Cornice aluminum plate curtain wall with built-in snow melting system for upright quadrangular pyramid grid roof and construction method of cornice aluminum plate curtain wall
By using the construction method of the aluminum panel curtain wall of the eaves of the aluminum panel of the eaves of the steel keel and the concrete structure are not firmly connected and the eaves of the ice cone fall in the eaves, it has solved the problem of the imperfect connection between the steel keel and the concrete structure and the drop of the eaves of the ice cone, achieving more efficient construction and water seepage prevention effect .
Patent Information
- Application Number
- CN202411452605.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-17
- Publication Date
- 2024-12-06
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing steel keel is not connected firmly with the concrete structure, and the keel unit is difficult to fix and position on the ground, resulting in inconvenience in construction, and the ice cones at the eaves may fall off when they melt, damaging the gutter structure and causing water seepage problems.
The construction method of the aluminum curtain wall of the curtain wall of the roof built-in snow melting system, including the installation of the steel keel and concrete structure connection system, the steel keel floor tire frame precision assembly system and the steel keel slat lifting system, through the adjustment section keel and anchor The keel body is connected in bolts, and the keel lifting stability is achieved using clamps and L-shaped plates, and a snow melting system is installed on the gutter cornice to prevent the formation of ice cones.
It improves the firmness of the steel keel and the building main body, enhances construction efficiency and safety, ensures the melting of the gutter eaves in ice and snow weather, prevents the formation of ice cones, and solves the problems of inconvenience in construction and water seepage.
Smart Images

Figure CN119083638A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to an aluminum plate curtain wall with an upright quadrangular pyramid grid roof and a built-in snow melting system eaves and a construction method thereof, belongs to the field of house construction, and is suitable for the construction of curtain walls and snow melting systems on the exterior walls of large-scale special-shaped buildings. Background Art
[0002] With the rapid development of science and technology and the continuous innovation of glass material manufacturing technology, the outstanding performance of glass curtain walls in quality, transparency and safety has become more and more significant, which has greatly promoted the vigorous expansion of the relevant market size. At the same time, the general improvement of environmental awareness has prompted the construction industry to tend to adopt low-carbon and high-efficiency design concepts. As an important member of this trend, the market demand for glass curtain walls is growing due to its unique advantages. However, with this rapidly growing market trend, the problem of building quality has become increasingly prominent, especially the quality of building exterior wall structures, which has become the focus of social attention. In the context of the current accelerated urbanization process, people have put forward higher standards and requirements for the safety and durability of building structures. Therefore, one of the important tasks facing construction companies is to strengthen technical research and development and continuously improve the construction technology of building structures. In particular, in-depth research and development of exterior wall structure construction technology is particularly critical. Through technological innovation, improving the construction quality of the exterior wall can not only ensure the overall safety and service life of the building, but also further improve the energy efficiency and environmental protection performance of the building, and meet the society's expectations for high-quality buildings.
[0003] The existing technology has the following deficiencies: (1) In the existing steel keel and concrete structure connection technology, the vertical keel is not directly stressed, and the connection between the keel and the building body is not firm. (2) The application of large keels is gradually becoming less common, and the irregularly shaped keel units cannot be fixed and positioned on the ground, making construction and assembly inconvenient. (3) The "ice cone" and other shapes formed at the eaves will suddenly fall off when melting, which may cause a certain degree of damage to the gutter surface and other structures, thereby destroying the gutter structure and causing gutter seepage.
