Construction device and construction process for building water supply and drainage engineering

By designing automated construction devices in building water supply and drainage projects, and using linear guide rails and conveying devices to realize the automatic installation of pipeline joints, the problem of inconvenient connection of vertical pipes is solved, and the installation efficiency and automation are improved.

CN119084664APending Publication Date: 2024-12-06KUNSHAN SHENGXIN BUILDING ENG
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411221134.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-02
Publication Date
2024-12-06

AI Technical Summary

Technical Problem

In building water supply and drainage projects, when installing vertical pipes, there is inconvenience in connecting the joints at the upper end of the pipe, especially when manually erecting ladders for installation, which increases labor intensity and installation difficulty.

Method used

A construction device including a frame, a linear guide rail, a temporary storage box and a conveying device is designed. The temporary storage box is moved to the top of the pipeline through the second linear guide rail, and the conveying device is used to drive the pipeline joints to move between adjacent pipelines to realize Automatic installation reduces manual operation, especially by driving the jaw assembly and the third linear guide rail to move, increasing the degree of automation of the construction device.

Benefits of technology

The joints at the top of the pipe can be installed without manual ladder setting, which improves installation efficiency and automation, and can install multiple sets of pipe joints at one time, reducing repeated movements and operations, and improving construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119084664A_ABST
    Figure CN119084664A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of water supply and drainage, in particular to a construction device and process for building water supply and drainage engineering. The first linear guide rail is vertically and fixedly connected to the rack and provided with a plurality of output ends, and each output end is fixedly connected with an electric clamping jaw used for clamping a pipeline; the second linear guide rail is vertically and fixedly connected to the rack; the temporary storage box is fixedly connected to the output end of the second linear guide rail, an opening is formed in the face, close to the first linear guide rail, of the temporary storage box, and a containing space used for containing the pipeline connector is formed in the temporary storage box. The conveying device is installed in the containing space and used for driving the pipeline connector to move to correspond to the pipeline. The pipe joint has the effect of facilitating installation of the pipe joint.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of water supply and drainage technology, and in particular to a construction device and a construction process for building water supply and drainage engineering. Background Art

[0002] Building water supply and drainage engineering is an important part of construction engineering, involving the construction of water supply and drainage systems inside and outside the building. Construction equipment and construction technology are crucial to ensure the quality of the project and the normal operation of the system.

[0003] The most commonly used construction device is a construction device for the construction of water supply and drainage pipes. Currently, this construction device consists of a clamp and a frame. The clamp is fixedly installed on the frame. The pipe is clamped vertically by the clamp to fix the pipe. There is no need to manually support the pipe, thus reducing labor.

[0004] During the installation process of the pipeline, it is also necessary to use a pipe joint to connect the two pipes together. Usually, after the pipes are clamped, the pipe joints will be put on the two adjacent pipes at the same time, and then glued to achieve the connection of the pipes.

[0005] However, in the process of installing the vertical pipeline, it is necessary to connect both the upper and lower ends of the pipeline, and the upper end of the pipeline is relatively high, which makes the installation inconvenient. Summary of the invention

[0006] The purpose of this application is to provide a construction device and a construction process for building water supply and drainage engineering, which facilitates the installation of pipe joints.

[0007] In the first aspect, the construction device for building water supply and drainage engineering provided by the present application adopts the following technical solution: Construction equipment for building water supply and drainage engineering, including: frame; A first linear guide rail is vertically fixedly connected to the frame and has a plurality of output ends, each of the output ends is fixedly connected to an electric clamp for clamping a pipe; A second linear guide rail, vertically fixedly connected to the frame; A temporary storage box, fixedly connected to the output end of the second linear guide rail and having an opening on a side close to the first linear guide rail, wherein a storage space for placing a pipe joint is provided in the temporary storage box; The conveying device is installed in the accommodating space and is used to drive the pipe joint to move to the corresponding position of the pipe.

