Anchor rod drilling machine control method and system and anchor rod drilling machine
By setting limited status data and electro-hydraulic control system, automatic drilling and automatic anchoring of anchor drilling rigs are achieved, which solves the problems of low automation and cumbersome operation of anchor drilling rigs, and improves the stability and safety of drilling and anchoring. Ensures reliability of anchor fastening.
Patent Information
- Application Number
- CN202411220218.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-02
- Publication Date
- 2024-12-06
AI Technical Summary
The anchor drilling rig has low degree of automation and cumbersome operation, which is prone to problems such as bending and slinging of drill rods. There is no state indication of the anchoring completion, so it is impossible to accurately know whether the anchoring is completed.
By setting limited status data, the feed mechanism, top mechanism and drill box of the anchor drill rig are controlled to perform automatic drilling and automatic anchoring, including drilling pipe top, bottom hole, stable drilling, tail hole, and anchor propulsion, including drilling rod top, In stages such as stirring resin and fastening anchor, the electro-hydraulic control system and sensors are used to detect real-time status data to ensure that the completion of each stage and the tightening pressure reaches the limit.
It improves the degree of automation of anchor drilling rigs, ensures the stability and safety of drilling and anchoring processes, avoids the accuracy of drilling rod deformation and automated control, and improves the reliability of anchor fastening.
Smart Images

Figure CN119084050A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of electro-hydraulic control systems for anchor drills, and in particular relates to an anchor drill control method, a system and an anchor drill. Background Art
[0002] With the country's support for the intelligent development of coal mines, the automation and intelligence of underground excavation equipment have made great progress, while the automation and intelligence level of support equipment used for tunnel excavation has progressed slowly, becoming the main factor affecting the speed of tunnel excavation.
[0003] The anchor drilling rig is a common equipment used for coal mine support. The commonly used anchor support process is that after the drilling rig is positioned, the drill box is equipped with a drill rod, and the drill box is first pushed upward to feed the drill rod to contact the roof, and the drill box is turned on to rotate and feed the hole. After the drilling is completed, the drill rod is withdrawn, and the resin is placed in the anchor hole and lifted with the upper end of the anchor rod. The lower end of the anchor rod is installed on the drill box, and the anchor rod and resin are pushed to the specified depth in the anchor hole. The mixing and tightening process is carried out, and the anchor support process is completed. The entire support process relies on the operator to constantly change the operating status to adapt to the process. The operation is cumbersome, the degree of automation is low, and the labor intensity of the workers is high. When the drill rod contacts the roof, drilling and anchoring operations, the drill rod is prone to bending, throwing the rod, etc., and there is no status indication for the completion of anchoring, and it is impossible to accurately know whether the anchoring is completed. Summary of the invention
[0004] In order to solve the above technical problems or at least partially solve the above technical problems, the present disclosure provides a bolter control method, system and bolter control method.
[0005] According to a first aspect, the present disclosure provides a method for controlling an anchor drilling rig, comprising the following steps: setting limited status data of the anchor drilling rig, the limited status data comprising: a drill rod top connection displacement limit, a drill rod top connection time limit, a bottom hole drilling displacement limit, a bottom hole drilling time limit, a stable drilling displacement limit, a stable drilling time limit, a tail hole drilling displacement limit, a tail hole drilling time limit, an anchor rod advancement displacement limit, an anchor rod advancement time limit, a resin stirring displacement limit, a resin stirring time limit and an anchor rod tightening pressure limit, an anchor rod tightening time limit; wherein the displacement and pressure limits are both upper limits, and the time limit is a lower limit; based on the above-mentioned limited status data, controlling the feed mechanism, the top connection mechanism and the drill box of the anchor drilling rig to perform automatic drilling and automatic anchoring in sequence, the automatic drilling comprising four stages of drill rod top connection, bottom hole drilling, stable drilling and tail hole drilling completed in sequence, and the automatic anchoring comprising three stages of anchor rod advancement, resin stirring and anchor rod tightening completed in sequence.
[0006] Preferably, the anchor drilling rig also includes a drill rod, and based on the above-mentioned limited state data, the feed mechanism, the top connection mechanism and the drill box of the anchor drilling rig are controlled to perform automatic drilling and automatic anchoring in sequence, and the automatic drilling specifically includes: the center of the drill box is opposite to the drilling position, the top connection mechanism contacts the coal wall at the drilling position, the feed mechanism drives the drill box and the drill rod to move upward, and the drill rod top connection displacement is controlled to be greater than, or equal to, the drill rod top connection displacement limit, and the drill rod top connection time is less than, or equal to, the drill rod top connection time limit, and the drill rod top connection is completed; after the drill rod top connection is completed, a drill rod top connection completion signal is sent to the drill box, the drill box drives the drill rod to rotate forward slowly, and the feed mechanism drives the drill box and the drill rod to move upward slowly to drill the bottom hole, and the displacement of the bottom hole is controlled to be greater than, or equal to, the displacement limit of the bottom hole. And the bottom hole drilling time is less than, or equal to the bottom hole drilling time limit, and the bottom hole drilling is completed; after the bottom hole drilling is completed, a bottom hole drilling completion signal is sent to the drill box, the drill box drives the drill rod to rotate forward at high speed, and the feed mechanism drives the drill box and the drill rod to move upward at high speed to perform a stable hole action, and the stable drilling displacement is controlled to be greater than, or equal to the stable drilling displacement limit and the stable drilling time is less than, or equal to the stable drilling time limit, and the stable drilling is completed; after the stable drilling is completed, a stable drilling completion signal is sent to the drill box, the drill box drives the drill rod to rotate forward at high speed, and the feed mechanism drives the drill box and the drill rod to move upward at a slow speed to perform a tail hole drilling action, and the tail hole displacement is controlled to be greater than, or equal to the tail hole displacement limit and the tail hole time is less than, or equal to the tail hole time limit, and the tail hole drilling is completed.