[0004] For the construction of aluminum curtain wall at the eaves of a square pyramid grid roof with a built-in snow melting system, it is urgent to propose a construction method that can improve construction efficiency while ensuring project quality and safety. Summary of the invention
[0005] The purpose of the present invention is to provide a construction method for an aluminum plate curtain wall at the cornice of a square pyramid grid roof with a built-in snow melting system, which is used to improve the efficiency of the aluminum plate curtain wall at the cornice of a roof with a built-in snow melting system and construction, and ensure the quality and safety of the project. To achieve the above purpose, the present invention adopts the following technical scheme: The construction method for an aluminum plate curtain wall at the cornice of a square pyramid grid roof with a built-in snow melting system comprises the following specific steps:
[0006] S1. Install the connection system between the steel keel and the concrete structure: weld the vertical keel to both ends of the horizontal keel, install the adjustable section keel to both ends of the horizontal keel, the horizontal keel, the vertical keel and the adjustable section keel together form the main body of the steel keel, the two sides of the keel main body are matched and connected with the concrete wall through the adjuster and the anchor bolts, the adjustable section keel is connected with the horizontal keel through the adjuster, and the adjustable section keel is connected with the concrete wall through the anchor bolts;
[0007] S2. Install the steel keel ground frame precise assembly system: weld the sleeve base on the frame base, install the first support column, the second support column and the third support column on the frame base, insert one end of the first support column, the second support column and the third support column into the sleeve base, install the positioning sleeve on the top of the support column, and install the load-bearing I-beam on the positioning sleeve; assemble the keel unit through the steel keel ground frame precise assembly system, and place the keel units on the upper ends of the support columns during assembly;
[0008] S3. Install the whole steel keel hoisting system: install a clamp on the device body, install an L-shaped plate on the clamp, and the L-shaped plate is located in the through groove in the device body; the whole keel body is hoisted by setting the clamp to control the L-shaped plate;
[0009] When the keel body is hoisted, the keel body is inserted into the through slot in the device body, and the L-shaped plate is driven by the clamping member to approach and clamp the keel body, so as to ensure that the keel body is stably fixed on the device body during the hoisting process; after the keel body is hoisted to the target position, the L-shaped plate is driven by the clamping member to move and release the L-shaped plate from the keel body, so that the keel body can be removed from the device body;
[0010] S4. Install the gutter eaves snow melting system: construct eaves and eaves plugs on the upstream roof, construct gutters on the downstream roof, and then construct an insulation layer between the upstream roof and the downstream roof. A trench is formed above the insulation layer, and trench bottom heating cables are laid at the bottom of the trench, and side wall heating cables are laid on the side walls of the trench. Finally, install the snow melting system controller to control the heating temperature of the trench bottom heating cables and the side wall heating cables.
[0011] Preferably, a fitting plate is provided on the inner side of the sleeve base, and an adjusting screw is threadedly connected to the sleeve base, one end of the adjusting screw is in contact with the fitting plate, and the fitting plate is brought into tight contact with the support column through the adjusting screw.
[0012] Preferably, an arc-shaped limiting groove is provided on the top of the support column, and the cylindrical steel component is limited by the arc-shaped limiting groove.
[0013] Preferably, in step S2, a wooden cushion is installed on the load-bearing I-beam; the second support column and the third support column are symmetrically installed on both sides of the first support column;
[0014] Preferably, in step S3, a support member is welded on the device body, a mounting member is arranged on the upper end of the support member, bolt holes are pre-made on the mounting member and the mounting member is connected to the upper structure of the lifting equipment through the bolt holes.
[0015] Preferably, the transverse keel is assembled from a plurality of transverse keel units, each of which is provided with a transverse keel hole, and adjacent transverse keel units are connected via the transverse keel holes.
[0016] The invention discloses an aluminum plate curtain wall at the eaves of an upright tetrahedral grid roof with a built-in snow melting system, which is obtained by a construction method of an aluminum plate curtain wall at the eaves of an upright tetrahedral grid roof with a built-in snow melting system.
