Frame assembly construction method for upper platform of offshore wind power booster station

By designing a frame assembly equipment including bottom mounting frame, sliding groove, rotating screw and servo motor on the upper platform of the offshore wind boost station, the problem of inconvenient frame erection is solved and more efficient component adjustment and stability are achieved , improve construction safety.

CN119083398AInactive Publication Date: 2024-12-06NANTONG SHIPPING COLLEGE
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411250466.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-06
Publication Date
2024-12-06
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

During the frame setting of the upper platform of the offshore wind power boost station, especially when erecting the frame at the bottom, it is inconvenient to use the crane, resulting in low construction efficiency and safety.

Method used

A frame assembly equipment including a bottom mounting frame, sliding groove, rotating screw, servo motor and hydraulic rod is designed. Through the cooperation of sliding blocks, rotating screw and servo motor, the angle adjustment and position adjustment of the frame assembly are realized, and the clamping is achieved. Holding and lifting operations improve assembly flexibility and stability.

Benefits of technology

This method improves the convenience of adjusting the clamping range of the frame assembly, increases the practicality and safety of the assembly equipment, avoids failures, and improves the stability and safety of construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083398A_ABST
    Figure CN119083398A_ABST
Patent Text Reader

Abstract

The invention discloses a frame assembly construction method for an upper platform of an offshore wind power booster station, and relates to the technical field of offshore wind power booster stations. The frame assembly construction method comprises a bottom mounting frame, a first sliding groove is formed in the top of the bottom mounting frame, and a first sliding block is slidably connected into the first sliding groove; the top of the first sliding block is rotationally connected with an upper mounting frame, a third sliding groove is formed in one side of the upper mounting frame, a first rotating lead screw is rotationally connected into the third sliding groove, and a third sliding block is slidably connected into the third sliding groove. The device has the beneficial effects that the clamping range of the frame assembly can be adjusted more conveniently by using the first sliding block with the angle and the position convenient to adjust, and the stability of the frame assembly during lifting can be improved while the device is used through the auxiliary lifting rope which is arranged above the side mounting frame and used for auxiliary lifting; the possibility of faults is avoided, and the safety is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of offshore wind power booster stations, and in particular to a frame assembly construction method for an upper platform of an offshore wind power booster station. Background Art

[0002] An offshore wind power booster station is a power gathering center for offshore wind farms and a key setting for power transmission and transformation. An offshore wind power booster station is generally composed of supporting pipe columns extending into the seabed below and a platform located on the upper part. Currently, the upper platforms of offshore wind power booster stations are mostly frame structures, formed by a combination of various types of frames. When erecting the frame, large equipment such as cranes are generally used for installation. However, it is inconvenient to use cranes when erecting frames at lower positions. Summary of the invention

[0003] In view of the deficiencies in the prior art, the present invention provides a frame assembly construction method for an upper platform of an offshore wind power booster station, which solves the problems raised in the above-mentioned background technology.

[0004] To achieve the above objectives, the present invention is implemented through the following technical solutions: a frame assembly device for the upper platform of an offshore wind power booster station, comprising a bottom mounting frame, a first sliding groove is provided on the top of the bottom mounting frame, a first sliding block is slidably connected inside the first sliding groove, an upper mounting frame is rotatably connected to the top of the first sliding block, a third sliding groove is provided on one side of the upper mounting frame, a first rotating screw rod is rotatably connected inside the third sliding groove, a third sliding block is slidably connected inside the third sliding groove, the first rotating screw rod passes through the third sliding block and is threadedly connected to the third sliding block, a side mounting frame is fixedly installed on one side of the third sliding block, and one side of the side mounting frame is rotatably connected to a rotating screw rod. A mounting frame, a first servo motor is fixedly installed on one side of the side mounting frame, an output end of the first servo motor penetrates into the interior of the side mounting frame and is fixedly connected to the rotating mounting frame, a clamping mounting frame is fixedly installed on one side of the rotating mounting frame, two fourth sliding grooves are provided on one side of the clamping mounting frame, the interiors of the two fourth sliding grooves are both rotatably connected with a second rotating screw rod, the interiors of the two fourth sliding grooves are both slidably connected with a fourth sliding block, the second rotating screw rod passes through the fourth sliding block and is threadedly connected to the fourth sliding block, a clamping mounting plate is fixedly installed on one side of the fourth sliding block, hydraulic rods are fixedly installed on the corresponding two sides of the clamping mounting plate, and a clamping plate is fixedly installed on the output end of the hydraulic rod.

[0005] Preferably, a fifth sliding groove is opened on one side of the clamping mounting plate, a fifth sliding block is slidably connected inside the fifth sliding groove, a connecting block is fixedly installed on the top of the fifth sliding block, and the connecting block is fixedly connected to the clamping plate.

