Construction method for shallow-buried gully bilateral bias pressure tunnel portal section

By adopting a construction method combining step-by-step excavation and permanent arch protection in shallow buried trench terrain, the bias problem of tunnel opening sections is alleviated, the risk of accidents in the roadbed section is reduced, and construction safety and operability are improved.

CN119084022APending Publication Date: 2024-12-06HUNAN PROVINCIAL COMM PLANNING SURVEY & DESIGN INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411137652.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-19
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

In shallow buried ditches terrain, the tunnel opening section shrinks to the biased side and covers the soil, resulting in the roadbed section being too high, increasing the risk of accidents.

Method used

Part of the soil inside the left and right holes of the tunnel are excavated in step by step, and permanent arches on the right and left sides are installed, and a horizontal support assembly is applied between the two, for the initial support of the circulating ruler and arch, and then Backfill the outer backfill layer to reduce the impact of bias.

Benefits of technology

Effectively alleviate the bias on both sides of the groove, reduce the risk of asymmetry in the tunnel structure load, improve construction safety and operability, shorten the construction cycle, and reduce costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119084022A_ABST
    Figure CN119084022A_ABST
Patent Text Reader

Abstract

According to the construction method for the shallow-buried gully double-side bias pressure tunnel portal section, the left side and the right side of a soil body in a tunnel main hole are excavated step by step, disturbance to a slope body can be reduced as much as possible, and meanwhile needed space can be provided for a right side permanent protection arch and a left side permanent protection arch; after the right side permanent protection arch, the left side permanent protection arch and the cross arm assembly are installed, biased pressure on the two sides of the gully can be effectively relieved, the backfill layer can further reduce the influence of the biased pressure on the tunnel structure, and the risk of construction in the tunnel is reduced; under the protection of the right-side permanent protection arch and the left-side permanent protection arch, remaining soil in the tunnel is excavated, the excavation circulation footage is controlled, disturbance to a slope body can be further reduced, an arch wall primary support is installed, after enough operation space is reserved in the tunnel, the inverted arch is excavated, and the inverted arch primary support, the protection arch and the arch wall primary support are closed to form a ring. Compared with underground excavation construction after full backfilling, the scheme has the advantages of better operability, shorter period, higher safety and lower manufacturing cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of tunnel technology, and in particular to a construction method for a shallow-buried gully double-sided biased tunnel portal section. Background Art

[0002] With the development of my country's economic construction, highways have begun to extend to remote mountainous areas. Affected by factors such as topography and environmental protection, highway line selection has become increasingly difficult, resulting in tunnel entrances being located in unfavorable terrain. Among them, when the tunnel entrance section is located in a shallow gully terrain, the gully is located between the left and right tunnels of the tunnel. At this time, the inner sides of the left and right tunnels of the tunnel are biased, and the bias will have an adverse effect on the tunnel. For example, the bias will cause asymmetric loads on the tunnel lining structure, which can easily cause shear failure of the lining structure.

[0003] At present, the conventional practice for tunnel portals in this type of terrain is to shrink the tunnel portal to a position where the soil on the eccentric side meets the requirements for entering the tunnel, and to make the portal into an end wall type, and then backfill soil and rocks between the left and right tunnels. However, although this method can effectively reduce the eccentric pressure problem of the tunnel portal, it leads to excessively high slopes in the roadbed section, increasing the risk of accidents in the roadbed section, such as increasing the risk of landslides, collapses, and rockfalls.

[0004] In view of this, it is necessary to propose a construction method for a shallow gully double-sided biased tunnel portal section to solve or at least alleviate the above defects. Summary of the invention

[0005] The main purpose of the present application is to provide a construction method for a shallow gully double-sided biased tunnel portal section, so as to solve the technical problem in the prior art that when the tunnel portal section is located in a shallow gully terrain, the tunnel portal section needs to be retracted to the biased side covered with soil to meet the entry requirements, and the portal is made into an end wall type, resulting in the side slope of the roadbed section being too high, thereby increasing the risk of accidents in the roadbed section.

[0006] To achieve the above-mentioned purpose, the present application provides a construction method for a shallow gully double-sided biased tunnel portal section, comprising the steps of:

[0007] S1, the i-th cycle footage of excavating the right soil in the left tunnel, the left soil in the right tunnel, and the gully soil between the left tunnel and the right tunnel in the depth direction; wherein i is a positive integer and the initial value of i is 1;

[0008] S2, installing a right permanent guard arch matching the left tunnel contour line, and installing a left permanent guard arch matching the right tunnel contour line, and driving a left tunnel guard arch locking anchor rod on the right permanent guard arch, and driving a right tunnel guard arch locking anchor rod on the left permanent guard arch;

[0009] S3, constructing a cross brace assembly between the right permanent guard arch and the left permanent guard arch;

[0010] S4, excavating the remaining soil on the left side of the left tunnel excavation contour line in the left tunnel and excavating the remaining soil on the right side of the right tunnel excavation contour line in the right tunnel along the depth direction for the i-th cycle footage, and performing the initial support of the left tunnel arch wall and the initial support of the right tunnel arch wall corresponding to the i-th cycle footage;

[0011] S5, determine whether the i-th cycle footage is the N-th cycle footage; if so, proceed to step S6; if not, assign i+1 to i and return to step S1; wherein the N-th cycle footage is the cycle footage corresponding to the starting section invert, N≥3;

[0012] S6, perform the initial support of the left tunnel invert and the right tunnel invert corresponding to the j-th cycle footage, and determine whether the i-th cycle footage is the last cycle footage of the tunnel entrance section; if so, proceed to step S7, if not, assign j+1 to j, and return to step S1; wherein j is a positive integer, and the initial value of j is 1;

[0013] S7, sequentially perform the left tunnel invert arch initial support and the right tunnel invert arch initial support of the remaining cycle footage of the tunnel entrance section to complete the tunnel entrance section construction of all cycle footages;

[0014] S8, constructing the waterproof layer and secondary lining corresponding to the left tunnel and the right tunnel, and constructing the backfill layer between the left tunnel and the right tunnel to the designed elevation.