[0007] Preferably, the anchor drilling rig also includes a stirring rod and an anchor, and the automatic anchoring specifically includes: the center of the drill box is facing the drilling position, the feeding mechanism drives the drill box, the stirring rod and the anchor to move upward, and the anchor is pushed forward, and the anchor displacement is controlled to be greater than, or equal to, the anchor displacement limit and the anchor time is less than, or equal to, the anchor time limit, and the anchor is pushed forward; after the anchor is pushed forward, an anchor push completion signal is sent to the drill box, the drill box drives the anchor to rotate forward at high speed, and the feeding mechanism drives the drill box, the stirring rod and the anchor The rod moves upward at medium speed, and the displacement of the stirring resin is controlled to be greater than, or equal to the displacement limit of the stirring resin, and the stirring time is less than, or equal to the time limit of the stirring resin, and the stirring of the resin is completed; after the stirring of the resin is completed, a resin stirring completion signal is sent to the drill box, and the drill box drives the stirring rod to rotate forward at medium speed, and the feed mechanism drives the drill box and the stirring rod to move upward at medium speed, and the pressure of the tightening anchor rod is controlled to be greater than, or equal to the pressure limit of the tightening anchor rod, and the tightening anchor rod time is less than, or equal to the time limit of the tightening anchor rod, and the tightening of the anchor rod is completed.
[0008] Preferably, when a failure occurs in each stage of automatic drilling and automatic anchoring, the corresponding action ends.
[0009] According to a second aspect, the present invention provides an anchor drilling rig control system for executing the anchor drilling rig control method described in the first aspect, including: a pump station, an electro-hydraulic control valve group, a rotary pressure sensor, a thrust pressure sensor, a drill box motor, an oil cylinder, a balance valve group, and a relief valve; the high-pressure oil port A of the pump station is connected to the oil inlet port P of the electro-hydraulic control valve group, the feedback oil port X of the pump station is connected to the feedback oil port LS of the electro-hydraulic control valve group, the oil suction port S of the pump station is connected to the oil tank, the oil return port T of the electro-hydraulic control valve group is connected to the oil tank, and the A1 port of the electro-hydraulic control valve group is connected to the P1 port of the drill box motor. The A1 port of the electro-hydraulic control valve group is also connected to the rotary pressure sensor, and the B1 port of the electro-hydraulic control valve group is connected to the T1 port of the drilling box motor; the A2 port of the electro-hydraulic control valve group is connected to the A3 port of the balance valve group, and the A2 port of the electro-hydraulic control valve group is also connected to the propulsion pressure sensor. At the same time, the A2 port of the electro-hydraulic control valve group is also connected to the oil inlet of the overflow valve, and the oil outlet of the overflow valve is connected to the oil tank, the B2 port of the electro-hydraulic control valve group is connected to the B3 port of the balance valve group, the A4 port of the balance valve group is connected to the A5 of the oil cylinder, and the B4 port of the balance valve group is connected to the B5 of the drilling cylinder 25.
[0010] Preferably, the rotary pressure sensor is used to detect the pressure at the drill box motor P1 port, which corresponds to the rotational torque of the anchor drilling rig; the feed pressure sensor is used to detect the pressure at the cylinder A5 port, which corresponds to the thrust of the anchor drilling rig; the overflow valve is used to limit the pressure value at the cylinder A5 port, which is used to limit the thrust size.
[0011] Preferably, the rotary pressure sensor 22 is also used to determine the anchor bolt tightening state. When the anchor bolt tightening pressure is greater than, or equal to, the anchor bolt tightening pressure limit, the anchor bolt support is qualified, otherwise the anchor bolt tightening operation is performed again.
[0012] Preferably, the relief valve is also used to limit the maximum value of the top-connecting pressure when the drill pipe is connected to the top. When the drill pipe is connected to the top, the control pressure does not exceed the maximum value of the top-connecting pressure.