[0008] By adopting the above technical solution, the temporary storage box is moved to the top of the pipeline by the second linear guide rail, and the pipeline joint is moved between adjacent pipelines by the conveying device, so that the pipeline joint is installed. There is no need to manually set up a ladder to install the pipeline joint at the top of the pipeline, which facilitates the installation of the pipeline.

[0009] Optionally, the conveying device includes a clamping jaw assembly and a third linear guide rail, the third linear guide rail is fixedly connected to the inner wall of the accommodating space, the clamping jaw assembly is fixedly connected to the output end of the third linear guide rail and is used to clamp the pipe joint, and the third linear guide rail drives the clamping jaw assembly to move to a position corresponding to the electric clamping jaw.

[0010] By adopting the above technical solution, by providing a third linear guide rail and a clamping jaw assembly, the third linear guide rail drives the clamping jaw assembly to move, thereby realizing the movement of the pipe joint, thereby increasing the degree of automation of the construction device.

[0011] Optionally, a sleeve for placing a pipe joint is fixedly connected to the temporary storage box, and the sleeve is located above the clamp assembly. When the clamp assembly pushes one of the pipe joints out of the accommodating space, the pipe joint in the sleeve can fall to the bottom wall of the accommodating space. When the clamp assembly is reset, it can re-clamp the pipe joint on the bottom wall of the accommodating space.

[0012] By adopting the above technical solution, when there are multiple sets of pipes that need to be installed, there is no need to move the temporary storage box to the bottom and reposition the pipe joints each time a set of pipes is installed. Instead, multiple sets of pipes can be installed at one time, which is convenient for use.

[0013] Optionally, two third linear guides are provided, and the two third linear guides are respectively provided on two mutually symmetrical inner walls of the accommodating space, the clamping jaw assembly comprises a clamping plate and a push plate, each output end of the third linear guide is fixedly connected to one clamping plate, the two clamping plates are symmetrically provided and one side of the two clamping plates close to each other is provided as a first abutting surface, each clamping plate is rotatably connected to one push plate, and one side of the push plate close to the corresponding clamping plate is provided as a second abutting surface; When the push plate pushes the pipe joint to move toward the electric clamping jaw, the first abutting surface abuts against the second abutting surface to limit the rotation of the push plate; When the push plate moves in a direction away from the electric clamping jaw, the first abutting surface is separated from the second abutting surface, and the push plate can rotate under the push of the pipe joint.

[0014] By adopting the above technical solution, through the rotational connection between the push plate and the clamping plate, the push plate can be rotated during the resetting process of the clamping plate, so that the pipe joint can be directly moved between the two clamping plates, which facilitates the use of the clamping claw assembly and increases the degree of automation of the construction device.

[0015] Optionally, a avoidance groove is formed on the surfaces of the two clamping plates that are close to each other, and the push plate can be rotated into the avoidance groove.

[0016] By adopting the above technical solution and setting the avoidance groove, the push plate can be rotated to be completely in the avoidance groove, and the spacing between adjacent clamping plates is adapted to the outer diameter of the pipe joint to ensure that the pipe joint can be clamped.

[0017] Optionally, it further comprises a limit post, the limit post corresponds to the position of the sleeve, a telescopic slot is provided on the bottom wall of the accommodating space, the limit post is slidably connected in the telescopic slot, a guide inclined surface is provided on a side of the limit post away from the electric clamp, and a third abutting surface for limiting the pipe joint from sliding in a direction away from the electric clamp is provided on a side of the limit post close to the electric clamp; An elastic member is arranged in the telescopic slot, one end of the elastic member acts on the inner wall of the telescopic slot, and the other end of the elastic member acts on the limiting column.

[0018] By adopting the above technical solution, when the pipe joint moves toward the electric clamp, the limit column slides into the telescopic groove under the guidance of the guide slope, and when the pipe joint moves away from the electric clamp, the third abutment surface limits the movement of the pipe joint, thereby reducing the position deviation of the pipe joint in the accommodating space.