[0015] Preferably, the initial support of the left arch wall and the initial support of the right arch wall corresponding to the i-th cycle footage in step S4 specifically include the following steps:

[0016] In the left tunnel arch wall area corresponding to the i-th cycle footage, C25 shotcrete is initially sprayed, and the end of the right permanent arch guard is cleaned, and two I20 I-beams are erected; one end of the I20 I-beam is connected to the right permanent arch guard, and the other end is overlapped at the left tunnel arch foot;

[0017] Locking anchor bolts were installed at the arch foot of the left tunnel, steel mesh was hung between two I20 I-beams, C25 shotcrete was sprayed, and then system anchor bolts were installed;

[0018] In the right tunnel arch wall area corresponding to the i-th cycle footage, C25 shotcrete is initially sprayed, and the end of the left permanent guard arch is cleaned, and two I20 I-beams are erected; one end of the I20 I-beam is connected to the left permanent guard arch, and the other end is overlapped at the right tunnel arch foot;

[0019] Locking anchor rods are installed at the arch foot of the right tunnel, steel mesh is hung between two I20 I-beams, C25 shotcrete is sprayed, and then system anchor rods are installed.

[0020] Preferably, the steps S7 and S8 further include the following steps:

[0021] A water intercepting ditch and a water collecting pool are constructed within the design range of the gully between the left tunnel and the right tunnel; wherein a water outlet is reserved at the bottom of the water collecting pool, the water intercepting ditch is arranged across the water collecting pool, and the water intercepting ditch is connected with the existing roadbed side ditch;

[0022] The cross brace assembly is used as a supporting structure to construct a first drainage pipe; wherein the water inlet end of the first drainage pipe passes through the water outlet and extends into the water collection tank;

[0023] Construct an energy dissipation pool outside the tunnel; wherein the water outlet end of the first drainage pipe is connected to the energy dissipation pool outside the tunnel, and the energy dissipation pool outside the tunnel is connected to the existing roadbed ditch.

[0024] Preferably, the right permanent arch guard and the left permanent arch guard are both corrugated steel plates, and a water collection bucket is provided on the outside of the corrugated steel plate near the tunnel arch foot. The water collection bucket is connected to the first drain pipe through a second drain pipe to drain the water accumulated on the outside of the corrugated steel plate to the built roadbed side ditch.

[0025] Preferably, the right side permanent arch protection includes a first right side permanent arch protection segment, a second right side permanent arch protection segment and a third right side permanent arch protection segment which are sequentially spliced ​​along the left tunnel contour line of the tunnel, and the left side permanent arch protection includes a first left side permanent arch protection segment, a second left side permanent arch protection segment and a third left side permanent arch protection segment which are sequentially spliced ​​along the right tunnel contour line of the tunnel; wherein, the third right side permanent arch protection segment is provided with a first through hole for the left tunnel arch protection locking anchor to pass through at an end away from the second right side permanent arch protection segment, and the third left side permanent arch protection segment is provided with a second through hole for the right tunnel arch protection locking anchor to pass through at an end away from the first left side permanent arch protection segment, the left tunnel arch protection locking anchor is anchored into the surrounding rock by passing through the first through hole and the tail is connected to the third right side permanent arch protection segment, and the right tunnel arch protection locking anchor is anchored into the surrounding rock by passing through the second through hole and the tail is connected to the third left side permanent arch protection segment.

[0026] Preferably, the cross brace assembly comprises a plurality of cross brace layers arranged at intervals in the vertical direction, and each of the cross brace layers comprises a plurality of cross braces arranged at intervals in the depth direction.

[0027] Preferably, the first drainage pipe is a HDPE pipe, and the second drainage pipe is a PVC pipe.

[0028] Preferably, the length of the water inlet end of the first drain pipe that passes through the water outlet and extends into the water collection tank is set between 8-20 cm.

[0029] Compared with the prior art, this application has the following beneficial effects:

[0030] The invention provides a construction method for a tunnel entrance section of a shallow buried gully double-sided biased tunnel. The method adopts the method of dividing part of the soil in the left tunnel and the right tunnel into the left and right sides for step-by-step excavation, which can reduce the disturbance to the slope as much as possible and provide required space for the right permanent protective arch and the left permanent protective arch. After the right permanent protective arch and the left permanent protective arch and the cross brace assembly are installed, a certain supporting effect is played on the slope, which can effectively alleviate the double-sided bias of the gully. Then, the outer backfill backfill layer is backfilled between the right permanent protective arch and the left permanent protective arch, which can further reduce the influence of the biased pressure on the tunnel structure and reduce the risk of construction in the tunnel. Under the protection of the right permanent protective arch and the left permanent protective arch, the remaining soil in the tunnel is excavated, and the excavation cycle advance is controlled, which can further reduce the disturbance to the slope. The initial support of the arch wall is installed, and the initial support of the arch wall is connected with the corresponding permanent protective arch. After enough operating space is left in the tunnel, the inverted arch is excavated, and the initial support of the inverted arch, the protective arch and the initial support of the arch wall are closed into a ring. Compared with backfilling followed by dark excavation, this solution is easier to operate, has a shorter cycle, is safer and has a lower cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying any creative work.