[0006] Preferably, a second mounting groove is provided inside the clamping mounting frame and between the two fourth sliding grooves, one end of each of the two second rotating screw rods is inserted into the second mounting groove and fixedly installed with a first bevel gear, a sixth sliding groove is provided inside the clamping mounting frame and on one side of the second mounting groove, a sixth sliding block is slidably connected inside the sixth sliding groove, a second servo motor is fixedly installed on the top of the output end of the second servo motor, a first pulley is fixedly installed on the outer side of the output end of the second servo motor, and one side of the second servo motor is fixed An auxiliary mounting frame is installed, and a rotating tube is rotatably connected inside the auxiliary mounting frame, a second pulley is fixedly installed on the top of the rotating tube, a first connecting belt is sleeved on the outer side of the second pulley, and the second pulley is drivingly connected to the first pulley through the first connecting belt, a telescopic square tube is slidably connected inside the rotating tube, a telescopic spring is installed inside the rotating tube and above the telescopic square tube, an electromagnet is fixedly installed on the top of the inner wall of the rotating tube, a first gear is fixedly installed on the bottom of the telescopic square tube, and a fixed rack is installed on one side of the inner wall of the second mounting groove, and the fixed rack meshes with the first gear.

[0007] Preferably, a top mounting bracket is fixedly installed on the top of one side of the upper mounting bracket, the top mounting bracket is internally rotatably connected to a rope storage disk, the outer side of the rope storage disk is wound with an auxiliary lifting rope, one end of the auxiliary lifting rope is fixedly connected to the side mounting bracket, one side of the rope storage disk is fixedly installed with a first worm gear, the inner side of the top mounting bracket is rotatably connected to the first worm gear, the first worm gear cooperates with the first worm gear, a third servo motor is fixedly installed on the top of the upper mounting bracket, a third mounting slot is provided inside the upper mounting bracket and below the third servo motor, the output end of the third servo motor penetrates into the inside of the third mounting slot and is installed with a second worm gear, the bottom of the second worm gear is fixedly connected to the first rotating screw rod, the inner side of the third mounting slot is rotatably connected to the first connecting shaft, the first connecting shaft is fixedly connected to the first worm gear, the outer side of the first connecting shaft is fixedly installed with a second worm gear, and the second worm gear cooperates with the second worm gear.

[0008] Preferably, a fifth mounting groove is provided inside the upper mounting frame and located on one side of the third sliding groove, a plurality of emergency support plates are rotatably connected inside the fifth mounting groove, a bottom fastening support plate is fixedly installed inside the fifth mounting groove and located below the emergency support plate, a fourth mounting groove is provided inside the upper mounting frame, a rope storage shaft is rotatably connected inside the fourth mounting groove, a lifting rope is wound around the outer side of the rope storage shaft, a fourth servo motor is fixedly installed on one side of the upper mounting frame, an output end of the fourth servo motor is fixedly connected to the rope storage shaft, the lifting rope passes through a plurality of emergency support plates, and a plurality of knots are provided on the outer side of the lifting rope.

[0009] Preferably, a sixth mounting groove is provided inside the first sliding block, and a third worm gear is rotatably connected inside the sixth mounting groove, a fifth servo motor is fixedly installed on one side of the first sliding block, an output end of the fifth servo motor penetrates into the sixth mounting groove and is fixedly connected to the third worm gear, a third pulley is rotatably connected inside the sixth mounting groove, a third worm gear is fixedly installed on one side of the third pulley, the third worm gear cooperates with the third worm gear, a seventh mounting groove is provided inside the first sliding block and below the two third pulleys, a second gear is rotatably connected inside the seventh mounting groove, a fourth pulley is fixedly installed on one side of the second gear, a second connecting belt is sleeved on the outer side of the fourth pulley, and the fourth pulley is transmission connected to the third pulley via the second connecting belt.

[0010] Preferably, an eighth mounting groove is provided inside the first sliding block and above the sixth mounting groove, a second electric telescopic rod is installed on the top of the inner wall of the eighth mounting groove, the second electric telescopic rod is fixedly connected to the upper mounting frame, a third bevel gear is fixedly installed on the output end of the second electric telescopic rod, a fourth bevel gear is fixedly installed on the outer side of the third worm gear, and the third bevel gear is meshed with the fourth bevel gear.

[0011] Preferably, a first mounting groove is opened inside the bottom mounting frame and below the first sliding groove, a first electric telescopic rod is fixedly installed inside the first mounting groove, a connecting rack is fixedly installed on the top of the first electric telescopic rod, and the connecting rack is meshed with the second gear.

[0012] Preferably, a second sliding groove is provided inside the bottom mounting frame and on both sides corresponding to the first sliding groove, a second sliding block is fixedly installed on both sides corresponding to the first sliding block, the second sliding block is slidably connected to the second sliding groove, an auxiliary rotating groove is provided on the top of the first sliding block, and a plurality of auxiliary rotating blocks are fixedly installed on the bottom of the upper mounting frame, and the auxiliary rotating blocks are slidably connected to the auxiliary rotating grooves.

[0013] A construction method for a frame assembly device for an upper platform of an offshore wind power booster station comprises the following steps:

[0014] S1. Position adjustment of the first sliding block: the third worm is driven to rotate by the fifth servo motor, and the third pulley is driven to rotate by the cooperation of the third worm and the third worm wheel. When the third pulley rotates, the second connecting belt drives the fourth pulley to rotate. At this time, the second gear rotates. When the left and right positions of the first sliding block need to be adjusted, the first electric telescopic rod is used to raise the connecting rack and contact the second gear. When the second gear rotates, the first sliding block is driven to move.