[0013] According to a third aspect, the present invention provides an anchor drilling rig, which is used to execute the anchor drilling rig control system described in the second aspect, including a control system, a feeding mechanism, a top connection mechanism, a frame mechanism, a drill rod, an anchor rod, a stirring rod, a drill box and a propulsion displacement sensor assembly; the control system collects real-time status data of the anchor drilling rig, and the real-time status data includes: drill rod top connection displacement, bottom hole displacement, stable drilling displacement, tail hole displacement, anchor rod propulsion displacement, resin stirring displacement and anchor rod tightening pressure; based on the real-time status data, the feeding mechanism, the top connection mechanism and the drill box are controlled to perform automatic drilling and automatic anchoring in sequence, the automatic drilling includes drill rod top connection, bottom hole drilling, stable drilling and tail hole drilling, and the automatic anchoring includes anchor rod propulsion, resin stirring and anchor rod tightening; the feeding mechanism is slidably connected to the drill box, the top connection mechanism is horizontally arranged at the top of the anchor drilling rig, the drill rod, the anchor rod and the stirring rod can be fed and rotated under the drive of the drill box, and the upper and lower end faces of the propulsion displacement sensor assembly are respectively connected to the upper and lower ends of the frame mechanism, which is used to detect the propulsion displacement of the drill rod or the anchor rod in real time.
[0014] Compared with the prior art, the technical solution provided by the embodiments of the present disclosure has the following advantages:
[0015] The anchor drilling rig provided by the present invention has stable, safe and reliable operation, and a high degree of automation in drilling and anchoring. The step-by-step control of automatic drilling and the adaptive adjustment control are more efficient and precise. At the same time, the step-by-step control of automatic anchoring makes the anchor control more precise and the anchor tightening more reliable. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present disclosure and, together with the description, serve to explain the principles of the present disclosure.
[0017] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.
[0018] Figure 1 Schematic diagram of automatic drilling of an anchor drill provided by an embodiment of the present invention;
[0019] Figure 2 An anchor drilling rig control system provided by an embodiment of the present invention;
[0020] Figure 3 A schematic flow chart of a method for controlling an anchor drilling rig provided by an embodiment of the present invention;
[0021] Figure 4 A structural diagram of a drill rod provided by an embodiment of the present invention;
[0022] Figure 5 Anchor rod structure diagram provided by an embodiment of the present invention;
[0023] Figure 6 Schematic diagram of automatic anchoring of an anchor drilling rig provided by an embodiment of the present invention;
[0024] Figure 7 An automatic drilling judgment flow chart provided by an embodiment of the present invention;
[0025] Figure 8 Automatic anchoring judgment flow chart provided by an embodiment of the present invention;
[0026] In the figure: 1-drill box, 2-feed mechanism, 3-top connection mechanism, 4-frame mechanism, 5-propulsion displacement sensor assembly, 6-coal wall, 7-drill rod, 8-anchor rod, 9-stirring resin, 10-stirring rod, 11-drill rod body, 12-drill bit, 13-anchor rod body, 14-tray, 15-ball pad, 16-nut, 20-pump station, 21-electro-hydraulic control valve group, 22-rotation pressure sensor, 23-propulsion pressure sensor, 24-drill box motor, 25-oil cylinder, 26-balance valve group, 27-overflow valve. DETAILED DESCRIPTION
[0027] In conjunction with the drawings in the embodiments of the present invention, the technical solutions in the embodiments of the present invention are clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other implementation methods obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0028] It should be noted that the structures, proportions, sizes, etc. illustrated in the drawings of this specification are only used to match the contents disclosed in the specification so that people familiar with this technology can understand and read them. They are not used to limit the conditions under which the present invention can be implemented, and therefore have no substantive technical significance. Any structural modification, change in proportional relationship or adjustment of size should fall within the scope of the technical contents disclosed in the present invention without affecting the effects and purposes that can be achieved by the present invention. It should be noted that in this specification, relational terms such as first and second are only used to distinguish one entity from several other entities, and do not necessarily require or imply any actual relationship or order between these entities.
[0029] The present invention provides an embodiment:
[0030] like Figure 1 As shown, an anchor drilling machine includes a control system, a feeding mechanism 2, a top connection mechanism 3, a frame mechanism 4, a drill rod 7, an anchor rod 8, a stirring rod 10, a drill box 1 and a propulsion displacement sensor assembly 5;
[0031] The control system collects real-time status data of the anchor drilling rig, and the real-time status data includes: displacement of the top connection of the drill rod 7, displacement of the bottom hole of the drill, displacement of the stable drilling, displacement of the tail hole of the drill, displacement of the advancement of the anchor rod 8, displacement of the stirring resin and pressure of the tightening anchor rod 8;
[0032] Based on the real-time status data, the feeding mechanism 2, the top connection mechanism 3 and the drilling box 1 are controlled to perform automatic drilling and automatic anchoring in sequence, wherein the automatic drilling includes top connection of the drill rod 7, bottom drilling, stable drilling and tail drilling, and the automatic anchoring includes advancing the anchor rod 8, stirring the resin and tightening the anchor rod 8;
[0033] The feeding mechanism 2 is slidably connected to the drill box 1, and the top connection mechanism 3 is horizontally arranged at the top of the anchor drilling rig. The drill rod 7, the anchor rod 8 and the stirring rod 10 can be fed and rotated under the drive of the drill box 1;
[0034] The upper and lower end surfaces of the propulsion displacement sensor assembly 5 are respectively connected to the upper and lower ends of the frame mechanism 4, and are used to detect the propulsion displacement of the drill rod 7 or the anchor rod 8 in real time.