[0017] The beneficial effects of the present invention are:
[0018] (1) The connection system between the steel keel and the concrete structure has reasonable force on the horizontal and vertical keels, good overall wall performance, improved firmness between the steel keel and the main building, and good technical and economic benefits;
[0019] (2) The steel keel ground frame precise assembly system improves the auxiliary control assembly accuracy, reduces the errors generated during construction and assembly, avoids the inconvenience of keel unit assembly on the ground, and improves the assembly construction efficiency;
[0020] (3) When the steel keel hoisting system is hoisting the keel body, the clamping parts are used to limit and fix the keel body, which ensures the stability of the keel body during use and reduces the construction risk of hoisting the steel keel body;
[0021] (4) The gutter eaves snow melting system can melt the ice and snow on the eaves of the gutter in icy and snowy weather, making it difficult for it to freeze and form "ice cones" and other shapes, preventing them from clogging the eaves of the gutter, thus solving the problem of difficulty in timely drainage of the roof in rainy and snowy weather. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 Schematic diagram of the connection architecture between steel keel and concrete structure.
[0023] Figure 2 Schematic diagram of the partial details of the connection system between steel keel and concrete structure.
[0024] Figure 3 Schematic diagram of the precise assembly system structure of the steel keel ground frame.
[0025] Figure 4 Schematic diagram of the steel keel whole frame hoisting system structure.
[0026] Figure 5 Schematic diagram of the gutter eaves snow melting system structure.
[0027] Description of the accompanying drawings: 1. Steel keel body, 2. Concrete wall, 3. Horizontal keel, 4. Anchor bolt, 5. Adjuster, 6. Horizontal keel hole, 7. Vertical keel, 8. Adjustment section keel, 9. Tire frame base, 10. Sleeve base, 11. First support column, 12. Second support column, 13. Third support column, 14. Laminating board, 15. Adjustment screw, 16. Positioning sleeve, 17. Wooden board cushion, 18. Load-bearing I-beam Steel, 19. Arc-shaped limit groove, 20. Keel body, 21. Arc-shaped surface, 22. L-shaped plate, 23. Device body, 24. Clamp, 25. Support, 26. Bolt hole, 27. Mounting part, 28. Gutter, 29. Eaves, 30. Gutter bottom heating cable, 31. Side wall heating cable, 32. Eaves plug, 33. Upstream roof, 34. Snow melting system controller, 35. Downstream roof, 36. Insulation layer. DETAILED DESCRIPTION
[0028] The following will be combined with the accompanying drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. In addition, it should be pointed out that for ordinary technicians in this technical field, without departing from the principle of the present invention, several improvements and modifications can be made to the present invention, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.
[0029] The construction system of the upright tetrahedral grid roof with built-in snow-melting system and the eaves aluminum curtain wall includes the connection system of the steel keel and the concrete structure, the precise assembly system of the steel keel and the ground frame, the whole steel keel hoisting system and the gutter and eaves snow-melting system.
[0030] like Figure 1 , Figure 2 As shown, the connection system between the steel keel and the concrete structure includes a steel keel body 1, which is composed of a transverse keel 3, a vertical keel 7, and an adjustment section keel 8. The transverse keel 3 is assembled from a number of transverse keel units. The transverse keel unit is provided with a transverse keel hole 6, and adjacent transverse keel units are connected through the transverse keel hole 6. The vertical keel 7 is welded and fixed to the two ends of the transverse keel 3, and the adjustment section keel 8 is located at the two ends of the transverse keel 3. The two sides of the steel keel body 1 are matched and connected with the concrete wall 2 through the adjuster 5 and the anchor bolt 4. The cross section of the adjustment section keel 8 is "L" shaped, and the adjustment section keel 8 is connected to the transverse keel 3 through the adjuster 5, and the adjustment section keel 8 is connected to the concrete wall 2 through the anchor bolt 4.
