Detachable overhanging discharging platform pull rope fixing device
The detachable cantilever unloading platform rope fixing device addresses structural damage and inefficiency by using semi-embedded bolt structures and disassembly mechanisms, ensuring reusability and simplifying installation, thus enhancing efficiency and reducing costs.
Patent Information
- Application Number
- CN202411136447.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-08-19
AI Technical Summary
Traditional steel wire rope fixing measures for cantilever unloading platforms cause structural damage, are not reusable, and have complex installation processes, leading to inefficiency and increased costs.
A detachable cantilever unloading platform rope fixing device with semi-embedded bolt structures, disassembly mechanisms, and pull rope systems that minimize structural stress, allow for reusability, and simplify installation by using movable connections and threaded rods.
The device reduces structural damage, lowers material waste, enhances installation efficiency, and improves economic feasibility by enabling quick stabilization and fixation of the unloading platform.
Smart Images

Figure CN119083743A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of building construction equipment, and more specifically, to a detachable cantilever unloading platform pull rope fixing device. Background Art
[0002] During the construction process of building projects, unloading platforms are widely used in engineering practice as the main channel for large-sized materials to enter and exit the construction floors. Among them, cantilevered unloading platforms are particularly common, and the installation and fixation of the wire ropes of cantilevered unloading platforms is a key issue in their application.
[0003] According to patent document CN220621102U, the utility model discloses a cantilever unloading platform that is easy to install and disassemble, including a cantilever steel platform, a first fixing device connected to the floor surface, and a second fixing device connected to the upper beam and the upper second beam. The first fixing device passes through the reserved floor sleeve through the U-shaped steel bar pull ring and is mechanically connected to the fixing bolt and the pad, so as to fix the fixed end of the cantilever steel platform on the floor surface, and then the horizontal displacement of the I-beam is limited by plugging the wooden wedge in the gap between the I-beam and the U-shaped steel bar pull ring; the second fixing device hinges the steel wire rope of the cantilever steel platform with the pull ring embedded in the beam end through the steel wire rope clamp. In the scheme of the utility model, the steel wire rope clamps in the first fixing device and the second fixing device can be installed and disassembled by twisting the bolts, which is convenient for the turnover of the cantilever unloading platform, thereby saving time cost and construction period; and the materials of the fixing device can be recycled and reused, and basically no waste is generated, which is in line with the concept of green construction.
[0004] At present, there are three problems in the installation and fixing application of traditional wire ropes:
[0005] Problem 1: The steel wire rope fixing measures for the cantilever unloading platform at the construction site are usually fixed by horizontally or vertically embedding double ear lifting rings through the beam. The traditional horizontal embedding through the beam needs to penetrate the structure to embed, which affects the force of the main structure; and the vertical embedding is close to the beam edge. When subjected to oblique downward force, the concrete on the beam edge is easily cracked, which is very likely to cause structural damage;
[0006] Problem 2: Traditional lifting rings need to be cut after use and cannot be reused, which is less economical.
[0007] Question 3: The installation of the wire rope of the traditional unloading platform is rather complicated. When the lifting ring is connected to the inclined cable, it is necessary to unfasten all four buckles on the inclined cable, then insert it into the lifting ring, and then tighten the buckle. The complicated process reduces the installation efficiency and wastes manpower and time costs.
[0008] Therefore, a convenient installation cantilever unloading platform rope fixing measure is needed to simplify the installation method, reduce structural damage and improve economic efficiency. Summary of the invention
[0009] In order to overcome the above-mentioned defects of the prior art, the present invention provides a detachable cantilever unloading platform rope fixing device. The technical problem to be solved by the present invention is: the steel wire rope fixing measures of the cantilever unloading platform on the construction site are usually fixed by pre-embedded double-ear lifting rings through the beam horizontally or vertically. The traditional transverse pre-embedded through the beam needs to penetrate the structure for pre-embedsion, which affects the force of the main body of the structure; and the vertical pre-embedded is close to the edge of the beam. When subjected to an oblique downward force, the concrete on the edge of the beam is easily cracked, which can easily cause structural damage. The traditional lifting ring needs to be cut after use and cannot be reused. The economy is poor. The installation of the traditional unloading platform steel wire rope is relatively cumbersome. When the lifting ring is connected to the inclined cable, the four buckles on the inclined cable need to be all unlocked, and then inserted into the lifting ring, and then the buckle is tightened. The cumbersome process reduces installation efficiency and wastes manpower and time costs.