[0035] like Figure 2 As shown, a bolting rig control system includes: a pump station 20, an electro-hydraulic control valve group 21, a rotary pressure sensor 22, a propulsion pressure sensor 23, a drill box motor 24, an oil cylinder 25, a balance valve group 26, and a relief valve 27;
[0036] The high-pressure oil port A of the pump station 20 is connected to the oil inlet port P of the electro-hydraulic control valve group 21, the feedback oil port X of the pump station 20 is connected to the feedback oil port LS of the electro-hydraulic control valve group 21, the oil suction port S of the pump station 20 is connected to the oil tank, the oil return port T of the electro-hydraulic control valve group 21 is connected to the oil tank, the A1 port of the electro-hydraulic control valve group 21 is connected to the P1 port of the drilling box motor 24, and the A1 port of the electro-hydraulic control valve group 21 is also connected to the rotary pressure sensor 22, and the B1 port of the electro-hydraulic control valve group 21 is connected to the T1 port of the drilling box motor 24. 1 port is connected; the A2 port of the electro-hydraulic control valve group 21 is connected with the A3 port of the balancing valve group 26, and the A2 port of the electro-hydraulic control valve group 21 is also connected with the propulsion pressure sensor 23. At the same time, the A2 port of the electro-hydraulic control valve group 21 is also connected with the oil inlet of the relief valve 27, and the oil outlet of the relief valve 27 is connected to the oil tank, the B2 port of the electro-hydraulic control valve group 21 is connected with the B3 port of the balancing valve group 26, the A4 port of the balancing valve group 26 is connected with the A5 of the oil cylinder 25, and the B4 port of the balancing valve group 26 is connected with the B5 of the oil cylinder 25.
[0037] In this embodiment, the electro-hydraulic control valve group 21 includes two parts: a rotating oil circuit and a feeding oil circuit, wherein the rotating oil circuit includes a rotating oil circuit reversing valve, two shuttle valves and two safety valves, and the feeding oil circuit includes a feeding oil circuit reversing valve, two shuttle valves and two safety valves. When the electro-hydraulic control valve group 21 receives a high-pressure oil control signal, the rotating oil circuit reversing valve and the feeding oil circuit reversing valve are switched, the rotating oil circuit and the feeding oil circuit are connected, and the hydraulic oil enters the drilling box motor 24 and the oil cylinder 25 respectively through the electro-hydraulic control valve. The control valve composition of the electro-hydraulic control valve group 21 is not limited by the present invention, as long as the oil can enter the drilling box motor 24 and the oil cylinder 25 respectively, and the oil circuits of the two do not interfere with each other.
[0038] In this embodiment, after the anchor drilling rig control system receives the control signal, the pump station 20 draws high-pressure oil from the oil tank through the S port, and then flows into the electro-hydraulic control valve group 21 through the A port and the P port. The electro-hydraulic control valve group 21 is divided into a rotating oil circuit and a feeding oil circuit. A part of the high-pressure oil flows through the rotating oil circuit and then flows into the drill box motor 24 through the A1 port. The return oil flows into the B1 port through the T1 port and then flows back to the oil tank through the T port. At this time, the drill box motor 24 starts to work and controls the corresponding drill rod 7 to perform a rotating action; another part of the high-pressure oil flows through the feed oil circuit and then flows into the balance valve group 26 through the A2 port and the A3 port, and then flows into the oil cylinder 25 through the A4 port and the A5 port. The return oil flows into the balance valve group 26 through the B5 port and the B4 port, and then flows back to the oil tank from the T port through the B3 port and the B2 port. At this time, the oil cylinder 25 starts to work and controls the corresponding drill rod 7 to perform a feeding action.
[0039] In this embodiment, the rotary pressure sensor 22 is used to detect the pressure at the drill box motor 24P1 port, which corresponds to the rotational torque of the anchor drilling rig; the thrust pressure sensor 23 is used to detect the pressure at the cylinder 25A5 port, which corresponds to the thrust force of the anchor drilling rig 8; the overflow valve 27 is used to limit the pressure value at the cylinder 25A5 port, which is used to limit the thrust force.
[0040] In this embodiment, the rotary pressure sensor 22 is also used to determine the tightening state of the anchor rod 8. When the tightening pressure of the anchor rod 8 is greater than or equal to the tightening pressure limit of the anchor rod 8, the anchor rod 8 support is qualified, otherwise the anchor rod 8 tightening operation is performed again.
[0041] In this embodiment, when the rotational pressure sensor 22 detects that the tightening pressure of the anchor rod 8 is ≥19.3MPa, the tightening torque of the anchor rod 8 support is 250Nm. When the rotational pressure is greater than 20MPa, the corresponding torque is 260Nm. At this time, the tightening torque meets the support design requirements and the anchor rod 8 support is qualified.