[0032] Figure 1 It is a schematic diagram of a construction method in one embodiment of the present application;

[0033] Figure 2 This is one of the application scenario diagrams in one embodiment of the present application;

[0034] Figure 3 is a schematic cross-sectional view of a gully in one embodiment of the present application;

[0035] Figure 4 This is the second application scenario diagram in one embodiment of the present application;

[0036] Figure 5 This is a schematic diagram of the elevation structure after the opening section is constructed in one embodiment of the present application;

[0037] Figure 6 It is a schematic diagram of the right permanent arch protection, the left permanent arch protection, the cross brace assembly, and the initial support connection of the arch wall in one embodiment of the present application;

[0038] Figure 7 It is a structural schematic diagram of a right permanent guard arch, a left permanent guard arch, and a cross brace assembly after construction in one embodiment of the present application;

[0039] Figure 8 for Figure 6 A is an enlarged schematic diagram;

[0040] Fig. 9 for Figure 6 An enlarged schematic diagram of the connection between the initial support of the left tunnel invert and the first right permanent arch section at B in the middle;

[0042] Fig.10 It is a structural schematic diagram of the right permanent arch protection segment in one embodiment of the present application;

[0043] Fig.11 It is a schematic plan view of the intersection of the intercepting ditch and the water collection pool in one embodiment of the present application;

[0044] Fig.12 It is a schematic elevation view of the intersection of the intercepting ditch and the water collection pool in one embodiment of the present application.

[0045] The purpose, features and advantages of this application will be further described in conjunction with the embodiments and with reference to the accompanying drawings.

[0046] Description of Figure Numbers:

[0047] 1. Left tunnel of the tunnel; 10. Permanent arch protection on the right side; 110. First permanent arch protection section on the right side; 120. Second permanent arch protection section on the right side; 130. Third permanent arch protection section on the right side; 140. Locking anchor rod for arch protection on the left tunnel; 150. Initial support for arch wall on the left tunnel; 151. I20 I-beam; 160. Initial support for inverted arch on the left tunnel; 170. Permanent arch protection section on the right side; 171. Main body of arch protection on the left tunnel; 172. First connection assembly; 1721. First connection plate; 1722. Second connection plate; 2. Right tunnel of the tunnel; 20. Left side Permanent arch protection; 210, first left permanent arch protection section; 220, second left permanent arch protection section; 230, third left permanent arch protection section; 240, right tunnel arch protection locking anchor rod; 250, right tunnel arch wall initial support; 260, right tunnel invert initial support; 3, cross brace assembly; 31, cross brace; 311, first end pad; 312, cross brace main section; 4, gully; 41, backfill layer; 5, intercepting ditch; 6, water collection pool; 61, water outlet; 7, open ditch; 8, first drainage pipe; 91, energy dissipation pool outside the tunnel; 92, landscape pool. DETAILED DESCRIPTION

[0048] It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0049] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0050] It should be noted that all directional indications in the embodiments of the present application (such as up, down, left, right, front, back, etc.) are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0051] In addition, the descriptions of "right part", "middle part" and the like in this application are only for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "right part" and "middle part" may explicitly or implicitly include at least one such feature. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in this field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by this application.

[0052] Please see attached Figures 1 to 12 In one embodiment of the present application, a construction method for a shallow gully double-side biased tunnel portal section comprises the following steps:

[0053] S1, the i-th cycle footage of excavating the right soil in the left tunnel 1, the left soil in the right tunnel 2, and the gully soil between the left tunnel 1 and the right tunnel 2 in the depth direction; wherein i is a positive integer and the initial value of i is 1;

[0054] Specifically, a cyclic excavation method is adopted along the longitudinal direction of the tunnel. In order to reduce the disturbance to the slope and ensure the safety of the excavation process, the cyclic advance is preferably set to 1m, i is a positive integer, and the initial value of i is 1. For example, when i is 1, the first cyclic advance is excavated, and the subsequent cyclic advances are analogous. It should be noted that in order to minimize the impact of excavation on the slope as much as possible and provide construction space for the arch protection on the biased side of the main tunnel of the tunnel (the side close to the gully 4), the present application first excavates the right soil in the left tunnel 1 of the tunnel, the left soil in the right tunnel 2 of the tunnel, and the gully soil corresponding to the cyclic advance, wherein the excavation contour line is as follows Figure 3As shown, the excavation slope ratio is preferably 1:0.5, the excavation contour line is preferably adjusted according to the ground line, and the inner soil excavation contour line within each cycle footage range is the same to facilitate the assembly between the right permanent arch segments 170 and the left permanent arch segments in the depth direction.

[0055] S2, installing a right permanent arch 10 that matches the left tunnel contour line, and installing a left permanent arch 20 that matches the right tunnel contour line of the tunnel, and driving a left tunnel arch locking anchor rod 140 on the right permanent arch 10 and a right tunnel arch locking anchor rod 240 on the left permanent arch 20;

[0056] Specifically, in order to alleviate the double-sided bias problem of the shallow buried gully 4, the present application first applies a right permanent arch 10 on the inner side of the left tunnel 1, and a left permanent arch 20 on the inner side of the right tunnel 2, wherein the right permanent arch 10 and the left permanent arch 20 can be steel arches or other arches with increased structural strength. Preferably, the right permanent arch 10 and the left permanent arch 20 are arches in the form of corrugated steel plates. For details, please refer to the attached Fig. 9 The corrugated steel plate has better bearing capacity, convenient construction characteristics, and waterproof effect. Furthermore, in order to facilitate the installation of the corrugated steel plate, a 15cm C20 concrete cushion layer can be leveled and laid at the overlap of the corrugated steel plate.