[0010] To achieve the above-mentioned purpose, the present invention provides the following technical solution: comprising three layers of concrete layers in an upper and lower array, two embedded installation structures are arranged inside the concrete layers, a disassembly structure is arranged inside the embedded installation structure, the inner walls of the disassembly structures of the first and second layers from top to bottom are both movably connected with a pull rope structure, one end of the pull rope structure is movably connected with a discharge platform, a stabilizing structure is arranged on both the left and right sides of the rear side of the discharge platform, and the outer wall of the stabilizing structure is movably connected with the inner wall of the disassembly structure of the first layer from bottom to top;
[0011] The concrete layer includes a concrete formwork, the front side of the concrete formwork is provided with two left-right symmetrical conical embedded openings, the inner wall rear end of the conical embedded opening is provided with a cylindrical cavity, and the inner wall rear end of the cylindrical cavity is provided with a square cavity;
[0012] The embedded installation structure includes a PPR rectangular outer shell, the outer wall of the PPR rectangular outer shell is fixedly connected to the inner wall of the square cavity, a circular movable hole 1 is opened on the front side of the PPR rectangular outer shell and penetrates to the interior, a PPR cylindrical outer shell is fixedly connected to the front side of the PPR rectangular outer shell corresponding to the center point of the circular movable hole 1, the outer wall of the PPR cylindrical outer shell is fixedly connected to the inner wall of the cylindrical cavity, the front end of the PPR cylindrical outer shell is fixedly connected to a PPR conical outer package opening, and the outer wall of the PPR conical outer package opening is fixedly connected to the inner wall of the conical embedded opening;
[0013] The disassembly structure includes a fixed cylinder 1, the outer wall of the fixed cylinder 1 is movably connected to the inner wall of the PPR cylinder outer shell, the front end of the fixed cylinder 1 is fixedly connected to a fixed sleeve, the outer wall of the fixed sleeve is fixedly connected to a fixed assembly, the inner wall of the fixed sleeve is movably connected to a driving assembly, the inner wall of the driving assembly is threadedly connected to a fixed screw 1, the front end of the fixed screw 1 is fixedly connected to a movable rod, the front end of the movable rod is fixedly connected to a fixed screw 2, and the front end of the fixed screw 2 is fixedly connected to a J-shaped limit clamp.
[0014] As a further solution of the present invention: a square head nut is fixedly connected to the inner wall of the PPR rectangular outer shell, and an internal thread groove is provided on the front side of the square head nut corresponding to a center point of the circular movable hole.
[0015] As a further solution of the present invention: the outer wall of the movable rod is movably connected to the inner wall of the fixed cylinder 1, and the outer wall of the fixed screw rod 1 is threadedly connected to the inner wall of the PPR rectangular outer shell.
[0016] As a further solution of the present invention: the fixing assembly includes a mounting plate, a circular through hole extending from the front side of the mounting plate to the rear side, the inner wall of the circular through hole is fixedly connected to the outer wall of the fixing sleeve, an annular groove is provided on the front side of the mounting plate, the inner wall of the annular groove is movably connected to one end of the J-shaped limit clip away from the second fixing screw, and mounting grooves are provided on both the left and right sides of the mounting plate.
[0017] As a further solution of the present invention: a circular movable hole 2 is opened on the top of the inner wall of the left mounting groove and penetrates to the outside, the inner wall of the circular movable hole 2 is movably connected with a rocker, the bottom of the mounting groove is fixedly connected with a bidirectional threaded rod, the center position of the outer wall of the bidirectional threaded rod is movably connected with a support sleeve, the outer wall of the support sleeve is fixedly connected to the inner wall of the left mounting groove, the outer wall of the bidirectional threaded rod is threadedly connected with two symmetrical sliders, and the left side of the slider is fixedly connected with a connecting block 1.