[0015] S2. Angle adjustment of the upper mounting frame: When adjusting the angle of the upper mounting frame, the second electric telescopic rod is extended to make the third bevel gear descend and contact the fourth bevel gear, so that the fourth bevel gear drives the third bevel gear and the second electric telescopic rod to rotate, and at the same time drives the upper mounting frame to rotate;

[0016] S3, frame assembly clamping adjustment: the hydraulic rod is extended, and the clamping plate contacts the frame assembly for clamping. Due to the different lengths of the frame assemblies, the relative distance between the two clamping mounting plates needs to be adjusted. When making adjustments, the second servo motor is started to drive the first pulley to rotate, and the second pulley and the rotating tube are rotated under the drive of the first connecting belt. Due to the meshing of the first gear and the fixed rack, the second servo motor is driven to move. When the second servo motor moves to the side that needs to be adjusted, the second bevel gear contacts the corresponding first bevel gear. At this time, the electromagnet is energized, and the telescopic square tube is adsorbed upward by the electromagnet to cancel the meshing with the fixed rack, so that the second bevel gear and the first bevel gear drive the second rotating screw to rotate, and the relative position of the fourth sliding block and the clamping mounting plate is adjusted;

[0017] S4, the frame assembly rises: the third servo motor is started, and the first rotating screw is driven to rotate by the third servo motor, thereby driving the third sliding block to move, and driving the side mounting frame to rise. When the side mounting frame rises, the first worm can be driven to rotate by the cooperation of the second worm and the second worm wheel, and the rope storage plate is driven to rotate by the cooperation of the first worm wheel and the first worm, and the auxiliary lifting rope is used for auxiliary lifting;

[0018] S5. The frame assembly descends: the fourth servo motor is started, and the rope storage shaft is driven to rotate by the fourth servo motor so that the lifting rope is wound around the rope storage shaft. At the same time, the rope knot on the lifting rope rises, and when it contacts the emergency support plate, the emergency support plate is driven to tilt upward, so that all the emergency support plates are located inside the fifth mounting slot, and the third sliding block descends.

[0019] The present invention provides a frame assembly construction method for an upper platform of an offshore wind power booster station, which has the following beneficial effects:

[0020] 1. This frame assembly construction method for the upper platform of an offshore wind power booster station can more conveniently adjust the clamping range of the frame assembly by using a first sliding block that is easy to adjust the angle and position, and can increase the stability of the frame assembly during lifting and lowering by using an auxiliary lifting rope for auxiliary lifting above the side mounting frame, thereby avoiding the possibility of failure and improving safety.

[0021] 2. This frame assembly construction method for the upper platform of the offshore wind power booster station can adjust the positions of the two clamping mounting plates separately by using a segmented adjustment method, and during the adjustment, the second servo motor is started to drive the first pulley to rotate, and the second pulley and the rotating tube are rotated under the drive of the first connecting belt. Due to the engagement of the first gear and the fixed rack, the second servo motor can be driven to move. When the second servo motor moves to the side that needs to be adjusted, the second bevel gear contacts the corresponding first bevel gear. At this time, the electromagnet is energized, and the telescopic square tube is adsorbed upward by the electromagnet to cancel the engagement with the fixed rack, so that the second bevel gear and the first bevel gear drive the second rotating screw to rotate, thereby driving the two clamping mounting plates to be adjusted separately, thereby increasing the practicality of the assembly equipment and making it more convenient to use.

[0022] 3. This frame assembly construction method for the upper platform of an offshore wind power booster station can prevent the third sliding block from falling rapidly in the event of a fault, thereby increasing the safety of the device by providing a blocking device on the side of the third sliding groove to prevent the third sliding block from falling. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a schematic diagram of the structure of the present invention;

[0024] Figure 2 is a cross-sectional view of the clamping mounting frame of the present invention;

[0025] Figure 3 is a cross-sectional view of the clamping and mounting plate of the present invention;

[0026] Figure 4 is a schematic structural diagram of a first sliding block of the present invention;

[0027] Figure 5 For the present invention Figure 1 A in the enlarged view;

[0028] Figure 6 For the present invention Figure 1 The enlarged view of point B in the figure;

[0029] Figure 7 For the present invention Figure 1 The enlarged view of point C in the figure;

[0030] Figure 8 For the present invention Figure 2 The enlarged view of D in the figure;

[0031] Fig. 9 For the present invention Figure 5 The enlarged view of point E in the figure;

[0032] Fig.10 For the present invention Figure 6 Enlarged view of point F in FIG.