[0031] like Figure 3As shown, the steel keel ground frame precise assembly system includes a frame base 9 and support columns. The support columns include a first support column 11, a second support column 12 and a third support column 13. The length of the first support column 11 is greater than the length of the second support column 12, and the length of the second support column 12 is greater than the length of the third support column 13, so that the steel keel ground frame precise assembly system is in a state of being high in the middle and low on both sides as a whole. A sleeve base 10 is provided on the frame base 9, and the lower end of the support column is inserted into the sleeve base 10. A bonding plate 14 is provided on the inner side of the sleeve base 10. An adjusting screw 15 is threadedly connected to the sleeve base 10. One end of the adjusting screw 15 is in contact with the bonding plate 14. The bonding plate 14 is tightly contacted with the support column through the adjusting screw 15, so that the support column can be firmly connected to the sleeve base 10. A positioning sleeve 16, an arc-shaped limiting groove 19, a load-bearing I-beam 18 and a wooden board cushion 17 are provided at the top of the support column.
[0032] like Figure 4 As shown, the whole steel keel hoisting system is composed of a device body 23, a clamping member 24, a keel body 20, a support member 25, and a mounting member 27, wherein the keel body 20 has an arc surface 21, the device body 23 is a rectangular frame structure, and a through slot is provided in the device body 23 for the keel body 20 to pass through. The device body 23 is provided with a clamping member 24, and an L-shaped plate 22 is connected to the clamping member 24. The clamping member 24 can drive the L-shaped plate 22 to move, and the L-shaped plate 22 is located in the through slot in the device body 23; the L-shaped plate 22 is controlled by the clamping member 24 to achieve temporary fixation during suspension and hoisting. The clamping member 24 can be a hydraulic cylinder, an electric cylinder, or other device.
[0033] A support member 25 is provided on the device body 23 , a mounting member 27 is provided on the support member 25 , a bolt hole 26 is provided on the mounting member 24 , and the device body 23 is connected to the upper structure of the hoisting equipment through the mounting member 27 .
[0034] like Figure 5 As shown, the gutter eaves snow melting system includes a gutter eaves roof system and a snow melting system. The gutter eaves roof system consists of an upstream roof 33, an eaves 29, an eaves plug 32, a downstream roof 35 and a gutter 28. The gutter 28 is arranged on a side of the downstream roof 35 close to the upstream roof 33. The eaves 29 is located at the lower end of the upstream roof 33, and the eaves plug 32 is arranged on the upstream roof 33.
[0035] The snow melting system is composed of a trench bottom heating cable 30, a side wall heating cable 31, an insulation layer 36 and a snow melting system controller 34. The insulation layer 36 is arranged between the upstream roof 33 and the downstream roof 35. A trench is formed above the insulation layer 36. The trench bottom heating cable 30 is laid at the bottom of the trench, and the side wall heating cable 31 is laid on the side wall of the trench. The trench bottom heating cable 30 and the side wall heating cable 31 are both laid along the length direction of the trench. The trench bottom heating cable 30 and the side wall heating cable 31 are both connected to the snow melting system controller 34, and the heating temperature of the trench bottom heating cable 30 and the side wall heating cable 31 is controlled by the snow melting system controller 34.
[0036] A construction method for an upright tetrahedral grid roof with a built-in snow melting system and an aluminum plate curtain wall at the cornice, comprising the following specific steps:
[0037] S1. Install the connection system between the steel keel and the concrete structure: weld the vertical keel 7 to the two ends of the transverse keel 3, and install the adjustment section keel 8 to the two ends of the transverse keel 3. The transverse keel 3, the vertical keel 7 and the adjustment section keel 8 together constitute the steel keel body 1. The two sides of the keel body 1 are matched and connected with the concrete wall 2 through the adjuster 5 and the anchor bolt 4. The adjustment section keel 8 is connected to the transverse keel 3 through the adjuster 5, and the adjustment section keel 8 is connected to the concrete wall 2 through the anchor bolt 4.