[0042] In this embodiment, the relief valve 27 can be a proportional relief valve 27, and the pressure limit of the proportional relief valve 27 can be set to 10MPa. The pressure collected by the propulsion pressure sensor 23 is compared with the pressure limit of the proportional relief valve 27. When the real-time pressure collected by the propulsion pressure sensor is equal to 10MPa, the top connection is completed. At this time, the drill rod 7 is not bent, ensuring normal drilling action in the subsequent stage.
[0043] like Figure 3 As shown, a bolting machine control method comprises the following steps:
[0044] Step S100: setting the limited state data of the anchor drilling rig, the limited state data including: the displacement limit of the drill rod 7 connecting to the top, the time limit of the drill rod 7 connecting to the top, the displacement limit of the bottom hole drilled, the time limit of the bottom hole drilled, the displacement limit of the stable drilling, the time limit of the stable drilling, the displacement limit of the tail hole drilled, the time limit of the tail hole drilled, the displacement limit of the anchor rod 8 advancing, the time limit of the anchor rod 8 advancing, the displacement limit of the resin stirring, the time limit of the resin stirring and the pressure limit of the anchor rod 8 tightening, the time limit of the anchor rod 8 tightening; wherein the displacement and pressure limits are both upper limits, and the time limit is the lower limit;
[0045] Step S200: Based on the above-mentioned limited state data, the feed mechanism 2, the top connection mechanism 3 and the drill box 1 of the anchor drilling rig are controlled to perform automatic drilling and automatic anchoring in sequence. The automatic drilling includes four stages of top connection of the drill rod 7, bottom hole drilling, stable drilling and tail hole drilling, and the automatic anchoring includes three stages of anchor rod 8 advancement, resin stirring and anchor rod 8 tightening, which are completed in sequence.
[0046] In this embodiment, the displacement limit of the drill rod 7 for connecting the top is set to L11, the time limit of the drill rod 7 for connecting the top is set to t11, the displacement limit of the bottom hole is set to L21, the time limit of the bottom hole is set to t21, the displacement limit of the stable hole is set to L22, the time limit of the stable hole is set to t22, the displacement limit of the tail hole is set to L23, the time limit of the tail hole is set to t23, the displacement limit of the anchor rod 8 for advancing is set to L31, the time limit of the anchor rod 8 for advancing is set to t31, the displacement limit of the resin stirring is set to L32, the time limit of the resin stirring is set to t32, and the pressure limit of the anchor rod 8 for tightening is set to P33, the time limit of the anchor rod 8 for tightening is set to t33. Among them, L11 is the distance between the top end of the drill rod 7 and the bottom surface of the coal wall 6, L21 is the distance between the bottom surface of the coal wall 6 and the deepest part of the bottom hole, L22 is the distance between the bottom surface of the coal wall 6 and the deepest part of the stable hole, and L23 is the distance between the bottom surface of the coal wall 6 and the deepest part of the tail hole.
[0047] In this embodiment, a drill rod 7 is installed on the drill box 1. The drill rod 7 includes a drill rod body 11 and a drill bit 12. The drill bit 12 is arranged at the upper end of the drill rod body 11. Figure 4As shown, the center of the drill box 1 is facing the drilling position, the top contact mechanism 3 contacts the coal wall 6 at the drilling position, and the feed mechanism 2 drives the drill box 1 and the drill rod 7 to move upward. The automatic drilling judgment process is as follows Figure 7 As shown, the top connection displacement of drill rod 7 is controlled to be ≥L11, the top connection time of drill rod 7 is ≤t11, and the top connection of drill rod 7 is completed; when the top connection displacement of drill rod 7 is <L11, the top connection time of drill rod 7 is <t11, the top connection action of drill rod 7 is not completed, and the top connection action of drill rod 7 continues; when the top connection displacement of drill rod 7 is <L11, the top connection time of drill rod 7 is >t11, the top connection action of drill rod 7 fails, and the automatic drilling ends.
[0048] After the drill rod 7 is connected to the top, a signal that the drill rod 7 is connected to the top is sent to the drill box 1. The drill box 1 drives the drill rod 7 to rotate slowly in the forward direction. The feed mechanism 2 drives the drill box 1 and the drill rod 7 to move slowly upward to cut the coal wall 6 and drill the bottom hole. The bottom hole displacement is controlled to be ≥L21 and the bottom hole time is ≤t21. The bottom hole drilling is completed. When the bottom hole displacement is <L21 and the bottom hole drilling time is <t21, the bottom hole drilling action is not completed and the bottom hole drilling action continues. When the bottom hole displacement is <L21 and the bottom hole drilling time is >t21, the bottom hole drilling action fails and the automatic drilling ends.
[0049] After the bottom hole drilling is completed, a bottom hole drilling completion signal is sent to the drill box 1, the drill box 1 drives the drill rod 7 to rotate forward at high speed, and the feed mechanism 2 drives the drill box 1 and the drill rod 7 to move upward at high speed to cut the coal wall 6 and perform a stable hole action. The stable drilling displacement is controlled to be ≥L22, and the stable drilling time is ≤t22. The stable drilling is completed. When the stable drilling displacement is <L22 and the stable drilling time is <t22, the stable drilling action is not completed and the stable drilling action continues; when the stable drilling displacement is <L22 and the stable drilling time is >t22, the stable drilling action fails and the automatic drilling ends.