[0019] Optionally, the outer diameter of the limiting column is adapted to the inner diameter of the pipe joint.

[0020] By adopting the above technical solution, the outer diameter of the limiting column is matched with the inner diameter of the pipe joint. When the limiting column is sleeved on the pipe joint, the limiting column limits the movement of the pipe joint.

[0021] Optionally, the guiding inclined surface is an arc surface.

[0022] By adopting the above technical solution, when the pipe joint falls, the guiding inclined surface can guide the pipe joint to ensure that the pipe joint falls to an accurate position.

[0023] In the second aspect, a construction process provided by the present application adopts the following technical solution: A construction process comprises the following steps: S1: erect the pipeline; S2: Lift the pipe with the electric gripper and move it to the required installation position; S3: Use the conveying device to move the pipe joint to a corresponding position, and insert the pipe into the pipe joint; S4: Apply glue to the connection between the pipe joint and the pipe to complete the fixation of the pipe and the pipe joint.

[0024] By adopting the above technical solution, the pipe joint is moved to the corresponding position by the conveying device, which reduces the process of manually moving the pipe joint to the corresponding position and facilitates the installation of the pipe joint.

[0025] In summary, the present application includes at least one of the following beneficial technical effects: 1. Move the temporary storage box to the top of the pipeline through the second linear guide rail, and move the pipeline joint between adjacent pipelines through the conveying device, so as to install the pipeline joint. There is no need to manually set up a ladder to install the pipeline joint at the top of the pipeline, which is convenient for pipeline installation; 2. When there are multiple sets of pipes that need to be installed, there is no need to move the temporary storage box to the bottom and reposition the pipe joints each time a set of pipes is installed. Instead, multiple sets of pipes can be installed at one time, which is convenient for use; 3. By setting the avoidance groove, the push plate can be rotated to be completely in the avoidance groove, and the spacing between adjacent clamping plates is adapted to the outer diameter of the pipe joint to ensure that the pipe joint can be clamped. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of the overall structure of the construction device for building water supply and drainage engineering in the embodiment of the present application.

[0027] Figure 2 It is a schematic diagram of the structure of the temporary storage box after the sleeve is hidden in the embodiment of the present application.

[0028] Figure 3 It is a partial structural schematic diagram of the clamping jaw assembly in the embodiment of the present application.

[0029] Figure 4 It is a schematic diagram of the cross-sectional structure of the temporary storage box after the sleeve is hidden in the embodiment of the present application.

[0030] In the figure, 1, frame; 11, vertical section; 12, horizontal section; 13, counterweight; 14, universal wheel; 21. a first linear guide rail; 22. a second linear guide rail; 3. Electric gripper; 4. Temporary storage box; 41. Accommodation space; 42. Sleeve; 43. Telescopic slot; 44. Elastic member; 45. Limiting column; 451. Guide slope; 452. Third abutting surface; 5. Conveying device; 51. Clamping claw assembly; 511. Clamping plate; 5111. First abutting surface; 5112. Avoidance groove; 512. Pushing plate; 5121. Second abutting surface; 52. Third linear guide rail; 6. Pipe joints. DETAILED DESCRIPTION

[0031] The following is combined with Figure 1 -Attached Figure 4 , further details of this application are given.

[0032] Embodiment 1: Construction equipment for building water supply and drainage engineering, reference Figure 1 , including a frame 1, which is L-shaped and consists of a vertical section 11 and a horizontal section 12. A counterweight 13 is fixedly connected to the horizontal section 12, and four universal wheels 14 are fixedly installed on the bottom wall of the horizontal section 12 to facilitate pushing the frame 1 to move to the work site.