[0033] In the figure: 1, bottom mounting frame; 2, first sliding groove; 3, first sliding block; 4, first mounting groove; 5, first electric telescopic rod; 6, connecting rack; 7, second sliding groove; 8, second sliding block; 9, upper mounting frame; 10, third sliding groove; 11, first rotating screw rod; 12, third sliding block; 13, side mounting frame; 14, first servo motor; 15, rotating mounting frame; 16, clamping mounting frame; 17, fourth sliding groove; 18, second rotating screw rod; 19, Fourth sliding block; 20, clamping mounting plate; 21, hydraulic rod; 22, clamping plate; 23, fifth sliding groove; 24, fifth sliding block; 25, connecting block; 26, second mounting groove; 27, first bevel gear; 28, second servo motor; 29, second bevel gear; 30, first pulley; 31, auxiliary mounting frame; 32, rotating tube; 33, second pulley; 34, first connecting belt; 35, telescopic square tube; 36, telescopic spring; 37, electromagnet; 38 , first gear; 39, fixed rack; 40, top mounting frame; 41, rope storage plate; 42, auxiliary lifting rope; 43, first worm gear; 44, first worm; 45, third servo motor; 46, third mounting slot; 47, second worm; 48, first connecting shaft; 49, second worm gear; 50, fourth servo motor; 51, fourth mounting slot; 52, rope storage shaft; 53, lifting rope; 54, fifth mounting slot; 55, emergency support plate; 56, bottom fastening support plate ; 58. knot; 59. sixth mounting slot; 60. fifth servo motor; 61. third worm; 62. third pulley; 63. third worm gear; 64. second gear; 65. fourth pulley; 66. second connecting belt; 67. seventh mounting slot; 68. eighth mounting slot; 69. second electric telescopic rod; 70. third bevel gear; 71. fourth bevel gear; 72. auxiliary rotating slot; 73. auxiliary rotating block; 74. sixth sliding slot; 75. sixth sliding block. DETAILED DESCRIPTION

[0034] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0035] See also Figures 1 to 10 The present invention provides a technical solution: a frame assembly device for an upper platform of an offshore wind power booster station, comprising a bottom mounting frame 1, a first sliding groove 2 is provided on the top of the bottom mounting frame 1, a first sliding block 3 is slidably connected inside the first sliding groove 2, an upper mounting frame 9 is rotatably connected to the top of the first sliding block 3, a third sliding groove 10 is provided on one side of the upper mounting frame 9, a first rotating screw rod 11 is rotatably connected inside the third sliding groove 10, a third sliding block 12 is slidably connected inside the third sliding groove 10, the first rotating screw rod 11 passes through the third sliding block 12 and is threadedly connected to the third sliding block 12, a side mounting frame 13 is fixedly installed on one side of the third sliding block 12, a rotating mounting frame 15 is rotatably connected to one side of the side mounting frame 13, and a rotating mounting frame 15 is rotatably connected to one side of the side mounting frame 13. A first servo motor 14 is fixedly installed on the side, and the output end of the first servo motor 14 penetrates into the interior of the side mounting frame 13 and is fixedly connected to the rotating mounting frame 15. A clamping mounting frame 16 is fixedly installed on one side of the rotating mounting frame 15. Two fourth sliding grooves 17 are provided on one side of the clamping mounting frame 16. The interiors of the two fourth sliding grooves 17 are both rotatably connected with second rotating screw rods 18. The interiors of the two fourth sliding grooves 17 are both slidably connected with fourth sliding blocks 19. The second rotating screw rod 18 penetrates the fourth sliding block 19 and is threadedly connected to the fourth sliding block 19. A clamping mounting plate 20 is fixedly installed on one side of the fourth sliding block 19, and hydraulic rods 21 are fixedly installed on the corresponding two sides inside the clamping mounting plate 20, and a clamping plate 22 is fixedly installed on the output end of the hydraulic rod 21.

[0036] Among them, a fifth sliding groove 23 is opened on one side of the clamping mounting plate 20, and the fifth sliding groove 23 is internally slidably connected with a fifth sliding block 24. A connecting block 25 is fixedly installed on the top of the fifth sliding block 24. The connecting block 25 is fixedly connected to the clamping plate 22, so that the clamping plate 22 is more stable when moving.

[0037] Among them, a second mounting groove 26 is provided inside the clamping mounting frame 16 and between the two fourth sliding grooves 17, one end of the two second rotating screw rods 18 are inserted into the second mounting groove 26 and fixedly installed with a first bevel gear 27, a sixth sliding groove 74 is provided inside the clamping mounting frame 16 and located on one side of the second mounting groove 26, a sixth sliding block 75 is slidably connected inside the sixth sliding groove 74, the sixth sliding groove 74 and the sixth sliding block 75 are both "T"-shaped structures, a second servo motor 28 is fixedly installed on the top of the sixth sliding block 75, a second bevel gear 29 is fixedly installed on the top of the output end of the second servo motor 28, a first pulley 30 is fixedly installed on the outer side of the output end of the second servo motor 28, an auxiliary mounting frame 31 is fixedly installed on one side of the second servo motor 28, and the auxiliary mounting frame The inside of 31 is rotatably connected with a rotating tube 32, a second pulley 33 is fixedly installed on the top of the rotating tube 32, a first connecting belt 34 is sleeved on the outside of the second pulley 33, and the second pulley 33 is transmission-connected with the first pulley 30 through the first connecting belt 34, a telescopic square tube 35 is slidably connected inside the rotating tube 32, a telescopic spring 36 is installed inside the rotating tube 32 and above the telescopic square tube 35, the telescopic spring 36 is made of 304 steel, the inner wall of the rotating tube 32 and the top of the telescopic square tube 35 are both square structures, the telescopic square tube 35 is made of iron, an electromagnet 37 is fixedly installed on the top of the inner wall of the rotating tube 32, a first gear 38 is fixedly installed on the bottom of the telescopic square tube 35, a fixed rack 39 is installed on one side of the inner wall of the second mounting groove 26, and the fixed rack 39 is meshed with the first gear 38.