[0018] As a further solution of the present invention: a sliding rod is fixedly connected to the upper and lower sides of the inner wall of the installation groove on the right, and two sliding sleeves are sleeved on the outer wall of the sliding rod. A connecting block 2 is fixedly connected to the right side of the sliding sleeve, and a splint is fixedly connected to the front side of the connecting block 1 and the connecting block 2, and the side of the two splints close to each other is movably connected to the outer wall of the concrete layer.
[0019] As a further solution of the present invention: the driving assembly includes an internal threaded barrel, the inner wall of the internal threaded barrel is threadedly connected to the outer wall of the fixed screw rod 2, the front side of the outer wall of the internal threaded barrel is fixedly connected to the fixed barrel 2, the outer wall of the fixed barrel 2 is fixedly connected to a connecting sleeve, the rear side of the outer wall of the internal threaded barrel is fixedly connected to a bearing, the outer wall of the bearing is fixedly connected to the inner wall of the fixed sleeve, the left and right sides of the outer wall of the connecting sleeve are provided with pin holes that penetrate to the bottom, and the inner wall of the pin hole is movably connected to a plug rod.
[0020] As a further solution of the present invention: the pull rope structure includes a steel wire rope, both ends of the steel wire rope are fixedly connected with connecting blocks, the ends of the two connecting blocks that are away from each other are rotatably connected with lifting rings, the circular ring of the upper lifting ring is sleeved on the outer wall of the J-shaped limit clamp, and the circular ring of the lower lifting ring is sleeved with a limit rod, the right end of the limit rod is fixedly connected with a spiral rod, and the front and rear sides below the left and right sides of the outer wall of the unloading platform are provided with internal threaded holes that penetrate to the sides close to each other, the outer wall of the spiral rod is threadedly connected to the inner wall of the internal threaded hole, and the outer wall of the spiral rod is threadedly connected to a nut on the right side.
[0021] As a further solution of the present invention: the stabilizing structure includes an internal and external threaded barrel, and an internal threaded hole 2 is opened on the top rear side of the main beam of the unloading platform and penetrates to the bottom. The outer wall of the internal and external threaded barrel is threadedly connected to the inner wall of the internal threaded hole 2, and the inner wall of the internal and external threaded barrel is threadedly connected to a spiral rod 2. The top of the spiral rod 2 is fixedly connected to a J-shaped stabilizing clamping rod, and the outer wall of the J-shaped stabilizing clamping rod is movably connected to the inner wall of the lowest J-shaped limit clamping member.
[0022] As a further solution of the present invention: a connecting plate is fixedly connected to the bottom of the internal and external threaded cylinder, a T-shaped block is fixedly connected to the rear side of the connecting plate, and the top of the T-shaped block is movably connected to the bottom of the lowest concrete layer.
[0023] The beneficial effects of the present invention are:
[0024] 1. The present invention uses semi-embedded bolt embedded parts through pre-embedded installation structure, disassembly structure and pull rope structure, which has little effect on the stress of the structure. At the same time, since the bolt embedded parts are horizontally embedded, the concrete tensile damage caused by vertical embedding is effectively solved. The threaded rod double-ear lifting ring is detachable and reusable, which reduces material loss, saves use cost, has high economic feasibility, and simplifies the installation process.
[0025] 2. The present invention can quickly stabilize and fix the unloading platform through the stabilizing knot, thereby improving the convenience and installation efficiency of the device and enhancing the stability of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1It is a structural schematic diagram of the present invention;
[0027] Figure 2 It is a schematic diagram of the structural cross section of the present invention;
[0028] Figure 3 It is a schematic diagram of the structural cross section of the concrete layer of the present invention;
[0029] Figure 4 It is a schematic diagram of the structural cross section of the pre-buried installation structure of the present invention;
[0030] Figure 5 It is a structural schematic diagram of the disassembly structure of the present invention;
[0031] Figure 6 It is a schematic diagram of the structural cross-section of the fixing assembly of the present invention;
[0032] Figure 7 It is a schematic diagram of the structure of the driving assembly of the present invention;
[0033] Figure 8 It is a structural schematic diagram of the pull rope structure of the present invention;
[0034] Fig. 9 It is a structural schematic diagram of the stable structure of the present invention.