[0033] A first linear guide 21 is fixedly connected to the vertical section 11. The first linear guide 21 is fixedly connected to the frame 1 and is arranged in a vertical direction. The first linear guide 21 has multiple output ends. In this embodiment, the first linear guide 21 has two output ends, that is, there are two freely sliding sliders on the first linear guide 21. An electric clamp 3 is fixedly connected to each output end. Multiple electric clamps 3 can clamp and fix the pipeline. At this time, the frame 1 is pushed to the work site to install the pipeline. During the installation of the pipeline, the electric clamp 3 can be driven up and down by the first linear guide 21 to adjust the height of the pipeline, which is convenient for installing the pipeline.

[0034] A second linear guide 22 is fixedly installed on the vertical section 11. The second linear guide 22 is arranged in a vertical direction. The second linear guide 22 has an output end and a temporary storage box 4 is fixedly connected to the output end. The temporary storage box 4 is provided with a receiving space 41, and the receiving space 41 is used to place the pipe joint 6.

[0035] Reference Figure 2 and Figure 3 An opening is provided on one side of the temporary storage box 4 close to the first linear guide rail 21, and a conveying device 5 is installed in the accommodating space 41. The conveying device 5 is used to move the pipe joint 6 placed in the accommodating space 41 to the installation position so that the pipe joint 6 corresponds to the position of the pipe.

[0036] Specifically, when two pipes need to be connected, a first pipe is usually pre-buried on the ground and a second pipe is pre-buried on the ceiling. At this time, one pipe is fixed by the electric clamp 3. The pipe on the electric clamp 3 is named the third pipe. The third pipe is transported between the first pipe and the second pipe, and the distance between the third pipe and the second pipe is greater than the length of the pipe joint 6.

[0037] At this time, the second linear guide 22 drives the temporary storage box 4 to move to the vicinity of the third pipe and the second pipe, and the conveying device 5 drives the pipe joint 6 to move between the third pipe and the second pipe, and then the second linear guide 22 is moved, so that the pipe joint 6 is sleeved on the second pipe, and then the first linear guide 21 drives the third pipe to move up and insert it into the pipe joint 6 to complete the connection between the third pipe and the second pipe. At this time, the preliminary connection between the first pipe and the second pipe can be completed by manually installing the pipe joint 6 between the first pipe and the third pipe. At this time, the first pipe, the second pipe and the third pipe have been initially fixed, and then the pipe joint 6 is glued separately, and the connection part is reinforced and waterproofed again.

[0038] The conveying device 5 includes a clamping jaw assembly 51 and a third linear guide 52. The third linear guide 52 is fixedly connected to the inner wall of the accommodating space 41. The clamping jaw assembly 51 is fixedly connected to the output end of the third linear guide 52. After the pipe joint 6 is placed in the accommodating space 41, the clamping jaw assembly 51 clamps the pipe joint 6, and then drives the pipe joint 6 to move through the third linear guide 52, so that the pipe joint 6 moves to the corresponding position, that is, the clamping jaw assembly 51 moves to the corresponding position of the electric clamp 3.

[0039] Furthermore, a sleeve 42 for placing pipe joints 6 is fixedly connected in the temporary storage box 4. When the clamping jaw assembly 51 is located in the accommodating space 41, the sleeve 42 is located directly above the clamping jaw assembly 51. Several pipe joints 6 are stacked in the sleeve 42. The outer diameter of the pipe joint 6 matches the inner diameter of the sleeve 42. When the clamping jaw assembly 51 pushes out a pipe joint 6, the pipe joint 6 in the sleeve 42 falls down to the bottom wall of the accommodating space 41. One pipe joint 6 is in the accommodating space 41, and the remaining pipe joints 6 are in the sleeve 42. When the clamping jaw assembly 51 is reset, the pipe joint 6 in the accommodating space 41 is clamped. At this time, the rack 1 is moved to the next position where the third pipe and the second pipe need to be installed, and the clamping jaw assembly 51 continues to repeat the above movement. Therefore, when there are multiple sets of first pipes, second pipes and third pipes that need to be installed, there is no need to move the temporary storage box 4 to the bottom and reposition the pipe joint 6 each time a set of first pipes, second pipes and third pipes is installed. Instead, multiple sets of first pipes, second pipes and third pipes can be installed at one time, which is convenient for use.