[0038] Among them, a top mounting frame 40 is fixedly installed on the top of one side of the upper mounting frame 9, and the top mounting frame 40 is internally rotatably connected to a rope storage disk 41, and an auxiliary lifting rope 42 is wound around the outside of the rope storage disk 41, and one end of the auxiliary lifting rope 42 is fixedly connected to the side mounting frame 13, and a first worm gear 43 is fixedly installed on one side of the rope storage disk 41, and the top mounting frame 40 is internally rotatably connected to a first worm 44, and the first worm gear 43 cooperates with the first worm 44, and a third servo motor 45 is fixedly installed on the top of the upper mounting frame 9. A third mounting groove 46 is provided inside the mounting frame 9 and below the third servo motor 45. The output end of the third servo motor 45 is inserted into the third mounting groove 46 and is provided with a second worm 47. The bottom of the second worm 47 is fixedly connected to the first rotating screw 11. A first connecting shaft 48 is rotatably connected inside the third mounting groove 46. The first connecting shaft 48 is fixedly connected to the first worm 44. A second worm wheel 49 is fixedly provided on the outer side of the first connecting shaft 48. The second worm wheel 49 cooperates with the second worm 47.

[0039] Among them, a fifth mounting groove 54 is opened inside the upper mounting frame 9 and located on one side of the third sliding groove 10, and a plurality of emergency support plates 55 are rotatably connected inside the fifth mounting groove 54, and a bottom fastening support plate 56 is fixedly installed inside the fifth mounting groove 54 and below the emergency support plate 55, and a fourth mounting groove 51 is opened inside the upper mounting frame 9, and a rope storage shaft 52 is rotatably connected inside the fourth mounting groove 51, and a lifting rope 53 is wound around the outer side of the rope storage shaft 52, and a fourth servo motor 50 is fixedly installed on one side of the upper mounting frame 9, and the output end of the fourth servo motor 50 is fixedly connected to the rope storage shaft 52, the lifting rope 53 passes through the plurality of emergency support plates 55, and a plurality of knots 58 are arranged on the outer side of the lifting rope 53.

[0040] Among them, a sixth mounting groove 59 is opened inside the first sliding block 3, and the third worm 61 is rotatably connected inside the sixth mounting groove 59. A fifth servo motor 60 is fixedly installed on one side of the first sliding block 3. The output end of the fifth servo motor 60 penetrates into the sixth mounting groove 59 and is fixedly connected to the third worm 61. The middle part of the third worm 61 is not provided with a thread. The third pulley 62 is rotatably connected inside the sixth mounting groove 59. A third worm gear 63 is fixedly installed on one side of the third pulley 62. The third worm gear 63 cooperates with the third worm 61. A seventh mounting groove 67 is opened inside the first sliding block 3 and below the two third pulleys 62. The second gear 64 is rotatably connected inside the seventh mounting groove 67. A fourth pulley 65 is fixedly installed on one side of the second gear 64. The outer side of the fourth pulley 65 is sleeved with a second connecting belt 66. The fourth pulley 65 is transmission-connected to the third pulley 62 through the second connecting belt 66.

[0041] Among them, an eighth mounting groove 68 is opened inside the first sliding block 3 and above the sixth mounting groove 59, and a second electric telescopic rod 69 is installed on the top of the inner wall of the eighth mounting groove 68. The second electric telescopic rod 69 is fixedly connected to the upper mounting frame 9, and a third bevel gear 70 is fixedly installed on the output end of the second electric telescopic rod 69. A fourth bevel gear 71 is fixedly installed on the outer side of the third worm gear 61. The third bevel gear 70 is meshed with the fourth bevel gear 71. When the upper mounting frame 9 needs to be rotated, the angle of the upper mounting frame 9 can be adjusted by the meshing of the third bevel gear 70 and the fourth bevel gear 71.

[0042] Among them, a first mounting groove 4 is opened inside the bottom mounting frame 1 and below the first sliding groove 2, and a first electric telescopic rod 5 is fixedly installed inside the first mounting groove 4. A connecting rack 6 is fixedly installed on the top of the first electric telescopic rod 5. The connecting rack 6 is meshed with the second gear 64 to facilitate the movement of the position of the first sliding block 3.

[0043] Among them, second sliding grooves 7 are provided inside the bottom mounting frame 1 and on both sides corresponding to the first sliding groove 2, second sliding blocks 8 are fixedly installed on both sides corresponding to the first sliding block 3, the second sliding block 8 is slidably connected to the second sliding groove 7, an auxiliary rotating groove 72 is provided on the top of the first sliding block 3, and a plurality of auxiliary rotating blocks 73 are fixedly installed on the bottom of the upper mounting frame 9, the auxiliary rotating blocks 73 are slidably connected to the auxiliary rotating groove 72, the cooperation of the second sliding groove 7 and the second sliding block 8 can increase the sliding stability of the first sliding block 3 inside the first sliding groove 2, and the cooperation of the auxiliary rotating groove 72 and the auxiliary rotating block 73 can further increase the rotation stability of the upper mounting frame 9.