[0035] In the figure: 1. Concrete layer; 2. Pre-embedded installation structure; 3. Disassembly structure; 4. Pull rope structure; 5. Unloading platform; 6. Stable structure; 11. Concrete formwork; 12. Conical pre-embedded opening; 13. Cylindrical cavity; 14. Square cavity; 21. PPR rectangular outer shell; 22. PPR cylindrical outer shell; 23. Square head nut; 24. Internal thread groove; 25. PPR conical outer opening; 31. Fixed cylinder 1; 32. Fixed sleeve; 33. Fixed assembly; 34. Drive assembly; 35. Fixed screw 1; 36. Movable rod; 37. Fixed screw 2; 38. J-shaped limit clamp; 331. Mounting plate; 332. Circular through hole; 33 3. Annular groove; 334. Mounting groove; 335. Rocker; 336. Bidirectional threaded rod; 337. Support sleeve; 338. Sliding block; 339. Connecting block one; 330. Sliding rod; 3301. Sliding sleeve; 3302. Connecting block two; 3303. Clamp; 341. Internally threaded cylinder; 342. Fixed cylinder two; 343. Connecting sleeve; 344. Bearing; 345. Pin hole; 346. Inserting rod; 41. Wire rope; 42. Connecting block; 43. Lifting ring; 44. Limiting rod; 45. Screw rod one; 46. Nut; 61. Internally and externally threaded cylinder; 62. Connecting plate; 63. T-shaped block; 64. Screw rod two; 65. J-shaped stabilizing clamp. DETAILED DESCRIPTION
[0036] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0037] like Figure 1-3 As shown, the present invention provides a detachable cantilever unloading platform rope fixing device, comprising three layers of concrete layers 1 in an upper and lower array, two embedded installation structures 2 are arranged inside the concrete layer 1, and a disassembly structure 3 is arranged inside the embedded installation structure 2, and the inner walls of the first and second layers of the disassembly structure 3 from top to bottom are both movably connected with rope structures 4, and one end of the rope structure 4 is movably connected with the unloading platform 5, and the left and right sides of the rear side of the unloading platform 5 are both provided with stabilizing structures 6, and the outer wall of the stabilizing structure 6 is movably connected with the inner wall of the first layer of the disassembly structure 3 from bottom to top;
[0038] The concrete layer 1 includes a concrete formwork 11 , the front side of which is provided with two left-right symmetrical conical pre-embedded openings 12 , the inner wall rear end of the conical pre-embedded openings 12 is provided with a cylindrical cavity 13 , and the inner wall rear end of the cylindrical cavity 13 is provided with a square cavity 14 .
[0039] like Figure 4-8As shown, the embedded installation structure 2 includes a PPR rectangular outer shell 21, the outer wall of the PPR rectangular outer shell 21 is fixedly connected to the inner wall of the square cavity 14, the front side of the PPR rectangular outer shell 21 is provided with a circular movable hole 1 that penetrates to the inside, the front side of the PPR rectangular outer shell 21 corresponding to the center point of the circular movable hole 1 is fixedly connected with a PPR cylindrical outer shell 22, the outer wall of the PPR cylindrical outer shell 22 is fixedly connected to the inner wall of the cylindrical cavity 13, the front end of the PPR cylindrical outer shell 22 is fixedly connected with a PPR conical outer package opening 25, the outer wall of the PPR conical outer package opening 25 is fixedly connected to the inner wall of the conical embedded opening 12, the inner wall of the PPR rectangular outer shell 21 is fixedly connected with a square head nut 23, and the square head nut 23 corresponds to the center point of the circular movable hole 1 An internal thread groove 24 is provided on the front side of the point, and the disassembly structure 3 includes a fixed cylinder 31, the outer wall of the fixed cylinder 31 is movably connected to the inner wall of the PPR cylindrical outer shell 22, the front end of the fixed cylinder 31 is fixedly connected to a fixed sleeve 32, the outer wall of the fixed sleeve 32 is fixedly connected to a fixed assembly 33, the inner wall of the fixed sleeve 32 is movably connected to a driving assembly 34, the inner wall of the driving assembly 34 is threadedly connected to a fixed screw 35, the front end of the fixed screw 35 is fixedly connected to a movable rod 36, the front end of the movable rod 36 is fixedly connected to a fixed screw 2 37, the front end of the fixed screw 2 37 is fixedly connected to a J-shaped limit clamp 38, the outer wall of the movable rod 36 is movably connected to the inner wall of the fixed cylinder 31, the outer wall of the fixed screw 35 is connected to the PPR rectangular outer shell 2 1 is threadedly connected to the inner wall of the fixing assembly 33, and the fixing assembly 33 includes a mounting plate 331. A circular through hole 332 extending to the rear side is provided on the front side of the mounting plate 331. The inner wall of the circular through hole 332 is fixedly connected to the outer wall of the fixing sleeve 32. An annular groove 333 is provided on the front side of the mounting