[0040] There are two third linear guides 52, and the two third linear guides 52 are respectively arranged on two mutually symmetrical inner walls of the accommodating space 41. The clamping jaw assembly 51 includes two clamping plates 511 and two push plates 512, and each output end of the third guide rail is fixedly connected to one of the clamping plates 511, and the two clamping plates 511 are symmetrically arranged and the side close to each other is set as the first abutting surface 5111, and each clamping plate 511 is rotatably connected to a push plate 512, and the side of the push plate 512 close to the clamping plate 511 is set as the second abutting surface 5121, and the side wall of the push plate 512 close to the electric clamping jaw 3 is provided with a rotating shaft, which is fixedly connected to the inner wall of the accommodating space 41 and is rotatably connected to the push plate 512, and the push plate 512 is rotatably connected to the clamping plate 511 through the rotating shaft, and when the push plate 512 is perpendicular to the clamping plate 511, the first abutting surface 5111 and the second abutting surface 5121 fit each other. In this embodiment, a torsion spring is provided on the rotating shaft, one end of the torsion spring is fixedly connected to the rotating shaft, and the other end is fixedly connected to the push plate 512. By providing the torsion spring, the push plate 512 can automatically reset after rotating.

[0041] When the push plate 512 needs to push the pipe connector 6 out of the accommodating space 41, the push plate 512 tends to rotate away from the electric clamp 3. At this time, the first abutting surface 5111 and the second abutting surface 5121 fit each other, thereby limiting the rotation of the push plate 512 and allowing the push plate 512 to push the pipe connector 6 to move.

[0042] When the clamping jaw assembly 51 is reset, the side of the push plate 512 away from the electric clamping jaw 3 abuts against the pipe joint 6 in the accommodating space 41, and the push plate 512 rotates toward the electric clamping jaw 3 under the push of the pipe joint 6, thereby moving the pipe joint 6 between adjacent clamping plates 511.

[0043] Furthermore, avoidance grooves 5112 are provided on the side walls where the two clamps 511 are close to each other, and the rotational connection between the push plate 512 and the clamps 511 is arranged in the avoidance groove 5112, that is, the first abutting surface 5111 is the inner wall of the avoidance groove 5112, and the push plate 512 can be rotated until it is completely in the avoidance groove 5112, and the spacing between adjacent clamps 511 is adapted to the outer diameter of the pipe joint 6 to ensure that the pipe joint 6 can be clamped. Rubber pads are fixedly connected to the sides where the two clamps 511 are close to each other. When the pipe joint 6 is between the two clamps 511, the two rubber pads are deformed to clamp the pipe joint 6. An inclined surface is provided on the end of the rubber pad close to the push plate 512. The setting of the inclined surface makes it easier for the pipe joint 6 to slide between the adjacent clamps 511.

[0044] Reference Figure 4Furthermore, a telescopic groove 43 is provided on the bottom wall of the accommodation space 41, and a limit post 45 is slidably provided in the telescopic groove 43. An elastic member 44 is also provided in the telescopic groove 43, and one end of the elastic member 44 is fixedly connected to the limit post 45, and the other end is fixedly connected to the inner wall of the telescopic groove 43. In this embodiment, the elastic member 44 is a spring. The position of the limit post 45 corresponds to the position of the sleeve 42. When the pipe joint 6 slides out of the sleeve 42, it will be sleeved on the limit post 45. The outer diameter of the limit post 45 is adapted to the inner diameter of the pipe joint 6. When the limit post 45 is sleeved on the pipe joint 6, the limit post 45 limits the movement of the pipe joint 6.