[0057] The present application provides a left hole arch locking anchor rod 140 on the right permanent arch 10 and a right hole arch locking anchor rod 240 on the left permanent arch 20, wherein the left hole arch locking anchor rod 140 includes a first anchoring end (not shown in the figure) and a first locking end (not shown in the figure) arranged relatively along its own extension direction, and the right hole arch locking anchor rod 240 includes a second anchoring end (not shown in the figure) and a second locking end (not shown in the figure) arranged relatively along its own extension direction, the first anchoring end passes through the right permanent arch 10 and is anchored into the surrounding rock, the first locking end is connected to the right permanent arch 10, and can be used as an initial fixing structure during the construction of the right permanent arch 10, and can also be used as a permanent system anchor rod for the later tunnel, thus killing two birds with one stone. Similarly, the second anchoring end passes through the left permanent arch 20 and is anchored into the surrounding rock, the second locking end is connected to the left permanent arch 20, and can be used as an initial fixing structure during the construction of the left permanent arch 20, and can also be used as a permanent system anchor rod for the later tunnel.

[0058] S3, constructing a cross brace assembly 3 between the right permanent guard arch 10 and the left permanent guard arch 20;

[0059] It should be noted that the present application cleverly connects the right permanent guard arch 10 and the left permanent guard arch 20 into a whole through the cross-bracing assembly 3. The cross-bracing assembly 3 can transmit the mountain pressure and make full use of the inner bias pressure of the left tunnel hole 1 and the inner bias pressure of the right tunnel hole 2 to balance and offset each other, thereby cleverly alleviating the bias problem by taking advantage of the double-sided bias pressure of the gully 4 and improving the stability of the overall structure.

[0060] Further, the cross brace assembly 3 includes a plurality of cross brace layers arranged at intervals in the vertical direction, and each cross brace layer includes a plurality of cross braces 31 arranged at intervals in the depth direction. As an optional example, the cross brace assembly 3 includes two cross brace layers arranged at intervals in the vertical direction. Preferably, the cross brace 31 is an I-beam cross brace 31@50cm, divided into two layers, and further, diagonal braces can be added between the cross braces 31 according to the span to improve the structural stability.

[0061] S4, excavate the remaining soil on the left side of the left tunnel excavation contour line in the left tunnel 1 and the remaining soil on the right side of the right tunnel excavation contour line in the right tunnel 2 along the i-th cycle advance, and perform the left tunnel arch wall initial support 150 and the right tunnel arch wall initial support 250 corresponding to the i-th cycle advance; specifically, after completing the right permanent arch protection 10, the left permanent arch protection 20 and the cross brace assembly 3, excavate the remaining soil of the current cycle advance (i.e., the soil outside the excavation contour line of each tunnel main tunnel). After the excavation is completed, all the soil in the tunnels corresponding to the current cycle advance are excavated. At this time, the left tunnel arch wall initial support 150 and the right tunnel arch wall initial support 250 corresponding to the current cycle advance can be performed to support the surrounding rock in time.

[0062] S5, determine whether the i-th cycle footage is the N-th cycle footage; if so, proceed to step S6; if not, assign i+1 to i and return to step S1; wherein the N-th cycle footage is the cycle footage corresponding to the starting section invert, N≥3;

[0063] Specifically, the invert construction of this application adopts the method of delayed arch wall initial support construction. First, it follows the principle of the New Austrian Tunneling Method to first release part of the stress of the surrounding rock to avoid excessive excavation and cause collapse. Second, it leaves operating space for the invert construction. The construction of the face and the invert construction can be carried out simultaneously, which greatly improves the construction efficiency. This step is to determine whether the current cycle footage is the cycle footage corresponding to the starting section of the invert. If so, the construction of the initial support of the invert is started. If not, i+1 is assigned to i, and step S1 is returned to start the next cycle. As a preferred example, the cycle footage of the invert and the cycle footage of the arch wall are both longitudinally 1m, and N is 5, that is, if the i-th cycle footage is the 5th cycle footage, the construction of the 1st invert cycle footage is started, and so on.

[0064] S6, perform the left tunnel invert initial support 160 and the right tunnel invert initial support 260 corresponding to the j-th cycle footage, and determine whether the i-th cycle footage is the last cycle footage of the tunnel entrance section; if so, proceed to step S7, if not, assign j+1 to j, and return to step S1; wherein j is a positive integer, and the initial value of j is 1;

[0065] It should be noted that, in this step, the initial support 160 of the left tunnel invert and the initial support 260 of the right tunnel invert corresponding to the j-th cycle footage are constructed, and then it is determined whether the ith cycle footage is the last cycle footage of the tunnel entrance section. If so, it means that the initial support 150 of the left tunnel arch wall and the initial support 250 of the right tunnel arch wall of the tunnel entrance section have been completed, and only the remaining several cycle footages of the invert have not been constructed. At this time, step S7 is entered to complete the initial support 160 of the left tunnel invert and the initial support 260 of the right tunnel invert of the remaining cycle footage. If not, j is assigned j+1, and the process returns to step S1 to enter the construction of the next cycle footage.

[0066] S7, sequentially perform the left tunnel invert initial support 160 and the right tunnel invert initial support 260 of the remaining cycle footage of the tunnel entrance section to complete the tunnel entrance section construction of all cycle footages;

[0067] S8, construct the waterproof layer and secondary lining corresponding to the left tunnel 1 and the right tunnel 2, and construct the backfill layer 41 between the left tunnel 1 and the right tunnel 2 to the designed elevation. The backfill layer 41 is constructed between the right permanent arch 10 and the left permanent arch 20. For example, the backfill layer 41 is foamed concrete, which can further reduce the impact of the bias pressure on the tunnel structure and reduce the risk of construction in the tunnel.