plate 331. The inner wall of the annular groove 333 is movably connected to an end of the J-shaped limiting clamp 38 away from the fixing screw rod 2 37. Mounting grooves 334 are provided on the left and right sides of the mounting plate 331. A circular movable hole 2 extending to the outside is provided on the top of the inner wall of the left mounting groove 334. A rocker 335 is movably connected to the inner wall of the circular movable hole 2. A bidirectional threaded rod 336 is fixedly connected to the bottom of the mounting groove 334. The center position of the outer wall of the bidirectional threaded rod 336 is movably connected to the support sleeve 3 37, the outer wall of the support sleeve 337 is fixedly connected to the inner wall of the left mounting groove 334, the outer wall of the bidirectional threaded rod 336 is threadedly connected with two symmetrical sliders 338, the left side of the slider 338 is fixedly connected with a connecting block 1 339, the upper and lower sides of the inner wall of the right mounting groove 334 are fixedly connected with a slide rod 330, the outer wall of the slide rod 330 is sleeved with two sliding sleeves 3301, the right side of the sliding sleeve 3301 is fixedly connected with a connecting block 2 3302, the connecting block 1 339 and the front side of the connecting block 2 3302 are fixedly connected with a clamping plate 3303, the side of the two clamping plates 3303 close to each other is movably connected to the outer wall of the concrete layer 1, the driving component 34 includes an internal threaded barrel 341, the inner wall of the internal threaded barrel 341 is threadedly connected to the outer wall of the fixing screw rod 2 37,The front side of the outer wall of the internal threaded cylinder 341 is fixedly connected to the fixed cylinder 2 342, the outer wall of the fixed cylinder 2 342 is fixedly connected to the connecting sleeve 343, the rear side of the outer wall of the internal threaded cylinder 341 is fixedly connected to the bearing 344, the outer wall of the bearing 344 is fixedly connected to the inner wall of the fixed sleeve 32, the left and right sides of the outer wall of the connecting sleeve 343 are provided with a pin hole 345 that penetrates to the bottom, the inner wall of the pin hole 345 is movably connected to the plug rod 346, the pull rope structure 4 includes a steel wire rope 41, and both ends of the steel wire rope 41 are fixedly connected to the connecting rod 346. Block 42, the ends of the two connecting blocks 42 that are away from each other are rotatably connected with a lifting ring 43, the circular ring of the upper lifting ring 43 is sleeved on the outer wall of the J-shaped limiting clamp 38, and the circular ring of the lower lifting ring 43 is sleeved with a limiting rod 44, and the right end of the limiting rod 44 is fixedly connected with a screw rod 1 45, and the front and rear sides below the left and right sides of the outer wall of the unloading platform 5 are provided with an internal threaded hole 1 penetrating to the side close to each other, the outer wall of the screw rod 1 45 is threadedly connected with the inner wall of the internal threaded hole 1, and the outer wall of the screw rod 1 45 is threadedly connected with a nut 46 on the right side;,
[0040] By inserting the fixing cylinder 1 31 into the interior of the PPR cylinder outer shell 22, and then shaking the shaking plate 335 to drive the bidirectional threaded rod 336 to rotate, the two sliders 338 drive the connecting block 1 339 and the clamping plate 3303 to move toward or away from each other, and at the same time drive the two connecting blocks 2 3302 to make the two sliding sleeves 3301 slide on the outer wall of the sliding rod 330, so that the clamping plate 3303 is more stable when moving, so that the clamping plate 3303 is close to or away from the outer wall of the concrete layer 1, and the installation and fixation of the disassembly structure 3 is realized, and then the upper lifting ring 43 is inserted into the outer wall of the J-shaped limit clamp 38, and then the insertion rod 346 is inserted into the inner wall of the pin hole 345 and shaken, thereby driving the connecting sleeve 343 to move. Rotate and drive the fixed cylinder 2 342 to rotate, and the internal thread cylinder 341 rotates on the inner wall of the bearing 344 through the rotation of the fixed cylinder 2 342. When the internal thread cylinder 341 rotates, it drives the fixed screw 2 37 to rotate and move. At the same time, the outer wall of the fixed screw 1 35 will rotate on the inner wall of the internal thread groove 24 to achieve bolt fixation. While rotating, the J-shaped limit clamp 38 also rotates, and finally stays on the inner wall of the annular groove 333 to achieve the fixation of the lifting ring 43. By inserting the limit rod 44 into the inner wall of the lower lifting ring 43, and inserting the screw rod 1 45 into the inner wall of the internal thread hole 1, and then screwing the nut 46 onto the outer wall of the screw rod 1 45, 4 can be installed on the unloading platform 5.
