Precast concrete pipe pile core sealing device and construction method
By designing a prefabricated concrete pipe pile core sealing device, using the structure of columns, struts and connecting rods, the problems of high cost and low efficiency of traditional methods for removing pile cores are solved, and rapid sealing and removal of pile cores are achieved, and construction is improved. Speed and quality reduce costs.
Patent Information
- Application Number
- CN202411322067.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-23
- Publication Date
- 2024-12-06
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The traditional method of removing prestressed concrete pipe pile core earthwork is costly and inefficient, which affects the construction progress.
A prefabricated concrete pipe pile core sealing device is designed, including columns, struts, connecting rods and friction plates. Through the cooperation of sliders, limit rods and springs, the pile core can be closed during the earth excavation process to prevent earthwork. It will be convenient to take out and facilitate construction in the later stage.
The pile core is quickly and safely closed, which improves construction speed and quality and reduces costs.
Smart Images

Figure CN119083756A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of pipe pile construction in building engineering, and specifically relates to a prefabricated concrete pipe pile core sealing device and a construction method. Background Art
[0002] With the continuous development of science and technology in modern society, the concept of architectural design has been constantly changing and innovating. Green, energy-saving, low-carbon, and efficient construction designs have gradually become the mainstream. PHC prestressed concrete pipe piles, as a form of foundation treatment and pile foundation, have now been greatly developed. With a series of advantages such as short construction period, high strength, convenient construction, industrialized production is not affected by seasons, no pollution to the construction site, and reliable quality, they have been widely used in various building foundations and play a huge role. After the prestressed concrete pipe piles are sunk, the earthwork is prone to collapse during the excavation process or when the ground earthwork is disturbed. The earthwork falls into the core of the prestressed concrete pipe pile, which is easy to cause blockage of the pile core. Before the subsequent construction of the pile cap foundation, the pile core soil must be cleaned up before placing the steel cage in the pile core and filling concrete. The traditional methods for removing the pile core soil are mechanical hole cleaning and manual hole cleaning, and the high cost of soil cleaning and slow construction efficiency affect the progress.
[0003] Therefore, there are above-mentioned various inconveniences and problems in the known method of removing pile core soil. Summary of the invention
[0004] The purpose of the present invention is to provide a safe and reliable prefabricated concrete pipe pile core sealing device.
[0005] Another object of the present invention is to provide a safe and reliable construction method for a prefabricated concrete pipe pile core sealing device.
[0006] To achieve the above purpose, the technical solution of the present invention is: A prefabricated concrete pipe pile core sealing device comprises a column, a support rod and a connecting rod, and is characterized in that: A fixing block is arranged at the bottom end of the column, and ear plates are arranged at both ends of the fixing block. A slider and a limit hole are arranged in the middle of the column, and a limit rod is arranged on the upper end surface of the slider, and the limit rod can be locked in cooperation with the limit hole; a circular steel plate for closing the pile core is fixedly welded on the side of the slider; a spring is arranged between the slider and the fixing block at the lower part of the column; The support rod is an oblique support rod, one end of which is provided with a friction plate, and the other end of the support rod is hinged to the ear plate at one end of the fixed block; One end of the connecting rod is hinged to the ear plate at one end of the sliding block, and the other end of the connecting rod is hinged to the middle part of the supporting rod.
[0007] The prefabricated concrete pipe pile core sealing device of the present invention can also be further implemented by adopting the following technical measures.
[0008] The aforementioned prefabricated concrete pipe pile core sealing device, wherein the friction plate abuts against the inner wall of the concrete pipe pile.
[0009] A construction method for a prefabricated concrete pipe pile core sealing device, characterized by comprising the following steps: a. Installation of the core sealing device of the precast concrete pipe pile. Before the pile is sunk, the core sealing device of the precast concrete pipe pile is installed in the pile core. The upper sealing steel plate of the device is used to prevent the earth from falling into the core of the prestressed concrete pipe pile during the excavation process or on the ground; b. Pipe pile construction: use a static pile driver to sink the pipe piles into the designed elevation; c. Earth excavation: After the construction of the pipe pile is completed, the earth will be excavated to the bottom of the pile cap according to the design drawings and plan requirements; d. Take out the precast concrete pile core sealing device. After the excavation is completed, separate the limit rod from the column by rotating it. The spring set between the fixed block and the slider pushes the slider to move upward, driving the connecting rod, the support rod and the friction plate to separate from the inner wall of the precast concrete pile, and take out the precast concrete pile core sealing device; e) Construction of precast concrete pipe pile cap: after the excavation is completed and the precast concrete pipe pile core sealing device is removed, the foundation cushion, waterproofing, pile core filling and pile cap construction shall be carried out according to the design drawings, plans and specifications.
[0010] After adopting the above technical solution, the prefabricated concrete pipe pile core sealing device and method of the present invention have the following advantages: 1. The closing device has a simple structure and is easy to manufacture; 2. Improve construction speed and ensure construction quality; 3. Reduce costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 It is a schematic diagram of the use status of the precast concrete pipe pile core sealing device according to an embodiment of the present invention. DETAILED DESCRIPTION
[0012] The present invention is further described below in conjunction with embodiments and accompanying drawings.
[0013] Example 1 The prefabricated concrete pipe pile core sealing device of the present invention comprises a column, a support rod and a connecting rod.