[0050] After the stable drilling is completed, a stable drilling completion signal is sent to the drill box 1, the drill box 1 drives the drill rod 7 to rotate forward at high speed, and the feed mechanism 2 drives the drill box 1 and the drill rod 7 to move upward slowly to cut the coal wall 6 and perform the tail hole drilling action. The tail hole displacement is controlled to be ≥L23, and the tail hole time is ≤t23. The tail hole drilling is completed. When the tail hole displacement is <L23 and the tail hole time is <t23, the tail hole drilling action is not completed and the tail hole drilling action continues; when the tail hole displacement is <L23 and the tail hole drilling time is >t23, the tail hole drilling action fails and the automatic drilling ends.
[0051] like Figure 6As shown, when the drilling tail hole completion signal is issued, the drilling is completed and the automatic drilling ends. At this time, the drill rod 7 is removed from the drill box 1 of the anchor rod 8 drilling machine, the stirring rod 10 is installed on the drill box 1, the anchor rod 8 is installed on the stirring rod 10, and the stirring resin 9 is installed in the hole of the anchor rod 8 drilled by the automatic drilling. The upper end of the anchor rod 8 supports the stirring resin 9, and the tray 14 is placed on the upper end surface of the top plate of the top connection mechanism 3. A plurality of ball pads 15 are arranged at the center of the bottom surface of the tray 14, and a nut 16 is arranged under the ball pad 15. The anchor rod 8 is as shown in FIG. Figure 5 As shown, it mainly includes an anchor rod body 13, a ball pad 15, a nut 16, and a tray 14.
[0052] The automatic anchoring action begins. The center of the drill box 1 is aligned with the drilling position. The feed mechanism 2 drives the drill box 1, the stirring rod 10 and the anchor rod 8 to move upward, and the anchor rod 8 is pushed forward. The automatic anchoring control judgment process is as follows: Figure 8 As shown, the anchor rod 8 is controlled to advance the displacement ≥ L31, the anchor rod 8 advances the anchor rod hole time ≤ t31, and the anchor rod 8 advances the anchor rod hole. When the anchor rod 8 advances the anchor rod hole displacement < L31, the anchor rod 8 advances the anchor rod hole time < t31, the anchor rod 8 advances the anchor rod 8 hole action is not completed, and the anchor rod 8 advances the anchor rod hole action continues; when the anchor rod 8 advances the anchor rod hole displacement < L31, the anchor rod 8 advances the anchor rod hole time > t31, the anchor rod 8 advances the anchor rod hole action fails, and automatic anchoring ends.
[0053] After the anchor rod 8 is pushed forward, a signal that the anchor rod 8 is pushed forward is sent to the drill box 1, and the drill box 1 drives the anchor rod 8 to rotate forward at high speed. The feed mechanism 2 drives the drill box 1, the stirring rod 10 and the anchor rod 8 to move upward at medium speed, and controls the displacement of the stirring resin 9 to be ≥L32, the stirring resin 9 time to be ≤t32, and the stirring of the stirring resin 9 is completed. When the displacement of the stirring resin 9 is <L32, the stirring resin 9 time is <t32, the stirring resin 9 action is not completed, and the stirring action of the stirring resin 9 continues; when the displacement of the stirring resin 9 is <L32, the stirring resin 9 time is >t32, the stirring action of the stirring resin 9 fails, and the automatic anchoring ends.
[0054] After the stirring resin 9 is fixed, a signal that the stirring of the resin 9 is completed is sent to the drill box 1, and the drill box 1 drives the stirring rod 10 to rotate forward at medium speed, and the feeding mechanism 2 drives the drill box 1 and the stirring rod 10 to move upward at medium speed, and controls the pressure of the fastening anchor rod 8 to be ≥P33, the fastening anchor rod 8 time to be ≤t33, the fastening anchor rod 8 is completed, and the fastening anchor rod 8 is actuated. When the pressure of the fastening anchor rod 8 is ≥P33, the fastening anchor rod 8 time is ≤t33, the fastening anchor rod 8 action is completed; when the pressure of the fastening anchor rod 8 is <P33, the fastening anchor rod 8 time is <t33, the action of the fastening anchor rod 8 is not completed, and the action of the fastening anchor rod 8 continues; when the pressure of the fastening anchor rod 8 is <P33, the fastening anchor rod 8 time is >t33, the action of the fastening anchor rod 8 fails, and the automatic anchoring ends.
[0055] The present invention can effectively avoid deformation and ejection of the drill rod when it is connected to the top, or injury to people caused by the rod being thrown off, and the automatic drilling and automatic anchoring are controlled in steps. The automatic drilling is divided into four stages of control: connecting the drill rod to the top, drilling the bottom hole, stabilizing the drilling and drilling the tail hole, so that the adaptive adjustment control is more efficient and precise. The automatic anchoring is divided into three stages of control: advancing the anchor hole, stirring the resin, and tightening the anchor, so that the anchor control is more accurate and the anchor tightening is more reliable during the automatic anchoring process. Furthermore, the anchor drilling rig using the anchor drilling rig control method works stably, safely and reliably, and the degree of automation of drilling and anchoring is improved.