[0041] like Fig. 9As shown, the stabilizing structure 6 includes an internal and external threaded barrel 61, and an internal threaded hole 2 is opened on the top rear side of the main beam of the unloading platform 5 and penetrates to the bottom. The outer wall of the internal and external threaded barrel 61 is threadedly connected to the inner wall of the internal threaded hole 2, and the inner wall of the internal and external threaded barrel 61 is threadedly connected to a spiral rod 2 64, and the top of the spiral rod 2 64 is fixedly connected to a J-shaped stabilizing clamping rod 65, and the outer wall of the J-shaped stabilizing clamping rod 65 is movably connected to the inner wall of the lowest J-shaped limiting clamp 38, and the bottom of the internal and external threaded barrel 61 is fixedly connected to a connecting plate 62, and the rear side of the connecting plate 62 is fixedly connected to a T-shaped block 63, and the top of the T-shaped block 63 is movably connected to the bottom of the lowest concrete layer 1;
[0042] By screwing the internal and external threaded tube 61 into the inner wall of the second internal threaded hole, and then screwing the second screw rod 64 into the inner wall of the internal and external threaded tube 61, the J-shaped stabilizing clamp 65 is inserted from the bottom to the inner wall of the first J-shaped limit clamp 38 from bottom to top, and then under the action of the connecting plate 62, the T-shaped block 63 supports the bottom of the first bottom-up concrete formwork 11, thereby realizing the installation of the unloading platform 5.
[0043] The working principle of the present invention is as follows: by inserting the fixing cylinder 31 into the interior of the PPR cylinder outer shell 22, and then shaking the shaking plate 335 to drive the bidirectional threaded rod 336 to rotate, so that the two sliders 338 drive the connecting block 1 339 and the clamping plate 3303 to move toward or away from each other, and at the same time drive the two connecting blocks 2 3302 to make the two sliding sleeves 3301 slide on the outer wall of the sliding rod 330, so that the clamping plate 3303 is more stable when moving, so that the clamping plate 3303 is close to or away from the outer wall of the concrete layer 1, and the installation and fixation of the disassembly structure 3 is realized, and then the upper lifting ring 43 is inserted into the outer wall of the J-shaped limit clamp 38, and then the insertion rod 346 is inserted into the inner wall of the pin hole 345 and shaken, thereby driving the connecting sleeve 3 43 rotates and drives the fixed cylinder 2 342 to rotate, and the internal thread cylinder 341 rotates on the inner wall of the bearing 344 through the rotation of the fixed cylinder 2 342. When the internal thread cylinder 341 rotates, it drives the fixed screw 2 37 to rotate and move. At the same time, the outer wall of the fixed screw 1 35 will rotate on the inner wall of the internal thread groove 24 to achieve bolt fixation. While rotating, the J-shaped limit clamp 38 also rotates, and finally stays on the inner wall of the annular groove 333 to fix the lifting ring 43. By inserting the limit rod 44 into the inner wall of the lower lifting ring 43, inserting the screw rod 1 45 into the inner wall of the internal thread hole 1, and then screwing the nut 46 onto the outer wall of the screw rod 1 45, 4 is installed on the unloading platform 5.