[0068] In the present application scheme, part of the soil in the left tunnel 1 and the right tunnel 2 of the tunnel is divided into the left and right sides for step-by-step excavation, which can minimize the disturbance to the slope and provide the required space for the right permanent arch 10 and the left permanent arch 20; after the right permanent arch 10 and the left permanent arch 20 and the cross brace assembly 3 are installed, they play a certain supporting role on the slope and can effectively alleviate the double-sided bias pressure of the gully 4. Then, the outer backfill layer 41 is backfilled between the right permanent arch 10 and the left permanent arch 20, which can further reduce the impact of the bias pressure on the tunnel structure and reduce the risk of construction in the tunnel; under the protection of the right permanent arch 10 and the left permanent arch 20, the remaining soil in the tunnel is excavated, and the excavation cycle advance is controlled, which can further reduce the disturbance to the slope, and the initial support of the arch wall is installed. The initial support of the arch wall is connected to the corresponding permanent arch, and after enough operating space is left in the tunnel, the invert arch is excavated, and the initial support of the invert arch, the arch, and the initial support of the arch wall are closed into a ring. Compared with backfilling followed by dark excavation, this solution is easier to operate, has a shorter cycle, is safer and has a lower cost.

[0069] As a preferred embodiment, the implementation of the left arch wall initial support 150 and the right arch wall initial support 250 corresponding to the i-th cycle footage in step S4 specifically includes the following steps:

[0070] In the left tunnel arch wall area corresponding to the i-th cycle footage, C25 shotcrete is sprayed initially, and the end of the right permanent arch 10 is cleaned, and two I20 I-beams 151 are erected; one end of the I20 I-beam 151 is connected to the right permanent arch 10, and the other end is overlapped at the left tunnel arch foot; a locking foot anchor rod is driven at the left tunnel arch foot, a steel mesh is hung between the two I20 I-beams 151, C25 shotcrete is sprayed again, and then the system anchor rod is driven;

[0071] In the right tunnel arch wall area corresponding to the i-th cycle footage, C25 shotcrete is initially sprayed, and the end of the left permanent guard arch 20 is cleaned, and two I20 I-beams 151 are erected; one end of the I20 I-beam 151 is connected to the left permanent guard arch 20, and the other end is overlapped at the right tunnel arch foot; locking foot anchor rods are driven at the right tunnel arch foot, and a steel mesh is hung between the two I20 I-beams 151, and C25 shotcrete is sprayed again, and then the system anchor rods are driven.

[0072] Specifically, by initially spraying C25 shotcrete in the arch wall area of ​​the left tunnel 1 and the right tunnel 2, a preliminary support layer is provided for the tunnel arch wall, which enhances the stability of the surrounding rock. The I20 I-beam 151 erected subsequently as a steel frame support further enhances the rigidity and strength of the support structure, which can effectively resist the surrounding rock pressure and prevent tunnel deformation; improve the integrity of the support system: one end of the I20 I-beam 151 is connected to the permanent arch protection, and the other end is overlapped at the arch foot. This connection method makes the support system form a continuous whole in the longitudinal direction, which improves the overall stability and bearing capacity of the support system. The locking foot anchor rod is set at the arch foot to fix the steel frame to prevent it from displacement or overturning, thereby improving the stress state of the support system. The locking foot anchor rod can also closely connect the surrounding rock at the arch foot with the support system to jointly bear the surrounding rock pressure; by re-spraying C25 shotcrete, the gap between the steel frame and the steel mesh can be filled to form a dense support layer and improve the support effect. At the same time, the shotcrete can be closely combined with the surrounding rock to form a common bearing system, further improving the stability of the tunnel; the driving of the system anchor can further strengthen the surrounding rock and improve the self-bearing capacity of the surrounding rock. At the same time, the system anchor can also closely connect the support system with the surrounding rock to form a more stable support structure.

[0073] Preferably, the I20 I-beam 151 of the left tunnel 1 is connected to the top of the right permanent arch 10, and the left tunnel inverted arch initial support is connected to the bottom of the left permanent arch 20. The connection diagram can be referred to in the attached Figure 6 and 9The I20 I-beam 151 of the right tunnel 2 is connected to the top of the right permanent arch, and the right tunnel inverted arch initial support 260 is connected to the bottom of the left permanent arch 20. The connection method can be bolt connection or welding. In this way, the right permanent arch 10 and the left permanent arch 20 can also serve as the permanent initial support structure of the tunnel, shortening the length of the I20 I-beam 151 and saving the engineering cost.

[0074] As a preferred embodiment, the steps S7 and S8 further include the following steps:

[0075] A drainage ditch 5 and a water collecting pool 6 are constructed within the design range of the gully 4 between the left tunnel 1 and the right tunnel 2 of the tunnel; wherein, a water outlet 61 is reserved at the bottom of the water collecting pool 6, the drainage ditch 5 is arranged across the water collecting pool 6, and the drainage ditch 5 is connected with the existing roadbed ditch (not shown in the figure); preferably, the drainage ditch 5 can be constructed 5m outside the back slope as a drainage channel during construction to prevent gully water from scouring the construction work surface.

[0076] The cross brace assembly 3 is used as a supporting structure to construct a first drainage pipe 8; wherein the water inlet end of the first drainage pipe 8 passes through the water outlet 61 and extends into the water collection tank 6;

[0077] An energy dissipation pool 91 is constructed outside the tunnel; wherein the outlet end of the first drainage pipe 8 is connected to the energy dissipation pool 91 outside the tunnel, and the energy dissipation pool 91 outside the tunnel is connected to the existing roadbed ditch.

