensive utilization of waste water and waste gas in sodium vanadium extraction, It is characterized in that The comprehensive utilization method comprises: The flue gas generated by sodium vanadium extraction is subjected to a first leaching and a second leaching in sequence to obtain qualified tail gas; The first elution includes eluting with acidic vanadium precipitation wastewater; the elution liquid obtained by the first elution is used to recover vanadium; The second elution includes eluting with alkaline vanadium precipitation wastewater after deammoniation; and the elution liquid obtained by the second elution is used to recover sodium salt.

2. The comprehensive utilization method according to claim 1, It is characterized in that The acidic vanadium precipitation wastewater used in the first elution includes the acidic vanadium precipitation wastewater generated in the vanadium precipitation process of sodium vanadium extraction; The pH value of the acidic vanadium precipitation wastewater used in the first elution is 1.5-2.

5.

3. The comprehensive utilization method according to claim 1, It is characterized in that The deaminated alkaline vanadium precipitation wastewater used in the second elution includes the acidic vanadium precipitation wastewater produced in the vanadium precipitation process of sodium vanadium extraction after deammoniation; The pH value of the deammoniation alkaline vanadium precipitation wastewater used in the second elution is 10-12.

4. The comprehensive utilization method according to claim 1, It is characterized in that The first washing comprises at least three stages of washing.

5. The comprehensive utilization method according to claim 1, It is characterized in that The liquid-to-gas ratio in the elution device during the first elution is L / Nm 3 It is (5-10):

1.

6. The comprehensive utilization method according to claim 1, It is characterized in that The gas-liquid contact time in the elution device during the first elution is 6-8s.

7. The comprehensive utilization method according to claim 1, It is characterized in that The second washing comprises at least three levels of washing.

8. The comprehensive utilization method according to claim 1, It is characterized in that The liquid-to-gas ratio in the elution equipment during the second elution is L / Nm 3 It is (5-10):

1.

9. The comprehensive utilization method according to claim 1, It is characterized in that The gas-liquid contact time in the elution device during the second elution is 6-8s.

10. The comprehensive utilization method as claimed in claim 1, It is characterized in that The method of recovering the sodium salt from the eluent obtained by the second elution includes evaporation and crystallization.