[0014] Please refer to Figure 1 , Figure 1The schematic diagram of the use state of the precast concrete pipe pile core sealing device of the embodiment of the present invention is shown in the figure. As shown in the figure, a fixed block 6 is arranged at the lower end of the column 1, and the fixed block and the support rod 5 are hingedly connected by an ear plate arranged on the fixed block. The other end of the support rod is provided with a friction plate 4, and the support rod is hingedly connected with the connecting rod 9 arranged on the slider; a steel plate 3 for closing the pile core is welded on the side of the slider, and a limit rod 8 is arranged on the upper part to form a limit device with a limit hole arranged on the column; a spring 10 is arranged between the slider 2 and the fixed block on the outside of the column, and the precast concrete pipe pile core sealing device drives the connecting rod, the support rod and the friction plate at the end of the support rod to be fixed with the inner wall 7 of the precast concrete pipe pile by moving the slider downward in the pile core, and the limit rod on the slider is locked with the limit hole on the column, and the precast concrete pipe pile core 11 sealing device is taken out later and separated from the column by rotating the limit rod, and the spring arranged between the fixed block and the slider supports the slider to move upward to drive the connecting rod, the support rod and the friction plate to separate from the inner wall of the precast concrete pipe pile. To solve the problem that after the prestressed concrete pipe piles are sunk, the holes are prone to collapse during the earth excavation process or when the ground earth is disturbed, and the earth falls into the core of the prestressed concrete pipe piles, which can easily cause blockage of the pile core. Before the subsequent construction of the pile cap foundation, the pile core soil must be cleaned before placing a steel cage in the pile core and filling it with concrete.
[0015] Example 2 The construction method of the prefabricated concrete pipe pile core sealing device of the present invention: a) Installation of precast concrete pipe pile core sealing device: Before the pipe pile is sunk, a precast concrete pipe pile core sealing device is installed in the pile core. The upper sealing steel plate of the device prevents the hole from collapsing during the earth excavation process or after the ground earth is disturbed, so that the earth falls into the core of the prestressed concrete pipe pile and blocks the pile core.
[0016] b) Pipe pile construction: use a static pile driver to sink the pipe piles to the designed elevation.
[0017] c) Excavation: After the construction of pipe piles is completed, the excavation shall be carried out to the bottom of the pile cap according to the design drawings and plan requirements.
[0018] d) Take out the precast concrete pipe pile core sealing device. After the excavation is completed, take out the precast concrete pipe pile core sealing device and separate it from the column by rotating the limit rod. The spring arranged between the fixed block and the slider pushes the slider to move upward, driving the connecting rod, the support rod and the friction plate to separate from the inner wall of the precast concrete pipe pile.
[0019] e) Construction of pile cap: after the excavation is completed and the prefabricated concrete pipe pile core sealing device is removed, the foundation cushion, waterproofing, pile core filling and pile cap construction shall be carried out according to the design drawings, plans and specifications.
[0020] The above embodiments are only for the purpose of illustrating the present invention, but not for limiting the present invention. A person skilled in the art may make various changes or modifications without departing from the spirit and scope of the present invention. Therefore, all equivalent technical solutions should also belong to the scope of the present invention and should be defined by the claims.
Claims
1. A prefabricated concrete pipe pile core sealing device, comprising a column (1), a support rod (5), and a connecting rod (9), characterized in that: A fixing block (6) is arranged at the bottom end of the column (1), and ear plates are arranged at both ends of the fixing block. A slider (2) and a limit hole are arranged in the middle of the column (1), and a limit rod (8) is arranged on the upper end surface of the slider, and the limit rod can cooperate with the limit hole to lock. A circular steel plate (3) for sealing the pile core is fixedly welded on the side of the slider. A spring (10) is arranged between the slider and the fixing block at the bottom of the column (1). The support rod (5) is an oblique support rod, one end of which is provided with a friction plate (4), and the other end of the support rod is hinged to an ear plate at one end of the fixed block; One end of the connecting rod (9) is hinged to the ear plate at one end of the slider, and the other end of the connecting rod is hinged to the middle part of the support rod (5).
2. The prefabricated concrete pipe pile core sealing device according to claim 1, characterized in that: The friction plate (4) abuts against the inner wall of the concrete pipe pile.
3. A construction method for the prefabricated concrete pipe pile core sealing device according to claim 1, characterized in that The following steps are involved: a. Installation of the core sealing device of the precast concrete pipe pile. Before the pile is sunk, the core sealing device of the precast concrete pipe pile is installed in the pile core. The upper sealing steel plate of the device is used to prevent the earth from falling into the core of the prestressed concrete pipe pile during the excavation process or on the ground; b. Pipe pile construction: use a static pile driver to sink the pipe piles into the designed elevation; c. Earth excavation: After the construction of the pipe pile is completed, the earth will be excavated to the bottom of the pile cap according to the design drawings and plan requirements; d. Take out the precast concrete pile core sealing device. After the excavation is completed, separate the limit rod from the column by rotating it. The spring set between the fixed block and the slider pushes the slider to move upward, driving the connecting rod, the support rod and the friction plate to separate from the inner wall of the precast concrete pile, and take out the precast concrete pile core sealing device; e) Construction of precast concrete pipe pile cap: after the excavation is completed and the precast concrete pipe pile core sealing device is removed, the foundation cushion, waterproofing, pile core filling and pile cap construction shall be carried out according to the design drawings, plans and specifications.
Citation Information
Patent Citations
Foldable downcast tube well temporary plugging device
CN117758770A
Detachable plugging mold suitable for small-section hole and construction method of detachable plugging mold
CN117822941A
Reserved hole plugging device
CN211622606U
Precast tubular pile core plugging device
CN214993849U
High-rise building circular truncated cone measuring pay-off hole reserving and plugging construction mold
CN218176651U