[0056] The above description is only a specific embodiment of the present disclosure, so that those skilled in the art can understand or implement the present disclosure. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present disclosure. Therefore, the present disclosure will not be limited to the embodiments described herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A bolter control method, characterized in that: The following steps are involved: Setting limited status data of the anchor drilling rig, the limited status data including: drill rod top connection displacement limit, drill rod top connection time limit, bottom hole drilling displacement limit, bottom hole drilling time limit, stable drilling displacement limit, stable drilling time limit, tail hole drilling displacement limit, tail hole drilling time limit, anchor rod advancement displacement limit, anchor rod advancement time limit, resin stirring displacement limit, resin stirring time limit and anchor rod tightening pressure limit, anchor rod tightening time limit; wherein the displacement and pressure limits are both upper limits, and the time limit is the lower limit; Based on the above-mentioned limited status data, the feeding mechanism, top connection mechanism and drill box of the anchor drilling rig are controlled to perform automatic drilling and automatic anchoring in sequence. The automatic drilling includes four stages of drill rod top connection, bottom hole drilling, stable drilling and tail hole drilling, and the automatic anchoring includes three stages of anchor rod advancement, resin stirring and anchor rod tightening, which are completed in sequence.
2. The anchor drilling machine control method according to claim 1, characterized in that: The anchor drilling machine also includes a drill rod (7). Based on the above-mentioned limited state data, the feed mechanism (2), the top connection mechanism (3) and the drill box (1) of the anchor drilling machine are controlled to perform automatic drilling and automatic anchoring in sequence. The automatic drilling specifically includes: The center of the drill box (1) faces the drilling position, the top connection mechanism (3) contacts the coal wall at the drilling position, and the feed mechanism (2) drives the drill box (1) and the drill rod (7) to move upward, and the top connection displacement of the drill rod (7) is controlled to be greater than or equal to the top connection displacement limit of the drill rod (7), and the top connection time of the drill rod (7) is less than or equal to the top connection time limit of the drill rod (7), and the top connection of the drill rod (7) is completed; After the top connection of the drill rod (7) is completed, a signal of completion of the top connection of the drill rod (7) is sent to the drill box (1), the drill box (1) drives the drill rod (7) to rotate in a slow forward direction, and the feed mechanism (2) drives the drill box (1) and the drill rod (7) to move upward slowly to perform the bottom hole drilling action, and the bottom hole drilling displacement is controlled to be greater than, or equal to, the bottom hole drilling displacement limit value and the bottom hole drilling time is less than, or equal to, the bottom hole drilling time limit value, and the bottom hole drilling is completed; After the bottom hole drilling is completed, a bottom hole drilling completion signal is sent to the drill box (1), the drill box (1) drives the drill rod (7) to rotate forward at high speed, and the feed mechanism (2) drives the drill box (1) and the drill rod (7) to move upward at high speed to perform a stable hole drilling action, and the stable drilling displacement is controlled to be greater than, or equal to, the stable drilling displacement limit value and the stable drilling time is less than, or equal to, the stable drilling time limit value, and the stable drilling is completed; After the stable drilling is completed, a stable drilling completion signal is sent to the drill box (1), the drill box (1) drives the drill rod (7) to rotate forward at high speed, and the feed mechanism (2) drives the drill box (1) and the drill rod (7) to move upward at a slow speed to perform the tail hole drilling action, and the tail hole displacement is controlled to be greater than, or equal to, the tail hole displacement limit value and the tail hole drilling time is less than, or equal to, the tail hole drilling time limit value, and the tail hole drilling is completed.
3. The anchor drilling machine control method according to claim 2, characterized in that: The anchor drilling machine further comprises a stirring rod (10) and an anchor rod (8), and the automatic anchoring specifically comprises: The center of the drill box (1) is facing the drilling position, and the feeding mechanism (2) drives the drill box (1), the stirring rod (10) and the anchor rod (8) to move upward to advance the anchor rod (8). The advancement displacement of the anchor rod (8) is controlled to be greater than, or equal to, the advancement displacement limit of the anchor rod (8) and the advancement time of the anchor rod (8) is less than, or equal to, the advancement time limit of the anchor rod (8), and the advancement of the anchor rod (8) is completed; After the anchor rod (8) is pushed forward, a signal indicating that the anchor rod (8) has been pushed forward is sent to the drill box (1), and the drill box (1) drives the anchor rod (8) to rotate forward at high speed, and the feed mechanism (2) drives the drill box (1), the stirring rod (10) and the anchor rod (8) to move upward at medium speed, and the displacement of the stirred resin (9) is controlled to be greater than, or equal to, the displacement limit of the stirred resin (9) and the stirring time of the stirred resin (9) is less than, or equal to, the time limit of the stirred resin (9), and the stirring of the stirred resin (9) is completed; After the stirring of the stirring resin (9) is completed, a signal indicating that the stirring of the stirring resin (9) is completed is sent to the drill box (1), and the drill box (1) drives the stirring rod (10) to rotate forward at a medium speed, and the feeding mechanism (2) drives the drill box (1) and the stirring rod (10) to move upward at a medium speed, and the pressure of the tightening anchor rod (8) is controlled to be greater than, or equal to, the pressure limit of the tightening anchor rod (8) and the time of the tightening anchor rod (8) is less than, or equal to, the time limit of the tightening anchor rod (8), and the tightening of the anchor rod (8) is completed.