[0044] In summary, when this frame assembly construction method for the upper platform of the offshore wind power booster station is used, the fifth servo motor 60 is first used to drive the third worm 61 to rotate, and the third worm 61 and the third worm wheel 63 are used to drive the third pulley 62 to rotate, and the second connecting belt 66 is used to drive the fourth pulley 65 to rotate while the third pulley 62 rotates, so that the second gear 64 rotates at the same time. When the left and right positions of the first sliding block 3 need to be adjusted, the first electric telescopic rod 5 is used to raise the connecting rack 6 and contact the second gear 64. When the second gear 64 rotates, the first sliding block 3 is driven to move. When the angle of the upper mounting frame 9 needs to be adjusted, the second electric telescopic rod 69 is extended to make the third bevel gear The wheel 70 descends and contacts the fourth bevel gear 71, so that the fourth bevel gear 71 drives the third bevel gear 70 and the second electric telescopic rod 69 to rotate, and at the same time drives the upper mounting frame 9 to rotate. When clamping the frame assembly, the position is first adjusted according to the above steps, and then the hydraulic rod 21 is extended to make the clamping plate 22 contact the frame assembly for clamping. Due to the different lengths of the frame assemblies, the relative distance between the two clamping mounting plates 20 needs to be adjusted. When adjusting, the first pulley 30 is driven to rotate by starting the second servo motor 28, and the second pulley 33 and the rotating tube 32 are rotated under the drive of the first connecting belt 34. Due to the meshing of the first gear 38 and the fixed rack 39, the second servo motor can be driven 28 moves, when the second servo motor 28 moves to the side that needs to be adjusted, the second bevel gear 29 contacts the corresponding first bevel gear 27, and the electromagnet 37 is energized at this time, and the telescopic square tube 35 is adsorbed upward by the electromagnet 37, and the meshing with the fixed rack 39 is cancelled, so that the second bevel gear 29 and the first bevel gear 27 drive the second rotating screw 18 to rotate, and adjust the relative position of the fourth sliding block 19 and the clamping mounting plate 20. When the clamping is completed, the first servo motor 14 can be directly used to adjust the angle of the rotating mounting frame 15 in a wide range. When the ascent is performed, the third servo motor 45 is started, and the third servo motor 45 is used to drive the first rotating screw 11 to rotate, thereby driving the third sliding block 12 to move, and driving the side mounting frame 13 to rise. When the side mounting frame 13 rises, the cooperation of the second worm 47 and the second worm wheel 49 can drive the first worm 44 to rotate, and then the cooperation of the first worm wheel 43 and the first worm 44 can drive the rope storage plate 41 to rotate, and the auxiliary lifting rope 42 is used for auxiliary lifting. When the third sliding block 12 rises, the third sliding block 12 will make the emergency support plate 55 slide toward the inside of the fifth mounting groove 54, and when the third sliding block 12 descends, the fourth servo motor 50 is started, and the rope storage shaft 52 is driven to rotate by the fourth servo motor 50, so that the lifting rope 53 is wound around the rope storage shaft 52, and at the same time, the position of the knot 58 on the lifting rope 53 rises, and when it contacts the emergency support plate 55, it will drive the emergency support plate 55 to tilt upward.All the emergency support plates 55 are located inside the fifth installation groove 54, which facilitates the lowering of the third sliding block 12.

[0045] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A frame assembly device for an upper platform of an offshore wind power booster station, comprising a bottom mounting frame (1), characterized in that: The top of the bottom mounting frame (1) is provided with a first sliding groove (2), the interior of the first sliding groove (2) is slidably connected to a first sliding block (3), the top of the first sliding block (3) is rotatably connected to an upper mounting frame (9), a side of the upper mounting frame (9) is provided with a third sliding groove (10), the interior of the third sliding groove (10) is rotatably connected to a first rotating screw rod (11), the interior of the third sliding groove (10) is slidably connected to a third sliding block (12), the first rotating screw rod (11) passes through the third sliding block (12) and is threadedly connected to the third sliding block (12), a side mounting frame (13) is fixedly installed on one side of the third sliding block (12), a side mounting frame (13) is rotatably connected to a rotating mounting frame (15), a side mounting frame (13) is fixedly installed with a first servo motor (14), the first The output end of the servo motor (14) is inserted into the interior of the side mounting frame (13) and is fixedly connected to the rotating mounting frame (15). A clamping mounting frame (16) is fixedly installed on one side of the rotating mounting frame (15). Two fourth sliding grooves (17) are provided on one side of the clamping mounting frame (16). The interiors of the two fourth sliding grooves (17) are both rotatably connected with second rotating screw rods (18). The interiors of the two fourth sliding grooves (17) are both slidably connected with fourth sliding blocks (19). The second rotating screw rod (18) passes through the fourth sliding block (19) and is threadedly connected to the fourth sliding block (19). A clamping mounting plate (20) is fixedly installed on one side of the fourth sliding block (19). Hydraulic rods (21) are fixedly installed on the corresponding two sides of the clamping mounting plate (20). The output end of the hydraulic rod (21) is fixedly installed with a clamping plate (22).