[0044] By screwing the internal and external threaded tube 61 into the inner wall of the second internal threaded hole, and then screwing the second screw rod 64 into the inner wall of the internal and external threaded tube 61, the J-shaped stabilizing clamp 65 is inserted from the bottom to the inner wall of the first J-shaped limit clamp 38 from bottom to top, and then under the action of the connecting plate 62, the T-shaped block 63 supports the bottom of the first bottom-up concrete formwork 11, thereby realizing the installation of the unloading platform 5.
[0045] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A detachable cantilever unloading platform rope fixing device, comprising three layers of concrete layers (1) in an upper and lower array, characterized in that: Two embedded installation structures (2) are arranged inside the concrete layer (1), and a disassembly structure (3) is arranged inside the embedded installation structure (2). The inner walls of the disassembly structures (3) of the first and second layers from top to bottom are both movably connected with a pull rope structure (4), and one end of the pull rope structure (4) is movably connected with a discharge platform (5). Stabilizing structures (6) are arranged on the left and right sides of the rear side of the discharge platform (5), and the outer wall of the stabilizing structure (6) is movably connected to the inner wall of the disassembly structure (3) of the first layer from bottom to top; The concrete layer (1) comprises a concrete formwork (11), the front side of the concrete formwork (11) is provided with two left-right symmetrical conical pre-embedded openings (12), the inner wall rear end of the conical pre-embedded opening (12) is provided with a columnar cavity (13), and the inner wall rear end of the columnar cavity (13) is provided with a square cavity (14); The embedded installation structure (2) comprises a PPR rectangular outer shell (21), the outer wall of the PPR rectangular outer shell (21) is fixedly connected to the inner wall of the square cavity (14), the front side of the PPR rectangular outer shell (21) is provided with a circular movable hole 1 penetrating to the interior, the front side of the PPR rectangular outer shell (21) corresponding to the center point of the circular movable hole 1 is fixedly connected to a PPR cylindrical outer shell (22), the outer wall of the PPR cylindrical outer shell (22) is fixedly connected to the inner wall of the cylindrical cavity (13), the front end of the PPR cylindrical outer shell (22) is fixedly connected to a PPR conical outer package opening (25), and the outer wall of the PPR conical outer package opening (25) is fixedly connected to the inner wall of the conical embedded opening (12); The disassembly structure (3) comprises a fixing cylinder (31), the outer wall of which is movably connected to the inner wall of the PPR cylinder outer shell (22), the front end of which is fixedly connected to a fixing sleeve (32), the outer wall of which is fixedly connected to a fixing assembly (33), the inner wall of which is movably connected to a driving assembly (34), the inner wall of which is threadedly connected to a fixing screw (35), the front end of which is fixedly connected to a movable rod (36), the front end of which is fixedly connected to a fixing screw (37), and the front end of which is fixedly connected to a J-shaped limiting clamp (38).
2. A detachable cantilever unloading platform rope fixing device according to claim 1, characterized in that: A square head nut (23) is fixedly connected to the inner wall of the PPR rectangular outer shell (21), and an internal thread groove (24) is formed on the front side of the square head nut (23) corresponding to a center point of the circular movable hole.
3. The detachable cantilever unloading platform rope fixing device according to claim 1 is characterized in that: The outer wall of the movable rod (36) is movably connected to the inner wall of the fixed cylinder (31), and the outer wall of the fixed screw (35) is threadedly connected to the inner wall of the PPR rectangular outer shell (21).
4. The detachable cantilever unloading platform rope fixing device according to claim 1 is characterized in that: The fixing assembly (33) comprises a mounting plate (331), a circular through hole (332) extending from the front side of the mounting plate (331) to the rear side, an inner wall of the circular through hole (332) being fixedly connected to an outer wall of the fixing sleeve (32), an annular groove (333) being formed on the front side of the mounting plate (331), an inner wall of the annular groove (333) being movably connected to an end of a J-shaped limiting clamp (38) away from the second fixing screw rod (37), and mounting grooves (334) being formed on both left and right sides of the mounting plate (331).