[0045] A guide slope 451 is provided on the side of the limit column 45 away from the electric clamp 3, and a third abutment surface 452 is provided on the side of the limit column 45 close to the electric clamp. When the pipe joint 6 is sleeved on the limit column 45, when the pipe joint 6 moves toward the electric clamp 3, the limit column 45 slides into the telescopic groove 43 under the guidance of the guide slope 451, and when the pipe joint 6 moves away from the electric clamp 3, the third abutment surface 452 limits the movement of the pipe joint 6.

[0046] Furthermore, the guiding inclined surface 451 is an arc surface, and the arc surface is a quarter spherical surface. When the pipe joint 6 falls, the guiding inclined surface 451 can guide the pipe joint 6 to ensure that the pipe joint 6 falls to an accurate position.

[0047] The implementation principle of the embodiment of the present application is: when multiple groups of first pipes, second pipes and third pipes are needed, a plurality of pipe joints 6 are first placed in the sleeve 42, and the lowest pipe joint 6 falls and is sleeved on the limiting column 45. At this time, it is necessary to press the highest pipe joint 6 first so that the lowest pipe joint 6 moves between adjacent clamps 511 and is clamped by the two clamps 511.

[0048] Then, the third pipe is clamped by the electric clamp 3, and the frame 1 drives the third pipe to move to the corresponding position. At this time, the second linear guide 22 drives the temporary storage box 4 to move to the vicinity of the third pipe and the second pipe, and the third linear guide 52 operates to drive the clamping plate 511 to move, so that the push plate 512 pushes the pipe joint 6 to move between the third pipe and the second pipe; The second linear guide 22 operates to drive the pipe joint 6 to be mounted on the second pipe, and the first linear guide 21 drives the electric clamp 3 to move to insert the third pipe into the pipe joint 6, and finally the pipe joint 6 between the first pipe and the third pipe is manually installed; when the pipe joint 6 is installed, glue is applied to the connection to achieve the purpose of strengthening the connection and waterproofing.

[0049] When the pipe joint 6 is pushed out of the accommodating space 41, the pipe joint 6 in the sleeve 42 falls and is sleeved on the limiting column 45. When the pipe joint 6 on the clamping jaw assembly 51 is installed, the clamping plate 511 is reset under the drive of the third linear guide rail 52. At this time, the push plate 512 is pushed by the pipe joint 6 sleeved on the limiting column 45 and rotates into the avoidance groove 5112. When the pipe joint 6 completely passes through the avoidance groove 5112, the push plate 512 is reset under the action of the torsion spring. At this time, the two clamping plates 511 clamp the pipe joint 6, and the above-mentioned process of installing the pipe joint 6 can be repeated again.

[0050] Embodiment 2: A construction process comprises the following steps: S1: erect the pipeline; S2: The pipe is lifted up by the electric clamp 3 and moved to the required installation position; S3: Use the conveying device 5 to move the pipe joint 6 to a corresponding position, and insert the pipe into the pipe joint 6; S4: Apply glue at the connection between the pipe joint 6 and the pipe to complete the fixation of the pipe and the pipe joint 6.

[0051] The embodiments of this specific implementation are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. The same components are represented by the same figure marks. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A construction device for building water supply and drainage engineering, characterized in that: include: Rack(1); A first linear guide rail (21) vertically fixedly connected to the frame (1) and having a plurality of output ends, each of the output ends being fixedly connected to an electric clamp (3) for clamping a pipe; A second linear guide rail (22) vertically fixedly connected to the frame (1); A temporary storage box (4) is fixedly connected to the output end of the second linear guide rail (22) and is provided with an opening on a side close to the first linear guide rail (21), wherein a receiving space (41) for placing a pipe joint (6) is provided in the temporary storage box (4); The conveying device (5) is installed in the accommodating space (41) and is used to drive the pipeline joint (6) to move to the corresponding position of the pipeline.