[0038] S2. Install the precise assembly system of the steel keel ground frame: weld the sleeve base 10 on the frame base 9 in advance, install the first support column 11, the second support column 12 and the third support column 13 on the frame base 9, insert one end of the first support column 11, the second support column 12 and the third support column 13 into the sleeve base 10, use the bonding plate 14 and the adjusting screw 15 to fix the first support column 11, the second support column 12 and the third support column 13, and the second support column 12 and the third support column 13 are symmetrically installed on both sides of the first support column 11; an arc-shaped limit groove 19 is provided on the top of the support column, a positioning sleeve 16 is installed on the top of the support column, a load-bearing I-beam 18 is installed on the positioning sleeve 16, and a wooden cushion layer 17 is installed on the load-bearing I-beam 18; the precise assembly system of the steel keel ground frame assembles the keel units, and during assembly, the keel units are placed on the upper ends of the support columns respectively. An arc-shaped limiting groove 19 is provided on the top of the support column for limiting the cylindrical component on the keel unit.
[0039] S3. Install the whole-frame hoisting system of the steel keel: first weld the support member 25 on the device body 23, set the mounting member 27 on the upper end of the support member 25, pre-make bolt holes 26 on the mounting member 27 and connect it to the upper structure of the hoisting equipment through the bolt holes 26; install the clamping member 24 on the device body 23, install the L-shaped plate 22 on the clamping member 24, and the L-shaped plate 22 is located in the through groove in the device body 23; the whole-frame hoisting of the keel body 20 is realized by setting the clamping member 24 to control the L-shaped plate 22.
[0040] When hoisting the keel body 20, the keel body 20 is inserted into the through groove in the device body 23, and the L-shaped plate 22 is driven by the clamping member 24 to approach and clamp the keel body 20 to ensure that the keel body 20 is stably fixed on the device body 23 during the hoisting process; after the keel body 20 is hoisted to the target position, the L-shaped plate 22 is driven by the clamping member 24 to move and release the L-shaped plate 22 from the keel body 20, so that the keel body 20 can be removed from the device body 23.
[0041] S4. Install the gutter eaves snow melting system: construct the eaves 29 and the eaves plug 32 on the upstream roof 33, construct the gutter 28 on the downstream roof 35, then construct the insulation layer 36 between the upstream roof 33 and the downstream roof 35, form a channel above the insulation layer 36, lay the channel bottom heating cable 30 at the bottom of the channel, lay the side wall heating cable 31 on the side wall of the channel, finally install the snow melting system controller 34, and control the heating temperature of the channel bottom heating cable 30 and the side wall heating cable 31 through the snow melting system controller 34.
[0042] The present invention is not limited to the above-mentioned optimal implementation mode. Anyone can derive other various forms of products under the inspiration of the present invention. However, no matter what changes are made in the shape or structure, all technical solutions that are the same or similar to those of the present application fall within the protection scope of the present invention.
Claims
1. Construction method of cornice aluminum curtain wall with built-in snow melting system on the tetrahedral grid roof. It is characterized in that The specific steps include: S1. Installing the connection system between the steel keel and the concrete structure: welding the vertical keel (7) to the two ends of the horizontal keel (3), installing the adjustment section keel (8) to the two ends of the horizontal keel (3), the horizontal keel (3), the vertical keel (7) and the adjustment section keel (8) together form a steel keel body (1), the two sides of the keel body (1) are matched and connected to the concrete wall (2) through the adjuster (5) and the anchor bolt (4), the adjustment section keel (8) is connected to the horizontal keel (3) through the adjuster (5), and the adjustment section keel (8) is connected to the concrete wall (2) through the anchor bolt (4); S2. Installing the steel keel ground frame precise assembly system: welding a sleeve base (10) on the frame base (9), installing a first support column (11), a second support column (12) and a third support column (13) on the frame base (9), inserting one end of the first support column (11), the second support column (12) and the third support column (13) into the sleeve base (10), installing a positioning sleeve (16) on the top of the support column, and installing a load-bearing I-beam (18) on the