[0078] It should be noted that when the tunnel portal section is located in the gully 4 section, gully 4 is located between the left tunnel 1 and the right tunnel 2 of the tunnel, and the gully water flow is large, the upslope external intercepting ditch 5 is usually used to intercept the surface water, divert it to the roadbed section, and discharge it to the roadbed ditch through the rapids trough. However, when the water catchment area of ​​the portal slope is large and the instantaneous rainfall is large, the gully water volume surges during heavy rain, and the intercepting ditch 5 can no longer meet the drainage requirements. It is easy for the rapids of gully 4 to break the ditch, and even the rapids will carry large rocks and destroy the portal wall. Secondly, the plane line shape of the drainage ditch is affected by the terrain and the relationship between the gully 4 and the portal position. For example, gully 4 is obliquely intersected with the main line of the tunnel at a large angle. In order to be able to connect to the roadbed ditch, it is necessary to excavate the mountain along the way, which not only increases the amount of engineering, but also has the risk of burying the ditch. In addition, the shortened tunnel portal leads to limited space on the top of the tunnel, making it difficult to lay the drainage ditch plane.

[0079] Specifically, as a preferred example, the bottom of the gully 4 within the design range is hardened, 20 cm thick concrete is laid, and then an intercepting ditch 5 is constructed. The size of the intercepting ditch 5 should be enlarged and connected to the gully 4 to serve as a temporary drainage channel during construction; tunnel drainage needs to solve the drainage during the construction period and the drainage during the operation period. The drainage during the construction period is divided into two parts. In the early stage, the gully water and the slope water are drained to the intercepting ditch 5 on the slope of the roadbed section through the intercepting ditch 5 during the dry season. After the right permanent guard arch 10, the left permanent guard arch 20 and the cross brace assembly 3 are completed, a water collection pool 6 is constructed, and a first drainage pipe 8 is pre-buried under the water collection pool 6. The first drainage pipe 8 is fixed by the cross brace assembly 3 and finally drained into the energy dissipation pool 91 outside the cave; after the backfill layer 41 (such as foam concrete) is backfilled, an open ditch 7 can also be reserved on the surface of the backfill foam concrete. The water inlet end of the open ditch 7 is connected to the water collection pool 6, preferably, it can be matched with the bottom of the water collection pool 6, and the water outlet end of the open ditch 7 can be connected to the built roadbed ditch.

[0080] Furthermore, the water collection pool 6 can be provided with two filters. A large-diameter filter screen is provided at the entrance of the first gully 4 to block large debris such as stones. The second filter screen is provided at the mouth of the first drain pipe 8 to block branches, leaves, etc. to avoid clogging the pipe. The mouth of the first drain pipe 8 is raised above the bottom of the water collection pool 6, for example, by 10 cm, so that the water at the bottom of the pool is stored by 10 cm. This can reduce the gully water flow from scouring the bottom plate of the water collection pool 6 and help form a siphon, thereby increasing the drainage capacity. The above design can ensure the amount of water required for the cave entrance landscape design, and can meet the problem of excessive drainage and insufficient drainage capacity when the instantaneous rainfall increases sharply. The use of the concealed first drain pipe 8 can solve the problem of difficulty in laying out the open ditch 7, and can improve the drainage capacity through the siphon effect.

[0081] Working process: when the gully water volume is not large, the gully water can be directly introduced into the open ditch 7 through the water collection pool 6, and then drained to the built roadbed ditch (or landscape design can be done at the outlet 61, and the gully water volume discharged by the open ditch 7 is stable). When the gully water volume is large, the excess water overflows from the intercepting ditch 5 and falls into the water collection pool 6, and then is discharged into the energy dissipation pool 91 outside the cave through the first drainage pipe 8. In this way, the gully water can be diverted to avoid the open ditch 7 and the landscape design being destroyed when the gully water volume is large, causing water damage, and can also provide an appropriate amount of flowing water for the cave entrance landscape design; this embodiment uses a combination of open ditch 7 and dark ditch to divert gully water, and can also reduce the risk of gravel blocking the first drainage pipe 8.

[0082] As a preferred embodiment, the right permanent arch guard 10 and the left permanent arch guard 20 are both corrugated steel plates, and a water collection bucket (not shown) is provided on the outside of the corrugated steel plates near the tunnel arch foot. The water collection bucket is connected to the first drain pipe 8 through a second drain pipe (not shown) to drain the water accumulated on the outside of the corrugated steel plates to the built roadbed ditch.

[0083] Specifically, a water collection bucket is arranged on the outside of the corrugated steel plate, near the tunnel arch foot, which can collect and concentrate the accumulated water from the outside of the corrugated steel plate. The water collection bucket is connected to the first drain pipe 8 through the second drain pipe, and is finally drained to the built roadbed ditch, which effectively solves the problem of water accumulation on the outside of the corrugated steel plate, thereby alleviating the water pressure outside the tunnel. This embodiment, combined with the gully 4 drainage of the above-mentioned embodiment, can alleviate the water pressure in the tunnel entrance section from multiple angles.