4. The anchor bolt (8) drilling rig control method according to claim 1, characterized in that: When a failure occurs in any stage of automatic drilling and automatic anchoring, the corresponding action ends.
5. An anchor drilling rig control system, used to execute the anchor drilling rig control method according to any one of claims 1 to 4, characterized in that: include: Pump station (20), electro-hydraulic control valve group (21), rotary pressure sensor (22), propulsion pressure sensor (23), drilling box motor (24), oil cylinder (25), balance valve group (26), overflow valve (27); The high-pressure oil port A of the pump station (20) is connected to the oil inlet port P of the electro-hydraulic control valve group (21), the feedback oil port X of the pump station (20) is connected to the feedback oil port LS of the electro-hydraulic control valve group (21), the oil suction port S of the pump station (20) is connected to the oil tank, the oil return port T of the electro-hydraulic control valve group (21) is connected to the oil tank, the A1 port of the electro-hydraulic control valve group (21) is connected to the P1 port of the drilling box motor (24), and the A1 port of the electro-hydraulic control valve group (21) is also connected to the rotary pressure sensor (22), and the B1 port of the electro-hydraulic control valve group (21) is connected to the T1 port of the drilling box motor (24). The A2 port of the electro-hydraulic control valve group (21) is connected to the A3 port of the balancing valve group (26), the A2 port of the electro-hydraulic control valve group (21) is also connected to the propulsion pressure sensor (23), and the A2 port of the electro-hydraulic control valve group (21) is also connected to the oil inlet of the relief valve (27), the oil outlet of the relief valve (27) is connected to the oil tank, the B2 port of the electro-hydraulic control valve group (21) is connected to the B3 port of the balancing valve group (26), the A4 port of the balancing valve group (26) is connected to the A5 port of the oil cylinder (25), and the B4 port of the balancing valve group (26) is connected to the B5 port of the oil cylinder (25).
6. The bolter control system according to claim 5, characterized in that: The rotary pressure sensor (22) is used to detect the pressure at the P1 port of the drill box motor (24), and the pressure corresponds to the rotary torque of the anchor drilling rig; The propulsion pressure sensor (23) is used to detect the pressure at the A5 port of the oil cylinder (25), which corresponds to the propulsion force of the anchor drilling rig; The overflow valve (27) is used to limit the pressure value of the A5 port of the oil cylinder (25) and to limit the magnitude of the propulsion force.
7. The bolter control system according to claim 6, characterized in that: The rotary pressure sensor (22) is also used to determine the tightening state of the anchor rod (8). When the tightening pressure of the anchor rod (8) is greater than or equal to the tightening pressure limit of the anchor rod (8), the anchor rod (8) support is qualified; otherwise, the anchor rod (8) tightening operation is performed again.
8. The bolter control system according to claim 6, characterized in that: The overflow valve (27) is also used to limit the maximum value of the top-connecting pressure when the drill rod (7) is connected to the top. When the drill rod (7) is connected to the top, the pressure is controlled not to exceed the maximum value of the top-connecting pressure.
9. An anchor drilling machine, characterized in that: A bolting rig control system for executing any one of claims 4 to 7, comprising a control system, a feeding mechanism (2), a top connection mechanism (3), a frame mechanism (4), a drill rod (7), an anchor rod (8), a stirring rod (10), a drill box (1) and a propulsion displacement sensor assembly (5); The control system collects real-time status data of the anchor rod (8) drilling rig, wherein the real-time status data includes: displacement of the top connection of the drill rod (7), displacement of the bottom hole of the drill, displacement of the stable drill hole, displacement of the tail hole of the drill, displacement of the advancement of the anchor rod (8), displacement of the stirring resin and pressure of the anchor rod (8); Based on the real-time status data, the feeding mechanism (2), the top connection mechanism (3) and the drilling box (1) are controlled to perform automatic drilling and automatic anchoring in sequence, wherein the automatic drilling includes top connection of the drill rod (7), bottom hole drilling, stable drilling and tail hole drilling, and the automatic anchoring includes advancing the anchor rod (8), stirring the resin and tightening the anchor rod (8); The feeding mechanism (2) is slidably connected to the drilling box (1), and the top connection mechanism (3) is horizontally arranged at the top of the anchor rod (8) drilling rig. The drill rod (7), the anchor rod (8) and the stirring rod (10) can be fed and rotated under the drive of the drilling box (1); The upper and lower end surfaces of the propulsion displacement sensor assembly (5) are respectively connected to the upper and lower ends of the frame mechanism (4) and are used to detect the propulsion displacement of the drill rod (7) or the anchor rod (8) in real time.