positioning sleeve (16); assembling the keel unit through the steel keel ground frame precise assembly system, and during assembly, placing the keel units on the upper ends of the support columns respectively; S3, installing the whole steel keel hoisting system: installing a clamping member (24) on the device body (23), installing an L-shaped plate (22) on the clamping member (24), and the L-shaped plate (22) is located in a through groove in the device body (23); the whole keel body (20) is hoisted by controlling the L-shaped plate (22) by setting the clamping member (24); When the keel body (20) is hoisted, the keel body (20) is inserted into the through groove in the device body (23), and the L-shaped plate (22) is driven by the clamping member (24) to approach and clamp the keel body (20), so as to ensure that the keel body (20) is stably fixed on the device body (23) during the hoisting process; after the keel body (20) is hoisted to the target position, the L-shaped plate (22) is driven by the clamping member (24) to move and release the L-shaped plate (22) from the keel body (20), so that the keel body (20) can be removed from the device body (23); S4. Installing the gutter and eave snow melting system: constructing the eaves (29) and the eaves plug (32) on the upstream roof (33), constructing the gutter (28) on the downstream roof (35), then constructing the heat insulation layer (36) between the upstream roof (33) and the downstream roof (35), forming a channel above the heat insulation layer (36), laying the channel bottom heating cable (30) at the bottom of the channel, laying the side wall heating cable (31) on the side wall of the channel, and finally installing the snow melting system controller (34), and controlling the heating temperature of the channel bottom heating cable (30) and the side wall heating cable (31) through the snow melting system controller (34).
2. The construction method of the cornice aluminum curtain wall with a built-in snow melting system of the upright tetrahedral grid roof according to claim 1, It is characterized in that A fitting plate (14) is provided on the inner side of the sleeve base (10), and an adjusting screw (15) is threadedly connected to the sleeve base (10), one end of the adjusting screw (15) is in contact with the fitting plate (14), and the fitting plate (14) is in tight contact with the supporting column through the adjusting screw (15).
3. The construction method of the cornice aluminum curtain wall with a built-in snow melting system of the upright tetrahedral grid roof according to claim 1, It is characterized in that An arc-shaped limiting groove (19) is arranged on the top of the support column, and the cylindrical steel component is limited by the arc-shaped limiting groove (19).
4. The construction method of the cornice aluminum curtain wall with a built-in snow melting system of a right-standing quadrangular pyramid grid roof according to claim 1, It is characterized in that In step S2, a wooden board cushion layer (17) is installed on the load-bearing I-beam (18); the second support column (12) and the third support column (13) are symmetrically installed on both sides of the first support column (11).
5. The construction method of the cornice aluminum curtain wall with a built-in snow melting system of a right-standing tetrahedral grid roof according to claim 1, It is characterized in that In step S3, a support member (25) is welded on the device body (23), and a mounting member (27) is arranged on the upper end of the support member (25). Bolt holes (26) are pre-made on the mounting member (27) and the mounting member (27) is connected to the upper structure of the lifting equipment through the bolt holes (26).
6. The construction method of the cornice aluminum curtain wall with a built-in snow melting system of a right-standing tetrahedral grid roof according to claim 1, It is characterized in that The transverse keel (3) is assembled from a plurality of transverse keel units. The transverse keel units are provided with transverse keel holes (6), and adjacent transverse keel units are connected via the transverse keel holes (6).
7. A square pyramid grid roof with a built-in snow melting system and an aluminum curtain wall at the cornice. It is characterized in that The invention is obtained by constructing the aluminum plate curtain wall at the cornice of the upright tetrahedral grid roof with a built-in snow melting system as described in any one of claims 1 to 6.
Citation Information
Patent Citations
Light steel keel structure and wall
CN109779087A
Saucer-shaped curved surface aluminized zinc steel plate roof and laying method thereof
CN115045445A
Modularized assembling construction method for large-span multi-curvature deformed steel truss roof
CN116677201A
Integrated steel structure pitched roof cornice and construction method thereof
CN117248690A
Metal roof anti-freezing inner gutter mounting structure
CN213359139U