[0084] As a preferred embodiment, the right permanent arch protection 10 includes a first right permanent arch protection segment 110, a second right permanent arch protection segment 120 and a third right permanent arch protection segment 130 which are sequentially spliced ​​along the left tunnel contour line of the tunnel, and the left permanent arch protection 20 includes a first left permanent arch protection segment 210, a second left permanent arch protection segment 220 and a third left permanent arch protection segment 230 which are sequentially spliced ​​along the right tunnel contour line of the tunnel; wherein the third right permanent arch protection segment 130 is provided with a locking mechanism for the left tunnel arch protection at an end away from the second right permanent arch protection segment 120. The anchor rod 140 passes through a first through hole (not shown in the figure), and the third left permanent arch protection section 230 is provided with a second through hole (not shown in the figure) for the right hole arch protection locking anchor rod 240 to pass through at an end away from the first left permanent arch protection section 210. The left hole arch protection locking anchor rod 140 is anchored into the surrounding rock by passing through the first through hole and the tail is connected to the third right permanent arch protection section 130. The right hole arch protection locking anchor rod 240 is anchored into the surrounding rock by passing through the second through hole and the tail is connected to the third left permanent arch protection section 230.

[0085] Specifically, the segmented splicing method makes the construction more flexible, and the length and splicing position of each segment can be adjusted according to actual conditions to adapt to different geological conditions and construction requirements; at the same time, it is easy to transport and install, reducing the difficulty and complexity of on-site construction.

[0086] As another preferred embodiment, the right side permanent arch protection 10 includes a plurality of right side permanent arch protection segments 170 sequentially spliced ​​along the left tunnel contour line, each of the right side permanent arch protection segments 170 includes a left tunnel arch protection body 171 and two first connecting components 172 respectively connected to the two ends of the left tunnel arch protection body 171, and two adjacent right side permanent arch protection segments 170 are connected by the first connecting components 172.

[0087] The first connecting assembly 172 includes a first connecting plate 1721 and a second connecting plate 1722 which are perpendicular to each other, wherein the first connecting plate 1721 is connected to the end of the left hole arch body 171, and the second connecting plate 1722 is connected to the first connecting plate 1721 and is located on the outer side of the left hole arch body 171, wherein the first connecting plate 1721 is provided with a first connecting hole for bolts to pass through, and the first connecting plate 1721 of the previous right permanent arch segment 170 is connected to the next right permanent arch segment 170 by bolts passing through the first connecting hole, and one end of the cross brace assembly 3 is connected to the second connecting plate 1722.

[0088] The left permanent arch protection 20 includes a plurality of left permanent arch protection segments (not shown in the figure) which are sequentially spliced ​​along the right tunnel contour line of the tunnel. Each of the left permanent arch protection segments includes a right tunnel arch protection body (not shown in the figure) and two second connecting components (not shown in the figure) respectively connected to the two ends of the right tunnel arch protection body. Two adjacent left permanent arch protection segments are connected via the second connecting components.

[0089] The second connection assembly includes a third connection plate (not shown) and a fourth connection plate (not shown) perpendicular to each other, the third connection plate is connected to the end of the right hole arch body, the fourth connection plate is connected to the third connection plate and is located outside the right hole arch body, wherein the third connection plate is provided with a second connection hole for bolts to penetrate, the third connection plate of the last left permanent arch segment is connected to the next left permanent arch segment by bolts penetrating the second connection hole, and the other end of the cross brace assembly 3 is connected to the fourth connection plate. The left permanent arch segment and the right permanent arch segment 170 can adopt the same structure, which will not be described in detail here.

[0090] The cross brace assembly 3 includes a plurality of cross brace layers arranged at intervals in the vertical direction, and each of the cross brace layers includes a plurality of cross braces 31 arranged at intervals in the longitudinal direction of the tunnel.

[0091] Each of the cross braces 31 includes a first end pad 311, a cross brace main section 312 and a second end pad (not shown) connected in sequence along its own extension direction, the second connecting plate 1722 is provided with a third connecting hole for bolts to pass through, the first end pad 311 is provided with a fourth connecting hole arranged in a one-to-one correspondence with the third connecting hole, the fourth connecting plate is provided with a fifth connecting hole for bolts to pass through, and the second end pad is provided with a sixth connecting hole arranged in a one-to-one correspondence with the fifth connecting hole, wherein the second connecting plate 1722 is connected to the first end pad 311 by bolts passing through the third connecting hole and the fourth connecting hole, and the fourth connecting plate is connected to the second end pad by bolts passing through the fifth connecting hole and the sixth connecting hole.

[0092] Specifically, the first end pad 311, the cross brace main section 312, the second end pad and the two connecting plates are tightly connected together by means of bolts passing through the connecting holes, which greatly enhances the connection strength and stability of the entire cross brace 31 structure. The bolt connection method can be easily disassembled and installed.

[0093] Furthermore, in the depth direction, two adjacent right permanent arch protection segments 170 can also be connected by bolts, which can also achieve rapid installation and removal.

[0094] As a preferred example, the first drainage pipe 8 is a HDPE pipe, and the second drainage pipe is a PVC pipe. Specifically, the pipe material of the drainage pipe can be set by technicians in this field according to actual needs.

[0095] As a preferred example, the length of the water inlet end of the first drain pipe 8 that passes through the water outlet 61 and extends into the water collection tank 6 is set between 8-20 cm. In other embodiments, those skilled in the art can also set the length extending into the water collection tank 6 as needed.

[0096] The above are only preferred embodiments of the present application, and are not intended to limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the present application specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection of the present application.