5. The detachable cantilever unloading platform rope fixing device according to claim 4 is characterized in that: A circular movable hole 2 is provided at the top of the inner wall of the left mounting groove (334) and extends to the outside. A rocker (335) is movably connected to the inner wall of the circular movable hole 2. A bidirectional threaded rod (336) is fixedly connected to the bottom of the mounting groove (334). A support sleeve (337) is movably connected to the center of the outer wall of the bidirectional threaded rod (336). The outer wall of the support sleeve (337) is fixedly connected to the inner wall of the left mounting groove (334). Two symmetrical sliders (338) are threadedly connected to the outer wall of the bidirectional threaded rod (336). A connecting block 1 (339) is fixedly connected to the left side of the slider (338).
6. A detachable cantilever unloading platform rope fixing device according to claim 5, characterized in that: A slide bar (330) is fixedly connected to the upper and lower sides of the inner wall of the right installation groove (334), and two slide sleeves (3301) are sleeved on the outer wall of the slide bar (330). The right side of the slide sleeve (3301) is fixedly connected to a connecting block 2 (3302), and a clamping plate (3303) is fixedly connected to the front side of the connecting block 1 (339) and the connecting block 2 (3302), and the sides of the two clamping plates (3303) close to each other are movably connected to the outer wall of the concrete layer (1).
7. The detachable cantilever unloading platform rope fixing device according to claim 1 is characterized in that: The driving assembly (34) comprises an internal threaded cylinder (341), the inner wall of the internal threaded cylinder (341) is threadedly connected to the outer wall of the second fixing screw (37), the front side of the outer wall of the internal threaded cylinder (341) is fixedly connected to the second fixing cylinder (342), the outer wall of the second fixing cylinder (342) is fixedly connected to a connecting sleeve (343), the rear side of the outer wall of the internal threaded cylinder (341) is fixedly connected to a bearing (344), the outer wall of the bearing (344) is fixedly connected to the inner wall of the fixing sleeve (32), the left and right sides of the outer wall of the connecting sleeve (343) are provided with a pin hole (345) extending through to the bottom, and the inner wall of the pin hole (345) is movably connected to an insert rod (346).
8. The detachable cantilever unloading platform rope fixing device according to claim 1 is characterized in that: The pull rope structure (4) comprises a steel wire rope (41), both ends of the steel wire rope (41) are fixedly connected with connecting blocks (42), the ends of the two connecting blocks (42) that are away from each other are rotatably connected with lifting rings (43), the circular ring of the upper lifting ring (43) is sleeved on the outer wall of the J-shaped limiting clamp (38), and the circular ring of the lower lifting ring (43) is sleeved with a limiting rod (44), the right end of the limiting rod (44) is fixedly connected with a spiral rod (45), and the front and rear sides below the left and right sides of the outer wall of the unloading platform (5) are provided with internal threaded holes that penetrate to the side close to each other, the outer wall of the spiral rod (45) is threadedly connected to the inner wall of the internal threaded hole, and the outer wall of the spiral rod (45) is threadedly connected to the inner wall of the internal threaded hole, and the right side of the outer wall of the spiral rod (45) is threadedly connected with a nut (46).
9. The detachable cantilever unloading platform rope fixing device according to claim 1 is characterized in that: The stabilizing structure (6) comprises an internal and external threaded cylinder (61), and a second internal threaded hole extending to the bottom is provided on the top rear side of the main beam of the unloading platform (5). The outer wall of the internal and external threaded cylinder (61) is threadedly connected to the inner wall of the second internal threaded hole, and the inner wall of the internal and external threaded cylinder (61) is threadedly connected to a second screw rod (64). The top of the second screw rod (64) is fixedly connected to a J-shaped stabilizing clamping rod (65), and the outer wall of the J-shaped stabilizing clamping rod (65) is movably connected to the inner wall of the lowest J-shaped limiting clamp (38).
10. A detachable cantilever unloading platform pull rope fixing device according to claim 9, characterized in that: The bottom of the internal and external threaded cylinder (61) is fixedly connected to a connecting plate (62), the rear side of the connecting plate (62) is fixedly connected to a T-shaped block (63), and the top of the T-shaped block (63) is movably connected to the bottom of the lowest concrete layer (1).
Citation Information
Patent Citations
Pull rod type cantilever unloading platform device
CN112922358A
Installation structure for overhanging type discharging platform
CN204139609U
Convenient-to-disassemble cantilever discharging platform for fabricated building
CN209670369U
Socket anchoring type discharging platform assembly
CN211873888U
Full-assembly type overhanging discharging platform
CN220058925U