2. The frame assembly equipment for the upper platform of an offshore wind power booster station according to claim 1, characterized in that: A fifth sliding groove (23) is provided on one side of the clamping mounting plate (20), a fifth sliding block (24) is slidably connected inside the fifth sliding groove (23), a connecting block (25) is fixedly installed on the top of the fifth sliding block (24), and the connecting block (25) is fixedly connected to the clamping plate (22).

3. The frame assembly equipment for the upper platform of an offshore wind power booster station according to claim 1, characterized in that: A second mounting groove (26) is provided inside the clamping mounting frame (16) and between the two fourth sliding grooves (17); one end of each of the two second rotating screw rods (18) is inserted into the second mounting groove (26) and fixedly installed with a first bevel gear (27); a sixth sliding groove (74) is provided inside the clamping mounting frame (16) and on one side of the second mounting groove (26); a sixth sliding block (75) is slidably connected inside the sixth sliding groove (74); a second servo motor (28) is fixedly installed on the top of the sixth sliding block (75); a second bevel gear (29) is fixedly installed on the top of the output end of the second servo motor (28); a first pulley (30) is fixedly installed on the outside of the output end of the second servo motor (28); and an auxiliary mounting frame (31) is fixedly installed on one side of the second servo motor (28). The auxiliary mounting frame (31) is internally connected to a rotating tube (32) for rotation, a second pulley (33) is fixedly installed on the top of the rotating tube (32), a first connecting belt (34) is sleeved on the outer side of the second pulley (33), and the second pulley (33) is transmission-connected to the first pulley (30) through the first connecting belt (34), a telescopic square tube (35) is slidably connected to the inside of the rotating tube (32), a telescopic spring (36) is installed inside the rotating tube (32) and above the telescopic square tube (35), an electromagnet (37) is fixedly installed on the top of the inner wall of the rotating tube (32), a first gear (38) is fixedly installed on the bottom of the telescopic square tube (35), a fixed rack (39) is installed on one side of the inner wall of the second mounting groove (26), and the fixed rack (39) is meshed with the first gear (38).

4. The frame assembly equipment for the upper platform of an offshore wind power booster station according to claim 1, characterized in that: A top mounting frame (40) is fixedly mounted on the top of one side of the upper mounting frame (9), the top mounting frame (40) is internally rotatably connected to a rope storage disk (41), an auxiliary lifting rope (42) is wound around the outside of the rope storage disk (41), one end of the auxiliary lifting rope (42) is fixedly connected to the side mounting frame (13), a first worm gear (43) is fixedly mounted on one side of the rope storage disk (41), the top mounting frame (40) is internally rotatably connected to a first worm (44), the first worm gear (43) cooperates with the first worm (44), a third servo motor (45) is fixedly mounted on the top of the upper mounting frame (9), the A third mounting slot (46) is provided inside the upper mounting frame (9) and below the third servo motor (45). The output end of the third servo motor (45) is inserted into the third mounting slot (46) and is provided with a second worm (47). The bottom of the second worm (47) is fixedly connected to the first rotating screw (11). The interior of the third mounting slot (46) is rotatably connected to a first connecting shaft (48). The first connecting shaft (48) is fixedly connected to the first worm (44). A second worm gear (49) is fixedly provided on the outer side of the first connecting shaft (48). The second worm gear (49) cooperates with the second worm (47).

5. The frame assembly equipment for the upper platform of an offshore wind power booster station according to claim 1, characterized in that: A fifth mounting slot (54) is provided inside the upper mounting frame (9) and on one side of the third sliding slot (10), and a plurality of emergency support plates (55) are rotatably connected inside the fifth mounting slot (54), and a bottom fastening support plate (56) is fixedly installed inside the fifth mounting slot (54) and below the emergency support plate (55). A fourth mounting slot (51) is provided inside the upper mounting frame (9), and a rope storage shaft (52) is rotatably connected inside the fourth mounting slot (51), and a lifting rope (53) is wound around the outside of the rope storage shaft (52). A fourth servo motor (50) is fixedly installed on one side of the upper mounting frame (9), and an output end of the fourth servo motor (50) is fixedly connected to the rope storage shaft (52). The lifting rope (53) passes through the plurality of emergency support plates (55), and a plurality of rope knots (58) are provided on the outside of the lifting rope (53).

6. The frame assembly equipment for the upper platform of an offshore wind power booster station according to claim 1, characterized in that: A sixth mounting groove (59) is provided inside the first sliding block (3), and a third worm (61) is rotatably connected inside the sixth mounting groove (59). A fifth servo motor (60) is fixedly installed on one side of the first sliding block (3), and the output end of the fifth servo motor (60) penetrates into the interior of the sixth mounting groove (59) and is fixedly connected to the third worm (61). A third pulley (62) is rotatably connected inside the sixth mounting groove (59), and a third worm gear (63) is fixedly installed on one side of the third pulley (62). The third worm gear (63) cooperates with the third worm (61), and a seventh mounting groove (67) is provided inside the first sliding block (3) and below the two third pulleys (62). The interior of the seventh mounting groove (67) is rotatably connected to the second gear (64), and a fourth pulley (65) is fixedly installed on one side of the second gear (64). The outer side of the fourth pulley (65) is sleeved with a second connecting belt (66), and the fourth pulley (65) is transmission-connected to the third pulley (62) through the second connecting belt (66).