Claims

1. A construction method for a shallow gully double-side biased tunnel portal section, characterized in that: Includes steps: S1, the i-th cycle footage of excavating the right soil in the left tunnel, the left soil in the right tunnel, and the gully soil between the left tunnel and the right tunnel in the depth direction; wherein i is a positive integer and the initial value of i is 1; S2, installing a right permanent guard arch matching the left tunnel contour line, and installing a left permanent guard arch matching the right tunnel contour line, and driving a left tunnel guard arch locking anchor rod on the right permanent guard arch, and driving a right tunnel guard arch locking anchor rod on the left permanent guard arch; S3, constructing a cross brace assembly between the right permanent guard arch and the left permanent guard arch; S4, excavating the remaining soil on the left side of the left tunnel excavation contour line in the left tunnel and excavating the remaining soil on the right side of the right tunnel excavation contour line in the right tunnel along the depth direction for the i-th cycle footage, and performing the initial support of the left tunnel arch wall and the initial support of the right tunnel arch wall corresponding to the i-th cycle footage; S5, determine whether the i-th cycle footage is the N-th cycle footage; if so, proceed to step S6; if not, assign i+1 to i and return to step S1; wherein the N-th cycle footage is the cycle footage corresponding to the starting section invert, N≥3; S6, perform the initial support of the left tunnel invert and the right tunnel invert corresponding to the j-th cycle footage, and determine whether the i-th cycle footage is the last cycle footage of the tunnel entrance section; if so, proceed to step S7, if not, assign j+1 to j, and return to step S1; wherein j is a positive integer, and the initial value of j is 1; S7, sequentially perform the left tunnel invert arch initial support and the right tunnel invert arch initial support of the remaining cycle footage of the tunnel entrance section to complete the tunnel entrance section construction of all cycle footages; S8, constructing the waterproof layer and secondary lining corresponding to the left tunnel and the right tunnel, and constructing the backfill layer between the left tunnel and the right tunnel to the designed elevation.

2. The construction method of the shallow buried gully double-side biased tunnel portal section according to claim 1 is characterized in that: The step S4 of carrying out the left arch wall initial support and the right arch wall initial support corresponding to the i-th cycle footage specifically includes the following steps: In the left tunnel arch wall area corresponding to the i-th cycle footage, C25 shotcrete is initially sprayed, and the end of the right permanent arch guard is cleaned, and two I20 I-beams are erected; one end of the I20 I-beam is connected to the right permanent arch guard, and the other end is overlapped at the left tunnel arch foot; Locking anchor bolts were installed at the arch foot of the left tunnel, steel mesh was hung between two I20 I-beams, C25 shotcrete was sprayed, and then system anchor bolts were installed; In the right tunnel arch wall area corresponding to the i-th cycle footage, C25 shotcrete is initially sprayed, and the end of the left permanent guard arch is cleaned, and two I20 I-beams are erected; one end of the I20 I-beam is connected to the left permanent guard arch, and the other end is overlapped at the right tunnel arch foot; Locking anchor rods are installed at the arch foot of the right tunnel, steel mesh is hung between two I20 I-beams, C25 shotcrete is sprayed, and then system anchor rods are installed.

3. The construction method of the shallow buried gully double-side biased tunnel portal section according to claim 1 is characterized in that: The steps S7 and S8 also include the following steps: A water intercepting ditch and a water collecting pool are constructed within the design range of the gully between the left tunnel and the right tunnel; wherein a water outlet is reserved at the bottom of the water collecting pool, the water intercepting ditch is arranged across the water collecting pool, and the water intercepting ditch is connected with the existing roadbed side ditch; The cross brace assembly is used as a supporting structure to construct a first drainage pipe; wherein the water inlet end of the first drainage pipe passes through the water outlet and extends into the water collection tank; Construct an energy dissipation pool outside the tunnel; wherein the water outlet end of the first drainage pipe is connected to the energy dissipation pool outside the tunnel, and the energy dissipation pool outside the tunnel is connected to the existing roadbed ditch.

4. The construction method of the shallow buried gully double-side biased tunnel portal section according to claim 3 is characterized in that: The right permanent arch guard and the left permanent arch guard are both corrugated steel plates. A water collection bucket is provided on the outside of the corrugated steel plate near the tunnel arch foot. The water collection bucket is connected to the first drain pipe through a second drain pipe to drain the water on the outside of the corrugated steel plate to the built roadbed ditch.

5. The construction method of the shallow buried gully double-side biased tunnel portal section according to claim 4 is characterized in that: The right side permanent arch protection includes a first right side permanent arch protection segment, a second right side permanent arch protection segment and a third right side permanent arch protection segment which are sequentially spliced ​​along the left tunnel contour line of the tunnel, and the left side permanent arch protection includes a first left side permanent arch protection segment, a second left side permanent arch protection segment and a third left side permanent arch protection segment which are sequentially spliced ​​along the right tunnel contour line of the tunnel; wherein, the third right side permanent arch protection segment is provided with a first through hole for the left tunnel arch protection locking anchor to pass through at an end away from the second right side permanent arch protection segment, and the third left side permanent arch protection segment is provided with a second through hole for the right tunnel arch protection locking anchor to pass through at an end away from the first left side permanent arch protection segment, the left tunnel arch protection locking anchor is anchored into the surrounding rock by passing through the first through hole and the tail is connected to the third right side permanent arch protection segment, and the right tunnel arch protection locking anchor is anchored into the surrounding rock by passing through the second through hole and the tail is connected to the third left side permanent arch protection segment.

6. The construction method of the shallow buried gully double-side biased tunnel portal section according to claim 1 is characterized in that: The cross brace assembly includes a plurality of cross brace layers arranged at intervals in the vertical direction, and each of the cross brace layers includes a plurality of cross braces arranged at intervals in the depth direction.

7. The construction method of the shallow buried gully double-side biased tunnel portal section according to claim 4 is characterized in that: The first drainage pipe is a HDPE pipe, and the second drainage pipe is a PVC pipe.

8. The construction method of the shallow buried gully double-side biased tunnel portal section according to claim 3 is characterized in that: The water inlet end of the first drainage pipe passes through the water outlet and extends into the water collection tank, and the length thereof is set between 8 and 20 cm.