2. The construction device for building water supply and drainage engineering according to claim 1, characterized in that: The conveying device (5) comprises a clamping jaw assembly (51) and a third linear guide rail (52); the third linear guide rail (52) is fixedly connected to the inner wall of the accommodating space (41); the clamping jaw assembly (51) is fixedly connected to the output end of the third linear guide rail (52) and is used to clamp the pipe joint (6); the third linear guide rail (52) drives the clamping jaw assembly (51) to move to a position corresponding to the electric clamping jaw (3).

3. The construction device for building water supply and drainage engineering according to claim 2, characterized in that: A sleeve (42) for accommodating a pipe joint (6) is fixedly connected to the temporary storage box (4), and the sleeve (42) is located above the clamping jaw assembly (51). When the clamping jaw assembly (51) pushes a pipe joint (6) out of the accommodating space (41), the pipe joint (6) in the sleeve (42) can fall to the bottom wall of the accommodating space (41). When the clamping jaw assembly (51) is reset, the pipe joint (6) located on the bottom wall of the accommodating space (41) can be clamped again.

4. The construction device for building water supply and drainage engineering according to claim 3, characterized in that: Two third linear guide rails (52) are provided, and the two third linear guide rails (52) are respectively provided on two mutually symmetrical inner walls of the accommodating space (41); the clamping jaw assembly (51) comprises a clamping plate (511) and a push plate (512); the output end of each third linear guide rail (52) is fixedly connected to one clamping plate (511); the two clamping plates (511) are symmetrically arranged with one another, and a side of the two clamping plates (511) close to each other is provided as a first abutting surface (5111); each clamping plate (511) is rotatably connected to one push plate (512), and a side of the push plate (512) close to the corresponding clamping plate (511) is provided as a second abutting surface (5121); When the push plate (512) pushes the pipe joint (6) to move in a direction close to the electric clamp (3), the first abutting surface (5111) abuts against the second abutting surface (5121), thereby limiting the rotation of the push plate (512); When the push plate (512) moves in a direction away from the electric clamp (3), the first abutting surface (5111) and the second abutting surface (5121) are separated, and the push plate (512) can rotate under the push of the pipe joint (6).

5. The construction device for building water supply and drainage engineering according to claim 4, characterized in that: An avoidance groove (5112) is formed on the surfaces of the two clamping plates (511) that are close to each other, and the push plate (512) can rotate into the avoidance groove (5112).

6. The construction device for building water supply and drainage engineering according to claim 3, characterized in that: It also includes a limiting column (45), the limiting column (45) and the sleeve (42) having corresponding positions, a telescopic groove (43) being provided on the inner bottom wall of the accommodating space (41), the limiting column (45) being slidably connected in the telescopic groove (43), a guiding inclined surface (451) being provided on a side of the limiting column (45) away from the electric clamp (3), and a third abutting surface (452) for limiting the pipe joint (6) from sliding in a direction away from the electric clamp (3) being provided on a side of the limiting column (45) close to the electric clamp (3); An elastic member (44) is arranged in the telescopic groove (43); one end of the elastic member (44) acts on the inner wall of the telescopic groove (43), and the other end of the elastic member (44) acts on the limiting column (45).

7. The construction device for building water supply and drainage engineering according to claim 6, characterized in that: The outer diameter of the limiting column (45) is adapted to the inner diameter of the pipe joint (6).

8. The construction device for building water supply and drainage engineering according to claim 7, characterized in that: The guiding inclined surface (451) is an arc surface.

9. A construction process using the construction device according to any one of claims 1 to 8, characterized in that: The following steps are involved: S1: erect the pipeline; S2: The pipe is lifted up by the electric clamp (3) and moved to the required installation position; S3: using the conveying device (5) to move the pipe joint (6) to a corresponding position, and inserting the pipe into the pipe joint (6); S4: Apply glue to the connection between the pipe joint (6) and the pipe to complete the fixation of the pipe and the pipe joint (6).