7. The frame assembly equipment for the upper platform of an offshore wind power booster station according to claim 6, characterized in that: An eighth mounting slot (68) is provided inside the first sliding block (3) and above the sixth mounting slot (59); a second electric telescopic rod (69) is installed on the top of the inner wall of the eighth mounting slot (68); the second electric telescopic rod (69) is fixedly connected to the upper mounting frame (9); a third bevel gear (70) is fixedly installed on the output end of the second electric telescopic rod (69); a fourth bevel gear (71) is fixedly installed on the outer side of the third worm gear (61); the third bevel gear (70) is meshed with the fourth bevel gear (71).

8. The frame assembly equipment for the upper platform of an offshore wind power booster station according to claim 6, characterized in that: A first mounting slot (4) is provided inside the bottom mounting frame (1) and below the first sliding slot (2); a first electric telescopic rod (5) is fixedly installed inside the first mounting slot (4); a connecting rack (6) is fixedly installed on the top of the first electric telescopic rod (5); and the connecting rack (6) is engaged with a second gear (64).

9. The frame assembly equipment for the upper platform of an offshore wind power booster station according to claim 1, characterized in that: A second sliding groove (7) is provided inside the bottom mounting frame (1) and on both sides corresponding to the first sliding groove (2); a second sliding block (8) is fixedly installed on both sides corresponding to the first sliding block (3); the second sliding block (8) is slidably connected to the second sliding groove (7); an auxiliary rotating groove (72) is provided on the top of the first sliding block (3); a plurality of auxiliary rotating blocks (73) are fixedly installed on the bottom of the upper mounting frame (9); the auxiliary rotating blocks (73) are slidably connected to the auxiliary rotating groove (72).

10. A construction method for frame assembly equipment for an upper platform of an offshore wind power booster station, characterized in that: The following steps are involved: S1. Position adjustment of the first sliding block (3): the third worm (61) is driven to rotate by the fifth servo motor (60), and the third pulley (62) is driven to rotate by the cooperation of the third worm (61) and the third worm wheel (63). When the third pulley (62) rotates, the second connecting belt (66) drives the fourth pulley (65) to rotate. At this time, the second gear (64) rotates. When the left and right positions of the first sliding block (3) need to be adjusted, the connecting rack (6) is raised by the first electric telescopic rod (5) and contacts the second gear (64). When the second gear (64) rotates, the first sliding block (3) is driven to move. S2. Angle adjustment of the upper mounting frame (9): When adjusting the angle of the upper mounting frame (9), the second electric telescopic rod (69) is extended to cause the third bevel gear (70) to descend and contact the fourth bevel gear (71), thereby using the fourth bevel gear (71) to drive the third bevel gear (70) and the second electric telescopic rod (69) to rotate, and at the same time drive the upper mounting frame (9) to rotate; S3, frame assembly clamping adjustment: the hydraulic rod (21) is extended, and the clamping plate (22) contacts the frame assembly for clamping. Since the lengths of the frame assemblies are different, the relative distance between the two clamping mounting plates (20) needs to be adjusted. When adjusting, the second servo motor (28) is started to drive the first pulley (30) to rotate, and the second pulley (33) and the rotating tube (32) are rotated under the drive of the first connecting belt (34). Due to the meshing of the first gear (38) and the fixed rack (39), The second servo motor (28) is driven to move. When the second servo motor (28) moves to the side that needs to be adjusted, the second bevel gear (29) contacts the corresponding first bevel gear (27). At this time, the electromagnet (37) is energized, and the telescopic square tube (35) is adsorbed upward by the electromagnet (37), canceling the engagement with the fixed rack (39), so that the second bevel gear (29) and the first bevel gear (27) drive the second rotating screw (18) to rotate, thereby adjusting the relative position of the fourth sliding block (19) and the clamping mounting plate (20); S4, the frame assembly rises: the third servo motor (45) is started, and the first rotating screw (11) is driven to rotate by the third servo motor (45), thereby driving the third sliding block (12) to move, and driving the side mounting frame (13) to rise. When the side mounting frame (13) rises, the first worm (44) can be driven to rotate by the cooperation of the second worm (47) and the second worm gear (49), and the rope storage plate (41) is driven to rotate by the cooperation of the first worm gear (43) and the first worm (44), and the auxiliary lifting rope (42) is used for auxiliary lifting; S5. The frame assembly is lowered: the fourth servo motor (50) is started, and the rope storage shaft (52) is driven to rotate by the fourth servo motor (50), so that the lifting rope (53) is wound on the rope storage shaft (52), and at the same time, the rope knot (58) on the lifting rope (53) is raised. When it contacts the emergency support plate (55), the emergency support plate (55) is driven to tilt upward, so that all the emergency support plates (55) are located inside the fifth installation groove (54), and the third sliding block (12) is lowered.